30
Implementing ISA101 A Case Study: High Performance, High Resolution, High Availability HMI Upgrade

Implementing ISA101 - District Energy

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Implementing ISA101 - District Energy

Implementing ISA101

A Case Study: High Performance,

High Resolution, High Availability

HMI Upgrade

Page 2: Implementing ISA101 - District Energy

Sunday, June 25, 2017

ISA 101 Overview: The HMI of the Past• Provided an overview of the process

• Many trends throughout Trends Process Values

Alarms Status

Page 3: Implementing ISA101 - District Energy

Sunday, June 25, 2017

DCS effect on the HMI

• Early DCS displays lost the big picture

• Control via alarms

Page 4: Implementing ISA101 - District Energy

Sunday, June 25, 2017

DCS graphics evolved

Page 5: Implementing ISA101 - District Energy

Sunday, June 25, 2017

The HMI Evolves

Page 6: Implementing ISA101 - District Energy

Sunday, June 25, 2017

What’s so bad about P&ID based graphics?

• Color use inconsistent and unhelpful

• Trends are relegated to a separate screen

• All data no information

• No way to scan screen and determine state of the plant

• Distracting, low value 3D or animated elements

Page 7: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High performance: Data in context is information

Alarm

High Alarm range

Desired range

Low alarm range

Page 8: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Data in context is information

Page 9: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Trends

Page 10: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Level example

Page 11: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Use of color

• Gray backgrounds are used to minimize glare and provide low contrast depiction to allow alarms to be obvious

• Bright colors are only used for alarms and abnormal situations

• Colors used for alarms are not used elsewhere

Page 12: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Status indication example

RUNNING

RUNNING

RUNNING

Page 13: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Performance: Faceplates

PSI

Page 14: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Resolution

• Implemented on 43” - 3840 × 2160 monitors

1920 x 1080 1920 x 1080

1920 x 1080 1920 x 1080

Page 15: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Resolution

• Each operator will use two

1920 x 1080

1920 x 1080

1920 x 1080

1920 x 1080

1920 x 1080

1920 x 1080

1920 x 1080

1920 x 1080

Page 16: Implementing ISA101 - District Energy

Sunday, June 25, 2017

HP HMI - Hierarchy

• Level 1 – Process area overview

– At a glance display

• Level 2 – Process Control Unit

– Controllers, Values, Alarms, Trends, Status

• Level 3 – Process Unit Detail

– Small equipment groups

• Level 4 – Diagnostic, Interlocks, First-Outs, Procedures, Documentation

Page 17: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Page 18: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Resolution• Navigation:

Page 19: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Level 1

Page 20: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Level 2

Page 21: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Level 3

Page 22: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Availability

Loop 15

CIU - 2LOOP 15

CIU - 1LOOP 15

Page 23: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Availability

Loop 15

SCSI SCSI

CIU - 2LOOP 15

CIU - 1LOOP 15

Interface Server:

OPC90 – AInterface Server:

OPC90 – B

COM Redundancy3 CIUs: CIU15A, CIU1A,

CIU11A

Page 24: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Availability

Loop 15

SCSI SCSI

OPC Redundancy managed by FTView

CIU - 2LOOP 15

CIU - 1LOOP 15

Horizon View-------------

IDC 1-------------

FT View

Horizon View-------------

IDC 2-------------

FT ViewFT View Server Redundancy managed by FT View

Thin Client Server Redundancy managed by Horizon View

Interface Server:

OPC90 – AInterface Server:

OPC90 – B

COM Redundancy3 CIUs: CIU15A, CIU1A,

CIU11A

Page 25: Implementing ISA101 - District Energy

Sunday, June 25, 2017

High Availability

Loop 15

SCSI SCSI

Thin Client

Thin Client

Thin Client NIC Redundancy managed by OS

OPC Redundancy managed by FTView

CIU - 2LOOP 15

CIU - 1LOOP 15

Horizon View-------------

IDC 1-------------

FT View

Horizon View-------------

IDC 2-------------

FT ViewFT View Server Redundancy managed by FT View

Thin Client Server Redundancy managed by Horizon View

Horizon View-------------

IDC 1-------------

FT View

Horizon View-------------

IDC 2-------------

FT ViewFT View Server Redundancy managed by FT View

Thin Client Server Redundancy managed by Horizon View

Interface Server:

OPC90 – AInterface Server:

OPC90 – AInterface Server:

OPC90 – BInterface Server:

OPC90 – B

COM Redundancy3 CIUs: CIU15A, CIU1A,

CIU11A

Page 26: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Operator Buy-in

• Operators miss the color

• Project performed in phases

• Solicit feedback throughout and after project

Page 27: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Wrap-up

• High Performance

• High Resolution

• High Availability

Page 28: Implementing ISA101 - District Energy

Sunday, June 25, 2017

For more information

• ANSI/ISA-101.01-2015 - Human Machine Interfaces for Process Automation Systems

Page 29: Implementing ISA101 - District Energy

Sunday, June 25, 2017

Acknowledgements

• Hollifield, B. R. (2008). The high performance HMI handbook: A comprehensive guide to designing, implementing and maintaining effective HMIs for industrial plant operations. Houston, TX: PAS.

Page 30: Implementing ISA101 - District Energy

Thank you