TECHNOLOGY SYMBOL LIST
SYMBOL: DESCRIPTION: NOTE:EQUIPMENT
LIST ABBREV.:
W
C#
C#1.INFORMATION OUTLET (CEILING)SC-IO-C
1.INFORMATION OUTLET (WALL)SC-IO-W
1.INFORMATION OUTLET WALL PHONE (WALL)SC-IO-W
C#-WAP1.WIRELESS ACCESS POINT DEVICE (CEILING)SC-WAP-C
C#1., 2.ELECTRICAL FLOOR BOX WITH TECHNOLOGYN/A
WP1 .AUDIO/VISUAL FACEPLATE (WALL) - TYPE 1AV-WP1-W
RTE
EDH
DC 3.DOOR CONTACTAC-DC
3.ELECTRIFIED DOOR HARDWAREAC-EDH
3.REQUEST TO EXITAC-RTE
CSS
CR2
CR1 3.CREDENTIAL READER - TYPE 1AC-CR1-W
3.CREDENTIAL READER - TYPE 2AC-CR2-W
3.CONTROLLED SECURITY SCHEME SCHEDULEIDENTIFIER
AC-CSS
CAM
CAM CLOSED CIRCUIT TELEVISION (CCTV) WALL CAMERA
.CLOSED CIRCUIT TELEVISION (CCTV) CEILING CAMERA
.N/A
N/A
AA1
AMS .AREA OF RESCUE - ASSISTANCE MASTER STATIONAR-AMS-W
.AREA OF RESCUE - ASSISTANCE CALL STATION -TYPE 1
AR-AA1-W
1
2
2-Port Faceplate
IDENTIFICATION
IDENTIFICATION
IDENTIFICATION
IDENTIFICATION
1 2
43
4-Port Faceplate
PAIR 3
PAIR 1PAIR 2 PAIR 4
WO WGO BL WBL G WBRBR
1 32 4 5 6 7 8
ANSI/TIA/EIA T568BPIN/PAIR ASSIGNMENT
TECHNOLOGY ABBREVIATION KEY
ENTRANCE FACILITYEF-#
MAIN CROSS-CONNECTMC-#
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
ABBR: DESCRIPTION:
UNLESS NOTED OTHERWISEUNO
TECHNOLOGY GENERAL NOTES:
1. ###-### INDICATES GENERAL TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT LIST ABBREVIATION"
2. REFER TO GENERAL TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.
TECHNOLOGY MOUNTING SUBSCRIPT KEY:A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASHH MOUNT ORIENTED HORIZONTALLYL MOUNT IN CASEWORKM MOUNT IN MODULAR FURNITURES MOUNT IN SURFACE RACEWAY
A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADA STANDARDS FOR ACCESSIBLE DESIGN. REFER TO THE ADA GUIDELINES FOR ALL CONFIGURATION DETAILS ON THIS PAGE FOR ADDITIONAL INFORMATION.
2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC. UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON BUILDING STRUCTURE.
3. BOXES LOCATED ON OPPOSITE SIDES OF NON-RATED WALLS SHALL BE OFFSET A MINIMUM OF 6" HORIZONTALLY. BOXES ON OPPOSITE SIDES OF FIRE RATED WALLS SHALL BE OFFSET A MINIMUM OF 24" HORIZONTALLY. "THRU-THE-WALL" BOXES SHALL NOT BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL OF THE FRA, LLC.
4. VERIFY ALL FURNITURE, MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH ARCHITECTURAL PLANS, ELEVATIONS, AND REVIEWED SHOP DRAWINGS. PRIOR TO MAKING THE ACTUAL TELECOMMUNICATIONS INSTALLATION, ADJUST OUTLETS OR CONNECTION LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.
5. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER SUBCONTRACTOR SHALL BE APPROVED IN ADVANCE BY THE OTHER SUBCONTRACTOR.
6. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED SUBCONTRACTOR AT THE EXPENSE OF THIS SUBCONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.
7. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF THROUGH-PENETRATION FIRESTOPS. REFER TO 07 84 13 FOR ADDITIONAL INFORMATION AND REQUIREMENTS SPECIFIC TO FIRESTOPPING.
8. REMOVE AND REINSTALL ALL CEILING TILES AS REQUIRED FOR THE EXECUTION OF TELECOMMUNICATIONS WORK THAT IS OUTSIDE THE CONTRACT LIMITS OF CONSTRUCTION. REPLACE CEILING TILES WITH IDENTICAL MATERIAL WHERE DAMAGED BY THIS SUBCONTRACTOR.
9. ALL LADDER RACK AND CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO SPECIFICATION SECTIONS 27 05 36 AND 27 11 00 FOR APPROVED MANUFACTURERS AND INSTALLATION REQUIREMENTS.
10. FLUSH MOUNT ALL TELECOMMUNICATION OUTLETS AT +18" FROM FLOOR (CENTERLINE DIMENSION), EXCEPT WHERE OTHERWISE NOTED. OUTLETS MAY BE SURFACE MOUNTED WHEN CONDUIT IS SPECIFIED EXPOSED.
TECHNOLOGY INSTALLATION NOTES:
GENERAL NOTES:
1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT. REFER TO THE GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION AND ITEMS.
2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL INFORMATION.
3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL INFORMATION.
4. REFER TO RISERS ON SHEET(S): T-16 AND T-17.
TECHNOLOGY SYMBOL NOTES:
1. "C#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO INFORMATION OUTLET SCHEDULE ON T-1 FOR ADDITIONAL INFORMATION.
2. INFORMATION OUTLET INSTALLED IN E.C. PROVIDED FLOOR BOX. "C#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION. REFER TO INFORMATION OUTLET SCHEDULE ON T-1 FOR ADDITIONAL INFORMATION. REFER TO THE ELECTRICAL FLOOR PLANS AND ELECTRICAL EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.
3. REFER TO CONTROLLED SECURITY SCHEME (CSS) TYPE SCHEDULE ON T-17 FOR ADDITIONAL INFORMATION.
CABLE TRAY, CHANNEL TRAY, BASKET TRAY
LADDER RACK
WIDTH X HEIGHT
WIDTH X HEIGHT
DIAMETERø C CONDUIT
CONDUIT DOWN
CONDUIT UP OR UP/DOWN
CONDUIT SLEEVE
CONTINUATION
TEMPERATURE CONTROLS SUBCONTRACTORT.C.C.
SECURITY SUBCONTRACTORS.C.
FIRE PROTECTION SUBCONTRACTORF.P.C.
PLUMBING SUBCONTRACTORP.C.
MECHANICAL SUBCONTRACTORM.C.
ELECTRICAL SUBCONTRACTORE.C.
SUBCONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY SUBCONTRACTORT.C.
AUDIO VISUAL SUBCONTRACTORA.V.C.
48
" M
AX
.20" MAX.
44
" M
AX
.
20"-25" MAX.
48
" M
AX
.
15
" M
IN. 48
" M
AX
.
46
" M
AX
.
10" MAX. 10"-24" MAX.
ADA GUIDELINES - FRONT ACCESS
ADA STANDARDS FOR ACCESSIBLE DESIGN
INSTALL ABOVE COUNTER DEVICE AT 44" ABOVE FINISHED FLOOR.
INSTALL ABOVE COUNTER DEVICE AT 40" ABOVE FINISHED FLOOR.
INSTALL DEVICE AT 18" ABOVE FINISHED FLOOR.
ADA GUIDELINES - SIDE ACCESS
INSTALL DEVICE AT 44" ABOVE FINISHED FLOOR.
INSTALL DEVICE AT 42" ABOVE FINISHED FLOOR.
REFER TO SPECIFICATIONS FOR IDENTIFICATION REQUIREMENTS (TYP.)
NUMBER INDICATES FACEPLATE POSITION (TYP.)
TECHNOLOGY SHEET INDEXT-1 TECHNOLOGY COVERSHEET
T-2 OVERALL TECHNOLOGY PLANS - TUNNEL AND LEVEL 01
T-3 TECHNOLOGY PLAN - TUNNEL - N1
T-4 TECHNOLOGY PLAN - TUNNEL - N2
T-5 TECHNOLOGY PLAN - TUNNEL - S1
T-6 TECHNOLOGY PLAN - TUNNEL - S2
T-7 TECHNOLOGY PLAN - TUNNEL - S3
T-8 TECHNOLOGY PLAN - TUNNEL - BTL-E
T-9 TECHNOLOGY PLAN - TUNNEL - BTL-W
T-10 TECHNOLOGY PLAN - LEVEL 01 - N1
T-11 TECHNOLOGY PLAN - LEVEL 01 - N2
T-12 TECHNOLOGY PLAN - LEVEL 01 - S1
T-13 TECHNOLOGY PLAN - LEVEL 01 - S2
T-14 TECHNOLOGY PLAN - LEVEL 01 - S3
T-15 TECHNOLOGY PLAN - LEVEL 01 - BTL-W
T-16 TECHNOLOGY ENLARGED PLANS
T-17 TECHNOLOGY DETAILS
T-18 TECHNOLOGY SECTIONS
T-19 TECHNOLOGY SECTIONS
T-20 TECHNOLOGY SECTIONS
T-21 TECHNOLOGY SECTIONS
T-22 TECHNOLOGY SECTIONS
SUGGESTED MATRIX OF RESPONSIBILITY
ITEM: SHOWN ON:
FURNISHED
BY:
INSTALLED
BY: NOTES:
TECHNOLOGY ROUGH-IN, REFER TOGENERAL TECHNOLOGY EQUIPMENTSCHEDULE AND SPECIFICATIONS FORDEFINITION
T-SERIES E.C. E.C. 3. 4.
INFORMATION OUTLET FACEPLATES,JACKS, AND TERMINATIONS
T-SERIES T.C. T.C.
CONDUIT SLEEVES (WHEN SHOWN ONDRAWINGS)
T-SERIES E.C. E.C.
CONDUIT SLEEVES (NOT SHOWN BUTREQUIRED FOR PROPER INSTALLATIONOF SYSTEM)
N/A T.C. T.C. 2. 4.
TELECOMMUNICATION SYSTEMSROUGH-IN
T-SERIES E.C. E.C. 1.
TELECOMMUNICATION EQUIPMENT,CABLING, AND TERMINATIONS
T-SERIES T.C. T.C.
CABLE TRAY (INCLUDING WIRE BASKETTRAY) REFER TO SPECIFICATIONSECTION 27 05 28 FOR DEFINITION
T-SERIES E.C. E.C.
LADDER RACK T-SERIES T.C. T.C. 5.
GROUNDING LUGS ON TECHNOLOGYEQUIPMENT
T-SERIES T.C. E.C. 6.
BONDING SYSTEM FOR TECHNOLOGYSYSTEM, REFER TO SPECIFICATIONSECTION 27 05 26 FOR DEFINITION
T-SERIES E.C. E.C. 7. 8.
CONNECTION OF TECHNOLOGYBONDING SYSTEM TO THE ELECTRICALGROUND SYSTEM
T-SERIES E.C. E.C.
LINE VOLTAGE POWER (+120V ORGREATER)
E-SERIES E.C. E.C.
LINE VOLTAGE POWER (NOT SHOWNBUT REQUIRED FOR PROPERINSTALLATION OF SYSTEM)
N/A T.C. E.C. 2. 4.
LINE VOLTAGE POWER FOR DOORHARDWARE POWER SUPPLIES
ARCH SPEC E.C. E.C.
LOW VOLTAGE CABLING FORTECHNOLOGY SYSTEMS
T-SERIES T.C. T.C.
CABLE HANGERS AND SUPPORTS OROTHER CABLE ROUTING METHODS(OTHER THAN CONDUIT AND CABLETRAY)
T-SERIES T.C. T.C. 5.
FLOOR BOX (ROUGH-IN) T & E SERIES E.C. E.C.
SUGGESTED MATRIX OF RESPONSIBILITY NOTES
1. LOCATIONS OF TELECOMMUNICATIONS ROUGH-INS SHALL BE INDICATED BY THE INFORMATIONOUTLET SYMBOLS ON THE DRAWINGS. REFER TO THE TECHNOLOGY SYMBOL LIST FORADDITIONAL INFORMATION.
2. BASED ON THE INHERENT DIFFERENCES IN PRODUCTS FROM VARIOUS MANUFACTURERS, ALLREQUIRED EQUIPMENT MAY NOT BE SHOWN ON THE DRAWINGS FOR ALL ACCEPTABLEMANUFACTURERS.
3. INCLUDES BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEMSINSTALLATION. THE E.C. SHALL BASE THE BID ON THE BASIS OF DESIGN SHOWN ON THECONTRACT DOCUMENTS.
4. ALL CHANGES TO THE SLEEVES, BACKBOXES, CONDUITS, AND POWER REQUIRED BECAUSE OFTHE T.C.'S SELECTION OF AN ALTERNATE ACCEPTABLE MANUFACTURER OR FROM SYSTEMCONFIGURATIONS THAT ARE LEFT TO THE CHOICE OF THE SUBCONTRACTOR SHALL BEINCLUDED IN THE T.C.'S BID. THIS BID SHALL INCLUDE INSTALLATION BY A LICENSEDELECTRICIAN.
5. UNLESS TRADE RULES DICTATE OTHERWISE.
6. FURNISHED AS PART OF THE EQUIPMENT WHEN POSSIBLE, OR FURNISHED TO THE E.C. FORINSTALLATION IN THE FIELD.
7. INCLUDES ALL CONDUCTORS, GROUND BARS, AND TERMINATIONS FOR THE COMPLETEBONDING SYSTEM REQUIRED BY THE SPECIFICATIONS.
8. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS OF PANELS AND SWITCHBOARDS SHOWNIN THE TECHNOLOGY BONDING RISER DIAGRAM AND TYPICAL TELECOM ROOM BONDING FLOWDIAGRAM.
TELECOM ROOM REFERENCES
TELECOM ROOM
DETAIL / SHEET
REFERENCE
FLOOR PLAN
REFERENCE ARCH ROOM NUMBER
TR-3 1/T-16 1/T-10 01H01
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
NOT TO SCALE
T-1
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY COVERSHEET
2021-03-12
2021-03-12
2021-03-12
2021-03-12
2021-0
3-1
2
THE EQUIPMENT LIST ABBREVIATIONS AND THE GENERAL TECHNOLOGY EQUIPMENT SCHEDULE ARE FOR THE CONVENIENCE OF THE SUBCONTRACTOR. EACH SUBCONTRACTOR SHALL BERESPONSIBLE FOR VERIFICATION OF QUANTITIES AND SHALL FURNISH ALL MATERIAL REQUIRED, WHETHER SPECIFIED OR NOT, TO PRODUCE A SATISFACTORY WORKING SYSTEM.
CATALOG NUMBERS ARE NOT TO BE CONSIDERED COMPLETE BUT ARE GIVEN ONLY TO AID THE SUBCONTRACTOR IN THE SEARCH FOR MATERIAL. NO MATERIAL SHALL BE ORDERED BYMANUFACTURER AND CATALOG NUMBER ONLY. EACH SUBCONTRACTOR SHALL FIRST READ THE COMPLETE DESCRIPTION OF THE MATERIAL ON THESE DRAWINGS AND SPECIFICATIONS. THEFIRST MANUFACTURER LISTED IS THE BASIS OF DESIGN. "STANDARD COLOR" INDICATES FACTORY FINISH AVAILABLE AT NO ADDITIONAL CHARGE.
GENERAL TECHNOLOGY EQUIPMENT SCHEDULE
EQUIPMENT LIST
ABBREVIATION EQUIPMENT LIST DESCRIPTION
EQUIPMENT LIST MANUFACTURER
AND MODEL
AC-CR1-W ACCESS CONTROL CREDENTIAL READER, WALL MOUNTED. PROXIMITY COMMUNICATIONS, MULTICOLOR LED,INTERNAL OR HOST CONTROL OF THE LED.
REFER TO 01/T-17 FOR CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL. REFER TO 02/T-17 FOR CABLING REQUIREMENTS.
CARDKEY L73-G-2W
NO SUBSTITUTION
AC-CR2-W ACCESS CONTROL CREDENTIAL READER, MULLION MOUNTED.
AC-CSS ACCESS CONTROL SECURITY SYSTEM. SYMBOL INDICATES THAT DOOR HAS SECURITY FUNCTIONALITY, REFER TO SPECIFICATIONSECTION 28 13 00 FOR COMPLETE INFORMATION.
REFER TO CONTROLLED SECURITY SCHEME (CSS) TYPE SCHEDULE ON T-17 FOR ADDITIONAL INFORMATION.
*
AC-DC DOOR POSITION INDICATOR SWITCH, SPDT OR DPDT CONTACTS. 1" DIAMETER OF CONTACTS WITH STANDARD GAP.
REFER TO 01/T-17 FOR CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL. REFER TO 02/T-17 FOR CABLING REQUIREMENTS.
SENTROL 1076
OR PRE-APPROVED EQUAL
AC-EDH ELECTRIC LOCKING HARDWARE, FURNISHED AND INSTALLED BY DOOR HARDWARE PROVIDER, CONTROLLED BY THE SECURITY SYSTEM.REFER TO ARCHITECTURAL DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
REFER TO 01/T-17 FOR CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL. REFER TO 02/T-17 FOR CABLING REQUIREMENTS.
*
AC-PSP-1 ACCESS CONTROL POWER SUPPLY AND DISTRIBUTION PANEL, NEMA 1 LOCKABLE ENCLOSURE. 120V INPUT, WITH LOCAL DISCONNECTIN ENCLOSURE TO SEPARATE 12VDC @ 6A AND 24VDC @ 6A POWER SUPPLIES. LOCKS SHALL BE INDEPENDENTLY FUSED, 12VDCDEVICES AT DOORS SHALL BE INDEPENDENTLY FUSED PER DOOR, FIRE ALARM DISCONNECT.
ALTRONIX AL600ULXB
OR PRE-APPROVED EQUAL
AC-RTE PIR REQUEST TO EXIT MOTION DETECTOR, DOOR MONITOR WITH SOUNDER ALERT, ADJUSTABLE LATCH TIME, SELECTABLE FAILSAFE/SECURE, ADJUSTABLE SOUNDER VOLUME, ACTIVATION LED, 12VDC OPERATION, SEQUENTIAL LOGIC INPUT, TWO FORM CCONTACTS. CEILING MOUNTED OR WALL MOUNTED AT 84" AFF.
REFER TO 01/T-17 FOR CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL. REFER TO 02/T-17 FOR CABLING REQUIREMENTS.
BOSCH DSI-160
OR PRE-APPROVED EQUAL
AC-SCP-1 ACCESS CONTROL PANEL. PANEL WILL CONTROL UP TO 12 DOORS. PROVIDE COMPLETE NETWORK CONTROLLER AND MODULES FOR ACOMPLETE SYSTEM. 30' X 42' PANEL NEMA 1 ENCLOSURE.
REFER TO 2/T-17 ACCESS CONTROL RISER DIAGRAM FOR ADDITIONAL INFORMATION.
JOHNSON CONTROLS SPA1B600-E310
NO SUBSTITUTION
AR-AA1-W EMERGENCY COMMUNICATION SYSTEM CALL STATION, SURFACE MOUNT, FACEPLATE SIZE 7-1/4” H X 4-3/4” W, PUSH FOR HELP BUTTON,WALL RECEIVED INDICATOR LIGHT, MICROPHONE, SPEAKER. INSTALL IN A7.25” H X 4.82” W X 1.86” D SURFACE MOUNT BACK BOX AT +48” AFF WITH A 3/4” EMT CONDUIT STUBBED TO ABOVE NEAREST ACCESSIBLECEILING.
REFER TO 04/T-17 RESCUE ASSISTANCE RISER DIAGRAM FOR ADDITIONAL INFORMATION.
RATH 2100-956SRM
CORNELLOR APPROVED EQUAL
AR-AMS-W EMERGENCY COMMUNICATION SYSTEM MASTER STATION, WALL MOUNT, STEEL ENCLOSURE, ACCOMMODATES UPTO 5 COMMUNICATION SYSTEM DEVICES. INSTALL CABLE AND CONNECTORS IN A 15.62” H X 12” W X 3” D BACK BOX AT +60” AFF WITH A 1”EMT CONDUIT STUBBED TO ABOVE NEAREST ACCESSIBLE CEILING.
REFER TO 04/T-17 RESCUE ASSISTANCE RISER DIAGRAM FOR ADDITIONAL INFORMATION.
RATH 2500-205FM
CORNELLOR APPROVED EQUAL
AR-PS-1 EMERGENCY COMMUNICATION SYSTEM POWER SUPPLY, WALL MOUNT. 11.25" W X 15.75" H X 4.5" D STEEL ENCLOSURE,120 VAC 5 AMP, 24VDC 8 AMP TOTAL OUTPUT VIA EIGHT CLASS 2 PTC-PROTECTED OUTPUTS, INTEGRAL BATTERY BACKUP VIA TWO 12 VDC BATTERIES.
REFER TO 04/T-17 RESCUE ASSISTANCE RISER DIAGRAM FOR ADDITIONAL INFORMATION.
RATH 2500 PWR 24
CORNELLOR APPROVED EQUAL
AV-WP1-F AV INFORMATION OUTLET, FLOOR BOX MOUNT FACEPLATE WITH FEMALE TO FEMALE CONNECTOR.
ROUTE HDMI CABLE DIRECTLY IN E.C. PROVIDED PATHWAY FROM AV INPUT PANEL AT FLOOR BOX TO AV-WP1-W INFORMATION OUTLETIN THE SAME ROOM.
COORDINATE AV INFORMATION OUTLET INSTALLATION WITH FURNITURE PROVIDER. INSTALL HDMI CABLE IN A 1-1/4" EMT CONDUITSTUBBED TO NON-CONTINUOUS CABLE SUPPORT ROUTE ABOVE NEAREST ACCESSIBLE CEILING.
FACEPLATEPANDUIT NK2FIWY
HDMI CONNECTORPANDUIT NKHDMIIW
EXTRON CABLE 26-650-XX
OR PRE-APPROVED EQUAL
AV-WP1-W AV INFORMATION OUTLET, WALL MOUNT FACEPLATE WITH FEMALE TO FEMALE CONNECTOR.
ROUTE HDMI CABLE DIRECTLY IN E.C. PROVIDED PATHWAY FROM AV-WP1-F AV INPUT PANEL AT FLOOR BOX TOAV-WP1-W INFORMATION OUTLET IN THE SAME ROOM.
INSTALL INFORMATION OUTLET IN A 4-11/16" SQUARE 2-1/8" DEEP BACKBOX WITH A SINGLE GANG PLASTER RINGAND A 1-1/4" EMT CONDUIT STUBBED TO NON-CONTINUOUS CABLE SUPPORT ROUTE ABOVE NEAREST ACCESSIBLE CEILING.
FACEPLATEPANDUIT NK2FIWY
HDMI CONNECTORPANDUIT NKHDMIIW
EXTRON CABLE 26-650-XX
OR PRE-APPROVED EQUAL
SC-EXT ETHERNET OVER 2-WIRE EXTENDER WITH POE+, MADE UP OF LOCAL AND REMOTE DEVICE. LOCAL AND REMOTE MUST BE USED AS APAIR, PORTS: ETHERNET: 10/100/1000BASE-T RJ-45 OR 100/1000BASE-X SFP COMBO, 2-WIRE TERMINAL BOLCK, FULL POE+ PORT AT335-1500FT OVER A SINGLE PAIR, STATUS LED, DIMENSION: 3.25"WX5.38"DX1.25"H, POWER: 48VDC, 45W.
TRANSITION NETWORKS LOCAL: EO2PSE4052-111
REMOTE: EO2PD4052-111
NO SUBSTITUTION
SC-IO-C INFORMATION OUTLET, CEILING MOUNT, 4-PORT COVERPLATE AS INDICATED ON DRAWINGS, SEE INFORMATION OUTLET SCHEDULE ONT-1 FOR PIN CONFIGURATION.
"#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION AS INDICATED ON THE PLANS. REFER TO INFORMATION OUTLETSCHEDULE ON T-1 FOR ADDITIONAL INFORMATION.
INSTALL INFORMATION OUTLET IN A 4" SQUARE BACKBOX WITH A SINGLE GANG PLASTER RING. INSTALL A 1" EMT CONDUIT TO ABOVEACCESSIBLE CORRIDOR CEILING. PROVIDE REMOVABLE BLANK INSERTS FOR UNUSED PORTS (PANDUIT NKBM SERIES OR APPROVEDEQUAL).
COVERPLATE:PANDUIT NK4FIWY
JACK:PANDUIT(CAT6A) NK6X88M SERIES
FCONNECTOR: CMFWH-C
OR PRE-APPROVED EQUAL
SC-IO-W INFORMATION OUTLET, WALL MOUNT, 2 OR 4-PORT COVERPLATE AS INDICATED ON DRAWINGS, SEE INFORMATION OUTLET SCHEDULEON T-1 FOR PIN CONFIGURATION.
"#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION AS INDICATED ON THE PLANS. REFER TO INFORMATION OUTLETSCHEDULE ON T-1 FOR ADDITIONAL INFORMATION.
INSTALL INFORMATION OUTLET IN A 4" SQUARE BACKBOX WITH A SINGLE GANG PLASTER RING. INSTALL A 1" EMT CONDUIT TO ABOVEACCESSIBLE CORRIDOR CEILING. PROVIDE REMOVABLE BLANK INSERTS FOR UNUSED PORTS (PANDUIT NKBM SERIES OR APPROVEDEQUAL).
COVERPLATE:PANDUIT NK2FIWY NK4FIWY
JACK:PANDUIT(CAT6A) NK6X88M SERIES
FCONNECTOR: CMFWH-C
OR PRE-APPROVED EQUAL
SC-LR-1 ALUMINUM LADDER TYPE CABLE TRAY. 4" NOMINAL OUTSIDE DEPTH. 3" NEMA LOADING DEPTH. 12" RUNG SPACING, 24" OR 36” WIDTH, 12'LENGTH. ALUMINUM ALLOY 6063-T6 COPPER FREE MARINE GRADE CONSTRUCTED AND LOAD TESTED PER NEMA 20A.
PROVIDE COMPLETE WITH ALUMINUM MID-SPAN SPLICE PLATES, ALUMINUM WEDGE LOCK SPLICE PLATES, ALUMIMUM VERTICALADJUSTABLE SPLICE PLATES, ALUMINUM HOLD DOWN CLAMP/GUIDES AS REQUIRED. PROVIDE BONDING JUMPERS AT EACH SPLICE.
PROVIDE COMPLETE WITH CABLE TRAY SUPPORT BRACKETS AS REQUIRED.
ALUMINUM 4" SIDERAIL, 24" WIDTH, 90 DEGREE HORIZONTAL BEND, 12” OR 24" RADIUS.
ALUMINUM 4" SIDERAIL, 24" WIDTH, 45 DEGREE HORIZONTAL BEND, 24" RADIUS
ALUMINUM 4" SIDERAIL, 24" WIDTH, HORIZONTAL TEE, 12" RADIUS.
ALUMINUM 4" SIDERAIL 36" WIDTH TO 24" REDUCER.
GROUND WIRE CLAMP.
HANGER ROD CLAMP.
CONDUIT TO CABLE TRAY ADAPTER - USE FOR 500KCM GROUND WIRE.
CABLE TRAYCOOPER B-LINE 24-A-12-24-144 24-A-12-36-144
WALL SUPPORT BRACKETS B-494-24
CANTILEVER BRACKETSB297-24
BONDING JUMPERS 99-N1
HORIZONTAL BENDS 4A-24-90HB24 4A-24-90HB12 4A-24-45HB24
HORIZONTAL TEE 4A-24-HT12 4A-36-HT12 4A-36-24-HT12
HORIZONTAL EXPANSION TEE 4A-24-42-HT
REDUCER 4A-36-SR24
GROUND CLAMP 9ZN-2351
HANGER CLAMP 9ZN-5324
CONDUIT ADAPTER 9ZN-1155-1”
OR PRE-APPROVED EQUAL
SC-LR-2 CABLE TRAY, WIRE MESH TYPE, 4" LOADING DEPTH, 12", 18", 24” AND 36” WIDTH, COMPLETE WITH ALL FITTINGS AND MOUNTINGHARDWARE. CUTTING OF MESH CABLE TRAY SHALL BE DONE WITH OFFSET CUTTERS ONLY. 10' MAXIMUM SUPPORT SPAN. EITHERSPLICE WASHERS OR TERMINAL GROUND SUPPORT AND JUMPER WIRE SHALL BE USED TO ATTAIN GROUNDING CONTINUITYTHROUGHOUT. Z-BRACKETS SHALL BE USED FOR WALL MOUNTED APPLICATIONS. REFER TO MANUFACTURERS INSTALLATIONINSTRUCTIONS AND SPECIFICATION SECTION 27 05 28 FOR ADDITIONAL INFORMATION.
COOPER FLEXTRAY FT 4 x 12 x 10 FT 4 x 18 x 10 FT 4 x 24 x 10 FT 4 x 36 x 10
L BRACKETS 12 LBRKTEG 20 LBRKTEG 24 LBRKTEG
SHELF BRACKETS FTB12CSGLV FTB18CSGLV FTB20CSGLV FTB24CSGLV
OR PRE-APPROVED EQUAL
SC-WAP-C INFORMATION OUTLET, 2-PORT SURFACE MOUNT BOX AS INDICATED ON DRAWINGS.
"#" INDICATES INFORMATION OUTLET FACEPLATE CONFIGURATION AS INDICATED ON THE PLANS. REFER TO T-1 FOR INFORMATIONOUTLET SCHEDULE FOR PIN CONFIGURATION.
INSTALL A 3/4" EMT CONDUIT 6" BEYOND BOX AND TERMINATE WITH A NYLON BUSHING.
COVERPLATE:PANDUIT NK2BXIW-A
JACK:PANDUIT(CAT6A) NK6X88M SERIES
OR PRE-APPROVED EQUAL
SC-WP-W INFORMATION OUTLET, WALL PHONE. PROVIDE (1) RJ-45 JACK FOR VOICE AT +48" AFF FOR WALL HUNG PHONE. PROVIDE WITHSTAINLESS STEEL FACEPLATE, MATING LUGS, (HUBBELL SFB10A OR APPROVED EQUAL).
INSTALL INFORMATION OUTLET IN A 4" SQUARE 2-1/8" DEEP BACKBOX WITH A SINGLE GANG PLASTER RING. INSTALL A1" EMT CONDUIT STUBBED TO NEAREST CABLE TRAY OR NON-CONTINUOUS CABLE SUPPORT ABOVE NEAREST ACCESSIBLE CEILING ANDTERMINATE WITH NYLON BUSHING UNLESS OTHERWISE NOTED. REFER TO SUGGESTED MATRIX OF SCOPE OF RESPONSIBILITY ONDRAWING T-1 FOR ADDITIONAL INFORMATION.
HUBBELL P630S1GJ8
2. PROVIDE CABLE FROM COMMAND CENTER CONSOLES FOR FRA, LLC. PROVIDED HDMI/DISPLAY PORT EXTENDERS.
SUPPORT FOR POSSIBLE RELOCATION AFTER WIRELESS SURVEY.
1. LOCATION OF FUTURE FRA, LLC. PROVIDED WIRELESS ACCESS POINT. PROVIDE A 20' SLACK COIL AT THE NEAREST CABLE
SCHEDULE NOTES:VOICE CAT 6A RJ-45
2. REFER TO SPECIFICAITONS SECTION 27 05 53 FOR ADDITIONAL INFORMATION ON LABELING REQUIREMENTS. BLANK BLANK FILLER MODULE
1. PROVIDE REMOVABLE BLANK INSERT(S) FOR ALL UNUSED PORTS. DATA CAT 6A RJ-45
NOTES: LEGEND
SINGLE GANG WALLPLATES
INFORMATION OUTLET SCHEDULE
CONFIGURATION FA
CE
PL
AT
E P
OR
TS
FACEPLATE PORT IDENTIFICATION
NOTESPO
SIT
ION
1 J
AC
K T
YP
E
PO
SIT
ION
2 J
AC
K T
YP
E
PO
SIT
ION
3 J
AC
K T
YP
E
PO
SIT
ION
4 J
AC
K T
YP
E
PO
SIT
ION
5 J
AC
K T
YP
E
PO
SIT
ION
6 J
AC
K T
YP
E
C1 2 DATA BLANK
C2 2 DATA DATA
C2-1 4 DATA DATA BLANK BLANK 2.
C2-WAP 2 DATA DATA 1.
C4 4 DATA DATA DATA DATA
W 1 VOICE
CSSCSSCSS
L1
L1
L2
L2
L3
L3
L4
L4
L5
L5
L6
L6
L7
L7
L8
L8
L9
L9
L10
L10
L11
L11
L12
L12
L13
L13
L14
L14
L15
L15
L16
L16
L17
L17
L18
L18
L19
L19
L20
L20
L21
L21
L22
L22
L23
L23
L24
L24
L25
L25
L26
L26
L27
L27
L28
L28
L29
L29
L30
L30
L31
L31
L32
L32
L33
L33
L34
L34
L35
L35
L36
L36
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
LBLB
LALA
L37
L37
L38
L38
L39
L39
L40
L40
L41
L41L42L43L44L45
L45
L46
L46
L47
L47
L48
L48
L49
L49
L50
L50
L52
L52
L53
L53
ADDITIVE ALTERNATE BUILDING EXTENSION
ADDITIVE ALTERNATE BUILDING EXTENSION
FC
FC
FA
FAFB
FB
F1
F1
F2
F2
1
CAM
/M
AT
CH
LIN
E:
SE
E 0
1T
-13
/M
AT
CH
LIN
E:
SE
E 0
1T
-13
/M
AT
CH
LIN
E:
SE
E 0
1T
-12
/M
AT
CH
LIN
E:
SE
E 0
1T
-12
/M
AT
CH
LIN
E:
SE
E 0
1T
-11
/M
AT
CH
LIN
E:
SE
E 0
1T
-11
/M
AT
CH
LIN
E:
SE
E 0
1T
-10
NO TECHNOLOGY ENLARGEMENT
NO TECHNOLOGY ENLARGEMENT
/MATCHLINE: SEE 01 T-15
/M
AT
CH
LIN
E:
SE
E 0
1T
-14
/MATCHLINE: SEE 01 T-14
CAM1
1
CAM
CAM1
CAM1
L1
L1
L2
L2
L3
L3
L4
L4
L5
L5
L6
L6
L7
L7
L8
L8
L9
L9
L10
L10
L11
L11
L12
L12
L13
L13
L14
L14
L15
L15
L16
L16
L17
L17
L18
L18
L19
L19
L20
L20
L21
L21
L22
L22
L23
L23
L24
L24
L25
L25
L26
L26
L27
L27
L28
L28
L29
L29
L30
L30
L31
L31
L32
L32
L33
L33
L34
L34
L35
L35
L36
L36
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
LBLB
LALA
L37
L37
L38
L38
L39
L39
L40
L40
L41
L41L42
L42
L43
L43
L44
L44
L45
L45
L46
L46
L47
L47
L48
L48
L49
L49
L50
L50
L52
L52
L53
L53
ADDITIVE ALTERNATE BUILDING EXTENSION
/M
AT
CH
LIN
E:
SE
E 0
1T
-7
/M
AT
CH
LIN
E:
SE
E 0
1T
-6
/MATCHLINE: SEE 01 T-8
/MATCHLINE: SEE 01 T-7
/MATCHLINE: SEE 01 T-9
/MATCHLINE: SEE 01 T-8
/M
AT
CH
LIN
E:
SE
E 0
1T
-6
/M
AT
CH
LIN
E:
SE
E 0
1T
-5
/M
AT
CH
LIN
E:
SE
E 0
1T
-5
/M
AT
CH
LIN
E:
SE
E 0
1T
-4
/M
AT
CH
LIN
E:
SE
E 0
1T
-4
/M
AT
CH
LIN
E:
SE
E 0
1T
-3
SHEET NOTES
KEY PLAN
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1" = 40'-0"
T-2
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOOVERALL TECHNOLOGY PLANS - TUNNEL AND
LEVEL 01
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1" = 40'-0"
OVERALL TECHNOLOGY PLAN - LEVEL 01 02
SCALE: 1" = 40'-0"
OVERALL TECHNOLOGY PLAN - TUNNEL 01
1. PROVIDE (1) 1” CONDUIT FROM CABLE TRAY TO ROOF PENETRATION WITH (1) CAT 6A CABLE FOR ROOF MOUNTED VIDEO SURVEILLANCE CAMERA. COORDINATE FINAL LOCATION OF ROOF PENETRATION AND CAMERA MOUNT WITH FRA, LLC. PRIOR TO INSTALLATION. VIDEO SURVEILLANCE CAMERA AND PARAPET MOUNT ARE FRA, LLC. PROVIDED AND INSTALLED BY THIS SUBCONTRACTOR. REFER TO ENLARGED FLOOR PLANS FOR ADDITIONAL INFORMATION. CAT 6A CABLE SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET. REFER TO 03/T-17 FOR ADDITIONAL INFORMATION.
UP
UP
UP
GB
GB
GB
W
W
GB
AA
1
GB
C2-WAP
C2-WAP
L2
L2
L3
L3
L4
L4
L5
L5
L6
L6
L7
L7
L8
L8
L9
L9
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
STAIR E1
01M09
VEST
00A02
STAIR VEST
00B01
SUPPORT -SOUTH
00E01
SUPPORT -NORTH
00C01
WARM FRONTEND
00B03
CORRIDOR
00D03
CORRIDOR
00F00
CORRIDOR
00D01
RF TRENCHACCESS STAIR
N
00F04
PPE
00D00
UPSTREAMLASER ROOM
00B02
(2) LEVELS (LOWER AND UPPER) OF SC-LR-1. REFER TO 01/T-19 FOR ADDITIONAL INFORMATION.
(44) 6" L-BEND CONDUITS UP TO MECHANICAL SPACE WITH 2" SNAP-LOC SPACERS
01
T-19
[HWR][SSR1-1][SSR1-2]
SC-LR-1UPPER LEVEL
1
2
E.C. PROVIDED GROUND BAR (TYP.)
3
/M
AT
CH
LIN
E:
SE
E 0
1T
-406
T-19(16) 6" CONDUITS FROM TUNNEL TO TRENCH. REFER TO 06/T-19.
12"x
4"
(40) 6" L-BEND CONDUITS UP TO MECHANICAL SPACE WITH 1-1/2" SNAP-LOC SPACERS
2
SC-LR-1+10 AFF
24"x4"
03
T-18
44
4
4
4
55
6
(2) LEVELS OF SC-LR-1 MOUNTED AT +10' AND +11' AFF (TYP.) REFER TO 08/T-21 FOR ADDITIONAL INFORMATION.
SC-LR-1 FROM HIGHBAY DOWN TO +10' AFF OF TUNNEL SLAB REFER TO T-10 AND 07/T-21 FOR ADDITIONAL INFORMATION.
(2) LEVELS OF SC-LR-1 TRANSITION FROM +10' AND +11' AFF DOWN TO +1' AND +2' AFF WITH 90 DEGREE BENDS. REFER TO 08/T-21 FOR ADDITIONAL INFORMATION.
UPPER LEVEL OF SC-LR-1MOUNTED AT +11' AFF.
LOWER LEVEL OF SC-LR-1MOUNTED AT +10' AFF.
6
24"x
4"
24"x
4"
24"x
4"
36"x4"
24"x4"
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-3
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - N1
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - N1 01
1. PROVIDE CANTILEVER BRACKETS AND ALL ADDITIONAL HARDWARE REQUIRED TO PROPERLY SUPPORT CABLE TRAY. SUPPORTS FOR CABLE TRAY SHOULD BE PER MANUFACTURER RECOMMENDATIONS AND NOT TO EXCEED 10'-0' WITH WITH NO SUPPORT HARDWARE AT A CABLE TRAY SPLICE. REFER TO 01/T-19 AND 08/T-21 FOR REQUIRED ELEVATIONS.
2. REFER TO 01/T-19 FOR MORE INFORMATION.3. REFER TO 03/T-18 FOR TECHNOLOGY TUNNEL GROUNDING DETAIL.4. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES OF THE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
5. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1.6. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC.
PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
1. INFORMATION OUTLETS SHALL BE SERVED FROM NETWORK ROOM 01H01. REFER TO T-10 FOR ROOM LOCATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
UP
GBGB
W AA1
L9
L9
L10
L10
L11
L11
L12
L12
L13
L13
L14
L14
L15
L15
L16
L16
L17
L17
L18
L18
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
(2) LEVELS (LOWER AND UPPER) OF SC-LR-1 AT 10'-4" AND 11'-6" AFF. REFER TO 01/T-20 FOR ADDITIONAL INFORMATION.
(15) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
(15) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
[SSR2-1][SSR2-2][SSR2-3][SSR2-4][SSR2-5][SSR2-6][SSR2-7][LB650-1][LB650-2]
SC-LR-1 AT +11'-6" AFF. REFER TO 01/T-20. (TYP.)
1
2
222
E.C. PROVIDED GROUND BAR (TYP.)
3
/M
AT
CH
LIN
E:
SE
E 0
1T
-3
/M
AT
CH
LIN
E:
SE
E 0
1T
-5
07
T-19
10" CONDUIT FROM TUNNEL TO TRENCH. (TYP. OF 35)
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
2
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
2
4
5
36"x4"
12"x
4"
12"x
4"
36"x4"
24"x
4"
24"x
4"
24"x
4"
24"x4"
36"x4"
12"x
4"
12"x
4"
24"x
4"
24"x
4"
24"x4"
1
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-4
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - N2
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - N2 01
1. PROVIDE CANTILEVER BRACKETS AND ALL ADDITIONAL HARDWARE REQUIRED TO PROPERLY SUPPORT CABLE TRAY. SUPPORTS FOR CABLE TRAY SHOULD BE PER MANUFACTURER RECOMMENDATIONS AND NOT TO EXCEED 10'-0' WITH WITH NO SUPPORT HARDWARE AT A CABLE TRAY SPLICE. REFER TO 01/T-20 FOR REQUIRED ELEVATIONS.
2. REFER TO 01/T-20 FOR MORE INFORMATION.3. REFER TO 03/T-18 FOR TECHNOLOGY TUNNEL GROUNDING DETAIL.4. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES OF THE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
5. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC. PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET. REFER TO T-11 FOR CABINET LOCATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
GBGBGB
L18
L18
L19
L19
L20
L20
L21
L21
L22
L22
L23
L23
L24
L24
L25
L25
L26
L26
L27
L27
L28
L28
L29
L29
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
01
T-20
(2) LEVELS (LOWER AND UPPER) OF SC-LR-1 AT 10'-4" AND 11'-6" AFF. REFER TO 01/T-20 FOR ADDITIONAL INFORMATION.
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
[LB650-3][LB650-4][LB650-5][LB650-6][LB650-7][LB650-8][LB650-9][HB650-1][HB650-2][HB650-3][HB650-4]
12
E.C. PROVIDED GROUND BAR (TYP.)
3
/M
AT
CH
LIN
E:
SE
E 0
1T
-4
/M
AT
CH
LIN
E:
SE
E 0
1T
-6
36"x4"
24"x4"
24"x
4"
24"x
4"
36"x4"
24"x4"
24"x
4"
36"x4"
24"x4"
(15) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
2
(15) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
2
(15) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
2
04
T-20
05
T-20
4
02
T-18
24"x
4"
24"x
4"
SC-LR-1 AT +11'-6" AFF. REFER TO 01/T-20. (TYP.)
1
SHEET NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-5
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - S1
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - S1 01
1. PROVIDE CANTILEVER BRACKETS AND ALL ADDITIONAL HARDWARE REQUIRED TO PROPERLY SUPPORT CABLE TRAY. SUPPORTS FOR CABLE TRAY SHOULD BE PER MANUFACTURER RECOMMENDATIONS AND NOT TO EXCEED 10'-0' WITH WITH NO SUPPORT HARDWARE AT A CABLE TRAY SPLICE. REFER TO 01/T-20 FOR REQUIRED ELEVATIONS.
2. REFER TO 01/T-20 FOR MORE INFORMATION.3. REFER TO 03/T-18 FOR TECHNOLOGY TUNNEL GROUNDING DETAIL.4. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES OF THE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
UP
GBGBGB
W
GB
AA1
L30
L30
L31
L31
L32
L32
L33
L33
L34
L34
L35
L35
L36
L36
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
L37
L37
L38
L38
L39
L39
L40
L40
L41
L41
(2) LEVELS (LOWER AND UPPER) OF SC-LR-1 AT 10'-4" AND 11'-6" AFF. REFER TO 01/T-20 FOR ADDITIONAL INFORMATION.
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
24"x4"
[FUTURE HB650-5][FUTURE HB650-6]
12
E.C. PROVIDED GROUND BAR (TYP.)
3
/M
AT
CH
LIN
E:
SE
E 0
1T
-5
/M
AT
CH
LIN
E:
SE
E 0
1T
-7
(2) LEVELS OF SC-LR-2BASKET TRAY MOUNTED AT +7' AND +6' AFF. (TYP.)
5
36"x4"
24"x
4"
24"x
4"
36"x4"
24"x4"
24"x
4"
(27) 6" S-BEND CONDUITS UP TO GALLERY WITH 6x3 SNAP-LOC SPACERS
218"x4"
18"x4"
36"x
4"
18"x4"
18"x4"
36"x4"
4
6
6
01
T-22
(12) 4" CONDUITS
03
T-22
/MATCHLINE: SEE 01 T-8
7
7
24"x
4"
24"x4"
(27) S-BEND CONDUITS - BASE BID CAP CONDUITS 3' BELOW GRADE. ADDITIVE ALTERNATE EXTEND CONDUITS TO GALLERY
8
36"x4"
24"x
4"
SC-LR-1 AT +11'-6" AFF. REFER TO 01/T-20. (TYP.)
1
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-6
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - S2
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - S2 01
1. PROVIDE CANTILEVER BRACKETS AND ALL ADDITIONAL HARDWARE REQUIRED TO PROPERLY SUPPORT CABLE TRAY. SUPPORTS FOR CABLE TRAY SHOULD BE PER MANUFACTURER RECOMMENDATIONS AND NOT TO EXCEED 10'-0' WITH WITH NO SUPPORT HARDWARE AT A CABLE TRAY SPLICE. REFER TO 01/T-20 FOR REQUIRED ELEVATIONS.
2. REFER TO 01/T-20 FOR MORE INFORMATION.3. REFER TO 03/T-18 FOR TECHNOLOGY TUNNEL GROUNDING DETAIL.4. INSTALL (12) 4" CONDUITS TIGHT TO CEILING. REFER TO 1/T-22 FOR ADDITIONAL
INFORMATION. PROVIDE 24” LADDER DROP-OUT ON SC-LR-1 TO ROUTE CABLES FROM SC-LR-1 TO 4" CONDUITS.
5. REFER TO 04/T-18 FOR TECHNOLOGY TUNNEL - BTL - GROUNDING DETAIL.6. SINGLE LEVEL OF SC-LR-2 AT +7' AFF. REFER TO 05/T-22 FOR ADDITIONAL
INFORMATION.7. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES OF THE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
8. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC. PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET. REFER TO T-13 FOR CABINET LOCATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
GBGBGB
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
L42
L42
L43
L43
L44
L44
L45
L45
L46
L46
L47
L47
L48
L48
L49
L49
L50
L50
L52
L52
L53
L53
ADDITIVE ALTERNATE BUILDING EXTENSION
/M
AT
CH
LIN
E:
SE
E 0
1T
-6
(2) LEVELS OF SC-LR-2BASKET TRAY MOUNTED AT +7' AND +6' AFF. (TYP.)
1
/MATCHLINE: SEE 01 T-8
18"x4"
18"x4"
36"x4"
2
(2) LEVELS OF SC-LR-2BASKET TRAY MOUNTED AT +7' AND +6' AFF. (TYP.)
1
(27) S-BEND CONDUITS WITH 6X3 SNAP-LOC SPACERS. - BASE BID CAP CONDUITS 3' BELOW GRADE, ADDITIVE ALTERNATE EXTEND CONDUITS TO GALLERY
(27) S-BEND CONDUITS - CAP CONDUITS 3' BELOW GRADE WITH 6x3 SNAP-LOC SPACERS
(27) S-BEND CONDUITS - CAP CONDUITS 3' BELOW GRADE WITH 6x3 SNAP-LOC SPACERS
(27) S-BEND CONDUITS - CAP CONDUITS 3' BELOW GRADE WITH 6x3 SNAP-LOC SPACERS
SHEET NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-7
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - S3
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - S3 01
1. REFER TO 04/T-18 FOR TECHNOLOGY TUNNEL - BTL - GROUNDING DETAIL.2. SINGLE LEVEL OF SC-LR-2 AT +7' AFF. REFER TO 05/T-22 FOR ADDITIONAL
INFORMATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
GB
GB
E.C. PROVIDED GROUND BAR (TYP.)
(2) LEVELS OF SC-LR-2BASKET TRAY MOUNTED AT +7' AND +6' AFF. (TYP.)
1
/MATCHLINE: SEE 01 T-7
/M
AT
CH
LIN
E:
SE
E 0
1T
-6
/MATCHLINE: SEE 01 T-9
/M
AT
CH
LIN
E:
SE
E 0
1T
-7
36"x4"
18"x4"
18"x4"
36"x4"
18"x4"
18"x4"
36"x4"
2
2
2
04
T-18
(2) LEVELS OF SC-LR-2BASKET TRAY MOUNTED AT +7' AND +6' AFF. (TYP.)
05
T-22
SHEET NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-8
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - BTL-E
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - BTL-E 01
1. REFER TO 04/T-18 FOR TECHNOLOGY TUNNEL - BTL - GROUNDING DETAIL.2. SINGLE LEVEL OF SC-LR-2 AT +7' AFF. REFER TO 05/T-22 FOR ADDITIONAL
INFORMATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
GB
GB
GB
GB
GB
CSS
CSSCSS
E.C. PROVIDED GROUND BAR (TYP.)
1
/MATCHLINE: SEE 01 T-8
(8) 4" CONDUITS
01
T-21
(32) 6" L-BEND CONDUITS UP TO BUILDING F37
2
1
2
1
2
1
3
24"x
4"
24"x
4"
18"x4"
36"x4"
18"x
4"
24" x
4"
24" x
4"
1
2
1
4
1
3
4
(TYP. OF 4)
SHEET NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-9
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - TUNNEL - BTL-W
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - TUNNEL - BTL-W 01
1. REFER TO 04/T-18 FOR TECHNOLOGY TUNNEL - BTL - GROUNDING DETAIL.2. (2) LEVELS OF SC-LR-2 MOUNTED AT +7' AND +6' AFF.3. (3) LEVELS OF SC-LR-2 MOUNTED AT +7' AND +6' AND +5' AFF.4. SINGLE LEVEL OF SC-LR-2 MOUNTED AT +7' AFF. REFER TO 01/T-21 FOR
ADDITIONAL INFORMATION.
E.C. SHALL CONFIRM CABLE TRAY ROUTING WITH FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION
GB
C4
C2-1
C2-1
WP
1
WP1
C2-WAP
C2-WAP
C2-WAP
C4
C4
C4
CR
1
CSS
CSS
CR2
C2-WAP
C2-1
C2-1
WP1
C2-1
C2-1
C2-1
C2-1
C4
C4
C4C4
CR1 CR1
CSSCSS
GB
C2 /A
GB GB
GB
AM
S
C2-WAP
C2-WAP C2-WAP
C2-WAP
C4
C4
C2-1 C2-1
C2-1
C2-1
C2-1C2-1
CR
1
CSS
CA
M
C2 /A
GB
GB
C1
L1
L1
L2
L2
L3
L3
L4
L4
L5
L5
L6
L6
L7
L7
L8
L8
L9
L9
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
LBLB
LALA
MECHANICAL
01G02
VEST
01E01
NW ENTRY
01E04
VEST
01D11
HIGH BAY
01G06
DOCK
01A09
ELEV. N
01B10STAIR E1
01B11
NETWORKROOM
01H01
W/C
01F05
COATS
01H14
W/C
01F02
CORRIDOR
01F03
COMMANDCENTER
01F12
TECH BAY
01F16
HUDDLE
01H17
CONFERENCE
01G16
HUDDLE
01G17
AV-WP1-F
(2) 1-1/4" CONDUIT
+48"
+48"
C2
1
24"x4"
01F16
+42"
+42"01E01
24"x4"
24"x4"
24"x4"
T-16
01
SC-LR-1UPPER LEVEL
SC-LR-2
SC-LR-1
24"x
4"
24"x
4"
24"x
4"
24"x
4"
24"x
4"
24"x
4"
24"x
4"
POWER POLE (TYP.) REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
24"x4"
12"x
4"
T-16
02
(84) 6" L-BEND CONDUITS UP FROM TRENCH. CONDUITS EXTEND 7' AFF
+90"
+54"
01D1101A09
+42" +42"
2
TYP. OF 6
SC-LR-1UPPER LEVEL
(3) LEVELS (LOWER, MID AND UPPER) OF SC-LR-1.
33 3 3 3 3 3
3
E.C. PROVIDED GROUND BAR
3
4
5
/M
AT
CH
LIN
E:
SE
E 0
1T
-11
6
+48"+48"
(2) 1-1/4" CONDUIT
1
AV-WP1-F
C2
(2) 1-1/4" CONDUIT
1
AV-WP1-F
C2
(16) 6" CONDUITS DOWN TO TRENCHREFER TO 06/T-19.
7
77
7
+90"+54"
5
SC-LR-1 DOWN TO +10' AFF OF TUNNEL SLAB WITH 90 DEGREE BEND. REFER TO T-3 AND 07/T-21 FOR ADDITIONAL INFORMATION.
88
05
T-21
+42"
01H01
SC-LR-1 TRANSITION FROM UPPER LEVEL OF TRAY HEIGHT DOWN TO LOWER LEVEL.
24"x
4"
3
INF
OR
MA
TIO
N O
UT
LE
TS
SH
ALL B
E S
ER
VE
D
FR
OM
EX
IST
ING
MA
IN N
ET
WO
RK
ING
RO
OM
401 IN
CR
YO
PLA
NT
BU
ILD
ING
. R
EF
ER
TO
4/T
-16 F
OR
RO
OM
LO
CA
TIO
N.
INF
OR
MA
TIO
N O
UT
LE
TS
SH
ALL B
E
SE
RV
ED
FR
OM
NE
TW
OR
K R
OO
M 0
1H
01.
(3) 4" SLEEVES
+10'
CAM 9
REFER TO 04/T-16
01
T-19
06
T-19
10
11
TR-3 12
SHEET NOTES
GENERAL NOTES
KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-10
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - N1
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - N1 01
1. ROUTE WITH HDMI CABLE (1) FRA, LLC. PROVIDED ZOOM CAMERA CABLE FROM AV-WP1-F TO ABOVE ACCESSIBLE CEILING ABOVE FLAT PANEL DISPLAY. COORDINATE ZOOM CAMERA CABLE FINAL LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
2. ROUTE INFORMATION OUTLET CABLES TO MILLWORK IN E.C. PROVIDED POWER POLE.
3. LOWER LEVEL OF SC-LR-1. 4. REFER TO 01/T-18 AND 02/T-18 FOR
TECHNOLOGY GALLERY GROUNDING DETAILS.
5. PROVIDE TRAPEZE SUPPORT KIT WITH 1/2" THREADED RODS AND ALL REQUIRED HARDWARE EVERY 10'. REFER TO GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
6. INFORMATION OUTLET PROVIDED FOR 3 X 3 VIDEO WALL. COORDINATE WITH FRA, LLC. AND FRA, LLC. CONSTRUCTION COORDINATOR PRIOR TO INSTALLATION.
7. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1.
8. FUTURE LOCATION. PROVIDE BACKBOX, CONDUIT AND BLANK COVER PLATE. REFER TO EQUIPMENT LIST SC-IO-C FOR ROUGH-IN INFORMATION.
9. PROVIDE (1) 1” CONDUIT FROM CABLE TRAY TO CANOPY WITH (1) CAT 6A CABLE FOR CEILING MOUNTED VIDEO SURVEILLANCE CAMERA. COORDINATE FINAL LOCATION OF CAMERA WITH FRA, LLC. PRIOR TO INSTALLATION. VIDEO SURVEILLANCE CAMERA IS FRA, LLC. PROVIDED AND INSTALLED BY THIS SUBCONTRACTOR. CAT 6A CABLE SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET. REFER TO 05/T-17 FOR ADDITIONAL INFORMATION.
10. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR ALL L-BEND CONDUITS.
11. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR CONDUITS.
12. PROVIDE ONE CAT 6 CABLE TO AREA OF RESCUE CALL MASTER FOR ANALOG PHONE SERVICE.
1. ACCESS CONTROL DEVICES TO BE FED FROM ACCESS CONTROL PANEL IN NETWORK ROOM 01H01. REFER TO T-16 FOR MORE INFORMATION
GBGB
CR1
CSS
GB GB
CSS
CR1
GB
C2-WAP
C2-WAP
C2-WAP
C2-WAP
C2-WAP
C2-WAP
C2-WAP
C2-WAP
C2-WAP
L9L10L11L12L13L14L15L16L17L18
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
STAIR W1
01V00
24"x4"
24"x4"
24"x4" 24"x4"
24"x4"
24"x4"
+42"
01AD02B
FRA, LLC. PROVIDED CABINET FOR DATA CABLE
(15) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(15) 6" S-BEND CONDUITS
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
(3) LEVELS (LOWER, MID AND UPPER) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
1
1
111
1
1
1111111111
+42"
01AD02C
4 4 4 4 4 4 4 4 4
2
2
E.C. PROVIDED GROUND BAR (TYP.)
/M
AT
CH
LIN
E:
SE
E 0
1T
-10
/M
AT
CH
LIN
E:
SE
E 0
1T
-12
10" CONDUIT DOWN TO TRENCH. REFER TO 07/T-19 FOR ADDITIONAL INFORMATION. (TYP. OF 35)
5
5
5
5
5
5
5
5
5
SC-LR-1UPPER LEVEL
3
SC-LR-1UPPER LEVEL
3
07
T-19
6
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-11
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - N2
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - N2 01
#
1. (2) LEVELS (LOWER AND MID) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
2. REFER TO 01/T-18 AND 02/T-18 FOR TECHNOLOGY GALLERY GROUNDING DETAILS.
3. PROVIDE TRAPEZE SUPPORT KIT WITH 1/2" THREADED RODS AND ALL REQUIRED HARDWARE EVERY 10'. REFER TO GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
4. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR ALL S-BEND CONDUITS. REFER TO 01/T-20 FOR MORE INFORMATION.
5. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1.6. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR CONDUITS.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET.
GBGB
CR1
CSS
W
GB
GB GB GB
GB
C2-WAPC2-WAPC2-WAPC2-WAPC2-WAPC2-WAP
C2-WAPC2-WAPC2-WAP
C2-WAPC2-WAPC2-WAP
CSS
CR
1
W
L18L19L20L21L22L23L24L25L26L27L28L29
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
LINAC GALLERY
01AD02
STAIR E2
01X13
E2 PPE
01X12
24"x4"
24"x4"
24"x4"
24"x4"
24"x4"
24"x4"
(3) LEVELS (LOWER, MID AND UPPER) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
SC-LR-1UPPER LEVEL
FRA, LLC. PROVIDED CABINET FOR DATA CABLE
01AD02D
+42"
24"x4"
24"x4"
24"x4"
(15) 6" S-BEND CONDUITS
(15) 6" S-BEND CONDUITS
(15) 6" S-BEND CONDUITS
(15) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4" 1111111111
SC-LR-1UPPER LEVEL
E.C. PROVIDED GROUND BAR (TYP.)
2
4
3
22
4444
/M
AT
CH
LIN
E:
SE
E 0
1T
-11
/M
AT
CH
LIN
E:
SE
E 0
1T
-13
5
5
5
5
5
5
5
5
5
5
5
53
01X13 6
+42"
7
02
T-18
01
T-18
SPACE FOR FUTURE ACCESS CONTROL PANEL
01
T-20
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-12
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - S1
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - S1 01
1. (2) LEVELS (LOWER AND MID) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
2. REFER TO 01/T-18 AND 02/T-18 FOR TECHNOLOGY GALLERY GROUNDING DETAILS.
3. PROVIDE TRAPEZE SUPPORT KIT WITH 1/2" THREADED RODS AND ALL REQUIRED HARDWARE EVERY 10'. REFER TO GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
4. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR ALL S-BEND CONDUITS. REFER TO 01/T-20 FOR MORE INFORMATION.
5. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1.6. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES WITHIN 3' OF THE GATE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET.7. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC. PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
GB
GB
CR1
CSS
W
GB
GB
C2-WAPC2-WAPC2-WAP
C2-WAPC2-WAP
C2-W
AP
GB
CR
1
CSS
GB
L30L31L32L33L34L35L36
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
L37
L37
L38
L38
L39
L39
L40
L40
L41
L41L42
L42
DOWNSTREAMLASER ROOM
01AS02
ADDITIVE ALTERNATE BUILDING EXTENSION
STAIR W2
01AV00
ELEV. S
01AT00
E3 PPE
01AZ12
STAIR E3
01AZ13
VESTIBULE
01AT01
24"x4"
24"x4"
24"x4"24"x4"
(3) LEVELS (LOWER, MID AND UPPER) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
01AD02E
+42"
FRA, LLC. PROVIDED CABINET FOR DATA CABLE
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
(27) 6" S-BEND CONDUITS
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
36"x
4"
111111
SC-LR-1UPPER LEVEL
E.C. PROVIDED GROUND BAR (TYP.)
3
2
444
2
/M
AT
CH
LIN
E:
SE
E 0
1T
-12
5
5
5
55
+42"
01AZ13
+10'
/M
AT
CH
LIN
E:
SE
E 0
1T
-14
6
7
(27) S-BEND CONDUITS - BASE BID CAP CONDUITS 3' BELOW GRADE. ADDITIVE ALTERNATE EXTEND CONDUITS TO GALLERY
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-13
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - S2
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - S2 01
#
1. (2) LEVELS (LOWER AND MID) OF SC-LR-1. REFER TO 02/T-20 FOR ADDITIONAL INFORMATION.
2. REFER TO 01/T-18 AND 02/T-18 FOR TECHNOLOGY GALLERY GROUNDING DETAILS.
3. PROVIDE TRAPEZE SUPPORT KIT WITH 1/2" THREADED RODS AND ALL REQUIRED HARDWARE EVERY 10'. REFER TO GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
4. SCHEDULE FOR MORE INFORMATION.5. SUBCONTRACTOR TO PROVIDE TEMPORARY PLUGS FOR ALL S-BEND CONDUITS.
REFER TO 01/T-20 FOR MORE INFORMATION.6. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1. 7. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH
SIDES WITHIN 3' OF THE GATE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET.8. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC. PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
GB
CR1
CSS
WCR
1
CSS
GB
LDLD
LELE
LFLF
LGLG
LHLH
LCLC
L42
L42
L43
L43
L44
L44
L45
L45
L46
L46
L47
L47
L48
L48
L49
L49
L50
L50
L52
L52
L53
L53
ADDITIVE ALTERNATE BUILDING EXTENSION
E4 PPE
01F07
STAIR E4
01F08
01F08
+42"
01BF02
+42"
/M
AT
CH
LIN
E:
SE
E 0
1T
-13
1
FRA, LLC. PROVIDED CABINET FOR DATA CABLE
2
(27) S-BEND CONDUITS - BASE BID CAP CONDUITS 3' BELOW GRADE. ADDITIVE ALTERNATE EXTEND CONDUITS TO GALLERY AND PROVIDE TEMPORARY PLUGS ON CONDUITS
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - S3 01
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-14
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - S3
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
1. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH SIDES WITHIN 3' OF THE GATE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
2. SUBCONTRACTOR TO INSTALL CAT 6A FROM DEVICE TO NEAREST FRA, LLC. PROVIDED CABINET AND PROVIDE ETHERNET EXTENDERS, SC-EXT AT EACH END. COORINATE FINAL LOCATIONS WITH FRA, LLC. REFER TO T-1 GENERAL TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET.
GB
CR
1
CR
1
CSS
CSS
GB
GB
C2-WAP
C2-WAP
PUMP ROOM
01F3700
F-37
01F3701
F-37 STAIR
01F3703
F-37 PPE
01F3702
FC
FC
FA
FA
FB
FB
F1
F1
F2
F2
F37-11
F37-13
01
T-21
(32) 6" L-BEND CONDUITS TO TUNNEL, SPACE WITH 3" SNAP-LOC SPACERS AND PROVIDE TEMPORARY PLUGS ON ALL CONDUITS
SC-LR-1(TYP.)
1
AC-SCP-1AC-PSP-1
FRA, LLC. PROVIDED WALL MOUNTED CABINET FOR DATA CABLING. CABINET MOUNTED BELOW SC-LR-1
1
1
+42"
+42"
SHEET NOTES GENERAL NOTES KEY PLAN
8
1/8"=1'-0"
0 8 16
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
N1N2S1S2S3
F-37
1/8" = 1'-0"
T-15
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY PLAN - LEVEL 01 - BTL-W
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: 1/8" = 1'-0"
TECHNOLOGY PLAN - LEVEL 01 - BTL-W 01
1. INTERLOCK LOCATION. PROVIDE 1900 BOXES FLUSHED MOUNTED ON BOTH SIDES OF THE DOOR WITH 1" CONDUIT CONNECTING THE BOXES. COORDINATE LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
2. WIRELESS ACCESS POINT SHALL BE MOUNTED ON SC-LR-1.
1. INFORMATION OUTLETS SERVED FROM NEAREST FRA, LLC. PROVIDED CABINET.2. INSTALL LADDER RACK AT 8'-10" AFF.
GB
GB
FRA, LLC.
PROVIDED
PATCH PANEL
FRA, LLC.
PROVIDED
NETWORK
EQUIPMENT
FRA, LLC.
PROVIDED
FIBER PANEL
L7
L7
LHLH
L7
L7
LHLH
LG.8LG.8
LG.9LG.9
L7.2
L7.2
LH
L7
L7.2
LG.9
AC-SCP-1
AC-PSP-1
+4'
+6'
FIRUS (BY FRA, LLC.) SEE ARCHITECTURAL DRAWINGS.
AR-PS-1
SPACE FOR FUTURE ACCESS CONTROL PANEL
L5
L5
L6
L6
L7
L7
12"x
4"
SC-LR-2
(4) 4" SLEEVES
REFER TO 01/T-10
L7
L7
LHLH
L7
L7
LHLH
LG.8LG.8
LG.9LG.9
L7.2
L7.2
LH
L7
L7.2
LG.9
(4) 4" SLEEVES
SC-LR-1(TYP.)
(6) 4" INCOMING CONDUITS. REFER TO ELECTRICAL DRAWINGS E-4 AND E-30 FOR ADDITIONAL INFORMATION
1
2
2
1
FRA, LLC. PROVIDED FIBER OPTIC BACKBONE
3
NEAREST FRA, LLC. PROVIDED CABINET
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CABLE TYPE. ALL INFORMATION OUTLETS ARE TYPICAL OF THE OUTLETS IN THE AREA SHOWN. REFER TO FLOOR PLANS FOR MORE SPECIFIC ROUTING AND QUANTITY INFORMATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REFER TO T-1 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
KEYNOTES:
1. 23 GAUGE, 4-PAIR, CATEGORY 6A, UNSHIELDED TWISTED PAIR CABLE, SEE SPECIFICATIONS.2. REFER TO INFORMATION OUTLET SCHEDULE ON T-1 AND THE FLOOR PLANS FOR QUANTITY OF
CABLES AND JACKS TO BE INSTALLED AT EACH INFORMATION OUTLET.3. RJ-45 TO RJ-45 CATEGORY CAT 6A UTP PATCH CORD PROVIDED BY SUBCONTRACTOR INSTALLED BY
FRA, LLC. SEE SPECIFICATIONS.4. FIBER PATCH CORD PROVIDED BY SUBCONTRACTOR INSTALLED BY FRA, LLC. SEE SPECIFICATIONS.
#
CAM
4
W
C#
2C#
CAM
4
1/4"=1'-0"
0 4 8
SCALE FEET
PR
OJE
CT
N
OR
TH
E
S
W
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
As indicated
T-16
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY ENLARGED PLANS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
EQUIPMENT PLAN LAYOUT - TR-3 01
SCALE: N.T.S.
TECHNOLOGY PLAN - EXISTING CRYO PLANT 04
SCALE: N.T.S.
EQUIPMENT PLAN PATHWAY - TR-3 02
SCALE: N.T.S.
CONNECTIVITY RISER DIAGRAM - TR-3 03
GENERAL NOTES:
1. INSTALL LADDER RACK AT 8'-6" AFF.
KEYNOTES:
1. PROVIDE 7' OF VERTICALLY MOUNTED SC-LR-1 TO INCOMING 4" CONDUITS. TOP OF VERTICAL LADDER RACK TO BE INSTALLED AT +96" AFF WITH THE BOTTOM AT +12" AFF.
AC-PSP-1
AR-PS-1
NOTES:
1. CONFIGURATIONS SHOWN IN THE DETAIL ABOVE ARE DIAGRAMMATIC, INTENDED TO DESCRIBE THE CONTROLLED SECURITY SCHEME ROUGH-IN REQUIREMENTS OF THE DOORS. DETAILS ABOVE MAY NOT ACCURATELY REPRESENT DOOR SIZE, DOOR SWING, DOOR HARDWARE, OR DOOR FUNCTIONALITY. REFER TO ARCHITECTURAL DOOR HARDWARE SCHEDULE, DOOR HARDWARE GROUPS AND DOOR HARDWARE SPECIFICATIONS FOR COMPLETE INFORMATION. MIRROR THE DETAIL AS REQUIRED.
2. ROUGH IN SHOWN IN THE DETAIL ABOVE REPRESENTS THE MINIMUM REQUIREMENTS FOR ALL CONTROLLED SECURITY SYSTEM DEVICES AND CABLING UNLESS OTHERWISE NOTED. COORDINATE EXACT REQUIREMENTS WITH SELECTED DOOR MATERIALS, DOOR HARDWARE, AND CONTROLLED SECURITY DEVICES AND CABLING PRIOR TO INSTALLATION.
3. ALL CABLING IN WALLS AND WHERE EXPOSED ON VERTICAL SURFACES SHALL BE INSTALLED IN EMT CONDUIT OR SURFACE MOUNT RACEWAY. CABLING ROUTED HORIZONTALLY ABOVE THE ACCESSIBLE CEILING MAY BE INSTALLED FREE-AIR CABLING PROPERLY RATED FOR THE CEILING ENVIRONMENT.
4. THE ELECTRICAL OR SECURITY SUBCONTRACTOR SHALL NOT MODIFY ANY FIRE RATED DOOR AND/OR DOOR FRAME. REFER TO THE ARCHITECTURAL DOOR SCHEDULE, DOOR HARDWARE SCHEDULE, AND DOOR HARDWARE SPECIFICATION FOR ADDITIONAL INFORMATION. MODIFICATION TO ANY FIRE RATED DOOR AND/OR FRAME WILL REQUIRE A RE-CERTIFICATION OF THE DOOR AND FRAME WITH THE LOCAL AUTHORITY HAVING JURISDICTION (AHJ).
5. INSTALLING SUBCONTRACTOR SHALL FURNISH AND INSTALL FIRESTOP MATERIALS FOR ALL CONTROLLED SECURITY SCHEME ROUGH-INS PER PROJECT REQUIREMENTS. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
6. REFER TO THE ACCESS CONTROL RISER DIAGRAM 2/T-17 FOR CABLING REQUIREMENTS AND THE CONTROLLED SECURITY SCHEME SCHEDULE ON T-17 FOR ADDITIONAL INFORMATION.
7. INSTALLATION SHALL INCLUDE ALL POWER REQUIRED FOR SYSTEM OPERATION INCLUDING +120VAC. REFER TO THE SUGGESTED MATRIX OF SCOPE RESPONSIBILITY FOR ADDITIONAL INFORMATION.
KEYNOTES:
1. PROVIDE JUNCTION BOXES IN THE DOOR FRAME WHERE SHOWN ON THIS DETAIL. ROUGH-IN SHALL BE PROVIDED WHETHER THE CURRENT SECURITY SCHEME UTILIZES THEM OR NOT. ALL CONDUITS SHALL BE EMT CONDUIT UNLESS OTHERWISE NOTED. FLEXIBLE CONDUIT OF ANY TYPE WILL NOT BE ACCEPTED. COORDINATE INSTALLATION WITH ON-SITE DOOR FRAME INSTALLATION SUBCONTRACTOR.
2. ALL DOOR POSITION SWITCHES ARE REQUIRED TO BE RECESSED UNLESS OTHERWISE NOTED. ELECTRIC HINGE MONITORS ARE NOT AN ACCEPTABLE REPLACEMENT FOR THE RECESSED DOOR POSITION SWITCH.
3. DOUBLE GANG BACKBOX WITH SINGLE GANG PLASTER RING. REFER TO FLOOR PLAN(S) FOR ACTUAL CREDENTIAL READER TYPE AND ROUGH-IN LOCATIONS.
4. CONDUIT SHALL ROUTE FROM THE CREDENTIAL READER TO THE SECURE SIDE OF THE DOOR. CONDUIT SHALL ROUTE TO THE NEAREST SECURITY PANEL.
5. MOUNT A MINIMUM 4" SQUARE 2-1/8" DEEP JUNCTION BOX WITH BLANK COVER PLATE ON THE SECURE SIDE OF THE DOOR ABOVE ACCESSIBLE CEILING. INSTALLING SUBCONTRACTOR SHALL SIZE THE JUNCTION BOXES PER SYSTEM INSTALLATION REQUIREMENTS AND APPLICABLE CODES. MAINTAIN ACCESS TO THE JUNCTION BOX.
6. PROVIDE A HORIZONTALLY MOUNTED SINGLE GANG BACKBOX FOR THE REQUEST TO EXIT SENSOR. REFER TO THE CONTROLLED SECURITY SCHEME SCHEDULE ON T-17 FOR DOORS THAT REQUIRE THIS ROUGH-IN.
7. CONDUIT SHALL ROUTE TO THE NEAREST SECURITY PANEL.8. CONDUIT INSTALLED IN PERMANENT MULLIONS ONLY. REFER TO THE ARCHITECTURAL DOOR SCHEDULE AND DOOR HARDWARE GROUPS FOR
LOCATIONS THAT REQUIRE THIS ROUGH-IN. PROVIDE A NYLON BUSHING ON THE CONDUIT END.
DOOR FRAME ROUGH-IN DIAGRAM (ALL SINGLE DOORS)
DOOR FRAME ROUGH-IN DIAGRAM (ALL DOUBLE DOORS WITH OR WITHOUT MULLION)
FINISHED ACCESSIBLE CEILING
MINIMUM 3/4" EMT CONDUIT TO ABOVE THE ACCESSIBLE CEILING
FINISHED FLOOR
CREDENTIAL READER ROUGH-IN 3
DOOR CONTACT ROUGH-IN
MINIMUM 1" EMT CONDUIT
11
REQUEST TO EXIT DEVICE ROUGH-IN
FOR DOOR HARDWARE POWER SUPPLIES
1/2" EMT CONDUIT MINIMUM (TYP.)
3'-6
"
1
MINIMUM 1" EMT CONDUITFOR DOOR
HARDWARE POWER SUPPLIES
MINIMUM 3/4" EMT CONDUIT TO ABOVE THE ACCESSIBLE CEILING
CREDENTIAL READER ROUGH-IN 3
REQUEST TO EXIT DEVICE ROUGH-IN
DOOR CONTACT ROUGH-IN
1
3'-6
"
2
2
4
4
5
5
5
5
66
4" 4" 4"
7 7
8
6"
6"
TYPICAL OF SINGLEDOORS WITH CARD READER
CONNECTION TO LAN
WIRING KEY:
18 AWG (2) TWO CONDUCTOR STRANDED
18 AWG (4) FOUR CONDUCTOR STRANDED
14 AWG (2) TWO CONDUCTOR STRANDED
22 AWG (6) SIX CONDUCTOR STRANDED
A
B
C
D
PERSONALCOMPUTER
TR-3
D
C
C
E
AC-SCP-1
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND NOT INTENDED TO SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CABLE TYPE.
2. ALL CABLING SHALL BE PLENUM RATED.3. REFER TO 1/T-17 FOR DOOR ROUGH-IN AND WIRING DIAGRAM.4. REFER TO T-1 FOR TECHNOLOGY EQUIPMENT SCHEDULE.
CR#DCRTE EDH
CSS
A
B
CATEGORY 6 PATCHCORDE
A DB
D
C
CR# DC RTEEDH
A
B
DC
A
TYPICAL OF DOUBLEDOORS WITH CARD READER
CSS
DC
A
TYPICAL OF DOOR CONTACT ONLY LOCATION
CSS
PARAPET WALL
2'-1 1/2"
2'-11
"
FLEXIBLE CONDUIT
NOTES:
1. SECURE WALL MOUNT BASE PLATE TO PARAPET WALL WITH MINIMUM 1/4" MASONRY FASTENERS. COORDINATE WITH FRA, LLC. FOR APPROVED MOUNTING LOCATION (I.E. BRICK, BLOCK, ETC.)
2. SEAL WALL MOUNT BASE PLATE TO PREVENT WATER INFILTRATION.3. SUBCONTRACTOR SHALL ENSURE SUPPORT OF ALL OPEN CABLE WITH APPROPRIATE
MEANS.4. THE DETAIL IS DIAGRAMMATIC, AND IS NOT INTENDED TO CONVEY ALL EQUIPMENT,
CONDUCTORS, CONNECTIONS, AND QUANTITIES REQUIRED. SUBCONTRACTOR SHALL PROVIDE EQUIPMENT AS NECESSARY TO SUPPORT ALL CAMERAS AS SHOWN ON PLANS.
5. SUBCONTRACTOR SHALL PROVIDE ROOF PENETRATION REAR CAMERA LOCATION. PROVIDED WEATHER HEAD PENETRATION OR APPROPRIATE PENETRATION TO SUPPORT CCTV CABLING. COORDINATE FINAL LOCATION WITH FRA, LLC. PRIOR TO INSTALLATION.
6. SUBCONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL TO PROPERLY SEAL ROOF PENETRATIONS AND ANCHOR POINTS TO PREVENT WATER INFILTRATION.
KEYNOTES:
1. ROUTE CAT 6A PATCH CORD FROM OWNER PROVIDED CAMERA TO LIGHTNING PROTECTION MODULE LOCATED NEAR CAMERA IN BUILDING. ROUTE CAT 6A CABLE TO LIGHTING PROTECTION MODULE AND TERMINATE CABLE WITH RJ-45 PLUG.
#
1
TUNNEL LEVEL
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CABLE TYPE. ALL INFORMATION OUTLETS ARE TYPICAL OF THE OUTLETS IN THE AREA SHOWN. REFER TO FLOOR PLANS FOR MORE SPECIFIC ROUTING AND QUANTITY INFORMATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REFER TO T-1 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
FIRST FLOOR
TR-3
AMS
AA1 AA1 AA1
18/2 PLENUM RATED CABLE 22/2 PAIR SHIELDED PLENUM RATED CABLE
NOTES:
1. COORDINATE EXACT LOCATION ON SITE WITH WORK BY OTHER TRADES TO ENSURE DESIRED VIEWING AREA AND SERVICE ACCESS AFTER COMPLETION OF PROJECT AND TO MINIMIZE ANY POSSIBLE DAMAGE TO INSTALLED CAMERA OR ASSOCIATED CABLING.
2. INSTALLING SUBCONTRACTOR SHALL FURNISH AND INSTALL FIRESTOP MATERIALS FOR CAMERA ROUGH-INS PER PROJECT REQUIREMENTS. REFER TO SPECIFICATIONS FOR FIRESTOP REQUIREMENTS.
3. CAMERA MOUNTING ACCESSORY SHALL BE FROM THE SAME MANUFACTURER OF THE CAMERA AND APPROVED BY THE MANUFACTURER FOR USE WITH THE SPECIFIC MODEL NUMBER OF CAMERA INSTALLED. SUBCONTRACTOR SHALL INSTALL CAMERA MOUNTING ACCESSORY AND CAMERA PER MANUFACTURER'S INSTRUCTIONS.
KEYNOTES:
1. ROUTE CAT 6A CABLE TO OWNER PROVIDED CAMERA. TERMINATE CABLE WITH RJ-45 PLUG.
SCHEDULED CEILING
1" FLEXIBLE METALLIC CONDUIT FROM JUNCTION BOX TO ENCLOSURE. FLEX CONDUIT SHALL ONLY BE USED FOR MAXIMUM OF 10'
4-SQUARE OR OCTAGON JUNCTION BOX AS REQUIRED FOR CAMERA
CAMERA AS SPECIFIED
1" EMT CONDUIT ROUTE TO NEAREST CABLE TRAY
IF REQUIRED, PROVIDE TRIM RING TO ENSURE BACK BOX IS COMPLETELY COVERED
#
1
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
NOT TO SCALE
T-17
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY DETAILS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
CONTROLLED SECURITY SCHEME DOOR ROUGH-IN DETAIL 01
SCALE: N.T.S.
ACCESS CONTROL RISER DIAGRAM 02
SCALE: N.T.S.
EXTERIOR PARAPET MOUNTING 03
CONTROLLED SECURITY SCHEME (CSS) TYPE SCHEDULEELECTRONIC DOOR HARDWARE SUCH AS ELECTRIC STRIKES, ELECTRIC LATCH RETRACTION, ETC. SHALL BE PROVIDED AND INSTALLED BY OTHERS. REFER TO THE GENERAL TECHNOLOGY EQUIPMENT SCHEDULE ON
T-1 FOR CREDENTIAL READER TYPE INFORMATION.
DOOR # RO
UG
H-I
N O
NL
Y
CREDENTIALREADER INTEGRATION
REQUEST TOEXIT DOOR HARDWARE
OTHER (REFER TONOTES)
NOTESCR
ED
EN
TIA
L R
EA
DE
R T
YP
E
MU
LT
IPL
E C
RE
DE
NT
IAL
RE
AD
ER
S O
PE
RA
TE
S S
ING
LE
DO
OR
OP
ER
AT
ES
MU
LT
IPL
E D
OO
RS
WIR
EL
ES
S
AU
TO
MA
TIC
DO
OR
OP
ER
AT
OR
EL
EV
AT
OR
LO
CK
ED
BY
EM
ER
GE
NC
Y D
UR
ES
S S
EQ
UE
NC
E
INF
AN
T P
RO
TE
CT
ION
RE
MO
TE
UN
LO
CK
VIA
IN
TE
RC
OM
MA
ST
ER
RE
MO
TE
UN
LO
CK
VIA
PU
SH
BU
TT
ON
INT
RU
SIO
N D
ET
EC
TIO
N
RE
MO
TE
UN
LO
CK
VIA
FIR
E C
OM
MA
ND
CE
NT
ER
VID
EO
SU
RV
EIL
LA
NC
E
WA
ND
ER
PR
EV
EN
TIO
N S
YS
TE
M
INT
ER
NA
L E
LE
CT
RIF
IED
HA
RD
WA
RE
CO
NN
EC
TIO
N
LO
CA
L P
US
HB
UT
TO
N D
OO
R H
AR
DW
AR
E O
VE
RR
IDE
MO
TIO
N D
ET
EC
TO
R
EL
EC
TR
ON
IC L
OC
KIN
G H
AR
DW
AR
E (
BY
OT
HE
RS
)
MA
G L
OC
K
LA
TC
H S
TA
TU
S D
ET
EC
TIO
N
LO
CA
L A
LA
RM
HO
RN
MO
NIT
OR
LA
TC
H B
OL
T
MO
NIT
OR
DO
OR
PO
SIT
ION
SW
ITC
H S
PD
T
MO
NIT
OR
DO
OR
PO
SIT
ION
SW
ITC
H D
PD
T
MO
NIT
OR
DO
OR
PO
SIT
ION
SW
ITC
H F
OR
OV
ER
HE
AD
DO
OR
DE
LA
YE
D E
GR
ES
S
LO
CA
L 1
20V
AC
PO
WE
R S
UP
PL
Y
SC
HE
DU
LE
BA
SE
D L
OC
KIN
G
VIS
UA
L S
TR
OB
E
CR1 ● ● ●
CR1 ● ● ●
CR1 ● ● ●
01A09 CR1 ● ● ●
01AD02B CR1 ● ● ●
01AD02C CR1 ● ● ●
01AD02D CR1 ● ● ●
01AD02E CR1 ● ● ●
01AZ13 CR1 ● ● ●
01BF02 CR1 ● ● ●
01D11 CR1 ● ● ●
01E01 CR2 ● ● ●
01F08 CR1 ● ● ●
01F16 CR1 ● ● ●
01H01 CR1 ● ● ●
01X13 CR1 ● ● ●
F37-11 CR1 ● ● ●
F37-13 CR1 ● ● ●
SCALE: N.T.S.
RESCUE ASSISTANCE RISER DIAGRAM04
#
SCALE: N.T.S.
INACCESIBLE CEILING MOUNTED CAMERA ROUGH-IN DETAIL 05
REAR OF EQUIP. RACK
REAR OF EQUIP. RACK
E.C. PROVIDED GROUND BAR
GROUND CABLE(TYP.)
GROUND TRUNK CABLE
GROUND CABLE(TYP.)
SC-LR-1UPPER LEVEL
SC-LR-1MID LEVEL
SC-LR-1LOWER LEVEL
GROUND WIRE CLAMP (TYP.)
1
3
3
2
2
2
3
4
E.C. PROVIDED GROUND BAR
GROUND CABLE
GROUND CABLE
GROUND TRUNK CABLE RUNS THE LENGTH OF THE TUNNEL
GROUND CABLE
SC-LR-1UPPER LEVEL
SC-LR-1UPPER LEVEL
SC-LR-1LOWER LEVEL
2
2
3
32
1
3
4
SC-LR-2+7' AFF
GROUND CABLE
E.C. PROVIDED GROUND BAR
3
4
2
GROUND TRUNK CABLE RUNS THE LENGTH OF THE TUNNEL
12
SC-LR-2+6' AFF
E.C. PROVIDED GROUND BAR
GROUND CABLE
GROUND TRUNK CABLE RUNS THE LENGTH OF THE GALLERY
SC-LR-1LOWER LEVEL
2
1
3
4
SC-LR-1MID LEVEL
2
SC-LR-1UPPER LEVEL
2
SC-LR-1UPPER LEVEL
2
SC-LR-1UPPER LEVEL
2
GROUND CABLE
3
GROUND CABLE
3
GROUND TRUNK CABLE RUNS THE LENGTH OF THE GALLERY
1
GROUND TRUNK CABLE RUNS THE LENGTH OF THE GALLERY
1
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
NOT TO SCALE
T-18
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY SECTIONS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
TECHNOLOGY GALLERY GROUNDING DETAIL A 01
NOTES:
1. CONFIGURATION SHOWN IN THE DETAIL ABOVE IS DIAGRAMMATIC AND INTENDED TO DESCRIBE THE CABLE TRAY GROUNDING. REFER TO SPECIFICATIONS FOR COMPLETE INFORMATION.
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.3. REFER TO 1/T-3 FOR SECTION LOCATION.
KEYNOTES:
1. EXTEND #500KCM COPPER BONDING CONDUCTOR TO NEXT SC-LR-1 FOR LENGTH OF TUNNEL.2. REFER TO FLOOR PLANS FOR CABLE TRAY LOCATIONS AND ELEVATIONS.3. #500KCM COPPER BONDING CONDUCTOR FOR GROUND WIRE.4. REFER TO ELECTRICAL DRAWINGS FOR E.C. PROVIDED GROUND BAR LOCATIONS AND QUANTITY.
NOTES:
1. CONFIGURATION SHOWN IN THE DETAIL ABOVE IS DIAGRAMMATIC AND INTENDED TO DESCRIBE THE CABLE TRAY GROUNDING. REFER TO SPECIFICATIONS FOR COMPLETE INFORMATION.
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.3. REFER TO 1/T-12 FOR SECTION LOCATION.
KEYNOTES:
1. EXTEND #500KCM COPPER BONDING CONDUCTOR TO NEXT SC-LR-1 FOR LENGTH OF GALLERY.2. REFER TO FLOOR PLANS FOR CABLE TRAY LOCATIONS AND ELEVATIONS.3. #500KCM COPPER BONDING CONDUCTOR FOR GROUND WIRE.4. REFER TO ELECTRICAL DRAWINGS FOR E.C. PROVIDED GROUND BAR LOCATIONS AND QUANTITY.
NOTES:
1. CONFIGURATION SHOWN IN THE DETAIL ABOVE IS DIAGRAMMATIC AND INTENDED TO DESCRIBE THE CABLE TRAY GROUNDING. REFER TO SPECIFICATIONS FOR COMPLETE INFORMATION.
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.3. REFER TO 1/T-8 FOR SECTION LOCATION.
KEYNOTES:
1. EXTEND #500KCM COPPER BONDING CONDUCTOR TO NEXT SC-LR-2 FOR LENGTH OF TUNNEL.2. REFER TO FLOOR PLANS FOR CABLE TRAY LOCATIONS.3. #500KCM COPPER BONDING CONDUCTOR FOR GROUND WIRE.4. REFER TO ELECTRICAL DRAWINGS FOR E.C. PROVIDED GROUND BAR LOCATIONS AND QUANTITY.
#
#
#
SCALE: N.T.S.
TECHNOLOGY TUNNEL GROUNDING DETAIL 03
SCALE: N.T.S.
TECHNOLOGY TUNNEL - BTL - GROUNDING DETAIL 04
SCALE: N.T.S.
TECHNOLOGY GALLERY GROUNDING DETAIL B 02
NOTES:
1. CONFIGURATION SHOWN IN THE DETAIL ABOVE IS DIAGRAMMATIC AND INTENDED TO DESCRIBE THE CABLE TRAY GROUNDING. REFER TO SPECIFICATIONS FOR COMPLETE INFORMATION.
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE INFORMATION.3. REFER TO 1/T-12 FOR SECTION LOCATION.
KEYNOTES:
1. EXTEND #500KCM COPPER BONDING CONDUCTOR TO NEXT SC-LR-1 FOR LENGTH OF GALLERY.2. REFER TO FLOOR PLANS FOR CABLE TRAY LOCATIONS AND ELEVATIONS.3. #500KCM COPPER BONDING CONDUCTOR FOR GROUND WIRE.4. REFER TO ELECTRICAL DRAWINGS FOR E.C. PROVIDED GROUND BAR LOCATIONS AND QUANTITY.
#
6" SCHEDULE 40L-BEND CONDUITS
SC-LR-1LOWER LEVEL
SC-LR-1UPPER LEVEL
10
'-4
"
11
'-6
"
CLEAR ZONE, NO SUPPORTS ARE ALLOWED IN THIS ZONE.1
0'-0
"
1
2
TUNNEL LEVEL
MECHANICAL SPACE
6" CONDUIT FROM TUNNEL TO TRENCH
6" CONDUIT FROM GALLERY TO TRENCH
12
'-8
"
TUNNEL LEVEL
GALLERY LEVEL
10" CONDUIT FROM TUNNEL TO TRENCH
10" CONDUIT FROM GALLERY TO TRENCH
12
'-8
"
TUNNEL LEVEL
TRENCH LEVEL
GALLERY LEVEL
L-BEND CONDUIT BANK 2.REFER TO 05/T-19 FOR ADDITIONAL INFORMATION.
L-BEND CONDUIT BANK 1. REFER TO 04/T-19 FOR ADDITIONAL INFORMATION.
(4) #4 BARS CONTINUOUS ON TOP AND BOTTOM
6" SCHEDULE 40 PVC
4" MINIMUM COMPACTED AGGREGATE BASE.
#4 TIE BARS AT 3'-0" ON CENTER
INTERMEDIATE SPACER
CONDUIT NONMETALLIC SPACER, MAXIMUM 5' ON CENTER. SNAP LOC S288RHN AND S289RHN SERIES
3" MIN.
3"
MIN
.8.1
4"
6.3
8"
2500 PSI CONCRETE
1 1/4" 1 1/4"
8.38"
NOTES :
1. INSTALL 2000 lb TENSILE STRENGTH BRAIDED POLYPROPYLENE PULL CORD IN ALL CONDUITS.2. TRENCHING AND BACKFILL ACCORDING TO SPECIFICATIONS.3. DOWEL ENDS OF DUCTBANK TO FOUNDATION OR MANHOLE WITH A MINIMUM OF (4) #4 DOWELS.4. (40) 6" L-BEND CONDUITS UP TO MECHANICAL SPACE WITH 1-1/2" SNAP-LOC SPACERS.
8.38"8.38"
8.38"
8.38"
8.38"
8.38"
8.38"5/8"
19
/32
"
1"
8.1
4"
8.1
4"
8.38"
(4) #4 BARS CONTINUOUS ON TOP AND BOTTOM
6" SCHEDULE 40 PVC
4" MINIMUM COMPACTED AGGREGATE BASE.
#4 TIE BARS AT 3'-0" ON CENTER
INTERMEDIATE SPACER
CONDUIT NONMETALLIC SPACER, MAXIMUM 5' ON CENTER. SNAP LOC S288RJN AND S289RJN SERIES
3" MIN.
3"
MIN
.8.6
4"
6.3
8"
2500 PSI CONCRETE
1 1/4" 1 1/4"
8.88"
NOTES :
1. INSTALL 2000 lb TENSILE STRENGTH BRAIDED POLYPROPYLENE PULL CORD IN ALL CONDUITS.2. TRENCHING AND BACKFILL ACCORDING TO SPECIFICATIONS.3. DOWEL ENDS OF DUCTBANK TO FOUNDATION OR MANHOLE WITH A MINIMUM OF (4) #4 DOWELS.4. (44) 6" L-BEND CONDUITS UP TO MECHANICAL SPACE WITH 2" SNAP-LOC SPACERS.
8.88"8.88"
8.88"
8.88"
8.88"
8.88"
8.88"
8.88"
8.88"5/8"
19
/32
"
1"
8.6
4"
8.6
4"
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
NOT TO SCALE
T-19
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY SECTIONS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO MECHANICAL SPACE ISO-VIEW A 02
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO MECHANICAL SPACE SECTION 01
NOTES:
1. REFER TO 1/T-3 AND 1/T-10 FOR SECTION LOCATION.2. REFER TO 02/T-19 AND 03/T-19 FOR ISO-VIEWS.
KEYNOTES:
1. SUBCONTRACTOR TO PROVIDE BELLED END, FLUSH WITH OPENING. INSIDE EDGE OF BELLED END CONDUIT SHALL BE GROUND AND BEVELED.
2. SUBCONTRACTOR TO PROVIDE BELLED END. INSIDE EDGE OF BELLED END CONDUIT SHALL BE GROUND AND BEVELED.
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO TRENCH SECTION A 06
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO TRENCH SECTION B 07
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO MECHANICAL SPACE ISO-VIEW B 03
SCALE: N.T.S.
L-BEND CONDUIT BANK 1 - TUNNEL TO MECHANICAL SPACE 04
SCALE: N.T.S.
L-BEND CONDUIT BANK 2 - TUNNEL TO MECHANICAL SPACE 05
NOTES:
1. REFER TO 1/T-3 AND 1/T-10 FOR SECTION LOCATION.2. SUBCONTRACTOR TO PROVIDE BELLED END, FLUSH WITH OPENING. INSIDE EDGE OF BELLED END CONDUIT
SHALL BE GROUND AND BEVELED FOR ALL CONDUIT.
NOTES:
1. REFER TO 1/T-4 AND 1/T-11 FOR SECTION LOCATION.2. SUBCONTRACTOR TO PROVIDE BELLED END, FLUSH WITH OPENING. INSIDE EDGE OF BELLED END CONDUIT
SHALL BE GROUND AND BEVELED FOR ALL CONDUIT.
#
SC-LR-1LOWER LEVEL
SC-LR-1LOWER LEVEL
6" SCHEDULE 80S-BEND CONDUITS
11
'-6
"
10
'-4
"
11
'-3
1/2
"
SC-LR-1UPPER LEVEL
SC-LR-1UPPER LEVEL
SC-LR-1MID-LEVEL
10
'-4
"
SC-LR-1UPPER LEVEL
CLEAR ZONE, NO SUPPORTS ARE ALLOWED IN THIS ZONE.1
0'-0
"
10
'-0
"
CLEAR ZONE, NO SUPPORTS ARE ALLOWED IN THIS ZONE.
1
2
3
11
'-6
"
GALLERY LEVEL
TUNNEL LEVEL
TRENCH LEVEL
SC-LR-1 (TYP.)S-BEND CONDUIT BANK 1. REFER TO 04/T-20 FOR ADDITIONAL INFORMATION.
SC-LR-1 (TYP.)
S-BEND CONDUIT BANK 2. REFER TO 05/T-20 FOR ADDITIONAL INFORMATION.
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
As indicated
T-20
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY SECTIONS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO GALLERY SPACE SECTION 01
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO GALLERY SPACE - ISO VIEW A 02
NOTES:
1. REFER TO 1/T-5 AND 1/T-12 FOR SECTION LOCATION.2. REFER TO 02/T-20 AND 03/T-20 FOR ISO-VIEWS.
KEYNOTES:
1. SUBCONTRACTOR TO PROVIDE SUPPORT AND BRACING TO PREVENT CONDUITS FROM SHIFTING DURING AND AFTER INSTALLATION. SUBCONTRACTOR TO PROVIDE MOCK-UP OF BRACING FOR FRA APPROVAL PRIOR TO INSTALLATION
2. SUBCONTRACTOR TO LIMIT CONDUIT SHIFT WITH ADDITIONAL SEALANT AT PENETRATION3. SUBCONTRACTOR TO PROVIDE BELLED END, FLUSH WITH OPENING. INSIDE EDGE OF BELLED END CONDUIT SHALL BE
GROUND AND BEVELED.
SCALE: N.T.S.
S-BEND CONDUIT BANK 1 - TUNNEL TO GALLERY SPACE 04
SCALE: N.T.S.
S-BEND CONDUIT BANK 2 - TUNNEL TO GALLERY SPACE 05
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO GALLERY SPACE - ISO VIEW B 03
NOTES:
1. (27) 6" S-BEND CONDUITS UP TO GALLERY SPACE WITH 3" SNAP-LOC SPACERS.
NOTES:
1. (15) 6" S-BEND CONDUITS UP TO GALLERY SPACE WITH 3" SNAP-LOC SPACERS.
#
(32) 6" SCHEDULE 40CONDUITS
SC-LR-2(TYP.)5
'-0
"
6'-0
"
7'-0
"
8'-0
"
SC-LR-1
1
TUNNEL LEVEL
BUILDING F37
SC-LR-2(TYP.)
(32) 6" CONDUITS. REFER TO 03/T-21 FOR ADDITIONAL INFORMATION.
SC-LR-1(TYP.)
12
'-8
"
12
'-8
"
SC-LR-1(TYP.)
11
'-6
"
10
'-4
"
10
'-4
"
SC-LR-1
SC-LR-1(TYP.)
SC-LR-1(TYP.)
(4) #4 BARS CONTINUOUS ON TOP AND BOTTOM
6" SCHEDULE 40 PVC
4" MINIMUM COMPACTED AGGREGATE BASE.
#4 TIE BARS AT 3'-0" ON CENTER
INTERMEDIATE SPACER
CONDUIT NONMETALLIC SPACER, MAXIMUM 5' ON CENTER. SNAP LOC S288RJN AND S289RJN SERIES
3" MIN.
3"
MIN
.9.6
4"
6.3
8"
2500 PSI CONCRETE
9.88"
1 1/4" 1 1/4"
9.88" 9.88"
NOTES :
1. INSTALL 2000 lb TENSILE STRENGTH BRAIDED POLYPROPYLENE PULL CORD IN ALL CONDUITS.2. TRENCHING AND BACKFILL ACCORDING TO SPECIFICATIONS.3. DOWEL ENDS OF DUCTBANK TO FOUNDATION OR MANHOLE WITH A MINIMUM OF (4) #4 DOWELS.4. (8) 6" L-BEND CONDUITS UP TO MECHANICAL SPACE WITH 3" SNAP-LOC SPACERS.
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
As indicated
T-21
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY SECTIONS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO BUILDING F37 SECTION 01
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO BUILDING F37 SPACE- ISO VIEW A 02
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO BUILDING F37 SPACE- ISO VIEW B 04
SCALE: N.T.S.
TECHNOLOGY HIGHBAY TO GALLERY SECTION 05
SCALE: N.T.S.
TECHNOLOGY HIGHBAY TO GALLERY SECTION ISO-VIEW A 06
NOTES:
1. REFER TO 1/T-10 FOR ELEVATION LOCATION.2. REFER TO 06/T-21 FOR ISO-VIEW.
NOTES:
1. REFER TO 1/T-9 AND 1/T-15 FOR SECTION LOCATION.2. REFER TO 02/T-21 AND 04/T-21 FOR ISO-VIEWS.
KEYNOTES:
1. SUBCONTRACTOR TO PROVIDE BELLED END AT BOTH ENDS OF CONDUITS, FLUSH WITH OPENING. INSIDE EDGE OF BELLED END CONDUIT SHALL BE GROUND AND BEVELED.
SCALE: N.T.S.
TECHNOLOGY PIT TO HIGH-BAY SPACE ISO-VIEW 07
SCALE: N.T.S.
TECHNOLOGY PIT SPACE ISO-VIEW 08
SCALE: N.T.S.
L-BEND CONDUIT BANK - TUNNEL TO F37 03
11
'-6
"
10
'-4
"
7'-2
"
(12) 4" CONDUITS
SC-LR-1(TYP.)
SC-LR-1(TYP.)
(12) 4" CONDUITS
(12) 4" CONDUITS
7'-0
"
6'-0
"SC-LR-2(TYP.)
SC-LR-2(TYP.)
SC-LR-2(TYP.)
(12) 4" CONDUITS
7'-0
"
SC-LR-2(TYP.)
6'-0
"
8'-0
"
REV. DATE
DESIGNED
CHECKED
APPROVED
SUBMITTED
DRAWN
DRAWING NO.DESCRIPTIONS
REVISIONSREV.
UNITED STATES DEPARTMENT OF ENERGY
NAME DATE
SCALE:
Consulting Engineers550 North Commons Drive Suite 116Aurora, IL 60504
Tel : 630.820.1022Fax: 630.820.0350
Architects11 East Madison Street Suite 300Chicago IL 60602
Tel : 312.456.0123Fax: 312.456.0124
Structural Engineers600 West Van Buren Suite 900Chicago, IL 60607
Tel : 312.341.0055Fax: 312.341.9966
MEP Engineers1100 Warrenville Rd. Suite 400WNaperville, IL 60563
Tel : 630.527.2320Fax: 630.527.2321
Landscape Architects1431 Opus Pl. Suite 400Downers Grove, IL 60515
Tel : 630.724.3200Fax: 630.724.3201
Pre-Construction Contractor55 East Monroe Street Suite 1430Chicago, IL 60603
Tel : 312.327.2770Fax: 312.327.2800 4-3-5
1/2" = 1'-0"
T-22
PIP-II Linac Complex
Fermilab Research Alliance
AA
JE
JK
JOTECHNOLOGY SECTIONS
2021-03-12
2021-03-12
2021-03-12
2021-03-12
202
1-0
3-1
2
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO BTL SECTION01
SCALE: N.T.S.
TECHNOLOGY TUNNEL TO BTL ISO-VIEW A 02
SCALE: N.T.S.
TECHNOLOGY BTL TO TUNNEL SECTION03
SCALE: N.T.S.
TECHNOLOGY BTL TO TUNNEL ISO-VIEW A 04
NOTES:
1. REFER TO 1/T-6 FOR SECTION LOCATION.2. REFER TO 02/T-22 FOR ISO-VIEW.
NOTES:
1. REFER TO 1/T-6 FOR SECTION LOCATION.2. REFER TO 03/T-22 FOR ISO-VIEW.
SCALE: N.T.S.
TECHNOLOGY TUNNEL - BTL 05
As indicated
NOTES:
1. REFER TO 1/T-8 FOR SECTION LOCATION.