Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
14
InCom WG 151(part II) (55.00 EUR)‘Design of Lock Gates under Seismic Actions’
MarCom WG 152 (82.00 EUR)‘Guidelines for Cruise Terminals’
RecCom WG 149 (Part II) (108.00 EUR)‘Guidelines for Marina Design – part II’
MarCom WG 153 (195.00 EUR)‘Recommendations for the Design and Assessment
of Marine Oil and Petrochemical Terminals’
InCom WG 139 (198.00 EUR)‘Values for Inland Waterways’
RecCom WG 149 (Part I) (52.00 EUR)‘Guidelines for Marina Design – part I’
PUBLISHED IN 2016
15
MarCom WG 172 (100.00 EUR)‘Design of Small to Mid-Scale Marine LNG Terminals including Bunkering’
MarCom WG 196 (195.00 EUR)‘Criteria for the Selection of Breakwater Types
and their Related Optimum Safety Levels’
YEARBOOK 2015
MarCom WG 162 (110.00 EUR)‘Recommendations for Increased Durability and
Service Life of New Marine Concrete Infrastructure’
16
All the PIANC Working Group Reports are available for free
for PIANC members on the Members Only site
Non-members of PIANC can purchase the PIANC Working Group Reports via:
http://www.pianc.org/technicalreportsbrowseall.php
TOP 10 Downloaded by PIANC Members
Yearbook 2013
1
2
3
4
5
6
7
8
9
10
419388380367348292285276218214
MarCom
RecCom
MarCom
RecCom
MarCom
InCom
MarCom
MarCom
MarCom
InCom
WG 152
WG 149/II
WG 153
WG 149/I
WG 144
WG 139
WG 172
WG 121
WG 196
WG 151/II
Guidelines for Cruise Terminals
Guidelines for Marina Design – Part II
Recommendations for the Design and Assessment of Marine Oil and Petrochemical Terminals
Guidelines for Marina Design – Part I
Classification of Soils and Rocks for the Maritime Dredging Process
Values for Inland Waterways
Design of Small to Mid-Scale Marine LNG Terminals including Bunkering
Harbour Approach Channels Design Guidelines
Criteria for the Selection of Breakwater Types and their Related Optimum Safety Levels
Design of Lock Gates under Seismic Actions
TOP 10 Bestsellers
1
2
3
4
5
6
7
8
9
10
MarCom
MarCom
RecCom
RecCom
RecCom
MarCom
MarCom
MarCom
MarCom
RecCom
Harbour Approach Channels Design Guidelines
Guidelines for Cruise Terminals
Guidelines for Marina Design – Part I
Guidelines for Marina Design – Part II
Catalogue of Prefabricated Marina Elements
Recommendations for the Design and Assessment of Marine Oil and Petrochemical Terminals
Guidelines for the Design of Fenders Systems: 2002
Floating Breakwaters – A Practical Guide for Design and Construction
Design and Maintenance of Container Terminal Pavements
Design and Operational Guidelines for Super Yacht Facilities
181818181614121110
8
WG 121
WG 152
WG 149/I
WG 149/II
WG 131
WG 153
WG 33
WG 13
WG 165
WG 134