35
Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Embed Size (px)

Citation preview

Page 1: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Innovation forProcess Improvements

Malcolm Saunders

Alpha Design

and Project Technology

Page 2: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Necessityis the

Mother of Invention

Page 3: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Challengesare the

Father of Innovation

Page 4: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of aPolyester Resin

Page 5: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of aPolyester Resin

Phthalic Anhydride in flake form

Page 6: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of aPolyester Resin

Phthalic Anhydride in flake form 25 kg bags

Page 7: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of aPolyester Resin

Phthalic Anhydride in flake form 25 kg bags Reactor charged manually by Operators

Page 8: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of aPolyester Resin

Phthalic Anhydride in flake form 25 kg bags Reactor charged manually by Operators Dust masks and face shields

Page 9: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Manufacture of a Polyester Resin

Phthalic Anhydride in flake form 25 kg bags Reactor charged manually by Operators Dust masks and face shields 8 tonne charge - 320 bags 2 hrs for 2 Operators

Page 10: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Page 11: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment

Page 12: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment

Phthalic flake generates a combustible dust

Page 13: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment

Phthalic flake generates a combustible dust Charging - time consuming

Page 14: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment

Phthalic flake generates a combustible dust Charging - time consuming Low density - delivery and storage not cost

effective

Page 15: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment

Phthalic flake generates a combustible dust Charging - time consuming Low density - delivery and storage not cost

effective Disposal of empty bags

Page 16: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Flake Form Phthalic AnhydrideDisadvantages

Operators need to wear protective equipment Phthalic flake generates a combustible dust Charging - time consuming Low density - delivery and storage not cost

effective Disposal of empty bags Need to raise temperature of cold flake

Page 17: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Other Options

Page 18: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Big Bags

Page 19: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Ground Level Feed Station

Page 20: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Ground Level Feed Station

Advantages– Better control of environment around the

discharge station– Intermediate storage area not required in

Production area– Avoid handling between main and intermediate

storage

Page 21: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Ground Level Feed Station

Disadvantages– Difficult to measure charge– Difficulty of conveying ‘sticky’ flake material– Flake P.A. can generate combustible dust

Page 22: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Bulk Storage of P.A. Flake

Page 23: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Bulk Storage of P.A. Flake

Advantages– more cost effective delivery– Eliminate need for storage of bags– Eliminate costs associated with disposal of

empty bags

Page 24: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Bulk Storage of P.A. Flake

Disadvantages– Difficulty in conveying ‘sticky’ flake– Difficulty in measuring and controlling charge– Flake P.A. can generate combustible dust

Page 25: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Molten Phthalic Anhydride

Storage and Distribution

Page 26: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Molten P.A. - Advantages

PA could be delivered and stored in bulk Density in liquid form greater than flake Liquid could be pumped and charge capacity controlled Charging process could be controlled by plc Charging time could be reduced Eliminate dust and flake particles No bags to dispose of Molten product - less heating time in reactor Storage in Production Areas eliminated Stock level can be monitored in tank

Page 27: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Molten P.A. - Challenges

Product to be transported in molten state Insulated tankers - guaranteed delivery

times Need to offload & store at elevated

temperature Control of vapour Piping flexibility

Page 28: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Meeting the Challenges

The Road Tankers

Page 29: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Meeting the Challenges

The Road Tankers Offloading and Storage

Page 30: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Meeting the Challenges

The Road Tankers Offloading and Storage Control of vapours

Page 31: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Meeting the Challenges

The Road Tankers Offloading and Storage Control of vapours Distribution

Page 32: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Meeting the Challenges

The Road Tankers Offloading and storage Discharge of vapours Distribution Reactor charging

Page 33: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

BENEFITS

Improved working conditions Reduced charging and process times Liberated Production area space Lower process costs

Page 34: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

SUMMARY

Concept of changing from flake to liquid was innovative

Meeting the challenges posed required innovative thinking

Result - a successful method of supplying, storing and distributing a raw material to a process

Page 35: Innovation for Process Improvements Malcolm Saunders Alpha Design and Project Technology

Innovation forProcess Improvements

Malcolm Saunders

Alpha Design

and Project Technology

Tel: 020 8657 1795

www.adapt88.com