State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Adams County
Adams County VA VARI Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 Multiple 100% Local
Funds
PE1 $0.00 $45,779.52 $24,343.20 $20,042.40 $724.32$669.60Init.1592864
Local Bridge
Program
PE1 $183,118.08 $0.00 $97,372.80 $80,169.60 $2,897.28$2,678.40
Adams County VA VARI Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 STP Local Bridge
Program
PE1 $123,894.88 $0.00 $20,286.00 $96,871.60 $3,500.88$3,236.40M 02 $276,584.601592864
100% Local
Funds
PE1 $0.00 $29,973.72 $5,071.50 $23,217.90 $875.22$809.10
Comments:No MPO - Add $20,286 federal funds and $5,071.50 local funds to FY 2018.
Adams County VA VARI Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 STP Local Bridge
Program
PE1 -$16,595.63 $0.00 $87,143.33 ($101,203.60) ($2,170.16)($365.20)M 06 $336,662.001592864
100% Local
Funds
PE1 $0.00 -$8,421.44 $16,513.30 ($24,300.90) ($542.54)($91.30)
Comments:No MPO - Add $87,143.33 federal and $16,513.30 local funds to FY 2018 - Reduce federal funds by $365.20 and local funds by $91.30 in FY 2019 - Reduce federal funds by $101,203.60 and local funds by $24,300.90 in FY 2020 - Reduce federal funds by $2,170.16 and local funds
by $542.54 in FY 2021.
Decatur ST 1003 Intersection
Improvement,
Roundabout
Intersection of 2nd St., Adams
St., Winchester St., and Mercer
Ave
Fort Wayne .28 STP 100% Local
Funds
PE1 $0.00 $348,750.00 $348,750.00 Init.1600708
100% Local
Funds
RW1 $0.00 $320,000.00 $320,000.00
Decatur ST 1003 Intersection
Improvement,
Roundabout
Intersection of 2nd St., Adams
St., Winchester St., and Mercer
Ave
Fort Wayne .28 STP Group IV Program PE1 $276,992.00 $0.00 $276,992.00 A 06 $2,372,657.001600708
100% Local
Funds
PE1 $0.00 -$279,502.00 ($279,502.00)
Comments:No MPO Add Federal PE to project in FY 2018.
Adams County IR 1005 Bike/Pedestrian
Facilities
Adams Co BP: from the
Wabash River to CR 850 S
Fort Wayne .32 STP Local
Transportation
Alternatives
CN $174,800.00 $0.00 $174,800.00Init.35191 /
1173218
100% Local
Funds
CN $0.00 $221,835.00 $221,835.00
Adams County IR 1005 New Bridge, Other Adams Co BP: Relocate and
erect RR Bridge
Fort Wayne 0 STP Local
Transportation
Alternatives
CN $380,000.00 $0.00 $380,000.00Init.35191 /
1600429
100% Local
Funds
CN $0.00 $95,000.00 $95,000.00
Adams County IR 1005 Bridge Deck
Replacement
Adams Co BP: Reconstruct RR
Bridge
Fort Wayne 0 STP 100% Local
Funds
CN $0.00 $84,060.00 $84,060.00Init.35191 /
1600430
Local
Transportation
Alternatives
CN $336,240.00 $0.00 $336,240.00
Indiana Department
of Transportation
US 27 Bridge Thin Deck
Overlay
Bridge over St Mary's River, NB
, 1.10 miles N of US 224
Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 01 $486,000.0037720 /
1701261
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 1 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
US 27 Bridge Thin Deck
Overlay
Bridge over St Mary's River, NB
, 1.10 miles N of US 224
Fort Wayne 0 NHPP Bridge
Construction
CN $328,670.40 $82,167.60 $410,838.00A 01 $486,000.0037720 /
1701261
Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 27 Bridge Thin Deck
Overlay
Bridge Over St. Mary's River,
Southbound, 1.10 Miles North
of US 224
Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 01 $486,000.0037720 /
1701262
Bridge
Construction
CN $328,670.40 $82,167.60 $410,838.00
Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 101 Bridge Deck Overlay Bridge over Drake Ditch, 0.88 N
of US 33
Fort Wayne 0 STP Bridge
Construction
CN $370,760.00 $92,690.00 $463,450.00 A 01 $463,450.0038562 /
1600186
Comments:NO MPO. Adding CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 224 Bridge Deck Overlay Bridge over Koos Ditch, 1.55
miles E of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $293,400.00 $73,350.00 $366,750.00 Init.38562 /
1700223
Indiana Department
of Transportation
SR 218 Bridge Replacement,
Other Construction
Bridge over the Wabash River
Overflow, 0.60 miles E of SR
116
Fort Wayne 0 STP Bridge
Construction
CN $894,960.00 $223,740.00 $1,118,700.00 Init.38604 /
1600275
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Indiana Department
of Transportation
US 27 Replace
Superstructure
Bridge over Over Loblolly
Creek, 0.62 miles S of SR 116
Fort Wayne .099 NHPP Bridge
Construction
CN $1,250,400.00 $312,600.00 $1,563,000.00 Init.38670 /
1298003
Indiana Department
of Transportation
US 27 Replace
Superstructure
Bridge over Over Loblolly
Creek, 0.62 miles S of SR 116
Fort Wayne .099 NHPP Bridge ROW RW1 $32,000.00 $8,000.00 $40,000.00 A 04 $1,654,000.0038670 /
1298003
Comments:NO MPO. Adding RW to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 27 Bridge Deck
Replacement &
Widening
Bridge over Wabash River, 1.8
0 miles N of SR 116
Fort Wayne .099 NHPP Bridge
Construction
CN $1,654,400.00 $413,600.00 $2,068,000.00 Init.38670 /
1298015
Indiana Department
of Transportation
US 27 Bridge Deck
Replacement &
Widening
Bridge over Wabash River, 1.8
0 miles N of SR 116
Fort Wayne .099 NHPP Bridge ROW RW1 $32,000.00 $8,000.00 $40,000.00 A 04 $2,386,000.0038670 /
1298015
Comments:NO MPO. Adding RW to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
From 0.12 M. N. of SR 116 (Har
rison St) to 0.86 M. S. of SR
218.
Fort Wayne 3.65 NHPP Road
Construction
CN $923,200.00 $230,800.00 $1,154,000.00 Init.38670 /
1500842
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
From 0.86 miles S of SR 218 to
1.00 miles S of SR 124
Fort Wayne 5.881 NHPP Road
Construction
CN $1,428,800.00 $357,200.00 $1,786,000.00 Init.38670 /
1500844
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
From 0.86 miles S of SR 218 to
1.00 miles S of SR 124
Fort Wayne 5.881 NHPP Road Consulting PE1 $360,000.00 $90,000.00 $450,000.00 A 06 $2,215,000.0038670 /
1500844
Comments:No MPO. Adding PE (CE) in FY 2018 into FY 2018-20121 STIP.
Indiana Department
of Transportation
US 224 HMA Overlay,
Preventive
Maintenance
0.31 miles W of US 27 N Jct to
0.83 miles E of US 27 S Jct
Fort Wayne 1.024 NHPP Road
Construction
CN $388,680.00 $97,170.00 $485,850.00 Init.38670 /
1592503
Indiana Department
of Transportation
SR 124 Repair Or Replace
Joints
Over Blue Creek, 0.98 miles E
of SR 101
Fort Wayne 0 STP Bridge
Construction
CN $12,040.00 $3,010.00 $15,050.00 Init.39355 /
1600562
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 2 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
SR 218 Debris Removal From
Channel
Over Wabash River, 0.73 miles
E of SR 116
Fort Wayne 0 STP Bridge
Construction
CN $21,272.00 $5,318.00 $26,590.00 Init.39556 /
1600563
Indiana Department
of Transportation
US 224 Debris Removal From
Channel
Over St Mary's River, 0.83
miles E of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $21,272.00 $5,318.00 $26,590.00 Init.39556 /
1600565
Indiana Department
of Transportation
SR 124 HMA Overlay Minor
Structural
From 0.98 mi E of US 27 (E Limit
Monroe) to 7.97 mi E of US 27 (
Ohio SL)
Fort Wayne 6.903 STP Road
Construction
CN $1,865,490.40 $466,372.60 $2,331,863.00 Init.39900 /
1601016
Road Consulting PE1 $60,000.00 $15,000.00 $75,000.00
Indiana Department
of Transportation
SR 101 Repair Or Replace
Joints
Bridge over the St Mary's River
, 0.06 miles N of US 33
Fort Wayne 0 STP Bridge
Construction
CN $139,138.40 $34,784.60 $173,923.00A 01 $199,000.0040457 /
1701296
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 218 Debris Removal From
Channel
Bridge over Wabash River, 0.7
3 miles E of SR 116
Fort Wayne 0 STP Bridge
Construction
CN $104,984.80 $26,246.20 $131,231.00A 01 $156,231.0040458 /
1701300
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 224 Debris Removal From
Channel
Bridge Over St. Marys River, 0.
85 Miles East of US 27
Fort Wayne 0 NHPP Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00 A 01 $156,231.0040458 /
1701301
Bridge
Construction
CN $104,984.80 $26,246.20 $131,231.00
Comments:NO MPO. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 124 Small Structure
Replacement
Carries Smith Ditch, 6.09 miles
E of SR 301
Fort Wayne 0 STP Bridge Consulting PE1 $120,000.00 $30,000.00 $37,500.00 $112,500.00A 02 $514,000.0040486 /
1383558
Bridge
Construction
PE1 $6,000.00 $1,500.00 $7,500.00
Bridge ROW RW1 $16,000.00 $4,000.00 $20,000.00
Comments:NO MPO. Adding PE to FY 2018, PE to FY 2019, PE to FY 2021 and RW to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 101 HMA Overlay Minor
Structural
From SR 124 to US 33 East Jct. Fort Wayne .001 STP Road Consulting PE1 $80,000.00 $20,000.00 $100,000.00 A 01 $900,000.0040486 /
1602123
Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 101 HMA Overlay Minor
Structural
From US 33 West Jct. to US
224 East Jct.
Fort Wayne 4.14 STP Road Consulting PE1 $120,000.00 $30,000.00 $150,000.00 A 01 $1,750,000.0040486 /
1602124
Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 224 Bridge Replacement,
Other Construction
Bridge Over Holthouse Ditch, 0.
95 Miles West of US 27
Fort Wayne 0 NHPP Bridge Consulting PE1 $140,000.00 $35,000.00 $52,500.00 $122,500.00A 02 $960,000.0040486 /
1701394
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 3 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
US 224 Bridge Replacement,
Other Construction
Bridge Over Holthouse Ditch, 0.
95 Miles West of US 27
Fort Wayne 0 NHPP Bridge ROW RW1 $8,000.00 $2,000.00 $10,000.00 A 02 $960,000.0040486 /
1701394
Comments:NO MPO. Adding PE to FY 2018, PE to FY 2019, and RW to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 218 Channel Clearing And
Protection
Over Wabash River, 0.73 Miles
of East of SR 116
Fort Wayne 0 STP Bridge
Construction
CN $71,860.00 $17,965.00 $89,825.00 A 17 $119,825.0041019 /
1801167
Bridge Consulting PE1 $24,000.00 $6,000.00 $30,000.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 224 Channel Clearing And
Protection
Over St Mary's River, 0.85
Miles East of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $63,324.00 $15,831.00 $79,155.00 A 17 $109,155.0041019 /
1801181
Bridge Consulting PE1 $24,000.00 $6,000.00 $30,000.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 218 Bridge Thin Deck
Overlay
Bridge Over Smith-Shoemaker
Ditch, 2.10 Miles East of US 27.
Fort Wayne 0 STP Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00A 18 $73,495.0041075 /
1800609
Bridge
Construction
CN $38,796.00 $9,699.00 $48,495.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 33 HMA Overlay,
Preventive
Maintenance
From 2.96 miles E of US 27 to 8
.44 miles E of US 27 (Ohio
State Ln)
Fort Wayne 5.494 NHPP Road
Construction
CN $1,274,156.00 $318,539.00 $1,592,695.00 A 18 $1,792,695.0041084 /
1800536
Road Consulting PE1 $160,000.00 $40,000.00 $200,000.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 218 HMA Overlay,
Preventive
Maintenance
From 0.99 Miles East of US 27
to 8.15 Miles East of US 27 (Ohi
o)
Fort Wayne 7.206 STP Road
Construction
CN $1,540,364.00 $385,091.00 $1,925,455.00 A 18 $2,175,455.0041084 /
1800544
Road Consulting PE1 $200,000.00 $50,000.00 $250,000.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 218 HMA Overlay,
Preventive
Maintenance
From SR 116 to 0.75 Miles West
of US 27 (West Limits Berne)
Fort Wayne 4.032 STP Road Consulting PE1 $120,000.00 $30,000.00 $150,000.00A 18 $1,218,970.0041120 /
1800551
Road
Construction
CN $855,176.00 $213,794.00 $1,068,970.00
Comments:NO MPO. Adding PE to FY 2019 and CN to FY 2021 into FY 2018 - 2021 STIP.
Adams County Total
Federal: $17,155,248.53 Match :$4,781,674.60 2018: $8,917,050.13 2019: $3,476,933.00 2020: $2,532,677.00 2021: $7,010,263.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 4 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Allen County
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
Heavy duty replacement hybrid
bus (1) for FY 17 funding is
5307 & 5340
Fort Wayne 0 Transit Transit PE1 $1,200,000.00 $0.00 $1,200,000.00 A 191382475
100% Local
Funds
PE1 $0.00 $300,000.00 $300,000.00
Comments:Transit Purchase Vehicles
Indiana Department
of Transportation
SR 930 Intersect. Improv. W/
Added Turn Lanes
At US 27, Add Left Turn Lanes
on E, W, & S Approaches
Fort Wayne .441 STP Mobility ROW RW1 $16,000.00 $4,000.00 $20,000.00 A 17 $3,470,292.001401845
Mobility Consulting PE1 $496,000.00 $124,000.00 $620,000.00
Comments:NIRCC Resolution 18-70. Adding PE to FY 2019 and RW to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Small Structure Pipe
Lining
Pipeliner, WB On Ramp, 4.0
Miles East of US 27.
Fort Wayne 0 NHPP Bridge
Construction
CN $58,500.00 $6,500.00 $65,000.00 Init.1500829
Indiana Department
of Transportation
I 469 Small Structure Pipe
Lining
Pipeliner, WB On Ramp, 4.0
Miles East of US 27.
Fort Wayne 0 NHPP Bridge
Construction
CN -$58,500.00 -$6,500.00 ($65,000.00) A 11 $0.001500829
Comments:NIRCC Resolution 18-64. Removing CN from STIP as work has already been completed.
Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 Multiple 100% Local
Funds
PE1 $0.00 $170,549.30 $71,467.86 $82,167.89 $8,581.77$8,331.78Init.1592872
Local Bridge
Program
PE1 $682,197.16 $0.00 $285,871.44 $328,671.54 $34,327.07$33,327.11
Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 STP Local Bridge
Program
PE1 $100,276.81 $0.00 $59,556.55 $40,720.26M 02 $1,030,401.961592872
100% Local
Funds
PE1 $0.00 $16,889.15 $14,889.15 $2,000.00
Comments:NIRCC Administrative Modification 17-276 - Add $59,556.55 federal and $14,889.14 local funds to FY 2018.
Allen County VA NBIS Bridge Inspections Countywide Bridge Inspection
and Inventory Program for
Cycle Years 2018-2021
Fort Wayne 0 STP Local Bridge
Program
PE1 -$102,612.99 $0.00 $115,654.41 ($138,069.46) ($20,101.77)($60,096.17)M 06 $849,826.221592872
100% Local
Funds
PE1 $0.00 -$17,473.81 $28,912.99 ($34,517.37) ($5,025.45)($6,843.98)
Comments:NIRCC - Add $115,654.41 federal and $28,912.99 local funds to FY 2018 - Reduce federal funds by $60,096.17 and local funds by $6,843.98 in FY 2019 - Reduce federal funds by $138,069.46 and local funds by $34,517.37 in FY 2020 - Reduce federal funds by $20,101.77 and local
funds by $5,025.45 in FY 2021.
Indiana Department
of Transportation
I 469 Debris Removal From
Channel
Bridge over St. Mary River, EB,
0.45 miles W of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN -$47,439.00 -$5,271.00 ($52,710.00) A 21 $0.001592918
Comments:NIRCC Resolution 18-83. Removing CN from STIP as project is being eliminated.
Indiana Department
of Transportation
I 469 Debris Removal From
Channel
Bridge over St. Mary River, EB,
0.45 miles W of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $47,439.00 $5,271.00 $52,710.00 Init.1592918
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
SB bridge over NS Railroad (Fo
storia), 0.57 miles W of SR 1
Fort Wayne 0 NHPP Bridge
Construction
CN $33,750.00 $3,750.00 $37,500.00 Init.1592982
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 5 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
SB bridge over NS Railroad (Fo
storia), 0.57 miles W of SR 1
Fort Wayne 0 NHPP Bridge
Construction
CN -$33,750.00 -$3,750.00 ($37,500.00) A 04 $0.001592982
Comments:NIRCC Resolution 18-55. Removing CN from STIP as work has already been completed.
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over US 24, NB, 1.35
miles N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN $86,400.00 $9,600.00 $96,000.00 Init.1592985
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over US 24, NB, 1.35
miles N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN -$86,400.00 -$9,600.00 ($96,000.00) A 04 $0.001592985
Comments:NIRCC Resolution 18-56. Removing CN from STIP as work has already been completed.
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over US 24, SB, 1.35
miles N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN $86,760.00 $9,640.00 $96,400.00 Init.1592986
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over US 24, SB, 1.35
miles N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN -$86,760.00 -$9,640.00 ($96,400.00) A 04 $0.001592986
Comments:NIRCC Resolution 18-57. Removing CN from STIP as work has already been completed.
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over NS Railroad, SB, 0.
50 miles S of SR 37
Fort Wayne 0 NHPP Bridge
Construction
CN $33,750.00 $3,750.00 $37,500.00 Init.1592988
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over NS Railroad, SB, 0.
50 miles S of SR 37
Fort Wayne 0 NHPP Bridge
Construction
CN -$33,750.00 -$3,750.00 ($37,500.00) A 04 $0.001592988
Comments:NIRCC Resolution 18-58. Removing CN from STIP as work has already been completed.
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Preventative
Maintenance
Capitalization of Maintenance Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $559,311.00 $25,000.00 $534,311.00 Init.1700469
Transit PE1 $2,237,242.00 $0.00 $100,000.00 $2,137,242.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Operating Complementary Paratransit Fort Wayne 0 Transit Transit PE1 $372,696.00 $0.00 $372,696.00 Init.1700470
100% Local
Funds
PE1 $0.00 $93,174.00 $93,174.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Operating Complementary Paratransit Fort Wayne 0 Transit Transit PE1 $387,604.00 $0.00 $387,604.00 Init.1700471
100% Local
Funds
PE1 $0.00 $96,901.00 $96,901.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Operating Special Rule Operating 2020 Fort Wayne 0 Transit Transit PE1 $814,487.20 $203,621.80 $1,018,109.00 Init.1700472
100% Local
Funds
PE1 $203,621.60 $50,905.40 $254,527.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Operating Special Rule Operating 2021 Fort Wayne 0 Transit Transit PE1 $875,297.60 $218,824.40 $1,094,122.00 Init.1700473
100% Local
Funds
PE1 $218,824.80 $54,706.20 $273,531.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 6 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
Four Replacement Minibus -
ACCESS
Fort Wayne 0 Transit Transit PE1 $299,200.00 $74,800.00 $374,000.00 Init.1700474
100% Local
Funds
PE1 $52,800.00 $13,200.00 $66,000.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $0.00 $0.00A 191700475
Transit PE1 $0.00 $0.00 $0.00
Comments:Transit Purchase Vehicles
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit Transit PE1 $480,000.00 $120,000.00 $600,000.00Init.1700475
100% Local
Funds
PE1 $84,705.60 $21,176.40 $105,882.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit Transit PE1 $480,000.00 $120,000.00 $600,000.00Init.1700476
100% Local
Funds
PE1 $84,705.60 $21,176.40 $105,882.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
Three Replacement Minibus -
ACCESS
Fort Wayne 0 Transit 100% Local
Funds
PE1 $39,600.00 $9,900.00 $49,500.00Init.1700477
Transit PE1 $224,400.00 $56,100.00 $280,500.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit Transit PE1 $499,800.00 $124,950.00 $624,750.00 Init.1700478
100% Local
Funds
PE1 $88,200.00 $22,050.00 $110,250.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
Three Replacement Minibus -
ACCESS
Fort Wayne 0 Transit Transit PE1 $280,500.00 $0.00 $280,500.00 Init.1700479
100% Local
Funds
PE1 $0.00 $49,500.00 $49,500.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $110,250.00 $110,250.00 Init.1700480
Transit PE1 $624,750.00 $0.00 $624,750.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Purchase
Vehicles
One Heavy Duty Replacement
Hybrid Bus
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $110,250.00 $110,250.00 Init.1700481
Transit PE1 $624,750.00 $0.00 $624,750.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 7 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Allen County MS
TRST
Transit Purchase
Vehicles
Transit Purchase Vehicles Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $10,000.00 $10,000.00 Init.1701461
Transit PE1 $40,000.00 $0.00 $40,000.00
Allen County MS
TRST
Transit Purchase
Vehicles
Transit Purchase Vehicles CTN Fort Wayne 0 Transit Transit PE1 $43,036.00 $0.00 $43,036.00 Init.1701462
100% Local
Funds
PE1 $0.00 $10,759.00 $10,759.00
Allen County MS
TRST
Transit Purchase
Vehicles
Transit Purchase Vehicles CTN
2018
Fort Wayne 0 Transit Transit PE1 $46,528.00 $0.00 $46,528.00 Init.1701463
100% Local
Funds
PE1 $0.00 $11,632.00 $11,632.00
Allen County MS
TRST
Transit Purchase
Vehicles
Transit Purchase Vehicles - E.S
. 2018
Fort Wayne 0 Transit Transit PE1 $46,528.00 $0.00 $46,528.00 Init.1701464
100% Local
Funds
PE1 $0.00 $11,632.00 $11,632.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Planning Transit Planning Project Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $200,000.00 $200,000.00 A 121702843
Comments:Transit
MPO - Fort Wayne IR 1001 Other Type Project (Mi
scellaneous)
Fort Wayne MPO - Unified Work
Program UPWP, PL & HSIP for
FY 2019
Fort Wayne 0 Multiple 100% Local
Funds
PE1 $0.00 $189,088.00 $189,088.00A 18 $700,000.001801295
MPO Unified
Planning Work
Programs
PE1 $609,700.00 $0.00 $609,700.00
Fort Wayne MPO PE1 $62,448.00 $0.00 $62,448.00
Comments:Approval of Amendments 18-69 thru 18-71 to the 2018-2021 NIRCC TIP
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Misc
Equipment
On-board security camera
system upgrade
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $60,600.00 $60,600.00 A 191801492
Transit PE1 $242,400.00 $0.00 $242,400.00
Comments:Transit Misc Equipment
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Preventative
Maintenance
Bus mechanic workforce
development training
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $6,000.00 $6,000.00 A 191801493
Transit PE1 $24,000.00 $0.00 $24,000.00
Comments:Transit Preventative Maintenance
Fort Wayne IR 1001 Intersect. Improv. W/
Added Turn Lanes
St Joseph Center Rd/Washingt
on Center Rd: from Clinton St to
Campus Ct
Fort Wayne .2 STP Fort Wayne MPO -
PYB
CN $2,670,000.00 $0.00 $2,670,000.00Init.30443 /
0710322
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 8 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fort Wayne IR 1001 Intersect. Improv. W/
Added Turn Lanes
St Joseph Center Rd/Washingt
on Center Rd: from Clinton St to
Campus Ct
Fort Wayne .2 STP 100% Local
Funds
CN $0.00 $667,500.00 $667,500.00Init.30443 /
0710322
Fort Wayne ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton
St (Phase One)
Fort Wayne .19 STP Fort Wayne MPO CN $160,000.00 $0.00 $160,000.00 Init.30743 /
1005151
Fort Wayne MPO -
PYB
CN $1,680,000.00 $0.00 $1,680,000.00
100% Local
Funds
CN $0.00 $460,000.00 $460,000.00
Fort Wayne ST 1001 New Bridge, Other State Blvd ? Bridge over Spy
Run Creek
Fort Wayne .04 STP 100% Local
Funds
CN $0.00 $360,000.00 $360,000.00Init.33130 /
1005152
Fort Wayne MPO CN $1,440,000.00 $0.00 $1,440,000.00
Fort Wayne ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton
St (Phase Two)
Fort Wayne .46 STP 100% Local
Funds
CN $0.00 $916,900.00 $916,900.00Init.33130 /
1005154
Fort Wayne MPO -
PYB
CN $3,210,000.00 $0.00 $3,210,000.00
Fort Wayne MPO CN $457,600.00 $0.00 $457,600.00
Fort Wayne ST 1001 New Bridge, Other State Blvd ? Pufferbelly
Pedestrian Brg over State Blvd.
Fort Wayne .04 STP Fort Wayne MPO -
PYB
CN $500,000.00 $0.00 $500,000.00Init.33130 /
1005155
100% Local
Funds
CN $0.00 $125,000.00 $125,000.00
Fort Wayne ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR 3
) to Coldwater Rd
Fort Wayne 1.8 STP 100% Local
Funds
CN $0.00 $2,650,000.00 $2,650,000.00 Init.34815 /
0901798
Fort Wayne MPO CN $2,042,867.00 $0.00 $2,042,867.00
Fort Wayne MPO -
PYB
CN $8,557,133.00 $0.00 $8,557,133.00
Indiana Department
of Transportation
US 27 Traffic Signals
Modernization
Between 6.29 mi S of SR 930 (
PauldingRd) to 0.99 mi S of SR
930 (Edgewood D
Fort Wayne 5.268 NHPP Safety
Construction
CN $1,576,960.00 $394,240.00 $1,971,200.00 Init.34924 /
1172175
Indiana Department
of Transportation
US 27 HMA Overlay,
Preventive
Maintenance
From 6.29 mi S of SR 930 (Paul
ding Rd) to 0.99 mi S of SR 930
(Edgewood Dr)
Fort Wayne 5.268 NHPP Road
Construction
CN $4,142,160.00 $1,035,540.00 $5,177,700.00 Init.34924 /
1296321
Indiana Department
of Transportation
SR 930 Intersect. Improv. W/
Added Turn Lanes
0.77 M.E. of US 27(at
Coldwater Rd), Add Right Turn
Lanes on N,E, & W approaches
Fort Wayne .199 NHPP Mobility
Construction
CN $1,422,400.00 $355,600.00 $1,778,000.00 Init.34924 /
1296911
Indiana Department
of Transportation
SR 930 Intersect. Improv. W/
Added Turn Lanes
0.77 M.E. of US 27(at
Coldwater Rd), Add Right Turn
Lanes on N,E, & W approaches
Fort Wayne .199 NHPP Mobility ROW RW1 $236,368.00 $59,092.00 $295,460.00 A 04 $2,516,000.0034924 /
1296911
Comments:NIRCC Resolution 16-191. Adding RW to FY 2018 into FY 2018 - 2021 STIP.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 9 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fort Wayne ST 1001 Road Reconstruction
(3R/4R Standards)
Maplecrest Rd: from State Blve
to Stellhorn Rd
Fort Wayne 1.4 STP 100% Local
Funds
CN $0.00 $2,070,000.00 $2,070,000.00Init.35622 /
1173162
Fort Wayne MPO CN $8,280,000.00 $0.00 $8,280,000.00
Allen County IR 1001 Other Intersection
Improvement
Liberty Mills Rd/CR 900 N at
County Line Rd Intersection
Fort Wayne 0 STP Fort Wayne MPO -
PYB
CN $1,392,000.00 $0.00 $1,392,000.00 Init.35623 /
1297238
100% Local
Funds
CN $0.00 $348,000.00 $348,000.00
Allen County ST 1027 Br Repl, Cont. Rc Slab Bridge 95 on Washington Cntr
Rd over Spy Run Creek
Fort Wayne .1 STP 100% Local
Funds
CN $0.00 $460,000.00 $460,000.00 Init.35987 /
1382497
Fort Wayne MPO CN $1,840,000.00 $0.00 $1,840,000.00
Allen County IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd: from Clifty Parkway
to Thomas Rd
Fort Wayne .7 STP 100% Local
Funds
CN $0.00 $834,200.00 $834,200.00 Init.36009 /
1382492
Fort Wayne MPO CN $3,336,800.00 $0.00 $3,336,800.00
Allen County IR 1001 Intersection
Improvement,
Roundabout
Minnich Rd and Tillman Rd
Intersection
Fort Wayne .25 STP Fort Wayne MPO CN $1,440,200.00 $0.00 $1,440,200.00 Init.36377 /
1382818
100% Local
Funds
CN $0.00 $160,023.00 $160,023.00
Fort Wayne ST 1026 Railroad Crossing Anthony Blvd:: Luther St to
Creighton Ave.
Fort Wayne .554 STP 100% Local
Funds
CN $0.00 $24,600,000.00 $24,600,000.00 Init.36378 /
1382496
Allen County I 69 Bridge Deck Overlay
and Widening
1.08 miles N of SR 14 (Bass
Road Bridge over I-69)
Fort Wayne 0 NHPP Bridge
Construction
CN $540,000.00 $60,000.00 $600,000.00 Init.37010 /
1383242
Allen County IR 1029 Road Reconstruction
(3R/4R Standards)
Ryan Road from Dawkins Road
to Harper Road
Fort Wayne 1.004 STP 100% Local
Funds
CN $0.00 $1,196,611.00 $1,196,611.00 Init.37320 /
1383353
Group IV Program CN $2,971,582.00 $0.00 $2,971,582.00
Allen County IR 1029 Road Reconstruction
(3R/4R Standards)
Ryan Rd/Bruick Rd::Harper
Road to US 24
Fort Wayne 1.11 STP Group IV Program CN $3,217,200.00 $0.00 $3,217,200.00 Init.37320 /
1400826
100% Local
Funds
CN $0.00 $1,394,300.00 $1,394,300.00
New Haven ST 1012 Road Reconstruction
(3R/4R Standards)
Broadway/Landin Rd: Powers
St to N. River Rd.
Fort Wayne .715 STP Fort Wayne MPO RW1 $150,000.00 $0.00 $150,000.00Init.37552 /
1400694
Fort Wayne MPO CN $960,000.00 $0.00 $960,000.00
100% Local
Funds
RW1 $0.00 $37,500.00 $37,500.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 10 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
New Haven ST 1012 Road Reconstruction
(3R/4R Standards)
Broadway/Landin Rd: Powers
St to N. River Rd.
Fort Wayne .715 STP 100% Local
Funds
CN $0.00 $240,000.00 $240,000.00 Init.37552 /
1400694
MPO - Fort Wayne MS
TRST
Transit Operating New listing in capitalization of
maintenance costs for FY 18
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $475,000.00 $475,000.00 Init.37616 /
1400999
Transit PE1 $1,900,000.00 $0.00 $1,900,000.00
MPO - Fort Wayne MS
TRST
Transit Operating New listing in complementary
paratransit costs for FY 18
Fort Wayne 0 Transit Transit PE1 $344,579.00 $0.00 $344,579.00 Init.37617 /
1401000
100% Local
Funds
PE1 $0.00 $86,145.00 $86,145.00
Indiana Department
of Transportation
I 69 Bridge Deck
Replacement &
Widening
Hillegas Road Bridge over I-69,
0.48 miles S of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN $2,088,000.00 $232,000.00 $2,320,000.00 Init.37657 /
1006172
Indiana Department
of Transportation
US 30 Bridge Replacement,
Other Construction
0.23 miles E of US 33 (Hillegas
Road Over US 30/US 33)
Fort Wayne .038 NHPP Bridge
Construction
CN $2,008,800.00 $502,200.00 $2,511,000.00 Init.37657 /
1383457
Bridge ROW RW1 $10,400.00 $2,600.00 $13,000.00
Fort Wayne ST 1033 Intersect. Improv. W/
Added Turn Lanes
Hillegas Road and Coliseum
Blvd
Fort Wayne .2 NHPP 100% Local
Funds
CN $178,380.00 $19,820.00 $198,200.00 Init.37657 /
1401164
Fort Wayne MPO CN $713,520.00 $79,280.00 $792,800.00
Fort Wayne ST 1033 Intersect. Improv. W/
Added Turn Lanes
Hillegas Road and Coliseum
Blvd
Fort Wayne .2 Safety Fort Wayne MPO CN $136,576.09 $15,175.12 $151,751.22 A 11 $991,000.0037657 /
1401164
100% Local
Funds
CN -$83,924.10 -$9,324.90 ($93,249.00)
Comments:Increase Federal funds for CN and change from STP to HSIP (90/10) per NIRCC Resolution 18-67
Indiana Department
of Transportation
US 33 Bridge Painting Bridge US 33 over US 30 Fort Wayne 0 NHPP Bridge
Construction
CN $186,360.00 $46,590.00 $232,950.00 Init.37657 /
1592680
Indiana Department
of Transportation
I 469 Interchange
Modification
I-469 at the US 24 Interchange Fort Wayne .558 NHPP Mobility
Construction
CN $6,201,000.00 $689,000.00 $1,490,000.00 $5,400,000.00Init.37684 /
1383675
Mobility ROW RW1 $1,350,000.00 $150,000.00 $1,500,000.00
Indiana Department
of Transportation
SR 930 Bridge Deck
Replacement
Bridge over Trier Ditch, 2.05
miles W of I-469
Fort Wayne 0 NHPP Bridge Consulting PE1 $32,556.00 $8,139.00 $40,695.00 A 01 $858,000.0037684 /
1600227
Bridge ROW RW1 $80,000.00 $20,000.00 $100,000.00
Comments:NIRCC Resolution 17-321. Adding PE to FY 2018 and RW to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay NB Bridge on I-469 at the US 24
Interchange
Fort Wayne 0 NHPP Mobility
Construction
CN $1,188,049.50 $132,005.50 $1,320,055.00Init.37684 /
1600316
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 11 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 469 Bridge Deck Overlay SB Bridge on I-469 at the US 24
Interchange
Fort Wayne 0 NHPP Mobility
Construction
CN $1,269,850.50 $141,094.50 $1,410,945.00Init.37684 /
1600317
Indiana Department
of Transportation
SR 101 Small Structure Pipe
Lining
Mourey Ditch, 2.60 miles N of
US 30
Fort Wayne 0 STP Bridge
Construction
CN $62,800.00 $15,700.00 $78,500.00Init.37720 /
1383552
Bridge ROW RW1 $4,000.00 $1,000.00 $5,000.00
Indiana Department
of Transportation
US 30 Bridge Painting US 30 bridge over Flatrock
Creek, EB, 0.79 miles E of SR
101
Fort Wayne 0 NHPP Bridge
Construction
CN $102,520.00 $25,630.00 $128,150.00Init.37720 /
1592659
Indiana Department
of Transportation
US 30 Bridge Painting US 30 bridge over Flatrock
Creek, WB, 0.79 miles E of SR
101
Fort Wayne 0 NHPP Bridge
Construction
CN $102,520.00 $25,630.00 $128,150.00Init.37720 /
1592661
Indiana Department
of Transportation
US 30 Bridge Deck Overlay Bridge over Flatrock Creek, WB
, 0.79 miles E of SR 101
Fort Wayne 0 NHPP Bridge
Construction
CN $589,680.00 $147,420.00 $737,100.00Init.37720 /
1600194
Indiana Department
of Transportation
US 30 Bridge Deck Overlay Bridge over Flatrock Creek, EB
Lane, 0.79 miles E of SR 101
Fort Wayne 0 NHPP Bridge
Construction
CN $589,760.00 $147,440.00 $737,200.00Init.37720 /
1600238
Allen County IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd from Thomas Road to
Hillegas Rd
Fort Wayne .6 STP 100% Local
Funds
CN $0.00 $814,500.00 $814,500.00 Init.38004 /
1401272
Fort Wayne MPO CN $3,257,700.00 $0.00 $3,257,700.00
Allen County IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd: from Scott Rd to
Hadley Rd
Fort Wayne 2 STP Fort Wayne MPO RW1 $1,856,230.00 $0.00 $1,856,230.00Init.38005 /
1401273
Fort Wayne MPO CN $9,100,000.00 $0.00 $9,100,000.00
100% Local
Funds
RW1 $0.00 $464,060.00 $464,060.00
100% Local
Funds
CN $0.00 $2,275,000.00 $2,275,000.00
Indiana Department
of Transportation
SR 14 HMA Overlay,
Preventive
Maintenance
2.44 miles W of I-69 to 0.28
miles E of I-69
Fort Wayne 2.447 STP Road
Construction
CN $1,241,060.00 $310,265.00 $1,551,325.00Init.38562 /
1600115
Indiana Department
of Transportation
SR 37 Small Structure Pipe
Lining
Over Branch #2, Sowers Ditch,
3.05 miles N of SR 101
Fort Wayne 0 STP Bridge
Construction
CN $164,474.40 $41,118.60 $205,593.00 Init.38564 /
1383542
Bridge ROW RW1 $4,000.00 $1,000.00 $5,000.00
Indiana Department
of Transportation
SR 101 Small Structure Pipe
Lining
Imback Ditch, 6.64 miles N of
US 30
Fort Wayne 0 STP Bridge
Construction
CN $57,790.40 $14,447.60 $72,238.00 Init.38564 /
1383553
Indiana Department
of Transportation
SR 3 HMA Overlay,
Preventive
Maintenance
From I-69 to 3.63 miles N of I-69 Fort Wayne 3.562 NHPP Road
Construction
CN $2,173,720.00 $543,430.00 $2,717,150.00 Init.38564 /
1592638
Indiana Department
of Transportation
US 33 Bridge Deck Overlay Bridge over Johnson Ditch, 5.3
3 miles N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN $277,720.00 $69,430.00 $347,150.00 Init.38564 /
1700224
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 12 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 69 Interchange
Modification
I-69 at SR 14 interchange Fort Wayne 2.125 NHPP Safety
Construction
CN $830,250.00 $92,250.00 $922,500.00 Init.38565 /
1401828
Indiana Department
of Transportation
I 69 Interchange
Modification
I-69 at SR 14 interchange Fort Wayne 2.125 NHPP Safety Consulting PE1 $13,500.00 $1,500.00 $15,000.00 A 01 $937,500.0038565 /
1401828
Comments:NIRCC Resolution 17-318. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 33 Bridge Deck Overlay Bridge over Johnson Ditch, 5.3
3 miles N of US 30
Fort Wayne 0 NHPP Bridge Consulting PE1 $60,000.00 $15,000.00 $75,000.00 A 04 $422,000.0038565 /
1700224
Comments:NO MPO. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 930 HMA Overlay,
Preventive
Maintenance
From 4.97 miles W of I-469 (Clo
verleaf) to 0.54 miles W of I-46
9 (Minnich
Fort Wayne 4.723 NHPP Road Consulting PE1 $160,000.00 $40,000.00 $200,000.00 A 04 $2,897,000.0038565 /
1701341
Road
Construction
CN $2,157,276.80 $539,319.20 $2,696,596.00
Comments:NIRCC Resolution 18-39. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Rehab-Pipe
Lining
CIPP Pipe Liner, 6.0 miles E of
US 27
Fort Wayne 0 NHPP Bridge ROW RW1 $4,500.00 $500.00 $5,000.00A 04 $257,000.0038565 /
1701348
Bridge Consulting PE1 $54,000.00 $6,000.00 $60,000.00
Bridge
Construction
CN $172,741.50 $19,193.50 $191,935.00
Comments:NIRCC Resolution 18-40. Adding PE to FY 2018, RW to FY 2019, and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 30 Bridge Deck Overlay Bridge over Hoffman Creek EB,
0.65 miles W of SR 101
Fort Wayne 0 NHPP Bridge
Construction
CN $623,903.20 $155,975.80 $779,879.00 A 04 $905,000.0038565 /
1701352
Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00
Comments:NIRCC Resolution 18-41. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 30 Bridge Deck Overlay Bridge over Hoffman Creek WB
, 0.65 miles W of SR 101
Fort Wayne 0 NHPP Bridge
Construction
CN $623,903.20 $155,975.80 $779,879.00 A 04 $905,000.0038565 /
1701353
Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00
Comments:NIRCC Resolution 18-42. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay Marion Center Rd over I 469, 1.
67 miles E of US 27
Fort Wayne 0 NHPP Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00 A 04 $1,556,000.0038565 /
1701354
Bridge
Construction
CN $1,287,607.50 $143,067.50 $1,430,675.00
Comments:NIRCC Resolution 18-43. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay Bridge over SR 37 Northbound,
3.65 miles N of US 24
Fort Wayne 0 NHPP Bridge
Construction
CN $1,185,954.30 $131,772.70 $1,317,727.00 A 04 $1,443,000.0038565 /
1701357
Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 13 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Comments:NIRCC Resolution 18-44. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay Bridge over SR 37 SB, 3.65
miles N of US 24
Fort Wayne 0 NHPP Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00 A 04 $1,443,000.0038565 /
1701358
Bridge
Construction
CN $1,185,954.30 $131,772.70 $1,317,727.00
Comments:NIRCC Resolution 18-45. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay Bridge over Wheelock Road, 1.
92 miles E of SR 37,
Eastbound
Fort Wayne 0 NHPP Bridge
Construction
CN $1,089,142.20 $121,015.80 $1,210,158.00 A 04 $1,335,000.0038565 /
1701359
Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00
Comments:NIRCC Resolution 18-46. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Deck Overlay Bridge over Wheelock Road, 1.
92 miles E of SR 37,
Westbound
Fort Wayne 0 NHPP Bridge
Construction
CN $1,089,142.20 $121,015.80 $1,210,158.00 A 04 $1,335,000.0038565 /
1701360
Bridge Consulting PE1 $112,500.00 $12,500.00 $125,000.00
Comments:NIRCC Resolution 18-47. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 101 Bridge Deck Overlay Bridge over Hoffman Creek, 0.3
6 miles N of US 30
Fort Wayne 0 STP Bridge Consulting PE1 $100,000.00 $25,000.00 $125,000.00 A 04 $676,000.0038565 /
1701362
Bridge
Construction
CN $440,604.80 $110,151.20 $550,756.00
Comments:NIRCC Resolution 18-48. Adding PE to FY 2018 and CN to FY 2020 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 930 Bridge Thin Deck
Overlay
Bridge Over Spy Run Creek
WB, 0.74 Miles West of US 27.
Fort Wayne 0 NHPP Bridge
Construction
CN $119,360.00 $29,840.00 $149,200.00 Init.38670 /
1500784
Indiana Department
of Transportation
US 27 Bridge Deck Overlay Bridge Over Houk Ditch, NBL, 0
.72 Miles North of I-469.
Fort Wayne 0 NHPP Bridge
Construction
CN $391,200.00 $97,800.00 $489,000.00 Init.38670 /
1500787
Indiana Department
of Transportation
US 27 Bridge Deck Overlay Bridge Over Houk Ditch, SBL, 0
.72 Miles North of I-469.
Fort Wayne 0 NHPP Bridge
Construction
CN $391,200.00 $97,800.00 $489,000.00 Init.38670 /
1500788
Indiana Department
of Transportation
US 27 Bridge Deck Overlay Bridge Over Berning Creek NB,
4.81 Miles South of I-469.
Fort Wayne 0 NHPP Bridge
Construction
CN $296,880.00 $74,220.00 $371,100.00 Init.38670 /
1500803
Indiana Department
of Transportation
US 27 Bridge Deck Overlay Bridge Over Berning Creek SB,
4.81 Miles South of I-469.
Fort Wayne 0 NHPP Bridge
Construction
CN $296,880.00 $74,220.00 $371,100.00 Init.38670 /
1500804
Indiana Department
of Transportation
SR 1 Scour Protection (Ero
sion)
Bridge over Deptmer Ditch,1.18
miles S of I-469
Fort Wayne 0 STP Bridge
Construction
CN $74,360.00 $18,590.00 $92,950.00 Init.38670 /
1592634
Indiana Department
of Transportation
SR 37 Scour Protection (Ero
sion)
Bridge over Wann Ditch, 0.38
miles S of SR 101
Fort Wayne 0 STP Bridge
Construction
CN $55,280.00 $13,820.00 $69,100.00 Init.38670 /
1592648
Bridge ROW RW1 $8,000.00 $2,000.00 $10,000.00
Allen County ST 1016 Other Type Project (Mi
scellaneous)
Placeholder for Payment to
Allen County for County let
Contract.
Fort Wayne 0 STP Major New -
Construction
CN $552,000.00 $138,000.00 $690,000.00 Init.39023 /
1592388
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 14 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
ST 1001 Railroad Protection Van Buren St at NS RR DOT#
478025T in Fort Wayne
Fort Wayne 0 STP Local Safety
Program - 130
CN $450,000.00 $0.00 $450,000.00 Init.39344 /
1500181
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Bridge over NS Railroad(Chicag
o), NB Lane, 0.53 miles N of SR
14
Fort Wayne 0 NHPP Bridge
Construction
CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /
1592908
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Bridge over NS Railroad(Chicag
o), SB Lane, 0.553 miles N of
SR 14
Fort Wayne 0 NHPP Bridge
Construction
CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /
1592914
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Bridge over CFE Railroad, NB
Lane, 0.81 miles N of SR 14
Fort Wayne 0 NHPP Bridge
Construction
CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /
1592916
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Bridge over CFE Railroad, SB
Lane, 0.81 miles N of SR 14
Fort Wayne 0 NHPP Bridge
Construction
CN $91,620.00 $10,180.00 $101,800.00 Init.39355 /
1592917
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over US 24 NB, 3.21
miles S of SR 14
Fort Wayne 0 NHPP Bridge
Construction
CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /
1592926
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over US 24, SB, 3.21
miles S of SR 14
Fort Wayne 0 NHPP Bridge
Construction
CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /
1592927
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over Maplecrest Road
EB, 3.99 miles E of SR 37
Fort Wayne 0 NHPP Bridge
Construction
CN $38,115.00 $4,235.00 $42,350.00 Init.39355 /
1592955
Indiana Department
of Transportation
I 69 Substructure Repair
And Rehabilitation
Lower Huntington Road over I
69, 2.97 miles S of US 24
Fort Wayne 0 NHPP Bridge
Construction
CN $24,120.00 $2,680.00 $26,800.00 Init.39355 /
1592980
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge WB Over - Maplecrest
Road NB/SB, 3.99 miles E of SR
37
Fort Wayne 0 NHPP Bridge
Construction
CN $88,650.00 $9,850.00 $98,500.00 Init.39355 /
1592989
Indiana Department
of Transportation
I 469 Small Structure Pipe
Lining
WB off ramp, 1.76 miles E of
US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $729,688.50 $81,076.50 $810,765.00Init.39429 /
1592490
Indiana Department
of Transportation
I 469 Small Structure Pipe
Lining
Pipe Liner, Unnamed Tributary
of Brindle Ditch, 3.76 miles E of
I-69
Fort Wayne 0 NHPP Bridge
Construction
CN $198,765.00 $22,085.00 $220,850.00Init.39429 /
1600240
Indiana Department
of Transportation
I 69 Bridge Rehab-Pipe
Lining
Over Graham McCullough Ditch
#4, 3.20 Miles South of US 24.
Fort Wayne .1 NHPP Bridge Consulting PE1 $162,000.00 $18,000.00 $180,000.00 A 04 $2,114,000.0039429 /
1700755
Bridge
Construction
CN $1,740,096.90 $193,344.10 $1,933,441.00
Comments:NIRCC Resolution 18-49. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 HMA Overlay,
Preventive
Maintenance
From 1.92 miles N of SR 37 to 1
.92 miles E of I-69 N Jct
Fort Wayne 2.422 NHPP Road
Construction
CN $1,749,920.40 $194,435.60 $1,944,356.00A 04 $2,100,000.0039429 /
1701204
Road Consulting PE1 $166,500.00 $18,500.00 $185,000.00
Comments:NIRCC Resolution 18-12. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over NS RR (Industrial
Spur), Southbound, 00.83 Miles
North of US 30
Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $1,063,000.0039429 /
1701208
Bridge
Construction
CN $889,281.00 $98,809.00 $988,090.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 15 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Comments:NIRCC Resolution 18-13. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over NS RR (Industrial
Spur), Northbound, 00.83 miles
N of US 30
Fort Wayne 0 NHPP Bridge
Construction
CN $589,734.00 $65,526.00 $655,260.00A 04 $730,000.0039429 /
1701209
Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00
Comments:NIRCC Resolution 18-14. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over Becketts Run,
Northbound, 1.94 miles S of SR
1
Fort Wayne 0 NHPP Bridge
Construction
CN $290,187.00 $32,243.00 $322,430.00A 04 $408,000.0039429 /
1701210
Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00
Comments:NIRCC Resolution 18-15. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Painting Bridge over Maplecrest Road
NB/SB, Eastbound, 3.99 Miles
East of SR 37
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $263,000.0039429 /
1701218
Bridge
Construction
CN $213,739.20 $23,748.80 $237,488.00
Comments:NIRCC Resolution 18-16. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Bridge Painting Bridge over Maplecrest Road
NB/SB, Westbound, 3.99 miles
E of SR 37
Fort Wayne 0 NHPP Bridge
Construction
CN $213,739.20 $23,748.80 $237,488.00A 04 $263,000.0039429 /
1701219
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-17. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
I69 NB/SB Ramp, 5.69 miles S
of US 24
Fort Wayne 0 NHPP Bridge
Construction
CN $709,084.80 $78,787.20 $787,872.00A 04 $878,000.0039429 /
1701225
Bridge Consulting PE1 $90,000.00 $10,000.00 $100,000.00
Comments:NIRCC Resolution 18-18. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over Becketts Run,
Southbound, 1.94 miles S of SR
1
Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $397,000.0039429 /
1701226
Bridge
Construction
CN $290,187.00 $32,243.00 $322,430.00
Comments:NIRCC Resolution 18-19. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over Vandolah Road, NB
, 4.07 miles N of SR 1
Fort Wayne 0 NHPP Bridge
Construction
CN $145,093.50 $16,121.50 $161,215.00A 04 $236,000.0039429 /
1701254
Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00
Comments:NIRCC Resolution 18-20. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over Vandolah Road, SB
, 4.07 miles N of SR 1
Fort Wayne 0 NHPP Bridge Consulting PE1 $67,500.00 $7,500.00 $75,000.00 A 04 $236,000.0039429 /
1701256
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 16 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 69 Bridge Thin Deck
Overlay
Bridge over Vandolah Road, SB
, 4.07 miles N of SR 1
Fort Wayne 0 NHPP Bridge
Construction
CN $145,093.50 $16,121.50 $161,215.00A 04 $236,000.0039429 /
1701256
Comments:NIRCC Resolution 18-21. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 930 Bridge Deck
Replacement
Bridge over Trier Ditch, 2.05
miles W of I-469
Fort Wayne 0 NHPP Bridge
Construction
CN $573,880.00 $143,470.00 $717,350.00Init.39430 /
1600227
Indiana Department
of Transportation
I 69 Small Structure Pipe
Lining
S. Jct of I69/I469 Interchange -
Loop Ramp from WB Laf. Ctr to
SB I69
Fort Wayne 0 NHPP Bridge
Construction
CN $172,305.00 $19,145.00 $191,450.00 Init.39433 /
1700221
Indiana Department
of Transportation
I 69 Small Structure Pipe
Lining
S. Jct of I69/I469 Interchange -
Loop Ramp from WB Laf. Ctr to
SB I69
Fort Wayne 0 NHPP Bridge Consulting PE1 $18,000.00 $2,000.00 $20,000.00 A 04 $212,000.0039433 /
1700221
Comments:NIRCC Resolution 17-296. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 205 Small Structure Pipe
Lining
Pipeliner for Johnson Ditch, 2.0
9 miles N of US 33
Fort Wayne 0 STP Bridge
Construction
CN $81,288.00 $20,322.00 $101,610.00 Init.39590 /
1296076
Indiana Department
of Transportation
SR 101 HMA Overlay,
Structural
From 0.18 mi N of US 24 to 8.49
mi N of US 24
Fort Wayne 8.391 STP Road
Construction
CN $3,010,800.00 $752,700.00 $3,763,500.00 Init.39636 /
1296471
Indiana Department
of Transportation
US 30 Other Intersection
Improvement
Intersection of US 30 & SR 101,
Allen County
Fort Wayne .461 NHPP Safety
Construction
CN $761,600.00 $190,400.00 $952,000.00 Init.39636 /
1298055
Indiana Department
of Transportation
I 469 HMA Overlay,
Preventive
Maintenance
From 1.76 mi E of I-469 S jct at
I-69 to 2.01 mi E of I -469, S jct
at I-69
Fort Wayne .266 NHPP District Other
Construction
CN $180,000.00 $20,000.00 $200,000.00 Init.39655 /
1601216
Indiana Department
of Transportation
I 469 HMA Overlay,
Preventive
Maintenance
From 0.89 mi E of I-469 S jct at
I-69 to 1.20 mi E of I -469, S jct
at I-69
Fort Wayne .274 NHPP District Other
Construction
CN $180,000.00 $20,000.00 $200,000.00 Init.39655 /
1601217
Indiana Department
of Transportation
SR 101 Bridge Deck Overlay Bridge Over Hamm Ditch, 1.49
Miles North of SR 37.
Fort Wayne 0 STP Bridge
Construction
CN $547,440.00 $136,860.00 $684,300.00Init.39801 /
1500781
Indiana Department
of Transportation
SR 930 Intersect. Improv. W/
Added Turn Lanes
1.68 miles W of US 27 (Goshen
Rd), Added left turn lane on W
approach
Fort Wayne .062 NHPP Mobility Consulting PE1 $40,000.00 $10,000.00 $50,000.00 Init.39902 /
1401850
Mobility ROW RW1 $40,000.00 $10,000.00 $50,000.00
Mobility
Construction
CN $581,600.00 $145,400.00 $500,000.00 $227,000.00
Indiana Department
of Transportation
US 33 Small Structure
Replacement
3.57 miles N of US 30, UNT of
Sutorious Ditch, RP 39-95
Fort Wayne .093 NHPP Bridge
Construction
CN $741,116.00 $185,279.00 $926,395.00 Init.39902 /
1600411
Bridge ROW RW1 $16,000.00 $4,000.00 $20,000.00
Bridge
Construction
PE1 $9,600.00 $2,400.00 $12,000.00
MPO - Fort Wayne MS
TRST
Transit Operating Allen County Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $178,000.00 $178,000.00 Init.39942 /
1601865
Transit PE1 $87,000.00 $0.00 $87,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 17 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 469 Concrete Pavement
Restoration (CPR)
From 0.54 Miles East of I-69
South to 2.28 Miles East of SR
1 (Winchester Rd).
Fort Wayne 8.385 NHPP Road
Construction
CN $2,662,650.00 $295,850.00 $2,958,500.00 Init.39953 /
1500837
Indiana Department
of Transportation
I 469 Concrete Pavement
Restoration (CPR)
From 0.54 Miles East of I-69
South to 2.28 Miles East of SR
1 (Winchester Rd).
Fort Wayne 8.385 NHPP Road
Construction
CN $225,000.00 $25,000.00 $250,000.00 M 01 $3,208,500.0039953 /
1500837
Comments:NO MPO. Adding additional CN to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Replace
Superstructure
Bridge over Feighner Road, 0.5
4 miles E of I-69, EBL
Fort Wayne 0 NHPP Bridge
Construction
CN $1,480,500.00 $164,500.00 $1,645,000.00 Init.39953 /
1601889
Indiana Department
of Transportation
I 469 Replace
Superstructure
Bridge over Feighner Road, 0.5
4 miles E of I-69, WBL
Fort Wayne 0 NHPP Bridge
Construction
CN $1,480,500.00 $164,500.00 $1,645,000.00 Init.39953 /
1601890
Indiana Department
of Transportation
SR 1 Demolition, Remove
Buildings,
Foundations
4.67 miles E of I-69 at Clay St in
Leo-Cedarville
Fort Wayne .05 STP District Other
Construction
CN $20,000.00 $5,000.00 $25,000.00 Init.40012 /
1602272
District Other
ROW
RW1 $72,000.00 $18,000.00 $90,000.00
Indiana Department
of Transportation
SR 1 Demolition, Remove
Buildings,
Foundations
4.67 miles E of I-69 at Clay St in
Leo-Cedarville
Fort Wayne .05 STP District Other
Consulting
PE1 $12,000.00 $3,000.00 $15,000.00 A 01 $131,000.0040012 /
1602272
Comments:NIRCC Resolution 17-319. Adding PE to FY 2018 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 27 Small Structure Pipe
Lining
Pipeliner for Valentine Ditch, 3.2
miles N of Adams/Allen Co Line.
Fort Wayne 0 NHPP Bridge ROW RW1 $10,400.00 $2,600.00 $13,000.00 Init.40129 /
0301145
Bridge
Construction
CN $148,640.00 $37,160.00 $185,800.00
Fort Wayne Public
Transportation
Corporation (Citilink
MS
TRST
Transit Operating Capitalization of Maintenance
Costs 2020
Fort Wayne 0 Transit 100% Local
Funds
PE1 $0.00 $513,760.00 $513,760.00 Init.40206 /
1700468
Transit PE1 $2,055,040.00 $0.00 $2,055,040.00
Indiana Department
of Transportation
VA VARI Railroad Protection Monroeville Rd at CFE RR DOT
#532328Y near Hoagland
Fort Wayne 0 Safety Local Safety
Program - 130
PE1 $20,000.00 $0.00 $20,000.00 A 02 $320,000.0040244 /
1700527
Local Safety
Program - 130
CN $320,000.00 $0.00 $320,000.00
Comments:PE Phase for $20,000.00 in FY 2018 amended into the 18-02 STIP. CN phase in FY 2019 for $320,000 amended into the 18-02 STIP. NIRCC Administrative Modification (Group Project) 17-314 to the 2016-2019 TIP. Dated April 12, 2017.
Indiana Department
of Transportation
SR 3 Replace
Superstructure
Bridge over Willow Creek, NB,
3.84 miles S of SR 205
Fort Wayne 0 STP Bridge
Construction
CN $401,680.00 $100,420.00 $502,100.00 Init.40354 /
1500801
Indiana Department
of Transportation
SR 3 Replace
Superstructure
Bridge Over Willow Creek, SB,
3.84 Miles South of SR 205.
Fort Wayne 0 STP Bridge
Construction
CN $401,680.00 $100,420.00 $502,100.00 Init.40354 /
1500802
Indiana Department
of Transportation
SR 3 Bridge Deck Patching Bridge over Willow Creek, NB,
4.19 miles S of SR 205
Fort Wayne 0 NHPP Bridge
Construction
CN $35,265.60 $8,816.40 $44,082.00A 04 $69,000.0040457 /
1701265
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NIRCC Resolution 18-22. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 18 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
SR 3 Bridge Deck Patching Bridge over Willow Creek,
Southbound, 4.19 miles S of SR
205
Fort Wayne 0 NHPP Bridge
Construction
CN $23,090.40 $5,772.60 $28,863.00A 04 $54,000.0040457 /
1701268
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NIRCC Resolution 18-23. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
US 24 Substructure Repair
And Rehabilitation
Bridge over Aboite Creek, 4.11
miles W of I-69
Fort Wayne 0 NHPP Bridge
Construction
CN $62,980.80 $15,745.20 $78,726.00A 04 $104,000.0040457 /
1701286
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NIRCC Resolution 18-24. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
SR 930 Repair Or Replace
Joints
SR 930 WB, over St Joseph
River, 1.74 miles E of US 27
Fort Wayne 0 NHPP Bridge
Construction
CN $16,764.00 $4,191.00 $20,955.00A 04 $46,000.0040457 /
1701304
Bridge Consulting PE1 $20,000.00 $5,000.00 $25,000.00
Comments:NIRCC Resolution 18-25. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Bridge over Lafayette Center
Road, EB, 0.94 miles E of I69
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $80,000.0040457 /
1701305
Bridge
Construction
CN $49,033.80 $5,448.20 $54,482.00
Comments:NIRCC Resolution 18-26. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Substructure Repair
And Rehabilitation
Bridge over Lafayette Center
Road, WB, 0.94 miles E of I 69
Fort Wayne 0 NHPP Bridge
Construction
CN $49,033.80 $5,448.20 $54,482.00A 04 $80,000.0040457 /
1701306
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-27. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Coverdale Road over I 469, 2.9
1 miles W of SR 1
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $46,000.0040457 /
1701307
Bridge
Construction
CN $18,859.50 $2,095.50 $20,955.00
Comments:NIRCC Resolution 18-28. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Anthony extended over I 469, 3
.79 miles E of SR 1
Fort Wayne 0 NHPP Bridge
Construction
CN $17,916.30 $1,990.70 $19,907.00A 04 $45,000.0040457 /
1701309
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-29. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Minnich Road NB over I 469, 1.
73 miles W of US 30
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $93,000.0040457 /
1701312
Bridge
Construction
CN $61,291.80 $6,810.20 $68,102.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 19 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Comments:NIRCC Resolution 18-31. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Minnich Road Southbound over
I 469, 1.72 miles W of US 30
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $93,000.0040457 /
1701313
Bridge
Construction
CN $61,291.80 $6,810.20 $68,102.00
Comments:NIRCC Resolution 18-32. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
Stellhorn Road over I469, 1.1
miles S of SR 37
Fort Wayne 0 NHPP Bridge
Construction
CN $23,573.70 $2,619.30 $26,193.00A 04 $54,000.0040457 /
1701314
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-33. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Repair Or Replace
Joints
I 469 WB over I 69, 1.26 miles E
of I 69
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $72,000.0040457 /
1701315
Bridge
Construction
CN $42,433.20 $4,714.80 $47,148.00
Comments:NIRCC Resolution 18-34. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over McCulloch Ditch/NS
RR Northbound, 0.80 miles S of
US 24
Fort Wayne 0 NHPP Bridge
Construction
CN $44,318.70 $4,924.30 $49,243.00A 04 $75,000.0040457 /
1701319
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-35. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge Over McCulloch Ditch/N
S RR Southbound, 0.80 Miles
South of US 24
Fort Wayne 0 NHPP Bridge
Construction
CN $44,318.70 $4,924.30 $49,243.00A 04 $75,000.0040457 /
1701320
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-36. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over Hadley Road
Northbound, 0.97 miles S of SR
14
Fort Wayne 0 NHPP Bridge
Construction
CN $42,433.20 $4,714.80 $47,148.00A 04 $72,000.0040457 /
1701321
Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00
Comments:NIRCC Resolution 18-37. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 69 Repair Or Replace
Joints
Bridge over Hadley Road
Southbound, 0.97 miles S of SR
14
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $72,000.0040457 /
1701322
Bridge
Construction
CN $42,433.20 $4,714.80 $47,148.00
Comments:NIRCC Resolution 18-38. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Debris Removal From
Channel
Bridge over St Marys River
Eastbound, 0.45 miles W of US
27
Fort Wayne 0 NHPP Bridge
Construction
CN $23,621.40 $2,624.60 $26,246.00A 04 $51,000.0040458 /
1701311
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 20 of 702 Report Created:6/5/2018 2:07:59PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Indiana Department
of Transportation
I 469 Debris Removal From
Channel
Bridge over St Marys River
Eastbound, 0.45 miles W of US
27
Fort Wayne 0 NHPP Bridge Consulting PE1 $22,500.00 $2,500.00 $25,000.00 A 04 $51,000.0040458 /
1701311
Comments:NIRCC Resolution 18-30. Adding PE to FY 2018 and CN to FY 2019 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
I 469 Replace
Superstructure
Bridge over Lafayette Center
Rd, EB 0.94 miles E of I-69.
Fort Wayne 0 NHPP Bridge
Construction
CN $1,734,229.80 $192,692.20 $1,926,922.00 A 04 $2,227,000.0040466 /
1701375
Bridge Consulting PE1 $270,000.00 $30,000.00 $300,000.00
Comments:NIRCC Resolution 18-1. Adding PE to FY 2018 and CN to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department