State Preservation and Local Initiated Projects FY 2018 - 2021 Indiana Department of Transportation (INDOT) SPONSOR CONTR ACT # / LEAD DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL CATEGORY PROGRAM PHASE FEDERAL MATCH Estimated Cost left to Complete Project* 2018 2019 2020 2021 STIP NAME Adams County Adams County VA VARI Bridge Inspections Countywide Bridge Inspection and Inventory Program for Cycle Years 2018-2021 Fort Wayne 0 Multiple 100% Local Funds PE1 $0.00 $45,779.52 $24,343.20 $20,042.40 $724.32 $669.60 Init. 1592864 Local Bridge Program PE1 $183,118.08 $0.00 $97,372.80 $80,169.60 $2,897.28 $2,678.40 Adams County VA VARI Bridge Inspections Countywide Bridge Inspection and Inventory Program for Cycle Years 2018-2021 Fort Wayne 0 STP Local Bridge Program PE1 $123,894.88 $0.00 $20,286.00 $96,871.60 $3,500.88 $3,236.40 M 02 $276,584.60 1592864 100% Local Funds PE1 $0.00 $29,973.72 $5,071.50 $23,217.90 $875.22 $809.10 Comments:No MPO - Add $20,286 federal funds and $5,071.50 local funds to FY 2018. Adams County VA VARI Bridge Inspections Countywide Bridge Inspection and Inventory Program for Cycle Years 2018-2021 Fort Wayne 0 STP Local Bridge Program PE1 -$16,595.63 $0.00 $87,143.33 ($101,203.60) ($2,170.16) ($365.20) M 06 $336,662.00 1592864 100% Local Funds PE1 $0.00 -$8,421.44 $16,513.30 ($24,300.90) ($542.54) ($91.30) Comments:No MPO - Add $87,143.33 federal and $16,513.30 local funds to FY 2018 - Reduce federal funds by $365.20 and local funds by $91.30 in FY 2019 - Reduce federal funds by $101,203.60 and local funds by $24,300.90 in FY 2020 - Reduce federal funds by $2,170.16 and local funds by $542.54 in FY 2021. Decatur ST 1003 Intersection Improvement, Roundabout Intersection of 2nd St., Adams St., Winchester St., and Mercer Ave Fort Wayne .28 STP 100% Local Funds PE1 $0.00 $348,750.00 $348,750.00 Init. 1600708 100% Local Funds RW1 $0.00 $320,000.00 $320,000.00 Decatur ST 1003 Intersection Improvement, Roundabout Intersection of 2nd St., Adams St., Winchester St., and Mercer Ave Fort Wayne .28 STP Group IV Program PE1 $276,992.00 $0.00 $276,992.00 A 06 $2,372,657.00 1600708 100% Local Funds PE1 $0.00 -$279,502.00 ($279,502.00) Comments:No MPO Add Federal PE to project in FY 2018. Adams County IR 1005 Bike/Pedestrian Facilities Adams Co BP: from the Wabash River to CR 850 S Fort Wayne .32 STP Local Transportation Alternatives CN $174,800.00 $0.00 $174,800.00 Init. 35191 / 1173218 100% Local Funds CN $0.00 $221,835.00 $221,835.00 Adams County IR 1005 New Bridge, Other Adams Co BP: Relocate and erect RR Bridge Fort Wayne 0 STP Local Transportation Alternatives CN $380,000.00 $0.00 $380,000.00 Init. 35191 / 1600429 100% Local Funds CN $0.00 $95,000.00 $95,000.00 Adams County IR 1005 Bridge Deck Replacement Adams Co BP: Reconstruct RR Bridge Fort Wayne 0 STP 100% Local Funds CN $0.00 $84,060.00 $84,060.00 Init. 35191 / 1600430 Local Transportation Alternatives CN $336,240.00 $0.00 $336,240.00 Indiana Department of Transportation US 27 Bridge Thin Deck Overlay Bridge over St Mary's River, NB , 1.10 miles N of US 224 Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 01 $486,000.00 37720 / 1701261 *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Page 1 of 702 Report Created:6/5/2018 2:07:59PM

Indiana Department of Transportation (INDOT) Department of Transportation (INDOT) SPONSOR CONTR ... No MPO Add Federal PE to project in FY 2018. ... Indiana Department of Transportation

Embed Size (px)

Citation preview

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Adams County

    Adams County VA VARI Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 Multiple 100% Local

    Funds

    PE1 $0.00 $45,779.52 $24,343.20 $20,042.40 $724.32$669.60Init.1592864

    Local Bridge

    Program

    PE1 $183,118.08 $0.00 $97,372.80 $80,169.60 $2,897.28$2,678.40

    Adams County VA VARI Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 STP Local Bridge

    Program

    PE1 $123,894.88 $0.00 $20,286.00 $96,871.60 $3,500.88$3,236.40M 02 $276,584.601592864

    100% Local

    Funds

    PE1 $0.00 $29,973.72 $5,071.50 $23,217.90 $875.22$809.10

    Comments:No MPO - Add $20,286 federal funds and $5,071.50 local funds to FY 2018.

    Adams County VA VARI Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 STP Local Bridge

    Program

    PE1 -$16,595.63 $0.00 $87,143.33 ($101,203.60) ($2,170.16)($365.20)M 06 $336,662.001592864

    100% Local

    Funds

    PE1 $0.00 -$8,421.44 $16,513.30 ($24,300.90) ($542.54)($91.30)

    Comments:No MPO - Add $87,143.33 federal and $16,513.30 local funds to FY 2018 - Reduce federal funds by $365.20 and local funds by $91.30 in FY 2019 - Reduce federal funds by $101,203.60 and local funds by $24,300.90 in FY 2020 - Reduce federal funds by $2,170.16 and local funds

    by $542.54 in FY 2021.

    Decatur ST 1003 Intersection

    Improvement,

    Roundabout

    Intersection of 2nd St., Adams

    St., Winchester St., and Mercer

    Ave

    Fort Wayne .28 STP 100% Local

    Funds

    PE1 $0.00 $348,750.00 $348,750.00 Init.1600708

    100% Local

    Funds

    RW1 $0.00 $320,000.00 $320,000.00

    Decatur ST 1003 Intersection

    Improvement,

    Roundabout

    Intersection of 2nd St., Adams

    St., Winchester St., and Mercer

    Ave

    Fort Wayne .28 STP Group IV Program PE1 $276,992.00 $0.00 $276,992.00 A 06 $2,372,657.001600708

    100% Local

    Funds

    PE1 $0.00 -$279,502.00 ($279,502.00)

    Comments:No MPO Add Federal PE to project in FY 2018.

    Adams County IR 1005 Bike/Pedestrian

    Facilities

    Adams Co BP: from the

    Wabash River to CR 850 S

    Fort Wayne .32 STP Local

    Transportation

    Alternatives

    CN $174,800.00 $0.00 $174,800.00Init.35191 /

    1173218

    100% Local

    Funds

    CN $0.00 $221,835.00 $221,835.00

    Adams County IR 1005 New Bridge, Other Adams Co BP: Relocate and

    erect RR Bridge

    Fort Wayne 0 STP Local

    Transportation

    Alternatives

    CN $380,000.00 $0.00 $380,000.00Init.35191 /

    1600429

    100% Local

    Funds

    CN $0.00 $95,000.00 $95,000.00

    Adams County IR 1005 Bridge Deck

    Replacement

    Adams Co BP: Reconstruct RR

    Bridge

    Fort Wayne 0 STP 100% Local

    Funds

    CN $0.00 $84,060.00 $84,060.00Init.35191 /

    1600430

    Local

    Transportation

    Alternatives

    CN $336,240.00 $0.00 $336,240.00

    Indiana Department

    of Transportation

    US 27 Bridge Thin Deck

    Overlay

    Bridge over St Mary's River, NB

    , 1.10 miles N of US 224

    Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 01 $486,000.0037720 /

    1701261

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 1 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    US 27 Bridge Thin Deck

    Overlay

    Bridge over St Mary's River, NB

    , 1.10 miles N of US 224

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $328,670.40 $82,167.60 $410,838.00A 01 $486,000.0037720 /

    1701261

    Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 27 Bridge Thin Deck

    Overlay

    Bridge Over St. Mary's River,

    Southbound, 1.10 Miles North

    of US 224

    Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 01 $486,000.0037720 /

    1701262

    Bridge

    Construction

    CN $328,670.40 $82,167.60 $410,838.00

    Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 101 Bridge Deck Overlay Bridge over Drake Ditch, 0.88 N

    of US 33

    Fort Wayne 0 STP Bridge

    Construction

    CN $370,760.00 $92,690.00 $463,450.00 A 01 $463,450.0038562 /

    1600186

    Comments:NO MPO. Adding CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 224 Bridge Deck Overlay Bridge over Koos Ditch, 1.55

    miles E of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $293,400.00 $73,350.00 $366,750.00 Init.38562 /

    1700223

    Indiana Department

    of Transportation

    SR 218 Bridge Replacement,

    Other Construction

    Bridge over the Wabash River

    Overflow, 0.60 miles E of SR

    116

    Fort Wayne 0 STP Bridge

    Construction

    CN $894,960.00 $223,740.00 $1,118,700.00 Init.38604 /

    1600275

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Indiana Department

    of Transportation

    US 27 Replace

    Superstructure

    Bridge over Over Loblolly

    Creek, 0.62 miles S of SR 116

    Fort Wayne .099 NHPP Bridge

    Construction

    CN $1,250,400.00 $312,600.00 $1,563,000.00 Init.38670 /

    1298003

    Indiana Department

    of Transportation

    US 27 Replace

    Superstructure

    Bridge over Over Loblolly

    Creek, 0.62 miles S of SR 116

    Fort Wayne .099 NHPP Bridge ROW RW1 $32,000.00 $8,000.00 $40,000.00 A 04 $1,654,000.0038670 /

    1298003

    Comments:NO MPO. Adding RW to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 27 Bridge Deck

    Replacement &

    Widening

    Bridge over Wabash River, 1.8

    0 miles N of SR 116

    Fort Wayne .099 NHPP Bridge

    Construction

    CN $1,654,400.00 $413,600.00 $2,068,000.00 Init.38670 /

    1298015

    Indiana Department

    of Transportation

    US 27 Bridge Deck

    Replacement &

    Widening

    Bridge over Wabash River, 1.8

    0 miles N of SR 116

    Fort Wayne .099 NHPP Bridge ROW RW1 $32,000.00 $8,000.00 $40,000.00 A 04 $2,386,000.0038670 /

    1298015

    Comments:NO MPO. Adding RW to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 27 HMA Overlay,

    Preventive

    Maintenance

    From 0.12 M. N. of SR 116 (Har

    rison St) to 0.86 M. S. of SR

    218.

    Fort Wayne 3.65 NHPP Road

    Construction

    CN $923,200.00 $230,800.00 $1,154,000.00 Init.38670 /

    1500842

    Indiana Department

    of Transportation

    US 27 HMA Overlay,

    Preventive

    Maintenance

    From 0.86 miles S of SR 218 to

    1.00 miles S of SR 124

    Fort Wayne 5.881 NHPP Road

    Construction

    CN $1,428,800.00 $357,200.00 $1,786,000.00 Init.38670 /

    1500844

    Indiana Department

    of Transportation

    US 27 HMA Overlay,

    Preventive

    Maintenance

    From 0.86 miles S of SR 218 to

    1.00 miles S of SR 124

    Fort Wayne 5.881 NHPP Road Consulting PE1 $360,000.00 $90,000.00 $450,000.00 A 06 $2,215,000.0038670 /

    1500844

    Comments:No MPO. Adding PE (CE) in FY 2018 into FY 2018-20121 STIP.

    Indiana Department

    of Transportation

    US 224 HMA Overlay,

    Preventive

    Maintenance

    0.31 miles W of US 27 N Jct to

    0.83 miles E of US 27 S Jct

    Fort Wayne 1.024 NHPP Road

    Construction

    CN $388,680.00 $97,170.00 $485,850.00 Init.38670 /

    1592503

    Indiana Department

    of Transportation

    SR 124 Repair Or Replace

    Joints

    Over Blue Creek, 0.98 miles E

    of SR 101

    Fort Wayne 0 STP Bridge

    Construction

    CN $12,040.00 $3,010.00 $15,050.00 Init.39355 /

    1600562

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 2 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    SR 218 Debris Removal From

    Channel

    Over Wabash River, 0.73 miles

    E of SR 116

    Fort Wayne 0 STP Bridge

    Construction

    CN $21,272.00 $5,318.00 $26,590.00 Init.39556 /

    1600563

    Indiana Department

    of Transportation

    US 224 Debris Removal From

    Channel

    Over St Mary's River, 0.83

    miles E of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $21,272.00 $5,318.00 $26,590.00 Init.39556 /

    1600565

    Indiana Department

    of Transportation

    SR 124 HMA Overlay Minor

    Structural

    From 0.98 mi E of US 27 (E Limit

    Monroe) to 7.97 mi E of US 27 (

    Ohio SL)

    Fort Wayne 6.903 STP Road

    Construction

    CN $1,865,490.40 $466,372.60 $2,331,863.00 Init.39900 /

    1601016

    Road Consulting PE1 $60,000.00 $15,000.00 $75,000.00

    Indiana Department

    of Transportation

    SR 101 Repair Or Replace

    Joints

    Bridge over the St Mary's River

    , 0.06 miles N of US 33

    Fort Wayne 0 STP Bridge

    Construction

    CN $139,138.40 $34,784.60 $173,923.00A 01 $199,000.0040457 /

    1701296

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 218 Debris Removal From

    Channel

    Bridge over Wabash River, 0.7

    3 miles E of SR 116

    Fort Wayne 0 STP Bridge

    Construction

    CN $104,984.80 $26,246.20 $131,231.00A 01 $156,231.0040458 /

    1701300

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 224 Debris Removal From

    Channel

    Bridge Over St. Marys River, 0.

    85 Miles East of US 27

    Fort Wayne 0 NHPP Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00 A 01 $156,231.0040458 /

    1701301

    Bridge

    Construction

    CN $104,984.80 $26,246.20 $131,231.00

    Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 124 Small Structure

    Replacement

    Carries Smith Ditch, 6.09 miles

    E of SR 301

    Fort Wayne 0 STP Bridge Consulting PE1 $120,000.00 $30,000.00 $37,500.00 $112,500.00A 02 $514,000.0040486 /

    1383558

    Bridge

    Construction

    PE1 $6,000.00 $1,500.00 $7,500.00

    Bridge ROW RW1 $16,000.00 $4,000.00 $20,000.00

    Comments:NO MPO. Adding PE to FY 2018, PE to FY 2019, PE to FY 2021 and RW to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 101 HMA Overlay Minor

    Structural

    From SR 124 to US 33 East Jct. Fort Wayne .001 STP Road Consulting PE1 $80,000.00 $20,000.00 $100,000.00 A 01 $900,000.0040486 /

    1602123

    Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 101 HMA Overlay Minor

    Structural

    From US 33 West Jct. to US

    224 East Jct.

    Fort Wayne 4.14 STP Road Consulting PE1 $120,000.00 $30,000.00 $150,000.00 A 01 $1,750,000.0040486 /

    1602124

    Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 224 Bridge Replacement,

    Other Construction

    Bridge Over Holthouse Ditch, 0.

    95 Miles West of US 27

    Fort Wayne 0 NHPP Bridge Consulting PE1 $140,000.00 $35,000.00 $52,500.00 $122,500.00A 02 $960,000.0040486 /

    1701394

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 3 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    US 224 Bridge Replacement,

    Other Construction

    Bridge Over Holthouse Ditch, 0.

    95 Miles West of US 27

    Fort Wayne 0 NHPP Bridge ROW RW1 $8,000.00 $2,000.00 $10,000.00 A 02 $960,000.0040486 /

    1701394

    Comments:NO MPO. Adding PE to FY 2018, PE to FY 2019, and RW to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 218 Channel Clearing And

    Protection

    Over Wabash River, 0.73 Miles

    of East of SR 116

    Fort Wayne 0 STP Bridge

    Construction

    CN $71,860.00 $17,965.00 $89,825.00 A 17 $119,825.0041019 /

    1801167

    Bridge Consulting PE1 $24,000.00 $6,000.00 $30,000.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 224 Channel Clearing And

    Protection

    Over St Mary's River, 0.85

    Miles East of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $63,324.00 $15,831.00 $79,155.00 A 17 $109,155.0041019 /

    1801181

    Bridge Consulting PE1 $24,000.00 $6,000.00 $30,000.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 218 Bridge Thin Deck

    Overlay

    Bridge Over Smith-Shoemaker

    Ditch, 2.10 Miles East of US 27.

    Fort Wayne 0 STP Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00A 18 $73,495.0041075 /

    1800609

    Bridge

    Construction

    CN $38,796.00 $9,699.00 $48,495.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 33 HMA Overlay,

    Preventive

    Maintenance

    From 2.96 miles E of US 27 to 8

    .44 miles E of US 27 (Ohio

    State Ln)

    Fort Wayne 5.494 NHPP Road

    Construction

    CN $1,274,156.00 $318,539.00 $1,592,695.00 A 18 $1,792,695.0041084 /

    1800536

    Road Consulting PE1 $160,000.00 $40,000.00 $200,000.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 218 HMA Overlay,

    Preventive

    Maintenance

    From 0.99 Miles East of US 27

    to 8.15 Miles East of US 27 (Ohi

    o)

    Fort Wayne 7.206 STP Road

    Construction

    CN $1,540,364.00 $385,091.00 $1,925,455.00 A 18 $2,175,455.0041084 /

    1800544

    Road Consulting PE1 $200,000.00 $50,000.00 $250,000.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 218 HMA Overlay,

    Preventive

    Maintenance

    From SR 116 to 0.75 Miles West

    of US 27 (West Limits Berne)

    Fort Wayne 4.032 STP Road Consulting PE1 $120,000.00 $30,000.00 $150,000.00A 18 $1,218,970.0041120 /

    1800551

    Road

    Construction

    CN $855,176.00 $213,794.00 $1,068,970.00

    Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.

    Adams County Total

    Federal: $17,155,248.53 Match :$4,781,674.60 2018: $8,917,050.13 2019: $3,476,933.00 2020: $2,532,677.00 2021: $7,010,263.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 4 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Allen County

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    Heavy duty replacement hybrid

    bus (1) for FY 17 funding is

    5307 & 5340

    Fort Wayne 0 Transit Transit PE1 $1,200,000.00 $0.00 $1,200,000.00 A 191382475

    100% Local

    Funds

    PE1 $0.00 $300,000.00 $300,000.00

    Comments:Transit Purchase Vehicles

    Indiana Department

    of Transportation

    SR 930 Intersect. Improv. W/

    Added Turn Lanes

    At US 27, Add Left Turn Lanes

    on E, W, & S Approaches

    Fort Wayne .441 STP Mobility ROW RW1 $16,000.00 $4,000.00 $20,000.00 A 17 $3,470,292.001401845

    Mobility Consulting PE1 $496,000.00 $124,000.00 $620,000.00

    Comments:NIRCC Resolution 18-70. Adding PE to FY 2019 and RW to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Small Structure Pipe

    Lining

    Pipeliner, WB On Ramp, 4.0

    Miles East of US 27.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $58,500.00 $6,500.00 $65,000.00 Init.1500829

    Indiana Department

    of Transportation

    I 469 Small Structure Pipe

    Lining

    Pipeliner, WB On Ramp, 4.0

    Miles East of US 27.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$58,500.00 -$6,500.00 ($65,000.00) A 11 $0.001500829

    Comments:NIRCC Resolution 18-64. Removing CN from STIP as work has already been completed.

    Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 Multiple 100% Local

    Funds

    PE1 $0.00 $170,549.30 $71,467.86 $82,167.89 $8,581.77$8,331.78Init.1592872

    Local Bridge

    Program

    PE1 $682,197.16 $0.00 $285,871.44 $328,671.54 $34,327.07$33,327.11

    Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 STP Local Bridge

    Program

    PE1 $100,276.81 $0.00 $59,556.55 $40,720.26M 02 $1,030,401.961592872

    100% Local

    Funds

    PE1 $0.00 $16,889.15 $14,889.15 $2,000.00

    Comments:NIRCC Administrative Modification 17-276 - Add $59,556.55 federal and $14,889.14 local funds to FY 2018.

    Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection

    and Inventory Program for

    Cycle Years 2018-2021

    Fort Wayne 0 STP Local Bridge

    Program

    PE1 -$102,612.99 $0.00 $115,654.41 ($138,069.46) ($20,101.77)($60,096.17)M 06 $849,826.221592872

    100% Local

    Funds

    PE1 $0.00 -$17,473.81 $28,912.99 ($34,517.37) ($5,025.45)($6,843.98)

    Comments:NIRCC - Add $115,654.41 federal and $28,912.99 local funds to FY 2018 - Reduce federal funds by $60,096.17 and local funds by $6,843.98 in FY 2019 - Reduce federal funds by $138,069.46 and local funds by $34,517.37 in FY 2020 - Reduce federal funds by $20,101.77 and local

    funds by $5,025.45 in FY 2021.

    Indiana Department

    of Transportation

    I 469 Debris Removal From

    Channel

    Bridge over St. Mary River, EB,

    0.45 miles W of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$47,439.00 -$5,271.00 ($52,710.00) A 21 $0.001592918

    Comments:NIRCC Resolution 18-83. Removing CN from STIP as project is being eliminated.

    Indiana Department

    of Transportation

    I 469 Debris Removal From

    Channel

    Bridge over St. Mary River, EB,

    0.45 miles W of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $47,439.00 $5,271.00 $52,710.00 Init.1592918

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    SB bridge over NS Railroad (Fo

    storia), 0.57 miles W of SR 1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $33,750.00 $3,750.00 $37,500.00 Init.1592982

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 5 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    SB bridge over NS Railroad (Fo

    storia), 0.57 miles W of SR 1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$33,750.00 -$3,750.00 ($37,500.00) A 04 $0.001592982

    Comments:NIRCC Resolution 18-55. Removing CN from STIP as work has already been completed.

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over US 24, NB, 1.35

    miles N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $86,400.00 $9,600.00 $96,000.00 Init.1592985

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over US 24, NB, 1.35

    miles N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$86,400.00 -$9,600.00 ($96,000.00) A 04 $0.001592985

    Comments:NIRCC Resolution 18-56. Removing CN from STIP as work has already been completed.

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over US 24, SB, 1.35

    miles N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $86,760.00 $9,640.00 $96,400.00 Init.1592986

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over US 24, SB, 1.35

    miles N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$86,760.00 -$9,640.00 ($96,400.00) A 04 $0.001592986

    Comments:NIRCC Resolution 18-57. Removing CN from STIP as work has already been completed.

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over NS Railroad, SB, 0.

    50 miles S of SR 37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $33,750.00 $3,750.00 $37,500.00 Init.1592988

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over NS Railroad, SB, 0.

    50 miles S of SR 37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN -$33,750.00 -$3,750.00 ($37,500.00) A 04 $0.001592988

    Comments:NIRCC Resolution 18-58. Removing CN from STIP as work has already been completed.

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Preventative

    Maintenance

    Capitalization of Maintenance Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $559,311.00 $25,000.00 $534,311.00 Init.1700469

    Transit PE1 $2,237,242.00 $0.00 $100,000.00 $2,137,242.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Operating Complementary Paratransit Fort Wayne 0 Transit Transit PE1 $372,696.00 $0.00 $372,696.00 Init.1700470

    100% Local

    Funds

    PE1 $0.00 $93,174.00 $93,174.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Operating Complementary Paratransit Fort Wayne 0 Transit Transit PE1 $387,604.00 $0.00 $387,604.00 Init.1700471

    100% Local

    Funds

    PE1 $0.00 $96,901.00 $96,901.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Operating Special Rule Operating 2020 Fort Wayne 0 Transit Transit PE1 $814,487.20 $203,621.80 $1,018,109.00 Init.1700472

    100% Local

    Funds

    PE1 $203,621.60 $50,905.40 $254,527.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Operating Special Rule Operating 2021 Fort Wayne 0 Transit Transit PE1 $875,297.60 $218,824.40 $1,094,122.00 Init.1700473

    100% Local

    Funds

    PE1 $218,824.80 $54,706.20 $273,531.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 6 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    Four Replacement Minibus -

    ACCESS

    Fort Wayne 0 Transit Transit PE1 $299,200.00 $74,800.00 $374,000.00 Init.1700474

    100% Local

    Funds

    PE1 $52,800.00 $13,200.00 $66,000.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $0.00 $0.00A 191700475

    Transit PE1 $0.00 $0.00 $0.00

    Comments:Transit Purchase Vehicles

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit Transit PE1 $480,000.00 $120,000.00 $600,000.00Init.1700475

    100% Local

    Funds

    PE1 $84,705.60 $21,176.40 $105,882.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit Transit PE1 $480,000.00 $120,000.00 $600,000.00Init.1700476

    100% Local

    Funds

    PE1 $84,705.60 $21,176.40 $105,882.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    Three Replacement Minibus -

    ACCESS

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $39,600.00 $9,900.00 $49,500.00Init.1700477

    Transit PE1 $224,400.00 $56,100.00 $280,500.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit Transit PE1 $499,800.00 $124,950.00 $624,750.00 Init.1700478

    100% Local

    Funds

    PE1 $88,200.00 $22,050.00 $110,250.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    Three Replacement Minibus -

    ACCESS

    Fort Wayne 0 Transit Transit PE1 $280,500.00 $0.00 $280,500.00 Init.1700479

    100% Local

    Funds

    PE1 $0.00 $49,500.00 $49,500.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $110,250.00 $110,250.00 Init.1700480

    Transit PE1 $624,750.00 $0.00 $624,750.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Purchase

    Vehicles

    One Heavy Duty Replacement

    Hybrid Bus

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $110,250.00 $110,250.00 Init.1700481

    Transit PE1 $624,750.00 $0.00 $624,750.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 7 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Allen County MS

    TRST

    Transit Purchase

    Vehicles

    Transit Purchase Vehicles Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $10,000.00 $10,000.00 Init.1701461

    Transit PE1 $40,000.00 $0.00 $40,000.00

    Allen County MS

    TRST

    Transit Purchase

    Vehicles

    Transit Purchase Vehicles CTN Fort Wayne 0 Transit Transit PE1 $43,036.00 $0.00 $43,036.00 Init.1701462

    100% Local

    Funds

    PE1 $0.00 $10,759.00 $10,759.00

    Allen County MS

    TRST

    Transit Purchase

    Vehicles

    Transit Purchase Vehicles CTN

    2018

    Fort Wayne 0 Transit Transit PE1 $46,528.00 $0.00 $46,528.00 Init.1701463

    100% Local

    Funds

    PE1 $0.00 $11,632.00 $11,632.00

    Allen County MS

    TRST

    Transit Purchase

    Vehicles

    Transit Purchase Vehicles - E.S

    . 2018

    Fort Wayne 0 Transit Transit PE1 $46,528.00 $0.00 $46,528.00 Init.1701464

    100% Local

    Funds

    PE1 $0.00 $11,632.00 $11,632.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Planning Transit Planning Project Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $200,000.00 $200,000.00 A 121702843

    Comments:Transit

    MPO - Fort Wayne IR 1001 Other Type Project (Mi

    scellaneous)

    Fort Wayne MPO - Unified Work

    Program UPWP, PL & HSIP for

    FY 2019

    Fort Wayne 0 Multiple 100% Local

    Funds

    PE1 $0.00 $189,088.00 $189,088.00A 18 $700,000.001801295

    MPO Unified

    Planning Work

    Programs

    PE1 $609,700.00 $0.00 $609,700.00

    Fort Wayne MPO PE1 $62,448.00 $0.00 $62,448.00

    Comments:Approval of Amendments 18-69 thru 18-71 to the 2018-2021 NIRCC TIP

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Misc

    Equipment

    On-board security camera

    system upgrade

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $60,600.00 $60,600.00 A 191801492

    Transit PE1 $242,400.00 $0.00 $242,400.00

    Comments:Transit Misc Equipment

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Preventative

    Maintenance

    Bus mechanic workforce

    development training

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $6,000.00 $6,000.00 A 191801493

    Transit PE1 $24,000.00 $0.00 $24,000.00

    Comments:Transit Preventative Maintenance

    Fort Wayne IR 1001 Intersect. Improv. W/

    Added Turn Lanes

    St Joseph Center Rd/Washingt

    on Center Rd: from Clinton St to

    Campus Ct

    Fort Wayne .2 STP Fort Wayne MPO -

    PYB

    CN $2,670,000.00 $0.00 $2,670,000.00Init.30443 /

    0710322

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 8 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Fort Wayne IR 1001 Intersect. Improv. W/

    Added Turn Lanes

    St Joseph Center Rd/Washingt

    on Center Rd: from Clinton St to

    Campus Ct

    Fort Wayne .2 STP 100% Local

    Funds

    CN $0.00 $667,500.00 $667,500.00Init.30443 /

    0710322

    Fort Wayne ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton

    St (Phase One)

    Fort Wayne .19 STP Fort Wayne MPO CN $160,000.00 $0.00 $160,000.00 Init.30743 /

    1005151

    Fort Wayne MPO -

    PYB

    CN $1,680,000.00 $0.00 $1,680,000.00

    100% Local

    Funds

    CN $0.00 $460,000.00 $460,000.00

    Fort Wayne ST 1001 New Bridge, Other State Blvd ? Bridge over Spy

    Run Creek

    Fort Wayne .04 STP 100% Local

    Funds

    CN $0.00 $360,000.00 $360,000.00Init.33130 /

    1005152

    Fort Wayne MPO CN $1,440,000.00 $0.00 $1,440,000.00

    Fort Wayne ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton

    St (Phase Two)

    Fort Wayne .46 STP 100% Local

    Funds

    CN $0.00 $916,900.00 $916,900.00Init.33130 /

    1005154

    Fort Wayne MPO -

    PYB

    CN $3,210,000.00 $0.00 $3,210,000.00

    Fort Wayne MPO CN $457,600.00 $0.00 $457,600.00

    Fort Wayne ST 1001 New Bridge, Other State Blvd ? Pufferbelly

    Pedestrian Brg over State Blvd.

    Fort Wayne .04 STP Fort Wayne MPO -

    PYB

    CN $500,000.00 $0.00 $500,000.00Init.33130 /

    1005155

    100% Local

    Funds

    CN $0.00 $125,000.00 $125,000.00

    Fort Wayne ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR 3

    ) to Coldwater Rd

    Fort Wayne 1.8 STP 100% Local

    Funds

    CN $0.00 $2,650,000.00 $2,650,000.00 Init.34815 /

    0901798

    Fort Wayne MPO CN $2,042,867.00 $0.00 $2,042,867.00

    Fort Wayne MPO -

    PYB

    CN $8,557,133.00 $0.00 $8,557,133.00

    Indiana Department

    of Transportation

    US 27 Traffic Signals

    Modernization

    Between 6.29 mi S of SR 930 (

    PauldingRd) to 0.99 mi S of SR

    930 (Edgewood D

    Fort Wayne 5.268 NHPP Safety

    Construction

    CN $1,576,960.00 $394,240.00 $1,971,200.00 Init.34924 /

    1172175

    Indiana Department

    of Transportation

    US 27 HMA Overlay,

    Preventive

    Maintenance

    From 6.29 mi S of SR 930 (Paul

    ding Rd) to 0.99 mi S of SR 930

    (Edgewood Dr)

    Fort Wayne 5.268 NHPP Road

    Construction

    CN $4,142,160.00 $1,035,540.00 $5,177,700.00 Init.34924 /

    1296321

    Indiana Department

    of Transportation

    SR 930 Intersect. Improv. W/

    Added Turn Lanes

    0.77 M.E. of US 27(at

    Coldwater Rd), Add Right Turn

    Lanes on N,E, & W approaches

    Fort Wayne .199 NHPP Mobility

    Construction

    CN $1,422,400.00 $355,600.00 $1,778,000.00 Init.34924 /

    1296911

    Indiana Department

    of Transportation

    SR 930 Intersect. Improv. W/

    Added Turn Lanes

    0.77 M.E. of US 27(at

    Coldwater Rd), Add Right Turn

    Lanes on N,E, & W approaches

    Fort Wayne .199 NHPP Mobility ROW RW1 $236,368.00 $59,092.00 $295,460.00 A 04 $2,516,000.0034924 /

    1296911

    Comments:NIRCC Resolution 16-191. Adding RW to FY 2018 into FY 2018 - 2021 STIP.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 9 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Fort Wayne ST 1001 Road Reconstruction

    (3R/4R Standards)

    Maplecrest Rd: from State Blve

    to Stellhorn Rd

    Fort Wayne 1.4 STP 100% Local

    Funds

    CN $0.00 $2,070,000.00 $2,070,000.00Init.35622 /

    1173162

    Fort Wayne MPO CN $8,280,000.00 $0.00 $8,280,000.00

    Allen County IR 1001 Other Intersection

    Improvement

    Liberty Mills Rd/CR 900 N at

    County Line Rd Intersection

    Fort Wayne 0 STP Fort Wayne MPO -

    PYB

    CN $1,392,000.00 $0.00 $1,392,000.00 Init.35623 /

    1297238

    100% Local

    Funds

    CN $0.00 $348,000.00 $348,000.00

    Allen County ST 1027 Br Repl, Cont. Rc Slab Bridge 95 on Washington Cntr

    Rd over Spy Run Creek

    Fort Wayne .1 STP 100% Local

    Funds

    CN $0.00 $460,000.00 $460,000.00 Init.35987 /

    1382497

    Fort Wayne MPO CN $1,840,000.00 $0.00 $1,840,000.00

    Allen County IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd: from Clifty Parkway

    to Thomas Rd

    Fort Wayne .7 STP 100% Local

    Funds

    CN $0.00 $834,200.00 $834,200.00 Init.36009 /

    1382492

    Fort Wayne MPO CN $3,336,800.00 $0.00 $3,336,800.00

    Allen County IR 1001 Intersection

    Improvement,

    Roundabout

    Minnich Rd and Tillman Rd

    Intersection

    Fort Wayne .25 STP Fort Wayne MPO CN $1,440,200.00 $0.00 $1,440,200.00 Init.36377 /

    1382818

    100% Local

    Funds

    CN $0.00 $160,023.00 $160,023.00

    Fort Wayne ST 1026 Railroad Crossing Anthony Blvd:: Luther St to

    Creighton Ave.

    Fort Wayne .554 STP 100% Local

    Funds

    CN $0.00 $24,600,000.00 $24,600,000.00 Init.36378 /

    1382496

    Allen County I 69 Bridge Deck Overlay

    and Widening

    1.08 miles N of SR 14 (Bass

    Road Bridge over I-69)

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $540,000.00 $60,000.00 $600,000.00 Init.37010 /

    1383242

    Allen County IR 1029 Road Reconstruction

    (3R/4R Standards)

    Ryan Road from Dawkins Road

    to Harper Road

    Fort Wayne 1.004 STP 100% Local

    Funds

    CN $0.00 $1,196,611.00 $1,196,611.00 Init.37320 /

    1383353

    Group IV Program CN $2,971,582.00 $0.00 $2,971,582.00

    Allen County IR 1029 Road Reconstruction

    (3R/4R Standards)

    Ryan Rd/Bruick Rd::Harper

    Road to US 24

    Fort Wayne 1.11 STP Group IV Program CN $3,217,200.00 $0.00 $3,217,200.00 Init.37320 /

    1400826

    100% Local

    Funds

    CN $0.00 $1,394,300.00 $1,394,300.00

    New Haven ST 1012 Road Reconstruction

    (3R/4R Standards)

    Broadway/Landin Rd: Powers

    St to N. River Rd.

    Fort Wayne .715 STP Fort Wayne MPO RW1 $150,000.00 $0.00 $150,000.00Init.37552 /

    1400694

    Fort Wayne MPO CN $960,000.00 $0.00 $960,000.00

    100% Local

    Funds

    RW1 $0.00 $37,500.00 $37,500.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 10 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    New Haven ST 1012 Road Reconstruction

    (3R/4R Standards)

    Broadway/Landin Rd: Powers

    St to N. River Rd.

    Fort Wayne .715 STP 100% Local

    Funds

    CN $0.00 $240,000.00 $240,000.00 Init.37552 /

    1400694

    MPO - Fort Wayne MS

    TRST

    Transit Operating New listing in capitalization of

    maintenance costs for FY 18

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $475,000.00 $475,000.00 Init.37616 /

    1400999

    Transit PE1 $1,900,000.00 $0.00 $1,900,000.00

    MPO - Fort Wayne MS

    TRST

    Transit Operating New listing in complementary

    paratransit costs for FY 18

    Fort Wayne 0 Transit Transit PE1 $344,579.00 $0.00 $344,579.00 Init.37617 /

    1401000

    100% Local

    Funds

    PE1 $0.00 $86,145.00 $86,145.00

    Indiana Department

    of Transportation

    I 69 Bridge Deck

    Replacement &

    Widening

    Hillegas Road Bridge over I-69,

    0.48 miles S of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $2,088,000.00 $232,000.00 $2,320,000.00 Init.37657 /

    1006172

    Indiana Department

    of Transportation

    US 30 Bridge Replacement,

    Other Construction

    0.23 miles E of US 33 (Hillegas

    Road Over US 30/US 33)

    Fort Wayne .038 NHPP Bridge

    Construction

    CN $2,008,800.00 $502,200.00 $2,511,000.00 Init.37657 /

    1383457

    Bridge ROW RW1 $10,400.00 $2,600.00 $13,000.00

    Fort Wayne ST 1033 Intersect. Improv. W/

    Added Turn Lanes

    Hillegas Road and Coliseum

    Blvd

    Fort Wayne .2 NHPP 100% Local

    Funds

    CN $178,380.00 $19,820.00 $198,200.00 Init.37657 /

    1401164

    Fort Wayne MPO CN $713,520.00 $79,280.00 $792,800.00

    Fort Wayne ST 1033 Intersect. Improv. W/

    Added Turn Lanes

    Hillegas Road and Coliseum

    Blvd

    Fort Wayne .2 Safety Fort Wayne MPO CN $136,576.09 $15,175.12 $151,751.22 A 11 $991,000.0037657 /

    1401164

    100% Local

    Funds

    CN -$83,924.10 -$9,324.90 ($93,249.00)

    Comments:Increase Federal funds for CN and change from STP to HSIP (90/10) per NIRCC Resolution 18-67

    Indiana Department

    of Transportation

    US 33 Bridge Painting Bridge US 33 over US 30 Fort Wayne 0 NHPP Bridge

    Construction

    CN $186,360.00 $46,590.00 $232,950.00 Init.37657 /

    1592680

    Indiana Department

    of Transportation

    I 469 Interchange

    Modification

    I-469 at the US 24 Interchange Fort Wayne .558 NHPP Mobility

    Construction

    CN $6,201,000.00 $689,000.00 $1,490,000.00 $5,400,000.00Init.37684 /

    1383675

    Mobility ROW RW1 $1,350,000.00 $150,000.00 $1,500,000.00

    Indiana Department

    of Transportation

    SR 930 Bridge Deck

    Replacement

    Bridge over Trier Ditch, 2.05

    miles W of I-469

    Fort Wayne 0 NHPP Bridge Consulting PE1 $32,556.00 $8,139.00 $40,695.00 A 01 $858,000.0037684 /

    1600227

    Bridge ROW RW1 $80,000.00 $20,000.00 $100,000.00

    Comments:NIRCC Resolution 17-321. Adding PE to FY 2018 and RW to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay NB Bridge on I-469 at the US 24

    Interchange

    Fort Wayne 0 NHPP Mobility

    Construction

    CN $1,188,049.50 $132,005.50 $1,320,055.00Init.37684 /

    1600316

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 11 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay SB Bridge on I-469 at the US 24

    Interchange

    Fort Wayne 0 NHPP Mobility

    Construction

    CN $1,269,850.50 $141,094.50 $1,410,945.00Init.37684 /

    1600317

    Indiana Department

    of Transportation

    SR 101 Small Structure Pipe

    Lining

    Mourey Ditch, 2.60 miles N of

    US 30

    Fort Wayne 0 STP Bridge

    Construction

    CN $62,800.00 $15,700.00 $78,500.00Init.37720 /

    1383552

    Bridge ROW RW1 $4,000.00 $1,000.00 $5,000.00

    Indiana Department

    of Transportation

    US 30 Bridge Painting US 30 bridge over Flatrock

    Creek, EB, 0.79 miles E of SR

    101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $102,520.00 $25,630.00 $128,150.00Init.37720 /

    1592659

    Indiana Department

    of Transportation

    US 30 Bridge Painting US 30 bridge over Flatrock

    Creek, WB, 0.79 miles E of SR

    101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $102,520.00 $25,630.00 $128,150.00Init.37720 /

    1592661

    Indiana Department

    of Transportation

    US 30 Bridge Deck Overlay Bridge over Flatrock Creek, WB

    , 0.79 miles E of SR 101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $589,680.00 $147,420.00 $737,100.00Init.37720 /

    1600194

    Indiana Department

    of Transportation

    US 30 Bridge Deck Overlay Bridge over Flatrock Creek, EB

    Lane, 0.79 miles E of SR 101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $589,760.00 $147,440.00 $737,200.00Init.37720 /

    1600238

    Allen County IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd from Thomas Road to

    Hillegas Rd

    Fort Wayne .6 STP 100% Local

    Funds

    CN $0.00 $814,500.00 $814,500.00 Init.38004 /

    1401272

    Fort Wayne MPO CN $3,257,700.00 $0.00 $3,257,700.00

    Allen County IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd: from Scott Rd to

    Hadley Rd

    Fort Wayne 2 STP Fort Wayne MPO RW1 $1,856,230.00 $0.00 $1,856,230.00Init.38005 /

    1401273

    Fort Wayne MPO CN $9,100,000.00 $0.00 $9,100,000.00

    100% Local

    Funds

    RW1 $0.00 $464,060.00 $464,060.00

    100% Local

    Funds

    CN $0.00 $2,275,000.00 $2,275,000.00

    Indiana Department

    of Transportation

    SR 14 HMA Overlay,

    Preventive

    Maintenance

    2.44 miles W of I-69 to 0.28

    miles E of I-69

    Fort Wayne 2.447 STP Road

    Construction

    CN $1,241,060.00 $310,265.00 $1,551,325.00Init.38562 /

    1600115

    Indiana Department

    of Transportation

    SR 37 Small Structure Pipe

    Lining

    Over Branch #2, Sowers Ditch,

    3.05 miles N of SR 101

    Fort Wayne 0 STP Bridge

    Construction

    CN $164,474.40 $41,118.60 $205,593.00 Init.38564 /

    1383542

    Bridge ROW RW1 $4,000.00 $1,000.00 $5,000.00

    Indiana Department

    of Transportation

    SR 101 Small Structure Pipe

    Lining

    Imback Ditch, 6.64 miles N of

    US 30

    Fort Wayne 0 STP Bridge

    Construction

    CN $57,790.40 $14,447.60 $72,238.00 Init.38564 /

    1383553

    Indiana Department

    of Transportation

    SR 3 HMA Overlay,

    Preventive

    Maintenance

    From I-69 to 3.63 miles N of I-69 Fort Wayne 3.562 NHPP Road

    Construction

    CN $2,173,720.00 $543,430.00 $2,717,150.00 Init.38564 /

    1592638

    Indiana Department

    of Transportation

    US 33 Bridge Deck Overlay Bridge over Johnson Ditch, 5.3

    3 miles N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $277,720.00 $69,430.00 $347,150.00 Init.38564 /

    1700224

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 12 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 69 Interchange

    Modification

    I-69 at SR 14 interchange Fort Wayne 2.125 NHPP Safety

    Construction

    CN $830,250.00 $92,250.00 $922,500.00 Init.38565 /

    1401828

    Indiana Department

    of Transportation

    I 69 Interchange

    Modification

    I-69 at SR 14 interchange Fort Wayne 2.125 NHPP Safety Consulting PE1 $13,500.00 $1,500.00 $15,000.00 A 01 $937,500.0038565 /

    1401828

    Comments:NIRCC Resolution 17-318. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 33 Bridge Deck Overlay Bridge over Johnson Ditch, 5.3

    3 miles N of US 30

    Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 04 $422,000.0038565 /

    1700224

    Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 930 HMA Overlay,

    Preventive

    Maintenance

    From 4.97 miles W of I-469 (Clo

    verleaf) to 0.54 miles W of I-46

    9 (Minnich

    Fort Wayne 4.723 NHPP Road Consulting PE1 $160,000.00 $40,000.00 $200,000.00 A 04 $2,897,000.0038565 /

    1701341

    Road

    Construction

    CN $2,157,276.80 $539,319.20 $2,696,596.00

    Comments:NIRCC Resolution 18-39. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Rehab-Pipe

    Lining

    CIPP Pipe Liner, 6.0 miles E of

    US 27

    Fort Wayne 0 NHPP Bridge ROW RW1 $4,500.00 $500.00 $5,000.00A 04 $257,000.0038565 /

    1701348

    Bridge Consulting PE1 $54,000.00 $6,000.00 $60,000.00

    Bridge

    Construction

    CN $172,741.50 $19,193.50 $191,935.00

    Comments:NIRCC Resolution 18-40. Adding PE to FY 2018, RW to FY 2019, and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 30 Bridge Deck Overlay Bridge over Hoffman Creek EB,

    0.65 miles W of SR 101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $623,903.20 $155,975.80 $779,879.00 A 04 $905,000.0038565 /

    1701352

    Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00

    Comments:NIRCC Resolution 18-41. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 30 Bridge Deck Overlay Bridge over Hoffman Creek WB

    , 0.65 miles W of SR 101

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $623,903.20 $155,975.80 $779,879.00 A 04 $905,000.0038565 /

    1701353

    Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00

    Comments:NIRCC Resolution 18-42. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay Marion Center Rd over I 469, 1.

    67 miles E of US 27

    Fort Wayne 0 NHPP Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00 A 04 $1,556,000.0038565 /

    1701354

    Bridge

    Construction

    CN $1,287,607.50 $143,067.50 $1,430,675.00

    Comments:NIRCC Resolution 18-43. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay Bridge over SR 37 Northbound,

    3.65 miles N of US 24

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,185,954.30 $131,772.70 $1,317,727.00 A 04 $1,443,000.0038565 /

    1701357

    Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 13 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Comments:NIRCC Resolution 18-44. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay Bridge over SR 37 SB, 3.65

    miles N of US 24

    Fort Wayne 0 NHPP Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00 A 04 $1,443,000.0038565 /

    1701358

    Bridge

    Construction

    CN $1,185,954.30 $131,772.70 $1,317,727.00

    Comments:NIRCC Resolution 18-45. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay Bridge over Wheelock Road, 1.

    92 miles E of SR 37,

    Eastbound

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,089,142.20 $121,015.80 $1,210,158.00 A 04 $1,335,000.0038565 /

    1701359

    Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00

    Comments:NIRCC Resolution 18-46. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Deck Overlay Bridge over Wheelock Road, 1.

    92 miles E of SR 37,

    Westbound

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,089,142.20 $121,015.80 $1,210,158.00 A 04 $1,335,000.0038565 /

    1701360

    Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00

    Comments:NIRCC Resolution 18-47. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 101 Bridge Deck Overlay Bridge over Hoffman Creek, 0.3

    6 miles N of US 30

    Fort Wayne 0 STP Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00 A 04 $676,000.0038565 /

    1701362

    Bridge

    Construction

    CN $440,604.80 $110,151.20 $550,756.00

    Comments:NIRCC Resolution 18-48. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 930 Bridge Thin Deck

    Overlay

    Bridge Over Spy Run Creek

    WB, 0.74 Miles West of US 27.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $119,360.00 $29,840.00 $149,200.00 Init.38670 /

    1500784

    Indiana Department

    of Transportation

    US 27 Bridge Deck Overlay Bridge Over Houk Ditch, NBL, 0

    .72 Miles North of I-469.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $391,200.00 $97,800.00 $489,000.00 Init.38670 /

    1500787

    Indiana Department

    of Transportation

    US 27 Bridge Deck Overlay Bridge Over Houk Ditch, SBL, 0

    .72 Miles North of I-469.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $391,200.00 $97,800.00 $489,000.00 Init.38670 /

    1500788

    Indiana Department

    of Transportation

    US 27 Bridge Deck Overlay Bridge Over Berning Creek NB,

    4.81 Miles South of I-469.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $296,880.00 $74,220.00 $371,100.00 Init.38670 /

    1500803

    Indiana Department

    of Transportation

    US 27 Bridge Deck Overlay Bridge Over Berning Creek SB,

    4.81 Miles South of I-469.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $296,880.00 $74,220.00 $371,100.00 Init.38670 /

    1500804

    Indiana Department

    of Transportation

    SR 1 Scour Protection (Ero

    sion)

    Bridge over Deptmer Ditch,1.18

    miles S of I-469

    Fort Wayne 0 STP Bridge

    Construction

    CN $74,360.00 $18,590.00 $92,950.00 Init.38670 /

    1592634

    Indiana Department

    of Transportation

    SR 37 Scour Protection (Ero

    sion)

    Bridge over Wann Ditch, 0.38

    miles S of SR 101

    Fort Wayne 0 STP Bridge

    Construction

    CN $55,280.00 $13,820.00 $69,100.00 Init.38670 /

    1592648

    Bridge ROW RW1 $8,000.00 $2,000.00 $10,000.00

    Allen County ST 1016 Other Type Project (Mi

    scellaneous)

    Placeholder for Payment to

    Allen County for County let

    Contract.

    Fort Wayne 0 STP Major New -

    Construction

    CN $552,000.00 $138,000.00 $690,000.00 Init.39023 /

    1592388

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 14 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    ST 1001 Railroad Protection Van Buren St at NS RR DOT#

    478025T in Fort Wayne

    Fort Wayne 0 STP Local Safety

    Program - 130

    CN $450,000.00 $0.00 $450,000.00 Init.39344 /

    1500181

    Indiana Department

    of Transportation

    I 69 Substructure Repair

    And Rehabilitation

    Bridge over NS Railroad(Chicag

    o), NB Lane, 0.53 miles N of SR

    14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /

    1592908

    Indiana Department

    of Transportation

    I 69 Substructure Repair

    And Rehabilitation

    Bridge over NS Railroad(Chicag

    o), SB Lane, 0.553 miles N of

    SR 14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /

    1592914

    Indiana Department

    of Transportation

    I 69 Substructure Repair

    And Rehabilitation

    Bridge over CFE Railroad, NB

    Lane, 0.81 miles N of SR 14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /

    1592916

    Indiana Department

    of Transportation

    I 69 Substructure Repair

    And Rehabilitation

    Bridge over CFE Railroad, SB

    Lane, 0.81 miles N of SR 14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /

    1592917

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge over US 24 NB, 3.21

    miles S of SR 14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /

    1592926

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge over US 24, SB, 3.21

    miles S of SR 14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /

    1592927

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over Maplecrest Road

    EB, 3.99 miles E of SR 37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $38,115.00 $4,235.00 $42,350.00 Init.39355 /

    1592955

    Indiana Department

    of Transportation

    I 69 Substructure Repair

    And Rehabilitation

    Lower Huntington Road over I

    69, 2.97 miles S of US 24

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /

    1592980

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge WB Over - Maplecrest

    Road NB/SB, 3.99 miles E of SR

    37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $88,650.00 $9,850.00 $98,500.00 Init.39355 /

    1592989

    Indiana Department

    of Transportation

    I 469 Small Structure Pipe

    Lining

    WB off ramp, 1.76 miles E of

    US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $729,688.50 $81,076.50 $810,765.00Init.39429 /

    1592490

    Indiana Department

    of Transportation

    I 469 Small Structure Pipe

    Lining

    Pipe Liner, Unnamed Tributary

    of Brindle Ditch, 3.76 miles E of

    I-69

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $198,765.00 $22,085.00 $220,850.00Init.39429 /

    1600240

    Indiana Department

    of Transportation

    I 69 Bridge Rehab-Pipe

    Lining

    Over Graham McCullough Ditch

    #4, 3.20 Miles South of US 24.

    Fort Wayne .1 NHPP Bridge Consulting PE1 $162,000.00 $18,000.00 $180,000.00 A 04 $2,114,000.0039429 /

    1700755

    Bridge

    Construction

    CN $1,740,096.90 $193,344.10 $1,933,441.00

    Comments:NIRCC Resolution 18-49. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 HMA Overlay,

    Preventive

    Maintenance

    From 1.92 miles N of SR 37 to 1

    .92 miles E of I-69 N Jct

    Fort Wayne 2.422 NHPP Road

    Construction

    CN $1,749,920.40 $194,435.60 $1,944,356.00A 04 $2,100,000.0039429 /

    1701204

    Road Consulting PE1 $166,500.00 $18,500.00 $185,000.00

    Comments:NIRCC Resolution 18-12. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over NS RR (Industrial

    Spur), Southbound, 00.83 Miles

    North of US 30

    Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $1,063,000.0039429 /

    1701208

    Bridge

    Construction

    CN $889,281.00 $98,809.00 $988,090.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 15 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Comments:NIRCC Resolution 18-13. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over NS RR (Industrial

    Spur), Northbound, 00.83 miles

    N of US 30

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $589,734.00 $65,526.00 $655,260.00A 04 $730,000.0039429 /

    1701209

    Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00

    Comments:NIRCC Resolution 18-14. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over Becketts Run,

    Northbound, 1.94 miles S of SR

    1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $290,187.00 $32,243.00 $322,430.00A 04 $408,000.0039429 /

    1701210

    Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00

    Comments:NIRCC Resolution 18-15. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Painting Bridge over Maplecrest Road

    NB/SB, Eastbound, 3.99 Miles

    East of SR 37

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $263,000.0039429 /

    1701218

    Bridge

    Construction

    CN $213,739.20 $23,748.80 $237,488.00

    Comments:NIRCC Resolution 18-16. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Bridge Painting Bridge over Maplecrest Road

    NB/SB, Westbound, 3.99 miles

    E of SR 37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $213,739.20 $23,748.80 $237,488.00A 04 $263,000.0039429 /

    1701219

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-17. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    I69 NB/SB Ramp, 5.69 miles S

    of US 24

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $709,084.80 $78,787.20 $787,872.00A 04 $878,000.0039429 /

    1701225

    Bridge Consulting PE1 $90,000.00 $10,000.00 $100,000.00

    Comments:NIRCC Resolution 18-18. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over Becketts Run,

    Southbound, 1.94 miles S of SR

    1

    Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $397,000.0039429 /

    1701226

    Bridge

    Construction

    CN $290,187.00 $32,243.00 $322,430.00

    Comments:NIRCC Resolution 18-19. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over Vandolah Road, NB

    , 4.07 miles N of SR 1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $145,093.50 $16,121.50 $161,215.00A 04 $236,000.0039429 /

    1701254

    Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00

    Comments:NIRCC Resolution 18-20. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over Vandolah Road, SB

    , 4.07 miles N of SR 1

    Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $236,000.0039429 /

    1701256

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 16 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 69 Bridge Thin Deck

    Overlay

    Bridge over Vandolah Road, SB

    , 4.07 miles N of SR 1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $145,093.50 $16,121.50 $161,215.00A 04 $236,000.0039429 /

    1701256

    Comments:NIRCC Resolution 18-21. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 930 Bridge Deck

    Replacement

    Bridge over Trier Ditch, 2.05

    miles W of I-469

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $573,880.00 $143,470.00 $717,350.00Init.39430 /

    1600227

    Indiana Department

    of Transportation

    I 69 Small Structure Pipe

    Lining

    S. Jct of I69/I469 Interchange -

    Loop Ramp from WB Laf. Ctr to

    SB I69

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $172,305.00 $19,145.00 $191,450.00 Init.39433 /

    1700221

    Indiana Department

    of Transportation

    I 69 Small Structure Pipe

    Lining

    S. Jct of I69/I469 Interchange -

    Loop Ramp from WB Laf. Ctr to

    SB I69

    Fort Wayne 0 NHPP Bridge Consulting PE1 $18,000.00 $2,000.00 $20,000.00 A 04 $212,000.0039433 /

    1700221

    Comments:NIRCC Resolution 17-296. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 205 Small Structure Pipe

    Lining

    Pipeliner for Johnson Ditch, 2.0

    9 miles N of US 33

    Fort Wayne 0 STP Bridge

    Construction

    CN $81,288.00 $20,322.00 $101,610.00 Init.39590 /

    1296076

    Indiana Department

    of Transportation

    SR 101 HMA Overlay,

    Structural

    From 0.18 mi N of US 24 to 8.49

    mi N of US 24

    Fort Wayne 8.391 STP Road

    Construction

    CN $3,010,800.00 $752,700.00 $3,763,500.00 Init.39636 /

    1296471

    Indiana Department

    of Transportation

    US 30 Other Intersection

    Improvement

    Intersection of US 30 & SR 101,

    Allen County

    Fort Wayne .461 NHPP Safety

    Construction

    CN $761,600.00 $190,400.00 $952,000.00 Init.39636 /

    1298055

    Indiana Department

    of Transportation

    I 469 HMA Overlay,

    Preventive

    Maintenance

    From 1.76 mi E of I-469 S jct at

    I-69 to 2.01 mi E of I -469, S jct

    at I-69

    Fort Wayne .266 NHPP District Other

    Construction

    CN $180,000.00 $20,000.00 $200,000.00 Init.39655 /

    1601216

    Indiana Department

    of Transportation

    I 469 HMA Overlay,

    Preventive

    Maintenance

    From 0.89 mi E of I-469 S jct at

    I-69 to 1.20 mi E of I -469, S jct

    at I-69

    Fort Wayne .274 NHPP District Other

    Construction

    CN $180,000.00 $20,000.00 $200,000.00 Init.39655 /

    1601217

    Indiana Department

    of Transportation

    SR 101 Bridge Deck Overlay Bridge Over Hamm Ditch, 1.49

    Miles North of SR 37.

    Fort Wayne 0 STP Bridge

    Construction

    CN $547,440.00 $136,860.00 $684,300.00Init.39801 /

    1500781

    Indiana Department

    of Transportation

    SR 930 Intersect. Improv. W/

    Added Turn Lanes

    1.68 miles W of US 27 (Goshen

    Rd), Added left turn lane on W

    approach

    Fort Wayne .062 NHPP Mobility Consulting PE1 $40,000.00 $10,000.00 $50,000.00 Init.39902 /

    1401850

    Mobility ROW RW1 $40,000.00 $10,000.00 $50,000.00

    Mobility

    Construction

    CN $581,600.00 $145,400.00 $500,000.00 $227,000.00

    Indiana Department

    of Transportation

    US 33 Small Structure

    Replacement

    3.57 miles N of US 30, UNT of

    Sutorious Ditch, RP 39-95

    Fort Wayne .093 NHPP Bridge

    Construction

    CN $741,116.00 $185,279.00 $926,395.00 Init.39902 /

    1600411

    Bridge ROW RW1 $16,000.00 $4,000.00 $20,000.00

    Bridge

    Construction

    PE1 $9,600.00 $2,400.00 $12,000.00

    MPO - Fort Wayne MS

    TRST

    Transit Operating Allen County Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $178,000.00 $178,000.00 Init.39942 /

    1601865

    Transit PE1 $87,000.00 $0.00 $87,000.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 17 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 469 Concrete Pavement

    Restoration (CPR)

    From 0.54 Miles East of I-69

    South to 2.28 Miles East of SR

    1 (Winchester Rd).

    Fort Wayne 8.385 NHPP Road

    Construction

    CN $2,662,650.00 $295,850.00 $2,958,500.00 Init.39953 /

    1500837

    Indiana Department

    of Transportation

    I 469 Concrete Pavement

    Restoration (CPR)

    From 0.54 Miles East of I-69

    South to 2.28 Miles East of SR

    1 (Winchester Rd).

    Fort Wayne 8.385 NHPP Road

    Construction

    CN $225,000.00 $25,000.00 $250,000.00 M 01 $3,208,500.0039953 /

    1500837

    Comments:NO MPO. Adding additional CN to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Replace

    Superstructure

    Bridge over Feighner Road, 0.5

    4 miles E of I-69, EBL

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,480,500.00 $164,500.00 $1,645,000.00 Init.39953 /

    1601889

    Indiana Department

    of Transportation

    I 469 Replace

    Superstructure

    Bridge over Feighner Road, 0.5

    4 miles E of I-69, WBL

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,480,500.00 $164,500.00 $1,645,000.00 Init.39953 /

    1601890

    Indiana Department

    of Transportation

    SR 1 Demolition, Remove

    Buildings,

    Foundations

    4.67 miles E of I-69 at Clay St in

    Leo-Cedarville

    Fort Wayne .05 STP District Other

    Construction

    CN $20,000.00 $5,000.00 $25,000.00 Init.40012 /

    1602272

    District Other

    ROW

    RW1 $72,000.00 $18,000.00 $90,000.00

    Indiana Department

    of Transportation

    SR 1 Demolition, Remove

    Buildings,

    Foundations

    4.67 miles E of I-69 at Clay St in

    Leo-Cedarville

    Fort Wayne .05 STP District Other

    Consulting

    PE1 $12,000.00 $3,000.00 $15,000.00 A 01 $131,000.0040012 /

    1602272

    Comments:NIRCC Resolution 17-319. Adding PE to FY 2018 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 27 Small Structure Pipe

    Lining

    Pipeliner for Valentine Ditch, 3.2

    miles N of Adams/Allen Co Line.

    Fort Wayne 0 NHPP Bridge ROW RW1 $10,400.00 $2,600.00 $13,000.00 Init.40129 /

    0301145

    Bridge

    Construction

    CN $148,640.00 $37,160.00 $185,800.00

    Fort Wayne Public

    Transportation

    Corporation (Citilink

    MS

    TRST

    Transit Operating Capitalization of Maintenance

    Costs 2020

    Fort Wayne 0 Transit 100% Local

    Funds

    PE1 $0.00 $513,760.00 $513,760.00 Init.40206 /

    1700468

    Transit PE1 $2,055,040.00 $0.00 $2,055,040.00

    Indiana Department

    of Transportation

    VA VARI Railroad Protection Monroeville Rd at CFE RR DOT

    #532328Y near Hoagland

    Fort Wayne 0 Safety Local Safety

    Program - 130

    PE1 $20,000.00 $0.00 $20,000.00 A 02 $320,000.0040244 /

    1700527

    Local Safety

    Program - 130

    CN $320,000.00 $0.00 $320,000.00

    Comments:PE Phase for $20,000.00 in FY 2018 amended into the 18-02 STIP. CN phase in FY 2019 for $320,000 amended into the 18-02 STIP. NIRCC Administrative Modification (Group Project) 17-314 to the 2016-2019 TIP. Dated April 12, 2017.

    Indiana Department

    of Transportation

    SR 3 Replace

    Superstructure

    Bridge over Willow Creek, NB,

    3.84 miles S of SR 205

    Fort Wayne 0 STP Bridge

    Construction

    CN $401,680.00 $100,420.00 $502,100.00 Init.40354 /

    1500801

    Indiana Department

    of Transportation

    SR 3 Replace

    Superstructure

    Bridge Over Willow Creek, SB,

    3.84 Miles South of SR 205.

    Fort Wayne 0 STP Bridge

    Construction

    CN $401,680.00 $100,420.00 $502,100.00 Init.40354 /

    1500802

    Indiana Department

    of Transportation

    SR 3 Bridge Deck Patching Bridge over Willow Creek, NB,

    4.19 miles S of SR 205

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $35,265.60 $8,816.40 $44,082.00A 04 $69,000.0040457 /

    1701265

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NIRCC Resolution 18-22. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 18 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    SR 3 Bridge Deck Patching Bridge over Willow Creek,

    Southbound, 4.19 miles S of SR

    205

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $23,090.40 $5,772.60 $28,863.00A 04 $54,000.0040457 /

    1701268

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NIRCC Resolution 18-23. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    US 24 Substructure Repair

    And Rehabilitation

    Bridge over Aboite Creek, 4.11

    miles W of I-69

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $62,980.80 $15,745.20 $78,726.00A 04 $104,000.0040457 /

    1701286

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NIRCC Resolution 18-24. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    SR 930 Repair Or Replace

    Joints

    SR 930 WB, over St Joseph

    River, 1.74 miles E of US 27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $16,764.00 $4,191.00 $20,955.00A 04 $46,000.0040457 /

    1701304

    Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00

    Comments:NIRCC Resolution 18-25. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Bridge over Lafayette Center

    Road, EB, 0.94 miles E of I69

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $80,000.0040457 /

    1701305

    Bridge

    Construction

    CN $49,033.80 $5,448.20 $54,482.00

    Comments:NIRCC Resolution 18-26. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Substructure Repair

    And Rehabilitation

    Bridge over Lafayette Center

    Road, WB, 0.94 miles E of I 69

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $49,033.80 $5,448.20 $54,482.00A 04 $80,000.0040457 /

    1701306

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-27. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Coverdale Road over I 469, 2.9

    1 miles W of SR 1

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $46,000.0040457 /

    1701307

    Bridge

    Construction

    CN $18,859.50 $2,095.50 $20,955.00

    Comments:NIRCC Resolution 18-28. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Anthony extended over I 469, 3

    .79 miles E of SR 1

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $17,916.30 $1,990.70 $19,907.00A 04 $45,000.0040457 /

    1701309

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-29. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Minnich Road NB over I 469, 1.

    73 miles W of US 30

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $93,000.0040457 /

    1701312

    Bridge

    Construction

    CN $61,291.80 $6,810.20 $68,102.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 19 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Comments:NIRCC Resolution 18-31. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Minnich Road Southbound over

    I 469, 1.72 miles W of US 30

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $93,000.0040457 /

    1701313

    Bridge

    Construction

    CN $61,291.80 $6,810.20 $68,102.00

    Comments:NIRCC Resolution 18-32. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    Stellhorn Road over I469, 1.1

    miles S of SR 37

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $23,573.70 $2,619.30 $26,193.00A 04 $54,000.0040457 /

    1701314

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-33. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Repair Or Replace

    Joints

    I 469 WB over I 69, 1.26 miles E

    of I 69

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $72,000.0040457 /

    1701315

    Bridge

    Construction

    CN $42,433.20 $4,714.80 $47,148.00

    Comments:NIRCC Resolution 18-34. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge over McCulloch Ditch/NS

    RR Northbound, 0.80 miles S of

    US 24

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $44,318.70 $4,924.30 $49,243.00A 04 $75,000.0040457 /

    1701319

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-35. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge Over McCulloch Ditch/N

    S RR Southbound, 0.80 Miles

    South of US 24

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $44,318.70 $4,924.30 $49,243.00A 04 $75,000.0040457 /

    1701320

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-36. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge over Hadley Road

    Northbound, 0.97 miles S of SR

    14

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $42,433.20 $4,714.80 $47,148.00A 04 $72,000.0040457 /

    1701321

    Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00

    Comments:NIRCC Resolution 18-37. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 69 Repair Or Replace

    Joints

    Bridge over Hadley Road

    Southbound, 0.97 miles S of SR

    14

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $72,000.0040457 /

    1701322

    Bridge

    Construction

    CN $42,433.20 $4,714.80 $47,148.00

    Comments:NIRCC Resolution 18-38. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Debris Removal From

    Channel

    Bridge over St Marys River

    Eastbound, 0.45 miles W of US

    27

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $23,621.40 $2,624.60 $26,246.00A 04 $51,000.0040458 /

    1701311

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

    Page 20 of 702 Report Created:6/5/2018 2:07:59PM

  • State Preservation and Local Initiated Projects FY 2018 - 2021

    Indiana Department of Transportation (INDOT)

    SPONSOR CONTR

    ACT # /

    LEAD

    DES

    ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2018 2019 2020 2021STIP

    NAME

    Indiana Department

    of Transportation

    I 469 Debris Removal From

    Channel

    Bridge over St Marys River

    Eastbound, 0.45 miles W of US

    27

    Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $51,000.0040458 /

    1701311

    Comments:NIRCC Resolution 18-30. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.

    Indiana Department

    of Transportation

    I 469 Replace

    Superstructure

    Bridge over Lafayette Center

    Rd, EB 0.94 miles E of I-69.

    Fort Wayne 0 NHPP Bridge

    Construction

    CN $1,734,229.80 $192,692.20 $1,926,922.00 A 04 $2,227,000.0040466 /

    1701375

    Bridge Consulting PE1 $270,000.00 $30,000.00 $300,000.00

    Comments:NIRCC Resolution 18-1. Adding PE to FY 2018 and CN to FY 2021 into FY 2018 - 2021 STIP.

    Indiana Department