Indian Power Scenario – At a glance
Installed Capacity : 1,18,000 MWPeak Demand : 87,000 MWPeak Availability : 77,000 MWEnergy growth : 8-9% per annum
30,860 MW
32,700 MW16,000
30,500 MW
2300
Surplus Regions
Deficit Regions
Future Power Supply Scenario
• Peak demand (expected)- 157,000 MW
• Capacity addition envisaged-100,000 MW
• Installed Capacity envisaged - 212,000MW
By the year 2011-12
Per Capita Energy consumption
• Present - 592 kWh
• Expected by 2012 - 932 kWh
• World Average - 2326 kWh (China – 1019 kWh)
Energy Resource Map
NR
WR
SR
ERNER
Ennore
KudankulamKayamkulam
Partabpur
Talcher/Ib Valley
Vindhyachal
Korba
LEGEND
Coal
Hydro
Lignite
Coastal
Nuclear
VizagSimhadri
Kaiga
Tarapur
Mangalore
Krishnapatnam
RAPP
SIKKIM
MYA
NMM
AR
CHICKEN NECK
Cuddalore
SRI LANKACOLOMBO
NEPALBHUTAN
DESHBANGLA
South Madras
Pipavav
Generation Load-Centre
Kolkata
Bhubaneswar
PatnaLucknow
Delhi
Mumbai
Chennai
Bangalore
Bhopal
Guwahati
Jammu
Ludhiana
Jaipur
Gandhinagar
Indore
Raipur
Thiruvananthapuram
Kozhikode
Hyderabad
Coal
Hydro• Hydro potential in NER and
upper part of NR
• Coal reserves mainly in ER
• Distribution of energy resources and consumption centres are extremely unbalanced
• To achieve economy of scale in the delivered cost, power transportation from pit-head generating stations is cheaper option
Necessitate establishment of large no. long distance lines & interconnection of all the five(5) Regional Grids
• National Grid planned in a phased manner• Phase-I envisaged Interconnection of Regional Grids
through HVDC Back-to-Back links having cumulative capacity of 5000 MW has been completed in 2002
• Present inter regional capacity is 9500 MW• It is envisaged to have 37,000 MW inter regional
capacity by 2012 comprising of high capacity HVDC and HVAC lines (both 765kV and 400kV) and 50,000MW by 2016
Development of National Grid
• To conserve the Right-of-Way while meeting the power transfer requirement of immediate as well as long-term – Technology adopted for progressive enhancement of
transmission capacity of same Tr. corridor through –• High capacity 400kV (quad) lines• 800kV EHVAC line initially operated at 400kV• High capacity 800kV HVDC systems initially operated at
600kV• Series compensation and TCSC• High temperature endurance conductor like INVAR• Multi-ckt. line and compact towers (ROW for 800kV line 85 m to 64 m)
– Optimal utilisation of existing infrastructure through –• Series Compensation• Uprating/Upgrading of lines• Enhancement of thermal capacity of line (75 -850 /950 C)
Technology Integration
HVDC Systems• Existing
– Rihand – Dadri 1500 MW, +500 kV – about 800 km– Talcher – Kolar 2000 MW, +500 kV – about 1450 km– HVDC Back to Back links
• Vindchyachal 500 MW : North-West• Gazuwaka 1000 MW – East – South• Chandrapur 1000 MW : West – South• Sasaram : East : North
HVDC System – For Future• Balia – Bhiwadi 2500 MW, +500 kV : Under
advance stage of investment approval. To be implemented by 2009-10.
• Upgradation of Talcher – Kolar by 500 MW• To transfer power from NER, feasibility of
HVDC bipole of 6000 MW, +800 kV is being explored.
• More HVDC links envisaged from NER
NER
ER
NR
WR
SR
Legend
500MW
500 MW
MW1000
MW500
GAZUWAKA
CHANDRAPUR
VINDHYACHAL
SASARAM
HVDC BACK-TO-BACK
400 kV
220 kV
BONGAIGAONBIRPARA
MALDA
KORBA BUDHIPADAR
KOLHAPUR
BELGAUM
U.SILERU
BALIMELA
DEHRISAHUPURI
MALANPUR
AURAIYAAN
DAM
AN &
NIC
OBAR
LAKSHADWEEP
ROURKELARAIPURTALCHER
KOLAR
HVDC BIPOLE
Present National Grid - Mainly HVDC Interconnections
FACTS Technologies• Existing
– SVC at Kanpur ( 2x +140 MVAr) – CSR at Itarsi (50 MVAR)– TCSC on Rourkela – Raipur 400 kV (40% fixed, 5-
15% variable)– TCSC on Kanpur – Ballabhgarh 400 kV
• Future (Under Implementation)– TCSC on Purnea – Muzzafarpur 400 kV (40% fixed,
5-15% variable)– TCSC on Muzzafarpur - Gorakhpur 400 kV (40%
fixed, 5-15% variable)
RAIPUR
SAHU
HVDC BACK-TO-BACK
VINDHYACHAL
LAKSHADW
EEP
KOLAR
BELGAUM
KOLHAPUR
WR
U.SILERU
CHANDRAPUR
1000 BALIMELAMW
KORBA
AURAIYA
MALANPUR
NR
MALDABIRPARAN
ICO
BAR
A
ND
AMAN
&
220 kV
HVDC BIPOLE
BUDHIPADAR
400 kV
SASARAM
ER
GAZUWAKA
TALCHER
ROURKELA
DEHRI
Legend
BONGAIGAON
NERFATEHPUR
AGRA
GWALIOR
GORAKHPUR MUZAFFARPUR
PATNAB'SHARIFF
BARHNABINAGAR
PURI
KOTA
UJJAIN
KANKROLI
ZERDA
RAPP
NAGDA RANCHISIPATNORTH KARANPURA
SIPAT
SALAKATI
765 kV
BALIA
SR
NAGJHARI
PONDA
By 2012Inter-regional capacity – 37,150 MWHybrid System of EHVAC & HVDC with FACTS Devices
R O U R K E LA
R A IP U RH IR M A
T A LC H E R
JA IP U R
N E R
E R
W R
N R
S R
B 'S H A R IF
A L LA H A B A D
S IP A T
G A Z U W A K A
JE Y P O R EC H A N D R A P U R
S IN G R A U LI
V IN D H Y A -
2000
MW
2000MW
2500M W
100 0M W
500M W
L U C K N O W
D IH A N G
C H IC K E N N E C K
T E E S T A
T IP A IM U K HB A D A R P U R
M IS A
D A M
K A TG U
LE G E N D
765 K V L IN E S 400 K V L IN E S
H V D C B /B
H V D C B IP O LE
E X IS T IN G / X P LA N N A T IO N A L
Z E R D A
H IS S A R
B O N G A IG A O N
K O LH A P U R
N A R E N D R A
K A IG A
P O N D A
IX P L A N
M A R IA N I
N O R T H
K A H A LG A O N
R A N G A N A D I
S E O N IC H E G A O N
B H A N D A R A
D E H G A M
K A R A D
L O N IK A N D
V A P I
G A N D H A R /
T A LA
B A N G LA
B A LLA B G A R H A 'P U R(D E LH I R IN G )
B A N G A LO R E
K O Z H IK O D E
C O C H IN
K A Y A M K U LA M
T R IV A N D R U M
P U G A LU R
K A Y A T H A R
K A R A IK U D I
C U D D A LO R E
S O U T H C H E N N A I
K R IS H N A P A T N A M
C H ITT O O R
V IJA Y A W A D A
S IN G A R P E T
P IP A V A V
L IM B D I
K IS H E N P U R
D U LH A S T IW A G O O R A
M O G A
U R I
B H U T A N
R A M A G U N D A M
S A T LU JR A V I
JU L LA N D H A R
D E S H
V A R A N A S I/U N N A O
M 'B A D
P U R N E A
K O R B A
N A G D A
S IL IG U R I/B IR P A R A
LAKSHAD
WEEP
T E H R I
M E E R U T
B H IW A D I
B IN A
S A T N A
M A L A N P U RS H IR O H I
K A W A S
A M R A V A T I
A K O LA
A G R A
S IR S I
C H A L
JE T P U RA M R E LI
B O IS A RT A R A P U R
P A D G H E
D H A B O L
K O Y N A
B A R H
G 'P U R
H O S U RM Y S O R E
K U D A N K U LA M
M 'P U R
K A R A N P U R A
M A ITH O N
JA M S H E D P U R
P A R LI
W A R D A
B E A R ILLY
S A L E M G R IDX I P L A N
National Grid by 2012THE POWER ‘HIGHWAY’