INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Embed Size (px)

Citation preview

Page 1: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN Testbed1 status L. Gaido, A. Ghiselli

WP6 meetingCERN, 11 December 2001

Page 2: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN participation to DataGrid WP6

• Integration Team:– packaging – installation and configuration using LCFG– Information Service– documentation

• Authorization

• Site managers

Page 3: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

The goal

• The goal is to provide a working infrastructure for the middleware validation

• This is achieved by providing:– a simple automatic installation tool– test suites– a wide deployment of the infrastructure– an effective support service

Page 4: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Infn Testbed resources

• They consist of:– Dedicated resources for middleware testing &

validation• 6 sites with a cluster (10 CPUs and a disk server with

300GB of disk space)

• 12 sites with a small cluster (3-5 nodes)

– A Tier1 Regional Centre prototype at CNAF– Experiments’ Tier2 and Tier3 RCs

Page 5: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

GARR PoP

access points (PoP)

main transport nodes

TORINO PADOVA

BARI

PALERMO

FIRENZE

PAVIA

MILANO

GENOVA

NAPOLI

CAGLIARI

TRIESTE

ROMA

PISA

L’AQUILA

CATANIA

BOLOGNA

UDINE

TRENTO

PERUGIA

LNF

LNGS

SASSARI

LECCE

LNS

LNL

SALERNO

COSENZA

S.Piero

FERRARA

PARMACNAF

ROMA2

Testbed Sites 6 main 12 small

INFN TESTBED SitesGeant2.5Gbps600Mbps

USA

Page 6: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

CMS CMS ReplicaReplicaCatalogueCatalogue

TB1 CNAF site

SESE370GB370GB

CECE (10 PIII 1GHz,(10 PIII 1GHz,512 MB RAM)512 MB RAM)

ATLAS ATLAS ReplicaReplicaCatalogueCatalogue

GE SwitchLCFG server

InfnGrid InfnGrid VOVOLdap serverLdap server

User Interface

TestTest RCRC

Page 7: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN TB1 site (6 sites)

SESE370GB370GB

CECE (10 PIII 1GHz,(10 PIII 1GHz, 512 MB RAM)512 MB RAM)

FE Switch

LCFG server

User Interface

Page 8: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

INFN sites for Testbed1

R.Broker

I I

Garr-B

Garr-G

Cnaf

MI

PD

CE

SETO

CT

CE

SERC/CMS

PICE

SE

CE

SECE

SE

CE

SE

RC/ATLAS VORC

(155M 622M)

(155M 622M)

(155M 622 M)

(155M 622M)

(155M ) 622M)

(155M 622M)

UI

UI

Page 9: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Testbed1 setup steps

• The rpm lists for the grid elements (CE, WN, SE and UI) have been tested and manually configured at CNAF (Globus2 alpha 15)

• The CE, WN, SE and UI have been installed and configured using LCFG in the Testbed1 sites

• Test-suites for the grid elements are being developed (SE almost ready, CE, WN, UI under construction)

• CEs and SEs have been registered in II at CNAF• The UI users have to be mapped to the local RB

account (e.g. wp1 at CNAF, condor at CERN).

Page 10: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Testbed1 setup steps

• InfnGrid VO has been created and populated with every InfnGrid application-independent people

• Testbed1 group (inside InfnGrid VO) created (users involved in test and validation activities)

• Mkgridmap ready to be used to create the gridmapfile where needed (CEs)

• Testbed1 users created on the UIs• NetSaint installed and configured to monitor the

INFN Testbed1 resources (ping, CPU, disk usage)

Page 11: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

InfnGrid & DataGrid testbeds

DataGrid Appl. & WP6 partners VOs

INFN-GridVO

Infn sites

2 grid domains:• 6 sites for DataGrid Testbed1 • 6+12sites for national Testbed1

CERN

Lyon/in2p3

RAL/pparc

nikhefmi to

ba

ca

nale pd/lnl

Cnaf/boctpi

roma

ts

ge

pvrm3

fepr

Each InfnGrid site can join the DataGrid Testbed if needed

Page 12: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

RB – II- GRIS layout

INFN (@CNAF)

CERN

UK

IN2P3

RB II

RB II

CT TO CNAF

ALICE

RB II

…..

Testbed1AliceCMS

CE & SE Grises:

…..CMS

RB II

Page 13: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

GRID monitoring at INFN

• Interim solution• Tool chosed: NetSaint (http://www.nagios.org)• Present/future activities:

– monitoring of all INFN Testbed1 sites– monitoring of the ALICE testbed– interface to the RRDTool for plots of historical trend of

monitored parameters– interface to Globus MDS 2 under way

• Current implementation: http://infngrid.ct.infn.it (username: infn-tb - password: guest)

Page 14: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Grid monitoring at INFN

Page 15: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Conclusions

• A lot of work has been done to install and test the software

• Strong cooperation among people from different WPs

• Site managers support for installation and testing

• some work still to be done

Page 16: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Conclusions

• Strong need for well defined software releases to work on

• The grid should be widely distributed. We are at a very early stage.

Need for a deployment plan and a support structure

• Test of an MDS infrastructure for the grid domains (VO) and services needed

Page 17: INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001

Thanks to

Marco Serra (Roma1) Enrico Ferro (Legnaro)

Massimo Biasotto (Legnaro) Marco Verlato (Padova)

Andrea Chierici (CNAF) Flavia Donno (Pisa)

Silvia Resconi (Milano) Roberto Barbera (Catania)

Carlo Rocca (Catania) Giuseppe Sava (Catania)

Gennaro Tortone (Napoli) Antonio Forte (Torino)

Stefano Lusso (Torino) Alessandro Cavalli (CNAF)

Stefano Barale (Torino) Alessandro Italiano (CNAF)

Daniele Mura (Cagliari) Andrea Sciaba’ (Pisa)

Alessandro De Salvo (Roma) P. Lo Re (Napoli)

and, last but not least, Authorization WG, IT & Loose Cannons