IMPACT OF LOAD SHEDDING IN DHAKA CITY
Md. Shakil Ahmed (3-09-16-041) Sourov Mutsuddi (3-08-14-053) Romena Parveen (3-09-16-012) Amit Debnath (3-09-16-044) Nahid Rijwan (3-09-17-033)
Submitted by
LOAD SHEDDING
Deliberate switching off of electrical supply to parts of the electricity network
Bangladesh is facing huge load shedding of electricity.
All part of Dhaka having load shedding of electricity everyday at least four to eight hours everyday.
To know about the detailed cause and effects of load shedding on people’s socio-economic life
Why this research
Whether there is any electricity outage, and the frequency of the problem.
Problems faced by general peoples due to load shedding.
How the peoples are tackling the power shortage problem in their day to day lives.
How is their perception on government’s role regarding the load shedding issue?
Suggestions.
Objectives
Age Gender Income level Occupation
Evaluation Variables
Research type – Exploratory Research Population size – People of Dhaka City Sample size – 100 People Sampling technique – Multistage Stratified
Random Sampling Nature of data collection – Primary data Data collection instrument – Questionnaire Data processing instrument – EXCEL
Methodology
FINDINGS & ANALYSIS
Frequency Distribution of Age
Frequency Distribution of Gender
Distribution of Occupation
Distribution of Income
Duration of Load Shedding
Occurrence of Load Shedding Period
Affected Activity
If adopted alternative measure
Alternative Type
Extra cost paid for alternative
Extra Cost Frequency5-10% 2210-15% 815-20% 1620-25% 9
As percentage of total cost of electricity
Respondents think they could reduce the loss of electricity at personal level
Does technical & administrative losses are the main reason for recent power crisis?
People’s perception on govt.’s role to meet up the load shedding problem
Type of Alternative - Adopted for alternative Cross-Table
Adopted for Alternative
TotalYes No
Type of Alternative
Generator 11 - 11
IPS / UPS 27 - 27
Rental Electricity 17 - 17
Others 0 - 0
Need Alternative - 29 29
Do not Need - 16 16
Total 55 45 100
Alternative type – income level cross table
Alternative Type
Not Using Alternative
TotalGenerator IPS/UPSRental Power
Income level
Below 3000 0 0 0 6 63000-8000 0 2 5 10 178000-15000 0 3 4 19 2615000-25000 3 21 8 10 42
Above 25000 8 1 0 0 9Total 11 27 17 45 100