Works in Progress to the Football World Cup Brazil 2014

Airports Pavement Seminar & VI FAA Airport Pavement Workshop, I Short Course of Airfield Pavements Maintenance

AIRPORT INFRASTRUCTURE FIFA WORLD CUP 2014August 2011Eng. Mrcio Eduardo Rodrigues Kuntz INFRAERO

Airports FIFA WORLD CUP 2014 Belo Horizonte (Confins) - MG 1. Tancredo Neves International Airport Confins 2. Belo Horizonte, Pampulha Airport Carlos Drummond de Andrade Braslia - DF 3. Braslia International Airport Presidente Juscelino Kubitschek Cuiab - MT 4. Marechal Rondon International Airport - Cuiab Curitiba - PR 5. Afonso Pena International Airport - Curitiba Fortaleza - CE 6. Pinto Martins International Airport - Fortaleza Manaus - AM 7. Eduardo Gomes International Airport Manaus Natal - RN 8. So Gonalo do Amarante International Airport NatalPorto Alegre Cuiab Braslia Confins Pampulha Campinas Congonhas Curitiba Galeo Santos Dumont Guarulhos Manaus Fortaleza Natal Recife

Salvador

Airports - FIFA WORLD CUP 2014 Porto Alegre - RS 9. Salgado Filho International Airport Porto Alegre Recife - PE 10. Recife Guararapes International Airport Gilberto Freire Rio de Janeiro - RJ 11. Rio de Janeiro,Galeo International Airport Antonio Carlos Jobim Rio de Janeiro 12. Santos Dumont Airport Rio de Janeiro Salvador - BA 13. Salvador International Airport Deputado Luis Eduardo Magalhes So Paulo, Guarulhos e Campinas - SP 14. Congonhas Airport - So Paulo 15. So Paulo,Guarulhos International Airport Gov. Andr Franco Montoro 16. Viracopos,Campinas International Airport - Campinas

Airports Investiments- FIFA WORLD CUP2014 Overview HostCitys FIFAWORLDCUPInvestiments 2010to2014 Value (R$million) Ord 1 SoPaulo City Airport Ca Guarulhos Congonhas Campinas Galeo SantosDumont Confins Pampulha Braslia PortoAlegre Curitiba Recife Salvador Fortaleza Manaus Cuiab So GonalodoAmarante TotaisLegend: Ca Capacity of Airport Terminal Dem Demand of passengers (boarding,landing and connection).

2010(mi) Dem 26,8 13,7 5,4 12,3 3,6 7,2 0,6 14,3 6,6 5,7 5,9 7,6 5,0 2,6 2,1 119,40 Ca

2014(mi) Dem 38,9 15,0 9,5 18,7 5,4 13,0 0,9 21,30 8,8 7,6 7,8 10,2 7,0 3,8 3,1 2,9 171,0

2 3 4 5 6 7 8 9 10 11 12

RiodeJaneiro BeloHorizonte Braslia PortoAlegre Curitiba Recife Salvador Fortaleza Manaus Cuiab Natal

1.229,36 804,1 697,30 505,65 563,24 711,35 242,36 24,60 47,61 347,78 393,51 91,33 506,32 5,658,19

24,9 12,0 6,8 17,4 8,5 10,2 1,5 14,0 11,2 7,8 16,7 12,9 6,2 6,4 1,9 158,40

52,7 15,0 24,0 44,0 8,5 16,5 1,5 26,5 15,2 14,6 16,7 12,9 8,6 13,5 5,7 5,9 275,90

City: Belo Horizonte Airport: Int. Tancredo Neves - ConfinsFIFA WORLD CUP 2014Investiments 2011-2014R$ 505,65 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 60.305 10,28 million 7,26 million 114.240

201467.675 16,5 million 13,0 million 306.640

City: Belo Horizonte Airport: Int. Tancredo Neves - Confins

1

AIRPORT TERMINAL RENOVATION AND ROAD SYSTEM ADEQUACY Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 236,65 million

2 RUNWAY AND APRON RENOVATION AND EXPANSIONScheduled Start: September,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 169,00 million

3

NEW REMOT AIRPORT TERMINAL, PARK, AIRPORT CARGO TERMINAL EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: March,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 100,00 million

City:Braslia Airport: Int. Pres. Juscelino KubitschekFIFA WORLD CUP 2014Investiments 2011-2014R$ 563,24 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 81.200 12,00 million 14,34 million 181.000

2014175.000 26,50 million 21,34 million 403.000

City:Braslia Airport: Int. Pres. Juscelino Kubitschek1 AIRPORT TERMINAL EXPANSION - TEMPORARYScheduled Start: August,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 4,63 million

2 AIRPORT TERMINAL RENOVATIONStart: April2011 Scheduled Conclusion: January,2012 Total Planned Investment: R$ 4,9 million

AIRPORT TERMINAL RENOVATION, APRON EXPANSION, ROAD SISTEM AND NEW BUI/LDINGS COMPLEMENTARY Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 4,9 million

3

4 2 AIRPORT VIADUCTScheduled Start: January,2012 Scheduled Conclusion: October,2012 Total Planned Investment: R$ 116,24 million

City: Cuiab Airport: Int. Marechal Rondon

FIFA WORLD CUP 2014Investiments 2011-2014R$ 91,33 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m): Airport Park (m): Aiport Park Capacity (un):

2010 5.460 1,98 million 2,1 million 38.800 9.450 405

201413.200 5,7 million 3,1 million 38.800 13.785 517 1.533

City: Cuiab Airport: Int. Marechal RondonAIRPORT TERMINAL RENOVATION AND EXPANSION, ROAD SYSTEM ADEQUACY END NEW PARK Scheduled Start: April,2012 Scheduled Conclusion: July,2013 Total Planned Investment: R$ 88,43million

1

2 AIRPORT TERMINAL EXPANSION - TEMPORARYStart: June,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 2,90 million

ESTACIONAMENTO VECULOS

City: Curitiba Airport: Int. Afonso Pena

FIFA WORLD CUP 2014Investiments 2011-2014R$ 242,36 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 45.000 7,8 million 5,7 million 84.062

201462.445 14,6 million 7,6 million 143.941

City: Curitiba Airport: Int. Afonso Pena

1 RUNWAY AND TAXIWAY SISTEM EXPANSIONStart: July,2011 Scheduled Conclusion: April,2013 Total Planned Investment: R$ 1,69 million

AIRPORT TERMINAL AND ROAD SISTEM EXPANSION Scheduled Start: April,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 41,30 million

2

3 AIRPORT CARGO TERMINAL EXPANSIONStart: December,2010 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 17,78 million

4 THIRD RUNWAY PROJECTScheduled Start: January,2013 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 14,28 million

City: Fortaleza Airport: Int. Pinto Martins

FIFA WORLD CUP 2014Investiments 2011-2014R$ 347,78 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 38.500 6,22 million 5,07 million 38.000

201461.964 8,7 million 6,5 million 76.000

City: Fortaleza Airport: Int. Pinto Martins

AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: January,2012 Scheduled Conclusion: December,2013 PTIO of AERONAVES Total Planned Investment: R$ 347,78 million

1

City: Manaus Airport: Int. Eduardo Gomes

FIFA WORLD CUP 2014Investiments 2011-2014R$ 393,51 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 43.000 6,4 million 2,6 million 45.000

201480.000 13,5 million 3,8 million 45.000

City: Manaus Airport: Int. Eduardo Gomes

AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: November,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 393,51 million

1

PTIO of AERONAVES

PISTA of POUSO,ofCOLAGEM

City: Natal Airport: So Gonalo do AmaranteFIFA WORLD CUP 2014Investiments 2010-2014R$ 506,32 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Apron(m):

2010 200.400

20145,9 million 2,9 million 200.400

City: Natal Airport: So Gonalo do Amarante

1 NEW TAXIWAY AND APRONStart: May,2011 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 98,32 million

2 AIRPORT TERMINAL CONSTRUCTIONScheduled Start: August,2011 Scheduled Conclusion: Total Planned Investment: R$ 408,00 million

City: Porto Alegre Airport: Int. Salgado FilhoFIFA WORLD CUP2014Investiments 2010-2014R$ 711,35 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m): Airport Park (vehicles) (m): Airport Park Capacity (vehicles) (un): Airport Park Demands (vehicles) (un):

2010 37.600 11,24 million 6,6 million 92.567 54.837 2.031 2.667

2014104.304 15,24 million 8,8 million 130.587 130.000 4.653 4.000

City: Porto Alegre Airport: Int. Salgado Filho1AIPORT TERMINAL AND APRON RENOVATION AND EXPANSION Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 345,80 million

2 RUNWAY AND TAXIWAY EXPANSIONScheduled Start: February,2012 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 223,20 million

3 NEW AIRPORT CARGO TERMINALStart: November,2010 Scheduled Conclusion: October,2012 Total Planned Investment: R$ 137,15 million

4 AIRPORT TERMINAL EXPANSIONStart: May,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 5,20 million

City:Recife Airport: Int. Gilberto Freire

FIFA WORLD CUP 2014Investiments 2010-2014R$ 24,60 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 52.000 8,0 million 4,7 million 132.000

201452.000 8,0 million 7,3 million 132.000

City:Recife Airport: Int. Gilberto Freire

1 NEW AIRPORT CONTROL TOWERScheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 18,47 million

2 NEW CONECTORFinished Total Planned Investment: R$ 6,13 million

City: Rio de Janeiro Airport: Int. Antnio Carlos JobimFIFA WORLD CUP 2014Investiments 2010-2014R$ 697,30 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 150.000 17,4 million 12,3 million 666.400

2014150.000 44,03 million 18,7 million 666.400

City: Rio de Janeiro Airport: Int. Antnio Carlos Jobim

1 AIRPORT TERMINAL 1 RENOVATIONScheduled Start: January, 2012 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 254,10 million

2 AIRPORT TERMINAL 2 RENOVATIONStart: November, 2008 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 316,53 million

RUNWAY AND APRON SISTEM RENOVATION Scheduled Start: September,2011 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 103,43 million

3

4 AIRPORT CARGO TERMINAL RENOVATIONStart: September,2009 Scheduled Conclusion: December,2011 Total Planned Investment: R$ 23,24 million

City: Salvador Airport: Int. Lus Eduardo MagalhesFIFA WORLD CUP 2014Investiments 2010-2014R$ 47,61million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 69.750 12,96 million 7,69 million 79.645

201469.750 12,96 million 10,28 million 91.395

City: Salvador Airport: Int. Lus Eduardo MagalhesPISTA of POUSO,ofCOLAGEM

1

AIRPORT TERMINAL RENOVATION AND ADEQUACY AND APRON EXPANSION Scheduled Start: March,2012 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 32,17 million

2 NEW AIRPORT CONTROL TOWERScheduled Start: January,2012 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 15,44 million

City: Guarulhos Airport: Int. Gov. Andr Franco MontoroFIFA WORLD CUP2014Investiments 2010-2014R$ 1,229 Billion

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year: Airport Apron(m):

2010 175.000 24,97 million 26,8 million 650.747,73

2014290.000 52,74 million 38,91 million 768.547,73

City: Guarulhos Airport: Int. Gov. Andr Franco Montoro1 THIRD AIRPORT TERMINAL PROJECTStart: May,2011 Scheduled Conclusion: November,2012 Total Planned Investment: R$ 752,91 million

2

RUNWAY AND APRON SISTEM EXPANSION Start: May,2010 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 307,05 million

3 NEW TAXIWAYScheduled Start: January,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 57,34 million

AIRPORT TERMINAL NEW EXPANSION TEMPORARY Scheduled Start: April,2012 Scheduled Conclusion: December,2012 Total Planned Investment: R$ 23,20 million

5

4 AIRPORT TERMINAL NEW EXPANSION TEMPORARY Start: July,2011 Scheduled Conclusion: January,2012 Total Planned Investment: R$ 86 million

City: Campinas Airport: Int. Viracopos

FIFA WORLD CUP2014Investiments 2009-2013R$ 804,10 million

Operational Data Airport Terminal (m): Airport Terminal Capacity (pax,year): Airport Passenger Demands,Year:

2009 25.215 6,8 million 5,4 million

201425.215 17,26 million 9,53 million

City: Campinas Airport: Int. Viracopos1AIRPORT TERMINAL NEW EXPANSION TEMPORARY Start: October,2010 Scheduled Conclusion: August,2011 Total Planned Investment: R$ 7,0 million

AIRPORT TERMINAL ADEQUACY Scheduled Start: July,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 48,06 million

2

NEW AIRPORT TERMINAL AND APRON Scheduled Start: June,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 664,61 million

3

TAXIWAYS WITH FILLETS FOR A380 ADAPTATION , AIRPORT CARGO TERMINAL EXPANSION, NEW APRON AND RUNWAY RESURFACING Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 79,43 million

5

SECOND RUNWAY Start: June,2011 Scheduled Conclusion: May,2012 Total Planned Investment: R$ 5,0 million

4

Thank You!Eng. Mrcio Eduardo Rodrigues Kuntz INFRAERO Superintendence of Works [email protected] (55 61) 3312-2568