SOLARPowerPlant
pVModule
(Renewablesourceof Energy)
7/29/2019 India Solar Power Plant VPC
2/35
With itsabundanceofsunlight,Indiahastremendouspotentialtoemergeasoneoftheleadersinsolarpowergeneration. According to the Government of Indiaspolicyforthesolarsector JawaharlalNehruNationalSolarMission(JNNSM) atargetof20GWofsolarinstallationsby2022hasbeenset.
7/29/2019 India Solar Power Plant VPC
3/35
GlobalScenarioSolar Energy demand globally has been growing at
about30%perannumoverthepast15years.
In comparison, the hydrocarbon demand growth rate is
02%
per
annum.
This
high
growth
rate
in
solar
energy
is
due to many reasons increasing cost of petroleumproducts and the parallel decreasing cost of producingpower
from
solar,
and
a
concern
world
over
on
the
harmfuleffectsofusingfossilfuels
7/29/2019 India Solar Power Plant VPC
4/35
Indiaisoneofthefewcountriesintheworldthat
has
a
dedicated
ministry
for
New
and
Renewable
energy
InIndia,
the
high
GDP
growth
rate
has
created
ahuge
demand forenergy,but thesupply isunable tomatchthedemand.Thetotalinstalledcapacityofpowerasof
January
2012
is
187
GW.
The
per
capita
totalconsumption is 778 kWh. The estimated shortage of
powerinIndiaisabout20GW.
SolarEnergy
in
India
7/29/2019 India Solar Power Plant VPC
5/35
PlantCommissionedinIndiaNameofPlant DCPeakPower(MW) Notes
MithapurSolarPowerPlant
Mithapur,Gujarat(TataPower) 25 CommissionedFebruary2012
WAASOLARPOWERPLANT
Surendranagar,Gujarat 10.22 CommissionedJanuary2012
ReliancePowerPokaranSolarPVPlant,Rajasthan 40 CommissioninginMarch2012
AdaniBittaSolarPlant,Gujarat 40 CompletedinJanuary2012
MahindraSolar
Plant,
Jodhpur,
Rajasthan
5 Completed
in
January
2012
SivagangaPhotovoltaicPlant 5 CompletedDecember2010KolarPhotovoltaicPlant 3 CompletedMay2010ItnalPhotovoltaicPlant,Belgaum 3 CompletedApril2010
AzurePower
PhotovoltaicPlant 2 Completed2009
ChesdinPower
BiomassandSolarPhotovoltaicPlants 4.1 CompletesDecember2011
Citraand
Sepset
Power
Plants
Solar
Photovoltaic
Plants
4 Commissioned
October
2011
JamuriaPhotovoltaicPlant 2 Completed2009NDPCPhotovoltaicPlant 1 Completed2010ThyagarajStadiumPlantDelhi 1 CompletedApril,2010GandhinagarSolarPlant 1 CompletedJanuary2011Tata
Mulshi,Maharashtra 3 CommissionedApril2011
AzurePower
Sabarkantha,Gujarat(Khadodavillage) 10 CommissionedJune2011.
MoserBaer
Patan,
Gujarat
30 Commissioned
July
2011
B&GSolarPvtLtd
Mayiladuthurai,TamilNadu 1 CommissionedJune2011
REHPL
Sadeipali,(Bolangir)Orissa 1 CommissionedJuly2011
Tata
Patapur,Orissa 1 CommissionedAugust2011
Tata
Osmanabad,Maharastra 1 Commissioned1stAug2011
AmruthSolarPowerPlant
Kadiri,AndhraPradesh 1 CommissionedMarch2012
Abengoa
Gwal
Pahari,
Haryana
3 Commissioned
September
2011ChandraleelaPowerEnergy
Narnaul,Haryana 0.8 CommissionedDecember2011
GreenInfraSolarEnergyLimited
Rajkot,Gujarat 10 CommissionedNovember2011
Total 182.1
7/29/2019 India Solar Power Plant VPC
6/35
WhyInIndia India is in thesunnyregionsof theworldwithmostpartsofthecountryreceiving47kwh(kilowatthour)
ofsolar
radiation
per
square
meter
per
day,
250
300
sunny days in a year. Even though Solar energyconstitutesaminisculepartinIndiasinstalledpower
generation
capacity
(with
grid
connected
solar
PV
generationatamere6MWasofMarch2010),inthemediumandlongrun,itisexpectedthatsolarenergy,
especiallysolar
PV
will
form
avital
component
of
the
country'senergymix.
7/29/2019 India Solar Power Plant VPC
7/35
7/29/2019 India Solar Power Plant VPC
8/35
SolarResourceMapofIndia
7/29/2019 India Solar Power Plant VPC
9/35
Differentsuppliers
of
ModuleManufacturer Country Model Number Watts (p) Life in years/Guarantee
given
Bosch Germany M 240 3 BB 240 10 years-90%,
25 years-80%Canadian solar Canada CS5A-170 170 25 years
Co energy US Power Plus 215 P 215 12 years-92%,
25years-80%
Del Solar Taiwan D6P_E 120 10 years-90%,
25 years-80%Evergreen solar US ES-A series 200 25 years
First solar US FS Series 70 10 years-90%,
Mitsubishi J apan TD/TE series 190
J A solar holdings China J AS 165 10 years-90%,
25 years-80%
Q cells Germany SL 1 70 25 years
PLG Solar India 10 years-90%,
25 years-80%
Moser Baer India 10 years-90%,
25 years-80%Tata BP Solar India 10 years-90%,
25 years-80%
7/29/2019 India Solar Power Plant VPC
10/35
IncentivesfromGovernment
7/29/2019 India Solar Power Plant VPC
11/35
JawaharlalNehruNationalSolar
Mission
The
JawaharlalNehruNationalSolarMission
(alsoknownastheNational
Solar Mission) is a major initiative of the
Government of India
and State
Governments to promote ecologically sustainable growthwhile addressing
Indias
energysecurity
challenges.Itwillalsoconstituteamajorcontribution
byIndiatotheglobalefforttomeetthechallengesof
climatechange.Named
forJawaharlalNehru,theMissionisoneoftheseveralinitiativesthatarepart
of National Action Plan on Climate Change.
The program was officially
inaugurated
byPrimeMinisterofIndia,ManmohanSingh.
7/29/2019 India Solar Power Plant VPC
12/35
SchemeonfinancingofOffGridand
DecentralisedSolar
Applications
Government
of
India,
Ministry
of
New
and
Renewable
Energy
(MNRE)has formulatedaschemeonfinancingofOffGridand
DecentralisedSolar (Photovoltaic andThermal)applicationsas
partof theJawaharlalNehruNational Solar Mission (JNNSM).
Underthescheme,banksmayextendsubsidised loansto
entrepreneursat
interest
rates
not
exceeding
five
per
cent
whererefinanceoftwopercentfromGovernmentofIndia
isavailable.
7/29/2019 India Solar Power Plant VPC
13/35
ExciseDuty
Exemption
on
Transmission
Equipments
Exemption
of
Excise
Duty
on
procurement
of
Transmission Equipments for initial setup of Solar
Power
Plant.
The
exemptionwould
be
available
on
transmission equipments wherever the contractual
obligation
for
installing
transmission
lines/equipmentsuptothepointofdeliveryisc0ston
thesolarpowerdeveloper.
7/29/2019 India Solar Power Plant VPC
14/35
Subsidyin
installation
of
Solar
Powerplant
TheMinistryofNewandRenewableEnergy(MNRE)provides70percentsubsidyontheinstallationcostof
asolar
photovoltaic
power
plant
in
North
East
states
and 30 percentage subsidy on other regions. Thedetailed outlay of the National Solar Mission
highlightsvarious
targets
set
by
the
government
to
increasesolarenergyinthecountry'senergyportfolio.
7/29/2019 India Solar Power Plant VPC
15/35
MajorotherincentivesIn the budget for 2010/11, the government has announced an
allocation of US $ 220 million towards the Jawaharlal NehruNational
Solar
Mission.
They encouraged private solar companies by reducing customs
duty onsolarpanelsby5%andexempting excise duty
on solar
photovoltaicpanels.
The budget also proposed a coal tax of
US$1 per metric ton
on
domesticand
imported
coal
used
for
power
generation.
The government has initiated a Renewable Energy Certificate
(REC) scheme, which is designed to drive investment in lowcarbonenergyprojects.
7/29/2019 India Solar Power Plant VPC
16/35
OpportunitiesandChallengesLandisascarceresourceinIndiaandpercapitalandavailabilityislow.Dedication
of landarea forexclusive installationofsolararraysmighthave tocompetewith
othernecessities that require land. The amount of land required
for utilityscale
solar power plantscurrently approximately 1 km2
for every 2060
megawatts
(MW)
generated
could pose a strain on India's available land resource. The
architecturemore
suitable
for
most
of
India
would
be
ahighly
distributed
set
of
individual rooftop power generation systems, all connected via a local
grid.
However, erecting such an infrastructure, which does not enjoy the
economiesof
scale
possible
in
mass,
utility
scale,
solar
panel
deployment,
needs
themarketpriceofsolartechnologydeploymenttosubstantially
decline,sothatit
attractstheindividualandaveragefamilysizehouseholdconsumer.Thatmightbe
possible in the future, because PV is projected to continue its current cost
reductionsforthenextdecadesandbeabletocompetewithfossilfuel.
7/29/2019 India Solar Power Plant VPC
17/35
SolarPowerPlantinGujarat
7/29/2019 India Solar Power Plant VPC
18/35
IncentivesfromStateGovernment GovernmentofGujaratdeclaredcomprehensiveSolarPolicy2009,whereinGovtwillpurchasethepoweratthe
following
minimum
rates.
fromdateofcommissioning
Solar PV Rs.12/
kWh Rs.3/
kWh
SolarThermal Rs.9/
kWh Rs.3/
kWh
for next12yearsfor first12years
7/29/2019 India Solar Power Plant VPC
19/35
Transmissioncharges&transmissionlosses
At 66kV : Transmission charges and transmissionlosses
applicable
to
normal
Open
Access
Consumer.
Below 66 kV : Transmission charges, applicable tonormal
open
access
consumer
and
transmission
and
wheeling losses @ 10%of the energy fed to the grid,forSolarpowerPlantofcapacitymorethan5MW.
For Solar power Plants of capacity less than 5 MW,Transmission charges, applicable to normal openaccess consumer and transmission and wheeling
losses
@
7%
of
the
energy
fed
to
the
grid.
7/29/2019 India Solar Power Plant VPC
20/35
7/29/2019 India Solar Power Plant VPC
21/35
PolicyrelatedtoLandAcquisitionforSolarPlant
At 66kV : Transmission charges and transmissionlosses
applicable
to
normal
Open
Access
Consumer.
Below 66 kV : Transmission charges, applicable tonormal open access consumer and transmission andwheeling losses @ 10%of the energy fed to the grid,forSolarpowerPlantofcapacitymorethan5MW.
For Solar power Plants of capacity less than 5 MW,Transmission charges, applicable to normal openaccess consumer and transmission and wheeling
losses
@
7%
of
the
energy
fed
to
the
grid.
7/29/2019 India Solar Power Plant VPC
22/35
Govt.sInitiativeTheGovernmentof Gujarat ispromotingSolarPowerParksintheSate.RolledOut SpecialPolicyin2009.
AlreadyfewPlantsareoperationalintheState.The development of solar parks will streamline the project developmenttimeline by letting government agencies undertake land acquisition and
necessary
permits,
and
provide
dedicated
common
infrastructure
for
setting
upsolarpowergenerationplantslargelyintheprivatesector.
The State Government is taking initiative in providing the commoninfrastructure/facilitieslikesitepreparationandleveling,powerevacuation,
availability
of
water,
access
roads,
security
and
services.
In
parallel
with
the
centralgovernment'sinitiative..
7/29/2019 India Solar Power Plant VPC
23/35
Contd.The Gujarat Electricity Regulatory Commission has announced
feedin
tariff
to
mainstream
solar
power
generation
which
will
beappliedforsolarpowergenerationplantsinthesolarpark.
Gujarat Power Corporation Limited is the responsible agency
fordeveloping
the
solar
park
of
500
megawatts
and
will
lease
thelandstotheprojectdeveloperstogeneratesolarpower.
GujaratEnergyTransmissionCorporationLimitedwilldevelop
thetransmission
evacuation
from
the
identified
interconnection
pointswiththesolardeveloper.Thisprojectisbeingsupported,inpart,bytheAsianDevelopmentBank
E l i d t f L d i
7/29/2019 India Solar Power Plant VPC
24/35
ExclusivemandateforLandinGujarat
Landarea : About1200 acre(485 hec.)Location
: 60kmfromAhmedabad(CapitalofGujarat)20kmfromSanand(PlantofTataNanoCar).
ExpectedPrice
: $12,000/ peracre
PrimaryUse :SolarPowerPlant
SecondaryUse : Storage/Warehousing
7/29/2019 India Solar Power Plant VPC
25/35
Location:INDIA
7/29/2019 India Solar Power Plant VPC
26/35
Location:Gujarat
7/29/2019 India Solar Power Plant VPC
27/35
Location:Bagodra
7/29/2019 India Solar Power Plant VPC
28/35
Location: Bagodratoproposedsite
7/29/2019 India Solar Power Plant VPC
29/35
Location :Proposedsite
7/29/2019 India Solar Power Plant VPC
30/35
ExpectedProduction1200 acre @ 10 MW /100 acre X 0.80
= 96
MW
Assumingefficiency80%
7/29/2019 India Solar Power Plant VPC
31/35
CostoftheProject($m)
Land Cost :
1.4 Cost of Approvals/Coversion/Devlopment 0.28(20% of land cost) PV Power Panels @ 4m 480.00 Thus total initial investment for 120 Mw : 48168
Say 500.00
Less Subsidy 30% 150.00
Net Investment 350.00
7/29/2019 India Solar Power Plant VPC
32/35
Expectedrevenue ExpectedRevenuefromtheSellingofElectricity @Rs.12/ perkWhforfirst12years:
=2,102,400,000/
orUSD$42mn/year
Assumingtheplantwillfor5hoursadaywithefficiencyof80%
7/29/2019 India Solar Power Plant VPC
33/35
ReturnofInvestment Paybackperiodof8yearsincludeslandalso
WiththatotherbenefitslikeCarbonCreditsand
othersubsidies,moreoverappreciationintheland
value.
7/29/2019 India Solar Power Plant VPC
34/35
Secondarybenefits
CanbeusedasStoragepurposeifconstructedasRoof
topSolar
power
plant,
to
store
the
items
which
is
not
effectedbyUVraysandotherharmfulrays.