12
Engagement: 0.0709092.001 Independent Assurance Report Heraeus Precious Metals GmbH & Co. KG Hanau Reasonable assurance engagement on the Refiner's Compliance Report for the year ended 31 December 2013

Independent Assurance Report - Heraeus · basis within the framework of our work. ... This independent assurance report has been prepared for the Refiner for the purpose ... Tungs

Embed Size (px)

Citation preview

Engagement: 0.0709092.001

Independent Assurance Report Heraeus Precious Metals GmbH & Co. KG Hanau

Reasonable assurance engagement on the Refiner's Compliance Report for the year ended 31 December 2013

PricewaterhouseCoopers refers to the network of member firms of PricewaterhouseCoopers International Limited, each of which is a separate and independent legal entity.

Independent Reasonable Assurance Report

We have been engaged by Heraeus Precious Metals GmbH & Co. KG, Hanau, (the "Refiner") to perform a reasonable assurance engagement on the Refiner’s Compliance Report prepared by the Refiner for the business group "Heraeus Precious Metals" (HPM) as defined in Table 5 of the Compliance Report for the year ended 31 December 2013 (the "Refiner’s Compliance Report").

The independent assurance scope consists of the Refiner’s Compliance Report.

Responsibilities

The management of the Refiner is responsible for the preparation and presentation of the Refiner’s Compliance Report in accordance with the LBMA Responsible Gold Guidance (version 5) as of January 18, 2013, as well as the Supplement on Tin, Tantalum and Tungsten of the OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas as of November 2012 (the "Guidance"). This responsibility includes establishing appropriate risk management and internal controls from which the reported information is derived. The criteria identi-fied by management as relevant for demonstrating compliance with the Guidance are the activities described in the Refiner’s Compliance Report.

Our responsibility is to carry out a reasonable assurance engagement in order to express a conclusion based on the work performed.

We conducted our reasonable assurance engagement in accordance with International Standard on Assurance Engagements (ISAE) 3000 Assurance Engagements other than Audits or Reviews of Historical Financial Information issued by the International Auditing and Assurance Standards Board and the supplementary guidance set out in the LBMA Responsible Gold Programme - Third Party Audit Guidance (version 2) as of January 18, 2013 (the "Audit Guidance"). This Audit Guidance requires that we comply with ethical requirements and plan and perform the assurance engagement, under consideration of materiality, to express our conclusion with reasonable assurance.

The procedures selected depend on the practitioner’s judgment. Knowledge of the business activities and the economic and legal environment of the Refiner are taken into account in the determination of evidence-gathering procedures. Internal controls rele-vant to the preparation of the Refiner’s Compliance Report and the evidence supporting the disclosures in the Refiner’s Compliance Report are examined primarily on a test basis within the framework of our work. Within the scope of our work we performed amongst others the following procedures:

Interviews with the compliance officers in charge of the preparation of the Refiner’s Compliance Report.

...

Interviews with management and employees of departments in charge of Recycling, Purchasing, Material Management and Trading.

Inspection of relevant corporate guidelines and documents describing the Management Systems, Due Diligence and Risk Management approach towards a responsible supply chain.

Review of documentation of requirements on the group-wide processes for collecting, analyzing and aggregating data on the supply chain of gold, tin, tanta-lum and tungsten.

Performance of site visits and control testing at HPM locations in Hanau (Germany), Hong Kong (China) and Singapore as part of our sample assessments of relevant systems, processes and controls; including process walkthroughs from supplier selection to materials receipt and lot processing.

Evaluation of the consistency of the statements provided in the Refiner’s Compliance Report with the findings obtained during our engagement.

We believe that the evidence we have obtained is sufficient and appropriate to provide a basis for our conclusion.

This independent assurance report has been prepared for the Refiner for the purpose of assisting management in determining whether the Refiner has complied with the Guidance and for no other purpose. Our independent assurance report is issued solely to the Refiner in accordance with the terms of our engagement. We do not accept or assume responsibility to anyone other than the Refiner for our work, or for the conclu-sions we have reached in the independent assurance report.

Inherent limitations

Non-financial information, such as that included in the Refiner’s Compliance Report, is subject to more inherent limitations than financial information, given the more qualitative characteristics of the subject matter and the methods used for determining such information. The methods used by the Refiner to comply with the Guidance may differ. It is important to read the Refiner’s conflict minerals supply chain policy available in the download section on HPM’s website:

http://heraeus-precious-metals.com/en/home/heraeus-precious-metals.aspx

Appendix

PwC Appendix

0.0709092.001

Index to appendices Page

Refiner’s Compliance Report………………………………………………………………………… 1

General Terms of Engagement: Allgemeine Auftragsbedingungen für Wirtschaftsprüfer und Wirtschaftsprüfungsgesellschaften vom 1. Januar 2002

Hera

2014‐04

Table

Refiner

Entities

Report

Date of

Senior this rep

Heraeudeep rocover pproduc In the frevenua leadi HeraeuIts Hon2013). This Headdend  

Herae

Table

Step 1

CompWe ha

1. HasTantal

The HdownsTungs

CommIn 200Condu(includcustom HPM oGuidanedition In 201the moMinerabased latest shttp://h

aeus Co

‐25                

1: Refiner’s

r’s name

s and locatio

ting year-end

f Report

Managemenport:

us is a globaoots in Germprecious metcts, quartz gla

financial yeaues of €16 bilng position i

us Precious Mng Kong baseFurther Hera

eraeus Comdum Table 5

us evaluati

2:

1: Establish

pliance Stateave fully com

s the refinerlum, and Tu

eraeus groustream entitiesten and Tan

ments and D07 we starteduct and policyding, but not mers are con

operates stricnce for Respn November

2 we further odel set out ials from Con due diligencsupply chainheraeus-prec

omplian

                      

details

ons

d

nt at HPM re

lly active premany. The cotals, materialass, and spe

r 2012 Heraellion. With mn its global m

Metals is oneed Gold refinaeus Gold re

pliance Repo, that belong

on 

Su

strong com

ement with Rmplied with St

r adopted a cungsten?

p has adoptees) regardingtalum as we

Demonstratiod formalizing y of complianlimited to Go

nflict-free.

ctly in accordponsible Sup2012.

continued ton the Annexflict-Affected

ce, screeningn policy can bcious-metals

nce Rep

HPM Compl

esponsible fo

ecious metal ompany has bls and technoecialty light so

eus generateore than 13,3

markets. (Mo

e of the largenery Heraeusefiners are lo

ort covers thg to the busin

ummary of a

mpany mana

Requirementep 1: Estab

company po

ed a compang due diligenll as other pr

on of Compour supply cnce and ethicold, Tin, Tant

dance with “Lpply Chains o

o formalize ox II of the OEd and High Rg and monitobe found on o.com/en/hom

port 20

liance Repor

Herae

PleasHPM behalf

31.12

2014-

or Hans

and technolobeen family-oologies, sensources.

ed product re300 employe

ore: www.her

est Gold refins Ltd. alone i

ocated in Han

e selected reness group “H

activities un

agement sys

nt: blish strong m

olicy regard

ny-wide policce for the surecious meta

pliance: chain policy fcs. In 2010 wtalum and Tu

LBMA Respoof Minerals fr

our supply chCD Due Dilig

Risk Areas. Toring of all traour website

me/heraeus-p

013 for 

rt for 2013

eus Precious

e refer to adis creating thf of the entiti

.2013

-04-24

Deutsch, CF

ogy Group bowned for msors, biomate

evenues of €ees in over 1raeus.com )

ners globallyis refining monau, Newark

efining and dHeraeus Pre

ndertaken to

stems

management

ding due dili

cy binding forupply chain oals.

for Precious we added anungsten) to e

onsible Gold rom Conflict-

hain policy fogence Guidahis sets out oansactions ain the downloprecious-met

HPM 

     

s Metals Gmb

dendum Tabhis Complianes and locat

FO of HPM:

ased in Hanore than 160erials, medic

€4.2 billion an00 subsidiar

. ore than 100and Santa F

downstream ccious Metals

o demonstra

systems.

gence for su

r all entities (f conflict min

Metals which additional fo

ensure, all pr

Guidance aAffected and

r Precious Mance for Respour responsind governanoads sectiontals.aspx.

        p

bH & Co. KG

ble 5 – nce Report ations listed in

hans.deutsc

au, near Fra0 years. Our cal and pharm

nd precious mries worldwid

0 tons of GoldFee Springs.

companies ms” (HPM).

ate complian

upply chain

(including HPnerals includ

h is based onocus on confroducts supp

nd the “OECd High Risk A

Metals which ponsible Supibility for connce structuren:

page 1 of 5 

G - HPM

lso on n this addend

ch@heraeus

ankfurt, and wbusiness gro

maceutical

metal tradingde, Heraeus

d annually (2

mentioned in

nce

ns of Gold, T

PM’s refinerying Gold, Tin

n our Code oflict mineralsplied to our

CD Due DiligeAreas” – Sec

is consistentpply Chains oducting risk s in place. T

dum

.com

with oups

g holds

2010-

n the

Tin,

y and n,

of

ence cond

t with of

he

Hera

2014‐04

2. Has

Herae

CommAn inteinternahas belocal creporti

3. Hasover tof oth

CommRef

We haentereTungstraceabefore

DowWe haentereTungsSpecifoutline Regulaconforescala

4. Hassupplycount

CommDuringsupplyfurtherRespo“Code downloWe revof the ConduBasedone, thIn the organiEinkaudiligen

5. Hasemplo

CommHeraeand Tu

aeus Co

‐25                

s the refiner

us Precious

ments and Dernal managal audit, comeen assignedcompliance oing to the exe

s the refinerhe supply cer supply c

ments and Dfiner units: ave a robust ed before we sten. Each lotability within oe processing wnstream unave a robust ed before we sten, to ensurfic controls reed in our inte

ar training ofrmance is unation was nec

s the refinerying counteerparties in

ments and Dg the reportinying counterpr modify our onsible Supp of Conduct oads sectionviewed the hDemocratic

uct for Preciod on our risk ahree or five yreporting yeazation), EPMuf und Logistnce measure

s the refineroyee particip

ments and Dus has deveungsten supp

omplian

                      

r set up an in

Metals has s

Demonstratioement syste

mmunication ad on group leofficers of all ecutive comm

r establishedchains of Gohain actors?

Demonstratio

‘lot’ receipts process anyt received is our productioincoming ma

nits: ‘lot’ receipts process any

re, that all raegarding rec

ernal guidelin

f our employenacceptable acessary durin

r strengthenerparties, an building du

Demonstrationg period Heparts, as welsupplier agrely Chains of for Precious

n. high risk counRepublic of C

ous Metal Suassessment,

years. ar we have e

MF (Europeatik e. V.) andments regar

r establishedpation and r

Demonstratioloped a mecply chain or o

nce Rep

HPM Compl

nternal man

set up an inte

on of Compm has been and senior mevel to designentities inclumittee.

d a strong inold, Tin, Tan?

on of Comp

process, andy gold-bearinaccurately re

on streams. Saterial as out

process, andy gold-bearinaw material ueived materies.

ees ensures and reportedng the report

ed companynd where poue diligence

on of Compraeus has col as other sueements so tMinerals froMetal Suppl

ntries and exCongo. All nppliers of He, we are now

engaged in vn Precious M FVEM (Facding Gold, T

d a companyrisk identific

on of Compchanism allowother identifie

port 20

liance Repor

nagement st

ernal manag

pliance: set up to de

management n, supervise uded in this r

nternal systntalum and T

pliance:

d specific dong and other registered in Specific conttlined in our

d specific dong and other used for our pals are carrie

that our guidd to the compting period.

y engagemeossible, assie capabilities

pliance: ontinued engppliers of cothat they mam Conflict-Aliers of Hera

xtended the lew supplierseraeus” befo

w renewing o

various businMetals FederchvereinigungTin, Tantalum

y-wide comcation to ma

pliance: wing employeed risks rega

013 for 

rt for 2013

tructure to s

gement struct

fine the govereview as peand review t

report. The co

tem of due dTungsten, in

ocuments muconflict mateour transacttrols regardininternal guid

ocuments muconflict mate

products are ed out before

delines are fopliance office

ent with Golst Gold, Tins?

gaging with Gonflict mineraake referenceAffected and H

eus” can be

ist in 4Q201s have to signre we are enur due dilige

ness organizaration, BME (g Edelmetall

m, and Tungs

municationanagement?

ees to voice arding conflic

HPM 

     

support sup

ture to suppo

ernance, roleer the adoptethe overall prompliance of

diligence, concluding tra

ust be receiveerials, includional systemng received melines.

ust be receiveerials, includconflict free

e processing

ollowed throuer and senior

ld, Tin, Tantn, Tantalum

Gold, Tin, Tals. In 2012 w

e to the OECHigh Risk Arfound on ou

2 to include n the latest v

ntering into a nce checks f

ations like IP(Bundesverbe) to promote

sten.

mechanism?

concerns ovct minerals o

        p

pply chain du

ort supply ch

es and respoed policy. A crocess and ifficer has a d

ontrols and aceability an

ed and transing Tin, Tant

m and ensurematerials are

ed and transing Tin, Tant.

g incoming m

ugh; any formr manageme

talum and Tand Tungst

ntalum and Twe started thCD Due Diligereas and the r website un

also all neigversion of oua new businefor all our su

PA (Internatioband Materiate awareness

m to promot

ver the Gold,or other comp

page 2 of 5 

ue diligence

hain due dilig

onsibilities, compliance os supported direct line of

transparencnd identifica

sactional detatalum and

es complete e carried out

sactional detatalum and

material as

m of non-nt. No such

Tungsten ten supplyin

Tungsten he process toence Guidanlatest versioder in the

hboring counr “Code of ss relationsh

uppliers every

onal Platinumalwirtschaft, s and due

e broad bas

Tin, Tantalupliance issue

e?

gence.

officer by

cy ation

ails

ails

ng

o ce for

on of

ntries

hip. y

m

sed

um es. A

Hera

2014‐04

functioIn addmay bThat in

No co

Step 2

CompWe ha

1. Doe

Herae

CommWe ideand alenterinwell asrisk-baSuppli Besideinformand sc

2. Doe

Herae

CommRef

Supplya businenhanGold pchild latransa

Dow For su conflictthe souDiligen In casepartnewith nebusine

3. Doe

CommThe cowell asand HpartneOnly ifthe CESeniorand Ta

aeus Co

‐25                

onal mailbox ition, we impe reported tonformation w

ncerns were

2: Identify an

pliance Stateave fully com

es the refine

us has proce

ments and Dentify and aslocated a risng any busins Tin, Tungstased approacers of Herae

es monitoringed about con

creening the

es the refine

us assesses

ments and Dfiner units: y chain due dness relationced due dilig

potentially orabor or other

actions under

wnstream unpply of Gold,t free smelteurcing or othence Guidance

e our due dilers. We mighew partners.ess relationsh

es the refine

ments and Dompliance ofs the OECD igh Risk Area

ers he will def the businesEO or CFO for managemeantalum.

omplian

                      

has been esplemented ino the ombuds

was widely pu

e raised by em

nd assess r

ement with Rmplied with St

er have a pro

esses in plac

Demonstratiossess risks ink profile acc

ness relationsten and Tantch and followeus”.

g governmennflict free mininternet on a

er assess ris

s the risk in li

Demonstratio

diligence comnship with angence for higiginates fromr high risk facrtaken throug

nits: , Tin, Tungst

ers. For any aer means fore for Respon

ligence asset suspend ou To enforce hips with a n

er report risk

Demonstratiofficers and thDue Diligencas as set outny acceptan

ss disagrees or final decis

ent retains the

nce Rep

HPM Compl

stablished wh 2013 an extsman by e-mublished thro

mployees in

risks in the s

Requirementep 2: Identif

ocess to ide

ce to identify

on of Compn the supply cording to ourship with anytalum supply

ws our requir

nt regulationsnerals issuesa regular bas

sks in light o

ght of the sta

on of Comp

mprising all mny Gold, Tin, gher risk catem or transits vctors. In addgh the course

ten and Tantadditional sur proof of orig

nsible Supply

ssment leavur business rour supply cotable numb

k assessme

on of Compheir teams asce Guidancet in the Annece of new buwith the ass

sion; no suche ultimate co

port 20

liance Repor

hich is reviewternal Comp

mail in any laoughout our o

the reporting

supply chai

nt: fy and asses

entify risks

the risks in t

pliance: chain. For evr risk profile cy Precious Mying counterprements as o

s and reportss like newslesis.

of the stand

andards of o

pliance:

measures reqTantalum an

egories, whicvia conflict aition, we cone of the relat

talum we ackppliers not ligin accordingy Chains of M

ves any doubrelationship whain policy in

ber of potenti

ent to the de

pliance: ssess the pote for Responsex II. If high rusiness partnsessment of th escalation wontrol and res

013 for 

rt for 2013

wed by the cliance Hotlinnguage or byorganization.

g year 2013 w

n

ss risks in the

in the suppl

the supply ch

very suppliercriteria. This

Metals counteparties. Our doutlined in ou

s from Unitedetter from Bu

dards of the

our due dilige

quired by thend Tungstench includes affected areas

nduct approptionship follow

knowledge thsted there, wg to our risk

Minerals from

bts we requeswith existing n the reportinial partners e

esignated m

tential risks isible Supply risks are idenner or cancethe complianwas necessasponsibility fo

HPM 

     

ompliance ofe, where susy telephone

with regards

e supply cha

ly chain?

hain

r we have esprocess is a

erparty, includdue diligence

ur “Code of C

d Nations, wesiness organ

ir due dilige

ence system

e LBMA is pesupplying coll gold-bearins and areas w

priate scrutinywing a risk b

he certificatiowe use eitherassessment

m Conflict-Aff

st additional partners or r

ng year, we respecially in

anager?

n-line with HChains of M

ntified with nel business w

nce officer, thary during theor the supply

        p

officer of the Hspected comin German a

s to conflict m

ain.

stablished a ca formal requding but not e process is

Conduct for P

e use variounizations, rep

ence system

erformed befounterpart. Wng mining mwith human y and monito

based approa

on of LBMA ar the EICC tet aligned withfected and H

documentatrefuse to operefused to enthe case of G

Heraeus interMinerals from

ew or existinwith existing phe issue will e reporting py chain of Go

page 3 of 5 

Heraeus grompliance violaand English.

minerals.

client databauirement befolimited to Gocarried out o

Precious Met

s resources ports of NGO

m?

fore enteringWe performeaterial and wrights abuse

oring of ach.

and EICC foremplate to veh the OECD Digh Risk Are

ions from ouen a relationnter into newGold supply.

rnal guideline Conflict-Affe

ng business partners. be escalated

period. old, Tin, Tung

up. ations

ase ore old as on a tal

to be O’s

into d

where e,

r erify Due

eas.

ur ship

w

es as ected

d to

gsten

Hera

2014‐04

Step 3

CompWe harisks.

1. Hasof the diseng

Heraewhile c

CommHeraesupplyand tracarefu Basedcase o

2. Whesteps regula

CommCorresassesslike proour su

Step 4

CompWe hadiligen

CommHeraeassurahttp://h

Step 5

CompWe ha

CommFurtheimplem“OECDRisk Aon ourhttp://h Herae

Table 3

Is the reOECD DHigh Ris

aeus Co

‐25                

3: Design an

pliance Stateave fully com

s the refiner risk while cgagement fr

us has deviscontinuing to

ments and Dus has set-u

y chain. In adansactions islly assessed

d on our risk of Gold supp

ere a managto be taken

ar reporting

ments and Dsponding prosment identifoof of origin.pply agreem

4: Arrange fo

pliance Stateave fully comnce.

ments and Dus engaged

ance report cheraeus-prec

5: Report on

pliance Stateave fully com

ments er informationmented to aliD Due DiligeAreas” – Secor company wheraeus-prec

eus overa

3:

efiner in comDue Diligencsk Areas for

omplian

                      

nd implemen

ement with Rmplied with St

r devised a scontinuing trom the risk

sed a stratego trade; (ii) m

Demonstratiop an automa

ddition and bs establishedd by the comp

managemenly.

gement stran and achiev

to designat

Demonstratioocedures arefies medium If we canno

ment.

or an indep

ement with Rmplied with St

Demonstratiothe services

can be viewecious-metals

n supply cha

ement with Rmplied with St

n and detailsgn to the spence Guidancond edition N

website’s dowcious-metals

ll conclus

Man

mpliance wice Guidancer the reporti

nce Rep

HPM Compl

nt a manage

Requirementep 3: Design

strategy for to trade; (ii) k

y for risk maitigation of th

on of Compated and ongased on the

d. In addition pliance office

nt we had to r

ategy of riskved, monitorted senior m

on of Compe in place and

or high risksot mitigate ou

endent third

Requirementep 4: Arrang

on of Comps of assuranced in the dow.com/en/dow

ain due dilig

Requirementep 5: Report

s of how Heraecific requirece for RespoNovember 20wnload sectio

.com/en/dow

sion

agement c

th the requie for Responing period?

port 20

liance Repor

ement syste

nt: n and implem

risk managmitigation o

anagement ohe risk while

pliance: going screen

risk assessm any ad-hocer and his te

reject a nota

k mitigation ring of perfo

managemen

pliance: d are –whens, we activelyur risk assess

d-party audi

nt: ge for an inde

pliance: ce provider Pwnload sectiownloads/dow

gence

nt: t on supply c

aeus’ systemements in theonsible Suppl012 have beeons: wnloads/dow

conclusion

irements of nsible Supp

013 for 

rt for 2013

em to respon

ment a mana

ement of anof the risk w

of an identifiesuspending

ing of all busment a regulaidentified risam and nece

able number

is undertakeormance, pet.

necessary –y approach osment to at le

it of the sup

ependent thi

PwC Germanon: wnloads-herae

chain due dili

ms, proceduree LBMA Resply Chains of en set out in

wnloads-herae

the LBMA Rply Chains o

HPM 

     

nd to identif

gement syst

n identified rwhile suspen

d risk by eithtrade or (iii)

siness partnear re-assessk brought upessary action

of potential p

en, it shoulderiodic reass

– applied accour suppliers east medium

pply chain du

rd-party aud

ny. Their inde

eus-precious

igence.

es, processeponsible GolMinerals fromour supply c

eus-precious

Responsiblef Minerals fr

        p

fied risks

tem to respo

risk by eithending trade

her (i) mitigatdisengagem

ers for identifsment of all bp by any stakns/measures

partners esp

d include msessment o

cordingly. In to receive fu

m risk level, w

ue diligence

it of the supp

ependent rea

s-metals.asp

es and controld Guidance m Conflict-Afchain policy w

s-metals.asp

e Gold Guidfrom Conflic

page 4 of 5 

nd to identifie

er (i) mitigator (iii)

tion of the risment from the

fying risks in business partkeholder will s decided.

ecially in the

easureable of risk, and

case our riskurther informwe will termin

e

ply chain due

asonable

px

ols have beeas well as thffected and Hwhich is ava

px

ance and thct-Affected a

ed

tion

sk e risk.

the tners be

e

k mation nate

e

en he High ilable

he and