Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 1
Casa Mila La Pidrera, Antoni Gaudi – Barcelona Spain
The mission of Information Technology Service at the Community college of Philadelphia is to plan,
create, and manage an information environment that enables members of the college community to
utilize information resources effectively, productively, and securely. We strive to support excellence
and innovation in teaching, learning, and to support efficiency and productivity in administration.
Information Technology Services partners with faculty, students, and staff to identify the needs of the
college community; provides appropriate infrastructure and tools to enable work; and helps service
areas and individuals meet their goals.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 2
Table of Contents Introduction: Information Technology Services Overview ........................................................................... 6
Enabling the College Mission, Core Values and Vision ................................................................................. 7
Goal I. Implement Green Initiatives through technology ............................................................................. 8
Goal I.a. FY12 Cisco Infrastructure Refresh Project .................................................................................. 8
Goal I.a. Objectives ............................................................................................................................... 8
Goal I.a. Planned Outcome ................................................................................................................... 8
Goal I.b. Implement VMWare virtualization software solution ................................................................ 9
Goal I.b. Objectives ............................................................................................................................... 9
Goal I.b. Planned Outcome ................................................................................................................... 9
Goal I.c. Implement a Pay for Print Management solution to reduce paper consumption ..................... 9
Goal I.c. Objectives ............................................................................................................................... 9
Goal I.c. Planned Outcome ................................................................................................................. 10
Goal I.d. Document Imaging ................................................................................................................... 10
Goal I.d. Objectives ............................................................................................................................. 10
Goal I.d. Planned Outcome ................................................................................................................. 11
Goal I.e. Explore the CLOUD ................................................................................................................... 11
Goal I.e. Objectives ............................................................................................................................. 12
Goal I.e. Planned Outcome ................................................................................................................. 13
Goal II. Improve the Delivery of Technology Services for the Teaching/Learning and Support Service
Environments .............................................................................................................................................. 13
Goal II.a. Support the Campus Expansion Project .................................................................................. 13
Goal II.a. Objectives ............................................................................................................................ 14
Goal I.a. Planned Outcome ................................................................................................................. 15
Goal II.b. Implement Microsoft Active Directory as an Identity Management Solution ........................ 15
Goal II.b. Objectives ............................................................................................................................ 15
Goal II.b. Planned Outcome ................................................................................................................ 16
Goal II.c. Implement Resource25/Schedule 25 ....................................................................................... 16
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 3
Goal II.c. Objectives ............................................................................................................................ 16
Goal II.c. Planned Outcome ................................................................................................................ 17
Goal II.d. Raiser’s Edge Implementation ................................................................................................. 17
Goal II.d. Objectives ............................................................................................................................ 18
Goal II.d. Planned Outcome ................................................................................................................ 18
Goal II.e. Implementation of the Disaster Recover/Business Continuity Planning Project .................... 18
Goal II.e. Objectives ............................................................................................................................ 18
Goal II.e. Planned Outcome ................................................................................................................ 22
Goal III Support Teaching/Learning and Education/Student Support Services through multiple priority
projects ....................................................................................................................................................... 23
Goal III.a. Develop a system for requesting priority projects requiring technology ............................... 23
Goal III.a. Objectives ........................................................................................................................... 23
Goal III.a. Planned Outcome ............................................................................................................... 23
Goal III.b. Provide the Technology Support Requested of ITS ................................................................ 24
One Summer – In Progress ................................................................................................................. 24
Student Billing Rewrite & Banner Self-Service modification .............................................................. 24
Hyperion (Brio) reporting via a Master Data Warehouse – Sept 2011 - Sept 2012 ........................... 24
Banner 9 Project Horizon implementation - PENDING ....................................................................... 24
Lumins 5 – MyCCP upgrade - PENDING .............................................................................................. 25
Academic Advising - PENDING ............................................................................................................ 25
Web Redesign Project – In Progress ................................................................................................... 25
CAPP – Banner Curriculum, Advising and Program Placement - Pending .......................................... 25
Hybrid course implementation – In Progress ..................................................................................... 26
QLess queuing system for Enrollment Services - Pending .................................................................. 26
ProED solution to assist in student verifications of Financial Aid – Pending ...................................... 26
Development of a New Graduation Application – In Progress ........................................................... 26
Non-baseline pre-requisite check process - Pending Completion June 2011 to be used Spring 2012
during EOT Drop ................................................................................................................................. 26
Self Service P&P 5 – Instructor Drop for Poor Attendance – In Progress - Testing ............................ 27
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 4
SWATODO – Development of an Enrollment Service ToDo list for students inside MyCCP – Not
Started ................................................................................................................................................ 27
Non-matriculating student process – In Progress – Pending completion – Testing in progress ........ 27
Federal Regulatory changes in SAP – Pending November 2011 Due Date ......................................... 27
AVOW system implementation – Pending ......................................................................................... 27
Registration integration for Barnes & Nobel – Not Started ............................................................... 27
Dining Services-Canteen-website build with catering form – Awaiting Spec ..................................... 27
Endowment Module – Finance & IA – Awaiting end-user input ........................................................ 27
Central Supply online web form – Awaiting Spec ............................................................................... 27
Redesign of Duplicating web request form – Not Started .................................................................. 27
ACH – Awaiting end user testing & sign-off ........................................................................................ 27
Automated Faculty Load process – Pilot scheduled for Summer 2011 .............................................. 28
Redesign of Professional Development website – Not Started .......................................................... 28
Web Time Entry – Pending a Pilot Summer 2011 ............................................................................... 28
HR/Payroll: Review of all reports built in Word – Not Started ........................................................... 28
Faculty Step Form – Pending .............................................................................................................. 28
Tenure/Non-Tenure Reporting – Pending .......................................................................................... 28
E-Brochure tied to Recruitment module – Pending ........................................................................... 28
MMS Reservation/Inventory system – Not Started ........................................................................... 28
Math Common Final Exam expansion beyond MATH 118 – In Progress ........................................... 28
Telecom RFP/Implementation ............................................................................................................ 28
RFP completed .................................................................................................................................... 28
Implementation of ISP provider August 2011 .................................................................................... 28
PRI-Local & Long distance service replacement – Pending RFP award .............................................. 28
KINBER installation – Pending PennREN scheduling ........................................................................... 28
Anti-virus review/replacement – Pending .......................................................................................... 28
Misc IDF HVAC issues – In progress .................................................................................................... 28
Ongoing Lease Replacement cycles – In Progress .............................................................................. 28
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 5
Sun Server Lease Refresh – In Progress – Sept 2011 and Dec 2011 ................................................... 28
Redesign of Governance website – Not Started ................................................................................. 28
Teleconferencing for ESS (umi Cisco); Advising. ................................................................................. 28
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 6
Introduction: Information Technology Services Overview
The Information Technology Services (ITS) department was restructured in 2003 following the start of
the SungardHE Banner Administrative and Student Systems implementation. The following units make
up the department:
Information Support Services (ISS) o Staff and Student Support Center (4ITSupport) o Banner Support and Development; Finance, HR/Payroll, Student o 3rd-Party Support and Development o Web & Interactive Systems Service Support and Development
Technology Support Services (TSS) o Network infrastructure Service and Support o Telecommunication (VoIP) infrastructure Service and Support o Hardware Service and Support o Desktop/Server Service and Support
Information Security and Policies
The ITS department strives to provide the Community College of Philadelphia’s faculty, staff and students with information resources and services that enable them to meeting their goals whether academic or professional growth. We strive to assist in identifying and supporting innovative uses of information technology to advance the academic and service mission of the College. The College has a large and complex information technology infrastructure which is managed by the ITS department. Campus technology resources include telecommunication systems, email systems, wired and wireless networks, web services, administrative systems, directory services, academic applications, support for teaching and learning initiatives and more. We are responsible for planning, testing, implementation, and maintenance of systems and services. We provide support for the administrative units of the College to ensure that business needs are met. In addition, our team provides technical support for the College’s web presence. The ITS department consults with and assists campus technology users to ensure their success and satisfaction.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 7
Enabling the College Mission, Core Values and Vision The Information Technology Services department stands strongly behind the College Mission, Core Values and Mission and is applying its resources towards goals stated therein. The strategic plans were central to our planning discussions for the 2011-2012 fiscal year. This report highlights areas of strategic impact in out FY12 work plan. A recent trip to Spain influenced our FY12 planning. The image on the front cover of this report is of Casa Mila La Pidrera designed by Antoni Gaudi (1852-1926). Gaudi inspired me to bring new thoughts to our discussions concerning our service level goals and our future support of the technology needs of the College. Gaudi’s innovative designs and “pushing the limit” of materials available during his lifetime encourages us to do more with less and to be more creative in our solutions during these tight budget years. Casa Mila was plagued throughout construction by Gaudi’s unconventional design ideas. His design concepts included a structure were the only weigh-bearing walls would be in the stairways. The undulating façade is picturesque but one wonders how it has remained standing since 1910. Unconventional or radical implementations will assist us in developing solutions as we tackle the Campus Expansion Project. Gaudi’s use of nature in his designs also reminds us that we are to move toward a green environment. You will see that the goals within this report detail not only plans to keep “going green” foremost in our minds as we renew technology equipment but to also be innovative in our use of existing spaces to provide technology to the college community. Many of the stated goals and objectives reflect the priorities as defined by the President and Cabinet. Those that are not included are listed in the associated ITS Priorities Listing and should be included as related to overall accomplishment in FY12. You may observe that some goals from FY11 are repeated here as FY12 goals, this is due to their incomplete status. Examples of these goals are the finalization of the Disaster Recovery/Business Continuity Planning (DR/BCP), Virtualization implementation, Data Warehouse and Data Management project, and the Web re-design project.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 8
Goal I. Implement Green Initiatives through technology To serve Philadelphia as a premier learning institution where student success exemplifies the strength of a diverse, urban community college.
State-of-the-art technology employed to enhance teaching and learning.
Goal I.a. FY12 Cisco Infrastructure Refresh Project The 2010-2011 year was used by ITS to plan for an infrastructure refresh that will ensure the Campus Expansion projects and existing main campus and regional centers have adequate bandwidth to support teaching, learning and support activities through technology. This refresh is meant to enable the College with a 10G infrastructure using a refreshed backbone structure with single mode fiber as well as the existing fiber ring connecting all campus locations. The design and equipment have been detailed in RFP # 9641. This RFP will increase the capability of all MDF and IDF locations. Project Timeline: June 2011 – March 2012 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal I.a. Objectives
The project will begin June 2011 and by completed by March 2012.
Build/refresh the College network infrastructure which will support the future of wired and wireless technology needs of the College.
Obtain further training for the Network Services staff to ensure knowledgebase is adequate to support the effort.
A promise of minor downtime inconveniences for the students, faculty and staff at all sites.
Improved Quality of Service for all network devices at the completion of the project.
Automated configuration of all MDF & IDF equipment to ensure up time of services.
Improved monitoring of services to ensure the availability of bandwidth to support College services and needs.
Goal I.a. Planned Outcome
The ITS team will implement the planned infrastructure refresh for all locations.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 9
Goal I.b. Implement VMWare virtualization software solution The green efforts with ITS will continue in FY12. The implementation of virtual servers with decrease
the need for server hardware and lower the cooling and electric costs of Core server rooms within the
College by consolidating servers within a virtual environment.
Project Timeline: August 2011 – January 2012 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal I.b. Objectives
The project will begin August 2011 and by completed by January 2012.
Using the current hardware/software at the NERC-DR site, implement a virtual server setup for core servers needed to support the critical services of the College.
Obtain further training for the Network Services staff to ensure knowledgebase is adequate to support the effort.
Once built, testing should include fail-over services for DR Testing.
Plan for expand the virtual capability for core services of the College.
Goal I.b. Planned Outcome
The ITS team will implement VMWare virtualization software solution to support server environments
then begin planning for expansion of virtual services to the desktop.
Goal I.c. Implement a Pay for Print Management solution to reduce paper
consumption This goal is intended to further support our green initiatives as well as reduce costs. In conjunction with
the CBord One Card solution, a Pay for Print management solution will be implemented first in the Main
Campus and Northeast Regional Center Library/Learning Commons areas as well as the main campus
Student Academic Computing Center (SACC).
The chosen solution, GoPrint, will provide the College with the ability to allow printing in a controlled
environment. The College One Card pre-loaded with “CCP Bucks” will allow student printing based on
their course load. A machine as well as a web interface will allow students to add to their printing
capability through our Campus One Card.
Project timeline: Pilot: June 2011 – August 2011 Full implementation: September 2011 - June 2012
Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal I.c. Objectives
The overall project will begin June 2011 and by completed by June 2012.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 10
Phase One will include a pilot deployment of the GoPrint solution to the main campus Library and the Northeast Regional Center Learning Commons.
o Discussions with Academic Affairs will include functional training on the product as well as discussions concerning the future amount of CCP Bucks to be provided to students.
o During the pilot phase Students will have a limited printing capacity but will be monitored to ensure that they can print during the Summer.
o Reporting will be used to help determine the amount per students of CCP printing bucks.
o The 4ITSupport call center will provide active support for the pilot operations to ensure students and staff are not adversely affected by the solution.
o Release stations will be setup near printers to allow for job release via the College One Card. Library staff will be consulted on the location of these stations.
o Job Control will be handled by both Library and Learning Commons staff as well as ITS. o Phase Two will expand this solution into all Student Academic Computer Centers and all
Learning Commons/Library facilities. o Future expand copy machines in these same locations will be added.
Goal I.c. Planned Outcome
Assist the College in a green initiative to control printing through the implementation of the GoPrint Pay
Printing Management solution via the College One Card system.
Goal I.d. Document Imaging The need to reduce paper storage both from a green perspective and limit the cost of external storage
has lead the College to pursue document imaging technology. Begun in 2010, this initiative will continue
into this fiscal year. Enrollment services will continue the efforts with Admissions and Records &
Registration to provide scanned images of paper documents provided by students related to enrollment
services. In addition, Human Resources and Payroll will move toward the imaging of documents to
reduce the storage of paper related to employment files.
Project Timelines:
Admissions and Records & Registration – June 2011 – October 2011
Human Resources & Payroll – August 2011 – December 2011 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal I.d. Objectives
Following the discovery defined in 2010-2011 for the offices of Admissions and Record and Registration, the process of intake and retrieval of student related information will become electronic.
o Acting in the role of Project Manager of the product, S.K. Calkins will ensure the goals of the project are completed.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 11
o ISS staff will provide the support of the implementation as in 2010-2011 through system administration and support of the implementation.
o Complete this activity by October 2011 bringing the Admissions office and Records & Registration live using the OnBase system.
o The TSS Network Team will upgrade the server and storage capacity of the system as well as provide the deployment and installation of hardware and software related to this system.
o Coordinate the implementation of defined workflows to improve processing. o Coordinate training of Enrollment Services staff in the use of the system. o ITS will continue in the role of system administration of the OnBase implementation
while the centralized area defined as the Document Imaging Center will continue in the responsibility of scanning and indexing. An ISS staff member is now certified in Sys Admin of OnBase.
o Implement the document retention module of OnBase to ensure compliance of Records Retention as defined by the General Counsel of the College for Enrollment Services.
A defined priority of this fiscal year, document imaging will be implemented for the offices of Human Resources and Payroll. These offices currently store duplicate copies of some employee information as well as individual office-related employee documents.
o Electronically stored information will become shared within an electronic repository through the implementation of specific security rules to ensure privacy of employee information.
o Coordinate the effort of the backlog paper scanning through a 3rd-party vendor to reduce the paper storage.
o Implement the necessary workstations and hardware in these offices to provide scanning capability of ongoing document imaging thus reducing paper storage.
o Coordinate the training of Human Resources and Payroll staff members in the use of the system.
o Go Live of this project will be June 2012.
Goal I.d. Planned Outcome
Implementation of document imaging for the offices of Admissions, Record & Registration, Human
Resources and Payroll as defined within the objectives of this goal.
Goal I.e. Explore the CLOUD To support the efforts to contain costs and reduce the carbon footprint of technology, ITS will further
explore the use of Cloud computing.
The centralized hosting of business application dates back to the 1960s. Starting at that decade, IBM and
other mainframe providers conducted a service bureau business, often referred to as time-sharing or
utility computing. Such services included offering computing power and database storage to banks and
other large organizations from their worldwide data centers.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 12
The expansion of the Internet during the 1990s brought about a new class of centralized computing,
called Application Service Providers (ASP). Application service providers provided businesses with the
service of hosting and managing specialized business applications, with the goal of reducing cost by
central administration and through the solution provider's specialization in a particular business
application.
In an extension to this concept, cloud computing fundamentally allows for a functional separation
between the resources used and the user's computer, usually residing outside the local network, for
example, in a remote outsourced datacenter. The principle behind the cloud is that any computer
connected to the Internet is connected to the same pool of computing power, applications, and files.
Software as a Service or SaaS is the "on-demand software," is a software delivery model in which
software and its associated data are hosted centrally [typically in the (Internet) cloud] and are typically
accessed by users using a thin client, normally using a web browser over the Internet.
The SaaS concept is currently being employed by Sungard to bring distinct upgrade paths to a previously
integrated system. These independent upgrades are a change in the philosophy and bring new
challenges to providing administrative and student services to the College. In addition, SaaS models are
proliferating throughout software provides as a means to lower costs of the user community while
centralizing services. The College currently employs the use of SaaS in the Human Resources
department through our agreement with PeopleAdmin which provides job applicant collection and
storage. The Cloud is also currently being utilized by the College to deliver student email via Google.
Issues related to this effort include:
Privacy and security of data
Delivery of services; maintaining the 5-Nines of system availability and reliability
Compliance and regulatory requirements
Cost of initiating Cloud and SaaS
Project Timeline: June 2011 – September 2011 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal I.e. Objectives
Deliver an analysis of Cloud and SaaS models to the Board of Trustees by the end of the first quarter of FY12.
o This analysis will include A review of what on-demand services can be provided. A review of the regulatory and compliance issues related to the concept of
resource pooling. A review of Cloud SaaS models available to the College.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 13
Comparison of Private, Public and Community Cloud concepts. A review of Quality of Service issues related to Cloud and SaaS provisioning. Initial costs associated with provisioning Cloud and SaaS as compared to current
costs.
Goal I.e. Planned Outcome
Provide a white paper analysis of the possibilities of moving the College to provisioning Cloud and SaaS to provide technology services.
Goal II. Improve the Delivery of Technology Services for the
Teaching/Learning and Support Service Environments
The College will enhance quality, innovation, and effectiveness in the delivery of academic, administrative, and student support services. – 2008-2012 Strategic Plan In efforts to continue the goals of the College Strategic Plan, ITS is part of the process to build a new strategic plan for 2013 and beyond. These discussions include improved delivery of services to a more technology savvy student body, demands for smart learning spaces and integration of services through social media and web-based services. As we move into the 2011-2012 year, the challenges of tomorrow are present today. The Campus Expansion project requires more technology availability to staff, faculty and students. The need for integration of services via the web is becoming increasing necessary to keep pace with the higher education environment. Distance Education has expanded by providing more courses and will become a course supplement of in-class courses, hybrid courses existing within both environments are becoming more common and the use of technology to tutor and enhance instruction is demanded by the Educational Support Services department. Use of hosted testing continues to be at the forefront. The current common math final is provided through a hosted service as is the College assessment testing process. Support for these initiatives and the need to further the expansion of technology is a paramount goal for 2011-2012 and beyond.
Goal II.a. Support the Campus Expansion Project The Campus Expansion Project has seen the fruition of the new Northeast Regional Center and now looks to the completion of the New Pavilion building, renovation of main campus spaces, and the expansion of the West Philadelphia Regional Center. These efforts are guided by the Planning & Finance division and require coordination with many other college constituents including ITS. As in the 2010-2011 year, ITS will continue to support the Campus Expansion Project by providing technology support in planning and implementation. Project timelines:
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 14
Pavilion Building – Opening July 2011 West Philadelphia Regional Center expansion – Go Live October 2011 West Building renovation – Go Live as defined by Construction Management Bonnell and Mint Building renovations – Go Live as defined by Construction Management One Card implementation – Staged: Phase One with opening of the Pavilion building Smart Classroom technology expansion – Ongoing Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal II.a. Objectives
Continue participation in the Main Campus Transition meeting to provide technology-related input into the expansion process.
Provide the necessary oversight to technology implementation as needed by the Director, Facilities Construction Management.
Provide technology assistance in swing-space moves. Provide technology assistance in setup and configuration of new space. Provide technology-related support to the One-Stop Enrollment Services configuration and
setup. Continue the implementation of related technology efforts of the Campus One Card and Digital
Signage projects. o Provide back-end system administration for the Campus One Card CBord and Digital
Signage implementations. Train ITS staff members as system administrators for support of the One Card
system. Implement the necessary hardware and software in support of the One Card
and NICE security systems as detailed in the One Card integration plan. This is to include improved ID processing, One Card vending, POS for Canteen services, GoPrint Pay Printing Management (Goal I.a.), One Card door access controls, and the NICE security system.
Provide support for staff and students in troubleshooting issues with the One Card implementation via the 4ITSupport Call Center.
Build and modify the appropriate Banner data feeds to supplement the One Card system.
Assist in the implementation of declining balance for the One Card system. o Provide input into the use of smart classroom technology.
ITS in conjunction with MMS and Academic Technology will continue to participate in efforts to improve and build more smart classrooms.
Implement more Smart Podiums in classrooms on all campus locations. Explore smart technology use in the Library and Learning Commons areas. Explore the use of a Telepresence system in the Learning Lab to enhance
tutoring; UMI Cisco. Continue to work toward a complete standardization of classroom technology
that will enhance the teaching/learning process.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 15
o Explore social media options for the College in relationship to the Enrollment Management Plan needs.
Explore the continued use of social media in recruiting and admissions. o Explore the ADA compliance issues within the internal web.
Explore the changes in ADA regulation and compliance issues. Determine a strategy for improving ADA compliance of internal web sites.
Goal I.a. Planned Outcome
Provide support and technology implementation and integration for the Campus Expansion project, the implementation of the College One Card system, and the Smart Classroom initiatives.
Goal II.b. Implement Microsoft Active Directory as an Identity Management
Solution The current network file, print and authentication services are provided by Novell. This network os is now at an end with the purchase by Attachmate in 2011. The end-of-life of the College email system, GrouWise, is looming. The Suse Linux OS on Novell servers will have continued support but the need for a true LDAP and identity vault is needed to provide staff, faculty and students with the secure and consistent access to College services. Implementation of Active Directory (AD) will bring the needed IDM services required to move the College email to Google. This outsourcing of email will lead to cost savings as well as increased functionality for users. Planned following the migration of the student email system to Google, security and identity management within our current Novell e-directory environment proved to be unable to provide a seamless and secure solution. In addition, IDM will bring true single sign-on capabilities to all systems provided at the College; Banner, Hyperion, Document Imaging, etc. This IDM concept uses a Kerbrose protocol environment to maintain security for all users of the system. Paramount in maintaining regulatory compliance, this solution will provide IT audit compliance for the College. Project Timeline: July 2011 – June 2012 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal II.b. Objectives
Define a team for implementation o W. Bromley & S.K. Calkins Project Leads o Team members: E. Crosbee, F. Talabis, J. Polich, A. Gatto o No outside consulting will be utilized
Assess the Goals for the migration from Novell to Windows migration
Create a vision
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 16
Create the Solution Concept
Define the Scope of the Project
Determine a timeline for the project with milestone deliverables
Assess Project Risks
Provide needed training for ITS staff
Development communications for College staff concerning project
Major Tasks and Deliverables: o Key design goals o Summary of existing environment o Scope Summary o Background information that places the solution in a business context o The solution design and architecture, from the conceptual, logical, and physical points of
view o Features and services that define the functionality of the solution o Component specifications that define the products that will be used to deliver required
features and services o Dependencies on other projects or resources outside the project team’s control o Master project plan and schedule, which describes when each piece of the work will be
done and shows how the work will be coordinated, taking dependencies into account. o An updated risk assessment with management plans for top risks. o See the TechNet document – Planning Your Novell to windows Migration Project for
details.
Goal II.b. Planned Outcome
Implement Microsoft Active Directory to provide an IDM solution for the College which will enable the
move to internal and external user services; Google, Hyperion, Banner, OnBase, CBord, Cloud
opportunities yet to be defined etc.
This implementation will lead to a migration of email services to the Cloud for faculty and staff as well as
secure Google email and apps for students.
Goal II.c. Implement Resource25/Schedule 25 A college product for many years, Collegenet’s R25/S25/X25 space management/analysis and scheduling software packages will be implemented by December 31, 2011. This implementation will provide better utilization of academic spaces as well as event planning. Project Timeline: June 2011 – Dec 2011 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal II.c. Objectives
Engage Collegenet services to perform a training/discovery session for the College.
Setup a team meeting to discuss goals of project – June 2011
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 17
o Team members: Facilities – Harry Moore, Nadya Day, Laura Harmon, Ed Nolan Marketing – Erica Harrison
Academic Affairs – Elayne Geissler, John Jones and Pete Llewellyn
Note correction to AA list 6/4/2011 per Dr. Gay ITS – S.K. Calkins, Beth Giampietro, Jerome Phillips Executive Committee – Jody Bauer, Lynette Brown, Judy Gay, Tom Hawk
IT Affinity group member offered assistance: Contact CCAC - http://www.ccac.edu/default.aspx?id=138057
Develop a timeline with milestones for December 2011 Go Live o Go Live will be a phased approach
Phase One: Dec 2011 will provide for room management during Spring 2012 Phase Two: March 2012 will provide for S25 build of the Summer & Fall 2012
academic schedules – involvement of academic schedulers imperative here
Purchase updated server hardware needed to support the expansion of the product
Purchase software licenses to support the expanded use of the product by multiple areas
Review and update current room attributes, characteristics and partitions related to academic scheduling and Facilities/ITS/Academic room needs
Review room request approval process
Review/define the uses of R25/S25
Provide training for users that will interact with R25/S25/X25
Provide updates on the status of the project to the President and Cabinet
Goal II.c. Planned Outcome
Implement R25/S25 for use as a room scheduling application for events, for academic room scheduling, and building an adequate room/equipment maintenance schedule for Facilities and ITS. Include all campus locations in the build including public, faculty and administrative office and support area space.
Goal II.d. Raiser’s Edge Implementation As an interim solution for Institutional Advance fundraising activities, a re-implementation of Raiser’s Edge will be accomplished. This solution will provide IA’s fundraising and alumni activities a real-time database solution with the objectives of:
Relationship Cultivation
Contact Management
Diversifying Fundraising Methods
Communication about Organizational Effectiveness
Operational Management
Automating Processes
Data Security
Project timeline: June 2011 – April 2012 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 18
Goal II.d. Objectives
Meet with institutional Advancement Executive Management to define the goals of the project, timeline, and team for the project including IA and Finance staff.
Contact Blackbaud for assistance in the re-build process.
Purchase new server hardware needed to support the project.
Determine licensing strategy best for the College.
Develop a timeline with milestones.
Report progress to the President and Cabinet on progress.
Determine training needs for staff.
Goal II.d. Planned Outcome
Implement an interim solution for Institutional Advancement fundraising activities using Raiser’s Edge from Blackbaud.
Goal II.e. Implementation of the Disaster Recover/Business Continuity
Planning Project This project, started 3 years ago continues as an ongoing project for the College and the ERMT
committee. ITS support for this project as to date included the setup and testing of a redundancy of the
AP/Payroll system to ensure payment of employees and vendors in the event of a disaster at the main
campus site. The backup location for this effort has been designated as the Northwest Regional Center
where equipment and access have been setup for this purpose. The ITS department continues to test
connectivity and viability of the setup.
New efforts during the 2010-2011 fiscal year included the construction of a disaster recovery room at
the Northeast Regional Center. The network server and storage equipment have been setup and are
awaiting resolution of the HVAC/UPS services to the room. Efforts will continue this year to setup and
test the redundancy of critical services of the College via technology.
Project Timeline: July 2011 – June 2012 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal II.e. Objectives
Continue to convene the DR/BCP team within ITS to perform discovery and planning for the NERC DR site.
ITS tasks to include: I. Hardware
List of all installed hardware in NERC room
List of all hardware targeted for NERC room but not yet in room. Include: Any existing hardware at Main campus and any other sites Purchased hardware not yet received
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 19
Hardware to be purchased (and anticipated dates by which purchase can be expected to be made)
For all hardware, determine who has the system/device password(s) and by what other means are those passwords accessible
II. Software
List of all software licensed for the room and its purpose/function
List of all software yet to be purchased for room and its intended function
List of data backup frequency and backup type (Full / Differential / Incremental) for each software/application
III. Support Service/Contracts
Define a list of support services for all hardware and software List to contain/detail, at least, the following:
Support provider
Contract number
Contract duration
Renewal period
Coverage hours/days
Any limits on usages/tickets to be submitted
Min/max guaranteed response time
Main CCP contact person designated (if applicable/relevant)
Support contact information: o Telephone number(s) o Web site(s) o Fax number(s) o E-mail address(es) o Any username or password required for access/call
Identify any plans that are in place to obtain support when support service is unavailable List to contain alternate plans for hardware and software
IV. Additional Services/Contracts
List of details for all additional services acquired/secured to support the room Internet Service Provider Network/LAN connectivity Off-site storage/Backup
Company, frequency of retrieval, duration of time storage available
If tape is used, note schedule will be replaced tape so it does not deteriorate
Network or systems monitoring
Devices/systems being monitored
Contact notification list
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 20
V. Business Processes
List of business processes that will be supported by the devices/applications in the NERC room List any production processes separately from any processes that would be
available in a disaster recovery mode
Timeline by which each business process / DR component is intended to be live in the NERC room
As business processes change, define a process where change will be earmarked/reviewed for inclusion in new room
What has been the agreed or promised recovery time for each business process? VI. Technical Configuration/Implementation Details
Detail/describe infrastructure supporting the room
For all devices/servers/systems in NERC room (or those in existence and targeted for NERC room): IP address Server name Mac address List of all software installed on each unit of hardware
Include any BIOS, firmware, operating system, application versions and other relevant details
Any relevant application names/identification
Identify which hardware/software devices/components support each business process
Identify associated storage device, if applicable
Plan for testing/validating configuration/failover Provide details of any tests that already occurred Provide schedule of tests currently planned
List plan to address or account for impact to existing processes (changes to upgrades, new installs, etc.)
Staff member/role responsible for monitoring certain hardware/software
For production processes operating from the room, data backup and recovery plans for those processes
VII. Other Items
Security Access to Room Detail who will be authorized to enter room Detail the process for access to room Details of any security log reviews for access to room
Determine who will review or monitor the security log(s)
Passwords Determine how passwords are stored or made available
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 21
Detail where can staff find the password(s) when primary responsible staff member [with password] is not available
Power backup Document and test the life of backup power Determine if any additional battery backup will be needed Develop a testing schedule for the UPS to know when replacement will be
necessary
Note any room protection measures (to protect room and/or devices/servers in room from natural or other disaster) Floods Winds Fire Overheating
Communications devices/accessories available within room Walkie-talkie Document available telephone number to room
Determine the need to have a backup or POTTS line in the room Cell carrier issues
Determine the viability of using cell/mobile devices in the room Post an Emergency contact list in the room
Other necessary items for the room Batteries Emergency contact list (hard copy) CCP Phone list Safe
Document the safe combination PCs / laptops for use
Document availability
Document printer and fax Additional laptop battery chargers Additional phone chargers Paper and writing utensils Water
List any other decision made regarding the room not otherwise categorized by the preceding list.
List any known issues/challenges/risks with room VIII. Emergency Events and Recovery Plans
Identify triggering event that will prompt failover to room for each process supported by the equipment housed at the site Document which services will fail-over automatically or must be triggered
manually
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 22
Note: Triggering of an event should be escalated from the ERMT or the Vice President ITS & CIO
Automatic fail-over should be documented and reviewed at the Executive Management Team level
Compare/contrast purpose of room with any current disaster prevention measures in place elsewhere for the processes moving into the room (Main, NWRC, other) This will allow a clear understanding of what recovery process will handle which
situation/scenario
Once a process has failed to room, detail the recovery plan to restore operations to original location (if any)
Goal II.e. Planned Outcome
To document, setup and test the redundancy of critical services of the College via technology located at the NERC.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 23
Goal III Support Teaching/Learning and Education/Student Support
Services through multiple priority projects As defined as priorities by Cabinet, the ITS department will support multiple project and
implementations in support of teaching & learning and support services of the College.
Goal III.a. Develop a system for requesting priority projects requiring
technology As the number and scope of projects involving technology increase, the ITS department will enlist the support of the President’s Cabinet in determining priorities for each fiscal year. In order to provide the user community with the support and analysis needs of exploring technology, ITS will develop a web-base form for submitting project requests. These submitted requests will be reviewed and vetted internally within ITS followed by a recommendation to the requesting body with optional solutions for their review. The user areas will then review the proposed solution options and bring a single option forward to the area of responsibility Vice President. The resulting project will then be placed as an agenda item for Cabinet review and prioritization among other IT projects. Project Timeline: Go Live August 2011 Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
Goal III.a. Objectives
ITS will develop a web-based form which will allow users to enter information pertaining to projects requiring technology.
ITS will develop a standardized process for reviewing submitted projects that have technology needs or support.
o The process should provide viable alternative where they exist. o The process should provide feedback to the originating group. o The process will be documented.
ITS will publish a listing of projects each quarter with a status for the college community.
Goal III.a. Planned Outcome
ITS will develop and publish a standardized procedure for submitting project requests involving technology.
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 24
Goal III.b. Provide the Technology Support Requested of ITS The multiple projects and timelines listed below have been approved by the President’s Cabinet where noted and will be accomplished as noted within the context of available staff resources. Most the projected listed below are in progress. Project Timeline: June 2011 – June 2012 (milestones are defined within each project) Activity Leaders: J. Bauer, W. Bromley, S.K. Calkins
One Summer – In Progress
College reporting modification
Support of implementation issues
Faculty seniority changes
Student Billing Rewrite & Banner Self-Service modification
Phase Two– Spring 2012 o Student Bill, SSB enhancements & (drop) payment match by payment group o OnBase solution allowing students to view multiple bills via MyCCP
Under review
Build Cost $8,000-$10,000
OnBase licensing – Cost unknown
Student bill PDF storage and retention – Cost unknown
Hyperion (Brio) reporting via a Master Data Warehouse – Sept 2011 - Sept 2012
Upgrade to Essbase
Perform Discovery Phase
Revisions to all reports and dashboards following upgrade o Phased approach – area by area
IR report revisions
Data dictionary build
Banner 9 Project Horizon implementation - PENDING
Dependence on Sungard Module release schedule o Discovery phase o Explore/Test multiple development platforms o Train ITS staff in development tools o Assess hardware needs
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 25
Lumins 5 – MyCCP upgrade - PENDING
Rebuild current MyCCP view to enhance student/staff/faculty productivity
Explore ADA compliance
Hardware/software upgrade
Requires and Identity Management Solution
Academic Advising - PENDING
Build of a new application for faculty/student advising sessions o Scheduling o Reporting o Payroll
Development tasks o Kiosk check-in solution for students with way finding o Scheduling system for faculty advising hours (workload)
Payroll interface required o Web interface for faculty entering information concerning student advising
session o Web interface for faculty concerning student to be advised o Academic history, Catalog year, Major status and history, program placement
level, CAPP information
Web Redesign Project – In Progress
Participate in the redesign phase
FY13 begin Re-build process of web as designed o Selection/Implementation of new hardware/software in support of the redesign o Selection/Implementation of a Search Engine o Selection/Implementation of a Content Management Solution
CAPP – Banner Curriculum, Advising and Program Placement - Pending
Perform discovery of progress in Academic Affairs & Student Affairs following meeting of Nov 2010
o Definition of vision & goals
Banner upgrade of CAPP patch – Implementation/Testing
Verify CAPP and Catalog builds
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 26
Hybrid course implementation – In Progress
High priority for Academic Affairs
Requires modifications of Course Finders, New & Developmental Course Search interfaces, Student Schedule, Enrollment Confirmation, My Enrollment Profile
Requires modifications of Master Schedule report, Institutional Research reporting, Finance reports
QLess queuing system for Enrollment Services - Pending
Request from Enrollment Services for new one-stop areas
A SaaS solution – no in-house hardware/software required
ProED solution to assist in student verifications of Financial Aid – Pending
3rd-party solution that will require outside agency access to Banner and OnBase o Security issues require exploration o SAS 70 compliance review o Cyber insurance review o Licensing cost for vendor access to OnBase o Development of a job to populate the popsel for verification within OnBase
workflow o Log for tracking of changes in Banner o Log for tracking of vendor VPN access o Log retention for support possible incidents o Define Quality Assurance for review of external vendor access to Banner and
OnBase systems
Development of a New Graduation Application – In Progress
In progress – (15+ components to address) Demo completed on 4/20. Several small defects discovered and being corrected. Awaiting specification of additional functionality requested.
Non-baseline pre-requisite check process - Pending Completion June 2011 to be used Spring
2012 during EOT Drop
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 27
Self Service P&P 5 – Instructor Drop for Poor Attendance – In Progress - Testing
SWATODO – Development of an Enrollment Service ToDo list for students inside MyCCP – Not
Started
Non-matriculating student process – In Progress – Pending completion – Testing in progress
Federal Regulatory changes in SAP – Pending November 2011 Due Date
AVOW system implementation – Pending
Review of a change to outsourced transcript processing
Registration integration for Barnes & Nobel – Not Started
Dining Services-Canteen-website build with catering form – Awaiting Spec
Endowment Module – Finance & IA – Awaiting end-user input
Central Supply online web form – Awaiting Spec
Redesign of Duplicating web request form – Not Started
ACH – Awaiting end user testing & sign-off
Banner AR Release 8.3 – In Progress o Will require an Intellicheck upgrade
Information Technology Services Program Plan FY12 (2011-2012)
ITS Program Plan FY12 May 2011 28
Automated Faculty Load process – Pilot scheduled for Summer 2011
Redesign of Professional Development website – Not Started
Web Time Entry – Pending a Pilot Summer 2011
HR/Payroll: Review of all reports built in Word – Not Started
Faculty Step Form – Pending
Tenure/Non-Tenure Reporting – Pending
E-Brochure tied to Recruitment module – Pending
MMS Reservation/Inventory system – Not Started
Math Common Final Exam expansion beyond MATH 118 – In Progress
Telecom RFP/Implementation
RFP completed
Implementation of ISP provider August 2011
PRI-Local & Long distance service replacement – Pending RFP award
KINBER installation – Pending PennREN scheduling
Anti-virus review/replacement – Pending
Misc IDF HVAC issues – In progress
Ongoing Lease Replacement cycles – In Progress
Sun Server Lease Refresh – In Progress – Sept 2011 and Dec 2011
Redesign of Governance website – Not Started
Teleconferencing for ESS (umi Cisco); Advising.