REPORT OF INVESTIGATIONS/1989 In Situ Measurements and Preliminary Design Analysis for Deep Mine Shafts in Highly Stressed Rock By M. P. Board and M. J. Beus BUREAU OF MINES UNITED STATES DEPARTMENT OF THE INTERIOR ""., '

In Situ Measurements and Preliminary Design Analysis for Deep

Embed Size (px)

Citation preview

Page 1: In Situ Measurements and Preliminary Design Analysis for Deep

REPORT OF INVESTIGATIONS/1989

In Situ Measurements and Preliminary Design Analysis for Deep Mine Shafts in Highly Stressed Rock

By M. P. Board and M. J. Beus

BUREAU OF MINES

UNITED STATES DEPARTMENT OF THE INTERIOR

""., '

Page 2: In Situ Measurements and Preliminary Design Analysis for Deep

Report of Investigations 9231

In Situ Measurements and Preliminary Design Analysis for Deep Mine Shafts in Highly Stressed Rock

By M. P. Board and M. J. Beus

UNITED STATES DEPARTMENT OF THE INTERIOR Manuel J. Lujan, Jr., Secretary

BUREAU OF MINES T S Ary, Director

Page 3: In Situ Measurements and Preliminary Design Analysis for Deep

Library of Congress Cataloging in Publication Data:

Board, M. P. (Mark P.) In situ measurements and preliminary design analysis for deep mine shafts in

highly stressed rock.

(Report of investigations / United States Department of the Interior, Bureau of Mines; 9231)

Bibliography: p. 20.

Sup!. of Docs. no.: I 28.23:9231.

1. Shaft sinking. 2. Rock deformation-Idaho-Coeur d'Alene Region. 3. Ground control-Idaho-Coeur d'Alene Region. I. Beus, Michael 1. II . T itle . III. Report of investigations (United States. Bureau of Mines); 9231.

TN23.U43 [TN283] 622 s [62' .25] 88-600304

Page 4: In Situ Measurements and Preliminary Design Analysis for Deep

CONTENTS Page

Abstract. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Acknowledgments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 General Ciescription ................... . .. .. ............................. .. . ... . .... .. 3

Rock mass characterization . ... ...... ........ . ... .... .... .... __ . . . . . . . . . . . . . . . . . . . . . . . 3 Instrumentation ....... . .. . ...... . ..... ... ......................................... 5 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Results ... . ... ... . ... . . . .............. .. . .. ..... . ................ _ . . . . . . . . . . . . . . . . 10 Rock mass displacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Liner stress and strain ................ .... . . . . .................... . . . .. .... ....... . . 11

Data analysis . .. ......................... .... .................... . . . .. .. . .. ... . ..... 14 Displacements .......................... ... ......................... . ............. 15 Rock mass as a transversely isotropic elastic body .. ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Directional plasticity model. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Liner stress . ............................ .. ........................... ... . ... ..... 17 Implications for shaft design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Conclusions .................................................................... . ... 20 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Appendix A-Engineering geology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Appendix B.-Rock and concrete temperature ...... .... .... . . . ..... . . .... . .. . .... .. ........ . 26 Appendix C.-Maximum displacements, liner pressures, and liner strains . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Appendix D.-Blast and advance schedule for each test site . . . ........ . .. ....... ...... .... ...... 45

ILLUSTRATIONS

1. Coeur d'Alene Mining District and location of Lucky Friday Mine and Silver Shaft .... .... . . . . .... 2 2. Lucky Friday Mine existing shafts and workings .................................. .. . . .. . . 4 3. Estimation of in situ modulus of deformation from NGI and CSIR classification methods ... .. .. . ... 5 4. Shaft test sites and instrument location, orientation, and rock profile . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 5. MPBX E2 instrument head recessed flush with shaft wall ................................... 8 6. Vertical profile of four test sites and installation and excavation schedule. . . . . . . . . . . . . . . . . . . . . . . . 9 7. Pressure cell and strain gauge briquettes being installed in kerb ring . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 8. Shaft wall displacements over initial 5-day interval .. . .............. ... ....... . .. . .. . . ... .. 10 9. Shaft wall displacements for 30 days elapsed time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

10. Typical response characteristics at indicated MPBX hole depths for MPBX E3 at 2,414 ft for the first 10 blasts and MPBX E2 at 5,191 ft for the first 5 blasts ..... .... ....... . . . ... . ... 12

Page 5: In Situ Measurements and Preliminary Design Analysis for Deep

ILLUSTRATIONS-Continued

Page

11. Liner pressure developed over 5-day interval following installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 12. Liner strain developed over 5-day interval following installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 13. Effects of support delay showing attenuation factor as a function of ratio between

measurement distance above the shaft bottom and shaft radius ........... .... . . . .. .. . .. ..... 14 14. Measured versus calculated radial displacement plotted as a function of radial distance

for each MPBX location at each site ................................................. 16 15. Geometry of concrete liner modeled as a thick elastic ring embedded in elastic rock mass

with no-slip interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 16. Measured versus calculated tangential Liner stress at each site .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 17. Effect of normalized liner thickness to normalized tangential stress for various shear modulus ratios ... 19 IS. Required support delay as a function of shaft depth for various shear modulus ratios . . . . . . . . . . . . . . . 19

A-I. Wedge-shaped overbreak features on the northeast side of shaft .............................. 22 A-2. Northwest-southeast-trending shear zone containing crushed quartzite and fine gouge paralleling beds .. 23 A-3. Bedding joints dipping toward observer with slickensides on exposed surface ............... . . . . . . 25 B-l. Temperature versus time for thermistors at PC 1, PC 2, and PC 3 for the first 5 days after installation

at 2,414-ft depth .............. . ................................................. 26 C-l. 2,414-ft depth-5-day displacement at each MPBX location .................................. 28 C-2. 2,414-ft depth-10-day displacement and liner stress at each MPBX location. . . . . . . . . . . . . . . . . . . . . . 29 C-3. 2,414-ft depth-30-day displacement and liner stress at each MPBX location. . . . . . . . . . . . . . . . . . . . . . 30 C-4. 4,063-ft depth-5-day displacement at each MPBX location ................................. . 31 C-5. 4,063-ft depth-lO-day displacement at each MPBX location ................................. 32 C-6. 4,063-ft depth-lO-day liner stress and strain and 3O-day liner stress and strain at each MPBX location .. 33 C-7. 4,063-ft depth-30-day displacement at each MPBX location ......................... . ...... . 34 C-S. 5,191-ft depth-5-day displacement at each MPBX location .................................. 35 C-9. 5,191-ft depth-10-day displacement at each MPBX location ................................ . 36

ColO. 5,191-ft depth-lO-day liner stress and strain and 30-day liner stress and strain at each MPBX location .. 37 C-ll. 5,191-ft depth-30-day displacement at each MPBX location ................................. 38 C-12. 5,955-ft depth-5-day displacement at each MPBX location ......................... . ........ 39 C-13. 5.955-ft depth-lO-day displacement at each MPBX location ................................. 40 C-14. 5,955-ft depth-lO-day liner stress and strain at each MPBX location ........................... 41 C-15. 5,955-ft depth-30-day displacement at each MPBX location ................................. 42 C-16. 5,955-ft depth-30-day liner stress and strain at each MPBX location ....................... . ... 43 C-17. 5,955-ft depth-300-day liner stress and strain at each MPBX location ........ . ................ . 44

Page 6: In Situ Measurements and Preliminary Design Analysis for Deep

TABLES

Page

1. Range of estimated quartzite deformation moduli from all test sites ............... . . 0 ..... 0 . . . 5 2. Estimated vertical and horizontal principal stresses for all test sites ................. . 0 .... 0 . . . . 5 3. Installation date and time for various instrumentation activities .............. 0 . 0 .. . . ...... . 0 . . 8 4. Computed values of a,(max)/a,(min) for various t/a and G,/G2 ratios .... 0 .. 0 ..... 0 0 . .. 0 . 0 . . . . . 18

A-I. Elastic parameters for Revell and St. Regis Formations . 0 . ....... .. ... 0 .. 0 ........ ... 0 0 0 . . . 21 A-2o Strength parameters for Revell and St. Regis Formations 0 . .... 0 .. 0 .. . 0 .. 0 .. 0 .... .. . .. 0 0 0 . . . 21 A-3. Estimates for in situ deformation moduli at 2,414-ft depth 0 0 . ... 0 .... 0 . 0 . 0 .. .. .. 0 0 .. .. 0 .. . .. 0 22 A-4. Est imates for in situ deformation moduli at 4,063-ft depth .. 0 0 0 0 .. 0 ... 0 .......... 0 . . . . 0 0 . . . . . 24 A-50 Estimated modulus of deformation at various extenso meter orientations at four test sites . . . . . . . . . . . . 24 C-l. Maximum radial displacement from four test sites .......... 0 .. 0 ............. 0 .. . . 0 . 0 .. 0 . . 27 C-2. Maximum liner stress from four test sites ............. 0 . 0 ... 0 .. 0 ............ 0 .. 0 . . 0 . . . . . 27 C-3o Maximum liner strain from four test sites ................. 0 .............. 0 ... 0 ... 0 0 0 0 . . . 27 C-4. Liner stress and strain at selected stages of shaft sinking activity following instrumentation

at 5,955-ft depth ....... 0 . 0 ........ 0 .......... . ... 0 .................. 0 . .... 0 . . . . . 27 0-1. Blast and advance schedule for 2,414-ft depth, day 113, 4/23/81 ... ................ 0 ... 0 0 . . . . . 45 0-2. Blast and advance schedule for 4,063-ft depth, day 256, 9/10/81 . ..... 0 ........ 0 ...... . 0 . . . . . . 45 0-3. Blast and advance schedule for 5,191-ft depth, day 116, 4/26/82 .... . . ...... 0 .. .. . 0 . . . . . . . . . . . 46 0-4. Blast and advance schedule for 5,955-ft depth, day 48, 2/17/83 . 0 . ....... ..... .. ..... 0 . . . . . . . . 46

Page 7: In Situ Measurements and Preliminary Design Analysis for Deep

UNIT OF MEASURE ABBREVIATIONS USED IN THIS REPORT

cm centimeter J.Lin/in microinch per inch

°C degree Celsius oz ounce

deg degree pct percent

ft foot Ib/fe pound per cubic foot

£tId foot per day PSt pound per square inch

GPa gigapascal tr oz troy ounce

h hour yd3 cubic yard

III inch yr year

J.Lf. microstrain (f. x 106)

Page 8: In Situ Measurements and Preliminary Design Analysis for Deep

IN SITU MEASUREMENTS AND PRELIMINARY DESIGN ANALYSIS FOR DEEP MINE SHAFTS

IN HIGHLY STRESSED ROCK

By M. P. Board 1 and M. J. Beus2

ABSTRACT

The U.S. Bureau of Mines, under a cooperative agreement with Hecla Mining Co., conducted a rock mechanics study at four widely spaced horizons in a deep mine shaft in northern Idaho. The objective of the project was to measure and analyze rock deformation and lining behavior during construction of a deep shaft in a high in situ stress field within an isotropic rock mass. Rock mass displacements were monitored with multiple-position borehole extensometers. Liner stress and strain were measured with concrete pressure cells and embedment strain gauges.

This report discusses the general trends and magnitudes of data from the four test sites, and relates the data to a proposed anisotropic constitutive model for the rock mass. A design procedure is then outlined for specifications of liner thickness and support installation sequences for future shaft sinking.

lph.D. candidate, University of Minnesota, Minneapolis, MN. 2Mining engineer, Spokane Research Center, U.S. Bureau of Mines, Spokane, WA.

Page 9: In Situ Measurements and Preliminary Design Analysis for Deep

2

INTRODUCTION

The shaft is truly the "lifeline" of an underground mine. Damage to the shaft lining and guides as a result of ground movement can necessitate extensive and continual repair, which in turn causes serious loss of production. In the Coeur d'Alene Mining District of northern Idaho (fig. 1), the problems caused by high horizontal in situ stress, and the resulting ground control problems, have been documented (4, 11).3 Rectangular shafts supported by wooden sets and oriented with the long axis normal to the bedding are the rule. In many cases, these shafts have been sunk close to active stoping areas. The bedded and heavily jointed nature of the quartzites of the district, com­bined with stress concentrations from surrounding work­ings, have resulted in rather extensive repair problems.

3Ita1 ic numbers in parentheses refer to items in the list of references preceding the appendixes at the end of this report.

"

To service the deep extensions of the Lucky Friday ore body, in 1979 Hecla Mining Co. made the decision to sink a circular, concrete-lined shaft from the surface. This shaft was unique to the district in that it was the first cir­cular concrete-lined shaft. Excavation of the shaft was ini­tiated in 1980 by the J. S. Redpath Corp. and completed in 1983 to a total depth of 6,200 ft (14).

Four test sites at shaft depths of 2,414,4,063, 5,191, and .3,955 ft were instrumented by the Bureau of Mines. Ref­erence dates from which to calculate the collection of data were established as follows: test sites 1 and 2-Decem­ber 31, 1980; test site 3-December 31, 1981; test site 4-December 31, 1982. This report analyzes the data from these four sites and describes their relevance to shaft design. Based on these data, a general procedure for con­crete liner design in the Coeur d'Alene Mining District is given.

~ll ~~ sPokan~­

WASHINGTO J l

---------­LEGEND X Mine

o Town -- Faull

[;iii Sha II .~ ~

Portla~ ) \

OREGON ) IDAHO'----' 1 I --L_-----.!

Figure 1.-Coeur d'Alene Mining District and location of Lucky FrIday Mine and Silver Shaft.

Page 10: In Situ Measurements and Preliminary Design Analysis for Deep

ACKNOWLEDGMENTS

The authors express their gratitude to officials and personnel of Hecla Mining Co., particularly P. Boyko, project manager; C. Flood and T. Stephenson, mining technicians; and J. S. Redpath Corp., the shaft-sinking contractor, for assistance with installation of the instruments.

Further thanks go to mining engineers R. Muhs and J . K. Whyatt and supervisory electronics technician J. R. McYey of the Spokane Research Cemer (SRC);

E. Hardin, geophysicist, of Science Applications, Inc., for computer hardware and software development, data processing, and assistance with instrument preparation and installation; and N. Barton and K. Bahktar, both formerly of Terra Tek, Inc., and now with the Norwegian Geotech­nical Institute (NGI) and Earth Technology, Inc., respec­tively, for rock characterization, instrument installation, and data analysis.

GENERAL DESCRIPTION

The Lucky Friday Mine (fig. 2) is located in the Coeur d'Alene Mining District in Idaho's "panhandle" region, approximately 95 miles east of Spokane, W A. The ore mined is silver-lead-zinc averaging about 18 tr oz of silver per short ton. Stoping is taking place as deep as the 5,100-ft level, with development occurring at the 5,300-ft level. The predominant mining method is nonmechanized overhand cut-and-fill using a breasting down or back­stoping technique. A limited amount of undercut-and-fill stoping is also performed. In stopes, either rockbolts (fully resin-grouted, 7/8-in diam) or timber sets are used for support, depending upon ground conditions. In develop­ment headings, resin-grouted, Split Set,4 or Swellex rock­bolts with chain link fencing are used for ground support.

The rock mass consists of a series of steeply dipping, interbedded quartzites and quartzitic argillites of the St. Regis and Revett Formations. These beds range in thickness from inches to 3 or 4 ft, and range in composi­tion from very hard and brittle, relatively pure quartzite to a soft argillitic quartzite. The beds are cut by semicontin­uous joint surfaces on 12-in or less centers. Ground con­trol problems include rock bursting and excessive closure. The No.2 shaft, for example, exhibited large closures (in one case in excess of 1 ft in 1 month) (9) which resulted in extensive shaft set repair.

The Silver shaft (nominal 2O-ft diam) is located some 1,000 ft west of the No. 2 shaft. Conventional drill­and-blast practices using handheld sinkers and a cactus grab rotary boom mucker mounted on the bottom of the Galloway work deck were employed during sinking. Pre­liminary support of the wall rock was provided by 5-ft Split Set bolts and chain link fence carried to within 4 ft of the

4Reference to specific products does not imply endorsement by the Bureau o f Mines.

working face. The liner, nominally specified by the con­tractor at 1-ft thickness, was carried 20 to 30 ft behind the face and advanced in 15-ft lengths. The heading was advanced by benching the north and south halves of the shaft at an average rate of 10 ftld, with a record I-month advance of 473 ft .

ROCK MASS CHARACTERIZATION

At each of the four test sites, a basic geologic map was prepared. In addition, the Norwegian Geotechnical Insti­tute (NGI) Q-system (2) of rock mass characterization was employed to provide an estimate of rock mass properties.

Three significant geologic features that can have signifi­cant effects on the mechanical response of the rock mass are evident in the shaft: (1) Distinct, continuous bedding surfaces, (2) two sets of semi continuous cross joints, and (3) shear zones that mayor may not be conformable with bedding surfaces. The bedding represents a distinct set of parallel, continuous features . The spacing of the bedding planes averages about 0.5 to 1.5 ft at all horizons, with occasional thick (2 ft) or very thin «6 in) beds. The strike of the bedding is consistent from level to level, averaging N 40° to 60° W with dips varying from about 60° to 80° SW. The bedding planes are cut by two sets of semi­continuous cross joints, which create a blocky appearance of the shaft walls. The first set strikes approximately S 70° to 9(r W, dipping at 60° to 70° N, and has a spacing of about 6 in and a mean length of 10 to 20 in. The second set strikes 0° to 10° W, dipping 60° E to 80° W, and has similar spacing and length. Thus, there are three distinct discontinuities; however, only bedding is continuous over extended lengths.

Page 11: In Situ Measurements and Preliminary Design Analysis for Deep

4

----- ------ Bottom at 6,200 11

Figure 2.-Lucky Friday Mine and existing shafts and workings.

Page 12: In Situ Measurements and Preliminary Design Analysis for Deep

A rock mass classification was performed at each level as a means of estimating the engineering properties. The in situ deformation modulus was estimated with the NGI Q-system. The relation of the Q-value as well as the Council for Scientific and Industrial Research (CSIR) rock mass rating (RMR) system (5) to deformation modulus is shown in figure 3. The Q-classification is estimated from the rock quality designation (RQD), number of joint sets, the ratio of rock stress to strength, and the degree of weathering of the weakest set. In this case, the Q-value ranges from approximately 2 for the argiI!:tic zone of thin beds to 10 to 15 for the massive quartzites. The modulus of deformation estimates for the rock mass vary distinctly with orientation because of the direction and intensity of jointing. The estimated values are summarized in table 1. These values reflect the orientation and distribution of fractures in directions perpendicular and parallel to the bedding structure. Further detail on each classification, Q-ratings, level geology, and rock strength is presented ir. appendix A.

z o

1 80

70 ..... «1 c(Cl. 60 ~(!J a: .50 000 LL~ 40 W...J O~ 30 ~O ..... 0 20 - ~ 00 10

NGI CLASSIFICATION CQ>

... o o

a..

4 10

"0 o o ~

o

"0 o o Ol

~

>

>-~

E ~"O

o >< 0 LUOl

I C 0"0 .- 0 ..... 0

~Ol

40 100 4001,000

o 0

KEY • NGI DeSIR

o E=2RMR-100

z o L-~ __ ~ ____ ~ __ ~ ____ ~ __ ~~

50 60 70

Fa i r Good

80 90 100

Very good

CSIR CLASSIFICATION

Figure 3.-Estimation of in situ modulus of deformation from Norwegian Geotechnical Institute (NGI) and Council for Scientific and Industrial Research (CSIR) classification methods.

TABLE l.-Range of estimated quarzlte deformation moduli from aU test site, million pounds per square Inch

5

=--;:-....,..,..-:-_CO-;-m.,,-m_e_n_ts _____ Be~t quality Parallel to bedding. . . . . . . . . 6.0

Heavily jointed 3.0

Perpendicular to bedding . . . . 1.5 .5

In situ stress measurements have been performed at several locations in the Coeur d'Alene Mining District over the past 20 yr (4, 11). The general expressions for the in situ stress are

°v 500 + 1.03 d, (1)

°hI 707 + 1.37 d, (2)

and °h2 530 + 1.05 d, (3)

where °v vertical stress, psi,

obI maximum horizontal stress, psi,

°h2 minimum horizontal stress, psi,

and d depth below surface, ft.

These data were used to project the magnitude and direc­tion of the stresses at each of the test sites (table 2). The district-wide data show highly consistent directions of the maximum horizontal stress at N 4SO to N 650 W, with a ratio of maximum to minimum horizontal stresses of 1.4.

TABLE 2.-Estimated vertical and horizontal principal stresses for all test sites, million pounds per square inch

Depth of te st site, It

2,414 ....... . . . 4,063 ... . . ... . . 5,191 ........ . . 5,955 ...... .. . .

Vetical Horizontal stress stress Maximum Minimum 3,200 4,000 2,800 4,800 6,600 4,600 5,900 8,300 5,700 6,600 9,400 6,500

INSTRUMENTATION

The goal for in situ measurement was to monitor (1) rock and liner displacement, (2) liner stress change, and (3) liner strain. The instruments used for these mea­surements included mUltiple-position borehole extensom e­ters (MPBX's) with grouted or hydraulic anchors, concrete pressure cells (PC's), embedment strain gauges (SG's), connecting signal cable, and a junction box (J-box). Surface equipment consisted of a data receiver and micro­computer with magnetic tape storage. All of the instru­ments and J-boxes were prcasscmblcd and sealed prior to

Page 13: In Situ Measurements and Preliminary Design Analysis for Deep

transport down the shaft. The goal was to produce a totally sealed, remotely accessed, environmentally secure package with no electronic or mechanical components exposed once the system left the shaft collar.

The MPBX's consisted of a reference head containing 2- to 4-in-range linear potentiometers, anchor assemblies, and stainless steel anchor extension rods. The 9-in-diam, mercury-filled PC's were precast into 12- by 12- by 4-in mortar briquettes and calibrated to 1,500 psi. This procedure negates effects of water migration to the stain­less steel surface and initiates a positive output at low pressures.

The embedment SG's were cast into 3- by 6-in concrete cylinders with the bridge completion located in the encapsulation. The PC's were packaged individually and the SG's prewired into an array. All instrument cables were sealed with watertight Mil-Spec plugs attached to flexible conduit.

The J-box used was a NEMA IV, stainless steel 2- by 4-ft by 8-in-deep box containing two 16-channel Micromux data telemetry modules, power supply and terminal strips, and signal conditioning. This box was located in a manway or station within 200 ft of the instruments. The 32 chan­nels of binary coded demical (BCD) integers, from 0 to 999 per channel, were multiplexed in frequency modulated pulses and transmitted serially in ASCII format up the shaft. Two shielded, twisted, 16-gauge wire pairs in self-supporting jacketed cables connected the two transmit­ters at each test site to the receiver station at the surface. The receiver stored the data, which were then avaitable to a desktop computer or telephone modem.

The data acquisition system was designed to be simple and rugged. The on-site data processing system consisted of an HP85 desktop computer and pen plotter. Data acquisition software was used to convert raw data to engi­neering units. Raw and converted data were stored on magnetic tape, and could be plotted at the mine site. A paper tape printout of converted engineering values of each scan was also available. Data were sent via modem to a mainframe computer at the Bureau's Spokane (WA) Research Center where further data filing, manipulation, and plotting were performed. A detailed description of this instrumentation system has been published (18).

INSTALLATION

Based on preliminary studies, it was anticipated that the rock mass and support would respond to (1) excavation, (2) orientation (both with respect to geology and in situ stresses), and (3) radial distance from the shaft wall. The

installation was designed to optimize the data based on this anticipated response and yet conduct the experiment under the constraints of time and budget. If the rock were elastic and homogeneous, the maximum radial displace­ment would occur in line with the maximum compression. However, it has been seen that, in most instances in the Coeur d'Alene mining district (with the exception of areas of high stress concentration), the geologic structure con­trols the location and direction of maximum displacement. This is particularly true when interbedded zones of hard, massive quartzites and squeezing argillites are encountered and maximum displacements occur perpendicular to the bedding. Therefore, extensometers were generally ori­ented with respect to the bedding in order to minimize the difficulty of data analysis.

Figure 4 is based on preliminary mapping and shows a plan view at each test site with instrument locations and orientations as well as the general rock structure and pro­file. The exact orientation of the MPBX holes is listed in appendix A.

Concrete PC's were used to determine stress distribu­tion within the liner. To determine the optimum orienta­tion of the PC's, the stress distribution in a circular ring subjected to external compression was examined. It was seen that the tangential stress in the liner was a much more sensitive indicator of external load than radial stress. Four PC's, placed at 90° intervals about the shaft circumference, were oriented to monitor tangential stress changes.

Strain in the liner was monitored with the concrete embedment SG's used at the 4,063-, 5,191-, and 5,955-ft­depth test sites. They were placed at 45° intervals and were oriented to measure tangential strain. Thermistors were also installed at the 2,414- and 4,063-ft-depth sites to determine the temperature distribution in the concrete and rock (see appendix B).

The installation sequence required about 2 days and followed a similar procedure at each test site. Installation was scheduled during downtime and holidays as much as possible to minimize interference with shaft sinking. Geologic mapping was followed by locating and drilling MPBX holes. In general, about 4 to 6 ft of muck was left on the bottom; this, coupled with the 3- to 4-ft height required to collar the hole, meant that the MPBX's were located approximately one shaft radius from the actual face. Small dogholes were blasted at each hole location so that the protective blockout over the MPBX head could be recessed flush with the shaft walls. Figure 5 shows an MPBX installed parallel to beds with the MPBX head in the doghole. Installation of the PC's and SG's occurred at

Page 14: In Situ Measurements and Preliminary Design Analysis for Deep

Shear zones

2,414-ft deoth

5,191-ft depth

Bedding

N

I o 3 6 9

Scala, ft

LEGEND

4,063- t ! depth

depth

Multiple-position borehole exlensomeler (MPBX)

PC. SG·

Pressure cell Strain gauge

Figure 4.-Shaft test sites and Instrument location, orientation, and rock profile.

7

Page 15: In Situ Measurements and Preliminary Design Analysis for Deep

8

Figure 5.-MPBX E2 Instrument head recessed flush with shaH wall.

the same shaft depth once the concrete forms reached that level. Figure 6 shows a section through the shaft and the four test sites. Table 3 summarizes these installation activities and the time required for each installation.

The installations at the 2,414- and 4,063-ft depth sites followed a somewhat different approach. The concrete was carried to the shaft bottom and the MPBX blockouts brought out flush with the forms. The PC's and SG's were

installed at the same time as the MPBX's. This afforded the necessary protection for the cables after sinking recommenced. However, this was not favored for the installations at the 5,191- and 5,955-ft depths because it was too disruptive of the normal sinking cycle. Figure 7 shows the PC and SG briquettes being installed in the fresh concrete in the kerb ring.

TABLE 3.-lnstallaUon date and time for various Instrumentation activities, hours

Activity

Locate MPBX holes and penorm geologic mapping Drill holes . .. . .. . . .............. . ... .. . .. . Install MPBX's . . . . . .. ..... . . .. . .. . . . . . ... . Install PC's and SG's . . ........ .. .. . ..... .. .

2,414-ft depth. 4/23/81

2.5 12 10 3

IDees not include downtime for shaft repair, maintenance. etc.; average total was 33 h.

2Hoist down. 31ncludes dogholes.

4.063-ft depth, 9/10/81

5.191-ft depth. 4/26/82

4 322

7 3

4Drill repair. 5Kerb ring intenerence. 6Hydraulic anchor plus grouting.

5,955-ft depth. Average I 2/17/83

Page 16: In Situ Measurements and Preliminary Design Analysis for Deep

2,404

2,414 Day 113-install I 1 MPBX's and PC's ~- -< 2...1 2,424

L~<4.J , 5 >-- 2,434 f--~ 6 I I 7 )---1 2,444 1-- -< 8 I I 9 >--1 2,454 r - -<- 10 --1

Day 256-install 4,063

MPBX's, PC's, 1~ - < 2 I 4,073 and SG's I 3 .>- - -j

t--..(. 4 I 4,083 I 5 ~-1 r -..( 6 / 4,093

... I 7 >--1 -. .--< 8 4,103 :I: I 9 >--~ I--- I 4,113 0-

W

5,191 Cl

Day 117-install

MPBX's 5,201

Day 119-install 5,211

6 liner with PC's 1-- 7 5,221 8 >---j and SG's I- - .... 9

1-10 I""-~ 5,231 -~..1~

Day 50-install 5,955

MPBX's 5,965

Day 52-instali 5,975

liner with PC's 5,985 and SG's

0 10 20

Scale, ft

Figure 6.-Vertlcal profile of four test sites and Installation and excavation schedule.

9

Figure 7.-Pressure cell and strain gauge briquettes being installed in kerb ring.

Page 17: In Situ Measurements and Preliminary Design Analysis for Deep

10

RESULTS

Initial data processing provided plots of the measured parameters over any desired time interval. Displacement plots show movement of individual anchor points relative to the most stable anchor, which was generally the deepest anchor at a depth of 55 to 60 ft. The complete set of data in appendix C shows displacement versus elapsed time (days since installation) of 5, 10, and 30 days, and tables of maximum displacement and liner pressure and strain. The plots presented in the text have been selected to illustrate the major response factors.

Instrument responses including those extraneous to the effect of ground movement, such as temperature differen­tials, rigid inclusion effects, concrete and grout shrinkage, and modulus contrast and variation with time, are also reflected in the initial data plots. For example, one major extraneous response was the effect of temperature and shrinkage of the liner and grout column in the MPBX holes. An initial displacement excursion of up to 0.1 in over the first 8 to 16 h following installation is evident in the MPBX plots. In most cases, this effect stabilized prior to initial zero readings. Another suspected source of error was a mechanical stick-slip type behavior on some of the deepest anchor extensions, particularly those exhibiting large movements. This resulted in an erroneous sense of movement in the referenced data. This malfunction was resolved by rereferencing to a more stable, shallower anchor position and is so noted in the plots.

ROCK MASS DISPLACEMENT

The maximum displacement on all instruments was measured at the collar of lhe borehole on the ~paft wall. At the 2,414- and 4,063-ft-depth sites, where the MPBX heads were located in the concrete liner, the indicated movement was actually less than that shown by the shallow anchors located in the rock. Figure 8 shows 5-day shaft wall displacements over a specific interval of elapsed time at each test site for each MPBX location, during which face advance was equivalent to approximately two to three shaft diameters. The exact blasting times are indicated by arrows. Appendix D lists the actual blast schedule for each test site. With the exception of the 2,414-ft depth, the orientation of the MPBX's to bedding followed a consistent pattern, i.e., E1-normal, E2-parallel, and E3-45°. At the 2,414-ft depth, the instruments were located 120° apart, with one parallel (E2) and two at 45° (E1 and E3) to the bedding strike.

0.1 A

0

-.1

-.2

- . 3

- .4

- . 5

-. 6 tl I I I I tt I t t I I I I It t _ . 7 L-__ L-__ L-__ L-~L-~L-~ __ ~ __ ~ __ ~ __ ~

115 115 . 5 116 116 . 5 117 117 . 5 lIB 118.5119 119.5120

0_ .' 01I r~8 ~I---'-.. lJ 0 C

- . 2

- . 3

-. 4 t t t t t t

c: - ' ~59 259 . 5 260 260 . 5 261 26 1 5 262 262 . 5 263 263 .5264

I­Z

TIME SINCE 12/31/80, days

W O. 1 r--:=-,---,---,---,----,----,----,----,-----,.-----, ~ W <..) '" -. 1 ...J a.. -.2

W j o - .3

- . 4

-. 5

~ : : '----'-_1----<1 _1_ ' "------'-_ -'-_ , ~~ 117117 . 5 lIB l1B . 5 119 119 .5120 120 .5121121.5122

TIME SINCE 12/31/81, days

0

- . 2

- . 4

- . 6

- . 8

-1 .0

- 1. 2

-1 . 4

D

I I t I t tl

KEY o E 1 ° E2 oE3

_ 1 . 6 - .I..- .-.....1..--------1 _ _ .~--L---_ ----L-------L- ~.!- _. I_

SO 50 . 5 51 51.5 52 52.5 53 53 .5 54 54.5 55 TIME SINCE 12/31/82, days

Figure S.-Shaft wall displacements measured by MPBX E-1-E-3 over initial 5-day Interval. A, 2,414-ft depth; B, 4,063-ft depth; C, 5,191-ft depth; 0, 5,955-ft depth.

Page 18: In Situ Measurements and Preliminary Design Analysis for Deep

Displacement normal to bedding was several times greater than that measured 45° or parallel to the bedding. The ratio of maximum to minimum shaft wall displace­ment is 6:1 at the 2,414- and 5,955-ft depths and 3:1 at the other two depths. The high ratio at the 2,414- and 5,955-ft depths is probably the result of shear zones that crossed the MPBX holes at locations near the shaft wall (see appendix A for details).

Figure 9 shows shaft wall displacements for 30 days elapsed time at each test site. The displacement rate steadily decreased and was minimal after 10 to 12 drill­aDd-blast cycles, representing about 4D to 60 ft of shaft advance beyond the instrumented level. This decrease in displacement rate usually occurred within the first 5 days following installation. Again, at the 2,414- and 5,955-ft depths, normal to the bedding strike, greater time-depen­dent displacement was exhibited.

The instruments at all four test sites exhibited similari­ties in response. There was an instantaneous and discrete displacement jump immediately following each blast. Each instrument responded depending on its proximity to the bench being blasted and distance from it to the shaft bottom. Some instruments reflected a significant time­dependent component of displacement between blasts, particularly normal to the bedding, which in some cases almost equaled the instantaneous response. All of these response characteristics are illustrated in figure 10.

The installation at the 5,955-ft depth exhibited anomalous behavior, but was found to be due to secondary excavation of a loading pocket about 45 ft below the instruments (3). Displacement was reactivated as shaft excavation resumed, as seen in figure 9D, at about 11 days elapsed time. MPBX-E3, which was oriented roughly par­allel (within 10°) of the longitudinal axis of the loading pocket, was most responsive. The additional increment of collar displacement due to loading pocket excavation and subsequent shaft sinking was almost 60 pet of the initial displacement levels at day 79. The displacement was also fairly deeprooted, as even the 15-ft anchor position showed additional movement (fig. C-15).

LINER STRESS AND STRAIN

The PC's and SG's were oriented to measure tangential stress near the neutral axis of the unreinforced liner. This location in the liner was selected to minimize the effects of liner bending on the measured stress. Figures 11 and 12 show the 5-day responses of the PC's and SG's, respec­tively. Times of individual blasts again are indicated

1O A

a - 10

- 20

- 30

- 40

- 50

-60

- 70

- 80 1 15

10

10

c -- - 30

I

o

11

KEY

• E 1 • E;:"I

• E 3 t B la s 1 lime

~ 12 1 127 1 33 139 145

- - 50 ltttt .. ~ ~ ~

~ 259 265 27 1 277 283 28 9

l1J TIME , d ays s in c e 12 / 31 / 80 :E 1 0 l1J C

~ U <l: ...J 10 c.. (f) -0 30

50

-~ 1 23 1 29 135 141 14 7

TIME, d a y s s in ce 1 2 /31/ 8 1

0 ~ I

-2 0 r--... .-~

- 40 -

- 60

-SO

\ - 100

120 r-~ 140 , t*ttl INt tt!lt.~ -1

50 56 6 2 68 74 80 TIME , d ays s inc e 1 2/31182

Figure 9.-Shaft wall displacements for 30 days' elapsed time. A, 2,414-ft depth; B, 4,063-ft depth; C, 5,191-ft depth; 0, 5,955-ft depth.

Page 19: In Situ Measurements and Preliminary Design Analysis for Deep

12

c

N I 0

f-Z W ~ w 0 <! ...J Q.. CI)

0

1 0 E3

0

·· 10

KEY ·20

• 30 f t

.. 15 f t

-30 • 10 f t

• 5 f t

• 3 f t - 40

e:. 0 f t

t Bias t t i In e -50

~ , t ~ , t • ~ • + I I I I I

60 1 5 1 16 1 17

TIME, days si nc e 12/31/80 5

E2

0

-5

- 1 0

- 1 5

t t t t ~ I

-20 117 118 119

TIME, days since 12/31181

Figure 10.-Typical response characteristics at Indicated hole depth for MPBX E3 at 2,414 ft for the first 10 blasts and MPBX E2 at 5,191 ft for the 'irst 5 blasts.

Page 20: In Situ Measurements and Preliminary Design Analysis for Deep

.. c.

'" 0

w a::

1 4

12

10

8

6

4

2

o -2

1 15 B

B 6

4

2

o

t It t t t t t t t

115.5 116 116.5 117 117.5 118 118.5 119 119.5 120

t t t t t t ~ _2 L-__ ~ __ ~ __ ~ __ -L __ ~ __ ~ ____ L-__ ~ __ ~ __ ~

en 259 259.5 260 260.5 261 261.5 262 262.5 263 263.5 264

~ TIME SINCE 12/31/80, days a:: a.. 4

~:~E~tt II I 119 119.5 120 120.51211215 122122.5123 123.5 124

TIME SINCE 12/31/81, days

12 ,---.---,---,----,---,---,----,---,---,---, D

10 KEY oPCl

8 • PC2

6

4

2

o t t

_2 L-__ ~ __ ~ __ ~~-L~~~~~~L-~~--~~~

51. 5 52 52. 5 53 53.5 54 54 . 5 55 55.5 56 5 6.5 TIME SINCE 12/31/82, days

Figure 11.-Liner pressure developed over 5-day Interval following installation. A, 2,414-ft depth; B, 4,063-ft depth; C, 5,191 ft depth; D, 5,955-ft depth.

13

350 I A KEY

t B I a s t timE'

250 eSGl aSG2

I

~ _SG3

150 9SG4 .SG5 o SG6 aSG7

50 oSG8

50 T t t t it H ~ __ ~----,I 1 18 119 120 121 122 123

600 ,-------,-------,-------,--------.----~~ 8

400

~200

z « a: f0-CI)

a: W Z

....J

o 259

600 C

450

300

150

0 600

D 500

400

300

200

100

0

- 100 t 51

260 261 262 263

TIME, days since 12/31/80

52 53 54 55 TIME, days since 12/31/82

264

56

Figure 12.-Liner strain developed over 5-day interval following installation. A, 4,063-ft depth; B, 5,191-ft depth; C-O, 5,955-ft depth.

Page 21: In Situ Measurements and Preliminary Design Analysis for Deep

14

by arrows. For the 2,414- and 4,063-ft levels, the liner was installed to the shaft bottom. On the 5,191- and 5,955-ft levels, the liner was installed in the normal fashion, 18 to 20 ft above the shaft bottom. As with the movement of the shaft wall rock (as indicated by the MPBX's), the PC's and SG's indicated discrete jumps at each blast. In addition, there was a significant creep component between blasts, due largely to curing of the concrete, particularly during the first 24 h following installation.

The tangential stress measured parallel with the bed­ding (southwest and northeast quadrants) was consistently larger than that measured normal to the bedding. In addi­tion, the stress on the footwall (southwest) side of the shaft was generally larger than that measured on the hanging wall (northeast) side. The maximum tangential stress ranged from less than 300 psi at the 5,191-ft depth to 1,100 psi on the 5,955-ft depth and nearly 1,600 psi on the 2,414-ft depth. Minimum tangential liner stresses (the nortbwest-southeast quadrants) ranged from less than 100 psi on the 5,191-ft depth to about 500 psi at the 5,955-ft depth.

The SG's, installed adjacent to the PC's at the last three test sites, generally tracked the PC's performance, although they exhibited a slightly more dominant creep behavior. Their magnitudes generally supported the PC results, particularly on the last installation at the 5,955-ft depth.

Maximum tangential strains measured at the 4,063-, 5,191-, and 5,955-ft test sites were 650, 400, and 600 IJ.f, respectively, all measured in either the southwest or northeast quadrants. Minimum strains were 200, 200, and 300 IJ. f, respectively. Again, as with the MPBX's, the liner stress and strain at the 5,955-ft depth increased substan­tially as a result of excavation of a loading pocket at the 6,000-ft depth. This effect can be seen in figures lW, 12C, and 12D and has been previously discussed in detail (3). Liner stress and strain rates decreased, indicating equilib­rium after about 12 drill-and-blast cycles (face advance beyond the test site equivalent to two to three shaft diameters).

DATA ANALYSIS

The primary purpose of the data analysis given here is to examine models of rock-support interaction to deter­mine their applicability in the design of deep mine shafts in highly stressed ground. Much attention has been given to the interaction between the rock mass and tunnel lining during the construction process. The estimation of con­crete liner stresses in tunneling and shaft sinking is nor­mally accomplished using analytical equations that account for the interaction of the rock mass and [he support (10).

These analytical methods have been developed for a variety of isotropic constitutive laws, including elastic and elastoplastic behavior and hydrostatic rock stress in two dimensions. This analysis has recently been extended to unequal biaxial field stresses (8). The three-dimensional effects of face advance have also been examined numeri­cally (16), resulting in the development of support delay attenuation factors (fig. 13). These factors are used to reduce, or "attenuate," calculated values when comparing them with measured values that reflect only a portion of the total displacement that has occurred. These methods are generally used in practice to provide a conservative estimate of induced liner stress for the assumption of plane strain. The liner design (primarily thickness) or installation method (delay behind the face) can then be weighed against the possibilities of ground instability or increased liner cost.

The actual field problem in shaft sinking varies from the preceding idealized case in several respects. First, the liner is generally placed at least one shaft diameter behind the face. At this point, most of the elastic rock mass dis­placement has already occurred (1, 10, 17). For a poured

concrete liner, the concrete also remains green for some time as face advance continues. At an advance rate of 6 to 10 ftld, which is standard in shaft sinking practice, the face can advance two shaft diameters in less than 1 week, and thus displacement equilibrium can occur before maximum concrete strength is reached. This effect is offset to a cer­tain extent by the use of additives that promote high early strength.

Second, the radial stresses exerted on the liner can be highly nonuniform as a result of geologic structural control of rock mass displacements. The two assumptions implicit in the rock-support interaction concept-radial symmetry and a continuum representing rock mass behavior-place limits on the ability to model response where structural features are of importance. The induced radial tangential

z o -S 1.0

4t I- -.8 <{OC ::J O .6 'r Zl- .4 Shaft bottom

' , , , w O I I I z I-<{ .2 1-lJ... 0 <{ -3 -2 -1 0 2 3

z/r Figure 13.-Effects of support delay showing aHenuation

factor ¢, the factor used to reduce calculated values so they agree with measured vaiues, as a function of ratio between measurement distance above shaft boHom z and shaft radius r.

Page 22: In Situ Measurements and Preliminary Design Analysis for Deep

stresses in cast-in-place concrete liners in a jointed rock mass under unequal field stresses have been examined. In one study (13), the distinct-element method was used to model the rock mass, and was coupled to a matrix struc­tural analysis approach for the concrete liner. Interface shear and normal stiffness were varied to simulate effects such as liner backpacking.

Displacement of the rock mass about the Silver shaft is iargelya function of bedding plane orientation where maxi­m um displacements occur normal to the bedding. Since there were no analytical methods available to the Bureau for describing the rock-support interaction resulting from the anisotropic displacements indicated, the approach taken to data analysis was twofold:

1. Examination of the mechanisms by which the rock mass structure apparently controls the radial displacements.

2. Examination of the use of eXIstlllg rock-support interaction approaches for bounding the range of mea­sured liner stresses.

This methodology is somewhat empirical since existing rock-support interaction solutions are not well suited for this problem. However, suitable engineering approaches for preliminary specification of liner dimensions are possi­bie. A methodology that provides for a conservative sup­port design under the conditions of nonuniform external loading is considered a reasonable and prudent approach.

DISPLACEMENTS

The rock mass displacements recorded at all four test sites indicated a high degree of consistency. In all cases, a transverse isotropy was indicated, with maximum displacement normal to the strike of the bedding. Some general observations can be made from the series of dis­placement plots given in figures 8 and 9. Components located at 450 and parallel to bedding indicate a near­elastic response and can be fit reasonably well using the fGrsch solution and a deformation modulus within the range given in table 1. The normal displacement com­ponent, however, indicated large, nonelastic deformations that were confined to about one-half to one shaft radius into the wall rock. At greater distances, the displacements converged for all anchors once equilibrium was estab­lished. The yielding observed here could be a general continuum response or the result of isolated discrete block motion into the shaft caused by sliding along existing fracture surfaces.

r nitial studies performed shortly after the installation were based upon rock-support interaction models (7) . The measured displacements were compared to analytical solutions for the displacements based upon elastic or elastoplastic rock mass behavior. However, none of these

15

solutions adequately explained the displacements because of the effect of anisotropy, which are very different to model.

ROCK MASS AS A TRANSVERSELY ISOTROPIC ELASTIC BODY

An initial transversely isotropic elastic analysis was conducted to determine the adequacy of this material model in explaining the displacements. As a test case, the data from the 5,955-ft-depth test site were used for com­parative purposes. A boundary-element approach was used to model the excavation in two dimensions and the axes of elastic anisotropy were assumed to coincide with the orientation of the bedding. The deformation modulus parallel to bedding (EJ was varied from 3 to 6.0 million psi and that normal to the bedding from 0.5 to 1.5 million psi, as derived from the rock mass characterization dis­cussed earlier. A transversely isotropic body requires three additional elastic constants: the cross-shear modulus, Gxy> and the Poisson's ratios, 1/"1 and I/yx. Although G is an independent property, the following formula for deier­mining the shear modulus based on rock laboratory testing has been suggested (12):

Gxv =--------Ey (1 + 21/) + Ex

(4)

where 1/ = I/xv = I/yx.

Using equation 4, the cross-shear modulus was estimated to be in the range of 0.5 to 1.2 million psi using a Poisson's ratio of 0.2. Implicit in this analysis is the assumption that the bedding dips at 900 to the horizontal plane. As the bedding actually dips at 600 to 800

, there is an error in this assumption. A series of parameter runs were made in which the material properties were varied and displacements determined. In all cases, an attenuation factor from figure 13 was applied to reduce the two-dimen­sional displacement calculations to account for the effect of face advance and support delay. The results indicated a reasonable agreement with the near-elastic response to MPBX's E2 and E3, as was expected. However, the agreement with the collar and 5-ft anchor displacements for MPBX E1 was seriously in error.

One complicating factor in this analysis was the presence of a shear zone striking roughly perpendicular to MPBX E1 approximately 2 ft into the MPBX hole. This shear zone had a fairly thick band of clay gouge and obviously caused additional radial displacement at the first two anchor points. Comparison of the transversely isotropic solution to data from the other instrumented horizons yielded somewhat better results, but the analyses were still seriously in error.

Page 23: In Situ Measurements and Preliminary Design Analysis for Deep

16

The results of this analysis indicated three points of im portance:

1. The response of the MPBX's parallel and at 45° to bedding strike was reasonably elastic.

2. The displacement response normal to bedding strike was nonelastic.

3. The depth of the yield zone was about 10 ft or less (one shaft radius) as indicated by return to elastic response at this distance.

DIRECTIONAL PLASTICITY MODEL

To account for the nonelastic response in the normal direction, a directional plasticity-slip plane approach was examined. A so-called ubiquitous joint model was incor­porated into the explicit finite-difference program, NESSI (6). In this model, the rock mass is assumed to be a continuum whose material response is governed by a series of weak planes that exist everywhere within the mass. The rock mass is numerically characterized by joint orientation and material properties. The joint plane constitutive behavior is given by the standard Mohr­Coulomb yield criterion, which can include dilation if desired.

During the calculations, an initial trial elastic-stress increment is computed at each time step. The stresses perpendicular and parallel to the joint direction are determined and compared to the yield surface. If the material has yielded, i.e., if the stress state falls outside the failure envelope, the shearing stress on the joint plane is reduced to keep the stress state on the yield surface. The corrected stresses are then rotated back to the global frame and cycling to equilibrium is continued in the same manner. At each time step, the stress state of each zone can be examined.

A parameter study was conducted using this model for a single set of joints coincident with the bedding surfaces. The material joint parameters, including friction angle and cohesion, were varied while the direction and magnitude of the in situ stresses remained constant. The results are illustrated in figure 14 where the predicted and actual displacements versus radial distance are plotted at equilib­rium for the three MPBX locations at each test site. An attenuation factor has been applied to the two-dimensional calculations to account for face advance.

The model reasonably reproduces the measured data from all four sites. The model is able to produce the important feature of a large displacement contrast between the direction normal and parallel to structure. An approxi­mately elastic response is seen at the parallel and 45" MPBX (E-2, E-3) locations.

1.2 A

1.0 KEY 0 E 1 0 E2

.8 0 E3 SI ip pi a ne model

.6 o ---Upper bound (normal to structure)

.4 -_. Lower bound

" (parallel to structure)

.2

0 c:

.6

I-.4 Z

W

::E .2 W U 0 < ...J .7 a.. .6 C en - .5 Cl

.4 .....J .3 < .2

Cl . 1

< 0 c:::

1.0 D

.8 0

.6

.4 , 0

~ .2 , ----. 0 . ---:-~_

o 10 20 30 40 50

RADIAL DISTANCE, ft

Figure 14.-Measured versus calculated radial displacement plotted as a function of radial distance for each MPBX locatJon (E-1-E·3) at each site. A, 2,414-" depth; B, 4,063-" depth; C, 5,191-ft depth; 0, 5,955-" depth.

Page 24: In Situ Measurements and Preliminary Design Analysis for Deep

The poorest correlation occurs at the collar anchors on the perpendicular MPBX's (E1) from the 2,414- and 5,955-ft depths and can be related to geologic conditions unique to both test sites. At the 2,414-ft depth, a con­formable contact between a soft, thinly bedded argillite and a hard, medium-bedded quartzite roughly separate the northern and southern halves of the shaft. The collar of MPBX E3 was located in the soft argillite, which was unconsolidated enough to be removed fairly easily with a pickax. At the 5,955-ft depth, a clay gouge zone was encountered 2 ft into the hole at being drilled for MPBX El. In both of these cases, the ratio of maximum (normal) to minimum (parallel and 45°) displacement was approximately 6:1, whereas it was about 3:1 at the 4,063-and 5,191-ft test site depths.

LINER STRESS

The primary goal of the analysis of liner stresses is to provide a reasonable engineering estimate of the stresses as a function of the in situ stress state and distance behind the face when the liner is installed. At the present time, an analytic rock-support interaction solution for a direc­tionally yielding rock mass under unequal biaxial stresses is not known to exist. Therefore, a directly analogous approach to the liner stress analysis as was taken for the displacements cannot be performed. The goal of providing aro engineering estimate of liner response can still be accomplished using existing methods. The solution for a thick ring embedded in an elastic rock mass with a non­slipping interface and unequal biaxial in situ stresses is used to bound the measured liner stresses for the range of estimated in situ moduli and liner thicknesses.

The problem of a thick elastic ring embedded in an elastic rock mass with a no-slip interface was examined. The geometry of this problem is illustrated in figure 15. Excavation and support installation are assumed to occur simultaneously and rock reinforcement, such as a Split Set or grouted bolts, is not considered. The solution for liner tangential stresses is presented as a function consisting of components proportional to the hydrostatic, PO, and deviatoric, So, stress components:

where

and f)

tangential liner stress,

hydrostatic and deviatoric stress components,

dimensionless stress functions,

angular measurement from the X axis.

17

1

_ pO -sO

Figure 15.-Geometry of concrete liner modeled as a thick elastic ring embedded in elastic rock mass with no-slip interface.

The two stress functions, Sh(r) and Sir), depend upon five dimensionless parameters: >. = G 1/G2, the ratio of the shear moduli of the liner to rock; p = bla, the ratio of the inner to outer radius of the liner; tla, the ratio of the liner thickness to outer radius; and 1/, and lJ 2, the Poisson's ratios of the liner and rock, respectively. The deviatoric stress portion is dependent upon the type of rock-liner interface condition.

This analysis does not consider support delay, and thus an overestimation of load is predicted using this equation. An attenuation factor is used to account for support delay. During the first two installations, the liner was placed approximately one radius behind the working face. Because of the operational difficulties of kerb ring installa­tion and the high induced tangential stress in the liner (see figure 1lA), the decision was made to drop the liner back to approximately 20 ft behind the face on the final two installations. The resulting attenuation factors of 0.3 and 0.1 were applied to stress predictions for the 2,414- and 4,063-ft depths and the 5,191- and 5,955-ft depths, respectively.

A parameter study was conducted to compare measured tangential liner stress to stress calculated by equation 5. Two parameters have the most important effect on tangen­tial stress: the shear modulus, ratio, >., and the ratio of liner thickness to outer radius, tl a (table 4). The effects of the>. variation are fairly obvious; however, the para­meters t and a can cause opposite variation in 0,; e.g., a

Page 25: In Situ Measurements and Preliminary Design Analysis for Deep

18

TABLE 4. - Computed values of a,(max)ja,(mln) for various tja and G1jG2 ratios

Ratio of liner Ratio of shear moduli of liner to rock (GILG~ thickness to 0.6 0.8 1 outer shaft radius (t/a)

a,(max) a,(min) a,(max) G,(min) a,(max) G,(min)

0.15 ...... 1.17 0.55 1.48 0.72 1.76 0.88 0.20 ...... 1.15 .57 1.44 .73 1.69 .88 0.25 ...... 1.13 .59 1.39 .74 1.62 .88

NOTE.-The value of a, must be multiplied by ¢P" obtain the actual value of the tangential stress.

thicker liner attracts higher support load because of increased stiffness, but the resulting thrust is transmitted by a larger cross sectional area. The fact that o,(max) decreases with increasing t/a reflects primarily the effect of large bending moments in the structure. The variation in thickness, however, has little effect on the stresses for low values of 'x.

In the actual field case, the thickness of the liner varied with angular position about the shaft because of under­break and/or overbreak. This variation in thickness was significant and ranged from 9 to 55 in (nominal design thickness of 12 in) at the four test sites. For the calcula­tions presented here, the liner thickness was varied over that range at that particular depth, whereas the value of ,x varied from 1 to 0.25, corresponding to the moduli esti­mates presented earlier. The assumption was also made that the concrete deformation modulus was constant at 2 million psi, based on the high early strength additives used in the concrete.

The results of the study are presented in figure 16. The tangential stress is plotted as a function of angle from the deviatoric stress direction. Each plot represents a separate test site and shows the calculated and actual field measure­ments for the cases of ,x = 1 to,X = 0.25 and for the range of liner thicknesses at that depth.

Several conclusions can be drawn from these plots. The field measurements indicate the same maximum and mini­mum locations as predicted by the no-slip formulation; the maximum stress occurs at ±90° from the principal hori­zontal stress direction. Als.o, the field data are bounded by the moduli contrasts given.

The data from the 4,063- and 5,191-ft depths match well for a ,x = 0.25. For the 2,414- and 5,955-ft depths, the o,(min) corresponds well to the lower bound of'x = 0.25, but the o,(max) is anomalous, corresponding to a ,x of 1. These were also the depths where the anomolously high displacements occurred normal to the bedding.

It is possible that nonuniform loading of the liner from rock mass structural variations resulted in larger induced stresses, as was previously shown (13). A larger compo­nent of deviatoric in situ stress would also result in more rapid change in the tangential component with angular distance around the shaft, but this would be expected on the basis of data from the other two test sites (4,063- and 5,191-ft depths) where a smooth variation was seen.

20 A

j--'-

1 6

12

8

4

1 =24 in

0

16

12

(/)

c. 8

C\J

0 4

>.=0.25,1=24 in

I:)

0

6

4

2

>. =0 . 25,1=20,55 o I I

12

8

4

o

\ = 1,

\=0 5,1=36 in

60 120 180 240 300

rj", fro m S o 360

Figure 16.-Measured versus calculated tangential liner stress at each site (shear modulus ratio, >.; liner thickness, t). A, 2,414-ft depth; B, 4,063-ft depth; C, 5,191-ft depth; 0, 5,955-ft depth,

Page 26: In Situ Measurements and Preliminary Design Analysis for Deep

Finally, A = 0.25 corresponds to a rock mass deforma­tion modulus of 8 million psi, assuming a Young's modulus for concrete of 2 million psi. Whereas this is possible, it is likely that the deformation modulus for the concrete is, instead, in the range of 1 to 1.5 million psi over the time these measurements were taken (i.e., about 10 days).

In summary, the above mentioned model equation 5 for predicting liner stresses accounts for the general variation of the tangential stress and can be shown to bound the field data for the field moduli range estimated using the Q-system. This model can be considered a reasonably conservative engineering estimate and is sufficient in the present case because extensive yielding of the rock mass did not occur.

IMPUCATIONS FOR SHAFT DESIGN

The primary design criteria of interest are (1) what minimum nominal liner thickness can be used and (2) how far behind the face can the liner be carried while main­taining a reasonable factor of safety against liner failure. A parameter study was conducted using the solution of equation 5 and various values of support delay, liner thick­ness, and concrete-to-rock mass shear modulus ratio (A). A general plot illustrating the relation of t/a to the nor­malized average tangential stress at its maximum position (o,(max)/4>P") for various values of the shear modulus ratio is given in figure 17. For a given hydrostatic stress component, P", support delay factor, ¢ (from fig. 13), and shear modulus ratio, A, the required liner thickness can be calculated. Thus, for general design purposes, the value of o,(max) can be calculated and compared to the concrete liner strength (assuming that no tensile stress exists) with any desirable factor of safety.

For the specific case of the Silver shaft, plots have been developed that illustrate the required support delay in terms of shaft radius as a function of depth for various ratios of t/a and A (fig. 18). These plots assume a 4,000-psi compressive strength concrete and a factor of safety of 2.0. The bounding value of A = 1.0 shows that for a support delay of two shaft radii, the maximum shaft depth before liner failure is about 8,000 ft. During construction, the shaft bottom reached 6,200 ft with one diameter delay with no liner stability problems.

'" _ .2

KEY • x = 0.4 .X=0.6

• X = 0.8 • X ~ 1.0

19

.1 ~~ __ -L __ -L~~ __ L-~ __ ~~-L __ ~ __ ~~ 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.B 1.9

Figure 17.- Effect o f normalized liner thIckness Va to nor­malized tangential stress (7,(max)/¢P" for various shear modulus ratios (>.).

1 0 ,---------r----"T"'--, A

9 KEY A ). = 0."

8·).=1.0 • ). = 1. ..

1

(') 6 o

_ Ii

:z: l-e.. .. w o

3

2 .

o 1 2 SUPPORT DELAY (x SHAFT RADIUS)

o 1 2 SUPPORT DELA Y

(x SHAFT RADIUS)

Figure 18. -Required support delay as a function of shah depth for various shear modulus ratios (>.). A, Va = 0.2; 8 , Va = 0.1.

Page 27: In Situ Measurements and Preliminary Design Analysis for Deep

20

CONCLUSIONS

There are many factors affecting the structural stability, and thus design, of a deep mine shaft. Variable factors include the size, shape, and orientation of the shaft, the type and dimension of support, and the time lag between excavation and support installation. Fixed conditions include the magnitude, direction, and ratio of in situ stresses, geologic environment, and rock mass properties. Of crucial importance to the present investigation is a pre­liminary evaluation of the ir! situ stress field and physical properties of the rock mass.

Measurements during construction of a deep shaft have shown that the effect of rock mass anisotropy is consider­able. A variety of numerical and analytical models have

been used to bracket the measured response and thus characterize the in situ conditions. A methodology for liner specification has been proposed in which the defor­mation moduli of the rock mass are estimated from rock characterization. An elastic no-slip rock-support inter­action approach was used with estimated moduli to bracket the measured liner response. Based on a combination of observational, analytical, and empirical approaches, overall behavior of the rock mass and support system in a deep mine shaft has been determined. Application of these methods to future shaft construction and repair will pro­vide deep mine operators with needed information for proper design and stability evaluations.

REFERENCES

1. Abel, J. F., Jr., J. E. Dowis, and D. P. Richards. Concrete Shaft Lining Design. Paper in 20th U.S. Symposium on Rock Mechanics. Dep. Petroleum Eng., Univ. TX, Austin, TX, 1979, pp. 627-640.

2. Barton, N., F. Losit, R Lien, and J. Lunde. Application of Q-System in Design Decisions Concerning Dimensions and Appropriate Support for Underground Installations. Subsurface Space, Pergamon, 1980, pp. 553-561.

3. 8eus, M. J., and M. P. Board. Field Measurement of Rock Dis­placement and Support Pressure at the 5,955-ft Level During Sinking of a Deep Circular Shaft in Northern Idaho. BuMines RI 8909, 1984, 11 pp.

4. 8eus, M. J ., and S. S. M. Chan. Shaft Design in the Coeur d'Alene Mining District, Idaho-Results of In Situ Stress and Physical Property Measurements. BuMines RI 8435, 1980, 39 pp.

5. Bieniawski, Z T. Determining Rock Mass Deformability: Experience From Case Histories. Int. J. Rock Mech. Min. Sci. and Geomech. Abstr., v. 15, 1978, pp. 237-247.

6. Cundall, P. A. User's Manual and Report on NESSI, Ver­sion 1.145. Shell Res. KSEPL, Rijswijk, Netherlands, 1983, 70 pp.

7. Daemen, J. J. K Tunnel Support Loading Caused by Rock Failure. Ph.D. Thesis, Univ. MN, Minneapolis, MN, 1975,445 pp.

8. Detournay, E. Two-Dimensional Elastoplastic Analysis of a Deep Cylindrical Tunnel Under Non-Hydrostatic Loading. Ph.D. Thesis, Univ. MN, Minneapolis, MN, 1983, 133 pp.

9. Gooch, A. E., and J. P Conway. Field Measurements and Cor­responding Finite-Element Analysis of Closure During Shaft Sinking at the Lucky Friday Mine. BuMines RI 8193, 1976, 19 pp.

10. Hoek, E., and E. T. Brown. Underground Excavations in Rock. Inst. of Min. and Metall. (London), 1980, pp. 244-286.

11. Langstaff, J. Hecla's Seismic Detection System. Paper in Site Characterization: 17th U.S. Symposium on Rock Mechanics (Snowbird, UT). Univ. UT, Salt Lake City, UT, 1976, pp. 3 A7-1-3 A7-20.

12. Lekhnitskii, I. Theory of Elasticity of an Anisotropic Elastic Body. Holden-Day, 1981, 430 pp.

13. Lorig. L A Hybrid Computational Scheme for Excavation and Support Design in Jointed Media. Ph.D. Thesis, Univ. MN, Minne­apolis, MN, 1984, 237 pp.

14. McKinstry, B. A. Sinking the Silver Shaft. Paper in Proceedings, 1983 Rapid Excavation and Tunneling Conference, ed. by H. Sutcliffe and J. W. Wilson (Chicago, II., June 12-16, 1983). AIME and ASCE, v. 1, Chicago, 1983, pp. 493-512.

15. Miller, R P. Engineering Oassification and Index Properties for Intact Rock. Ph.D. Thesis, Univ. IL, Urbana, IL, 1965, 332 pp.

16. Schwartz, C. W., and H. H. Einstein. Inspired Designs for Tunnel Supports: Volume I-Simplified Analysis for Ground-Structure Interaction in Tunneling. U.S. Dep. Transportation Rep. DOT-TSC­UMI7-M-27.1, 1980,450 pp.

17. Terzaghi, K, and L Richart. Stresses in Rocks Around Cavities. Geotechnique, v. 2, No.1, 1952, pp. 57-75.

18. Whyatt, J. K, and E. Hardin. Microcomputer-Based Instrumen­tation System for Monitoring Ground Support in a Deep Mine Shaft. BuMines IC 9062, 1985, 88 pp.

Page 28: In Situ Measurements and Preliminary Design Analysis for Deep

21

APPENDIX A.-ENGINEERING GEOLOGY

Numerous laboratory measurements of the physical properties of Coeur d'Alene Mining District rocks have been made (4).1 Table A-I summarizes typical mean values of Poisson's ratios and Young's Elastic moduli determined at various mines in the Revett and St. Regis Formations.

The initial instrumentation station in the Silver shaft was at or near the contact of the St. Regis and Revett For­mations. The lower stations were all within the Revett quartzites. The St. Regis Formation is characterized by argillitic quartzites with interbedded argillites, while the Revett Formation consists primarily of hard, medium-to­massive, bedded, clean quartzites.

There is also a wide variation in strength properties of the quartzites. The factor that most affects the strength

lItalic numbers in parentheses rerer to items in the list or rererences preceding this appendix.

is discontinuities, which range from microfractures to large-scale weakness planes. Of greatest interest here is that most laboratory samples behave in a highly linear manner prior to failure. Table A-2 shows typicallabora­tory determined strength parameters for the Revett and St. Regis Formations.

However, values pertinent to the present study are more appropriately determined by methods that integrate the major geologic features of the rock mass. Therefore, joint strike and dip readings, rock mass classification values (0- and RMR-systems), and data on Schmidt ham­mer rebound for unconfined compressive strengths were obtained. Little time was available for mapping the geology of the shaft at the instrument locations because of scheduling and conditions that were far from ideal.

TABLE A-1.-Elastlc parameters for Revett and St. Regis Formations

Formation and mine

Revett: Lucky Friday ..... Star ........ . .. .

St. Regis: Calladay ........ Sunshine ..... . . .

NA Not available.

Formation and mine Revett:

Lucky Friday .. . Star ......... .

St. Regis: Calladay Sunshine ..... .

Young's modules, 106 psi

8.10 :!:0.75 9.26 :!:1.48

9.57:!: .28 10.54 :!: 1.39

Poisson's ratio

0.25 :!:0.07 .29 :!: .075

.205:!: .048

.26 :!: .070

TABLE A-2.-Strength parameters for Revett and St. Regis Formations

Uniaxial compressive Tensile Cohesion, psi strength, psi strength, psi

44,916 :!:5,530 1,710:!:446 NA 20,613:!:1,237 3,496:!:321 NA

18,275:!:4,993 2,200:!:292 2,836 23,036:!:3,513 2,619:!:690 3,300

Angle of friction, deg

NA NA

52 50

Page 29: In Situ Measurements and Preliminary Design Analysis for Deep

22

2,414-ft Test Site

Marginally different bedding orientations in the argillite and quartzite were observed with mean strike and dip orientations of 93° and 80" S and 5~ and 75° S, respec­tively. The approximate north-south split between the quartzite and argillite is across the east-west diameter of the shaft. Wedge-shaped overbreak features in the quartz­ite, shown in figure A-1 on the northeast side of the shaft, indicate the presence of at least two additional sets of joints.

The lithology and joint structure revealed by mapping suggest strongly anisotropic deformability. Estimates of Q-values obtained from joint mapping in the shaft ranged from approximately 2 in the argillite to 8 in the quartzite, suggesting upper-bound values of deformation moduli (E) in the range of 1.7 to 5.1 psi, respectively. The esti­mates of upper-bound deformation moduli obtained from these Q-values may imply the possible ranges at this depth (table A-3).

An obvious reason for the broad range of E-values gen­erally experienced is the orientation of loading relative to

major joint sets. In the case of the shaft, a larger value would be expected in a loading (or unloading) direction parallel to the bedding strike, i.e, approximately east-west. A lower value would obviously be expected perpendicular to bedding (north-south). Any joint shearing mechanism (due to diagonal loading) would be likely to give the lowest values of all. Thus, from a geological engineering view­point, E-values in the various MPBX directions might be crudely estimated from the above considerations as follows: MPBX E2 (NNW), approximately perpendicular to bedding (quartzite), =3.2 million psi; MPBX E3 (E), approximately parallel to bedding (quartzite), =5.2 million psi; and MPBX E1 (SSW), approximately 20° inclination to bedding (argillite), =0.5 million psi.

TABLE A-3.-Estlmates for In situ deformation modulus at 2,414-ft depth, million pounds per square Inch

Emax . .. . .. . .... . Emean . . . ... . ... . Emin .... . . . . .. . .

Argillite 1.7 1.1 .4

Quartzite 5.1 3.2 1.3

Figure A-1.-Wedge-shaped overbreak features on northeast side of shaft

Page 30: In Situ Measurements and Preliminary Design Analysis for Deep

Laboratory tests have indicated a good correlation between the Schmidt L-hammer rebound number (R), the rock density, and the laboratory-scale unconfined compres­sion strength (15). The following two sets of values were recorded in the shaft on the sound (nondrummy) areas of rock: North side (quartzite) 55, 57, 60, 35, 50, 62, 34, 25, and 50, mean of 48; south side (argillite) 47,44,45,35,32, and 27, mean of 38.

Assuming rock densities of 180 Iblef and 1651blef for quartzite and argillite, respectively, these mean values suggest laboratory-scale, unconfmed compression strengths of approximately 22,860 psi and 10,700 psi, respectively. While these values have only a minor influence on rock mass strengths (because of jointing), they appear realistic for small, intact samples.

4,063-ft Test Site

The rock found at the second test site consists predominately of green-tan, thin-to-medium-thick, bedded, slightly argillaceous quartzite having sericite on the bed­ding surfaces. Thin beds of fme-grained, green argillite

23

occur every few feet. A marked northwest-southeast­trending shear zone parallels the bedding. The shear zone contains approximately 5 to 15 cm of crushed quartzite and fine gouge (fig. A-2). Because of local undulations of the bedding, strike readings range from about N 40° to 60° W, with a southwesterly dip of about 56° to 64°. In general, the bedding joints are spaced 15 to 50 cm apart, but increase in number (5 to 15 em apart) across the center of the shaft on either side of the shear zone. Two sets of less-continuous cross-joints intersect the bedding, giving the walls of the shaft a blocky appearance. Because of the dip of the beds and the combination of heavy blasting and high stress, there was considerable overbreak in the northeast side of the shaft.

The thin beds on either side of the shear zone have an average Q-value around 3 to 4, and an RMR-value of about 57. This suggests a mean deformation modulus of about 2 million psi, but a wide range is possible. It is not clear what influence t.he shear zone has in reducing this value. The crushed quartzite and gouge filling are proba­bly transmitting normal stress in the range of 5,000 to 7,000 psi, which suggests the bedding zone will be

Figure A-2.-Northwest-southeast-trendlng shear zone containing crushed quartzite and fine gouge paralleling beds.

Page 31: In Situ Measurements and Preliminary Design Analysis for Deep

74

extremely stiff compared to a shear zone at the moderate depth.

The more massive quartzite on either side (southwest and northeast) of the zone of thin beds has a O-value of about 10 to 15, suggesting a mean deformation modulus in the range of 4.3 to 5.7 million psi. Estimates for in situ deformation modulii are listed in table A-4. The rock mass deformation modulus estimated for each extensom­eter direction is shown in table A-5.

TABLE A-4.-Estlmates for In situ deformation moduli at 4,063-ft depth, million pounds per square Inch

Emax ........... . Emean .......... . Emin ........... .

Best quartzite 6.3 3.9 1.6

Jointed zone 3.3 2

.8

TABLE A-S-Estlmated moduli of deformatlonl

at various extensometer orientations at four test sites, million pounds per square Inch

Test site depth, ft

2,414 ...

4,063 ...

MPBX Hole Orientation

E1 S 35° W E2 N 25° W E3 S 85° E E1 S 45° W E2 N 45° W E3 E-W E1 S 23° W E2 N 68° W E3 N 58° E E1 S 36" W E2 N 16" W E3 N7goE

NA Not available.

Est modulus

a.s} 3.2 5.2

1.6} 3.4 3.9

1.2} 4.7 NA

0.8 -1.6} 3.3 -6

NA

Bedding orientation

N8O"W

N5O"W

N 70" W

N 65°W

IBased on rock mass quality (0) designation. 2Based on a 4.063-ft-depth analysis and similar geology for parallel

and perpendicular directions.

5,191-ft Test Site

The rock type at this depth is predominately yellowish­to grayish-tan, medium-bedded quartzite. A greenish-tan, 0.5- to 1.5-ft thick, soft argillite was noted in the north wall. Bedding trends west-northwest to east-southeast, with a steep dip toward the southwest, quite consistent with the dip of the bedding at the previous instrument site.

The principal bedding and joint orientations observed at the 5,191-ft depth had a strike value of N 65° to 75° W and a dip value of 64° to 76° SW.

The appearance of the bedding joints is shown in figure A-3. On the south side of the shaft, at the position of MPBX E1, the beds dip away from the observer, with a typical joint spacing of 12 to 18 in. On the north side of the shaft, the spacing is more typically 4 to 10 in. More marked secondary jointing makes the south side of the shaft appear more jointed than the north.

The east-west diameter of the shaft is characterized by more closely spaced bedding joints, particularly between two minor crushed zones, where the spacing is down to 1 to 2 in locally.

A classification of rock mass quality based on the O-system is as follows:

where ROD rock quality designation, 75,

I n two joint sets plus random, ~,

J r rough, planar joint surfaces, :::::1.5,

Ja unaltered joint surfaces, :::::1.0,

Jw medium pressure water inflow, ~.66,

and SRF mild rock burst, :::::8.

The resulting O-value [(75/6) x (1.5/1.0) x (0.66/8)] is 1.5. As a result of slabbing and occasional bursting, the rock mass is classified in the poor category, 'Hith Q-values generally in the range 1 through 4.

The compressive strength of the rock at this level (laboratory-scale values) was estimated by means of a Schmidt L-hammer survey incorporating at least 20 tests. The following values were obtained: 42, 40, 45, 48, 40, 45, 46, SO, 54, SO, 56, 56, SO, 50, 48, 56, 44,44,42,40, and 46.

The overall mean of 47 and the mean of the highest 10 results (52) suggest unconfmed compression strengths approximately in the range of 18,8SO to 24,650 psi. Table A-5 summarizes the estimated modulus values for the four test sites.

Page 32: In Situ Measurements and Preliminary Design Analysis for Deep

15

FIgure A-3.-Beddlng JoInts dIppIng toward observer wIth slickensIdes on exposed surface.

Page 33: In Situ Measurements and Preliminary Design Analysis for Deep

26

APPENDIX B.-ROCK AND CONCRETE TEMPERATURE

For the initial installation, two sets of thermistors were used, one set within the instruments in the liner, and one set along MPBX E1 with measurement points 5, 10, 15, and 20 ft back from the collar. A typical plot of the tem­perature as a function of time is shown in figure B-1. The pressure cell (PC) thermistors indicate that maximum curing temperature was reached within 15 h. The magni­tude varied and depended on the localized thickness of the liner. For example, thermistor TPC 1 was located where the liner was nearly 3 ft thick and temperatures reached a maximum of about 51°C, whereas the liner at TPC 3 was only 9 in thick and resulted in a maximum temperature of

55

50

<.) 0

.45 W a: ~ 40 f-<t: 0: 35 W c.. ~ W

30

f-

25

20 1 15 1 1 6 1 1 7

TIME, days

about 4~ C. After approximately 5 days, all thermistors were slowly approaching equilibrium of about 26° C.

The extensometer thermistors showed that a temperature gradient of less than 1° C existed between the 5- and 2O-ft radial distances. The rock mass temperature increased by about 0.5° to r C because of the presence of the liner. The rock temperatures equilibrated at 27° C after approximately one-half day. In addition, the mea­surements indicated little, if any, thermal gradient in the shaft. One important result of the temperature measure­ments was that no temperature correction to the MPBX displacements was required.

KEY

• T PC 1

• TPC 2

• T PC 3

1 1 8 1 9 120

s inc e 12/31/80

Figure B-1.-Temperature versus time for thermistors at PC 1, PC 2, and PC 3 for the first 5 days after Installation at 2,414-ft depth.

Page 34: In Situ Measurements and Preliminary Design Analysis for Deep

APPENDIX C.-MAXIMUM DISPLACEMENTS, LINER PRESSURES, AND LINER STRAINS

27

TABLE C·1 .-Maxlmum radial displacement from four test sites, Inch

TABLE C-3.-Maxlmum liner strain from four test sites,

Instrument MPBX E1, MPBX E2, MPBX E3, depth, ft normal parallel 450

2,414 10.620 0.050 10.100 4,063 .375 1. 120 .096 5,191 .720 1. 190 .240 5,955 .880 .2'25 2.250

IArgillite or argillitic shear zone. 20isplacement following loading pocket excavation at 6,()()() ft

'.vas 1.5 in.

mlcrolnch per Inch

Instrument 2,414

SG 1 NAp SG 2 NAp SG 3 Nft.p SG 4 NAp SG 5 NAp SG 6 NAp SG 7 NAp SG 8 NAp SG 9 NAp SG 10 ... NAp

Depth, ft (I )

4,063 5,191 5,955 600

~ 575 850 200 460 500 700 200 4"0 1,100 2CO

~ 325 800

NAp 450 1,250 NAp 32~ 450 750 NAp ( 2 ) 520 950 NAp ( ) 250 200 NAp NAp 325 800 NAp NAp 375 900 TABLE C-2.-Maxlmum liner stress from four test sites,

pounds per square Inch

Instrument depth, ft

PC 1 PC 2 PC 3 PC 4

NAp Not applicable. Iincrease in strain because of loading pocket excavation at 6,000 ft. 2Malfunctioning i:1strument. 3Unencapsulated.

2,4141 ....... . 4,063 .... . ... . 5,191 ........ . \955 ........ . ( ) ........ ..

Neg 580 250

1,100 1,850

250 Neg 250 400 850

1,550 320

2375 1,050 2,050

250 80

125 500

1,250 Neg Negligible; insufficient contact, leakage, or improper

orientation. IOriented north, south, east, and west. 20riented 2250 from PC 1. 31ncrease in pressure because of loading pocket excavation at

6,000 ft.

TABLE C-4.-Uner stress and strain at selected stages of shaft sinking following Instrumentation at 5,955 ft

Activity Stress, psi Strain, /Lin/in PC 1 PC 2 PC 3 PC 4 SG 1 SG 2 SG 3 SG 4 SG 5

Sink shaft from 5,977 to 6,000 ft, 7 days 1,100 350 1 ,()()() 500 560 450 425 325 450 elapsed time.

Excavate loading pocket at 6,000 ft 14 days 1,400 500 1,700 900 700 550 600 550 800 elapsed time.

Sink shaft from 6,000 to 6,070 ft, 27 days 1,750 650 2,()()() 1,100 900 650 800 650 1,050 elapsed time.

Complete shaft to 1950 11,750 6,200 ft, 66 days 800 1,200 1 ,OOQ 725 975 800 1,275

elapsed time. No activity, 298 days 650 750 650 1,100 900 900 1,200 825 1,400

elapsed time.

I Possible malfunction of pressure cells. 2Malfunction of strain gauges.

SG 6 SG 7 SG 8

450 525 250

550 675 350

650 900 425

775 1,050 500

( 2 ) 1,050 475

Page 35: In Situ Measurements and Preliminary Design Analysis for Deep

28

2 E1

-------r-KEY

t B I a s I lime 95 f I

. 30 f I 02 f I

615 f I 00 f I -2 .10 II

-6

-- 10 L ___ I 10

E2 ----r

c .- 5 N I 0 0

r- I -5 -l

Z

~ UJ ~ -10 UJ <.) I <{

.- 15

--j ..J a.. Cf)

0 - 20

-25 L

50

· 60

H • t t • t t t t • t t t t t t t t I I

- 70 1 15 1 16 1 17 118 119 1 20

TIME, days since 12/31/80

Figure C-1.-2,414-ft depth-S-day displacement at each MPBX location (E-l-£-3).

Page 36: In Situ Measurements and Preliminary Design Analysis for Deep

5 E 1

0

5

- 10

- 1 5 c:

10 E2 C\J I 0 - 10

f- - 30 Z KEY LU • 30

It ~ - 50 LU ()

<t: - 70

...J

.. 15 II o PC 1

<J PC 2 • 10 I I

0 PC3

• 5 I I

+ PC4 o 2 I I

0-(/)

c 0 I I ~ 8 I a s I lime

0 -90

10 E3

-- 10

-30

- 50

-· 70

.- 1,800 (f)

Q.

LU- 1 ,400

a: :::J (/)1,000 (/)

LU a: 000 0-

a: 200 W

Z

...J - 200 t + + lIS 117 119 121 123 1 2 t>

TIME, days since 12/31/80

Figure C-2.-2,414-tt depth-1 D-day displacement and liner stress at each M?BX location (E-1-£-3) ,

29

Page 37: In Situ Measurements and Preliminary Design Analysis for Deep

30

5 ,---E-1---------;-----,------~-------.-- --l o l 5

- 10

- 1 5 ~ ______ ~ ________ ~ ______ ~ ________ _L _______ ~

c

~ 1 0 ~~~~~~~~;;~~~;;II~~~~~~--l o -10

f- -30 Z W

~ W -50

()

« -70 ....J 0... Cf)

o -90 1 0 ,---------------,-------

- 10

-30

-50

-70

I

KEY • 30 It

o PC 1 .. 15 It

Q PC 2 • 10 It

0 PC3 .. 5 f t

+ PC4 o 2 It

D 0 It t 81 as t t j rn e

-~

- 9 0 L-______ ----'-________ ~ _____ ~ _____ ____L ______ _

~1,800~~-~~-l

W- 1 ,400

a: ::J Cf) 1,000 Cf)

W a: 600 0...

a: W Z

200

....J -200 =-"--"'--'----'C-~'____L

1 1 5 121 127 133 139

TIME, days since 12/31/80 145

Figure C-3,-2,414-ft depth-30-day displacement and liner stress at each MB PX location (E-I-£-3).

Page 38: In Situ Measurements and Preliminary Design Analysis for Deep

o

-5

-10 ~

I .t

• t t , • t • • t tj I I I I I

- 15 I I I

259 260 261 262 263 264 TIME, days si nee 12/31/80

Figure C-4.-4,063-ft depth-5-day displacement at each MPBX location (E-l-E-3).

Page 39: In Situ Measurements and Preliminary Design Analysis for Deep

32

5 r----------,--------.-,------ ----,------E 1

o

-5

- 10

- 1 5

- 20

-25

-30

-35

- 4 0 '-----------'------5 ,------------,

c::

C\J 0 I

o

f- - 5 Z UJ ~ UJ - 1 0 U « -J CL (/)-15

o

E2

KEY

tSlast time

.30 f t

.. 1 5 f l

.10 f t

.5 f t

02 f t ~O It

- 2 0 ~ ______ __'__. ______ ----' __________ ~ ____ __L __ _

5 ,------------,---------,----------,--

o

-5

- 1 0

- 1 5 259

t H t t t HH tt tH ttt tt 261 263 265 267

TIME, days since 12/31/80

Figure C-5.-4,063-ft depth-10-day displacement at each MPBX location (E-1-E-3)_

I

I .J

269

Page 40: In Situ Measurements and Preliminary Design Analysis for Deep

.~ 700 ~I-A---~---~-----~---~----

W 500 a: ~ (/)

(/)

W a: 0..

300

a: 100 W Z -J - 100 L-___ --'---___ ---L ____ '---___ -L-___ ~

700 r------,---------r----,------~---~

~ 600

Z 500

« a: 400 l-(/) 300

a: W 200 Z -J 100

B

o ~~~~~ ___ -L ____ L-___ ~ ___ ~

259

700 en Q.

W 500 a: ~ (/)

(/) JOO W a: 0..

a: 100

c

261 263 265 267 269

W I--~~~~~~~~~-

Z

-J. 1 0 0 L-___ --'---___ ---L ___ ---.JL-___ .L-___ ~

(J)

::L

800

-600 Z

. ..:(

a: I- 400 (/)

a: W 200 Z

-J

KEY • PC 1

• PC2

• PC3 • PC4 o SG 1

C> S G 2

o SG3

Q S G4

time o ~ ___ ~ ___ -L ___ ---.J ____ ~ ___ ~

259 265 271 277 283 TIME, days since 12/31/80

289

Figure C-6.-4,063-ft depth-10-day liner stress (A) and strain (B) and 30-day liner stress (C) and stram (0) at each MPBX location.

33

Page 41: In Situ Measurements and Preliminary Design Analysis for Deep

34

c

N I 0

f-Z UJ

~ UJ ()

« ....J c::L (f)

0

~---------.-----------.----------.----------~--------.

E1 5

6

- 1 7

-28

-39

-50

5

0

-5

-10

- 1 5

-20

5

o

-5

-10

E2

KEY t Bla s t time

.30 It

.15 It

.10 It

95 I:

02 It

00 It

~ ttt ~Ht tt 1'Ht - 1 5

259 265 271 277 283

TIME, days since 12/31/1980

Figure C-7_-4,063-ft depth-30-day displacement at each MPBX location (E-I-E-3)_

289

Page 42: In Situ Measurements and Preliminary Design Analysis for Deep

35

10 r----------.-----------,-----------r----------~--------~

- 10

• • -30

I 50 ---j

- 70 ----- I ~ 5 ------r -l E2

c KEY .-

I N 0 t Blast time

l I .30 It 0 a 15 It

-5 .10 It I-

J Z 95 It

W . 3 It ::?: aO It W - 10 U I <t: .....J a... Cf)

-15

0

-20 ---~

5 E3

0

-5

--- ... -- • - 10

- 1 '5

-20

t t t t t -? 5 I t • I • • I t t t

117 118 119 120 121 1? 2

TIME. days since 12/31/81

Figure C-S. -5, 191 -ft depth-S-day displacement at each MPBX location (E- l-E-3).

Page 43: In Situ Measurements and Preliminary Design Analysis for Deep

36

10,---------,----------,---------,-----------,---------,

• - 10

- 30

!

50 J

I

- 7 0 I'--____ ---' _____ .---'-____ --L-___ -------.L_~~ ___ ____'

5 ,---------,----------,---------,-----

c

N I o

Z UJ

~

o

-5

UJ - 1 0 U « -.J

~-15 o

E2

KEY .30 It

.15 It

.10 It

.5 It

.3 It

Cl 0 It

tS'ast time

l

J I ,

-20 L-________ ~ ________ -L ________ ~ __________ L _______ ~

5,------

E3

o

-5

- 10

- 15

-20

25 [ I HI! 30

Itttt t,tH t tptt 1 17 119 1?1 123 125 1 2 7

TIME, days since 12/31/81

Figure C-9.-S,191-ft depth-10-day displacement at each MPBX location (£-1-£-3).

Page 44: In Situ Measurements and Preliminary Design Analysis for Deep

- 300 ,-------,-----,-----y--------,---------, (fJ

0. 250

w a: 200 ::J (/)1 50 (/)

w 1 00 a: c.. 50 a: w z

o l-~~----------~----J

-.J - 50 '---------"'---------''--------'-'-----'--------' 1 : 9 1 2 1 123 1 25 1 27 129

4 5 0 ,-----,.------,.-----y--------,-----,

<J)

:::L

z 350

« 2 50 a: f-

(/) 150

a: W Z 50

8

50 ~tt~~~~~~~~~~~~~~____" 1 18

-~ 350 C

w 250 a: ::J (/)

(f) W 150

a: c..

a: w Z

50

-.J-50 119

120 i?2 1 2 4 1 2 6 1 28

1 25 1 3 1 1 37 14 3 1 49

600 ,-----,.------,.---------,-----------,-----,

<J)

:::L 500

-Z 400

« a: 3 0 0 f-(/) 200

a: 100 W Z o

o

.PC1· SG1

apC2 0 SG3 KEY

.P C3 oSG4

t+ • P C 4 t B I a s t tim e -100 ~~~~~~~~I-~· ____ -LI ______ IL-___ ~

118 124 130 136 142 148

TIME, days since 12/31/81

Figure C-l0.-S,191-ft depth-l0-day liner (A) stress and strain (8) and 30-day liner stress (C) and strain (0) at each MPBX location.

37

Page 45: In Situ Measurements and Preliminary Design Analysis for Deep

38

10 ,----------,------------r----------,----------,r----------~

- 1 0

~--------~----------30

- 50

- 10 '-------------~.~-~-----

-20

-30 L-________ ~ __________ ~ __________ ~ ________ ~ __________ ~

1 17 123 129 135 141 147

TIME, days since 12/31/81

Figure C-11.-S,191-ft depth-30-day displacement at each MPBX location (E-1--£-3).

Page 46: In Situ Measurements and Preliminary Design Analysis for Deep

25

0

-25

-50

-75

- 100

-125

- 150

5

c

(\J

I 0

-5

~

Z UJ

~ UJ

U - 15 <t: ...J !l.. (/)

0

-· 25

5

0

-5

- 10

-15

-20 50

E1

KEY .30 f I

.15 f I

.5 f I

00 f I

~ t B I a 5 I lime

E3

t t t t t t A

I 51 52

TiME, days

0

-.1 ___

f t t I

53

sine e 12/31/82

~ -----.J

d

• ,

54

• ,

I I

55

Figure C-12.-5,955-ft depth-5-day displacement at each MPBX location (E-1-E-3).

39

Page 47: In Situ Measurements and Preliminary Design Analysis for Deep

40

75 E1 KEY

SO e30 It .. 5 It .,5 It C> 0 f t

25 t B I a s t i ,rn e

0

- 25

-50

- 75

100

125

-150

5

l E2 -r-

c

N I 0

-5

f-Z W

~ W

U -15 « ...J Il..

-J Cf)

0

-25 L

51£3

0

- 5

- 10

~ j _ 20 L--t_t_tt __ t--,---t_t _t _t __ t---'---I _t_t __ t_t-'--___ ~ t __ J - 15

50 52 54 56 58 60

TIME, days since 12/31/82

Figure C-13.-5,955-ft depth-10-day displacement at each MPBX location (E-1--E-3).

Page 48: In Situ Measurements and Preliminary Design Analysis for Deep

(/)

Cl.

W a: :::l (j)

(j)

W a: 0..

a: w Z

-J

w ~

Z

<: 0: f-(j)

0: W Z

-J

1,500

1,200

900

600

300

0 750

600

450

300

150

0 700

500

300

100

100 51

A

B

C

KEY t BI as t time

.PCl <JSG5

APC2 OSG6 .PC3 +SG7 .PC4 xSG8

.SG1 oSG2 aSG3 oSG4

---~

-, -1

t t t t t t t t t 53 55 57 59 61

TIME, days since 12/31/82

Figure C-14. -5,955-ft depth-l O-day liner stress (A) and strain (B-C) at each MPBX location.

Page 49: In Situ Measurements and Preliminary Design Analysis for Deep

42

75

50

25

0

- 2 5

-50

- 7 5

- 100

-125

E1

KeY .30 It

.15 It

.5 II

L) 0 I I

tSlast tim e

~ I

-150

5 E2

c -- 0 C\J I 0 -5

f-Z

-10 '----.- . UJ ~ -- 1 5 UJ () <{

-20 ...J a.. Cf) - -25 0

-30

5 E3

0 ~ .. --...... ... __ .... - A

-5

- 10

- 1 5

- 2 0

-25

M ~1t HHt -30 I

50 56 62 68 74 80 TIME, days since 12/31/82

Figure C-15.-5,955-ft depth-30-day displacement at each MPBX location (E-1-£-3).

Page 50: In Situ Measurements and Preliminary Design Analysis for Deep

43

2,100 A

~ ,BOO (f)

Q.

- 1,500 W a: ::J

1 ,200 (j)

(j)

W a:.: 900 u.. a: 600 UJ Z

I ....J 300 1

0 ~ I 1,050

8

900

750

600 KEY

450 ePC1 oSG2

APC2 ClSG3

300 IJJ

:l..

- 150 Z

<t: a:: 0

.PC3 OSG4

~ 9PC4 I7SG5

t B I a s I OSGU lime +SG7 .SG1 X SGB

f-- i,200 Cf) C a:: 1,100

LU 1,000 Z

....J 900

BOO

700

600

500

400

300

200

100

0

- 100 51 57 63 69 75 8 1

TIME, days siflce 12/31/82

Figure C-16.-S,95S-ft depth-30-day liner stress (A) and strain (8-C) at each MPBX location.

Page 51: In Situ Measurements and Preliminary Design Analysis for Deep

44

L. lUU ,----------,,------------,-----------,-----------,-----------,

.~ 1 ,B 00

0.

w- 1,500

a: => Cf) 1,200

Cf)

W a: 900 CL

a: 600 W Z

....J 300

A KEY

.PCl .SGl oSG5

aPC2 OSG2 OSG6

.PC3 ClSG3 +SG7

.PC4 OSG4 XSGB

O __ --------~-----------~-----------L----------~--------~ 1,350

8 1 ,2 00

1,050

900

750

600

450

3 00

z 150

<t: a: O __ ---------~----------~-----------L----------~--------~ I- 1, 3 50 Cf)

a: 1 ,2 00 w Z ....J 1,050

900

750

600

450

300

150

----o-----~~J

o .-----------~---------~--------~-----------~----------~ 50 110 170 230 290 350

TIME, days since 12/31182

Figure C-17.-S,9SS-ft depth-300-day liner stress (A) and strain (8-C) at each MPBX location.

Page 52: In Situ Measurements and Preliminary Design Analysis for Deep

Blast

1 .... 2 .... 3 4 . . .. 5 .... 6 .. .. 7 . . .. 8 . . . . 9 . . . . 10 ... 11 ... 12 ...

Blast 1 ... . 2 .. , . 3 " . . 4 . .. . 5 . . . . 6 .... 7 '" . 8 .... 9 ... . 10 .. ,

APPENDIX D.-BLAST AND ADVANCE SCHEDULE FOR EACH TEST SITE

TABLE D-1 .-Blast and advance schedule for 2,414-ft depth, day 113, 4/23/81

(Install MPBX's and PC's by day 114.6; bottom of shaft at 2,420 ft; elapsed time since 12/31/80)

Bench Elapsed time Shaft bottom, ft Blast Bench Elapsed time

11 115.22 2,424 13 ... 2 117.55 1 115.29 2,427 14 ... 2 118.28 2 115.50 2,430 15 ... 1 118.52 1 115.67 2,433 16 . . . 2 119.20 2 115.83 2,438 17 . .. 1 119.40 1 116.03 2,443 18 ... 2 119.60 2 116.33 2,448 19 ... 1 119.85 1 116.54 2,453 20 ... 1 120.40 2 116.65 2,458 21 ... 2 120.50 1 116.95 2,462 22 ... 1 121 .00 2 117.12 2,465 23 ... 2 121 .20 1 117.30 2,469 24 ... 2 121.30

TABLE D-2.-Blast and advance schedule for 4,063-ft depth, day 256,9/10/81

45

Shaft bottom, ft

2,473 2,478 2,481 2,485 2,491 2,496 2,501 2,506 2,511 2,516 2,520 2,523

(Install MPBX's and PC's, and SG's by day 225.85; bottom of shaft at 4,067 ft; elapsed time since 12/31/80)

Bench Elapsed time Shaft bottom, ft Blast Bench Elapsed time Shaft bottom, ft 1 259.58 4,072 11 . .. 1 263.95 4,119 2 259.88 4,077 12 .. . 2 264.24 4,124 1 260.04 4,081 13 ... 1 264.81 4,128 2 260.54 4,086 14 . .. 2 265.15 4,133 1 261 .17 4,091 15 . .. 1 265.29 4,138 2 261.60 4,095 16 .. . 2 265.78 4,143 1 262.75 4,100 17 . .. 1 266.04 4,147 2 262.90 4,105 18 ... 2 266.23 4,152 1 263.28 4,114 19 . .. 1 266.87 4,155 2 263.28 4,119 20 ... 2 267.13 4,162

Page 53: In Situ Measurements and Preliminary Design Analysis for Deep

46

TABLE 0 -3.-Blast and advance schedule for 5,191-ft depth, day 116,4/26/82

(Elapsed time since 12/31/81)

Blast Bench Elapsed time Shaft bottom, ft INSTALL MPBX'S AT 5,191 ft, DAY 116.90,

SHAFT BOnOM AT 5,200 ft 1 2 117.40 5,203 2 1 117.69 5,207 3 2 117.91 5,210 4 1 118.13 5,213 5 2 118.38 5,216

INSTALL PC'S AND SG'S AT 5,191 ft; POUR CONCRETE TO 5,193 ft

6 1 119.17 5,219 7 2 119.56 5,222 8 1 119.88 5,225 9 2 120.23 5,228

POUR CONCRETE TO 5,208 ft 10 1 120.87 5,232 11 2 121.21 5,235 12 1 121.47 5,239 13 2 121.61 5,242 14 1 122.15 5,245

POUR CONCRETE TO 5,223 ft 15 2 122.83 5,248 16 1 123.01 5,251 17 2 123.22 5,254 18 1 123.39 5,257 19 2 123.61 5,261

• U.S. GOVERNMENT PRINTING OFFICE. 611-012100,052

TABLE D-4.-Blast and advance schedule for 5,955-ft depth, day 48, 2/17/83

(Elapsed time since 12/31/82)

Blast Bench Elapsed time Shaft bottom, ft INSTALL MPBX'S AT 5,955 ft, DAY 49.80,

SHAH BOnOM AT 5,958 ft 1 1 48.80 5,958 2 2 50.74 5,965 3 1 51.01 5,970 4 2 51.13 5,975

INSTALL PC'S AND SG'S; POUR CONCRETE TO 5,958 ft

5 1 51.85 5,980 6 2 52.05 5,983 7 1 52.27 5,985 8 2 52.83 5,987 9 1 53.12 5,991 9a .. • 16000 53.80 NAp 9b .,. 16000 54.40 NAp 10 ... 2 54.78 5,994 lOa 16000 55.40 NAp

POUR 88 yd3 CONCRETE TO 5,973 ft

16000 11 ... 55.74 NAp lla .. 16000 NAp NAp NAp Not applicable.

IStation.