Indra Datta Head Of Projects DBFS Ltd www.dbfs.co.uk. Our Expertise: Your Future. Agenda. Unsuccessful project delivery Delivering software projects Gluing “top down” and “bottom up” approaches Measurement and metrics Benefits. Our Expertise: Your Future. Unsuccessful project delivery. - PowerPoint PPT Presentation

Citation preview

Page 1: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Indra DattaHead Of Projects

DBFS Ltd

www.dbfs.co.uk

Our Expertise: Your Future

Page 2: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Agenda

Our Expertise: Your Future

• Unsuccessful project delivery

• Delivering software projects– Gluing “top down” and “bottom

up” approaches

• Measurement and metrics

• Benefits

Page 3: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Unsuccessful project deliveryDefinition of project failure • It is not delivered on time • It is not on or under budget • The solution does not work as required

Reasons for failure• Lack of stakeholder involvement and objective

setting• Lack of standardised, repeatable and measurable

processes• Poor or no requirements• Long or unrealistic time scales• Scope creep and lack of change control• Poor testing• Poor risk assessment• Lack of metrics

Our Expertise: Your Future

Page 4: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Delivering software projects successfully

Gluing “top down” and “bottom up”

• Top down approach– Key sponsor buy-in– Standardisation and repeatability– Measurability– Constant risk assessment and quality

control

Our Expertise: Your Future

Page 5: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Top Down

Our Expertise: Your Future

DBFS Software Delivery Methodology

Design TestingAnalysis Deploy-mentProject

CompletionDevelopmentProject Intiation

ObjectivesSpecification

ProjectInitiatiobnChecklist

Objectives

Pid Sign Off

Requirements

High LevelCost Estimate

Prototype

Feasibility &Prototyping

Requirements Functionality Test Senarios

FunctionalSpec

TechnicalImplementation

TechnicalSpec

DetailedCost

Estimate

QAAssessment

Template

Final SignOff

DevTemplate

Development

QA

TestScripts

SystemTesting

User testScripts

UserTesting

Test PLan

Systemtest

Scripts

SupportHandover

ProjectReview

Deploy-mentPlan

User Guide

SupportHandover

ProjectDe-brief

CONFIGURATION MANAGEMENT

CHANGE MANAGEMENT

PLANNING

Change Management Template

Configuration Management Best Practice

Progress Report Project IssuesResourcing Plan Test IssuesProject Plan

IssuesLog

Deploy-mentPlan

IssuesLog

GlossaryTemplate

Re-usablecode

RISK MANAGEMENT

QUALITY MANAGEMENT

Business CaseJustificaTION

Page 6: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Delivering software projects successfully

Bottom up approach with continuous integration

• Integration with top down approach• Reusable solution libraries• Improved code management, review

and control• Measurability• Constant risk assessment and quality

control

Our Expertise: Your Future

Page 7: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Bottom Up

Our Expertise: Your Future

Page 8: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Measurement and Metrics

Key metrics available to measure project success

• Sponsors can measure objectives• Users can measure requirements• Technical metrics available for

project managers and technical leads

• Project Manager can use all of the above through out project lifecycle

Our Expertise: Your Future

Page 9: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Measurements and Metrics

Our Expertise: Your Future

DBFS Software Delivery Methodology

Design TestingAnalysis Deploy-mentProject

CompletionDevelopmentProject Intiation

CONFIGURATION MANAGEMENT

CHANGE MANAGEMENT

PLANNING

O1

O2

R2

R1

R4

R3

T1

F2

TS6

TS7

TS8

TS9

F5 T5

TS13

TS14

TS15

TS16

F6 T6

TS17

TS18

TS19

TS20

F3 T3

TS10

TS11

F4 T4

TS12

TechnicalImplementation

FunctionsRequirementsObjectives Test Senarios

F1 T1

TS1

TS2

TS3

TS4

TS5

T2

RISK MANAGEMENT

QUALITY MANAGEMENT

Page 10: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Benefits

• An integrated top down and bottom up methodology to help meet project objectives

• A set of standardised and repeatable processes

• A set of metrics to measure all phases of the project including risk and quality to help deliver project objectives

• Reusable code libraries• Project efficiencies• Cost Benefit

Our Expertise: Your Future

Page 11: Indra Datta Head Of Projects DBFS Ltd dbfs.co.uk

Indra [email protected]

+44(0)2073325917

Questions

Our Expertise: Your Future

Thank-you for your time