Environmental Monitoring Report This report has been submitted to ADB by the Public Works Department, Government of Chattisgarh, Raipur and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 44427-013 October 2017 Period: January 2016 – June 2016 IND: Chhattisgarh State Road Sector Project Subproject : Group C Roads Submitted by Public Works Department, Government of Chattisgarh, Raipur

IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Embed Size (px)

Citation preview

Page 1: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Environmental Monitoring Report

This report has been submitted to ADB by the Public Works Department, Government of Chattisgarh, Raipur and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 44427-013 October 2017 Period: January 2016 – June 2016

IND: Chhattisgarh State Road Sector Project

Subproject : Group C Roads

Submitted by

Public Works Department, Government of Chattisgarh, Raipur

Page 2: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract
Page 3: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 0

Public Works Department Government of Chhattisgarh

PIU (ADB Projects); Raipur, Chhattisgarh, India

Environmental Safeguard Monitoring Report

(Reporting Period: From January - June 2016)

Consultancy Services for Road Construction Supervision of Rehabilitation

and Upgradation of Group C Roads (Contract Package 16 to 19)

Loan No - 2981-IND

Intercontinental Consultants and Technocrats Pvt. Ltd. A-8, Green Park, New Delhi – 110016, India In joint venture with

Rodic Consultants Pvt. Ltd.

July - 2016

Page 4: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

This environmental safeguard monitoring report is a document of the borrower and made publicly

available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff.

LOAN NUMBER – 2981 IND

Environmental Safeguard Monitoring Report

Reporting Period: From January to June 2016

IND: Chhattisgarh State Road Sector Project

Group - C (Package-16 to 19)

Prepared by Public Works Department, Government of Chhattisgarh for the Asian Development

Bank.

Page 5: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 2

TABLE OF CONTENTS

SL. NO. ITEMS PAGE

Abbreviations 4

Executive Summary 5

1.0 Introduction 6

1.1 Project Description 6

1.2 Package Wise Details 7

1.2.1 Package 16: Sheorinarayan – Birra - Champa (SH-9) 7

1.2.2 Package 17: Ratanpur - Kota-Lormi (SH-10) 8

1.2.3 Package 18: Lormi – Pandariya & Mungeli– Lormi with

Mungeli bypass (SH-10/MDR)

9

1.2.4 Package 19: Jairamnagar – Masturi – Malhar – Jondhara -

Lawan (MDR)

10

1.3 Project Progress Status and Implementation Schedule 11

A. Progress Status of Pre-Construction Activities 11

a) Construction Camps 11

b) Tree Cutting Status 12

c) Borrow Area Details 12

d) Environmental Review Meetings 14

B. Implementation Schedule 15

2.0 Compliance to National /State/Local Regulations 15

3.0 Compliance to Environmental Covenants from the ADB Loan

Agreement

15

4.0 Compliance to Safeguards Management Plan 19

Page 6: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 3

5.0 Environmental Monitoring Results and Unanticipated Impacts 21

6.0 Implementation of Grievance Redress Mechanism and

Complaints Received from Stakeholders

21

7.0 Conclusion and Recommendations 22

Annexures

Annexure-I : Photographs of Project Site/Activities 23

Annexure-II : Letters Regarding Formation and Composition of GRC

25

Annexure-III : Compliance with Environmental Regulations 30

Annexure-IV : Environmental Monitoring Reports 33

LIST OF TABLES

TABLE NO. ITEMS PAGE

1.0 Road Packages under Implementation 6

1.1 Salient Features of Packag-16

7

1.2 Salient Features of Packag-17 8

1.3 Salient Features of Packag-18 9

1.4 Salient Features of Package-19 10

1.5 Tree cutting Status 12

1.6 Borrow Area Details 12

3.0 Status of Compliance With Safeguards Loan Covenants 13

Page 7: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 4

ABBREVIATIONS

ADB Asian Development Bank

AIDS Acquired Immune Deficiency Syndrome

C.G. Chhattisgarh

CGPWD Chhattisgarh Public

CPR Community Property Resources

CSC Construction Supervision Consultant

CSRSP Chhattisgarh State Roads Sector Development Project

CTE Consent to Establish

DPR Detailed Project Report

EA Executing Agency

EARF Environmental Assessment & Review Framework

EMMP Environmental Management & Monitoring Plan

EMP Environmental Management Plan

GRC Grievance Redress Committee

GRM Grievances Redress Mechanism

HIV Human Immunodeficiency Virus

HMP Hot Mix Plant

H.Q. Head Quarter

IEE Initial Environmental Examination

IPPF Indigenous Peoples Planning Framework

LHS Left Hand Side

NGO Non-governmental Organization

NOC No Objection Certificate

PIU Project Implementation Unit

PPE Personal Protective Equipment

PUC Pollution Under Control

PWD Public Works Department

RF Resettlement Framework

RHS Right Hand Side

RP Resettlement Plan

SPS Safeguard Policy Statement

WMM Water Mix Macadam

Page 8: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 5

EXECUTIVE SUMMARY

The Government of Chhattisgarh (GoCG) plans to improve about 916 kms of the state road

network under Chhattisgarh State Roads Sector Development Project (CSRSDP) with the

assistance of Asian Development Bank. The Chhattisgarh Public Works Department is the

executing agency for the project. All 19 project roads have been divided into three Groups

(Group A, B &C). The Consultancy services have been engaged for advisory and construction

supervision. The Supervision Consultancy works for Group “C” Road (Package-16 to 19)

comprising of 191.944 km road network have been awarded to M/s. Intercontinental Consultant

and Technocrats Pvt. Ltd. (ICT) in joint venture with M/s. RODIC Consultant Pvt. Ltd. The sub-

projects (Package-16 to 19) have been assessed to be of environmental category B as per

ADB’s Safeguard Policy Statement (2009) and environmental assessment guidelines 2003. The

civil work contract has been awarded for all four packages (Package-16 to 19).

The package-16 & 19 were handed over to contractor on 20th April 2015 and the physical

progress on these packages are 29.68 % and 26.28 % respectively whereas package 17 & 18,

which were handed over to contractor on 13th April 2016, have achieved physical progress 0.49

% and 1.13 % respectively as contractors were mainly engaged in preconstruction activities like

mobilization of plants and equipment’s, construction of camps, establishing of laboratories, erection and commissioning of plants, marking of centerline, checking of GPS pillars,

benchmarks etc. The cuttings of trees are being carried out and almost completed. Supervision

Consultant, through its environmental expert and site staff is monitoring the implementation of

environmental issues. The contractors have also been asked to nominate one of their staff as

Environmental Safeguard Officer so that he may be guided /trained in EMP implementation.

The one day workshop on social and environmental safeguard issues was organized by

consultant on 30.04.2016 in ICT Project Office, Bilaspur with an aim to improve compliance with

Safeguard Measures provided in contract documents and as agreed with ADB. The issues

related to Implementation of Environmental Management & Monitoring Plan (EMMP) and social

aspects were covered by Environmental Specialist and Social Specialist of ICT Pvt. Ltd. The

PIU staff, supervisory/field staff of consultant, concerned and Contractor’s key staff along with their environment & social safeguard officers were invited to attend the program.

There is a provision of Grievances Redress Mechanism (GRM) related to the implementation of

the project. The GRM include formation of District level Grievance Redress Committee (GRC)

comprising of District Commissioner, revenue official, forest official, public representative and

respective nodal officer from PWD.

The Group-C projects falls in five district namely Janjgir-Champa, Bilaspur, Mungeli, Kabirdham

and Baloda Bazar District. The Grievance Redressal Committee (GRC) has been formed in all

five districts. The contractors have been advised take care of environmental issues emerging

by execution of project and strictly adhere to the provisions of EMP and FIDIC conditions to

minimize negative impact on surrounding.

The Supervision Consultant has assessed the implementation of EMMP during the reporting

period as partially satisfactory because there is partial compliance by contractor on issues like

safety arrangements, traffic management and usage of personal protective equipment (PPE) by

the construction workers of Package-16 to 19.

Page 9: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 6

1.0 INTRODUCTION

The Government of Chhattisgarh (GoCG) plans to improve the state road network under

Chhattisgarh State Roads Sector Development Project (CSRSDP) with the assistance of Asian

Development Bank and for that has applied a loan through Government of India from the Asian

Development Bank (ADB) for the improvement of about 916 kms state roads in Chhattisgarh.

This road up-gradation and rehabilitation project will improve transport efficiency of the State

road network which will contribute to expansion of economic opportunities and poverty

reduction.

The Chhattisgarh Public Works Department is the executing agency for the project. The project

roads have been divided into three Groups (Group A, B &C). The Consultancy services have

been engaged for advisory and construction supervision, institutional strengthening, social

rehabilitation and resettlement, environmental mitigation and road safety measures. The

Supervision Consultancy works for Group “C” Road (Package-16 to 19) have been awarded to

M/s. Intercontinental Consultant and Technocrats Pvt. Ltd. (ICT) in joint venture with M/s.

RODIC Consultant Pvt. Ltd.

The sub-projects (Package-16 to 19) have been assessed to be of environmental category B as

per ADB’s Safeguard Policy Statement (2009) and environmental assessment guidelines 2003.

1.1 PROJECT DESCRIPTION

This project comprises of widening and strengthening of state highways and major district

roads. Under Group-C roads, there are four packages -16 to 19 comprising of 191.944 km road

network. The details of road package, name of the road and length under each package are

given below in Table 1.0 while project location Map is given in Figure 1.0

Table 1.0: Road Packages under Implementation

S.

No. Package Name of the Road

Length

(km)

ADB

Category

District

1. Package- 16 Sheorinarayan – Birra –

Champa (SH-9) 51.798 B

Janjgir-

Champa

2. Package- 17 Ratanpur - Kota-Lormi

(SH-10) 50.200 B

Bilaspur &

Mungeli

3. Package- 18

Lormi – Pandariya & Mungeli–

Lormi with Mungeli bypass

(SH-10/MDR)

37.007 B Mungeli &

Kabirdham

4. Package- 19

Jairamnagar – Masturi –

Malhar – Jondhara - Lawan

(MDR)

52.939 B

Bilaspur &

Baloda

Bazar

District

Total Length in km 191.944

Page 10: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 7

Figure 1.0: Project Location Map

1.2 PACKAGE WISE DETAILS

1.2.1 Package 16: Sheorinarayan – Birra - Champa (SH-9) - 51.798 Km, Package-16

The Construction Contract for Rehabilitation and up-gradation of Sheorinarayan – Birra -

Champa (SH-9) from Ch.0+000 to 51+798, Package-16 of length 51.798 km has been

awarded to M/s GPL-RKTCPL JV for a Contract Price of Rs.119,07,00,988.00. The

Time for Completion is 24 months (730 days) from Commencement Date on 20th April

2015. The salient features of Package-16 are as below:

Table 1.1: Salient Features of Package-16

S.No. Description Details

Name of the work: Rehabilitation and up-gradation of Sheorinarayan – Birra

- Champa (SH-9) from Ch.0+000 to 51+798 (51.798 km.)

1 Implementing Agency PWD, Government of

Chhattisgarh

2 DPR Consultant M/s STUP Pvt. Ltd.

3 Supervision Consultant ICT Pvt. Ltd. In JV with RODIC

Page 11: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 8

Consultants Pvt. Ltd.

4 Contractor M/s GPL-RKTCPL JV

5 Contract Agreement no. 04/2014-15 Dated 11/02/2015

6 Total Project Cost as per Contract

Agreement Rs.119, 07, 00,988.00.

7 Date of Commencement 20th April 2015.

8 Cumulative Physical Progress (%)

As on 30 June, 2016 29.68 %

9 Construction Period 24 months (730 days)

10 Completion Date 19/04/2017

11 Major Bridge 1 Nos.

12 Minor Bridge 3 Nos.

13 No. of Box Culverts 11 Nos.

14 No. of Pipe Culverts 120 Nos.

15 No. of Slab Culverts 2 Nos.

1.2.2 Package 17: Ratanpur - Kota-Lormi (SH-10)

The Construction Contract for Rehabilitation and up-gradation of Ratanpur – Kota –

Lormi (SH-10) from Ch.0+000 to 50+200, Package-17 of length 50.200 km has been

awarded to M/s Jindal -PRL (JV) for a Contract Price of Rs.106,94,70,045.00. The Time

for Completion is 24 months (730 days) from Commencement Date on 13th April 2016.

The salient features of Package-17 are as below:

Table 1.2: Salient Features of Package-17

S.No. Description Details

Name of the work: Rehabilitation and up-gradation of Ratanpur – Kota –

Lormi (SH-10) from Ch.0+000 to 50+200 (50.200 km.)

1 Implementing Agency PWD,

Government of Chhattisgarh

2 DPR Consultant M/s STUP Pvt. Ltd.

3 Supervision Consultant ICT Pvt. Ltd. In JV with RODIC

Consultants Pvt. Ltd.

4 Contractor M/s Jindal -PRL (JV)

Page 12: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 9

5 Contract Agreement no. 7/2015-16 dated 29-02-2016

6 Total Project Cost as per Contract

Agreement Rs. 106,94,70,045.00

7 Date of Commencement 13th April 2016

8 Cumulative Physical Progress (%)

As on 30 June, 2016 0.49 %

9 Construction Period 24 months (730 days)

10 Completion Date 12/04/2018

11 Major Bridge 2 Nos.

12 Minor Bridge 10 Nos.

13 No. of Box Culverts 19 Nos.

14 No. of Pipe Culverts 92 Nos.

15 No. of Slab Culverts 2 Nos.

1.2.3 Package 18: Lormi - Pandariya&Mungeli– Lormi with Mungeli bypass (SH-

10/MDR)

The Construction Contract for Rehabilitation and up-gradation of Lormi – Pandariya

Roadfrom Ch.58+200 to 80+282& Mungeli – Lormi Road from Ch.0+000 to 12+175

with Mungeli Bypass from Ch.0+000 to 0+750, Package-18 of length 37.007 km has

been awarded to M/s BEL-NC Nahar (JV) for a Contract Price of

Rs.81,86,44,170.00.The Time for Completion is 18 months (548 days) from

Commencement Date on 13thApril 2016. The salient features of Package-18 are as

below:

Table 1.3: Salient Features of Package-18

S.No. Description Details

Name of the work: Rehabilitation and up-gradation of Lormi – Pandariya

Roadfrom Ch.58+200 to 80+282&Mungeli – Lormi Road from Ch.0+000 to

12+175 with Mungeli Bypass from Ch.0+000 to 0+750

1 Implementing Agency PWD,

Government of Chhattisgarh

2 DPR Consultant M/s STUP Pvt. Ltd.

3 Supervision Consultant ICT Pvt. Ltd. In JV with RODIC

Consultants Pvt. Ltd.

Page 13: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 10

4 Contractor M/s BEL-NC Nahar (JV)

5 Contract Agreement no. 8/2015-16 dated 01-03-2016

6 Total Project Cost as per Contract

Agreement Rs. 81,86,44,170.00

7 Date of Commencement 13th April 2016

8 Cumulative Physical Progress (%)

As on 30 June,2016 1.13 %

9 Construction Period 24 months (730 days)

10 Completion Date 12/04/2018

11 Major Bridge 2 Nos.

12 Minor Bridge 10 Nos.

13 No. of Box Culverts 12 Nos.

14 No. of Pipe Culverts 55 Nos.

15 No. of Slab Culverts 01 Nos.

1.2.4 Package 19: Jairamnagar – Masturi – Malhar – Jondhara - Lawan (MDR)

The Construction Contract for Rehabilitation and up-gradation of Jairamnagar – Masturi

– Malhar – Jondhara - Lawan Road (MDR) from Ch.0+000 to 53+524, Package-19 of

length 52.939 km has been awarded to M/s SEW Infrastructure Ltd. for a Contract Price

of Rs.129,76,40,422.00. The Time for Completion is 24 months (730 days) from

Commencement Date on 20th April 2015. The salient features of Package-19 are as

below:

Table 1.4: Salient Features of Package-19

S.No. Description Details

Name of the work: Rehabilitation and Upgrading of Jairamnagar – Masturi –

Malhar – Jondhara - Lawan (MDR) from Ch. 0+000 to Ch. 53+524 (52.939 km)

1 Implementing Agency PWD,

Government of Chhattisgarh

2 DPR Consultant M/s STUP Pvt. Ltd.

3 Supervision Consultant ICT Pvt. Ltd. In JV with RODIC

Consultants Pvt. Ltd.

Page 14: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 11

4 Contractor M/s SEW Infrastructure Ltd.

5 Contract Agreement no. 14/2014-15 Dated 10/03/2015

6 Total Project Cost as per Contract

Agreement INR 129,76,40,422.00

7 Date of Commencement 20th April 2015

8 Cumulative Physical Progress (%)

As on 30th June,2016 26.28%

9 Construction Period 24 months (730 days)

10 Completion Date 19/04/2017

11 Major Bridge 1 No.

12 Minor Bridge 2 Nos.

13 No. of Box Culverts 27 Nos.

14 No. of Pipe Culverts 105 Nos

15 No. of Slab Culverts 04 Nos.

1.3 PROJECT PROGRESS STATUS AND IMPLEMENTATION SCHEDULE

A. Progress Status of Pre-Construction Activities

The preconstruction activities like mobilization of plants and equipment’s, construction of camps, construction of laboratories, erection and commissioning of plants for Package

16 &19 have been completed and is in progress for Package 17 &18. Marking of

centreline, checking of GPS pillars, benchmarks are also in progress for Package 17

&18.

a) Construction Camps

The following Construction camps are being established:

Package 16: Established Batching Plant at 16+200 (RHS), HMP at km 29+200 (LHS)

and site office at Km 47+920 near Hathanewara Village

Package17: Camp established at Gobripat (KOTA) village at Km 19+500(LHS)

Package 18: Established at Ch. 69+100 Km (LHS)

Package 19: Construction Camp established at Km.5+300 near Shiv Petrol pump,

Masturi.

Page 15: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 12

b) Tree Cutting Status

The cuttings of trees are being carried out based on the approval of competent

authority. It is carried out with all safety requirements. The details of tree cut in each

package as on 30th June 2016 is as follows:

Table 1.5: Tree cutting Status

Package

No.

No. of Trees

to be Cut

No. of Trees Cut

As on 30th June 2016

Balance to be cut

16 1183 1168 15

17 4371 2070 2301

18 1341 1009 332

19 2408 2335 73

c) Borrow Areas

The following borrow area have been identified under each construction package:

Table 1.6: Borrow Area Details

S.

No.

Borrow

Area

No.

Chainage LHS/RHS Gram Panchayat Qty.

(Cum)

Package 16

1 1 48+150 LHS Govt. Land 11711

2 3 9+590 RHS Govt. Land 8400

3 4 44+170 LHS Govt. Land 4987.5

4 5 44+170 RHS Govt. Land 7920

5 6 10+700 LHS Govt. Land 1440

6 10 25+300 LHS Govt. Land 6600

7 11 28+600 LHS Govt. Land 9020

8 11A 28+600 LHS Govt. Land 30000

9 12 3+930 RHS Govt. Land

9000

10 15 9+590 RHS Govt. Land

21600

11 15A 9+590 RHS Govt. Land

30000

Page 16: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 13

12 16 9+100 LHS Govt. Land

15000

13 16A 9+100 LHS Govt. Land

30000

14 17 48+150 LHS Govt. Land

15000

15 18 47+050 LHS Govt. Land

14400

16 19 47+050 LHS Govt. Land

18000

17 21 28+750 RHS Govt. Land

33750

18 21A 28+750 RHS Govt. Land

30000

19 22 24+630 RHS Govt. Land

15000

20 22A 24+630 LHS Govt. Land

18000

21 25 18+544 LHS Govt. Land

16500

22 26 18+670 LHS Govt. Land

36570

23 29 44+170 LHS Govt. Land

30000

24 31 44+170 LHS Govt. Land

75940

25 32 25+300 LHS Govt. Land

22500

Package 17

1 01 46+000 LHS Ghoghra village 14400

Package 18

1 1 67+800 RHS Amaldiha 15000

2 2 67+800 LHS Kapadah 12750

3 3 67+800 RHS Amaldiha 9000

Package 19

1 BA-01 8+000 LHS BodhaParsada 20250

2 BA-02 3+700 RHS KirariPanchayat 21000

3 BA-03 3+700 RHS BadoraPanchayat 24000

4 BA-04 0+000 RHS BaneswarPanchayat 25000

Page 17: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 14

5 BA-05 27+300 LHS Kewtara 45000

6 5A 27+330 LHS Kewtara 51000

7 5B 27+300 LHS Kewtara 51000

8 BA-06 0+750 Jairamnagar 30000

9 BA-07 12+360 LHS Dondaki 30000

10 BA-07A 12+360 LHS Dondaki 49500

11 BA-08 33+020 LHS Chilhati 30000

12 BA-09 27+680 RHS Kokdhi 36000

13 BA-10 24+760 RHS Dhruvakari 22500

14 BA-11 31+200 LHS Goradi 25000

15 BA-13 47+350 RHS Kasiyaara 57500

d) Environmental Review Meetings

The following Environmental Safeguards Review meetings were conducted with

representatives of Contractors and staff of Construction Supervision Consultant during

this reporting period i.e. from Jan. to June 2016:

Package-16: 13th January 2016 & 28th April 2016

Package-17: 29th April 2016 & 4th May 2016

Package-18: 29th April 2016& 4th May 2016

Package-19: 27th April 2016

The Civil Work Contract does not have provision of Environmental Personnel. However,

there is a provision of Accident Prevention (Safety) Officer in contract who has been

nominated by respective contractors for implementation of Environmental and Social

Safeguard issues. During the progress review meeting the civil work contractors were

reminded to obtain all permissions required under the existing statutory environmental

regulations mainly Consent to establish and operate Hot Mix Plant/ Crushers/ Batching

Plant/WMM Plant, Permission to withdraw water for construction, permission for

Quarry/Borrow areas, PUC for construction vehicles, labor license, Insurance policies

etc.. The contractors were also advised to go through the Environmental Management

Plan (EMP) provided in contract agreement and implement the mitigation measures

suggested thereon. The reporting formats were developed in consultation with

contractors and were issued to them for reporting in monthly progress report. The

contractors of package -16 & 19 are submitting “Environment and Social Safeguard Compliance Report” every month. The contractors of package -17 & 18 have not

submitted any report till date.

Page 18: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 15

B. Implementation Schedule

The Project Sheorinarayan-Birra-Champa (SH-9) package -16 consists of rehabilitation

and upgrading to two lanes with 2.5m earthen shoulder having length of 51.798 km. The

Project Jairamnagar – Masturi – Malhar – Jondhara – Lawan Road (MDR) package -19

consists of rehabilitation and upgrading to two lanes with 1.5m earthen shoulder having

length of 52.939 km. The Time for Completion for package-16 & 19 is 24 months (730

days) from Commencement Date on 20th April 2015.

The project Ratanpur – Kota – Lormi (SH-10) package-17 consist of rehabilitation and

upgrading to two lanes with 2.5m earthen shoulder having length of 50.200 km.

The project Lormi – Pandariya Roadfrom (Ch.58+200 to 80+282) & Mungeli – Lormi

Road (Ch.0+000 to 12+175) with Mungeli Bypass from Ch.0+000 to 0+750 package-18 (

total length 37.007 km) consist of rehabilitation and upgrading to two lanes with 2.5m

earthen shoulder for Lormi- Pandariya Road and 1.5m earthen shoulder for Mungeli-

Lormi Road with Bypass. The Time for Completion for package-17 & 18 is 24 months

(730 days) from Commencement Date on 13th April 2016.

2.0 COMPLIANCE TO NATIONAL/STATE/LOCAL REGULATIONS

The Chhattisgarh Public Works Department, an executing agency for the project, have obtained permissions required for trees cutting. PIU and supervision consultant asked the civil works contractors to obtain all permissions required under the existing statutory environmental regulations. Supervision Consultant is regularly reminding contractors to obtain/renew statutory clearances/consents for Quarry/Borrow areas from Mining Departments/DEIAA and for plants established at their respective sites from State Pollution Control board and to submit the complete details regarding the status of clearances/approvals/consents applied for/obtained. The Contractors have also been asked to submit Pollution Under Control Certificate (PUC) for vehicles engaged on construction activity. The status of “Compliance with Environmental Regulations” is detailed in Annexure- I

3.0 STATUS OF COMPLIANCE WITH SAFEGUARDS LOAN COVENANTS

Safeguards

Covenants

Description Status of Compliance / Remarks

Schedule 5

Para No. 4

The Borrower shall ensure or cause the EA

to ensure that the preparation, design,

construction, implementation, operation

and decommissioning of the Project, and

all Subprojects’ facilities comply with (i) all applicable laws and regulations of the

Borrower and the State relating to

environment, health, and safety; (ii) the

Environmental Safeguards; (iii) the EARF;

and (iv) all measures and requirements set

forth in the respective IEE and EMP, and

any corrective or preventative actions set

forth in a Safeguards Monitoring Report.

It is being complied with.

All environment safeguards

requirements being implemented in

accordance with relevant policies

and regulations of the Government of

India, State Government of

Chhattisgarh and the ADB Safeguard

Policy Statement, 2009 (SPS).

All measures and requirements set

forth in the respective EMPs are

being implemented accordingly.

Page 19: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 16

Safeguards

Covenants

Description Status of Compliance / Remarks

Schedule 5

Para No. 5

The Borrower shall ensure or cause the EA

to ensure that all land and all rights-of way

required for the Project, and all

Project/Subproject facilities are made

available to the Works contractor in

accordance with the schedule agreed

under the related Works contract and all

land acquisition and resettlement activities

are implemented in compliance with (i) all

applicable laws and regulations of the

Borrower and the State relating to land

acquisition and involuntary resettlement;

(ii) the Involuntary Resettlement

Safeguards; (c) the RF; and (d) all

measures and requirements set forth in the

respective RP, and any corrective or

preventative actions set forth in a

Safeguards Monitoring Report.

Project roads (package-16 &19) have

been handed over to the contractor

on 20th April, 2015. Project roads

(package-17 &18) have been handed

over to the contractor on 13th April,

2016. The details about land

acquisition and resettlement activities

being implemented are provided in

Social Monitoring Report.

Schedule 5

Para No. 6

Without limiting the application of the

Involuntary Resettlement Safeguards, the

RF or the RP, the Borrower shall ensure or

cause the EA to ensure that no physical or

economic displacement takes place in

connection with any Subproject until:

(a) compensation and other entitlements

have been provided to affected people in

accordance with the RP; and

(b) a comprehensive income and livelihood

restoration program has been established

in accordance with the RP.

The compensation and other

entitlements provided to affected

people and establishment of

comprehensive income and

livelihood restoration program are

detailed in Social Monitoring Report.

Schedule 5

Para No. 7

In the event of any Subproject involving

indigenous peoples, the Borrower shall

ensure or cause the EA to ensure that the

preparation, design, construction,

implementation and operation of the

Project, each Subproject and all

Project/Subproject facilities comply with (a)

all applicable laws and regulations of the

Borrower and the State relating to

indigenous peoples; (b) the Indigenous

Peoples Safeguards; (c) the IPPF; and (d)

The details provided in Social

Monitoring Report.

Page 20: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 17

Safeguards

Covenants

Description Status of Compliance / Remarks

all measures and requirements set forth in

the respective IPP, and any corrective or

preventative actions set forth in a

Safeguards Monitoring Report.

Schedule 5

Para No. 8

(a) The Borrower shall ensure or cause the

EA to ensure that all necessary budgetary

and human resources to fully implement

the EMP, the RP and the IPP as required,

are made available.

(b) The EA shall designate at least one

expert each to supervise implementation of

the EMPs and RPs.

All necessary budgetary and human

resources required to implement the

EMP is made available.

One Environmental Expert and One

Social Expert placed to PIU (H.Q.) to

supervise implementation of the

EMPs and RPs respectively.

Schedule 5

Para No. 9

The Borrower shall ensure or cause the EA

to ensure that all bidding documents and

contracts for Works contain provisions that

require contractors to:

(a) comply with the measures and

requirements relevant to the contractor set

forth in the IEE, the EMP, the RP and the

IPP (to the extent they concern impacts on

affected people during construction), and

any corrective or preventative actions set

out in a Safeguards Monitoring Report;

(b) make available a budget for all such

environmental and social measures;

(c) provide the CGPWD with a written

notice of any unanticipated environmental,

resettlement or indigenous peoples risks or

impacts that arise during construction,

implementation or operation of the

Project/Subproject that were not

considered in the IEE, the EMP, the RP or

the IPP;

(d) adequately record the condition of

roads, agricultural land and other

infrastructure prior to starting to transport

materials and construction; and

(e) fully reinstate pathways, other local

infrastructure, and agricultural land to at

least their pre-project condition upon the

It is being complied.

a) The project falls under category B

and IEE for the subprojects has been

prepared accordingly.

EMP is part of contractor’s agreement.

b) Shall be complied

c) Shall be complied with if situation

arises

d) Shall be complied with during

execution of work

e) Shall be complied with after

execution of work

Page 21: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 18

Safeguards

Covenants

Description Status of Compliance / Remarks

completion of construction.

Schedule 5

Para No. 10

The Borrower shall ensure or cause the EA

to ensure the following:

(a) submit semi-annual Safeguards

Monitoring Reports to ADB and disclose

relevant information from such reports to

affected persons promptly upon

submission;

(b) if any unanticipated environmental

and/or social risks and impacts arise during

construction, implementation or operation

of the Project/Subproject that were not

considered in the IEE, the EMP, the RP or

the IPP as applicable, promptly inform ADB

of the occurrence of such risks or impacts,

with detailed description of the event and

proposed corrective action plan; and

(c) no later than three months from the

commencement of RP implementation of

the first Subproject, engage qualified and

experienced external experts or qualified

nongovernmental organizations under a

selection process and terms of reference

acceptable to ADB, to verify information

produced through the project monitoring

process for resettlement, environment and

indigenous peoples (if any), and facilitate

the carrying out of any verification activities

by such external experts;

(d) report any breach of compliance with

the measures and requirements set forth in

the EMP, the RP or the IPP promptly after

becoming aware of the breach.

a) Being complied.

b) Shall be complied with if situation

arises

c) Details covered under Social

Monitoring Report

d) Shall be complied with if such

situation arises

Schedule 5

Para No. 11

The Borrower shall ensure or cause the EA

to ensure that no proceeds of the Loan

under the Project are used to finance any

activity included in the list of prohibited

investment activities provided in Appendix

5 of ADB’s Safeguard Policy Statement

(2009).

EA ensures that no part of the Loan

under the Project shall be used to

finance any activity included in the

list of prohibited investment activities

provided in Appendix 5 of ADB’s Safeguard Policy Statement (2009).

Page 22: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 19

4.0 COMPLIANCE TO SAFEGUARDS MANAGEMENT PLAN

Supervision Consultant, through its environmental expert and site staff is monitoring the

implementation of environmental issues on package-16 to19 which have been awarded

and construction activities are being carried out by contractor. The contractors were

asked to nominate one of their staff as Environmental Safeguard Officer so that he may

be guided /trained in EMP implementation. The supervision consultant submits

Monthly/Quarterly progress report to PWD that includes information on implementation

of environmental issues. The environmental information captured in these reports

includes environmental monitoring status of construction sites, pollution control measure

being adopted, and measures for workers safety at construction site and camp site,

safety of road user/public etc. The Supervision Consultant has assessed the

implementation of EMMP during the reporting period as partially satisfactory because

there is partial compliance by contractor on issues like safety arrangements, traffic

management and usage of personal protective equipment (PPE) by the construction

workers. The statutory permissions are also to be obtained for the construction plants

being erected by contractor, for extraction of ground water, for borrow/quarry areas etc.

The complaint handling system has been established at each construction sites for

effective and timely redressal of public grievances. The Supervision Consultant has not

received any complaint from the public on environmental issues during this reporting

period i.e. from January to June 2016.

The one day workshop on social and environmental safeguard issues was organized by

consultant on 30.04.2016 in ICT Project Office, Bilaspur with an aim to improve

compliance with Safeguard Measures provided in contract documents and as agreed

with ADB. The training program was started at 3:00 PM with the inaugural address by

Mr. K.P. Dutta Roy, Team Leader, CSRSP (Group-C Project), in which he emphasized

the importance of social & environmental issues in project execution. He informed the

gathering that, being ADB funded project, non-compliance of environmental and social

safeguards (proper implementation of EMP and RP) will be reviewed seriously and stern

actions will be taken for non-compliance. The photographs of project site/activities are

enclosed as Annexure-IV.

The issues related to Implementation of Environmental Management & Monitoring Plan

(EMMP) were covered by Mr. Pawan Malik, Environmental Specialist and social aspects

were addressed by Dr. S.K. Singh, Social Specialist of ICT Pvt. Ltd. The PIU staff,

supervisory/field staff of consultant, concerned and Contractor’s key staff along with

their environment & social safeguard officers were invited to attend the program. The

various issues covered in this training program includes but not limited to:

• Environmental Safeguards Requirements,

• Environmental Management & Monitoring Plan (EMMP) and its Implementation

• Roles and Responsibilities of ADB's/ Client's/ Consultant's/Contractors in

safeguards compliance

• Clearances Required for Project,

• Social impact assessment process and understanding resettlement planning

documents, resettlement framework etc.

Page 23: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 20

• Practical experience, thoughts and photographs of good and bad practice being

observed at various sites.

• Challenges in implementing EMMP, effect of EMP noncompliance, ways to handle

persistent non-compliance by different stakeholders,

• Prerequisite of updating of RPs and its disclosure before community and on

websites of Executing Agency and ADB

• The specified role of NGO in every stages of project implementation and support of

CSC Expert

• Tenure and extension of NGOs involvement in RP implementation

• The formats to be used for reporting at different interval of times and its uniformity

• The modalities and steps required for shifting of CPRs, social welfare of

public/contractor's personnel, reporting requirements, reporting formats etc.

After presentation, questions and answers session was held in which contractors

raised their queries and same was replied by concerned specialist. The Participants

appreciated the program which ended at 5:30 PM with the vote of thanks from Team

Leader of M/s ICT.

A view of the capacity building workshop held on 30.04.2016

5.0 ENVIRONMENTAL MONITORING RESULTS AND UNANTICIPATED IMPACTS

The baseline environmental monitoring has already been conducted for all four

packages and detailed results for ambient air quality, water quality, soil quality and noise

levels are provided in IEE reports.

Subsequently a comprehensive environmental monitoring plan has been prepared and

provided in IEE Report as well as in Civil Work Contract. The monitoring programme has

Page 24: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 21

been designed focusing monitoring during construction and operation stage. The

following Environmental Parameters shall be monitored:

a) Ambient Air Quality Monitoring

b) Water Quality

c) Noise Level Monitoring

The contractors have been advised to carry out the environmental monitoring as per the

environmental monitoring plan provided in IEE report/ Civil Work Contract and submit a

copy of the monitored results on regular basis. During this reporting period,

environmental monitoring was carried out by the civil work contractors of Package-16 &

19 in the month March and January 2016 respectively. The work on Package 17&18

were commenced on 13th April and contractors were busy in mobilizing their resources

to the site and doing preconstruction activity. The all the parameters monitored are

within permissible limit. The environmental monitoring Reports are enclosed as

Annexure-II.

6.0 IMPLEMENTATION OF GRIEVANCE REDRESS MECHANISM AND COMPLAINTS

RECEIVED FROM STAKEHOLDERS

There is a provision of Grievances Redress Mechanism (GRM) related to the

implementation of the project, particularly regarding the environmental management

plan. The GRM include formation of District level Grievance Redress Committee (GRC)

comprising of District Commissioner, revenue official, forest official, public

representative and respective nodal officer from PWD. Similarly village level GRC are to

be formed in the project. The GRM framework is shown below:

The Group-C projects falls in five district namely Janjgir-Champa, Bilaspur, Mungeli ,

Kabirdham and Baloda Bazar District. The Grievance Redressal Committee (GRC) has

been formed in all five districts. The letters regarding formation and composition of GRC

are attached as Annexure-III.

From Package-16 to 19, till date no complaint received from the public/commuter on

environmental safeguard issues.

Page 25: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 22

7.0 CONCLUSION AND RECOMMENDATIONS

The contractors are being reminded to take care of environmental issues emerging by

execution of project and strictly adhere to the provisions of EMP and FIDIC conditions to

minimize negative impact on surrounding. Some of the areas which need improvement

are providing safety measures for worker & traffic, debris/construction waste disposal,

dust suppression and camp site management. The contractors of Package-16 to 19 have

been asked to obtain all remaining statutory permissions, to conduct HIV/AIDS

awareness program regularly at site, to conduct Environmental Monitoring as per

environmental monitoring plan provided in contract and to provide PPE to all workers and

ensure its use by them. The Contractors assured to put all efforts to comply with the

EMP/Contractual requirements. The Supervision Consultant has assessed the

implementation of EMMP during the reporting period as partially satisfactory because

there is partial compliance by contractor on issues like safety arrangements, traffic

management and usage of personal protective equipment (PPE) by the construction

workers.

Page 26: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 23

Annexure-I

Site Photographs

Package – 16

Progress Review Meeting at 13.01.2016 Public consultation

Project Information Signboard Water sprinkling on haul road in Camp

Package – 17

Camp Office Material testing Lab inspection by PD

Construction Camp yet to be fenced Proposed Plant site Inspection by PD

Page 27: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 24

Package – 18

Leveling of Campsite Erection of Batching Plant

Safety measures at earthwork site Material testing in Lab

Package – 19

Awareness Poster for Sexually Transmitted Disease

Fencing around electric pole/transformer

Water Sprinkling on Embankment layer HIV/AIDS awareness program on 10.01.2016

Page 28: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 25

Annexure-II

District level Grievance Redress Committee

Page 29: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 26

Page 30: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 27

Page 31: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 28

Page 32: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 29

Page 33: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads (Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 30

Annexure-III

Status of Compliance by Contractor with Environmental Regulations (January– June 2016)

S.

No.

Permits/

Approvals

Status

Package 16 Package 17 Package 18 Package 19

1 Consent to Establish /

Operate for Hot mix

plant, Crushers.

Batching Plant

Consent for Concrete Batching

Plant obtained vide letter no.

49/R.O./T.S./C.E.C.B./2016 dated

07/04/2016 (under Air Act) & vide

letter no. 48/R.O./T.S./C.E.C.B./

2016 dated 07/04/2016 (under

Water Act)

Consent for Hot Mix Plant obtained

vide letter no. 2475/R.O./T.S.

/C.E.C.B./2016 dated 18/03/2016

(under Air Act) & vide letter no.

2474/R.O./ T.S./C.E.C.B./2016

dated 18/03/2016 (under Water

Act)

The Consent to Establish &

Operate for WMM Plant yet to be

submitted by Contractor.

The contractor is procuring

coarse aggregates from the local

Crusher Plants which has been

taken on lease(i) M/s Shree

Balaji Crusher Udhyog, (Lease

Date 16.09.2015, C.G.

Crusher, WMM and Batching Plant mobilized at site. The Consent to Establish / Operate yet not submitted

Crusher, WMM and Batching Plant mobilized at site. The Consent to Establish / Operate yet not submitted

Consent to Establish & Operate

from Regional Office C.G.

Environment Conservation Board,

Raipur for HMP, Batching Plant,

Crusher Plant obtained by

Contractor.

For crusher vide letter no.

3277/Dt:30.03.15 (valid up to

30.04.18) and for HMP, Batching,

WMM vide letter no.

1435/Dt:14.10.15 (Valid up to

14.10.16)

Page 34: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads (Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 31

S.

No.

Permits/

Approvals

Status

Package 16 Package 17 Package 18 Package 19

Environment Conservation Board

validity till 31.10.2016).

(ii) M/s Bhadresh G. Shah

Mines. ( Lease Date 01.10.2015,

C.G. Environment Conservation

Board validity till 31.08.2016)

2 Permission to withdraw

water for construction

from Surface Water

sources

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

3 Permission to withdraw

water for construction

from Ground Water

sources

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be

submitted by Contractor

4 Permission for storage,

handling and transport

of hazardous materials

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

NOC/Permission yet to be submitted by Contractor

Permission for transport of 6KL

petrol obtained

5 PUC for vehicles for

construction under

Central Motor and

Vehicle Act 1988

PUC Certificates Submitted PUC Certificates Yet To Submit

PUC Certificates Yet To Submit

PUC Certificates Submitted

6 Quarry Lease Deed and

Quarry License from

State Department of

Quarry Lease Deed Submitted Yet To Submit Yet To Submit Quarry Lease Deed Submitted

Page 35: IND: Chhattisgarh State Road Sector Project · Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of ... Safeguard Measures provided in contract

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads (Contract Package 16 To 19)

Environmental Safeguard Monitoring Page 32

S.

No.

Permits/

Approvals

Status

Package 16 Package 17 Package 18 Package 19

Mines and Geology

7 Labor license Obtained for 50 labours Yet To Submit Yet To Submit Obtained for 150 labours

8 Contractors All

Risk Insurance Policy/

Workmen

Compensation

Insurance

Contractors All Risk Insurance

Policy is in place.

Valid till 19.01.2018

Yet To Submit Yet To Submit Contractors All Risk Insurance

Policy is in place.

Valid till 19.01.2018

9 Consent for disposal of

sewage from labour

camps.

Mostly local labour are employed

and only 14 migrant labour are

there to whom rented

accommodation is provided.

Details/ Document Yet To Submit

Details/ Document Yet To Submit

Mostly local labour are employed

and only 14 migrant labour are

there to whom rented

accommodation is provided

10 Permission / agreement

with regards to use of

Borrow areas

Consents are being obtained from

Gram Panchayat for Borrow Areas.

Contractor has been advised to

obtain permission from DEIAA

Yet To Submit Yet To Submit Consents are being obtained from

Gram Panchayat for Borrow Areas.

Contractor has been advised to

obtain permission from DEIAA