27
Implementation of LED Street lighting Project at 12 ULBs of Telangana State Energy Efficiency Services Limited (EESL) By IL&FS Energy Development Company Ltd on Behalf of

Implementation of LED Street lighting Project at 12 ULBs ... of LED Retrofitting... · Implementation of LED Street lighting ... 5. Siricilla ... the same which would form basis for

Embed Size (px)

Citation preview

Implementation of LED Street lighting

Project at 12 ULBs of Telangana State

Energy Efficiency Services Limited (EESL)

By

IL&FS Energy Development Company Ltd

on Behalf of

1. Gajwel Nagara Panchayat

2. Karimnagar Corporation

3. Nizamabad Corporation

4. Siddipet Municipality

5. Siricilla Municipality

6. Ramagundam Corporation

7. Khammam Corporation

8. Mahbubnagar Municipality

9. Manchiryal Municipality

10.Nalgonda Municipality

11.Tandur Municipality, &

12.Warangal Corporation

Sricilla

Gajwel

Ramagundam

Project Details

Scope:

Retrofitting of existing street lights with LED luminaries

CCMS at switch points (during full scale project)

Light quality : to match or exceed existing light output

Replacement on point to point

Retrofit wattages of LED

3

Existing wattages, W 40 70 150 250 400Other losses, W 8 10 15 25 40

Gross wattage, W 48 80 165 275 440LED Wattage (range) 15-20 35-45 70-85 120-140 190-210

Implementation Plan

Proposed to be implemented in two phases:

Phase -1: Implementation of Pilot stretches in 12 ULBs

Phase -2: Implementation of full scale Project in 12 ULBs

Objectives of Pilot :

To understand the practical issues while at site and incorporate

the rectifications in full-scale project

To demonstrate energy consumption, savings and monitoring of

the same which would form basis for annuity payments to EESL

in full-scale project

Implementation Steps

Rectification of infrastructure by ULBs based on survey findings

EESL to initiate installations in ULBs, for Phase-1

Demonstration for 15 days; 7 days for each existing & retrofit fixtures

Rectification of infrastructure by ULBs

Full scale Project implementation

Survey of balance street lights to identify infrastructure requirements

Key Points

• MAUD / ULBs to provide

authorizations & approvals

for full scale Project

• Replacements on point to

point basis

• Installation reports to be

signed by ULB daily basis

• Empty poles replacement

shall be as per adjacent

fixtures in the stretch or

fixture rationing

Inventory of lights for Phase-1Sl. No. Name of ULB

Existing Streetlights Inventory

40W 70W 120W 150W 250W 400W Total

1 Gajwel Nagar Panchayat 62 7 69

2 Mahabubnagar Municipality 310 310

3 Nalgonda Municipality 196 10 206

4 Nizamabad Corporation 68 5 269 44 386

5 Siddipet Municipality 135 69 204

6 Tandur Municipality 190 48 238

7 Khammam Corporation 10 1 209 3 223

8 Mancherial Municipality 152 152

9 Ramagundam Corporation 68 138 206

10 Sircilla Municipality 240 38 278

11 Warangal Corporation 28 390 418

12Karimnagar Municipal

Corporation 177 143 196 24 540

Total 255 209 28 212 2352 174 3230

Roles & responsibilities

MAUD/ CDMA EESL ULBs

Co-ordinating with ULBs / EESL; Survey of project area Carry out rectification found in

primary survey;

Provide permission to EESL / vendors

& authorized representatives;

Make capital investments in the

project

Authorize EESL / its representatives

/ vendors for project

implementation

Provide access to Project facility; Selection of manufacturers for

retrofitting with LEDs

Handover stretches;

Provide data / support; Supervision during implementation Appoint Engineer- in-charge;

Make timely payment against invoices; Contract Management Acknowledge the receipt of existing

fixtures;

Establish payment security

mechanisms;

Operation & maintenance during

contract period

Co-operate / counter-sign

measurement reports;

After pilot- support for full scale

implementation

Rectify non-functioning fixtures. Issue project completion certificate;

Take-up full scale project after

completion of pilot

Access to use of equipments, tools

/tackles etc.

Bracket missing from

pole

Fixture to be replaced by

EESL. Cabling shall be

done by ULB

Direct wire connection

MCBs, fuses, switches be installed

Pole damaged

Needs replacement

Rectification works … 1

8Meters to be installed on all switch points

Lamps operating using auto

switch

Lamps operating using

MCBs. Meter may be

installed with junction box

cover

Direct connection using

wires/ meters working

MCB, switches, fuses may be

installed with junction box

Rectification works … 2

9

Summary of Survey findings

Summary of Findings

Sl.

No.ULB Name

Stretch Details

Lamps

Poles Status of Switch & Meter Panels

RemarksName of Stretch Total Missing

Arms

missing

Fixtures

missing

Total

Connection

s

Direct

with

Switch /

MCB

Meter

working

1Gajwel Nagar

Panchayat1

Toopran – Pragnapur

(SH17) road

62*250 W

+ 7*400W34 0 0 0 1 0 1 0

2Mahabubnagar

Municipality1

Central Lighting: Padmavathi

Colony – Bandameedipally310*250W 153 29 16 13 7 1 5

5 of 7 Direct had

meters working

3Nalgonda

Municipality

1Mysaiah statue - Thrirumala

corner 10*400W +

196*250W101 1 11 10 1

2 Clock tower - Govt hospital

3 Clock tower to Milk Centre

4Nizamabad

Corporation

1Phulong X Road - Boargoan

Arch

44*400W +

269*250W

+ 5*70W +

68*40W

159 2 39 29 1026 of 29 Direct

had meters

working

2Phulong X road - Varni X

Road

3Phulong X road - Railway

Kamman

4 Old LIC - Ananth Gas

Summary of Findings ... Contd

Sl.

No.ULB Name

Stretch Details

Lamps

Poles Status of Switch & Meter Panels

RemarksName of Stretch Total Missing

Arms

missing

Fixtures

missing

Total

Connection

s

Direct

with

Switch /

MCB

Meter

working

5Siddipet

Municipality1

Part of Bharath Nagar

Ward Nos. 17, 18, 19

and 21

69*150W

+

135*70W

204 8 1 71 of 1 Direct

had Meter

not working

6Tandur

Municipality

1Railway Station Kamman

- Indira Chowk

48*400W

+

190*250

W

178 6 9 4 54 of 4 Direct

had Meter

not working

2Indira Chowk - William

Moon High School

3

Indira Chowk - Ayappa

Nagar on Kodangal

Road

4

Indira Chowk - Sishu

Takies on Chincholi

Road

7Khammam

Corporation

1Mayuri Centre - Jubliee

Club centre 3*400W

+

209*250

W +

1*70W +

10*40W

154 2 18 0 16 12 1 33 of 12 Direct

had meters

working

2Raparthynagar Centre -

RTA office centre

3Bustand - Gandhi Park

Cenre

4Zila Parishad - Church

compound

Summary of Findings ... Contd

Sl.

No.ULB Name

Stretch Details

Lamps

Poles Status of Switch & Meter Panels

RemarksName of Stretch Total Missing

Arms

missing

Fixtures

missing

Total

Connection

s

Direct

with

Switch /

MCB

Meter

working

8Mancherial

Municipality1

Ambedkar Chowk/ IB -

Ambedkar School

152*250

W76 5 1 8 6 2

6 direct has

meters

working

9

Ramagunda

m

Corporation

1Municipal Corporation

office - 5 Incline Chowk 138*150

W +

68*70W

103 7 6 1 51 meter not

working

2

Regal Show Market -

Kalyannagar Chowk -

Labour court

10Sircilla

Municipality

1

Ambedkar Chowrasta -

Autonagar on

Karimnagar Road

38*400W

+

240*250

W

126 3 11 5 65 of 5 Direct

had Meter

not working

2

Ambedkar Chowrasta -

Sai Nagar on

Kammareddy Road

3Ambedkar Chowrasta- Vidyanagar Water Tank on Siddipet Road

Summary of Findings ... Contd

Sl.

No.ULB Name

Stretch Details

Lamps

Poles Status of Switch & Meter Panels

RemarksName of Stretch Total

Missin

g

Arms

missing

Fixtures

missing

Total

Connection

s

Direct

with

Switch /

MCB

Meter

working

11Warangal

Corporation

1T.P Temple to Alankar

Junction

390*250

+ 28*120

W

209 10 17 13 6 7

6 direct has

meters

working

2

Reddy Chicken Centre

Road - Bheemaram X

Road

3Rahmath Nagar - Diesel

Colony

4

Kashibugga -

Venkatrama Central

Lightning DRC

12

Karimnagar

Municipal

Corporation

1SE Office - Opposite

Andhra Bhawan 196*250

W +

24*250W

+

143*150

W +

177*40W

431 2 3 21 1 4 16

4 with MCB

and meter

not working

2IB - Opposite to IB Guest

House

3Ambedkar Chowk - SE

Hostel

4

Near Venkateshwara

temple - Clock Tower -

Boyawada Chowk

THANK YOU

PICTURES – SWITCHING & METERING

POINT - 2

Switching Point # 2

Switch is working; MCB’s are by-passed

Meter # 5715

Analysis of Electricity Bills for 12 ULBs

ULB Name

Actual

load

(kW)

Energy

Cnsmptn

(kWh)

Billed

Amount

(Rs)

Cost

in Rs

/Unit

Avg

Optg

hr/day

% of

11

hour

1Gajwel Nagara

Panchayat20.13 43,383 3,81,020 8.78 5.90 54%

2Mahabubnagar

Municipality85.25 2,19,542 15,90,078 7.24 6.91 63%

3 Nalgonda Municipality 58.3 67,150 4,88,943 7.28 3.16 29%

4Nizamabad

Corporation97 3,15,331 27,55,827 8.74 8.47 77%

5 Siddipet Municipality 22.19 2,57,543 18,62,900 7.23 31.81 289%

6 Tandur Municipality 73.37 26,864 2,89,186 10.76 1.50 14%

7 Khammam Corporation 59.36 25,330 1,99,057 7.86 4.68 43%

8Mancherial

Municipality41.8 99,035 6,95,847 7.03 6.36 58%

9Ramagundam

Corporation28.21 Data not provided

10 Sircilla Municipality 82.72 1,27,554 9,20,644 7.22 4.43 40%

11 Warangal Corporation 110.9 2,32,043 18,35,778 7.91 5.77 52%

12Karimnagar M.

Corporation92.59 3,11,051 24,55,152 7.89 9.92 90%

Total 771.8 17,24,8261,34,74,43

2 7.81 6.12 56%

FINDINGS

• Average operating hours in 4

municipalities is < 50%.

• In fact, except for Karimnagar,

the operating hours are way

below 80%. The following are the

possible causes for such high

downtime :

o Non – working lights

o Improper lamp operation

o faults in cables, fuses, etc

o power availability

• Siddipet : Operating hours are

at 289% (~ 32 hours daily).

Energy consumption is 2.57 lakh

units against computed 0.89 lakh

units

• This is technically not possible,

except for the following reasons :

o Pilferage and power theft

o Mixed load connected to

meter

• Cost per unit electricity is in ranging from Rs 7.22 / unit to Rs 10.76 / unit.

• Possible reasons are : Additional charges on account of low power factor, interest

charges & low connected load

• Electricity duty : 6 paise / unit

» » 12 hours operation, energy consumption would be 3.38 MUs; instead of 1.72

MUs as per bills

Comparative with Led retrofits (projected)

50.1%

Existing With retrofit Existing With retrofit

1 Gajwel Nagara Panchayat 20.1 10.1 88,169 40,471 670,667 308,754 3,81,020

2 Mahabubnagar Municipality 85.3 43.4 373,395 174,251 2,840,257 1,329,359 15,90,078

3 Nalgonda Municipality 58.3 29.4 255,354 118,202 1,942,369 901,759 4,88,943

4 Nizamabad Corporation 97.0 48.0 424,860 192,840 3,231,730 1,471,178 27,55,827

5 Siddipet Municipality 22.2 11.2 97,192 44,928 739,300 342,754 18,62,900

6 Tandur Municipality 73.4 36.2 321,361 145,343 2,444,454 1,108,820 2,89,186

7 Khammam Corporation 59.4 30.1 259,997 120,860 1,977,685 922,036 1,99,057

8 Mancherial Municipality 41.8 21.3 183,084 85,439 1,392,642 651,815 6,95,847

9 Ramagundam Corporation 28.2 13.9 123,560 55,792 939,867 425,640 - NA -

10 Sircilla Municipality 82.7 41.2 362,314 165,418 2,755,966 1,261,972 1,27,554

11 Warangal Corporation 110.9 56.4 485,742 226,526 3,694,833 1,728,167 2,32,043

12 Karimnagar M. Corporation 92.6 45.8 405,544 183,807 3,084,803 1,402,260 3,11,051

Total 771.8 387.0 3,380,572 1,553,877 25,714,573 11,854,516 1,34,74,432

As per bills

(Rs)

Sl.

No.ULB Name

Actual load

(kW)

Reduced

load (kW)

Prjctd energy consmptn (kWh) Projected Bill Amount (Rs )

Uniform repayment to EESL

Cost of retrofitting LED Street Lights (INR) 541,82,520

Project Management Consultancy % 5%

Project Management Cost (INR) 27,09,126

Addl Cost of Supervision (for 3 months) 9,00,000

Total Capital cost of the Project (INR) 586,91,646

Life of Project (years) 7

Debt : Equity 80:20

Cost per LED/ Watt, incl driver (INR) 140

Total no. of Street Lights to be replaced 3,230

Total Watts for LED lights to be replaced 3,87,018

Debt : 462,33,317 (80%)

Equity : 115,58,329 (20%)

Financial years 1 2 3 4 5 6 7 Total

1 Debt at beginning of FY 46,953,317 42,370,529 37,214,892 31,414,801 24,889,698 17,548,958 9,290,625 -

2 Debt at End of FY 42,370,529 37,214,892 31,414,801 24,889,698 17,548,958 9,290,625 - -

3 Principal payout - annually 4,582,788 5,155,637 5,800,091 6,525,103 7,340,740 8,258,333 9,290,625 46,953,317

4 Interest 12.50% 5,869,165 5,296,316 4,651,862 3,926,850 3,111,212 2,193,620 1,161,328 26,210,352

5 Debt repayment - equated installment 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 73,163,669

6 Annual maintenance charges 4.00% 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 15,171,106

7 Return on Equity 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 23,555,431

8 Annual repayment

(excluding service tax)15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 111,890,205

9 Service Tax @ 12.36% 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 13,829,629

10 Annual repayment

(including service tax)17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 125,719,835

Benefits of project implementation

• Improved quality of service by better illumination of public places• Reduction in actual load on power for street lights from 772 kW to 387 kW • Reduction in energy costs by savings – Rs. 3.46 Crores cumulative in 7 year and Rs. 2.8 Crores every year after 7 year contract period

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 3.38 3.38 3.38 3.38 3.38 3.38 3.38

2 Electricity bill with existing fittings INR 2.54 2.62 2.70 2.78 2.86 2.95 3.04 19.48

3 Annual maintenance bill INR 0.58 0.64 0.70 0.77 0.85 0.93 1.03 5.51

4 Gross expenses with existing fittings INR 3.12 3.26 3.40 3.55 3.71 3.88 4.06 24.99

Scenario after retrofit

5 Energy consumption with retrofits MUs 1.55 1.55 1.55 1.55 1.55 1.55 1.55

6 Electricity bill after retrofits INR 1.17 1.20 1.24 1.28 1.31 1.35 1.40 8.95

7 Annuity to EESL INR 1.80 1.80 1.80 1.80 1.80 1.80 1.80 12.57

8 Gross expenses after retrofits INR 2.96 3.00 3.04 3.07 3.11 3.15 3.19 21.52

9 Net benefits retained by ULBs INR 0.16 0.26 0.36 0.48 0.60 0.73 0.87 3.46

THANK YOU

Benefits of project implementation – ULB wise … … 1

1 Gajwel Nagara Panchayat (1)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.09 0.09 0.09 0.09 0.09 0.09 0.09 -

2 Electricity bill with existing fittings INR 0.07 0.07 0.07 0.07 0.07 0.08 0.08 0.51

3 Annual maintenance bill INR 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.13

4 Gross expenses with existing fittings INR 0.08 0.08 0.09 0.09 0.10 0.10 0.10 0.64

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

6 Electricity bill after retrofits INR 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.23

7 Annuity to EESL INR 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.33

8 Gross expenses after retrofits INR 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56

9 Net benefits retained by ULBs INR 0.00 0.01 0.01 0.01 0.01 0.02 0.02 0.08

2 Mahabubnagar Municipality (2)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.37 0.37 0.37 0.37 0.37 0.37 0.37 -

2 Electricity bill with existing fittings INR 0.28 0.29 0.30 0.31 0.32 0.33 0.34 2.15

3 Annual maintenance bill INR 0.06 0.07 0.08 0.08 0.09 0.10 0.11 0.59

4 Gross expenses with existing fittings INR 0.34 0.36 0.37 0.39 0.41 0.43 0.45 2.74

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -

6 Electricity bill after retrofits INR 0.13 0.13 0.14 0.14 0.15 0.15 0.16 1.00

7 Annuity to EESL INR 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.41

8 Gross expenses after retrofits INR 0.33 0.34 0.34 0.34 0.35 0.35 0.36 2.41

9 Net benefits retained by ULBs INR 0.01 0.02 0.03 0.04 0.06 0.07 0.09 0.33

Benefits of project implementation – ULB wise … … 2

3 Nalgonda Municipality (3)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.26 0.26 0.26 0.26 0.26 0.26 0.26 -

2 Electricity bill with existing fittings INR 0.19 0.20 0.20 0.21 0.22 0.22 0.23 1.47

3 Annual maintenance bill INR 0.04 0.05 0.05 0.06 0.06 0.07 0.07 0.40

4 Gross expenses with existing fittings INR 0.23 0.24 0.25 0.27 0.28 0.29 0.30 1.87

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -

6 Electricity bill after retrofits INR 0.09 0.09 0.09 0.10 0.10 0.10 0.11 0.68

7 Annuity to EESL INR 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.96

8 Gross expenses after retrofits INR 0.23 0.23 0.23 0.23 0.24 0.24 0.24 1.64

9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.04 0.05 0.06 0.23

4 Nizamabad Corporation (4)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.42 0.42 0.42 0.42 0.42 0.42 0.42 -

2 Electricity bill with existing fittings INR 0.32 0.33 0.34 0.35 0.36 0.37 0.38 2.45

3 Annual maintenance bill INR 0.07 0.08 0.08 0.09 0.10 0.11 0.12 0.66

4 Gross expenses with existing fittings INR 0.39 0.41 0.42 0.44 0.46 0.48 0.51 3.11

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.19 0.19 0.19 0.19 0.19 0.19 0.19 -

6 Electricity bill after retrofits INR 0.14 0.15 0.15 0.16 0.16 0.17 0.17 1.11

7 Annuity to EESL INR 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.56

8 Gross expenses after retrofits INR 0.37 0.37 0.38 0.38 0.39 0.39 0.40 2.67

9 Net benefits retained by ULBs INR 0.02 0.03 0.05 0.06 0.08 0.09 0.11 0.44

Benefits of project implementation – ULB wise … … 3

5 Siddipet Municipality (5)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -

2 Electricity bill with existing fittings INR 0.07 0.08 0.08 0.08 0.08 0.08 0.09 0.56

3 Annual maintenance bill INR 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.23

4 Gross expenses with existing fittings INR 0.10 0.10 0.11 0.11 0.12 0.12 0.13 0.79

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

6 Electricity bill after retrofits INR 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.26

7 Annuity to EESL INR 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.36

8 Gross expenses after retrofits INR 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.62

9 Net benefits retained by ULBs INR 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.16

6 Tandur Municipality (6)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.32 0.32 0.32 0.32 0.32 0.32 0.32 -

2 Electricity bill with existing fittings INR 0.24 0.25 0.26 0.26 0.27 0.28 0.29 1.85

3 Annual maintenance bill INR 0.05 0.06 0.06 0.07 0.07 0.08 0.09 0.47

4 Gross expenses with existing fittings INR 0.29 0.30 0.32 0.33 0.35 0.36 0.38 2.33

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.15 0.15 0.15 0.15 0.15 0.15 0.15 -

6 Electricity bill after retrofits INR 0.11 0.11 0.12 0.12 0.12 0.13 0.13 0.84

7 Annuity to EESL INR 0.17 0.17 0.17 0.17 0.17 0.17 0.17 1.18

8 Gross expenses after retrofits INR 0.28 0.28 0.28 0.29 0.29 0.29 0.30 2.01

9 Net benefits retained by ULBs INR 0.01 0.02 0.03 0.04 0.05 0.07 0.08 0.31

Benefits of project implementation – ULB wise … … 4

7 Khammam Corporation (7)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.26 0.26 0.26 0.26 0.26 0.26 0.26 -

2 Electricity bill with existing fittings INR 0.20 0.20 0.21 0.21 0.22 0.23 0.23 1.50

3 Annual maintenance bill INR 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.41

4 Gross expenses with existing fittings INR 0.24 0.25 0.26 0.27 0.28 0.30 0.31 1.91

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -

6 Electricity bill after retrofits INR 0.09 0.09 0.10 0.10 0.10 0.11 0.11 0.70

7 Annuity to EESL INR 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.98

8 Gross expenses after retrofits INR 0.23 0.23 0.24 0.24 0.24 0.25 0.25 1.67

9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.04 0.05 0.06 0.23

8 Mancherial Municipality (8)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.18 0.18 0.18 0.18 0.18 0.18 0.18 -

2 Electricity bill with existing fittings INR 0.14 0.14 0.15 0.15 0.15 0.16 0.16 1.05

3 Annual maintenance bill INR 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.29

4 Gross expenses with existing fittings INR 0.17 0.18 0.18 0.19 0.20 0.21 0.22 1.34

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.09 0.09 0.09 0.09 0.09 0.09 0.09 -

6 Electricity bill after retrofits INR 0.06 0.07 0.07 0.07 0.07 0.07 0.08 0.49

7 Annuity to EESL INR 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.69

8 Gross expenses after retrofits INR 0.16 0.16 0.17 0.17 0.17 0.17 0.18 1.18

9 Net benefits retained by ULBs INR 0.01 0.01 0.02 0.02 0.03 0.04 0.04 0.16

Benefits of project implementation – ULB wise … … 59 Ramagundam Corporation (9)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -

2 Electricity bill with existing fittings INR 0.09 0.10 0.10 0.10 0.10 0.11 0.11 0.71

3 Annual maintenance bill INR 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.26

4 Gross expenses with existing fittings INR 0.12 0.13 0.13 0.14 0.14 0.15 0.16 0.97

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.06 0.06 0.06 0.06 0.06 0.06 0.06 -

6 Electricity bill after retrofits INR 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.32

7 Annuity to EESL INR 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.45

8 Gross expenses after retrofits INR 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.77

9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.03 0.04 0.05 0.20

10 Sircilla Municipality (10)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.36 0.36 0.36 0.36 0.36 0.36 0.36 -

2 Electricity bill with existing fittings INR 0.27 0.28 0.29 0.30 0.31 0.32 0.33 2.09

3 Annual maintenance bill INR 0.06 0.06 0.07 0.08 0.08 0.09 0.10 0.55

4 Gross expenses with existing fittings INR 0.33 0.34 0.36 0.37 0.39 0.41 0.43 2.63

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -

6 Electricity bill after retrofits INR 0.12 0.13 0.13 0.14 0.14 0.14 0.15 0.95

7 Annuity to EESL INR 0.19 0.19 0.19 0.19 0.19 0.19 0.19 1.34

8 Gross expenses after retrofits INR 0.32 0.32 0.32 0.33 0.33 0.34 0.34 2.29

9 Net benefits retained by ULBs INR 0.01 0.02 0.04 0.05 0.06 0.07 0.09 0.34

Benefits of project implementation – ULB wise … … 6

11 Warangal Corporation (11)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.49 0.49 0.49 0.49 0.49 0.49 0.49 -

2 Electricity bill with existing fittings INR 0.37 0.38 0.39 0.40 0.41 0.42 0.44 2.80

3 Annual maintenance bill INR 0.08 0.09 0.10 0.11 0.12 0.13 0.15 0.78

4 Gross expenses with existing fittings INR 0.45 0.47 0.49 0.51 0.53 0.56 0.58 3.58

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.23 0.23 0.23 0.23 0.23 0.23 0.23 -

6 Electricity bill after retrofits INR 0.17 0.18 0.18 0.19 0.19 0.20 0.20 1.31

7 Annuity to EESL INR 0.26 0.26 0.26 0.26 0.26 0.26 0.26 1.83

8 Gross expenses after retrofits INR 0.43 0.44 0.44 0.45 0.45 0.46 0.47 3.14

9 Net benefits retained by ULBs INR 0.02 0.03 0.04 0.06 0.08 0.10 0.12 0.44

12 Karimnagar Corporation (12)

Financial years 1 2 3 4 5 6 7 Total

Scenario with existing fixtures

1 Energy consumption with existing fittings MUs 0.41 0.41 0.41 0.41 0.41 0.41 0.41 -

2 Electricity bill with existing fittings INR 0.30 0.31 0.32 0.33 0.34 0.35 0.36 2.34

3 Annual maintenance bill INR 0.08 0.09 0.09 0.10 0.11 0.13 0.14 0.74

4 Gross expenses with existing fittings INR 0.38 0.40 0.42 0.44 0.46 0.48 0.50 3.08

Scenario after retrofit

5 Energy consumption with retrofits MUs 0.18 0.18 0.18 0.18 0.18 0.18 0.18 -

6 Electricity bill after retrofits INR 0.14 0.14 0.15 0.15 0.16 0.16 0.17 1.06

7 Annuity to EESL INR 0.21 0.21 0.21 0.21 0.21 0.21 0.21 1.49

8 Gross expenses after retrofits INR 0.35 0.35 0.36 0.36 0.37 0.37 0.38 2.55

9 Net benefits retained by ULBs INR 0.03 0.04 0.06 0.07 0.09 0.11 0.12 0.53