INNOVMAT – Smolenice, SK2011-12-13 1
Production Technology forAdditive Manufacturing
Electron Beam Melted (EBM®) Ti-based medical implants
or
How implant manufacturers use Additive Manufacturingto reduce production costs and increase profits
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 2/17
INNOVMAT – Smolenice, SK2011-12-13 2
Production Technology forAdditive Manufacturing
• Swedish innovation from the beginning of the 1990’s
• Arcam AB incorporated 1997
• Listed on Nordic Growth Market• Main owner (25%) Industrifonden (Industrial capital trust)
• Turnover 10.1 M€ (2010)
• First EBM system delivered in 2003
• About 70 systems installed worldwide
• 50 people, in Sweden, the U.S., Italy and China
• Sales partners in Europe and Asia
Arcam
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 3/17
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 4/17
INNOVMAT – Smolenice, SK2011-12-13 4
Production Technology forAdditive Manufacturing
Electron Beam Melting (EBM®)
• A high energy beam (up to 3.000 W)is generated in the electron beam gun
•
The beam melts each layer of metalpowder to the desired geometry
• The high beam power gives high buildrate (up to 80 cm3 /h) and productivity
•
Extremely fast beam translationwith no moving parts
• Vacuum process eliminates impuritiesand yields excellent material properties
•High process temperature (700 ºC fortitanium) gives low residual stress–> no need for heat treatment
• Low operating costs
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 5/17
INNOVMAT – Smolenice, SK2011-12-13 5
Production Technology forAdditive Manufacturing
• Overview
• Applications
•Medical Implants
• Aerospace
• Arcam Products
• Materials
Medical Implants
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 6/17
INNOVMAT – Smolenice, SK2011-12-13 6
Production Technology forAdditive Manufacturing
• Freedom in design
•
Excellent material properties• Cost-efficient production
•And, for implant manufacturing
EBM - Core Benefits
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 7/17
INNOVMAT – Smolenice, SK2011-12-13 7
Production Technology forAdditive Manufacturing
• Design your trademark trabecular structure in CAD
• Optimize for osseointegration
• Pore geometry (no limitation)
• Pore size (down to ~400 µm)
• Porosity (up to ~85%)
• Competitive manufacturing costs
• EBM production cost, typical: < 2 € / cm3 trabecular structure
Trabecular Structures™
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 8/17
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 9/17
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 10/17
INNOVMAT – Smolenice, SK2011-12-13 10
Production Technology forAdditive Manufacturing
• Single-step production of solid and porous sections,with structural continuity between them
• All-porous implants possible (augments, wedges, …)
• No secondary high temperature process to apply theporous structure that could cause grain growth
•High process temperature gives low residual stress,and no need for heat treatment after the build
Production Benefits
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 11/17
INNOVMAT – Smolenice, SK2011-12-13 11
Production Technology forAdditive Manufacturing
Cost Savings with EBM
• The additional cost for applying a porous coating on anacetabular cup can be anything from 30 to 60 € per cup
• With EBM you produce the cups with an integrated porousstructure, which eliminates this cost
•
When producing acetabular cups from bar, 60-70%of the stock material is typically machined away
• With EBM you only use the material needed to producethe cups. The remaining powder is recycled and reused
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 12/17
INNOVMAT – Smolenice, SK2011-12-13 12
Production Technology forAdditive Manufacturing
EBM Production Cost, typicalAdditive Manufacturing of Ti6Al4V acetabular cups with integrated trabecular structures
Cup Weight Build Batches per Cups per Production
size cup, build time / batch week batch cost / cup
(g) (h) (€)
44 71 10 14 16 40
46 79 10 14 16 42
48 87 10 14 13 49
50 95 10 14 12 54
52 104 10 14 12 56
54 113 11 14 10 65
56 123 11 13 10 69
58 133 11 13 9 76
60 143 11 13 9 78
62 154 12 12 9 83
64 165 12 12 9 86
66 176 12 12 7 103
Includes costs for EBM system, material, Support & Maintenance agreement and operator
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 13/17
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 14/17
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 15/17
INNOVMAT – Smolenice, SK2011-12-13 15
Production Technology forAdditive Manufacturing
• Overview
• Applications
•Medical Implants
• Aerospace
• Arcam Products
• Materials
Aerospace
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 16/17
INNOVMAT – Smolenice, SK2011-12-13 16
Production Technology forAdditive Manufacturing
Turbine Blades
Material: γ-TiAl
Size: 8 x 12 x 325 mm
Weight: 0,5 kg
Build time: 7 hours / blade
For stages 6 and 7 in the low pressure turbinein General Electric’s GEnx aero engine, wherethe TiAl (~4 g/cm3) replaces blades made inheavier (>8 g/cm3) nickel-based superalloys
7/28/2019 INNOVMAT-2011-Smolenice-Arcam
http://slidepdf.com/reader/full/innovmat-2011-smolenice-arcam 17/17
INNOVMAT – Smolenice, SK2011-12-13 17
Production Technology forAdditive Manufacturing
Contact
Arcam AB
Krokslätts Fabriker 27A
SE-431 37 Mölndal, SwedenPhone: +46 31 710 32 00
Web site: http://www.arcam.com
E-mail: [email protected]
Thank you for your attention!
Arcam - Manufacturing Revolutionized