15
Journal of Civil Engineering and Architecture 2011, David Publishing Company, USA 1 Ineffectiveness of Planning Control and Its Implication to Housing Oversupply: A Case Study of Johor Bahru, Malaysia Alias Rameli 1 and Ratnawati Aman 2 1 Federal Department of Town and Country Planning, Ministry of Housing and Local Government, Malaysia. ([email protected]) 2 RA Planning and Management Services Consultant, Johor Bahru, Malaysia ([email protected]) ABSTRACT The role of land use planning system in housing development is not limited to the meeting of housing needs but also encourages and ensures the efficiency of the housing market system. Even in the failure of the housing market, planning system is seen able to rectify the failure by properly governing the activities of housing approval. The effectiveness of planning system in Malaysia however, is questionable due to the existence of housing oversupply and property overhang. The shortcomings in the approach and practice of planning control have arguably contribute to the problem. The veracity of the argument is proven by the empirical research conducted in the Johor Bahru Conurbation area. In the research, the effectiveness of the planning control process is measured by examining the outcomes of housing approval. The method of content analysis has been applied to analyse selected housing application files. The research shows that there are shortcomings in controlling and approving new housing applications. The non-compliance to the proposed land use zoning, lack of consideration to the aspects of housing demand and failure to impose the exact planning conditions are among the causes of the ineffectiveness of the planning control process which eventually contribute to the existence of housing oversupply. Keywords: Land use planning, housing development, housing planning, planning control 1. INTRODUCTION The land use planning system plays a pivotal role in achieving sustainability, efficiency and effectiveness in the development of the housing sector. In Malaysia, the current planning mechanisms, particularly the structure plan (SP), local plan (LP) and planning control are recognized as tools to plan and control the development and the supply of housing (Alias, 2007). Through the preparation of the SP, housing policies are formulated to achieve housing planning and development objectives. Subsequently, housing land area, housing quantity and suitable locations for future housing development will be determined and allocated in the preparation of LP. The housing planning activity is completed at the stage of planning control,

Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

  • Upload
    rd-jpbd

  • View
    214

  • Download
    1

Embed Size (px)

DESCRIPTION

Ineffectiveness of Planning Control and Its Implication to Housing Oversupply: A Case Study of Johor Bahru, Malaysia by Alias Rameli and Ratnawati Aman

Citation preview

Page 1: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

1

Ineffectiveness of Planning Control and Its Implication to Housing Oversupply: A Case Study of

Johor Bahru, Malaysia

Alias Rameli1 and Ratnawati Aman

2

1Federal Department of Town and Country Planning,

Ministry of Housing and Local Government, Malaysia.

([email protected])

2 RA Planning and Management Services Consultant,

Johor Bahru, Malaysia ([email protected])

ABSTRACT

The role of land use planning system in housing development is not limited to the meeting of

housing needs but also encourages and ensures the efficiency of the housing market system.

Even in the failure of the housing market, planning system is seen able to rectify the failure by

properly governing the activities of housing approval. The effectiveness of planning system in

Malaysia however, is questionable due to the existence of housing oversupply and property

overhang. The shortcomings in the approach and practice of planning control have arguably

contribute to the problem. The veracity of the argument is proven by the empirical research

conducted in the Johor Bahru Conurbation area. In the research, the effectiveness of the

planning control process is measured by examining the outcomes of housing approval. The

method of content analysis has been applied to analyse selected housing application files. The

research shows that there are shortcomings in controlling and approving new housing

applications. The non-compliance to the proposed land use zoning, lack of consideration to the

aspects of housing demand and failure to impose the exact planning conditions are among the

causes of the ineffectiveness of the planning control process which eventually contribute to the

existence of housing oversupply.

Keywords: Land use planning, housing development, housing planning, planning control

1. INTRODUCTION

The land use planning system plays a pivotal role in achieving sustainability, efficiency and

effectiveness in the development of the housing sector. In Malaysia, the current planning

mechanisms, particularly the structure plan (SP), local plan (LP) and planning control are

recognized as tools to plan and control the development and the supply of housing (Alias,

2007). Through the preparation of the SP, housing policies are formulated to achieve housing

planning and development objectives. Subsequently, housing land area, housing quantity and

suitable locations for future housing development will be determined and allocated in the

preparation of LP. The housing planning activity is completed at the stage of planning control,

Page 2: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

2

where each housing application will be assessed prior to approval. By conducting these

activities effectively, the housing planning process are assumed to meet the objectives of

meeting housing needs, fulfil the household housing demands, consider the housing market

demands and balance the supply and demand of housing.

The effectiveness of land use planning system in Malaysia however, is questionable due to the

existence of housing oversupply and property overhang. The shortcomings in the approach and

practice of planning control have arguably contribute to the problem. The factuality of the

argument has been proven by the empirical research conducted in the Johor Bahru Conurbation

(JBC) area. The research shows there are shortcomings in controlling and approving new

housing applications which eventually contribute to the existence of housing oversupply in the

area. These findings will be discussed in detail in this paper. Prior to that, the paper will briefly

explain some theoretical points related to the role of land use planning system in housing supply

process and the framework of Malaysian housing planning process. The paper will also discuss

the issue of housing oversupply and the methods of measuring the effectiveness of planning

control process.

2. THE ROLE OF LAND USE PLANNING SYSTEM IN HOUSING SUPPLY

PROCESS

The land use planning system through the mechanisms of development plan and planning

control and the market system as operated in the housing production process are among the

systems which exist and influenced the structure, process and outcomes of housing supply

(Golland, 1998). According to Adams and Watkins (2002), the operation of the systems, in

relation to the production of housing supply, are not separated but interrelated and complement

each other. The argument is supported by Rydin (1993) who stresses that the housing

development goals can only be achieved through a good interaction between the operation of

land and housing markets by house-builders with the activities of land use planning

administered by local authorities. The land use planning’s role in housing supply process is not

only limited to fulfilling the goal of meeting housing needs and ensure the development of

housing is in a sustainable manner, but also to encourage efficiency in the system and operation

of housing market (Greed, 1996; Chan, 1997). Indeed, it is recognised that the planning system

has an ability to rectify the imperfection and failure of the housing market by properly

governing the process of housing approval (Rydin, 1993).

It becomes a key function of land use planning to allocate adequate land for new housing

development according to planned assessment of the housing needs and to coordinate these land

allocations with supporting infrastructure (Carmona et al., 2003). With regard to this, there are

two dominant discourses wrapped around the decisions regarding allocation of land for housing.

The first is the amount or quantity of new-build required and the intensity to which land should

be developed. The second concerns the marketability of the land supply released by local

authorities in their housing land availability schedule (Hull, 1997). This concern basically

relates to where and how to allocate suitable locations for current and future housing

development. Adam and Watkins (2002) perceives that the land use planning system can play a

Page 3: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

3

significant role in this aspect by determining potential areas and specific localities for future

housing and considering the expected future market demands.

The matters of land allocation, quantity and location for housing has attracted Carmona et al.

(2003) to debate further. According to Carmona et al. (2003), the philosophy of ‘predict and

provide’ as previously adopted by the UK’s housing planning had forced local authorities to

comply to the housing numbers predicted at the national and regional levels, to deliver their

allocation in advance of demand. This system arguably contributed to the provision of housing

in the wrong type and quantity and caused the locational mismatches between the supply of and

demand for housing. The introduction of the ‘plan, monitor and manage’ system in the UK was

perceived as a responsive approach to planning for housing in the right type and quantity and in

the right locations (Carmona et al., 2003). This new system has led LPAs to endeavour to meet

the best housing requirement for local population (Adams and Watkins, 2002).

The role of land use planning system in managing housing supply was practically exercised

through the activities of forward planning and development control. The preparation of

development plans, as a mechanism for forward planning, will examine the existing housing

conditions, formulate housing policies and determine future housing requirements in terms of

quantity, land area and location. This is subsequently followed by the process of development

and planning control which become an important stage in the overall housing production

process. At this stage, housing development applications will be assessed by the planning

authorities before development is permitted (Figure 1).

Figure 1: The role of the land use planning system in housing supply process

Source: Adapted from Alias et al. (2007)

Housing Planning

Control Process

Housing Market

Operations by

Developer

Preparation of

Development Plans Other

Activity

Other

Activity

Other

Activity

Assess, control and approve

new housing supplies

Examine existing

housing conditions

Formulate housing

policies

HOUSING PLANNING PROCESS

FORWARD

PLANNING HOUSING PRODUCTION PROCESS

DEVELOPMENT

CONTROL

Determine future

housing requirement

Page 4: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

4

In exercising the housing planning process, it becomes fundamental for the land use planning

system to achieve the objective of meeting housing needs by providing adequate housing

(Golland and Gillen, 2004). Basically, the housing planning goal is considered achieved when

the objective of meeting housing needs is met (Pearce, 1992). Nicol (2002) however, argues

that meeting housing needs alone is insufficient to achieve a more integrated and effective

housing supply. Nicol proposes the housing planning process to take into consideration as well

the aspects of housing demand. This is agreed by Golland and Gillen (2004) who viewed that by

considering the housing demands, it will help the planning authority to know more about the

choices of households will make in gaining access to a new house and their ability (effective

demand) to pay for housing.

Market demand criteria, in addition to the household `effective demand’, is also important in the

housing planning process. Bramley (1992) identifies several elements in the housing market

criteria, such as local housing market conditions and the house buyer preferences in terms of

price, location and type of housing. The importance of these factors have been emphasized by

Hull (1997), who stresses that apart from playing a role in meeting housing needs and housing

demands, the forward planning and development control process should also look at the

importance of the market criteria, especially with regards to the factor of marketable location.

The significance of market demand criteria is also addressed by Bramley et al. (1995), who

propose a greater awareness of the market by the housing planning process through

incorporating policies and procedures sensitive to the needs of the market. Pearce (1992) and

Nicol (2002) also highlight the responsibility of local authorities in the adequate understanding

of housing market before the decision to release new housing supply. In similar tone, Golland

and Gillen (2004) emphasize the necessity for the planning process to understand the

consumer’s `taste’ in housing market. Stressing on the above arguments, Healey (1992)

proposes three approaches into achieving the housing planning goals by the planning system

consisting of following the market, managing the market and creating the market.

The above discussion clarifies that the land use planning system through the mechanisms of

development plan and planning control play an important role in managing housing supply. The

mechanisms should operate not only to meet the housing requirements in broad (housing needs),

but also to fulfil and consider the household’s effective demands and the current and future

market demands. It also becomes the role of the mechanisms, particularly planning control to

balance the number of housing supply with the number of housing demand required by the

household and market. In principal, by properly exercising the activities of housing planning in

the development plans and planning control, an effective process of housing supply will be

attained (Figure 2).

Page 5: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

5

Figure 2: The framework of housing planning process in managing housing supply

3. THE PROCESS OF PLANNING AND CONTROLLING OF HOUSING SUPPLY IN

MALAYSIA

The process of housing planning in Malaysia is guided by the provisions of Town and Country

Planning Act, 1976 (Act 172). This Act has provides a statutory power to the State and local

planning authorities to formulate and implement policies related to housing planning and

development. As shown in Figure 3, the housing development policies will be formulated

during preparation of SP. Prior to that, the SP examines the current housing conditions and

forecasts the future housing requirement for the whole SP area. Broad housing policies in the

SP will be detailed out in the preparation of the LP. The LP further proceeds with the

forecasting of future housing requirements, followed by the determination of total housing land

area and distribution of suitable locations for future housing development.

Figure 3: The process of planning and controlling of housing supply

Source: Alias et al. (2007)

Meeting Housing Needs

PLANNING

SYSTEM FORWARD

PLANNING Housing Planning in

Development Plans

DEVELOPMENT

CONTROL Housing Planning

Control

Fulfilling Effective

Demand

Considering Market Demands

HOUSING

PLANNING

ACTIVITY

Effective

Housing

Supply

Process

Balancing supply and demand

STRUCTURE

PLAN

LOCAL

PLAN

PLANNING

CONTROL

Examination of current housing supply, needs and demand

Forecasting of future housing requirement for the local plan’s areas

Assessing, controlling and approving new housing supply

ACTIVITIES RELATED TO THE PLANNING AND

CONTROLLING OF HOUSING SUPPLY

PLANNING

MECHANISMS

Forecasting of future housing requirement for the structure plan’s area

Formulating housing planning and development policies

Locating suitable locations for future housing supply

Determining total land area and housing quantity for future housing

supply

Page 6: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

6

Besides development plans, the planning control mechanism also plays a significant role in the

process of housing planning by controlling and monitoring the applications of housing

development. At this stage, all housing development applications submitted by the applicant

(housing developer) will be assessed before approval by local planning authorities (LPAs). The

process and procedures to control and monitor the housing development were stated in Part IV

(Planning Control), Act 172. The provision under section 18(1) for instance, states that “no

person shall use or be permitted to use any land or building otherwise than in conformity with

the local plan”. This provision clarifies that any housing development should be in line with the

outcomes and proposals produced by the LPs

Thus, the planning control procedure requires the LPA to consider several aspects in controlling

housing supply, such as compliance to the proposed land use zoning, stipulation of housing

development priority areas (housing development phases), density control, planning guidelines

and current housing policies (Asiah, 1999; Alias, 2007) (Figure 4). Legally the LPA may only

grant an approval if the housing application is situated in the housing zone. Nevertheless, in

practice there are many cases where approvals were still given although the sites are planned for

other land use activities or located outside the permitted development area. The practice of non-

compliance to the LP’s land use zoning occurred extensively in mid 1990s. This practice was

argued to have contributed to the existence of housing oversupply and property overhang in

Peninsular Malaysia (Kerajaan Malaysia, 1999; Mohamad Fadzil, 2005).

Figure 4: The procedure of controlling and approving of housing supply

In relation to the requirement to comply with the stipulation of priority areas for housing

development, less attention is given regarding this aspect in the process of controlling and

approving of housing supply in Malaysia. The failure of most LPs to mark clearly the boundary

of housing development priority areas (housing development phases) has discouraged the LPAs

to consider this factor (Alias et al., 2007). With regard to density control, housing development

Meeting housing needs.

Fulfilling housing

demands.

Considering market

demand criteria.

Balancing supply and demand of housing

Comply the proposed land use zone.

Future housing land area (whole and certain planning periods)

Future housing locations (land use zoning) (whole and certain

planning phases)

Planning guidelines (density control, ratio of category and types of development, etc).

STRUCTURE PLAN

PLANNING

CONTROL

(By LPA)

LOCAL PLAN

Housing policies

General proposals on

housing

Approve housing according to priority areas

(development phases).

Comply the low-cost housing policy.

Approve housing according to density control, ratio and types of development allowed.

Page 7: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

7

applications will need to follow the permitted maximum density as outlined in the LP. Basically,

there are two methods of housing density control enforced by LPAs, namely a control by area

(e.g. 6-8 units per acre for village settlement area and 10-15 units per acre for urban area) and

control by housing category particularly for flatted housing (e.g. 20 units per acre for

condominium, 40 units per acre for apartment and 60 units per acre for low-cost housing)

(JPBD Johor, 2002).

The planning guidelines related to the ratio of housing category and types of housing

development have also become a significant factor in controlling housing supply. Most of the

LPAs particularly in the Johor State impose a ratio of 40:40:20 (40.0% for low-cost housing,

40.0% for medium-cost housing and 20.0% for high-cost housing) as a condition that need to be

followed by housing developers (Alias, 2007). In relation to the type of housing development,

there are LPAs that set the condition, such as only landed housing is permitted to be developed

in certain areas aimed at avoiding housing developers from developing flatted housing,

especially for low-cost, in unsuitable areas (Alias et al., 2007).

Besides having to be in conformity with the LP, the housing development applications also have

to fulfil the current housing policies formulated by each State. The policy on low-cost housing

allocation is one of the eminent policies that are directly related to the control of housing

supply. This policy requires housing developers to construct at least 30 percent (40 percent for

the Johor State) of the total housing units as low-cost housing (Alias, 2007).

In exercising the process of planning and controlling of housing supply, it is becomes the role of

all planning mechanisms, development plans as well as planning control, to achieve the

objectives of housing planning. According to Alias et al. (2007), the process should fulfil at

least four objectives, namely meet the population housing needs, fulfil the household housing

demands (household effective demand), consider the current and future market demands and

matching the number of housing supply with the number of housing demand. The objective to

meet the housing needs becomes the main basis for the process of housing planning. The

achievement of this objective is important to ensure the aim of the national housing

development policy to provide adequate housing for all Malaysians is achievable (Asiah, 1999).

Achieving the objective to meet the population housing needs alone, however, was insufficient

in order to achieve a more integrated and responsive housing planning. The process of housing

planning also needs to fulfil and consider the aspects related to housing demand, particularly

household effective demands (household affordability) and current and future market demands.

In relation to the objective to balance the housing supply with housing demand, Ho (1994) and

Alias et al. (2007) generally perceive that the process of planning and controlling of housing

supply has to achieve the objective to avoid mismatch between the housing supply and demand

that may cause shortage or surplus to the housing supply.

Page 8: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

8

4. THE ISSUE OF HOUSING OVERSUPPLY IN MALAYSIA

The Malaysian housing sector faces various problems. Housing oversupply recorded throughout

the country since 1998 has been an issue of regular debates by property and planning players.

The seriousness of the issue is attested by housing figures such as high overhang and over-

approved housing rates. Official statistics published by the National Property Information

Centre (NAPIC) for the years 2000 to 2007 display a persistence of overhang in the housing

property market. A total of 51,348 units were identified as such in the year 2000 with a total

worth of RM6.6 Billion. The latest figure for 2007 also puts 23,866 or 20.17% of the total

118,317 completed launched units, in the category of overhang with a total worth of RM3.82

billion.

Besides critical figures on overhang housing, data on new housing approvals as recorded in

most states in Peninsular Malaysia for the years 2000 and 2005 also describe an unhealthy

housing development scenario. Figures from 2000 indicate that out of a total 5,338,000 units of

housing supply (including existing and committed housing units), essentially only 3,941,000

were required to fulfil the household housing needs in Peninsular Malaysia. This figure

indicates 1,396,000 units, approved by planning authorities, as oversupply. The issue of

oversupply also existed in 2005, indicating a surplus of new housing approvals at 755,000 units

(Table 1) (JPBD Semenanjung Malaysia, 2003).

Table 1: Comparison between housing supply and housing need in Peninsular Malaysia in

2000 and 2005

Housing Supply Housing Need Oversupply

2000 2000 2005 2000 2005

5,338,000 3,941,200 4,583,000 1,396,800 755,000

Source: Adapted from JPBD Semenanjung Malaysia (2003).

The oversupply issue has sparked lively discussions and debates. The National Economic

Action Council (NEAC) has identified the process of speculative demand and supply by private

developers and loopholes in the planning system as major factors affecting the issues (Kerajaan

Malaysia, 1999). Likewise, Chin (2003), Abdul Ghani (2004) and Mohd Talhar (2004) blame

the weakness on the planning approval process, where housing applications are permitted

without due consideration of the actual demand. Moreover, Mohd Fadzil (2005) has identified

the non-compliance practices to the housing planning policies and guidelines in the

development plans as a main factor contributing to the issue. These arguments generally

describe an influence and contribution by the planning process and practice onto the oversupply

of housing. The veracity of these arguments have been proven by the research conducted in the

Johor Bahru Conurbation (JBC) area. The weakness and ineffectiveness of LPAs in controlling

and approving housing development applications have identified as a major factor contributing

to the existence of housing oversupply in the area. This fact, which is evaluated through several

measurement criteria, is elicited based on the outcomes of housing approvals which are

collected and analysed using the method of content analysis.

Page 9: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

9

5. THE MEASUREMENT OF THE EFFECTIVENESS OF PLANNING CONTROL

5.1 Measurement Criteria

The effectiveness of the planning control process in controlling and approving housing supply is

measured based on the extent to which the housing approvals by the LPAs comply with the

proposals of development plan (particularly to the proposed land use zone), consider the aspects

of housing demand (effective demand, market demand and balancing the number of housing

supply and demand) and impose the conditions on development phase, density, category and

type of housing development. These criteria are selected in line with the basic requirements that

need to be considered by LPAs as in the procedure of controlling and approving of housing

supply (refer Figure 4).

5.2 The Case Study Area - Johor Bahru Conurbation (JBC)

The research conducted selects the JBC area as a case study. The area is located at the southern

part of the Johor State, neighbour to Singapore. It has a total land area of 181,776 hectares

(1,818 sq. km.), representing 9.58 percent of the total land area of Johor State. The area falls

under the jurisdiction of four local authorities, namely Johor Bahru City Council (MBJB),

Central Johor Bahru Municipal Council (MPJBT), Kulai Municipal Council (MPKu) and Local

Authority of Pasir Gudang (PBTPG). The rationales of selecting this area is based on its urban

function as one of the fastest growing region in Peninsular Malaysia. The JBC’s population in

2000 is approximately 1,159,079 with an average growth rate of 4.59 percent between 1991 –

2000. The high growth of population has directly increased the development of housing in the

area from 304,829 units in 2000 to 398,911 in 2003.

The JBC area, similar to the national context, also faces the high rate of overhang and

oversupply of housing. A total of 3,060 housing units in the area were identified as overhang in

2004, continually increasing to 4,905 in 2005 and 6,366 in 2006. The surplus of committed

supply becomes the major housing issue faced by the area. Around 748,703 new housing units

were approved by the LPAs until 2003. This figure, together with the total existing stock

(398,911 units) makes the total housing supply in the JBC area amounting to 1,147,614 units in

2003, whereas the actual housing need only required 339,043. These figures describe a large

surplus in housing supply in JBC, that is 59,868 units or 117.0% from the existing stocks and

808,571 units or 338.0% from the total supply (Figure 5). This not only means the current total

supply is more than enough to fulfil the current housing requirement, but that it can also cater

the population’s housing needs up to year 2040. To fulfil the housing needs for the year 2020, it

was accounted that only 196,600 units or 26.3 percent from the 2003 total committed supply

need to be constructed. This leaves 552,103 committed supply units in 2003 as oversupply up to

the year 2020. The existence of housing oversupply in the JBC area rationalised the research to

select it as a case study.

Page 10: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

10

398,911

748,703

339,043 369,706451,382

526,481595,511

1,147,614

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Existing

Stock

(2003)

Committed

Supply

(2003)

Total

Supply

(2003)

Housing

Needs

(2003)

Housing

Needs

(2005)

Housing

Needs

(2010)

Housing

Needs

(2015)

Housing

Needs

(2020)

Hou

sin

g U

nit

s

Figure 5: Comparison between the committed housing supply and the total housing supply

with the housing needs in the JBC area.

Source: Adapted from JPBD Semenanjung Malaysia (2004)

5.3 Data Collection

The research applies the method of content analysis to elicit and evaluate the data in the form of

facts (written statements) and figures from housing development application files. An

examination on the application files is important because all information from the stage of

submission until the stage of planning approval is recorded in the application files. Thus, the

status of housing approvals, the extent of its compliance to the provisions of SP and LP and

what are the conditions imposed for each application can be recorded. The data which collected

using a predetermined semi-structured pro-forma involves eighty-two (n=82) samples

encompassing all housing applications under the category of either land area of more than 100

hectares or total housing unit of more than 2,500 and approved by LPAs in the JBC area from

the year 1985 to 2006. The number of the samples represents 15.3 percent from the total

housing development applications approved in the area until 2006 which amounted to 535. Out

of the 82 applications, 37 of them (45.4%) are applied in the MPJBT area, followed by 29

application in MBJB area (35.4%), 11 applications in PBT Pasir Gudang area (13.4%) and 5

applications in MP Kulai area (6.1%) (Table 2).

Table 2: The number of samples by local planning authority

Local Planning

Authority

Number of

Sample

Percentage

(%)

Total Housing

Application

Percentage

(%)

MBJB 29 35.4 168 31.4

MPJBT 37 45.1 186 34.7

MP Kulai 5 6.1 165 30.8

PBT PG 11 13.4 16 3.1

Total 82 100.0 535 100.0

Source: Content analysis of housing development application (2006)

Page 11: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

11

5.4 Data Analysis

The data collected in the pro-forma was analysed quantitatively in the form of descriptive

statistics. This analysis helps to summarise the original data in the form of fact (written

statement) to numerical data which eventually simplified the understanding and interpretation of

the data. The results are presented in the form of frequency distribution and percentage.

6. RESULTS

6.1 Compliance to the Proposed Land Use Zone

The analysis conducted shows that from the 82 housing applications approved in the JBC area,

only 44 applications (53.7%) are situated in the area zoned for housing. The remainder are

located in the areas planned for other use, i.e. agriculture (15 applications or 18.3%), open space

and green area (15 applications or 18.3%), industrial (2 application or 2.4%), institution (1

application or 1.2%) and other land uses (5 applications or 6.1%) (Table 3).

Table 3: The compliance of housing approval to the proposed land use zone

Land Use Zone Frequency Percent (%)

Housing 44 53.7

Agriculture 15 18.3

Open space and green area 15 18.3

Industrial 2 2.4

Institution 1 1.2

Other land use 5 6.1

Total 82 100.0

Source: Content analysis of housing development application (2006)

This clearly indicates that the practice of non-compliance to the proposals of development plans

exist in the process of housing approval in the JBC area. Almost half (46.3% or 38 applications)

of the approvals contradicted with the proposed land use zone in the development plans. These

approvals have contributed to 410,514 committed housing supplies in the JBC area in the period

of 1985 to 2006.

6.2 Consideration of the Aspects of Effective Demand, Market Demand and Balancing

the Supply and Demand of Housing

The content analysis performed indicates that consideration for the aspects of effective demand,

market demand and balancing the number of supply with the number of demand in the process

of housing approval are very poor. Regarding effective demand, only 1 housing approval

(1.2%), that is by the PBT of Pasir Gudang has tried to consider this aspect. As for the aspect of

market demand, the analysis shows that only 4 (4.9%) have considered this aspect before an

approval is given. From the figure, 3 applications were approved by the PBT of Pasir Gudang

Page 12: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

12

and 1 by MPJBT. The analysis also reveals that none of the LPAs in the study area has

considered the aspect of balancing the number of supply to the demand in the process of

housing planning control.

6.3 Imposition of Conditions for Development Phase, Density, Category and Type of

Housing Development

The analysis shows that no single approval imposes the conditions for development phase. It is

found that the process of housing planning control in the JBC area still applied the basis of

granting the approval based on the total land area and total housing units submitted by the

applicant. For example, if one housing application proposed an area of 1000 hectares consisting

of 5,000 units, the approval will be given according to the entire land area or total housing units

without considering the requirement of housing quantity and housing land for certain periods.

This practice was applied in the approval process of mega scaled housing projects around the

JBC area, such as Kota Seri Johor (1,609 ha./ 50,041 units) in MBJB area, Taman Impian Mas

(1,298 ha./ 24,898 units) in MPJBT area as well as Bandar Putra (2,293 ha./49,369 units) and

Bandar Indahpura (3,407 ha./46,774 units) in MP Kulai area.

In relation to the conditions regarding the density and housing category control, the analysis

indicates that these two aspects were given a substantial consideration in the process of housing

approval in the JBC area. The condition for density control was outlined in 73 housing

approvals (89.0%). It is normally addressed in the form of density standard either for each type

of housing development (e.g. 60 units per acre for the development of low-cost flat) or for

certain areas (e.g. 6 units per acre for the development of housing in sub-urban areas). For the

housing category control, the analysis shows that 78.0 percent of the housing approvals (64

applications) underlined the conditions to control the composition of housing development,

particularly for low-cost and low medium-cost houses (Table 4).

Table 4: Imposition of conditions for density, category and types of housing development

Conditions Stated in the Approval Not stated in the Approval

Frequency % Frequency %

Density control 73 89.0 9 11.0

Control of housing category 64 78.0 18 22.0

Control of housing development

type (landed or flatted)

9 11.0 73 89.0

Source: Content analysis of housing development application (2006)

For the control of types of housing development, the analysis indicates that the LPAs in the JBC

area failed to consider this aspect seriously in the process of housing approval. Out of the 82

applications, only 11.0 percent (9 applications) imposed the condition for the types of housing

development (either landed or flatted housing) allowed for the applications.

Page 13: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

13

7. DISCUSSION AND CONCLUSION

The empirical research indicates that out of the eight aspects that are supposed to be considered

in the process of housing planning control, only two aspects, i.e. density control and the control

of housing development category are given an emphasis by the LPAs in the JBC area. The

compliance to the proposed land use zone, consideration to the aspects of housing demand and

imposition of conditions for development phase and types of housing development can be

considered poor. This shows that the process of housing planning control in the area is

ineffective in controlling the approval of housing development applications which eventually

contribute to the existence of housing oversupply.

The research implicitly reveals the underachievement of the planning control process towards

realising the objectives of housing planning. Out of the four objectives that should be achieved

by the process, only the objective to meet the housing needs can be considered as successful.

The large number of committed supply (748,703 units), the existence of housing approvals in

the areas not planned for housing (38 applications out of 82 / 410,514 units) and the negligence

of the LPAs to phase out the housing approvals according to certain development phases

indicate that the objective is given priority by the process of planning control. The objectives to

fulfil the household housing demand, to consider the housing market demands and to balance

the supply and demand of housing basically unattained. The facts which revealed that only 1

approval considered the aspect of effective demand, 4 approvals considered the aspect of

market demand and no single approval considered the aspect of balancing the number of supply

with the number of demand proven that the planning control process in the JBC area has failed

to achieve all the three objectives.

The weakness and ineffectiveness identified in the process of housing planning control certainly

requires a review and improvement. The LPAs have to make sure that the applications for

housing development comply with the proposals of development plans, such as the housing

planning policies (in the SP), proposed land use zone, and planning guidelines and standards (in

the LP). The practice of approving housing applications where the sites are not planned for

housing (non-compliance to the proposed land use zone) need to be strictly avoided in the

future. Other than complying with the planning aspects, the LPAs also need to give due

consideration to the aspects of household effective demand, market demand and balancing the

supply and demand before making decision to approve the applications for housing

development. Consideration of the aspects of market demand and balancing the supply and

demand will enable the LPAs to reject the applications for housing development if it is proven

that there is no immediate demand required or if the number of housing supply (existing or

committed) has already exceeded the demand. By incorporating the demand (household

effective demands and market demands) mechanisms together with the stronger nature of

housing planning and development policy, it will not only improve and streamline the process

of housing planning, but will also strengthen the role of land use planning system in providing

sufficient housing, encouraging sustainable housing development and ensuring efficiency in the

housing delivery system.

Page 14: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

14

REFERENCES

Abdul Ghani Othman (2004). Keynote Address. The Proceeding of the Seminar of Johor

Property Investment Outlook 2004 and Beyond: Monetising Assets, Balancing Supply and

Demand. August, 24. Johor Bahru: Universiti Teknologi Malaysia.

Adams, D. and Watkins, C. (2002). Greenfield, Brownfields and Housing Development. United

Kingdom: Blackwell Science.

Alias Rameli (2007). Application of Method of Content Analysis and Perception Survey in

Evaluating the Effectiveness of Planning System in Managing Housing Supply. Proceedings of the 2

nd. Post Graduate Seminar on Research of Built Environment. March

6. Faculty of Built Environment, Universiti Teknologi Malaysia.

Alias Rameli, Foziah Johar and Ho Chin Siong (2007). The Effectiveness of Malaysian Planning System in Managing Housing Supply. Jurnal Alam Bina, UTM. Jilid 09 No.

02/2007: 1-22.

Asiah Othman (1999). The Effect of The Planning System on Housing Development: A Study of

Developers Behaviour in Kuala Lumpur and Johor Bahru, Malaysia. University of Aberdeen: Ph.D. Thesis.

Bramley, G., Bartlett, W. and Lambert, C. (1995). Planning, The Market and Private

Housebuilding. London: UCL Press Ltd.

Carmona, M., Carmona, S. and Gallent, N. (2003). Delivering New Homes: Processes, Planners

and Providers. London: Routledge.

Chan Kek Tong (1997). Housing Delivery System. Proceeding of the National Housing Convention. May 26-27. Kuala Lumpur: ISIS Malaysia.

Gillen, M. and Golland, A. (2004). The Private House-Building Industry and the Housing

Market. In: Golland, A. and Blake, R. eds. Housing Development: Theory, Process and

Practice. London: Routledge. 71 – 94.

Golland, A. and Gillen, M. (2004). Housing Need, Housing Demand and Housing Supply. In:

Golland, A. and Blake, R. eds. Housing Development: Theory, Process and Practice.

London: Routledge. 45 – 70.

Golland, A. (1998). System of Housing Supply and Housing Production in Europe: A

Comparison of the United Kingdom, the Netherlands and Germany. England: Ashgate.

Greed, C. (1996) The Question `What is Town Planning? Revisited. In Greed, C. ed. Investigating Town Planning: Changing Perspective and Agendas. England: Addison

Wesley Longman Limited. 2-16.

Healey, P. (1992). The Reorganisation of State and Market in Planning. Urban Studies. 29(3):

411-43.

Ho Chin Siong (1994). Evaluation of Housing Estate Development In Relation To Housing

Supply In Malaysia (With Reference To Urban Management and Housing Approval

System). Toyohashi University of Technology: Ph.D. Thesis.

Hull, A. (1997). Restructuring the Debate on Allocating Land for Housing Growth. Journal of

Housing Studies. 12(03):367 – 382.

Jabatan Perancangan Bandar dan Desa Semenanjung Malaysia (2003). National Physical Plan:

Housing Technical Report. Kuala Lumpur: JPBD Semenanjung Malaysia. Unpublished.

Jabatan Perancangan Bandar dan Desa Semenanjung Malaysia (2004). Laporan Teknikal

Rancangan Tempatan Daerah Johor Bahru. Unpublished.

Page 15: Ineffectiveness of Planning Control and Its Implication to Housing Oversupply

Journal of Civil Engineering and Architecture 2011,

David Publishing Company, USA

15

Kerajaan Malaysia (1999). Kertas Memorandum Daripada Menteri Perumahan dan Kerajaan

Tempatan (KPKT (R) 01/538/1-85/1): Cadangan Pindaan Kepada Akta Perancangan

Bandar dan Desa 1976 (Akta 172). Kertas Mesyuarat Jemaah Menteri Pada 20 Oktober 1999. Unpublished.

Mohd. Fadzil Mohd Khir (2005). Isu dan Cabaran Dalam Pembangunan Hartanah. Seminar

Kebangsaan Perancangan dan Pembangunan 2005. 1 Jun. Majlis Perbandaran Sepang.

Mohd. Talhar Abdul Rahman (2004). Johor Property Investment Outlook and Redefining Property Development Strategies and Portfolios for Competitiveness in Real Estate

Investment. The Proceeding of Johor Property Investment Outlook 2004 And Beyond:

Monetising Assets, Balancing Supply and Demand. August, 24. Johor Bahru: Institute of Sultan Iskandar, Universiti Teknologi Malaysia.

Nicol, C. (2002). The Formulation of Local Housing Strategies: A Critical Evaluation. England:

Ashgate.

Pearce, B. J. (1992). The Effectiveness of the British Land Use Planning System. Town Planning Review. 63(01):13-28.

Valuation and Property Services Department (2005-2008). Property Market Report 2004-2007.

Kuala Lumpur: Percetakan Nasional Malaysia Berhad.

Von Einsiedel, N. (1997). Towards A Sustainable Housing Strategy. Proceedings of the

National Housing Convention. May 26-27. Kuala Lumpur: ISIS Malaysia.