11
Indigenous Production Arturo de Onís System Development Adviser TYNDP 2017 Transparency Process SJWS#6 13 July 2016 Hotel Silken Berlaymont, Brussels

Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

Indigenous Production

Arturo de Onís

System Development Adviser

TYNDP 2017 Transparency Process

SJWS#6 13 July 2016

Hotel Silken Berlaymont, Brussels

Page 2: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

2

Data Collection relates to:

• Conventional production

• Unconventional production

Biomethane: specific data collected for each of the scenarios

Shale Gas Production: no production reported by any country

Production for TYNDP 2017

Page 3: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

3

Conventional Production

Page 4: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

4

Production for TYNDP 2017Conventional Production

> Dutch Government decided, through a draft assent letter for consultation, to limit the production level from the Groningen field to 24 bcma (-11%) *

> Cyprus MCIT (Ministry of Energy, Commerce, Industry and Tourism) reportedprojections for the Aphrodite Field production of 117 TWh/y starting in 2022

EU Small Producers (< 100 TWh/y)EU Conventional Production

* 1 October 2016

Page 5: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

5

Production for TYNDP 2017

Conventional Production

bcma 2017 2020 2025 2030 2035 2037

Conventional Production 116,5 112,4 103,1 71,0 50,9 47,7

Biomethane Max (GR) 2,5 5,1 10,6 16,6 21,1 23,4

Biomethane Int (BT) 2,0 4,3 8,5 12,7 15,7 17,4

Biomethane Min (SP) 1,4 2,3 3,1 3,8 4,9 5,4

EU Conventional Production

Page 6: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

6

Unconventional Production

Page 7: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

7

Production for TYNDP 2017

Conventional Production and Biomethane

Biomethane Scenarios Biomethane vs Conventional

bcma 2017 2020 2025 2030 2035 2037

Conventional Production 116,5 112,4 103,1 71,0 50,9 47,7

Biomethane Green Revolution 2,5 5,1 10,6 16,6 21,1 23,4

Biomethane Blue Transition 2,0 4,3 8,5 12,7 15,7 17,4

Biomethane Slow Progression 1,4 2,3 3,1 3,8 4,9 5,4

Page 8: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

8

Unconventional Production: Shale Gas

> ENTSOG‘s discussions with IOGP* concluded in a potential for shale gas based on Poyry‘s “Some Shale Gas” scenario, but delayed by at least 5 years

> This potential was not confirmed by the Data collection: no Shale Gas reported

> In consequence, no Shale Gas retained for the TYNDP assessment

Production for TYNDP 2017

Shale Gas Potential

* IOGP: International Association of Oil and Gas Producers

Page 9: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

9

Conclusions

Page 10: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

10

Conclusion: import needs

Most scenarios show increasing EU import needs

Overall Production vs Demand Scenarios

BT

GR

Page 11: Indigenous Production · 4 Production for TYNDP 2017 Conventional Production > Dutch Government decided, through a draft assent letter for consultation, to limit the production level

Thank You for Your Attention

ENTSOG -- European Network of Transmission System Operators for GasAvenue de Cortenbergh 100, B-1000 Brussels

EML:WWW: www.entsog.eu

Arturo de OnísSystem Development Advisor

[email protected]