Implementation of LED Street lighting
Project at 12 ULBs of Telangana State
Energy Efficiency Services Limited (EESL)
By
IL&FS Energy Development Company Ltd
on Behalf of
1. Gajwel Nagara Panchayat
2. Karimnagar Corporation
3. Nizamabad Corporation
4. Siddipet Municipality
5. Siricilla Municipality
6. Ramagundam Corporation
7. Khammam Corporation
8. Mahbubnagar Municipality
9. Manchiryal Municipality
10.Nalgonda Municipality
11.Tandur Municipality, &
12.Warangal Corporation
Sricilla
Gajwel
Ramagundam
Project Details
Scope:
Retrofitting of existing street lights with LED luminaries
CCMS at switch points (during full scale project)
Light quality : to match or exceed existing light output
Replacement on point to point
Retrofit wattages of LED
3
Existing wattages, W 40 70 150 250 400Other losses, W 8 10 15 25 40
Gross wattage, W 48 80 165 275 440LED Wattage (range) 15-20 35-45 70-85 120-140 190-210
Implementation Plan
Proposed to be implemented in two phases:
Phase -1: Implementation of Pilot stretches in 12 ULBs
Phase -2: Implementation of full scale Project in 12 ULBs
Objectives of Pilot :
To understand the practical issues while at site and incorporate
the rectifications in full-scale project
To demonstrate energy consumption, savings and monitoring of
the same which would form basis for annuity payments to EESL
in full-scale project
Implementation Steps
Rectification of infrastructure by ULBs based on survey findings
EESL to initiate installations in ULBs, for Phase-1
Demonstration for 15 days; 7 days for each existing & retrofit fixtures
Rectification of infrastructure by ULBs
Full scale Project implementation
Survey of balance street lights to identify infrastructure requirements
Key Points
• MAUD / ULBs to provide
authorizations & approvals
for full scale Project
• Replacements on point to
point basis
• Installation reports to be
signed by ULB daily basis
• Empty poles replacement
shall be as per adjacent
fixtures in the stretch or
fixture rationing
Inventory of lights for Phase-1Sl. No. Name of ULB
Existing Streetlights Inventory
40W 70W 120W 150W 250W 400W Total
1 Gajwel Nagar Panchayat 62 7 69
2 Mahabubnagar Municipality 310 310
3 Nalgonda Municipality 196 10 206
4 Nizamabad Corporation 68 5 269 44 386
5 Siddipet Municipality 135 69 204
6 Tandur Municipality 190 48 238
7 Khammam Corporation 10 1 209 3 223
8 Mancherial Municipality 152 152
9 Ramagundam Corporation 68 138 206
10 Sircilla Municipality 240 38 278
11 Warangal Corporation 28 390 418
12Karimnagar Municipal
Corporation 177 143 196 24 540
Total 255 209 28 212 2352 174 3230
Roles & responsibilities
MAUD/ CDMA EESL ULBs
Co-ordinating with ULBs / EESL; Survey of project area Carry out rectification found in
primary survey;
Provide permission to EESL / vendors
& authorized representatives;
Make capital investments in the
project
Authorize EESL / its representatives
/ vendors for project
implementation
Provide access to Project facility; Selection of manufacturers for
retrofitting with LEDs
Handover stretches;
Provide data / support; Supervision during implementation Appoint Engineer- in-charge;
Make timely payment against invoices; Contract Management Acknowledge the receipt of existing
fixtures;
Establish payment security
mechanisms;
Operation & maintenance during
contract period
Co-operate / counter-sign
measurement reports;
After pilot- support for full scale
implementation
Rectify non-functioning fixtures. Issue project completion certificate;
Take-up full scale project after
completion of pilot
Access to use of equipments, tools
/tackles etc.
Bracket missing from
pole
Fixture to be replaced by
EESL. Cabling shall be
done by ULB
Direct wire connection
MCBs, fuses, switches be installed
Pole damaged
Needs replacement
Rectification works … 1
8Meters to be installed on all switch points
Lamps operating using auto
switch
Lamps operating using
MCBs. Meter may be
installed with junction box
cover
Direct connection using
wires/ meters working
MCB, switches, fuses may be
installed with junction box
Rectification works … 2
9
Summary of Findings
Sl.
No.ULB Name
Stretch Details
Lamps
Poles Status of Switch & Meter Panels
RemarksName of Stretch Total Missing
Arms
missing
Fixtures
missing
Total
Connection
s
Direct
with
Switch /
MCB
Meter
working
1Gajwel Nagar
Panchayat1
Toopran – Pragnapur
(SH17) road
62*250 W
+ 7*400W34 0 0 0 1 0 1 0
2Mahabubnagar
Municipality1
Central Lighting: Padmavathi
Colony – Bandameedipally310*250W 153 29 16 13 7 1 5
5 of 7 Direct had
meters working
3Nalgonda
Municipality
1Mysaiah statue - Thrirumala
corner 10*400W +
196*250W101 1 11 10 1
2 Clock tower - Govt hospital
3 Clock tower to Milk Centre
4Nizamabad
Corporation
1Phulong X Road - Boargoan
Arch
44*400W +
269*250W
+ 5*70W +
68*40W
159 2 39 29 1026 of 29 Direct
had meters
working
2Phulong X road - Varni X
Road
3Phulong X road - Railway
Kamman
4 Old LIC - Ananth Gas
Summary of Findings ... Contd
Sl.
No.ULB Name
Stretch Details
Lamps
Poles Status of Switch & Meter Panels
RemarksName of Stretch Total Missing
Arms
missing
Fixtures
missing
Total
Connection
s
Direct
with
Switch /
MCB
Meter
working
5Siddipet
Municipality1
Part of Bharath Nagar
Ward Nos. 17, 18, 19
and 21
69*150W
+
135*70W
204 8 1 71 of 1 Direct
had Meter
not working
6Tandur
Municipality
1Railway Station Kamman
- Indira Chowk
48*400W
+
190*250
W
178 6 9 4 54 of 4 Direct
had Meter
not working
2Indira Chowk - William
Moon High School
3
Indira Chowk - Ayappa
Nagar on Kodangal
Road
4
Indira Chowk - Sishu
Takies on Chincholi
Road
7Khammam
Corporation
1Mayuri Centre - Jubliee
Club centre 3*400W
+
209*250
W +
1*70W +
10*40W
154 2 18 0 16 12 1 33 of 12 Direct
had meters
working
2Raparthynagar Centre -
RTA office centre
3Bustand - Gandhi Park
Cenre
4Zila Parishad - Church
compound
Summary of Findings ... Contd
Sl.
No.ULB Name
Stretch Details
Lamps
Poles Status of Switch & Meter Panels
RemarksName of Stretch Total Missing
Arms
missing
Fixtures
missing
Total
Connection
s
Direct
with
Switch /
MCB
Meter
working
8Mancherial
Municipality1
Ambedkar Chowk/ IB -
Ambedkar School
152*250
W76 5 1 8 6 2
6 direct has
meters
working
9
Ramagunda
m
Corporation
1Municipal Corporation
office - 5 Incline Chowk 138*150
W +
68*70W
103 7 6 1 51 meter not
working
2
Regal Show Market -
Kalyannagar Chowk -
Labour court
10Sircilla
Municipality
1
Ambedkar Chowrasta -
Autonagar on
Karimnagar Road
38*400W
+
240*250
W
126 3 11 5 65 of 5 Direct
had Meter
not working
2
Ambedkar Chowrasta -
Sai Nagar on
Kammareddy Road
3Ambedkar Chowrasta- Vidyanagar Water Tank on Siddipet Road
Summary of Findings ... Contd
Sl.
No.ULB Name
Stretch Details
Lamps
Poles Status of Switch & Meter Panels
RemarksName of Stretch Total
Missin
g
Arms
missing
Fixtures
missing
Total
Connection
s
Direct
with
Switch /
MCB
Meter
working
11Warangal
Corporation
1T.P Temple to Alankar
Junction
390*250
+ 28*120
W
209 10 17 13 6 7
6 direct has
meters
working
2
Reddy Chicken Centre
Road - Bheemaram X
Road
3Rahmath Nagar - Diesel
Colony
4
Kashibugga -
Venkatrama Central
Lightning DRC
12
Karimnagar
Municipal
Corporation
1SE Office - Opposite
Andhra Bhawan 196*250
W +
24*250W
+
143*150
W +
177*40W
431 2 3 21 1 4 16
4 with MCB
and meter
not working
2IB - Opposite to IB Guest
House
3Ambedkar Chowk - SE
Hostel
4
Near Venkateshwara
temple - Clock Tower -
Boyawada Chowk
PICTURES – SWITCHING & METERING
POINT - 2
Switching Point # 2
Switch is working; MCB’s are by-passed
Meter # 5715
Analysis of Electricity Bills for 12 ULBs
ULB Name
Actual
load
(kW)
Energy
Cnsmptn
(kWh)
Billed
Amount
(Rs)
Cost
in Rs
/Unit
Avg
Optg
hr/day
% of
11
hour
1Gajwel Nagara
Panchayat20.13 43,383 3,81,020 8.78 5.90 54%
2Mahabubnagar
Municipality85.25 2,19,542 15,90,078 7.24 6.91 63%
3 Nalgonda Municipality 58.3 67,150 4,88,943 7.28 3.16 29%
4Nizamabad
Corporation97 3,15,331 27,55,827 8.74 8.47 77%
5 Siddipet Municipality 22.19 2,57,543 18,62,900 7.23 31.81 289%
6 Tandur Municipality 73.37 26,864 2,89,186 10.76 1.50 14%
7 Khammam Corporation 59.36 25,330 1,99,057 7.86 4.68 43%
8Mancherial
Municipality41.8 99,035 6,95,847 7.03 6.36 58%
9Ramagundam
Corporation28.21 Data not provided
10 Sircilla Municipality 82.72 1,27,554 9,20,644 7.22 4.43 40%
11 Warangal Corporation 110.9 2,32,043 18,35,778 7.91 5.77 52%
12Karimnagar M.
Corporation92.59 3,11,051 24,55,152 7.89 9.92 90%
Total 771.8 17,24,8261,34,74,43
2 7.81 6.12 56%
FINDINGS
• Average operating hours in 4
municipalities is < 50%.
• In fact, except for Karimnagar,
the operating hours are way
below 80%. The following are the
possible causes for such high
downtime :
o Non – working lights
o Improper lamp operation
o faults in cables, fuses, etc
o power availability
• Siddipet : Operating hours are
at 289% (~ 32 hours daily).
Energy consumption is 2.57 lakh
units against computed 0.89 lakh
units
• This is technically not possible,
except for the following reasons :
o Pilferage and power theft
o Mixed load connected to
meter
• Cost per unit electricity is in ranging from Rs 7.22 / unit to Rs 10.76 / unit.
• Possible reasons are : Additional charges on account of low power factor, interest
charges & low connected load
• Electricity duty : 6 paise / unit
» » 12 hours operation, energy consumption would be 3.38 MUs; instead of 1.72
MUs as per bills
Comparative with Led retrofits (projected)
50.1%
Existing With retrofit Existing With retrofit
1 Gajwel Nagara Panchayat 20.1 10.1 88,169 40,471 670,667 308,754 3,81,020
2 Mahabubnagar Municipality 85.3 43.4 373,395 174,251 2,840,257 1,329,359 15,90,078
3 Nalgonda Municipality 58.3 29.4 255,354 118,202 1,942,369 901,759 4,88,943
4 Nizamabad Corporation 97.0 48.0 424,860 192,840 3,231,730 1,471,178 27,55,827
5 Siddipet Municipality 22.2 11.2 97,192 44,928 739,300 342,754 18,62,900
6 Tandur Municipality 73.4 36.2 321,361 145,343 2,444,454 1,108,820 2,89,186
7 Khammam Corporation 59.4 30.1 259,997 120,860 1,977,685 922,036 1,99,057
8 Mancherial Municipality 41.8 21.3 183,084 85,439 1,392,642 651,815 6,95,847
9 Ramagundam Corporation 28.2 13.9 123,560 55,792 939,867 425,640 - NA -
10 Sircilla Municipality 82.7 41.2 362,314 165,418 2,755,966 1,261,972 1,27,554
11 Warangal Corporation 110.9 56.4 485,742 226,526 3,694,833 1,728,167 2,32,043
12 Karimnagar M. Corporation 92.6 45.8 405,544 183,807 3,084,803 1,402,260 3,11,051
Total 771.8 387.0 3,380,572 1,553,877 25,714,573 11,854,516 1,34,74,432
As per bills
(Rs)
Sl.
No.ULB Name
Actual load
(kW)
Reduced
load (kW)
Prjctd energy consmptn (kWh) Projected Bill Amount (Rs )
Uniform repayment to EESL
Cost of retrofitting LED Street Lights (INR) 541,82,520
Project Management Consultancy % 5%
Project Management Cost (INR) 27,09,126
Addl Cost of Supervision (for 3 months) 9,00,000
Total Capital cost of the Project (INR) 586,91,646
Life of Project (years) 7
Debt : Equity 80:20
Cost per LED/ Watt, incl driver (INR) 140
Total no. of Street Lights to be replaced 3,230
Total Watts for LED lights to be replaced 3,87,018
Debt : 462,33,317 (80%)
Equity : 115,58,329 (20%)
Financial years 1 2 3 4 5 6 7 Total
1 Debt at beginning of FY 46,953,317 42,370,529 37,214,892 31,414,801 24,889,698 17,548,958 9,290,625 -
2 Debt at End of FY 42,370,529 37,214,892 31,414,801 24,889,698 17,548,958 9,290,625 - -
3 Principal payout - annually 4,582,788 5,155,637 5,800,091 6,525,103 7,340,740 8,258,333 9,290,625 46,953,317
4 Interest 12.50% 5,869,165 5,296,316 4,651,862 3,926,850 3,111,212 2,193,620 1,161,328 26,210,352
5 Debt repayment - equated installment 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 10,451,953 73,163,669
6 Annual maintenance charges 4.00% 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 2,167,301 15,171,106
7 Return on Equity 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 3,365,062 23,555,431
8 Annual repayment
(excluding service tax)15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 15,984,315 111,890,205
9 Service Tax @ 12.36% 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 1,975,661 13,829,629
10 Annual repayment
(including service tax)17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 17,959,976 125,719,835
Benefits of project implementation
• Improved quality of service by better illumination of public places• Reduction in actual load on power for street lights from 772 kW to 387 kW • Reduction in energy costs by savings – Rs. 3.46 Crores cumulative in 7 year and Rs. 2.8 Crores every year after 7 year contract period
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 3.38 3.38 3.38 3.38 3.38 3.38 3.38
2 Electricity bill with existing fittings INR 2.54 2.62 2.70 2.78 2.86 2.95 3.04 19.48
3 Annual maintenance bill INR 0.58 0.64 0.70 0.77 0.85 0.93 1.03 5.51
4 Gross expenses with existing fittings INR 3.12 3.26 3.40 3.55 3.71 3.88 4.06 24.99
Scenario after retrofit
5 Energy consumption with retrofits MUs 1.55 1.55 1.55 1.55 1.55 1.55 1.55
6 Electricity bill after retrofits INR 1.17 1.20 1.24 1.28 1.31 1.35 1.40 8.95
7 Annuity to EESL INR 1.80 1.80 1.80 1.80 1.80 1.80 1.80 12.57
8 Gross expenses after retrofits INR 2.96 3.00 3.04 3.07 3.11 3.15 3.19 21.52
9 Net benefits retained by ULBs INR 0.16 0.26 0.36 0.48 0.60 0.73 0.87 3.46
Benefits of project implementation – ULB wise … … 1
1 Gajwel Nagara Panchayat (1)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.09 0.09 0.09 0.09 0.09 0.09 0.09 -
2 Electricity bill with existing fittings INR 0.07 0.07 0.07 0.07 0.07 0.08 0.08 0.51
3 Annual maintenance bill INR 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.13
4 Gross expenses with existing fittings INR 0.08 0.08 0.09 0.09 0.10 0.10 0.10 0.64
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -
6 Electricity bill after retrofits INR 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.23
7 Annuity to EESL INR 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.33
8 Gross expenses after retrofits INR 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56
9 Net benefits retained by ULBs INR 0.00 0.01 0.01 0.01 0.01 0.02 0.02 0.08
2 Mahabubnagar Municipality (2)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.37 0.37 0.37 0.37 0.37 0.37 0.37 -
2 Electricity bill with existing fittings INR 0.28 0.29 0.30 0.31 0.32 0.33 0.34 2.15
3 Annual maintenance bill INR 0.06 0.07 0.08 0.08 0.09 0.10 0.11 0.59
4 Gross expenses with existing fittings INR 0.34 0.36 0.37 0.39 0.41 0.43 0.45 2.74
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -
6 Electricity bill after retrofits INR 0.13 0.13 0.14 0.14 0.15 0.15 0.16 1.00
7 Annuity to EESL INR 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.41
8 Gross expenses after retrofits INR 0.33 0.34 0.34 0.34 0.35 0.35 0.36 2.41
9 Net benefits retained by ULBs INR 0.01 0.02 0.03 0.04 0.06 0.07 0.09 0.33
Benefits of project implementation – ULB wise … … 2
3 Nalgonda Municipality (3)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.26 0.26 0.26 0.26 0.26 0.26 0.26 -
2 Electricity bill with existing fittings INR 0.19 0.20 0.20 0.21 0.22 0.22 0.23 1.47
3 Annual maintenance bill INR 0.04 0.05 0.05 0.06 0.06 0.07 0.07 0.40
4 Gross expenses with existing fittings INR 0.23 0.24 0.25 0.27 0.28 0.29 0.30 1.87
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -
6 Electricity bill after retrofits INR 0.09 0.09 0.09 0.10 0.10 0.10 0.11 0.68
7 Annuity to EESL INR 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.96
8 Gross expenses after retrofits INR 0.23 0.23 0.23 0.23 0.24 0.24 0.24 1.64
9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.04 0.05 0.06 0.23
4 Nizamabad Corporation (4)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.42 0.42 0.42 0.42 0.42 0.42 0.42 -
2 Electricity bill with existing fittings INR 0.32 0.33 0.34 0.35 0.36 0.37 0.38 2.45
3 Annual maintenance bill INR 0.07 0.08 0.08 0.09 0.10 0.11 0.12 0.66
4 Gross expenses with existing fittings INR 0.39 0.41 0.42 0.44 0.46 0.48 0.51 3.11
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.19 0.19 0.19 0.19 0.19 0.19 0.19 -
6 Electricity bill after retrofits INR 0.14 0.15 0.15 0.16 0.16 0.17 0.17 1.11
7 Annuity to EESL INR 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.56
8 Gross expenses after retrofits INR 0.37 0.37 0.38 0.38 0.39 0.39 0.40 2.67
9 Net benefits retained by ULBs INR 0.02 0.03 0.05 0.06 0.08 0.09 0.11 0.44
Benefits of project implementation – ULB wise … … 3
5 Siddipet Municipality (5)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.10 0.10 0.10 0.10 0.10 0.10 0.10 -
2 Electricity bill with existing fittings INR 0.07 0.08 0.08 0.08 0.08 0.08 0.09 0.56
3 Annual maintenance bill INR 0.02 0.03 0.03 0.03 0.03 0.04 0.04 0.23
4 Gross expenses with existing fittings INR 0.10 0.10 0.11 0.11 0.12 0.12 0.13 0.79
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -
6 Electricity bill after retrofits INR 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.26
7 Annuity to EESL INR 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.36
8 Gross expenses after retrofits INR 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.62
9 Net benefits retained by ULBs INR 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.16
6 Tandur Municipality (6)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.32 0.32 0.32 0.32 0.32 0.32 0.32 -
2 Electricity bill with existing fittings INR 0.24 0.25 0.26 0.26 0.27 0.28 0.29 1.85
3 Annual maintenance bill INR 0.05 0.06 0.06 0.07 0.07 0.08 0.09 0.47
4 Gross expenses with existing fittings INR 0.29 0.30 0.32 0.33 0.35 0.36 0.38 2.33
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.15 0.15 0.15 0.15 0.15 0.15 0.15 -
6 Electricity bill after retrofits INR 0.11 0.11 0.12 0.12 0.12 0.13 0.13 0.84
7 Annuity to EESL INR 0.17 0.17 0.17 0.17 0.17 0.17 0.17 1.18
8 Gross expenses after retrofits INR 0.28 0.28 0.28 0.29 0.29 0.29 0.30 2.01
9 Net benefits retained by ULBs INR 0.01 0.02 0.03 0.04 0.05 0.07 0.08 0.31
Benefits of project implementation – ULB wise … … 4
7 Khammam Corporation (7)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.26 0.26 0.26 0.26 0.26 0.26 0.26 -
2 Electricity bill with existing fittings INR 0.20 0.20 0.21 0.21 0.22 0.23 0.23 1.50
3 Annual maintenance bill INR 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.41
4 Gross expenses with existing fittings INR 0.24 0.25 0.26 0.27 0.28 0.30 0.31 1.91
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -
6 Electricity bill after retrofits INR 0.09 0.09 0.10 0.10 0.10 0.11 0.11 0.70
7 Annuity to EESL INR 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.98
8 Gross expenses after retrofits INR 0.23 0.23 0.24 0.24 0.24 0.25 0.25 1.67
9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.04 0.05 0.06 0.23
8 Mancherial Municipality (8)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.18 0.18 0.18 0.18 0.18 0.18 0.18 -
2 Electricity bill with existing fittings INR 0.14 0.14 0.15 0.15 0.15 0.16 0.16 1.05
3 Annual maintenance bill INR 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.29
4 Gross expenses with existing fittings INR 0.17 0.18 0.18 0.19 0.20 0.21 0.22 1.34
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.09 0.09 0.09 0.09 0.09 0.09 0.09 -
6 Electricity bill after retrofits INR 0.06 0.07 0.07 0.07 0.07 0.07 0.08 0.49
7 Annuity to EESL INR 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.69
8 Gross expenses after retrofits INR 0.16 0.16 0.17 0.17 0.17 0.17 0.18 1.18
9 Net benefits retained by ULBs INR 0.01 0.01 0.02 0.02 0.03 0.04 0.04 0.16
Benefits of project implementation – ULB wise … … 59 Ramagundam Corporation (9)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.12 0.12 0.12 0.12 0.12 0.12 0.12 -
2 Electricity bill with existing fittings INR 0.09 0.10 0.10 0.10 0.10 0.11 0.11 0.71
3 Annual maintenance bill INR 0.03 0.03 0.03 0.04 0.04 0.04 0.05 0.26
4 Gross expenses with existing fittings INR 0.12 0.13 0.13 0.14 0.14 0.15 0.16 0.97
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.06 0.06 0.06 0.06 0.06 0.06 0.06 -
6 Electricity bill after retrofits INR 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.32
7 Annuity to EESL INR 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.45
8 Gross expenses after retrofits INR 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.77
9 Net benefits retained by ULBs INR 0.01 0.02 0.02 0.03 0.03 0.04 0.05 0.20
10 Sircilla Municipality (10)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.36 0.36 0.36 0.36 0.36 0.36 0.36 -
2 Electricity bill with existing fittings INR 0.27 0.28 0.29 0.30 0.31 0.32 0.33 2.09
3 Annual maintenance bill INR 0.06 0.06 0.07 0.08 0.08 0.09 0.10 0.55
4 Gross expenses with existing fittings INR 0.33 0.34 0.36 0.37 0.39 0.41 0.43 2.63
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.17 0.17 0.17 0.17 0.17 0.17 0.17 -
6 Electricity bill after retrofits INR 0.12 0.13 0.13 0.14 0.14 0.14 0.15 0.95
7 Annuity to EESL INR 0.19 0.19 0.19 0.19 0.19 0.19 0.19 1.34
8 Gross expenses after retrofits INR 0.32 0.32 0.32 0.33 0.33 0.34 0.34 2.29
9 Net benefits retained by ULBs INR 0.01 0.02 0.04 0.05 0.06 0.07 0.09 0.34
Benefits of project implementation – ULB wise … … 6
11 Warangal Corporation (11)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.49 0.49 0.49 0.49 0.49 0.49 0.49 -
2 Electricity bill with existing fittings INR 0.37 0.38 0.39 0.40 0.41 0.42 0.44 2.80
3 Annual maintenance bill INR 0.08 0.09 0.10 0.11 0.12 0.13 0.15 0.78
4 Gross expenses with existing fittings INR 0.45 0.47 0.49 0.51 0.53 0.56 0.58 3.58
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.23 0.23 0.23 0.23 0.23 0.23 0.23 -
6 Electricity bill after retrofits INR 0.17 0.18 0.18 0.19 0.19 0.20 0.20 1.31
7 Annuity to EESL INR 0.26 0.26 0.26 0.26 0.26 0.26 0.26 1.83
8 Gross expenses after retrofits INR 0.43 0.44 0.44 0.45 0.45 0.46 0.47 3.14
9 Net benefits retained by ULBs INR 0.02 0.03 0.04 0.06 0.08 0.10 0.12 0.44
12 Karimnagar Corporation (12)
Financial years 1 2 3 4 5 6 7 Total
Scenario with existing fixtures
1 Energy consumption with existing fittings MUs 0.41 0.41 0.41 0.41 0.41 0.41 0.41 -
2 Electricity bill with existing fittings INR 0.30 0.31 0.32 0.33 0.34 0.35 0.36 2.34
3 Annual maintenance bill INR 0.08 0.09 0.09 0.10 0.11 0.13 0.14 0.74
4 Gross expenses with existing fittings INR 0.38 0.40 0.42 0.44 0.46 0.48 0.50 3.08
Scenario after retrofit
5 Energy consumption with retrofits MUs 0.18 0.18 0.18 0.18 0.18 0.18 0.18 -
6 Electricity bill after retrofits INR 0.14 0.14 0.15 0.15 0.16 0.16 0.17 1.06
7 Annuity to EESL INR 0.21 0.21 0.21 0.21 0.21 0.21 0.21 1.49
8 Gross expenses after retrofits INR 0.35 0.35 0.36 0.36 0.37 0.37 0.38 2.55
9 Net benefits retained by ULBs INR 0.03 0.04 0.06 0.07 0.09 0.11 0.12 0.53