39
Indian Affairs-Facility Management System (IA-FMS) Training DM Work Order Approval (Gatekeeper) Process Indian Affairs, Division of Facilities Management and Construction

Indian Affairs-Facility Management System (IA-FMS) Training

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Indian Affairs-Facility Management System (IA-FMS) Training

Indian Affairs-Facility

Management System (IA-FMS)

Training

DM Work Order Approval (Gatekeeper)

Process

Indian Affairs, Division of Facilities

Management and Construction

Page 2: Indian Affairs-Facility Management System (IA-FMS) Training

The DM Work Order Approval Process

IA-FMS - DM WO Approval

(Gatekeeper) Process

• The Deferred Maintenance (DM) Work Order Approval Process allows Indian

Affairs (IA) to evaluate and verify the accuracy of Deferred Maintenance work

orders created in Maximo.

• The primary objective of the approval process is to ensure the accuracy of

Deferred Maintenance work orders and their cost estimates before being included

in critical calculations of IA-FMS, including a location’s DM, Facility Condition Index

(FCI), or Ranking.

• In order for a DM work order to be considered in a location’s DM cost or FCI, it

must reach COAPPR (Central Office Approved) status. DM work orders must reach

COAPPR status before they can be eligible to be funded using BPERM.

Page 3: Indian Affairs-Facility Management System (IA-FMS) Training

DM Work Order Approval Process

IA-FMS - DM WO Approval

(Gatekeeper) Process

• Most work orders must go through Agency, Regional, Gatekeeper, and

Central Office approval.

• Emergency work orders go through Regional and Central Office

approval.

• Certain work orders generated from S&CAP enter the process in the

Central Office queue and only require one level of approval before they

are in COAPPR status.

Page 4: Indian Affairs-Facility Management System (IA-FMS) Training

The DM Work Order Approval Process Statuses

IA-FMS - DM WO Approval

(Gatekeeper) Process

Work Order Status Description

WAPPR (Waiting on Approval) A newly created work order.

AGAPPR (Agency Approved) A DM work order approved at the Agency level.

RGAPPR (Region Approved) A DM work order approved at the Region level.

GKAPPR (Gatekeeper Approved) A DM work order approved at the Gatekeeper level.

COAPPR (Central Office Approved) A DM work order approved at the Central Office level.

REWORK (Rejected for Rework) A DM work order rejected at some point in the DM Work

Order Approval (Gatekeeper) Process that has been sent

back to the creator of the work order (or to the Site level)

to be updated and re-submitted for approval.

Page 5: Indian Affairs-Facility Management System (IA-FMS) Training

The DM Work Order Approval Process Flow

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 6: Indian Affairs-Facility Management System (IA-FMS) Training

Click Route Workflow

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 7: Indian Affairs-Facility Management System (IA-FMS) Training

My DM Work Orders in Approval Process

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 8: Indian Affairs-Facility Management System (IA-FMS) Training

Agency Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 9: Indian Affairs-Facility Management System (IA-FMS) Training

Agency Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 10: Indian Affairs-Facility Management System (IA-FMS) Training

Agency Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 11: Indian Affairs-Facility Management System (IA-FMS) Training

Agency Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 12: Indian Affairs-Facility Management System (IA-FMS) Training

Automatic Escalation

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 13: Indian Affairs-Facility Management System (IA-FMS) Training

Automatic Escalation – Time Limits

IA-FMS - DM WO Approval

(Gatekeeper) Process

Approval Level Time Limit

Agency 10 days

Region 10 days

Gatekeeper 10 days

Central Office 10 days

Approval Level Time Limit

Region 2 days

Central Office 2 days

Non-Emergency DM Work Orders

Emergency DM Work Orders

Page 14: Indian Affairs-Facility Management System (IA-FMS) Training

Region Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 15: Indian Affairs-Facility Management System (IA-FMS) Training

Region Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 16: Indian Affairs-Facility Management System (IA-FMS) Training

Region Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 17: Indian Affairs-Facility Management System (IA-FMS) Training

Gatekeeper Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 18: Indian Affairs-Facility Management System (IA-FMS) Training

Gatekeeper Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 19: Indian Affairs-Facility Management System (IA-FMS) Training

Gatekeeper Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 20: Indian Affairs-Facility Management System (IA-FMS) Training

Central Office Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 21: Indian Affairs-Facility Management System (IA-FMS) Training

Central Office Branches

IA-FMS - DM WO Approval

(Gatekeeper) Process

Central Office Branch Responsibility

Safety Branch • Category S (Safety/Health) Deferred Maintenance work

orders

• Category H (Handicap) Deferred Maintenance work

orders

Quarters Branch • Deferred Maintenance work orders tied to a Quarters

location that are not Category S (Safety/Health) or

Category H (Handicap)

Environmental Branch • Category X (Environmental) Deferred Maintenance

work orders

Page 22: Indian Affairs-Facility Management System (IA-FMS) Training

Central Office Branches (continued)

IA-FMS - DM WO Approval

(Gatekeeper) Process

Central Office Branch Responsibility

Operations and Maintenance (O&M)

Branch

• Category U (Emergency) Deferred Maintenance work

orders

• Category E (Energy) Deferred Maintenance work

orders

• Category M (Physical Plant) Deferred Maintenance

work orders

• Category F (Fire) Deferred Maintenance work orders

• Category C (New Construction) Deferred Maintenance

work orders

• Category P (Programmatic) Deferred Maintenance work

orders

• Category R (Outyear Renewal) Deferred Maintenance

work orders

Central Office Super Group • The Central Office Super Group will see all DM work

orders in their queue. They are not responsible for

approving any particular work orders, but have the

ability to Central Office Approve any work order.

Page 23: Indian Affairs-Facility Management System (IA-FMS) Training

Central Office Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 24: Indian Affairs-Facility Management System (IA-FMS) Training

Central Office Review

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 25: Indian Affairs-Facility Management System (IA-FMS) Training

Rejecting for Rework

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 26: Indian Affairs-Facility Management System (IA-FMS) Training

Rejecting for Rework

IA-FMS - DM WO Approval

(Gatekeeper) Process

Agency Region

Gatekeeper Central Office

Page 27: Indian Affairs-Facility Management System (IA-FMS) Training

Updating Reported By field

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 28: Indian Affairs-Facility Management System (IA-FMS) Training

Updating Reported By field

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 29: Indian Affairs-Facility Management System (IA-FMS) Training

Updating a REWORK Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 30: Indian Affairs-Facility Management System (IA-FMS) Training

Updating a REWORK Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 31: Indian Affairs-Facility Management System (IA-FMS) Training

Updating a REWORK Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

• Edit the work order

Page 32: Indian Affairs-Facility Management System (IA-FMS) Training

Resubmit REWORK work order for Approval

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 33: Indian Affairs-Facility Management System (IA-FMS) Training

Cancelling a Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 34: Indian Affairs-Facility Management System (IA-FMS) Training

Cancelling a Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Agency Region

Site Level (from

REWORK status) Central Office

Page 35: Indian Affairs-Facility Management System (IA-FMS) Training

Cancelled Work Order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 36: Indian Affairs-Facility Management System (IA-FMS) Training

Reviewing Work Order History

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 37: Indian Affairs-Facility Management System (IA-FMS) Training

Cancelling a COAPPR status work order

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 38: Indian Affairs-Facility Management System (IA-FMS) Training

Sending a COAPPR status work order back to WAPPR

IA-FMS - DM WO Approval

(Gatekeeper) Process

Page 39: Indian Affairs-Facility Management System (IA-FMS) Training

Demonstration

DM WO Approval (Gatekeeper) Process