Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
P l a n n I n g a h e a d
1 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Andreas Fliege
Infrastructure and signalling divisionHANNING & KAHL GmbH & Co. KGOerlinghausen Germany
INNOVATIVE DEPOT TECHNOLOGY
www.hanning-kahl.com
Headquarters in Oerlinghausen
P l a n n I n g a h e a d
2 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
General idea of modern Depot Technology
www.hanning-kahl.com
� We don’t want to kill jobs� We provide more resources� We help to save money� Daily business will be easier
P l a n n I n g a h e a d
3 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Introduction
www.hanning-kahl.com
� Common practice� Motivation� Legal Aspect and Safety� Requirements� System Architecture
System Concepts� System Components� Applications
P l a n n I n g a h e a d
4 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Common practice
www.hanning-kahl.com
� Dispatcher room
Karlsruhe 2007
P l a n n I n g a h e a d
5 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Common practice
www.hanning-kahl.com
� Dispatcher room
Helsinki 2013
� operating panel
P l a n n I n g a h e a d
6 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Common practice
www.hanning-kahl.com
� point and route indicator
Stockholm 2014
P l a n n I n g a h e a d
7 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Motivation
www.hanning-kahl.com
� Defects will be detected before the tram enters the depot (Axle short circuit tester)
� Maintenance of the trams will be organized automatically.(Sanding, washing after every second turnaround)
� Depot movements are faster(parking area -> work shop)
P l a n n I n g a h e a d
8 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
Motivation
www.hanning-kahl.com
Several Depots can be handled by one dispatcher
Dresden Gorbitz 2013
Reick
Gorbitz
Trachenberge
P l a n n I n g a h e a d
9 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
LEGAL ASPECT
www.hanning-kahl.com
� Local laws
� BO-Strab
� VDV Recommendations
P l a n n I n g a h e a d
10 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SAFETY
www.hanning-kahl.com
� SIL 3 up to SIL 4 according EN 5012x
� AK 6 (DIN V 19250)
� SIG RZA(VDV technical law)
Example: 1 x 10-7 = in average 1 Hazard in 1441 years
10-9 ≤ THR < 10-8
Tolerable Hazard RiskTHR per hour and per function
Safety Integrity Level(SIL)
10-8 ≤ THR < 10-7
10-7 ≤ THR < 10-6
10-6 ≤ THR < 10-5
4
3
2
1
P l a n n I n g a h e a d
11 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SAFETY
www.hanning-kahl.com
� nothing is too little� SIL2 is sufficient
2
(driving on sight, no passengers, low speed)
P l a n n I n g a h e a d
12 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
REQUIREMENTS
www.hanning-kahl.com
� Vehicle Storage� Maintenance � Safety / Vital� Economy
P l a n n I n g a h e a d
13 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
www.hanning-kahl.com
� Vehicle identification (before entering the depot)
� Vehicle Test (before entering the depot)
Identification vehicle test Depot area
Parking
Maintenance
Depot areaDepot ManagementSystem+
REQUIREMENTS
P l a n n I n g a h e a d
14 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
www.hanning-kahl.com
� What is the Scope of work from H&K?
www.hanning-kahl.com
A vehicle test Depot area
Depot areaDepot ManagementSystem+
B
B´
� H&K takes you from A to B in a save way
REQUIREMENTS
P l a n n I n g a h e a d
15 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SAFETY / VITAL CONCEPT
www.hanning-kahl.com
� advantages
� Three local and self contained signalling installations for three control segments
� The safety level is achieved via the autark signalling installations
� High availability� Redundancy via back-up levels� Remote maintenance/diagnosis via network� Communication between display and
operating level via data collector
P l a n n I n g a h e a d
16 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SAFETY / VITAL CONCEPT
www.hanning-kahl.com
� System architecture
� Availability� Redundancy
2. Level - 1. Back-up level
Route selection via O & O dispatch with
dispatcher
3. Level – 2. Back-up level
Route selection via pushbutton stations
1. Level
Automatic route selection via
communication system or BMS
P l a n n I n g a h e a d
17 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SAFETY / VITAL CONCEPT
www.hanning-kahl.com
� Level 1
� Level 2
� Level 3
P l a n n I n g a h e a d
18 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SYSTEM COMPONENTS
www.hanning-kahl.com
� Hanning & Kahl vital Processor System
� Vehicle detection
HFP HSKHFK
HNP
P l a n n I n g a h e a d
19 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SYSTEM COMPONENTS
www.hanning-kahl.com
� CommunicationTWC
� Signalling
P l a n n I n g a h e a d
20 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
SYSTEM COMPONENTS
www.hanning-kahl.com
� Data Collector
P l a n n I n g a h e a d
21 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
CONTROLLER CONCEPT ADVANTAGES
www.hanning-kahl.com
Concept with possibility to integrate:� Operate & Observe (O&O)� Depot Management System (BMS)� Point Heating controller� Gate Controller� Test Equipment (Axle tester Com-Sys.)� CCTV� Maintenance (Sanding, Lubrication)
P l a n n I n g a h e a d
22 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
CONTROLLER CONCEPT ADVANTAGES
www.hanning-kahl.com
� Test Equipment (Axle tester, Com-Sys.)
P l a n n I n g a h e a d
23 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
CONTROLLER CONCEPT ADVANTAGES
www.hanning-kahl.com
� Maintenance hall with driver terminal and washing track
P l a n n I n g a h e a d
24 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
OPERATE & OBSERVE
www.hanning-kahl.com
� Visualisation of process data� Symbolic representation of objects on route
level (points, signals, routes)� Operator control actions (route setting and
cancelling, normal operation switch-on)� Text representation of alarm status
P l a n n I n g a h e a d
25 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
OPERATE & OBSERVE
www.hanning-kahl.com
P l a n n I n g a h e a d
26 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
ECONOMY
www.hanning-kahl.com
Benefit:� Detailed information what problem� Quick Overview� Maintenance if necessary� => Economic
P l a n n I n g a h e a d
27 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
REFERENCE PROJECTS
www.hanning-kahl.com
Project Country Comment IB
Depot Karlsruhe-Gerwigstraße D incl. O&O, BMS 2008
Depot Brussel-Haren B incl. O&O, BMS 2009
Depot Potsdam-Babelsberg D incl. O&O, BMS 2009
Depot Brussel-Haren II B incl. O&O, BMS 2011
Depot Chemnitz-Krenkelstraße D incl. O&O, BMS 2011
Depot Chemnitz-Adelsberg D incl. O&O, BMS 2011
Depot Basel-Wiesenplatz CH incl. O&O, STA 2011
Depot Bern-Bolligenstr. CH incl. O&O, BMS 2011
Many German and foreign transport authorities rely on H&K and VAB‘s proven and permanently developed depot conce pt
P l a n n I n g a h e a d
28 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE POTSDAM
www.hanning-kahl.com
GS 1
12
GS 613
GS 6
21
EA 112
EA 612
Bre
msp
rüfg
leis
P l a n n I n g a h e a d
29 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE POTSDAM
www.hanning-kahl.com
VK 02
HN-SA - Master
RS
485
H&
K-A
K6
-BU
SR
S 4
85
Siemens Steuerschrank
ohne S5
LWL-Patch
172.16.21.x
Prozess-LAN (H&K)
Betriebshof PotsdamTechnikraum
Dispositions-LAN (ViP)
Fahrdienstleiter
Arbeitsplatz B&B
Internet
VPN
Fernwartung über VPN
VAB + H&K
Fahrdienstleiter
Arbeitsplatz BMS
9
1 4 1 3
1 2 1 1
RS2-1 6M
16
1 0
+24V
+24V *
F ault
FAULT P2
STAN D-BY
P1
RM
V.2 4
RMST AN D-B Y
4 3
2 1
8 7
6 5
1 0
x
DA/STAT
13
9
5
1
16
12
8
4
15
00:63: 80:xx :yy: zz
VK01
HN-SA - Slave
RS 232/1
RS
485
H&
K-A
K6
-BU
S
Switch
HEG
Spleisbox
RS
48
5
Siemens Steuerschrank
ohne S5
VK03
HN-SA - Master
RS 232/1
HN-SA - Slave Switch
HEG9
1 4 1 3
1 2 1 1
RS2-1 6M
16
1 0
+24V
+24V *
F ault
FAULT P2
STAN D-BY
P1
RM
V.2 4
RMST AN D-B Y
4 3
2 1
8 7
6 5
1 0
x
DA/STAT
13
9
5
1
16
12
8
4
15
00:63: 80:xx :yy: zz
Spleisbox
Siemens Steuerschrank
ohne S5
LWLStellbereich 1 Stellbereich 2
H&K-AK6-BUS
Umsetzer
Umsetzer
LWLLWL
Arbeitsplatz B&B
Ortsbedienplatz
9
14 13
12 11
RS2-16M
16
1 0
+24V
+24V *
F ault
FAULT P2
STAN D-BY
P1
RM
V.24
RMST AN D-B Y
4 3
2 1
8 7
6 5
10
x
DA/STAT
13
9
5
1
16
12
8
4
15
00:63: 80:xx :yy: zz
Datensammler
Leitstelle
VPN Gateway
Kommu-Server
19"-Einbau
172.16.21.2
172.16.19.180
10.0.250.19
DB-Server
19"-Einbau
172.16.19.30
10.0.250.4
FIS-Server
19"- Einbau
172.16.19.181
10.0.250.18
Outband (Fernwartung) 10.0.250.x (Subnetmask: 255.255.255.224)
FIT
172.16.19.182FIT Halle
172.16.19.194
H&K-AK6-BUS
Die genaue Anzahl der LWL-Adern,
die verwendeten Stecker und deren
Verschaltung sind im Dokument
40100317_LWL_Netz_Potsdam
Ersatz
Desktop
Konverter
LWL
CAT5
Konverter
LWL
Switch
Gateway
Ethernet
Relaismodul
I 7063
RS485
2 potentialfreie
Kontakte
Schranken
Bedienpult
Gateway
Linker Teil
Steuerschrank
Zentrale IMU
Auskoppel-BG
RS232
EA_011
EA_612
bis172.16.21.3
172.16.21.4
172.16.21.11172.16.21.12
172.16.21.20172.16.21.100
172.16.21.1
172.16.21.10
I7510
Repeater
172.16.21.21
RS
48
5
Matrixanzeigen
172.16.21.22
Gateway
FSA-Schrank Server-Schrank
VPN Gateway172.16.19.185
P l a n n I n g a h e a d
30 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE POTSDAM
www.hanning-kahl.com
P l a n n I n g a h e a d
31 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE POTSDAM
www.hanning-kahl.com
P l a n n I n g a h e a d
32 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com (asbestos)
P l a n n I n g a h e a d
33 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com
P l a n n I n g a h e a d
34 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com
P l a n n I n g a h e a d
35 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com
P l a n n I n g a h e a d
36 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com
P l a n n I n g a h e a d
37 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Brussels HAAREN
www.hanning-kahl.com
P l a n n I n g a h e a d
38 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Leipzig Heiterblick
www.hanning-kahl.com
P l a n n I n g a h e a d
39 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Leipzig Heiterblick
www.hanning-kahl.com
P l a n n I n g a h e a d
40 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Leipzig Heiterblick
www.hanning-kahl.com
P l a n n I n g a h e a d
41 © HANNING & KAHL 29.04.2015
INNOVATIVE DEPOT TECHNOLOGY
EXAMPLE Dölitz
www.hanning-kahl.com
P l a n n I n g a h e a d
42 © HANNING & KAHL 29.04.2015
Innovative signalling technology
� Questions or comments?
P l a n n I n g a h e a d
43 © HANNING & KAHL 29.04.2015
Innovative signalling technology
� Thank you for your time