28
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/282420687 Importance of good sampling practice throughout the gold mine value chain Article in Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology · August 2015 DOI: 10.1179/1743286315Y.0000000028 CITATIONS 7 1 author: Some of the authors of this publication are also working on these related projects: Mine value chain sampling optimisation View project Simon Dominy Curtin University 87 PUBLICATIONS 510 CITATIONS SEE PROFILE All content following this page was uploaded by Simon Dominy on 10 July 2016. The user has requested enhancement of the downloaded file.

Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

  • Upload
    votuyen

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/282420687

Importance of good sampling practice throughout the gold mine value chain

Article  in  Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology · August 2015

DOI: 10.1179/1743286315Y.0000000028

CITATIONS

7

1 author:

Some of the authors of this publication are also working on these related projects:

Mine value chain sampling optimisation View project

Simon Dominy

Curtin University

87 PUBLICATIONS   510 CITATIONS   

SEE PROFILE

All content following this page was uploaded by Simon Dominy on 10 July 2016.

The user has requested enhancement of the downloaded file.

Page 2: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

1

Importance of good sampling practice throughout the gold mine value chain S. C. Dominy*1,2 1. Western Australian School of Mines, Curtin University, Bentley, WA 6102, Australia 2. Camborne School of Mines, University of Exeter, Penryn, Cornwall TR10 9FE, UK *Corresponding author, email [email protected] The mining industry routinely collects samples to assist with decision making, whether for exploration, resource estimation, grade control, or plant design and balances. Poorly designed sampling protocols can result in elevated project risk by increasing variability. Critically, such variability produces both financial and intangible losses. Sample collection, preparation and assay or test work protocols that are optimised to suit the ore type, together with QAQC systems will reduce variability. Many gold deposits display a high natural variability, where the in-situ variability can be enhanced by poor sampling practice to yield a high nugget effect. In this case, specialised protocols are often required. Reporting codes require the Competent Person to consider the quality and implication of sampling programmes. Despite its importance, sampling often does not receive the attention it deserves. The importance of good sampling practice is exemplified through a series of case studies which show the many sampling issues that frequently go unrecognised or unaddressed, resulting in poor decisions and financial loss. Keywords: Theory of Sampling; Sampling errors; Gold sampling; Protocol optimisation; Financial and intangible losses

Introduction The importance of high quality sampling throughout the gold mine value chain; from exploration, through to evaluation and exploitation, has been stressed by many authors (Carrasco, Carrasco and Jara, 2004; Dominy, Esbensen and Xie, 2016; Dominy, Noppé and Annels, 2004; Gy, 1982, 2004; Holmes, 2004, 2015; Minnitt, 2007, 2013; Morrison and Powell, 2006; Pitard, 1993, 2009; Sketchley, 1998; Spangenberg, 2011). The sampling process, inclusive of sample collection, preparation and assaying or testing, is a critical component to all stages of a mining project as it forms the basis for Mineral Resource and Ore Reserve estimates (JORC, 2012). Sampling includes in-situ material and broken (or crushed) rock for both geological and metallurgical purposes. The focus is often on grade sampling (e.g. resource definition and grade control), though (geo)-metallurgical sampling for plant design, control and metal balances must not be ignored (Dominy, 2014b; Dominy, Esbensen and Xie, 2016; Giblett, Dunne and McCaffery, 2012; Guresin et al., 2012; Holmes, 2004). In all cases, the aim is to gain a representative sample to accurately describe the material in question. Field sample collection is followed by sample reduction in both mass and fragment size to provide an assay charge or test sample. This process is challenging in the gold environment and particularly when a high nugget effect and/or coarse gold is present (Dominy, 2014a; Dominy et al., 2000; Dominy and Petersen, 2005; Pitard, 2007; Royle, 1989). This contribution presents case studies that exemplify some of the sampling issues that are typically identified across the gold mine value chain. The effects of poor practice are presented and solutions given. An attempt is made to provide a financial and intangible loss estimate for each case study.

Page 3: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

2

Theory of Sampling (TOS) TOS overview Samples should be collected and prepared within the framework of the Theory of Sampling (Gy, 1982; Pitard, 1993), along with an appropriate QAQC system (Sketchley, 1998; Simon and Gosson, 2010; Vallée, 1998). Sampling errors are defined in TOS; the key errors are defined in Table 1 (Gy, 1982; Pitard, 1993). Uncontrolled errors lead to an elevated nugget effect (Carrasco; 2009; Dominy, 2014a; Pitard, 2007). TOS was developed in the 1950s by Dr Pierre Gy at the time to deal with sampling challenges in the mining industry (François-Bongarçon, 2008; Gy, 1982). Its usage subsequently spread to other sampling applications across the food, pharmaceuticals, environmental and waste management sectors to name a few. Across the mining industry, its application has been highly variable though on the increase since the late 1980s, but to date not routinely applied. Over the last 15 years, the author has had involvement with around 100 gold projects globally, for which only around 20 could be said to be fully compliant with TOS. Some authors have questioned the applicability of TOS and in particular the so-called FSE equation applied to gold (Geelhoed, 2011). François-Bongarçon (1998) and François-Bongarçon and Gy (2002) addressed key issues and proposed a modified FSE equation. The modified equation has been applied successfully by practitioners to optimise sampling campaigns (Afewu and Lewis, 1998; Cintra et al., 2007; Cossio et al., 2004; Dominy and Petersen, 2005; Dominy et al., 2011; Fallon et al., 2012; Pitard, 2009; Thalenhorst and Dumka, 2010). The use of the equation represents a modelled expectation that may or may not be attained in practice, but provides a starting point for optimisation. Beyond the FSE equation, TOS provides important guidelines for reducing sampling errors (Table 1). It is here to stay, though there is still much to do in the context of research, communication and education (François-Bongarçon, 2008, 2015; Pitard, Esbensen and Paoletti, 2015). Nugget effect and TOS The nugget effect is the random component of variability that is superimposed on the regionalised variable, and is defined in a variogram as the percentage ratio of nugget variance to total variance. The magnitude of the nugget effect relates to: in-situ heterogeneity of the mineralisation; sample support; sample density; and sample and assay procedures (Carrasco, 2009; François-Bongarçon, 2004; Pitard, 2007). The nugget effect has two principal components (Carrasco, 2009; Dominy, 2014a; François-Bongarçon, 2004; Pitard, 2007; Platten and Dominy, 2003): the geological nugget effect (GNE) and the sampling nugget effect (SNE). Some deposits naturally have an inherently high GNE, which can be inflated through poor quality sampling. A major cause of SNE is the heterogeneity of broken rock (e.g. a rock pile, crushed rock or pulp), which to some extent reflects the primary in-situ heterogeneity. In this context, heterogeneity is defined as the nature of the lot, in which all the contained fragments are non-identical. In this case, two types of heterogeneity are defined: the Constitution Heterogeneity (CH), and the Distribution Heterogeneity (DH). CH and DH contribute to the sampling nugget effect (SNE), through the Fundamental (FSE) and Grouping and Segregation (GSE) errors. Throughout the mine value chain, optimised sampling protocols aim to reduce the total sampling variance thereby also reducing the: total nugget variance; skewness of the data distribution; and number of extreme data values.

Page 4: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

3

Correct sampling errors (CSE) CSE are considered ‘correct’ because they cannot be removed by correct sampling (Table 1; FSE and GSE). They relate to the inherent heterogeneity of the material being sampled and control sample precision (Pitard, 1993). Precision specifically relates to the CH of the material in question and leads to the FSE. Poor precision in samples generates ore/waste misclassification. The FSE can be estimated via the FSE equation (François-Bongarçon and Gy, 2002; Gy, 1982). Out of all sampling errors, the FSE does not cancel out and remains even after a sampling operation is perfect. It is controlled via the optimisation of sample mass and size reduction process (Petersen, Dahl and Esbensen, 2004). The DH and related GSE, also contribute to sample precision. DH represents the difference in average composition of the lot from one place to the next in the lot; it is responsible for the irregular distribution of grade and values in groups of fragments of broken ore. The DH can be influenced by large differences in density and fragment composition. DH of a given lot is governed by CH, the spatial distribution of fragments and the lot shape thus DH leads to GSE. From a practical perspective GSE cannot be measured, but may have a material effect on the total sample error (François-Bongarçon, 2014; Pitard and François-Bongarçon, 2011). It is controlled by accumulating many small increments to form a composite sample. Segregation can theoretically be reduced by homogenisation, though in the presence of liberated gold particles is a futile exercise that promotes further segregation. The treatment of coarse gold-bearing samples is a special case (Dominy, 2014a; Dominy and Petersen, 2005; Royle, 1989). Incorrect sampling errors (ISE) The ISE (Table 1; DE to PE) arise as a consequence of the physical interaction between the material being sampled and the technology employed to extract the sample. They result in bias, which can be reduced by the correct application of sampling methods, equipment and procedures (Esbensen and Paasch-Mortensen, 2010; Gy, 1982; Holmes, 2015; Petersen, Dahl and Esbensen, 2004; Pitard, 1993, 2009). The AE is generally not considered an ISE, though remains a potential bias generator. It can be minimised through proper QAQC in the laboratory across staff activity, and analytical equipment maintenance and calibration. It may also by affected by rock matrix effects. Defining a representative sample A sample can be described as being representative when it results in acceptable levels of bias and precision. The total variance for resource and grade control sampling should not be more than ±32%, with the total FSE component no more than ±16% (Pitard, 2013). The FSE is reported at a given confidence limit, usually 68% or one standard deviation. All sampling variances are cumulative and contribute to the total, which in turn contributes to the SNE. In reality, FSE and GSE are likely to contribute up to 90%, with DE, EE and AE up to 25% of the total (Pitard, 1993). FSE equation and application to gold ores The Fundamental Sampling Error (FSE) can be theoretically estimated before material is sampled, provided characteristics (e.g. sampling constant - K) embedded in the FSE equation are determined (Gy, 1982; Pitard, 1993). The equation addresses key questions of sampling broken rock:

what weight of sample should be taken from a larger mass, so that the FSE will not exceed a specified variance;

Page 5: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

4

what is the possible FSE when a sample of a given weight is obtained from a larger lot; and

before a sample of given weight is drawn from a larger lot, what is the degree of crushing or grinding required to lower error to a specified FSE.

A technical issue with the use of the FSE equation is the numerical value of the power in the so-called liberation factor (François-Bongarçon, 1998; Gy, 2004). The problem was addressed by François-Bongarçon (1998), who suggested a modified FSE equation that

includes the parameters α and liberation diameter (d)(François-Bongarçon, 1998; François-Bongarçon and Gy, 2002). K can be experimentally determined using a sampling tree-based method, which also yields a value for α (François-Bongarçon and Gy, 2002; Minnitt and Assibey-Bonsu, 2010; Minnitt, Rice and Spangenberg, 2007). In addition, the heterogeneity test (HT) can also be used to determine K, though no value of α is defined (Pitard, 1993; Magri, 2007; Minnitt and Assibey-Bonsu, 2010). The heterogeneity test possesses representivity challenges when applied to coarse gold-bearing deposits (Dominy and Xie, 2015).

As originally defined, d represents the mineral liberation size below which 95% of the material must be ground in order to liberate at least 85% of the gold (Gy, 1982; Pitard,

2004). For gold mineralisation d can be redefined to dm, representing the screen size that retains 5% of gold given a theoretical lot of liberated gold (Bazin, Hodouin and Blondin, 2013; Dominy, 2014a; François-Bongarçon and Gy, 2002; Pitard, 2015; Royle, 1991). If

coarse gold is dominant, then dm can represent the coarse most influential population

(Dominy et al., 2012; Pitard, 2009). If gold particles cluster, then dm should be redefined

as dclus (Dominy and Platten, 2007; Pitard, 2007, 2009). The value of K is dependent on

the microscopic properties of the minerals, and varies with gold grade and dm or d.

A direct approach to the determination of gold particle size and dm is suggested by some practitioners (Dominy, Esbensen and Xie, 2016; Dominy et al., 2011; Dominy and Xie, 2015; Pitard, 2015). This may include a combination of mineral particle size determination via optical and/or electron/X-ray microscopy (Dominy et al., 2012; Lyman and Schouwstra, 2011) and/or crush-screen-concentration (Dominy et al., 2011; Gonzales and Cossio, 2007). Research has indicated that α can generally be taken as 1.5 (François-Bongarçon, 1998; François-Bongarçon and Gy, 2002).

Gold mineralisation and sampling Nature of mineralisation Gold mineralisation frequently displays evidence of two populations, representing fine- and coarse-gold (above 100 µm) particles (Dominy et al., 2008; Dominy and Platten, 2007; Pitard, 2009). These may be part of separate paragenetic stages. In general, the fine gold particles are likely to be relatively disseminated through the mineralisation and responsible for a ‘background’ grade of between 0.5 g/t Au and 5 g/t Au (Dominy et al., 2008). Whereas coarse particles are likely to be more dispersed and/or locally clustered, being critical to economic viability in low-grade deposits. Mineralisation containing substantive quantities of coarse gold (>15% >100 µm) is often typified by a high-nugget effect which represents variations in: (1) the in-situ size distribution of gold particles (including effects of gold particle clustering), and (2) gold particle abundance (Dominy, 2014a). Grade is generally correlated to gold particle size, although the relationships are complex (Dominy and Platten, 2007; Dominy et al., 2008). Higher grades often relate to abundant coarse gold and/or clustered gold particles. The

Page 6: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

5

coarse gold particle population will generally be challenging to sample compared to the fine gold population (Dominy, 2014a). Peculiarities of gold sampling There are a number of peculiarities of sampling for gold, which relate to both CSE and ISE. Those that drive FSE include:

Primary gold particle distribution is often erratic (high GNE), with localised clustering effects (Dominy and Platten, 2007; Platten and Dominy, 2003); and

Grades are relatively low (g t-1 Au), thus gold particles can be relatively rare ‘events’ (e.g. Poisson distribution) particularly in low grade ores (Pitard and Lyman, 2013).

The gold content of a sample and the gold content of the surrounding ore can be very different. Similarly, there may be large differences between the primary sample and subsequent sub-samples unless rigorous optimisation is undertaken.

Those issues that contribute to the GSE and ISE include:

Poor disintegration of gold particles during pulverising often lead to smearing and/or the coating of sample preparation or testing equipment leading to PE (Dominy and Petersen, 2005; Pitard, 2009);

High contrast between the densities of gold and gangue minerals promote segregation once liberated which leads to GSE (François-Bongarçon, 2015; Pitard, 2009); and

Bias during diamond drilling relates to the plucking of gold particles from the core surface as a result of the drilling process (Dominy, 2014a; Pitard, 2009), which leads to a negative grade bias (EE). Core sawing can also lead to gold loss in the cuttings (PE).

These problems can be overcome through the use of larger sample and assay charges, and careful procedures to minimise sampling errors.

Case Studies Introduction The following case studies documented between 2001 and 2007, show sampling issues that can be found in gold projects globally. Each case study is reported anonymously, and the sampling errors and relative impact on the project is discussed. It was deemed for all presented case studies that the sampling issues where the most material. For those that were producing operations, the resource/reserve estimation process was generally considered to be appropriate. Case study 1: Core quality issues A shear-zone style deposit located in the Former Soviet Union was at an advanced stage of evaluation as a joint open pit and underground operation. A Feasibility study had been completed. The deposit was characterised by steeply-dipping gold-quartz-sulphide veins up to 0.3 m in width, forming a larger 15 m to 30 m wide stockwork zone. The global reserve grade was 5.7 g t-1 Au. There was minimal coarse gold present, though the deposit was nuggety due to the pod-like nature of the sulphide mineralisation within the veins. The resource had been diamond drilled on a relatively fine grid and had some underground development in it. An estimate by the owner defined Measured, Indicated and Inferred Mineral Resources, in accordance with the 2004 JORC Code.

Page 7: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

6

During an independent review, it was found that there was poor documentation with regard to QAQC and that the (total) core recovery was generally between 44% and 71% with a mean of 61%. The owner had drilled a number of confirmatory diamond holes, whose recovery improved, but were still relatively low at between 65% and 83%. The low recoveries indicated that there was a large amount of core (sample) loss, and that the actual sample collection process was prone to a high EE. Further investigation showed that core loss was principally related to the sheared and altered nature of much of the mineralisation and to some extent drilling quality. RQD values were typically across the ‘poor’ category. The remaining half core was highly fragmented and friable, testifying to the difficulty in cutting the original sample. Where such a core problem exists, it is strongly recommended that after detailed logging and photography, the entire core composite be crushed and then split for laboratory submission (Annels and Dominy, 2003). A mineralogical and assay investigation should be undertaken to ascertain the impact of the core loss on the mineralisation. These issues were of obvious concern and as a result, the Measured and Indicated Resource blocks were reallocated to the Inferred category, and most of the original Inferred Resources became unclassified. As a result of the resource downgrade, the company was unable to raise the finance required for project development. They had to fund additional diamond drilling to confirm their expectations of the deposit, revise the Feasibility study, and undertake an investor relation programme to avoid loss of confidence in the project. Proper consideration of core quality early on would have saved the operator both money and reputation. The additional drilling used a triple tube core barrel and driller with improved expertise in poor ground. In zones of poor core recovery, the entire sample was crushed, split in half and one half submitted to the laboratory. Case study 2: Incorrect compositing The deposit was located in North America, where a new vein system had been located between two former underground operations. A steeply-dipping 3 m to 5 m wide vein had been defined using diamond drilling on a 20 m by 20 m grid. All drill cores were logged and 1 m half-core lengths submitted for 1-kg SFA. Coarse, often visible gold was known from the previously mined veins and was confirmed in the new vein by core logging and SFA. A resource estimate yielded a global grade of 6.5 g t-1 Au, which was lower than the expected 10-15 g t-1 Au required to support a small underground mine. The project was put on hold. A later review found that in the drive to collect 1 m core samples, any core samples on the footwall of the vein that were less than 0.5 m were bagged and not sent for assay. Geological studies revealed that the footwall of the structure contained a discrete high-grade vein bearing visible-gold. This entire mineralisation stage had been virtually excluded from the estimate with a loss of 50-60% of the gold inventory. The remaining footwall (half) core was collected, assayed by SFA and the resource re-estimated. The new global grade was 12.9 g t-1 Au, much closer to expectation. This example shows the clear need for proper training of staff and communication between all parties. The project geologists were focussed with fixed core lengths, with no consideration that a geologically-based sample regime was more appropriate. In essence, this was an EE, where the mineralised zone was not sampled fully. From a project

Page 8: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

7

perspective this error led a good project to be put on hold for 9 months. The project subsequently went into production, yielding a ROM grade of 14 g t-1 Au over 4.5 years. Case study 3: What coarse gold? A pseudo-coarse gold problem may be present in some gold deposits, due to the presence of gold particle clusters that give the effect of individual coarse-gold particles (Dominy and Platten, 2007). These clusters, which may be distributed on the centimetre-scale or greater, give rise to high assay variability in field samples. However, once a sub-sample is pulverised, the effect of the clusters is removed if the individual gold particles making up the clusters are liberated. Thus any resulting pulp will tend to have lower variability, unless ‘true’ coarse-gold particles exist. An Australian greenstone-hosted narrow vein (1.5-2.5 m width) deposit was found to have a coarse gold problem. The orebody had a mean global reserve grade of 11 g t-1 Au. High variability was found for the first 12 months of reconciliation, where the annual ROM grade was 7.5 g t-1 Au. Checks of diamond half (NQ) core and laboratory pulp duplicates indicated a very high variability, where 90% of the data was ±60% (Half Absolute Relative Difference: HARD) or worse. The issue had been ignored, as there was apparently no indication of visible gold within drill core. Assays were based on a 30 g sub-sample for fire assay (FA) scooped from the pulveriser bowl. An initial review of metallurgical data indicated that a gravity recoverable gold (GRG) yield of 55% was achievable, suggesting coarse gold was present. A number of samples were taken from low- to high-grade intersections, where mineralogical studies revealed the presence of gold particles up to 1 mm in size, with many in the 150 µm to 500 µm range. A series of fifty half core samples were taken for whole-sample SFA and it was found that between 15% and 75% of the gold in the samples reported to the screen (mean 40%). A comparison was made between the new SFA grades and the original 30 g FA, and it was found that the SFA were generally higher than the original FA by about 35%. Drill holes were re-logged and it was found that visible gold was common. In addition, it was found that clusters of visible gold particles extended over 2 cm. This clustering resulted in increased heterogeneity within both half and crushed core. In this case there was adequate QA, but no QC follow-up since the pulp duplicate data was ignored. An inappropriate sampling protocol in a clustered-coarse gold environment resulted in a high FSE. Furthermore, the pulps were prone to a high GSE, as not all the coarse gold was reduced in size during pulverisation. Scooping from the bowl was in effect grab sampling with an inherent high DE and EE. Given the presence of coarse gold, there was also the potential for contamination (PE) and the need for cleaning the pulveriser bowl with a barren flush between samples. Timely identification of visible gold in core should have been achieved and acted upon. The original sample protocol was replaced by a half core LeachWELL and effective QC follow-up. Reconciliation improved over the following 6 months, with grade and tonnes within ±11% of expectation. Case study 4: Gold segregation in pulps An underground narrow vein (1-2 m width) operation in North America was known to contain coarse gold particles up to 1.2 mm in size, and rarely up to 4 mm. The plant recovered between 40% to 60% of gold via a gravity circuit. The vein had an average

Page 9: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

8

global reserve grade of 17.8 g t-1 Au. Monthly reconciliations were up to ±50% on grade and up to ±15% on tonnes. From drill core and underground chip samples, a 2 kg sample was pulverised and a 30 g FA undertaken. There were no formal sampling protocols or laboratory QAQC system. With new owners, systems were introduced into the pre-existing laboratory. It was identified that the pulp duplicates displayed a very poor precision; where 90% of the data was ±55% HARD. In addition, the pulverisers were not cleaned between samples and there was evidence of gold contamination between some samples. A number of exhaustive tests were undertaken on 2 kg pulp lots, where the pile was mixed, flattened and 40 consecutive 50 g sub-samples taken for FA. The variability was very high, and in one instance the range between the minimum and maximum values was 250 g t-1 Au. These findings confirmed that the pulps were heterogeneous due to the poor comminution of gold particles during pulverisation and the excessive GSE within the pulps. Different pulp sub-sampling techniques further augmented the level of GSE. One laboratory technician homogenised the pulp by ‘mat rolling’ then simply scooped off 30 g from the top of the pile, thereby missing gold that had segregated to the bottom of the pile. Another technician placed the pulp on the mat, shook it rigorously, flattened the pile and cut a series of sample lines through the pile with a greater chance of picking up segregated gold at the pile base. An additional issue of sample contamination was identified. Where very high grade samples (>30 g t-1 Au) usually bearing visible gold were present, the following sample or two samples were often contaminated. Tests were undertaken, where it was found up to 10% of the high grade was smeared into the following samples. At the time, no barren flushes were undertaken in the laboratory and equipment hygiene was mediocre. In essence, the ‘mat roll’ method understated, whilst the ‘shake, flatten and cut’ technique overstated the gold grade. The recent mine records were revisited and it was found that during a leave of absence by the ‘overstating’ technician, a number of stope blocks had been abandoned due to the low sample grades achieved. The stope-bounding drives and raises were subsequently re-sampled and assayed using the new protocol. They were found to be of ore grade and subsequently mined out recovering 11 000 oz Au. The key issue was that coarse gold needs to be treated differently. Pulps bearing liberated gold cannot be homogenised; GSE can be highly problematic; and proper protocols and procedures must be set up both in the mine and laboratory. A SFA was introduced to account for coarse gold, along with improved laboratory procedures and staff training. Full QAQC protocols were introduced, particularly covering equipment cleaning and contamination monitoring. Barren flushes between samples were introduced and were assayed at a rate of 1 in 20. Where visible gold was observed or high grades expected, additional barren samples were introduced and automatically subjected to FA. Case study 5: Grab sampling for grade control Grab sampling has been used as a grade control tool in many gold operations globally (Dominy, 2010). A shear-zone hosted underground operation in Australia consistently had reconciliation problems. Mineralisation did bear some coarse gold, though this was not dominant. Most gold was sulphide-hosted and below 250 µm in size. This was manifested as a general under-call with respect to the reserve grade (7.4 g t-1 Au) of around 25%. The decision to send material from the stockpile to the plant was based solely on grab sampling.

Page 10: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

9

Each stock pile represented approximately 500 t of supposed ore. Twenty 3 kg samples were taken from around the edge of the stockpile, at a fragment size of generally <12 cm. Each sample was sent to the laboratory for a 500 g LeachWELL-based pulverise-and-leach (PAL) assay. A test study was undertaken based on 200 3-kg grab samples collected from a chosen stockpile. For the total population the mean grade was 12.8 g t-1 Au, the minimum grade 0.01 g t-1 Au and the maximum grade 79.7 g t-1 Au. There are a number of grade permutations possible if an exhaustive 20 set sample batches are drawn. Out of 200 samples, the lowest grade combination of 20 samples was 0.1 g t-1 Au, and the highest grade 49.1 g t-1 Au. The mean was 10.6 g t-1 Au. The test stockpile was fed to the plant and autosampler after secondary crushing, where a batch mean head grade of 4.2 g t-1 Au determined. The mean of the first 20 samples taken was 8.2 g t-1 Au, which implies under normal circumstances that the lot would have been sent to the plant as ore. At the time, a mine cut-off grade of 4.6 g t-1 Au was applied. The operation was battling reconciliation problems and achieving a lower head grade. The reserve model was based on diamond drill data on a 20-30 m by 20-30 m pattern. Face chip sample data was ignored, as it was considered to be biased and only represented around 50% of mine faces due to operational constraints. As a result, all material dumped on the surface stockpiles, which included mineralised waste, and marginal, medium and high grade ore, was grab sampled prior to being sent to the waste tip or plant. Given the biased nature of grab sampling, most of the mineralised waste and marginal ore was sent to the plant diluting the ore feed. Grab sampling was considered the key issue. The grade estimate was also considered to be sub-optimal. This study showed that the use of grab samples to assess grade is problematic. The majority of stockpiles were sent to the mill as ore. This was in part related to a higher proportion of gold in the fine (<1 cm) fraction, thus biasing grab samples high. An important point to note is that each grab sample or group of 20 grab samples did not represent the stockpile. Grab sampling is prone to chronic FSE, GSE, DE and EE (Dominy, 2010; Pitard, 2009). FSE calculations indicated that a 25 t sample was required from the stockpile to achieve an acceptable level of FSE. Grade control subsequently re-focussed to use the diamond drilling, which was closed to a 15 m by 15 m spacing. LeachWELL (1-2 kg) was used for all samples and grab sampling was stopped. The resource model was also improved via the use of an optimised kriged block model. A managed low-grade stockpile was introduced. Reconciliation improved to within ±10% for grade and tonnes within six months. Case study 6: Reverse circulation and blast hole sampling In many open pit gold projects blast hole (BH) drilling has been used as the principal grade control sampling method. More recently, BH has generally been replaced with reverse circulation (RC) drilling in an attempt to improve sample quality and grade control outputs (Pitard, 2008; Chieregati et al., 2015). This case study is based in an African open pit gold operation, working a large tonnage low-grade (1.9 g t-1 Au) greenstone hosted shear-zone type deposit. Gold was principally distributed in quartz veins, though some local wallrock disseminations were observed. The gold was quartz and/or pyrite hosted, with minimal visible gold. About 20% of the gold was gravity recoverable and mineralogical studies identified a maximum gold particle size of around 350 µm. During the first few years of operation all grade control was undertaken as part of the BH drilling pattern and samples were taken from the cuttings. Such a methodology is known to

Page 11: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

10

be problematic with issues relating to DE, EE and GSE, namely, hole-wall caving, sample loss into cavities, contamination and particle segregation within the drill hole. DE also existed where the hole was drilled below the current bench – the so-called ‘sub-drill’. In addition, the collection of sample material from the surface ‘cone’ was fraught with problems relating to high FSE, pile segregation (GSE) and sample delimitation and extraction (DE and EE). In this case BH samples were collected with a sectorial or pie tray (approx. 10 kg from 200 kg, representing 2.5 m), providing for an acceptable DE in some cases, though the EE can be high due to overfilling resulting in sample loss. However, half of the 10 kg sample (e.g. 5 kg) was poured (no splitter used) into a bag for laboratory submission. After crushing to P80 -2 mm, a 1 kg sub-sample was taken and pulverised to P90 -75 µm and a 200 g sub-sample riffle split and a 30 g FA undertaken. This protocol yielded an FSE of ±92%. Subsequently, RC drilling with a face hammer bit was introduced for grade control. RC has many improvements over BH drilling through the air propelled recovery of the drill chippings up the centre of the drill rod which leads to a reduction in contamination and improved mass recoveries. It also provides improvements in grade and geological resolution (a closer spacing than BH and capability for angled holes to reflect the mineralisation trend) and reduced overall sampling error (reduced FSE, EE, DE and GSE). The key issue with taking a sub-sample from a 200 kg lot of chippings is that the FSE can only be lowered by either reducing the entire nominal fragment size of the entire lot or by taking a bigger sample. The RC drilling produced a finer product and the run length was reduced to 0.7 m to decrease the primary sample size. A 10 kg RC sample was collected via a cone splitter at the rig. At the laboratory, this was crushed to P80 -1.5 mm, 5 kg riffle split for pulverisation, and 1 kg taken for a LeachWELL assay. The overall FSE for this protocol was ±29%; a clear improvement over the old BH protocol. This was still not an optimal figure, but an overall improvement was achieved. At the time of introduction, it was possible to compare the drilling and assay results of both the BH and RC samples for a number of benches. It was found that the RC drilling protocol yielded a nugget effect of 44%, whereas the BH samples gave a value of 62%. An improvement supporting the use of RC versus BH drilling for grade control was seen. However, a level of compromise had to be accepted, even with the sampling protocols for RC where a large field sample can be required to minimise the FSE. Case study 7: Uncertainty in heterogeneity testing in coarse gold ores The HT is a relatively common approach to determine the value of K for FSE equation use. The method consists of extracting a number of fragments at random from different size fractions of the lot. The number of individual fragments should generally be as large as possible, but for practical purposes is suggested to be around 50 (Gy, 1982; Pitard, 1993). Table 2 shows variability in HT results from South American coarse gold-bearing mineralisation. The mine operator aimed to optimise sampling protocols and undertook a HT on ore fragments from a stockpile. The initial test (Test #01 in Table 2) yielded a relatively low K value. Sampling protocols were optimised for this figure. A later review noted that the K value was below expectation given that the mine recovered some 65% of its gold via gravity and that visible gold was common in both drill core and underground exposure. Three additional tests were undertaken, this time with 100 fragments in each test lot (Tests #02-04; Table 2). The K values defined displayed strong variability ranging from 230 to 2,600 g cm-1.5. Test #04 yielded a particularly high value for

both K and dAu, being related to two very high grades. A fifth test was undertaken using 200 fragments of 1 kg weight.

Page 12: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

11

A study was undertaken of gold particle size and distribution based upon mineralogical observation, inspection of gravity concentrates and metallurgical screening and assay

tests. It concluded that for ROM grade ore of 15 g t-1 Au, the dAu value was 3 mm. The original sample protocol was based on half HQ core sampling, pulverising of the entire sample, and sub-sampling 500 g for a later sub-sample of 30 g for FA. Duplicate pulp FA were rarely undertaken, but those undertaken showed high variability (90% within ±70% HARD). Test work also identified coarse gold contamination between samples preceded by high-grade material. Two barren flushes were introduced after any sample bearing visible gold or expected to be high grade. Protocols were adjusted to take into account the coarse gold-bearing mineralisation, through the application of total sample SFA of all half core or face samples. In many cases where coarse gold particles are relatively sparsely distributed, the picking of 100 test fragments is likely to only represent low-grade fine-gold background population (Dominy, 2014a). This example shows that the calibration of the FSE equation using HT can be problematic in the coarse gold environment (Dominy and Xie, 2015). It is generally

found that a direct approach to dAu determination is more appropriate (Dominy et al., 2011; Pitard, 2015). Case study 8: Case of QA with no QC In this example, a greenstone-hosted disseminated gold deposit in Central Africa had been drilled out by three NQ diamond drill campaigns. Spatially, the three sets of drilling broadly covered the same mineralised zones. The gold is fine-grained, hosted in pyrite and/or arsenopyrite and generally below 50 µm in size. The largest campaign contained 60% of the assay database that was used for resource estimation. During an independent review of the resource, it was found that the key drill programme had problematic QAQC data. In particular, the results for the CRMs, inserted at a rate of about 1 in 30, were consistently high. The results of inter-laboratory check pulp samples, submitted at a rate of 1 in 50 were overall acceptable. The sample collection and preparation protocols were found to be acceptable. Despite the high bias indications of the CRM data, the implications were ignored in the resource estimate. Detailed review showed that the entire batch of assays was about 36% higher with respect to grade. This error was shown to relate to the laboratory, where poor maintenance and calibration of AAS equipment led to high AE. This is an example of clear QA with no supporting QC. The remaining half core was assayed using the same protocol at a different laboratory. CRMs were inserted at a rate of 1 in 20. The resource was re-estimated, which led to the deposit grade reducing from 1.8 g t-1 Au to 1.5 g t-1 Au. This resulted in project suspension and withdrawal of funding. Case study 9: Poor mill balance sampling An underground operation in South America was extracting 100 000 t per annum at 15 g t-1 Au. Much of the gold was coarse (up to 2 mm in size), with the processing plant based on a 13 t per hour gravity-only circuit to extract around 80-85% of the gold. On an annual basis the operation was expected to produce around 40 000 oz Au. By the end of the first year of production, the operation had produced 31 000 oz Au. Based on the mill balance, a recovery of 94% was calculated from a head grade of 10.3 g t-1 Au and mean tailings grade of 0.6 g t-1 Au. A review of all aspects of grade control and reconciliation was undertaken. It was found that the tailings grades were based on a single 1 kg hand sample collected via a small

Page 13: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

12

bucket once per hour, and this was sometimes missed. Thus 13 t of ore was represented by a 1 kg tailings sample. A series of 250 kg bulk samples of tails were collected and tested in a metallurgical laboratory. It was found that the grade of these averaged around 2.5 g t-1 Au and that gold particles up to 0.75 mm were contained. An autosampler was fitted to the tails outflow, which was initially set to collect a 2.5 kg sample every 5 minutes. Over a period of one month this revealed grades averaging 3 g t-1 Au and on a shift basis up to 6.5 g t-1 Au. These high grades were linked back to the gravity circuit, which was not optimised and thus coarse gold was being lost. The initial tailings sample yielded an FSE of ±51%, together with increased DE and EE using a manual sampler. The revised test protocol dropped the FSE to ±9% and importantly took multiple increments over an hour thus having a higher probability of collecting a coarse gold particle(s). By collecting multiple samples, the periodic fluctuation error was also reduced (Pitard, 1993). An autosampler was also introduced. In the original protocol, the small hourly samples did not resolve periodic pulses of gold lost to the tails stream which represented higher feed grades to the gravity circuit. The incorrect tails sampling was understating the actual gold content by 6 700 oz, which was effectively unaccounted for in the mill balance and hence a high recovery was calculated. The study led to a number of changes in the plant to improve recovery, including modifications to the grinding circuit to grind finer and improvements to the gravity circuit. The post-modification tailings sample protocol was reduced to 1 kg sample per 20 minutes, which given the removal of the coarse gold yielded an FSE of ±7%. Six months after modifications, plant recovery had increased to 89%, based on a 13.5 g t-1 Au head grade. Case study 10: Poor metallurgical sampling strategy A South American project was being evaluated with the intent to re-commence underground operations. Mineralisation is dominated by quartz-sulphide reefs generally 1 m in width hosted in granodiorite. Economic grades are related to ore shoots which extended around 75 m along strike and >300 m down plunge. The central 25 m core of the Main Reef ore shoot contains a high grade zone at 15-30 g t-1 Au, compared to the 4-8 g t-1 Au in peripheral zones. Gold mineralisation contained coarse gold up to 2.5 mm in size, particularly in the core zone. Finer gold (<0.15 mm) was common in the peripheral zones. Historical mining had previously used simple gravity and amalgamation methods to extract gold, yielding recovered head grades in the 15-25 g t-1 Au range. As part of the evaluation programme, HQ diamond core drilling was undertaken. Core recovery and quality was generally good. During re-evaluation, two 100 kg diamond half-core composites (H#1 and H#2) were taken for metallurgical recovery testing based on the standard GRG test. The two samples were crushed to P80 -3 mm and 25 kg split off for GRG testing. Composite head grades were 36 g t-1 Au and 47 g t-1 Au for H#1 and H#2 respectively, yielding GRG values of 90% and 96%. A single 100 kg half-core composite was taken from the low-grade peripheral zone (L#1), the sample was crushed to P80 -3 mm and 25 kg split off for GRG testing. This yielded a head grade of 16 g t-1 Au and a GRG value of 81%. Based on these results a 75 000 t per annum gravity plant was built, with a recovery expectation of 70%. The expected head grades of 15 g t-1 Au were not being achieved, yielding around 5 g t-1 Au and a gold recovery of 30-40%. A number of issues related to geological interpretation and metallurgical sampling were identified. The original metallurgical samples H#1 and H#2 were from very high-grade core mineralisation, and were not representative of that domain. Only two samples were collected. Sample L#1 was unrepresentative of the low-grade zone, and was biased by

Page 14: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

13

one intersection of relatively high-grade material that was present in the low-grade zone. Only one sample was collected. During sample preparation, the crushing and splitting of the 100 kg samples down to 25 kg test masses yields a high FSE (up to ±38% at 90% confidence), where less than ±15% would be preferable. In addition, the splitting process after crushing was based on shovelling 25 kg directly into buckets from a pile. The splitting of metallurgical test sub-samples from a primary composite is a key issue, where the split process is not representative (Dominy, 2014b). This is further compounded when the primary sample is not representative either. In this case the sub-sampling process was non-equiprobable with high risk of DE, EE and GSE. Geological interpretation of the high-grade zone focussed on a 'continuous' zone down the centre of the shoot (considered to be 35% of the shoot). This was not the case, where in reality there was a high-grade core but it comprised a series of en-echelon sub-shoots which only accounted for about 15% of the shoot. The high-grade zones contain a high-level of GRG, whereas the low-grade zones contain substantially less. This lead to a reserve grade bias (15 g t-1 Au versus 5 g t-1 Au) and over-reliance on GRG gold for plant design. Subsequent metallurgical testing of the low-grade shoot indicated that an achievable GRG was in the range of 20-25% with most of the gold (>70-80%) being sub-100 µm, sulphide-hosted and requiring 24 hour leaching to achieve a 75-85% recovery. A further metallurgical testing programme for the low-grade domain was instigated (25 75-100 kg samples), which ultimately led to the commissioning of a CIL plant at the mine. After further controls on mining were applied and the operation of the new CIL circuit, head grades were increased to 13 g t-1 Au, with recoveries between 90-95%.

Discussion The sampling issues reported in the case studies relate to the full range of TOS errors (Table 3), that resulted in monetary and intangible losses (Table 4). These errors were reduced through the implementation of new protocols, often supported by new or additional ore characterisation (Table 5). QAQC issues in Case 1 relate to poor QA and lack of QC implementation. Accepted QAQC procedures are well-documented and require appropriate training and implementation (Abzalov, 2008; DS3077, 2013; Sketchley, 1998; Vallée, 1998). Full and timely analysis of QA data is required and must lead to investigation if required.

Inappropriate sample type is exemplified in Cases 5 and 6, where grab samples are used for underground grade control and blast holes for open pit grade control. Both methods have well-documented issues and their use is discredited in many circumstances. Alternatives for underground grade control include better use of geology and geological mapping, and closer-spaced diamond drilling. For open pit grade control the application of RC drilling is recommended. RC drilling has also been applied in the underground environment with some success (Clark and Carswell, 2014). Inappropriate coarse gold sampling protocols for resource estimation and grade control led to problems in Cases 4 and 7. Protocols may involve pulverisation of an entire sample, which results in gold liberation. In such a case, sample splitting is problematic other than with a rotary sample splitter. Any kind of homogenisation attempt will be useless and merely promote GSE. Mat mixing and scooping from a pile of pulp should be avoided at all costs. A large sample assay method such as SFA or LeachWELL is optimal. Good

Page 15: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

14

preparation equipment hygiene is required. Barren flushes of the pulverising equipment should be undertaken between each sample. Poor core recovery (Case 1) typically reflects poor drilling and/or ground conditions (Annels and Dominy, 2003). Where this is unavoidable, there will be a strong bias in assay grade due to mineral loss. From a sampling perspective, the best option is to either (a) assay the entire sample length or (b) to crush it and split off a proportion for laboratory submission. Poor quality samples through low core recovery are a negative issue for metallurgical samples, as well as for grade determination.

Poor laboratory practice in Cases 3 and 8 led to bias. One case study shows a common issue of handling pulps containing liberated gold. Scooping from the pile in any fashion will be affected by the segregation of liberated gold particles. The incorrect calibration of analytical equipment is careless.

An inappropriate sampling strategy for the plant balance led to erroneous reconciliation in Case 9. The flawed protocol was poorly executed. Manual samplers cannot be considered best practice. In addition, the protocol was not optimised for the coarse gold ore type. Poor sampling strategy is shown in Cases 2 and 10, where grade distribution and/or geology were ignored. Effective understanding of the ore zone and likely geometallurgical domains are critical to designing grade and metallurgical sampling programmes.

Conclusions 1) Sampling errors across the entire mine value chain generate both monetary and

intangible losses. At the project development stage these losses can relate to biased resource/reserve estimates, potential project delay and/or wasted/misused capital. During mine operation, issues principally relate to ore/waste misclassification and poor reconciliation. In all cases, there are monetary costs in correcting protocols. Intangible costs relate to people and company reputation, poor relationships between technical disciplines, and wasted time enforcing poor protocols and implementing new ones.

2) In many cases project teams are more interested in the effects of poor sampling,

than dealing with the cause. For example during poor reconciliation, disciplines often spend more time trying to apply correction factors and/or apportioning blame. Management and practitioners often consider sampling to be of minimal importance, which reflects a lack of knowledge and understanding of its proper application across the mine value chain.

3) Design of an optimised sampling protocol must consider its aim and objective (s) in context of ore type and position in the mine value chain. In most cases a dedicated ore characterisation programme will be required to support application of TOS and final protocol design. An approach to protocol design is presented in Table 6.

4) The optimisation process should consider:

Geological/mineralogical nature of ore type(s) and likely geometallurgical domains and relationship to grade. Characterisation with respect to gold particle sizing, mineralogy and heterogeneity is critical;

whole core sampling followed by full sample assay via SFA or LeachWELL effectively yields FSE and GSE values of zero. With good laboratory practice, the PE and AE can be minimised. Arguments against whole core sampling revolve around no reference core remaining, though this author

Page 16: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

15

contends that with modern digital photography and detailed logging this should not be an issue;

alternatively, RC drilling may be considered given that it provides a larger field sample size than core, though there is a loss of geological information and extreme care must be taken during sample splitting and assaying;

application of TOS and FSE equation to optimise protocols;

avoiding gold liberation, except during pulverisation of the final assay charge sub-sample and test for possible contamination in coarse gold ores;

using effective large assay charge techniques such as SFA or LeachWELL if coarse gold is present; or whole sample processing via a laboratory-scale system;

ensuring that separate splitters, crushers and pulverisers are used where coarse gold is present and that equipment is effectively cleaned between samples and blanks are used;

in the plant, autosamplers taking multiple increments should be used supported by appropriate sample preparation and assay protocols;

carrying out systematic QAQC programmes to measure the reliability of each of the sampling, preparation and assaying steps, and then optimising the process; and

proper documentation, staff training and periodic review.

5) Throughout any sampling and assaying or test work programme, QAQC must be a primary feature. Metallurgical sampling and test work programmes frequently have minimal to zero QAQC. Protocols must be set up with judicious consideration to cover field collection and security, laboratory preparation and analysis/testing to minimise sampling errors.

6) The overall conclusion of this discourse is that correct sampling and assaying

practices are critical to a profitable gold mining industry. Management, technical and field staff should be educated to ‘sample better’ throughout the mine value chain. A project or operation should appoint an appropriately trained TOS champion to drive best practice. Good resources now exist to service this need, both in the form of consultants and educators, and a new international sampling standard (DS3077, 2013). It is now time for TOS to be integrated into international reporting codes (e.g. JORC Code 2012).

Acknowledgements The author would like to acknowledge the companies who have consented to the presentation of the case studies under confidentiality agreements. The late Dr Allen Royle (University of Leeds, UK), Professor Yuling Xie (University of Science and Technology Beijing, PRC), Professor Richard Minnitt (University of Witwatersrand, RSA) and Professor Kim Esbensen (GEUS and KHE Consulting, Denmark) are thanked for helpful discussions. Mining Technology reviewers are acknowledged for their constructive comments on the manuscript.

References Abzalov, M. Z. 2008. Quality control of assay data: a review of procedures for measuring and monitoring precision and accuracy, Exploration and Mining Geology, 17, 131-144. Afewu, K. I. and Lewis, G. O. 1998. Sampling a run-of-mine mill feed – a practical approach, Journal of the Southern African Institute of Mining and Metallurgy, 98, 299-304.

Page 17: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

16

Annels, A. E. and Dominy, S. C. 2003. Core recovery and quality: important factors in mineral resource estimation, Applied Earth Sciences (Transactions of the Institutions of Mining and Metallurgy: Section B), 112, 305-311. Bazin, C., Hodouin, D. and Blondin, R. M. 2013. Estimation of the variance of the fundamental error associated to the sampling of low grade ores, International Journal of Mineral Processing, 124, 117-123. Carrasco, P. C. Nugget effect – artificial or natural? 2009. Proceedings of World Conference on Sampling and Blending, Johannesburg: Southern African Institute of Mining and Metallurgy, 211-217. Carrasco, P. C., Carrasco, P. and Jara, E. 2004. The economic impact of incorrect sampling and analysis practices in the copper mining industry, Chemometrics and Intelligent Laboratory Systems, 74, 209-214. Cintra, E. C., Scabora, J. A., Viegas, E. P., Barata, R. and Maia, G. F. 2007. Coarse gold sampling at Sao Francisco mine, Brazil, Proceedings of World Conference on Sampling and Blending, Porto Alegro: Fundacao Luiz Englert, 187-197. Chieregati, A. C., El Hajj, T. M., Imoto, C. F. and Pignatari, L. E. C. 2015. Validation of reverse circulation drilling rig for reconciliation purposes, TOS Forum, 5, 105-110. Clark, F. and Carswell, J. T. 2014. Using RC drilling to improve sampling in a complex underground gold operation – approach to underground grade control at the Sunrise Dam mine, WA, Proceedings of International Mining Geology Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 143-152. Cossio, S., Noyola, J-L., Gonzalez, P. and Espinosa, R. 2004. Sampling and assaying of coarse gold at La Herradura, Mexico, CIM Bulletin, 1084, 1-5. Dominy, S. C. 2010. Grab sampling for underground gold mine grade control, Journal of the Southern African Institute of Mining and Metallurgy, 110, 2010, 277-287. Dominy, S. C. 2014a. Predicting the unpredictable – evaluating high-nugget effect gold deposits. Mineral Resource and Ore Reserve Estimation, Melbourne: Australasian Institute of Mining and Metallurgy, 659-678. Dominy, S. C. 2014b. Effects of sample mass on gravity recoverable gold test results in low grade ores, Applied Earth Sciences (Transactions of the Institutions of Mining and Metallurgy: Section B), 123, 234-242. Dominy S. C., Esbensen, K. H. and Xie, Y. 2016. Geometallurgical sampling of a bulk mineable gold deposit: ore characterisation and protocol development, Proceedings of Third International Geometallurgy Conference, Melbourne: Australasian Institute of Mining and Metallurgy, accepted. Dominy, S. C., Johansen, G. F., Annels, A. E. and Cuffley, B. W. 2000. General considerations of sampling and assaying in a coarse gold environment, Applied Earth Sciences (Transactions of the Institutions of Mining and Metallurgy: Section B), 109, 145-167. Dominy, S. C., Noppé, M. A. and Annels, A. E. 2004. Errors and uncertainty in Mineral Resource and Ore Reserve Estimation: the importance of getting it right, Exploration and Mining Geology, 11, 77-98.

Page 18: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

17

Dominy S. C. and Petersen J. S. 2005. Sampling coarse gold-bearing mineralisation - developing effective protocols and a case study from the Nalunaq mine, southern Greenland, Proceedings of World Conference on Sampling and Blending, Melbourne: Australasian Institute of Mining and Metallurgy, 151-165. Dominy, S. C. and Platten, I. M. 2007. Gold particle clustering – a new consideration in sampling applications, Applied Earth Sciences (Transactions of the Institutions of Mining and Metallurgy: Section B), 116, 130-142. Dominy, S. C., Platten, I. M., Howard, L. E., Bell, R-M., Xie Y. and Minnitt, R. C. A. 2012. Determination of the sampling liberation diameter in a high-grade coarse gold ore by high-resolution X-ray computed tomography, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 161-169. Dominy, S. C., Platten, I. M., Xie, Y. and Minnitt, R. C. A. 2011. Underground grade control protocol design: case study from the Liphichi gold project, Larecaja, Bolivia, Applied Earth Sciences (Transactions of the Institutions of Mining and Metallurgy: Section B), 119, 205-219. Dominy, S. C. and Xie, Y. 2015. Optimising sampling protocols via the heterogeneity test: challenges in coarse gold mineralisation, Mining Technology (Transactions of the Institutions of Mining and Metallurgy: Section A), in press. Dominy, S. C., Xie, Y. and Platten, I. M. 2008. Gold particle characteristics in narrow vein deposits: implications for evaluation and metallurgy, Proceedings of Narrow Vein Mining Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 91-104. DS3077, 2013. Representative Sampling – Horizontal Standard, Copenhagen: Danish Standards Foundation. Esbensen, K. H. and Paasch-Mortensen, P. 2010. Process sampling: Theory of Sampling – the missing link in Process Analytical Technologies, in Process Analytical Technology, Chichester: Wiley, 37-80. Fallon, M., Rowley, M., Du Plessis, E., Golenya, F., Robertson, I. and Swanson, R. 2012. Confirming the sampling, sample preparation and assaying protocols used at two Yilgarn gold deposits, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 47-62. François-Bongarçon, D. M. 1993. The practice of the sampling theory of broken ores, CIM Bulletin, 86, 75-81. François-Bongarçon, D. M. 1998. Extensions to the demonstration of Gy’s formula, Exploration and Mining Geology, 7, 149-154. François-Bongarçon, D. M. 2004. Theory of Sampling and geostatistics: an intimate link, Chemometrics and Intelligent Laboratory Systems, 74, 143-148. François-Bongarçon, D. M. 2008. A brief history of Pierre Gy’s sampling theory and current trends in its acceptance in the mining world, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 13-14. François-Bongarçon, D. M. 2014. State of affairs and current research trends in Theory of Sampling fundamentals, including segregation and correctness, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 11-15.

Page 19: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

18

François-Bongarçon, D. M. 2015. Future challenges and research: Theory of Sampling (TOS), TOS Forum, 3, 4-5. François-Bongarçon, D. M. and Gy, P. M. 2002. The most common error in applying Gy’s formula in the theory of mineral sampling and the history of the Liberation factor, Journal of the Southern African Institute of Mining and Metallurgy, 102, 475-479. Geelhoed, B. 2011. Is Gy’s formula for the fundamental sampling error accurate? Experimental evidence, Minerals Engineering, 24, 169-173. Giblett, A., Dunne, R. and McCaffery, K. 2012. Defining practical metallurgical accounting discrepancy limits for gold operations, Proceedings of Mill Operators Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 3-9. Gonzales, P. and Cossio, S., 2007. A review of sampling protocol for a gold ore based on liberation study, Proceedings of World Conference on Sampling and Blending, Porto Alegre: Fundacao Luiz Englert, 163-174. Guresin, N., Lorenzen, L., Dominy, S. C., Muller, H. and Cooper, A. 2012. Importance of effective sampling and test work protocols for process plant design, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 95-107. Gy, P. M. 1982. Sampling of Particulate Materials, Amsterdam: Elsevier. Gy, P. M. 2004. Sampling of discrete minerals – a new introduction to the theory of sampling I: Qualitative approach, Chemometrics and Intelligent Laboratory Systems, 74, 7-24. Holmes, R. J. 2004. Correct sampling and measurement – the foundation of metallurgical accounting, Chemometrics and Intelligent Laboratory Systems, 74, 71-83. Holmes, R. J. 2015. Sample station design and operation, TOS Forum, 5, 119-128. JORC, 2012. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, The JORC Code. Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia, December 2012. Lyman, G. J. and Schouwstra, R. 2011. Use of scanning electron microscope to determine the sampling constant and liberation factor for fine materials, Proceedings of World Conference on Sampling and Blending, Santiago: Gecamin, 89-103. Magri, E. J. 2007. Some experiences in heterogeneity tests and mine sampling, Proceedings of World Conference on Sampling and Blending, Porto Alegre: Fundacao Luiz Englert, 329-348. Minnitt, R. C. A. 2007. Sampling: the impact on costs and decision making, Journal of the Southern African Institute of Mining and Metallurgy, 107, 451-462. Minnitt, R. C. A. 2013. Sampling in the South African minerals industry, Proceedings of Sampling and Analysis Conference, Johannesburg: Southern African Institute of Mining and Metallurgy, 1-28.

Page 20: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

19

Minnitt, R. C. A. and Assibey-Bonsu, W. 2010. A comparison between the duplicate series method and the heterogeneity test as methods for calculating the sampling constants, Journal of the Southern African Institute of Mining and Metallurgy, 110, 251-268. Minnitt, R. C. A., Rice, P. M. and Spangenbeg, C. 2007. Part 2: Experimental calibration of sampling parameters K and alpha for Gy’s formula by the sampling tree method, Journal of the Southern African Institute of Mining and Metallurgy, 107, 513-518. Morrison, R. and Powell, M. 2006. Design for sampling – preliminary exploration, Journal of the Southern African Institute of Mining and Metallurgy, 106, 697-706. Petersen, L., Dahl, C. K. and Esbensen, K. H. 2004. Representative mass reduction in sampling – a critical survey of techniques and hardware, Chemometrics and Intelligent Laboratory Systems, 74, 95-114. Pitard, F. F. 1993. Pierre Gy’s Sampling Theory and Sampling Practice, Boca Raton: CRC Press. Pitard, F. F. 2007. The in-situ nugget effect: a major component of the random term of a variogram, Proceedings of World Conference on Sampling and Blending, Porto Alegre: Fundacao Luiz Englert, 91-110. Pitard, F. F. 2008. Blasthole sampling for grade control – the many problems and solutions, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 15-21. Pitard, F. F. 2009. Pierre Gy’s Theory of Sampling and C. O. Ingamells Poisson Process Approach: Pathways to Representative Sampling and Appropriate Industry Standards, Doctoral Thesis, Esberg: Aalborg University. Pitard, F. F. 2013. Guidelines for acceptable allotted sampling uncertainty, Proceedings of World Conference on Sampling and Blending, Santiago: Gecamin, 89-98. Pitard, F. F. 2015. The advantages and pitfalls of conventional heterogeneity tests and a suggest alternative, TOS Forum, 5, 13-18. Pitard, F. F. and François-Bongarçon, D. M. 2011. Demystifying the Fundamental and Grouping and Segregation error for practitioners, Proceedings of World Conference on Sampling and Blending, Santiago: Gecamin, 39-55. Pitard, F. F., Esbensen, K. H. and Paoletti, C. 2015. TOS: Progress through continuity and community, TOS Forum, 4, 25-27. Pitard, F. F. and Lyman, G. 2013. Single and multi-stage Poisson processes: a case study for gold exploration, Proceedings of World Conference on Sampling and Blending, Santiago: Gecamin, 371-385. Platten, I. M. and Dominy, S. C. 2003. The occurrence of high-grade gold pockets in quartz reefs at the Gwynfynydd mine, Wales, United Kingdom: a geological explanation of the nugget effect, Exploration and Mining Geology, 10, 249-272. Royle, A. G. 1989. Splitting gold assay pulps containing coarse gold particles, Leeds University Mining Association Journal, 63-68.

Page 21: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

20

Sketchley, D. A. 1998. Gold deposits: establishing sampling protocols and monitoring quality control, Exploration and Mining Geology, 7, 129-138. Simon, A. and Gosson, G. 2010. Considerations on QAQC and sampling security, Proceedings of Sampling Conference, Melbourne: Australasian Institute of Mining and Metallurgy, 135-140. Thalenhorst, H. and Dumka, D. 2010. Bulk sampling of mineral projects using a sample tower: lessons from the field, CIM Journal, 1, 44-54. Spangenberg, C. 2011. The status of sampling practice in the gold mining industry of Africa, Proceedings of World Conference on Sampling and Blending, Santiago: Gecamin, 105-112. Vallée, M. A. 1998. Sampling quality control, Exploration and Mining Geology, 7, 107-116.

Page 22: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

21

List of abbreviations AAS Atomic absorption spectroscopy ACE Accelerated cyanide extraction AE Analytical error BH Blast hole drilling CH Constitution heterogeneity CSE Correct sampling errors DH Distribution heterogeneity DE Delimitation error

dAu Gold liberation diameter EE Extraction error FA Fire assay FSE Fundamental sampling error GNE Geological nugget effect GRG Gravity recoverable gold GSE Grouping and segregation error HARD Half absolute relative difference HT Heterogeneity test HQ Diamond drill core (diameter of 63.5 mm) ISE Incorrect sampling error K Sampling constant NQ Diamond drill core (diameter of 48 mm) PAL Pulverise and leach PE Preparation error QAQC Quality assurance/quality control RC Reverse circulation drilling ROM Run of mine RQD Rock Quality Designation SFA Screen fire assay SNE Sampling nugget effect TOS Theory of Sampling

Page 23: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

22

Tables

Table 1 - Definition of sampling errors as defined in the Theory of Sampling

Sampling error

Acronym Error type

Effect on sampling

Source of error Error definition

Delimitation DE

Inco

rrect S

am

plin

g E

rror (IS

E)

Syste

ma

tic E

rrors

-

Bia

s G

ene

rato

r

Sampling equipment and materials handling

Results from an incorrect shape of the volume delimiting a sample

Extraction EE Results from the incorrect extraction of a sample. Extraction is only correct when all fragments within the delimited volume are taken into the sample

Weighting WE Relates to collecting samples that are of a comparable support. Samples should represent a consistent mass per unit

Preparation PE Refers to issues during sample transport and storage (e.g. mix-up, damage, loss and alteration), preparation (contamination and/or losses), and intentional (sabotage and salting) and unintentional (careless actions and non-adherence of protocols) human error

Analytical AE - Analytical process

Relates to all errors during the assay and analytical process, including issues related to rock matrix effects, human error, and analytical machine maintenance and calibration

Fundamental FSE

Corre

ct S

am

plin

g E

rror (C

SE

)

Ran

do

m E

rrors

-

Pre

cis

ion

Ge

ne

rato

r

Characteristics of the ore type. Relates to Constitution and Distribution Heterogeneity

Results from grade heterogeneity of the broken lot. Of all sampling errors, the FSE does not cancel out and remains even after a sampling operation is perfect. Experience shows that the nugget effect can be artificially high because sample weights are not optimal

Grouping and Segregation

GSE Relates to the error due to the combination of grouping and segregation of rock fragments in the lot. Once rock is broken, there will be segregation of particles at any scale (e.g. surface stockpile or laboratory pulp)

Page 24: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

23

Table 2 - Fifty, 100 and 200 piece experiments for a coarse gold ore deposit in North America. All fragments were approximately 1.5 kg (equivalent particle size diameter 16

cm) and where pulverised in their entirety and subsequently screen fire assayed

Test No. No of test fragments

Grade of lot (g t

-1 Au)

K value (g cm

1.5)

Calculated liberation

diameter (µm)

01 50 3 180 40

02 100 7 230 90

03 100 16 290 160

04 100 270 2 600 4 300

05 200 46 1,300 900

Page 25: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

24

Table 3 - Summary of case study conclusions. Sampling errors defined in Table 1

Case Dominant sampling

errors

Stage of sampling issue Key sampling issues

1 EE & DE Core drilling and sampling Core loss led to poor core sample quality. Poor QAQC

2 EE Core sampling Poor geological understanding and compositing strategy led to sections of drill core not being submitted for assay

3 FSE, GSE, DE, EE & PE

Core sampling, sample preparation and assay method

Whole sample pulping, pulp splitting and fire assay inapproprite

4 FSE, GSE, DE, EE & PE

Sample preparation and assay method

Poor laboratory practice led to massive bias via inappropriate pulp splitting and fire assay inapproprite. No QAQC

5 FSE, GSE, DE, EE & PE

Sampling method, sample preparation and assay method

Grade control process over-reliant on grab sampling from stockpiles, followed by fire assay

6 FSE, GSE, DE and EE

Sampling method, sample preparation and assay method

Grade control process over-reliant on RC drilling, followed by fire assay

7 FSE, GSE, DE, EE & PE

Sample preparation and assay method

In the coarse gold environment the application of the heterogeneity tests often provide misleading results. Pulp splitting and fire assay inapproprite

8 AE Analytical method Poor AAS maintenance and calibration led to elevated grades

9 FSE, GSE, DE

& EE

Sampling method Small samples taken at irregular intervals by hand

10 FSE, GSE, DE and EE

Sample selection strategy and sample preparation

Original metallurgical samples taken from very high-grade unrepresentative material. Primary samples were poorly sub-sampled for testing

Page 26: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

25

Table 4 – Estimated monetary and intangible loss estimates for case studies. Monetary loss includes estimate of correction cost. For operations, includes loss in revenue from poor reconcilation (i.e. gold loss from actual versus planned). Monetary loss is on an annual basis for operations and over the delay period for development projects. For development projects includes sustaining cost over delay period

Case study

Project status

Estimated US$ loss (M, million)

Intangible loss

1 OD/UD $3-4M Project delay 18 months. Company and management reputation. Majority of staff laid off. Reduction of standing in the local community. Delays in capital investment

2 UD $2-3M Project delay 9 months. Company and management reputation. Reduction of standing in the local community. Delays in capital investment

3 UO $8-10M Management reputation. Fraught internal relationships. Time to implement improvements

4 UO $8-10M Management reputation. Fraught internal relationships. Time to implement improvements

5 UO $2-3M Management reputation. Fraught internal relationships. Time to implement improvements

6 OO $2-3M Management reputation. Fraught internal relationships. Time to implement improvements

7 UO $3-4M Management reputation. Fraught internal relationships. Time to implement improvements

8 OD $3-4M Project delay 18 months. Company and management reputation. Delays in capital investment

9 UO $5-6M Management reputation. Fraught internal relationships. Time to implement improvements

10 UD $2-3M Project delay 9 months. Company and management reputation. Some staff laid off. Reduction of standing in the local community. Delays in capital investment

Key: OD, open pit in development; UD, underground in development; OP, open pit in production; UP, underground in production.

Page 27: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

26

Table 5 – Summary of original and revised sampling protocols Case study Original sample protocol Revised sample protocol

1

a) Half diamond core b) Crush and pulverise all sample c) Split 200 g for 30 g fire assay Poor QAQC

a) Half diamond core (triple tube) b) Crush to P80 -2.5 mm and riffle split 50% c) Pulverise and riffle split 150 g for 30 g fire

assay For poor recovery zones, crush entire interval and riffle split half. Implement full QAQC programme

2 a) Fixed 1 m sample length b) Total sample SFA

a) Sample to geology b) Total sample SFA

3 a) Diamond core and RC b) Crush and pulverise entire sample c) Split 200 g for 30 g fire assay No QC

a) Half diamond core b) Crush and pulverise all sample c) Total sample LeachWELL Improved QAQC programme

4 a) Half diamond core & face samples b) Crush and pulverise entire sample c) Split 250 g for 30 g fire assay Poor laboratory consistency on pulp splitting No QAQC

a) Half diamond core & face samples b) Crush and pulverise entire sample c) Total screen fire assay Removed need for pulp splitting. Implement full QAQC programme, including barren flushes between high-grade sample

5 a) Grab sampling, approx. 3 kg (stockpiles) b) Crush entire sample to P90 -2 mm c) Riffle split 0.5 kg for LeachWELL PAL

a) Half diamond core and face samples b) Samples crushed to P80 -2 mm and riffle split

50% c) Total sample LeachWELL Grab sampling ceased. Drill spacing reduced. Better use of geology

6 a) Blasthole (1 m composites) b) Split approx. 5 kg from pile c) Crush (P80 -3mm) and pulverise entire

sample d) Split 200 g for 30 g fire assay

a) Reverse circulation (0.7 m composites) b) Split approx. 10 kg at rig c) Crush to P80 -1.5 mm and riffle split 1 kg d) Pulverise e) Total sample LeachWELL

7 a) Half diamond core

b) Crush and pulverise entire sample c) Split 500 g for 30 g fire assay

a) Half diamond core b) Crush and pulverise entire sample c) Total screen fire assay Introduce barren flushes between high-grade sample

8 Minimal AAS maintenance and incorrect calibration

of AAS. Poor QC Full/regular AAS maintenance programme. Per shift calibration of AAS, with mid-shift check. Improved QAQC programme

9 a) Manually collected tails sample (1 kg/hour) b) Pulverise and split for 30 g fire assay

a) Tails auto-sampler (5 kg/hour) b) Pulverise and split for 30 g fire assay

10 Poor sampling strategy Splitting of 25 kg test sample from 100 kg primary sample in low grade ore

Considered sampling strategy based on grade control sampling of underground development along high-grade and low-grade zones. Entire GRG samples tested (75-100 kg)

Page 28: Importance of good sampling practice throughout the … · The importance of good sampling practice ... though (geo)-metallurgical sampling for plant design, control and ... provided

Dominy – Importance of good sampling…

27

Table 6 - Key stages in the design and implementation of a new or revised sampling protocol

Stage Aim Actions

1

Business case

Stakeholder engagement Define aim(s) of protocol and set data quality objectives

2 Characterise Preliminary review and design of characterisation programme Undertake characterisation programme

3 Design Review and interpret from Stage 2 Design sampling protocols within framework of TOS Review cost benefit of planned protocol

4 Implement Set-up systems and written codes of practice Training of staff

5 Monitor On-going QAQC Annual internal and/or external peer review of systems Annual internal and/or external peer review of individuals

6 Update On-going training/re-fresher Revision of protocols if deemed necessary in Stage 5 – return to Stage 2 or 3 as appropriate