8
Improving engineering productivity APEGGA

Improving engineering productivity APEGGA. Improving Productivity Mega Projects History What is needed How will it be done Division of Labour

Embed Size (px)

Citation preview

Page 1: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

Improving engineering productivity

APEGGA

Page 2: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

Improving Productivity Improving Productivity Mega ProjectsMega Projects

HistoryWhat is neededHow will it be doneDivision of LabourWhere do we go from here

Page 3: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

HistoryHistory

Results so farComparison to other Mega ProjectsDoing the same things…Cost, Schedule, QualityThe owners

Page 4: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

What is neededWhat is needed

What is the taskTemplates for taskSchedule of information

Page 5: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

How will it be doneHow will it be done

Approach to the taskDetailsChecking

WhoHowLists

Page 6: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

Division of labourDivision of labour

Who is best to do the task

How do we know?

How could we know?

Page 7: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

Where do we go Where do we go from herefrom here

Assessment of skills

Tracking of skills

Mentoring

Page 8: Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour

Skills & levelsSkills & levels

21 Design Details 2 1 1 1 1 1 1 1       1.40

22 Language Skills 10 1 11                 12.00

23 Writing Skills 10 1 1 1               3.00

24 Specifications $ Data sheets 4 1 1 1 1 1           2.00