· assessment, in accordance with BD21/97 and BD56/96, concludes that the span has a capacity of...
46
· assessment, in accordance with BD21/97 and BD56/96, concludes that the span has a capacity of 40 tonnes Assessment Live Loading (heavy traffic, poor surfacing)