Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution Indonesia Geothermal Potential; Indonesia Geothermal Potential; Status in 2014, and Status in 2014, and Opportunities for Medium Opportunities for Medium Low Low Enthalpy Resources Enthalpy Resources Development Development Suryantini Suryantini [email protected] Institut Teknologi Bandung Member of Indonesia Geothermal Association

Indonesia Geothermal Potential; Status in 2014, and Opportunities

  • Upload
    lethu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Indonesia Geothermal Potential;Indonesia Geothermal Potential;Status in 2014, and  Status in 2014, and  

Opportunities for MediumOpportunities for Medium‐‐LowLow‐‐Enthalpy Resources Enthalpy Resources DevelopmentDevelopment

Suryantini Suryantini 

[email protected] Teknologi Bandung

Member of Indonesia Geothermal Association

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

OutlineOutline

•• A quick overview of the region and the overall potential;A quick overview of the region and the overall potential;

•• Projects in the construction stage;Projects in the construction stage;

•• Projects in the discovery or confirmation phases;Projects in the discovery or confirmation phases;

•• Project associated with nonProject associated with non‐‐conventional  geothermal conventional  geothermal resources.resources.

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

The Region, Prospects and PotencyThe Region, Prospects and Potency

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

GEOTHERMAL POTENTIAL MAP(Geological Agency, MEMR, 2011, Statistik EBTKE 2013, BAPPENAS 2014)

Existing Plant

Ready to DevelopedDetail SurveyPreliminary Survey

Note:RESOURCES(MWe) % RESERVE

(MWe) %

Speculative Hypothetical43%

Possible Probable Proven57%

7,247 4,886 13,373 823 2,288

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Indonesian Geothermal Development Stage and the Type of PotencyIndonesian Geothermal Development Stage and the Type of Potency

Geothermal Potential

Preliminary Survey

Exploration Feasibility Study

Exploitation Utilization

Government/ Local Gov./

Business EntitiesBusiness Entities

Geothermal Business Permit (IUP)

Determination of GWA 

Tender Process

IUP Issuance

Note: - GWA : Geothermal Working Area (concession)

Spe

cula

tive

Res

ourc

es

Hyp

othe

tic

Res

ourc

es

Pos

sibl

e R

eser

ve

Prob

able

R

eser

ve

Prov

en

Res

erve

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Geothermal Working Areas (GWA or WKP)Geothermal Working Areas (GWA or WKP)

• Until 2013, there are 58 WKP (Statistik EBTKE, 2013)

• In 2014, additional 9 WKP has been tendering (MEMR News, 2014)

• 9 existing field with total Instaled Capacity 1320 Mwe mostly in expansion program (Statistik EBTKE, 2013; BAPPENAS 2014)

• Other status include; Preparation for tendering, Exploration and Preliminary Survey (BAPPENAS 2014)

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

7

ACEH 2 WKPJaboi: 70 MWSeulawah Agam: 130 MW

NORTH SUMATERA 5 WKPSibayak – Sinabung: 130 MWSibual – Buali: 750 MWSipaholon Ria-ria: 75 MWSorik Marapi: 200 MWSimbolon Samosir : 155 MW

JAMBI 1 WKPSungai Penuh: 70 MW

SOUTH SUMATERA 2 WKPLumut Balai: 250 MWRantau Dedap: 106 MW

BANTEN 2 WKPKaldera Danau Banten: 115 MWG. Endut: 80 MW

WEST SUMATERA 4 WKPBukit Kili: 83 MWGn Talang: 35 MWLiki Pinangawan: 400 MWBonjol: 200 MW

LAMPUNG 4 WKP Gn.Rajabasa: 91 MWSuoh Sekincau: 230 MWWaypanas – Ulubelu: 556 MW Way Ratai :105 MW

WEST JAVA 10 WKPCiater - Tgkban Perahu: 60 MW Cibeureum–Parabakti: 485 MWCibuni: 140 MWCisolok Cisukarame: 45 MWGn. Tampomas: 50 MWGn. Tgkuban Perahu: 100 MWKamojang-Darajat: 1465 MWKaraha Cakrabuana: 725 MWPangalengan: 1106 MWG. Ciremai: 150 MW

CENTRAL JAVA 5 WKPBaturaden: 175 MWDataran Tinggi Dieng: 780 MWGuci: 79 MWGn. Ungaran: 100 MWUmbul Telomoyo : 72 MW EAST JAVA 3 WKP

Blawan – Ijen: 270 MWGn. Iyang Argopuro: 295 MWTelaga Ngebel: 120 MW

BALI 1 WKP Tabanan: 276 MW

WEST NUSA TENGGARA 2 WKP Hu'u Daha: 65 MWSembalun : 100 MW

EAST NUSA TENGGARA 5 WKPAtadei: 40 MWSokoria: 30 MWUlumbu: 199 MWMataloko: 63 MWOka Ile Ange : 40 MW

MALUKU 1 WKPTulehu: 100 MW

NORTH MALUKU 2 WKP Jailolo: 75 MWSonga Wayaua: 140 MW

NORTH SULAWESI 2 WKP Kotamobagu: 410 MWLahendong-Tompaso: 358 MW

GORONTALO 1WKPSuwawa: 110 MW

CENTRAL SULAWESI 2WKP Marana: 35 MWBora Pulu : 152 MW

BENGKULU 2 WKP Tmbg Sawah-Hululais: 873 MWKepahiyang : 180 MW

CENTRAL JAVA & EAST JAVA 1 WKPGunung Lawu : 195 MW

SOUTH SUMATERA & LAMPUNG 1 WKPDanau Ranau: 210 MW

Source MEMR 2014, IIGCE 2014

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Existing  Operating Geothermal Project as of October 2013Existing  Operating Geothermal Project as of October 2013

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Projects in the construction stageProjects in the construction stage

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

3 Power Plant Development : 

1. Patuha 1x55 MW, which  is scheduled to start commercial operation in 2014, (Geodipa, 2014) 

Patuha Power Plant Construction 20/05/2014

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

3 Power Plant Development : 

2. Sarulla 330 MW (World’s largest geothermal plant), where the 1st phase (3x60 MW) is scheduled to start operation in 2016. (Asian Developmen Bank, 2014, Medco 2014).  1stwell /drilling started 23 September 2014. The plan is to drill 34 production and injection wells. Development of infrastructure is in progress.  

3. Lumut Balai unit 1, 55 MW will be ready for commercial  operation in 2015, while unit 2 is in progress and is expected to be ready for commercial operation in 2016 (PGE Annual Report 2012)

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

2 Steam Field Development : 

Ulubelu unit 3 and 4, 2x55 MW and 

Lahendong unit 5 and 6, 40 MW (expansion of existing plant)

(World Bank, 2014 )

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Project  in Construction Phase by September  2014Project  in Construction Phase by September  2014

Patuha 55 MW (West Java)Power Plant Development

Lahendong 5&6 (North Sulawesi)2x20 MW Steam Field Development

Ulubelu 3 & 4 (Lampung)2x55 MW

Steam Field Development

Sarulla 330 MW (North Sumatera)Power Plant Development

Lumutbalai (S. Sumatra)

2x55 MWPower Plant and Steam

Field Development

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Projects in the discovery or confirmation phasesProjects in the discovery or confirmation phases

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

• Muara Laboh (Supreme Energy) : 6 exploration wells (www.supreme‐energy.com)

• Tompaso (PGE) : 8 production wells to support 2x20 MW, currently is targeting injection well. (pge.pertamina.com)

• Hululais‐Tambang Sawah (PGE) : to develop  2x55 MW, 2 exploration well (PGE Annual Report, 2012)

• Lumut Balai (PGE) : to develop 2x55, 18 delineation wells (WWW.jica.go.jp,  

www.tambangnews.com/; PGE Annual Report 2012)

• Karaha Bodas (PGE): to develop 2x30 MW, >5 wells have been drilled (PGE Annual Report 2012)

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Project associated with nonProject associated with non‐‐conventional  conventional  geothermal resources.geothermal resources.

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

1. Hot Sedimentary Aquifer for Geothermal Cooling

2. Binary Plant for medium enthalpy resources

3. Direct Use

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Hot Sedimentary Aquifer Hot Sedimentary Aquifer for Geothermal Coolingfor Geothermal Cooling

LAPI ITBLAPI ITB‐‐IF Technology, 2014IF Technology, 2014

• Preliminary Study 

• Initiated by Pertamina Corporate in 2014

• To provide cooling for skyscraper building with “zero 

energy” in the heart of Jakarta

• The potential resources seems to be promising

• The major concern are the environmental and social 

community

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Binary Plant for Medium Enthalpy ResourcesBinary Plant for Medium Enthalpy Resources

• Current study are conducted in Lahendong and Wayang Windu, the study is carried out in collaboration with German Institutions

• Jailolo (Star Energy) are being studied.

• Other interest coming from Japanese Company to study the possibility of binary plant in some prospect located in West Java Province.

Personal Communications from various sources

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Direct Use 

• In the phase of Desk Study

• Geothermal low enthalpy for manufacturing facilities at Karawang City, a centre for industry

• Study of direct use for various purpose; milk sterilization, hotel cooling, etc.

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Concluding Remark

• Indonesia is a country with large geothermal potential but the utilization, mostly for generating electricity with conventional plant, is still low.

• Exploitation of low to medium enthalpy is still in the phase of desk (literature) study

• There are still plenty opportunity for expanding geothermal energy utilisation

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Thank you for your attentionThank you for your attention

Geothermal Resources Council 38th Annual Meeting & GEA Geothermal Energy Expo September 28 - October 1, 2014 Oregon Convention Center Portland, Oregon • USA Geothermal: A Global Solution

Suryantini Institut Teknologi Bandung

Reference• http://www‐

wds.worldbank.org/external/default/WDSContentServer/WDSP/EAP/2014/06/27/090224b08253ba69/1_0/Rendered/PDF/Indonesia000Ge0Report000Sequence004.pdf

• http://www.adb.org/projects/42916‐014/main• www.geodipa.co.id• apecenergy.tier.org.tw/.../2_Pertamina_Geothermal_Activities_Current_Status• http://www.tambangnews.com/berita/utama/1639‐jica‐danai‐proyek‐pertamina‐lumut‐balai.html• http://medcopower.co.id/node/24• www.supreme‐energy.com• pge.pertamina.com• MEMR 2013, Statistik EBTKE 2013• PGE, Annual Report 2012.• LAPI ITB 2014,  Report  on Quick Scan: Early Investigation into Hot Sediment Aquifer Resource for Geothermal 

Cooling System Application in PERTAMINA Energy Tower Building • BAPPENAS, 2014,  Geothermal Hand Book of Indonesia