Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.Informe tcnico v
Pgina 1de 30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Jhimmy CalvacheConsultor en Sistemas de Informacin Geogrfica
El presente informe contiene los resultados tcnicos de lasimulacin de mxima avenida y clculos informticos delperfil de socavacin para las secciones tranversales del RoOrito en la seccin de confluencia con el Puente El Triunfo.
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente ElTriunfo Municipio de Orito
Putumayo.
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
2/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 2de 30
1. OBJETIVO
Realizar la representacin fsica y numrica del comportamiento hidrulico del Ro Orito en la seccin deconfluencia con el Puente El Triunfo, en un escenario de flujo supercrtico para un mximo periodo deretorno, al mayor nivel de intensidad horaria en lluvias.
2. METAS
Establecer seccionamiento del perfil hidrulico transversal de la corriente. Estimar caudal mximo de acomodamiento. Estimar el tirante mximo en funcin de caudal de mxima avenida. Calcular y espacializar las reas de inundacin. Calcular las cotas de socavacin.
3. ESTUDIO REALIZADO
3.1. Localizacin del EstudioEl estudio se localiza en la Vereda El Triunfo, Municipio de OritoPutumayo, sobre los 7640'18.349"Wde Longitud Oeste, 038'58.016"N de Latitud Norte y 265.3 m.s.n.m.m. (Promedio)
Ilustracin 2. Vista Tridimensional del Area de Estudio (SRTMv3)
Ilustracin 1.Localizacin del Proyecto (Izq-Der Dpto Putumayo-Orito-Puente el Triunfo)
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
3/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 3de 30
Ilustracin 3. Imagen Astrium (Air-Bus) del rea de estudio, 2014 (Oct)
3.2. MetodologaLa presente simulacin se realiz mediante la aplicacin de la Frmula de Energa, adaptada desde lametodologa de Choquehuanca, N 2012. para la Evaluacin de Riesgo de Inundaciones Basado SobreGIS y Modelamiento Hidrulico (Hec-GeoRas), ajustado a los modelos matemticos dispuestos de HEC-RAS River Analysis System, del Cuerpo de Ingenieros de la Armada de los Estados Unidos, 2010. Para
efectos asociados al clculo de socavacin de aplic en HEC-RAS la funcin de transporte deAckers-White, fusinada con el mtodo de clasificacin de Exner 5y mtodo de caida de velocidad de Ruby, noobstante para se realizo rastreo numrico de los datosreporte- software aplicando el criterio de Lischtvan
Levedievpara socavacin de fondo y estribos.
3.2.1. Modelo de Inundacin (Balance de Energa)
HEC-RAS resuelve el flujo gradualmente variado a partir de la ecuacin de balance de energa (trinomiode Bernoulli) entre dos secciones dadas, excepto en los casos en los que se simules estructuras comopuentes, vertederos o tramos cortos entubados (culverts). En tales casos HEC-RAS resuelve la ecuacinde conservacin de la cantidad de movimiento, as como ciertas ecuaciones de carcter empricoestablecidas ad hocpara estas estructuras1.
a. Ecuacin de Energa
La ecuacin bsica para la estimacin de la posicin de la superficie libre del agua, en rgimenpermanente, es la ecuacin de balance de energa, esto es, el Trinomio de Bernoulli. HEC-RAS considerael caso en que la pendiente longitudinal del ro o canal es suficiente pequea 2, como para poder aceptar
1Modelacin numrica en ros en rgimen permanente y variable. Una visin a partir del modelo HEC-RAS
2En general HEC-RAS acepta como lmite que el cauce del ro forme, a lo sumo, una pendiente del 10%.
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
4/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 4de 30
que la vertical y la perpendicular en un punto cualquiera coincidan. Si la seccin 1 es una seccin aguasarriba de la 2, HEC-RAS considera el balance de energa entre ambas secciones transversales comosiguiente distribucin:
Figura 1. Representacin de los trminos de balance de energa. Fuente: (HEC 2014)
Donde:
- z1y z2son la cota de la seccin respecto a un plano de referencia arbitrario. En caso de geometras
irregulares, como en general sucede en un ro, se toma la cota del pinto ms bajo de la seccin.
- y1 y y2 son los calados en cada una de las secciones consideradas. En caso de geometrasirregulares, la profundidad respecto del ounto mas bajo de la seccin.
- v1y v2 son las velocidades medioas en cada seccin. En el caso de rgimen permanente seobtienen como el cociente entre el caudal y el rea de la seccin.
- 1y 2son los coeficientes de Cirolisestimados en cada seccin, que permiten corregir el hechode que la distribucin de velocidad en la seccin se aleja de una distribucin uniforme.
- Hes el trmino que estima la energa por unidad de peso que se disipa entre las secciones 1 y2. En concreto, dicha energa debe incluir las prdidas contnuas por razonamiento con elcontorno, as como las prdidas localizadas que se den entre ambas:
H = I L12 + AHlocal
Las perdidas contnuas se determinan como el producto de la pendiente (I) por la distancia entreambas secciones (L12).
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
5/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 5de 30
3.2.1. Mtodos y MaterialesPara el modelamiento informtico se utiliz software GIS como: ArcGIS 10.3 ArcInfo Hec-GeoRAS 10.1 Hec-RAS 4.1.0 RAS-Mapper 4.1.0 Global Mapper 17.0
3.2.2. Modelo digital de elevaciones (DEM)Para la realizacin del modelo hidrulico a simular, se require de manera obligatoria contar con un modelode elevaciones digital en estructura raster. ste modelo fue obtenido a partir del levantamiento batimtricoprovedo por la empresa encargada del diseo.
Datos Generales del DEM
Triangulation Method: Delaunay ConformingNumber of Data Nodes: 266Number of Data Triangles: 519Z Range: (260.79, 286.51)
Ilustracin 4. Modelo Digital de Elevaciones (DEM) del rea de estudio
3.2.3. Digitalizacin de Hombros y Fondo del Talweg
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
6/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 6de 30
Para la digitalizacin de las fronteras de la geometra del Talweg del ro se utiliz un control horizontal de10 metros con pendiente no superior al 5% de los 180 ([email protected],1.05-180). As las cosas se procedia delimitar los hombros, dos laterales (izq y der) para la seccin hidrulica del nodo, mas el fondo de lalnea de energa hidrulica principal. Los datos geomtricos del modelo son los siguientes:
Ilustracin 5. Localizacin de las geometras del Talweg
3.2.4. Digitalizacin de Estaciones Transversales de anlisisSe digitaliz 16 estaciones tranversales al cauce principal, con inclusiones horizontales no superiores alos 5 sobre los hombros. La unidad de cobertura se estim con distanciamientos de 14.2 metros enpromedio, alcanzando una cobertura general del rea del 94.6%. del mismo modo, en este proceso seagreg la estructura de paso propuesta para el proyecto (Puente colgante).
Hidro_ID Longitud (m)
Ro 189.09Hombro Izquierdo 171.21Hombro derecho 220.94
Tabla 1. Mtricas del Talweg (Izq Hombros, Der Cauces)
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
7/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 7de 30
Ilustracin 6. Distribucin de estaciones tranversales de anlisis
3.2.5. Coeficientes de rugosidad
Para seleccionar las n de Manningse opt por homogenizar la informacin topogrfica y estratigrficadel rea de estudio. En los registros del estudio de gradacin se constat que a lo largo del ro larugosidad del cauce y de las planicies de inundacin se mantiene de forma similar, por lo que se decidiotorgar el mismo valor de n para todas las secciones. Segn Chow, V T. 1985, valores de n para lasplanicies de inundacin de 0.05 y para el cauce de 0.028. As mismo se debe tener como elemento deconsideracin que el cauce maneja ese factor de rugosidad porque en la poca de visita se identifica demanera clara que se encuentra afectado por un proceso de sedimentacin ligera, el cual hace que seformen depsitos que actan como freno para el flujo del agua (contraccin hidrulica).
3.2.6. Caudales
Para el ajuste de flujo mixto (permanente-subcrtico) del rea a simular se tom como referencia losresultados del estudio hidrolgico aportado por el diseador de la obra. La tabla 2 contiene los valores decaudal esperados al tiempo de retorno diferenciado.
AOS(T)
Caudal esperadoen m3/s
15 341.80
25 373.12
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
8/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 8de 30
A OS(T)
Caudal esperadoen m3/s
50 415.63
100 458.13
Tabla 2. Caudales mximos esperados para la fuente. Fuente (Estudio Hidrolgico R. Caicedo)
Para efectos de clculo en sta simulacin se conserv los valores del estudio hidrolgico, debido a queste no denotaba las expresiones de confianza algebraica, y por lo tanto se asumi como indicadores devarianza dentro de la desviacin estndar aceptable.
Ilustracin 7. Asociacin de caudales y periodos de retorno para las fuentes
4. RESULTADOS
Los resultados de simulacin del presente estudio se han compilado de manera grfica y numrica porcada una de las secciones de anlisis del proyecto, sto con la finalidad de proveer de los datos deanlisis necesarios para el diseo de la estructura.
4.1. Flujo sub-crtico
Se modeliz las secciones en planta para un modelo hidrulico estable sin concentracin de energas nodisipables, indicando la lmina de gua con rendimiento ordinario.
Plot perspetiva del Cauce en T15 y T20
180.75168.0017 156.1293
144.3703
135.8899
125.1094
114.5713101.1004
88.07693
61.2480751.41473
40.24812
29.05383
19.58834
10.32886
SIM_TRIUNFO Plan: Plan 02 0 1/11/2015
Legend
WS 15Aos
Ground
Bank Sta
180.75168.0017 156.1293
144.3703
135.8899
125.1094
114.5713101.1004
88.07693
61.2480751.41473
40.24812
29.05383
19.58834
10.32886
SIM_TRIUNFO Plan: Plan 02 0 1/11/2015
Legend
WS 25Aos
Ground
Bank Sta
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
9/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 9de 30
Ilustracin 8. Simulacin de lmina de agua sub-crtica Cauce Ro Orito
Plot perspetiva del Cauce en T50 y T100
Ilustracin 9. Simulacin de lmina de agua sub-crtica Cauce Ro Orito
4.2. Modelo de inundacin
Para identificar las reas suscetibles a ser inundables, se modeliz la red de drenajes con estado dediscipacin natural por laderas, ajustados a los cocientes de rugosidad y capacidad de gradacin. Lasimulacin da como resultado que para periodos mximos > 25 aos con un caudal extremo inicial de341.8 m3/s se presenta efectos de desborde sobre el ro, lo cual indica la suscetibilidad a una amenazapor inundacin. Para efectos del informe se gener las salidas grficas y numricas del modelo desimulacin por cada seccin para un tiempo de retorno de 100 aos, haciendo de ste modo compatibleslos resultados con la naturaleza de la obra a construir.
Ilustracin 10. Modelo de inundacin a T= 100 aos
180.75168.0017 156.1293
144.3703
135.8899
125.1094
114.5713101.1004
88.07693
61.2480751.41473
40.24812
29.05383
19.58834
10.32886
SIM_TRIUNFO Plan: Plan 02 0 1/11/2015
Legend
WS 50Aos
Ground
Bank Sta
180.75168.0017 156.1293
144.3703
135.8899
125.1094
114.5713101.1004
88.07693
61.2480751.41473
40.24812
29.05383
19.58834
10.32886
SIM_TRIUNFO Plan: Plan 02 0 1/11/2015
Legend
WS 100 Aos
Ground
Bank Sta
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
10/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 10de 30
Ilustracin 11. Espacializacin de las secciones de anlisis y reas de inundacin
Para el caso de los perfiles propios de inundacin se ha desarrollado un compendio de imgenes y recordde datos que se adjuntan a continuacin.
Indicaciones:
E.G. Elev (m) : Rasante energa para elevacin de la superficie del agua dadaVel Head (m) : Velocidad de cabezaW.S. Elev (m) : Superficie del agua calculada de la Ecuacin energticaCrit W.S. (m) : Elevacin crtica de la superficie del aguaE.G. Slope (m/m) : Pendiente de la lnea de energa de la seccinQ Total (m3/s) : Caudal TotalTop Width (m) : Ancho TotalVel Total (m/s) : Velocidad TotalMax Chl Dpth (m) : Mxima profundidad del canal principalConv. Total (m3/s) : Transporte de la seccin transversal totalLength Wtd. (m) : Longitud ponderada de la base de distribucin de flujo (Canal, Margen izquierda y derecha)Min Ch El (m) : Elevacin mnima del canal
Wtd Sco Ch El (m) : Elevacin Ponderada de Socavacin en el CanalFrctn Loss (m) : Prdidas por friccin en las dos secciones continuasC & E Loss (m) : Contraccin (-) o expansin de prdidas entre las dos secciones contnuasWt. n-Val. : Valor ponderado de ManningReach Len. (m) : Longitud alcanzada aguas abajo de la seccin (Canal, Margen izquierda y derecha)Flow Area (m2) : rea de flujo aguas abajo de la secin
Area (m2) : rea de flujo aguas abajo se la seccin (Incluye reas inefectivas)Flow (m3/s) : Caudal aguas abajoTop Width (m) : Ancho total aguas abajo
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
11/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 11de 30
Avg. Vel. (m/s) : Velocidad media aguas abajoHydr. Depth (m) : Mxima profundidad aguas abajoConv. (m3/s) : Transporte de la seccin aguas abajoWetted Per. (m) : Permetro hmedo aguas abajo
Shear (N/m2) : Tensin de cizallamientoStream Power (N/m s) : Potencia Total de la CorrienteCum Volume (1000 m3) : Volumen total de agua acumulada aguas abajoentre seccinCum SA (1000 m2) : rea total de agua acumulada aguas abajoentre seccin
Plan: Plan 02 Orito Principal RS: 180.75 Profile: 100 Aos
E.G. Elev (m) 272.56 Element Left OB Channel Right OB
Vel Head (m) 0.15 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.41 Reach Len. (m) 11.72 12.75 14.1
Crit W.S. (m) 10.33 Flow Area (m2) 12.21 313.16 0.01
E.G. Slope (m/m) 0.000165 Area (m2) 12.21 313.16 0.01
Q Total (m3/s) 548.13 Flow (m3/s) 6.82 541.31 0
Top Width (m) 54.86 Top Width (m) 7.53 47.08 0.25
Vel Total (m/s) 1.68 Avg. Vel. (m/s) 0.56 1.73 0.05
Max Chl Dpth (m) 10.18 Hydr. Depth (m) 1.62 6.65 0.05
Conv. Total (m3/s) 42666.3 Conv. (m3/s) 530.9 42135.3 0.1
Length Wtd. (m) 12.75 Wetted Per. (m) 8.19 50.76 0.27
Min Ch El (m) 262.23 Shear (N/m2) 2.41 9.99 0.07
Wtd Sco Ch El (m) 1.25 Stream Power (N/m s) 3382.1 0 0
Frctn Loss (m) 3.33 Cum Volume (1000 m3) 1.92 43.35 4.91
C & E Loss (m) 2.46 Cum SA (1000 m2) 1.16 6.98 2.21
0 10 20 30 40 50 60 70 80256
258
260
262
264
266
268
270
272
274
276
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 A os
WS 100 Aos
EG 50 Aos
WS 50 Aos
EG 25 Aos
WS 25 Aos
EG 15 Aos
WS 15 Aos
0.2 m/s
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
12/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 12de 30
Plan: Plan 02 Orito Principal RS: 168.0017 Profile: 100 Aos
E.G. Elev (m) 272.56 Element Left OB Channel Right OB
Vel Head (m) 0.15 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.41 Reach Len. (m) 11.61 11.87 12.25
Crit W.S. (m) 10.81 Flow Area (m2) 7.7 313.74 14.28
E.G. Slope (m/m) 0.00015 Area (m2) 7.7 313.74 14.28
Q Total (m3/s) 548.13 Flow (m3/s) 3.63 536.64 7.86
Top Width (m) 59.38 Top Width (m) 5.44 45.7 8.24
Vel Total (m/s) 1.63 Avg. Vel. (m/s) 0.47 1.71 0.55
Max Chl Dpth (m) 10.66 Hydr. Depth (m) 1.42 6.87 1.73
Conv. Total (m3/s) 44698.1 Conv. (m3/s) 296.4 43760.9 640.8
Length Wtd. (m) 11.87 Wetted Per. (m) 6.2 48.18 9.14
Min Ch El (m) 261.75 Shear (N/m2) 1.83 9.6 2.3
Wtd Sco Ch El (m) 1.48 Stream Power (N/m s) 3342.35 0 0
Frctn Loss (m) 2.77 Cum Volume (1000 m3) 1.81 39.35 4.81
C & E Loss (m) 2.68 Cum SA (1000 m2) 1.09 6.39 2.15
0 10 20 30 40 50 60 70 80256
258
260
262
264
266
268
270
272
274
276
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
13/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 13de 30
Plan: Plan 02 Orito Principal RS: 156.1293 Profile: 100 Aos
E.G. Elev (m) 272.55 Element Left OB Channel Right OB
Vel Head (m) 0.14 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.41 Reach Len. (m) 10.97 11.76 12.64
Crit W.S. (m) 9.71 Flow Area (m2) 20.18 306.76 20.16
E.G. Slope (m/m) 0.000145 Area (m2) 20.18 306.76 20.16
Q Total (m3/s) 548.13 Flow (m3/s) 11.55 524.04 12.54
Top Width (m) 65.14 Top Width (m) 11.03 44.57 9.54
Vel Total (m/s) 1.58 Avg. Vel. (m/s) 0.57 1.71 0.62
Max Chl Dpth (m) 9.57 Hydr. Depth (m) 1.83 6.88 2.11
Conv. Total (m3/s) 45513.7 Conv. (m3/s) 959.1 43513.2 1041.5
Length Wtd. (m) 11.77 Wetted Per. (m) 11.86 45.93 10.45
Min Ch El (m) 262.84 Shear (N/m2) 2.42 9.5 2.74
Wtd Sco Ch El (m) 1.03 Stream Power (N/m s) 3285.86 0 0
Frctn Loss (m) 2.51 Cum Volume (1000 m3) 1.64 35.67 4.6
C & E Loss (m) 2.56 Cum SA (1000 m2) 0.99 5.85 2.05
0 10 20 30 40 50 60 70 80256
258
260
262
264
266
268
270
272
274
276
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
14/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 14de 30
Plan: Plan 02 Orito Principal RS: 144.3703 Profile: 100 Aos
E.G. Elev (m) 272.55 Element Left OB Channel Right OB
Vel Head (m) 0.13 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.42 Reach Len. (m) 7.77 8.48 9.28
Crit W.S. (m) 9.77 Flow Area (m2) 20.36 319.79 28.17
E.G. Slope (m/m) 0.000119 Area (m2) 20.36 319.79 28.17
Q Total (m3/s) 548.13 Flow (m3/s) 11.18 518.42 18.53
Top Width (m) 63.13 Top Width (m) 10.02 43.16 9.95
Vel Total (m/s) 1.49 Avg. Vel. (m/s) 0.55 1.62 0.66
Max Chl Dpth (m) 9.64 Hydr. Depth (m) 2.03 7.41 2.83
Conv. Total (m3/s) 50257.6 Conv. (m3/s) 1025.2 47533.4 1699
Length Wtd. (m) 8.49 Wetted Per. (m) 10.97 44.64 11.58
Min Ch El (m) 262.78 Shear (N/m2) 2.17 8.36 2.84
Wtd Sco Ch El (m) 0.09 Stream Power (N/m s) 3226.97 0 0
Frctn Loss (m) 1.50 Cum Volume (1000 m3) 1.42 31.99 4.29
C & E Loss (m) 2.58 Cum SA (1000 m2) 0.88 5.33 1.92
0 10 20 30 40 50 60 70258
260
262
264
266
268
270
272
274
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
15/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 15de 30
Plan: Plan 02 Orito Principal RS: 135.8899 Profile: 100 Aos
E.G. Elev (m) 272.54 Element Left OB Channel Right OB
Vel Head (m) 0.11 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.43 Reach Len. (m) 8.78 10.78 13.18
Crit W.S. (m) 10.18 Flow Area (m2) 16.51 342.59 29.06
E.G. Slope (m/m) 0.000096 Area (m2) 16.51 342.59 29.06
Q Total (m3/s) 548.13 Flow (m3/s) 7.78 524.27 16.08
Top Width (m) 63.31 Top Width (m) 8.49 42.49 12.34
Vel Total (m/s) 1.41 Avg. Vel. (m/s) 0.47 1.53 0.55
Max Chl Dpth (m) 10.07 Hydr. Depth (m) 1.95 8.06 2.36
Conv. Total (m3/s) 55944.8 Conv. (m3/s) 794 53510 1640.8
Length Wtd. (m) 10.84 Wetted Per. (m) 9.53 44.4 13.18
Min Ch El (m) 262.36 Shear (N/m2) 1.63 7.26 2.08
Wtd Sco Ch El (m) -0.45 Stream Power (N/m s) 3824.96 0 0
Frctn Loss (m) 1.59 Cum Volume (1000 m3) 1.28 29.18 4.03
C & E Loss (m) 2.66 Cum SA (1000 m2) 0.8 4.97 1.82
0 20 40 60 80260
262
264
266
268
270
272
274
276
278
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
16/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 16de 30
Plan: Plan 02 Orito Principal RS: 125.1094 Profile: 100 Aos
E.G. Elev (m) 272.54 Element Left OB Channel Right OB
Vel Head (m) 0.13 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.41 Reach Len. (m) 9.27 10.54 11.69
Crit W.S. (m) 9.74 Flow Area (m2) 14.61 315.02 32.09
E.G. Slope (m/m) 0.000115 Area (m2) 14.61 315.02 32.09
Q Total (m3/s) 548.13 Flow (m3/s) 6.95 519.04 22.13
Top Width (m) 59.46 Top Width (m) 8.48 40.27 10.72
Vel Total (m/s) 1.52 Avg. Vel. (m/s) 0.48 1.65 0.69
Max Chl Dpth (m) 9.61 Hydr. Depth (m) 1.72 7.82 2.99
Conv. Total (m3/s) 51107.1 Conv. (m3/s) 648.3 48394.9 2063.8
Length Wtd. (m) 10.57 Wetted Per. (m) 9.5 41.85 11.97
Min Ch El (m) 262.8 Shear (N/m2) 1.73 8.49 3.02
Wtd Sco Ch El (m) 0.01 Stream Power (N/m s) 4433.5 0 0
Frctn Loss (m) 1.85 Cum Volume (1000 m3) 1.14 25.63 3.62
C & E Loss (m) 2.51 Cum SA (1000 m2) 0.73 4.53 1.67
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.4 m/s
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
17/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 17de 30
Plan: Plan 02 Orito Principal RS: 114.5713 Profile: 100 Aos
E.G. Elev (m) 272.53 Element Left OB Channel Right OB
Vel Head (m) 0.2 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.33 Reach Len. (m) 11.01 13.47 16.59
Crit W.S. (m) 8.76 Flow Area (m2) 13.73 257.3 24.74
E.G. Slope (m/m) 0.000224 Area (m2) 13.73 257.3 24.74
Q Total (m3/s) 548.13 Flow (m3/s) 8.68 519.69 19.76
Top Width (m) 60.64 Top Width (m) 8.92 40.24 11.48
Vel Total (m/s) 1.85 Avg. Vel. (m/s) 0.63 2.02 0.8
Max Chl Dpth (m) 8.56 Hydr. Depth (m) 1.54 6.39 2.16
Conv. Total (m3/s) 36629.9 Conv. (m3/s) 580.2 34729.5 1320.2
Length Wtd. (m) 13.53 Wetted Per. (m) 9.62 41.51 12.21
Min Ch El (m) 263.77 Shear (N/m2) 3.13 13.61 4.45
Wtd Sco Ch El (m) 2.39 Stream Power (N/m s) 4715.49 0 0
Frctn Loss (m) 4.25 Cum Volume (1000 m3) 1.01 22.62 3.29
C & E Loss (m) 2.25 Cum SA (1000 m2) 0.65 4.1 1.54
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.6 m/s
0.8 m/s
1.0 m/s
1.2 m/s
1.4 m/s
1.6 m/s
1.8 m/s
2.0 m/s
2.2 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
18/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 18de 30
Plan: Plan 02 Orito Principal RS: 101.1004 Profile: 100 Aos
E.G. Elev (m) 272.52 Element Left OB Channel Right OB
Vel Head (m) 0.24 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.29 Reach Len. (m) 9.9 13.02 17.05
Crit W.S. (m) 7.96 Flow Area (m2) 13.63 238.53 17.7
E.G. Slope (m/m) 0.000289 Area (m2) 13.63 238.53 17.7
Q Total (m3/s) 548.13 Flow (m3/s) 9.88 523.77 14.48
Top Width (m) 58.14 Top Width (m) 8.7 39.94 9.5
Vel Total (m/s) 2.03 Avg. Vel. (m/s) 0.72 2.2 0.82
Max Chl Dpth (m) 7.73 Hydr. Depth (m) 1.57 5.97 1.86
Conv. Total (m3/s) 32262.5 Conv. (m3/s) 581.6 30828.9 852.1
Length Wtd. (m) 13.05 Wetted Per. (m) 9.41 41.07 10.2
Min Ch El (m) 264.56 Shear (N/m2) 4.1 16.44 4.91
Wtd Sco Ch El (m) 2.89 Stream Power (N/m s) 4271.67 0 0
Frctn Loss (m) 5.28 Cum Volume (1000 m3) 0.86 19.28 2.94
C & E Loss (m) 1.98 Cum SA (1000 m2) 0.55 3.56 1.36
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
19/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 19de 30
Plan: Plan 02 Orito Principal RS: 88.07693 Profile: 100 Aos
E.G. Elev (m) 272.52 Element Left OB Channel Right OB
Vel Head (m) 0.25 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.26 Reach Len. (m) 19.3 19.3 19.3
Crit W.S. (m) 8.17 Flow Area (m2) 11.2 235.73 9.36
E.G. Slope (m/m) 0.000306 Area (m2) 11.2 235.73 9.36
Q Total (m3/s) 548.13 Flow (m3/s) 8.53 532.72 6.88
Top Width (m) 51.61 Top Width (m) 6.82 39.05 5.75
Vel Total (m/s) 2.14 Avg. Vel. (m/s) 0.76 2.26 0.74
Max Chl Dpth (m) 7.91 Hydr. Depth (m) 1.64 6.04 1.63
Conv. Total (m3/s) 31344.2 Conv. (m3/s) 487.6 30463.1 393.5
Length Wtd. (m) 19.3 Wetted Per. (m) 7.5 40.59 6.6
Min Ch El (m) 264.35 Shear (N/m2) 4.48 17.41 4.25
Wtd Sco Ch El (m) 3.11 Stream Power (N/m s) 4418.17 0 0
Frctn Loss (m) 8.70 Cum Volume (1000 m3) 0.74 16.19 2.71
C & E Loss (m) 1.90 Cum SA (1000 m2) 0.48 3.05 1.23
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
Crit 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
20/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 20de 30
Plan: Plan 02 Orito Principal RS: 70.32062BR U Profile: 100 Aos
E.G. Elev (m) 272.51 Element Left OB Channel Right OB
Vel Head (m) 0.25 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.26 Reach Len. (m) 2 2 2
Crit W.S. (m) 8.16 Flow Area (m2) 11.16 235.48 9.32
E.G. Slope (m/m) 0.000307 Area (m2) 11.16 235.48 9.32
Q Total (m3/s) 548.13 Flow (m3/s) 8.5 532.78 6.86
Top Width (m) 51.6 Top Width (m) 6.81 39.05 5.74
Vel Total (m/s) 2.14 Avg. Vel. (m/s) 0.76 2.26 0.74
Max Chl Dpth (m) 7.91 Hydr. Depth (m) 1.64 6.03 1.62
Conv. Total (m3/s) 31285.4 Conv. (m3/s) 485 30409.2 391.3
Length Wtd. (m) 2 Wetted Per. (m) 7.49 40.59 6.59
Min Ch El (m) 264.35 Shear (N/m2) 4.48 17.46 4.25
Wtd Sco Ch El (m) 3.12 Stream Power (N/m s) 4418.17 0 0
Frctn Loss (m) 0.90 Cum Volume (1000 m3) 0.52 11.64 2.53
C & E Loss (m) 1.90 Cum SA (1000 m2) 0.34 2.29 1.12
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
Crit 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
21/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 21de 30
Plan: Plan 02 Orito Principal RS: 70.32062BR D Profile: 100 Aos
E.G. Elev (m) 272.49 Element Left OB Channel Right OB
Vel Head (m) 0.19 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.3 Reach Len. (m) 5.53 5.53 5.53
Crit W.S. (m) 9.54 Flow Area (m2) 11.4 263.86 21.61
E.G. Slope (m/m) 0.000204 Area (m2) 11.4 263.86 21.61
Q Total (m3/s) 548.13 Flow (m3/s) 6.57 524.43 17.12
Top Width (m) 54.99 Top Width (m) 7.6 38.4 9
Vel Total (m/s) 1.85 Avg. Vel. (m/s) 0.58 1.99 0.79
Max Chl Dpth (m) 9.35 Hydr. Depth (m) 1.5 6.87 2.4
Conv. Total (m3/s) 38382.3 Conv. (m3/s) 460.3 36722.9 1199
Length Wtd. (m) 5.53 Wetted Per. (m) 8.55 40.66 10.11
Min Ch El (m) 262.95 Shear (N/m2) 2.67 12.98 4.28
Wtd Sco Ch El (m) 2.24 Stream Power (N/m s) 4326.73 0 0
Frctn Loss (m) 1.67 Cum Volume (1000 m3) 0.5 11.14 2.5
C & E Loss (m) 2.34 Cum SA (1000 m2) 0.33 2.22 1.11
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
Crit 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
22/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 22de 30
Plan: Plan 02 Orito Principal RS: 61.24807 Profile: 100 Aos
E.G. Elev (m) 272.49 Element Left OB Channel Right OB
Vel Head (m) 0.19 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.3 Reach Len. (m) 10.17 9.83 9.77
Crit W.S. (m) 9.54 Flow Area (m2) 11.39 263.81 21.6
E.G. Slope (m/m) 0.000204 Area (m2) 11.39 263.81 21.6
Q Total (m3/s) 548.13 Flow (m3/s) 6.57 524.45 17.12
Top Width (m) 55.13 Top Width (m) 7.59 38.4 9.14
Vel Total (m/s) 1.85 Avg. Vel. (m/s) 0.58 1.99 0.79
Max Chl Dpth (m) 9.35 Hydr. Depth (m) 1.5 6.87 2.36
Conv. Total (m3/s) 38370 Conv. (m3/s) 459.9 36712 1198.1
Length Wtd. (m) 9.83 Wetted Per. (m) 8.54 40.66 10.24
Min Ch El (m) 262.95 Shear (N/m2) 2.67 12.99 4.22
Wtd Sco Ch El (m) 2.26 Stream Power (N/m s) 4326.73 0 0
Frctn Loss (m) 2.96 Cum Volume (1000 m3) 0.44 9.68 2.38
C & E Loss (m) 2.34 Cum SA (1000 m2) 0.29 2 1.06
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
23/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 23de 30
Plan: Plan 02 Orito Principal RS: 51.41473 Profile: 100 Aos
E.G. Elev (m) 272.48 Element Left OB Channel Right OB
Vel Head (m) 0.26 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.23 Reach Len. (m) 11.47 11.17 10.65
Crit W.S. (m) 7.57 Flow Area (m2) 12.01 198.14 52
E.G. Slope (m/m) 0.000401 Area (m2) 12.01 198.14 52
Q Total (m3/s) 548.13 Flow (m3/s) 10.32 468.57 69.24
Top Width (m) 63.36 Top Width (m) 7.55 38.11 17.69
Vel Total (m/s) 2.09 Avg. Vel. (m/s) 0.86 2.36 1.33
Max Chl Dpth (m) 7.32 Hydr. Depth (m) 1.59 5.2 2.94
Conv. Total (m3/s) 27383.9 Conv. (m3/s) 515.5 23409.1 3459.2
Length Wtd. (m) 11.11 Wetted Per. (m) 8.21 39.03 18.44
Min Ch El (m) 264.91 Shear (N/m2) 5.74 19.94 11.08
Wtd Sco Ch El (m) 3.46 Stream Power (N/m s) 4614 0 0
Frctn Loss (m) 5.49 Cum Volume (1000 m3) 0.32 7.41 2.02
C & E Loss (m) 2.17 Cum SA (1000 m2) 0.21 1.63 0.93
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
24/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 24de 30
Plan: Plan 02 Orito Principal RS: 40.24812 Profile: 100 Aos
E.G. Elev (m) 272.47 Element Left OB Channel Right OB
Vel Head (m) 0.32 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.15 Reach Len. (m) 10.78 11.19 11.31
Crit W.S. (m) 5.90 Flow Area (m2) 11.76 179.27 42.64
E.G. Slope (m/m) 0.000536 Area (m2) 11.76 179.27 42.64
Q Total (m3/s) 548.13 Flow (m3/s) 12.24 475.73 60.16
Top Width (m) 59.38 Top Width (m) 6.2 36.51 16.67
Vel Total (m/s) 2.35 Avg. Vel. (m/s) 1.04 2.65 1.41
Max Chl Dpth (m) 5.58 Hydr. Depth (m) 1.9 4.91 2.56
Conv. Total (m3/s) 23668.2 Conv. (m3/s) 528.5 20542.1 2597.5
Length Wtd. (m) 11.19 Wetted Per. (m) 7.51 36.97 17.26
Min Ch El (m) 266.57 Shear (N/m2) 8.24 25.5 12.99
Wtd Sco Ch El (m) 3.06 Stream Power (N/m s) 4956.32 0 0
Frctn Loss (m) 7.28 Cum Volume (1000 m3) 0.18 5.31 1.52
C & E Loss (m) 1.59 Cum SA (1000 m2) 0.13 1.21 0.74
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
25/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 25de 30
Plan: Plan 02 Orito Principal RS: 29.05383 Profile: 100 Aos
E.G. Elev (m) 272.46 Element Left OB Channel Right OB
Vel Head (m) 0.39 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 272.07 Reach Len. (m) 9.11 9.47 10.14
Crit W.S. (m) 6.21 Flow Area (m2) 9.28 166.35 38.09
E.G. Slope (m/m) 0.000662 Area (m2) 9.28 166.35 38.09
Q Total (m3/s) 548.13 Flow (m3/s) 9.51 483.14 55.48
Top Width (m) 57.8 Top Width (m) 6.5 34.62 16.68
Vel Total (m/s) 2.56 Avg. Vel. (m/s) 1.02 2.9 1.46
Max Chl Dpth (m) 5.82 Hydr. Depth (m) 1.43 4.8 2.28
Conv. Total (m3/s) 21298.2 Conv. (m3/s) 369.5 18773 2155.7
Length Wtd. (m) 9.55 Wetted Per. (m) 7.11 35.1 17.21
Min Ch El (m) 266.25 Shear (N/m2) 8.48 30.78 14.37
Wtd Sco Ch El (m) 4.39 Stream Power (N/m s) 4108.88 0 0
Frctn Loss (m) 7.48 Cum Volume (1000 m3) 0.07 3.37 1.06
C & E Loss (m) 1.62 Cum SA (1000 m2) 0.06 0.81 0.55
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
26/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 26de 30
Plan: Plan 02 Orito Principal RS: 19.58834 Profile: 100 Aos
E.G. Elev (m) 272.44 Element Left OB Channel Right OB
Vel Head (m) 0.53 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 271.9 Reach Len. (m) 9.43 9.26 10.37
Crit W.S. (m) 5.30 Flow Area (m2) 2.55 136.32 40.82
E.G. Slope (m/m) 0.001157 Area (m2) 2.55 136.32 40.82
Q Total (m3/s) 548.13 Flow (m3/s) 2.32 465.35 80.46
Top Width (m) 53.86 Top Width (m) 3.03 33.6 17.23
Vel Total (m/s) 3.05 Avg. Vel. (m/s) 0.91 3.41 1.97
Max Chl Dpth (m) 4.76 Hydr. Depth (m) 0.84 4.06 2.37
Conv. Total (m3/s) 16116.1 Conv. (m3/s) 68.3 13682 2365.7
Length Wtd. (m) 9.4 Wetted Per. (m) 3.55 34.3 17.8
Min Ch El (m) 267.14 Shear (N/m2) 8.15 45.09 26.01
Wtd Sco Ch El (m) 5.12 Stream Power (N/m s) 3782.83 0 0
Frctn Loss (m) 12.39 Cum Volume (1000 m3) 0.01 1.94 0.66
C & E Loss (m) 1.34 Cum SA (1000 m2) 0.02 0.49 0.38
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0.5 m/s
1.0 m/s
1.5 m/s
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
27/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 27de 30
Plan: Plan 02 Orito Principal RS: 10.32886 Profile: 100 Aos
E.G. Elev (m) 272.41 Element Left OB Channel Right OB
Vel Head (m) 0.69 Wt. n-Val. 0.03 0.025 0.03
W.S. Elev (m) 271.72 Reach Len. (m) 5.53 6.54 8.65
Crit W.S. (m) 5.80 Flow Area (m2) 0.2 128.33 32.5
E.G. Slope (m/m) 0.00148 Area (m2) 0.2 128.33 32.5
Q Total (m3/s) 548.13 Flow (m3/s) 0.09 492.81 55.23
Top Width (m) 52.84 Top Width (m) 0.7 31.18 20.95
Vel Total (m/s) 3.4 Avg. Vel. (m/s) 0.45 3.84 1.7
Max Chl Dpth (m) 5.11 Hydr. Depth (m) 0.28 4.12 1.55
Conv. Total (m3/s) 14249.9 Conv. (m3/s) 2.3 12811.8 1435.8
Length Wtd. (m) 6.8 Wetted Per. (m) 0.97 32.54 21.3
Min Ch El (m) 266.61 Shear (N/m2) 2.99 57.22 22.14
Wtd Sco Ch El (m) 4.19 Stream Power (N/m s) 3435.23 0 0
Frctn Loss (m) 10.95 Cum Volume (1000 m3) 0 0.71 0.28
C & E Loss (m) 1.34 Cum SA (1000 m2) 0 0.19 0.18
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
0 m/s
1 m/s
2 m/s
3 m/s
4 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
28/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 28de 30
Plan: Plan 02 Orito Principal RS: 3.784361 Profile: 100 Aos
E.G. Elev (m) 272.34 Element Left OB Channel Right OB
Vel Head (m) 1.23 Wt. n-Val. 0.025 0.03
W.S. Elev (m) 271.11 Reach Len. (m) 5.56 6.72 8.89
Crit W.S. (m) 5.36 Flow Area (m2) 90.13 31.84
E.G. Slope (m/m) 0.003572 Area (m2) 90.13 31.84
Q Total (m3/s) 548.13 Flow (m3/s) 469.31 78.82
Top Width (m) 48.45 Top Width (m) 26.72 21.73
Vel Total (m/s) 4.49 Avg. Vel. (m/s) 5.21 2.48
Max Chl Dpth (m) 4.13 Hydr. Depth (m) 3.37 1.47
Conv. Total (m3/s) 9171.1 Conv. (m3/s) 7852.4 1318.7
Length Wtd. (m) 6.91 Wetted Per. (m) 28.04 22.99
Min Ch El (m) 266.98 Shear (N/m2) 112.6 48.51
Wtd Sco Ch El (m) 4.01 Stream Power (N/m s) 2923.42 0 0
Frctn Loss (m) 24.08 Cum Volume (1000 m3)
C & E Loss (m) 1.10 Cum SA (1000 m2)
0 20 40 60 80 100260
262
264
266
268
270
272
274
276
278
280
SIM_TRIUNFO Plan: Plan 02 01/11/2015
Station (m)
Elevation(m)
Legend
EG 100 Aos
WS 100 Aos
Crit 100 Aos
2.0 m/s
2.5 m/s
3.0 m/s
3.5 m/s
4.0 m/s
4.5 m/s
5.0 m/s
5.5 m/s
Ground
Bank Sta
.03 .025 .03
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
29/30
Mocoa - Putumayo, Rumiyaco CA3Cel. (+57) 3133746944Tel. (+57) 8 - 4205858
[email protected]://jhimmycalvache.wix.com/work
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Pgina 29de 30
Consideraciones:
Dentro de las descripciones numricas y pictricas anteriores se observa que nicamente
en la seccin (65 metros antes del puente) se presenta efecto desedimentacin, con un perfil medio de 45 cm desde el fondo actual. sta seccincorresponde precisamente con el alineamiento de disipacin de energa que proviene delmeandro anterior del ro.
Desde la seccin (43 metros antes del puente) crece exponencialmente elproceso de socavacin de fondo con incremento en la expansin lateral (socavacinlateral), los valores son cercanos e iguales a 5 metros antes de la prxima rotura de energaen el meandro aguas abajo.
En el rea hidrulica correspondiente el puente El Triunfo existe un valor de socavacin defondo de 2.24 metros, con 2.34 de expansin lateral, que afectara la estabilidad de la torrederecha, ste contacto aunque no es directo, la distancia socavada estara a 0.31 metrosde la estructura, con 0.44 metros de fondo, por lo cual se recomienda replantear lalocalizacin de la misma en una longitud que supere el Talweg proyectado, lo cual seraen una distancia mayor que 2.5 metros. Para el caso de la torre izquierda no se evidenciaque la probabilidad de socavacin pueda afectar la cimentacin.
Ilustracin 12. Perfil general de inundacin y socavacin
De acuerdo a la Ilustracin 12 se observa de forma clara como el efecto de socavacin se incrementasenoidalmente desde las dos secciones anteriores a la estrucutura proyectada, lo cual no solo se debe a
la calidad del suelo (poco cohesivo) sino al gradiente de alturas que posibilita el incremento de energa yen consecuencia de la velocidad, tal como se observa en la Ilustracin 13, donde se grafica la velocidadgeneral, y la distribucin de la misma en los hombros.
0 50 100 150250
255
260
265
270
275
280
SIM_TRIUNFO Plan: Plan 02 01/11 /2015
Main Channel Distance (m)
Elevation(m)
Legend
EG 1 00 Aos
WS 100 Aos
Crit 10 0 Aos
Ground
LOB
ROB
10.32886
19.58834
29.05383
40.24812
51.41473
61.24807
70.32062
88.07693
101.1004
114.5713
125.1094
135.8899
144.3703
156.1293
168.0017
180.75
Orito Principal
mailto:[email protected]://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workhttp://jhimmycalvache.wix.com/workmailto:[email protected]7/24/2019 Informe de Simulacin Ro Orito Puente Triunfo SF
30/30
Mocoa - Putumayo, Rumiyaco CA3C l ( 57) 3133746944
Informe de Simulacin de Inundacin ySocavacin, Ro Orito, Puente El Triunfo
Munici io de Orito Putuma o.
Informe tc
Ilustracin 13. Perfil de distribucin de velocidades.
Es el Informe,
Jhimmy Calvache FajardoMP 24847 AGR
0 50 100 150 2000
1
2
3
4
5
6
SIM_TRIUNFO Plan: Plan 02 01 /11/2015
Main Channel Distance (m)
VelLeft(m/s),VelChnl(m/s),VelRight(
m/s)
Legend
Vel Chnl 100 Aos
Vel Right 100 Aos
Vel Left 100 Aos
Orito Principal