Impact of high-frequency Quality Cost Control Kaizen Institute Catarina Stepanov Bukovac Thesis to obtain the Master of Science Degree in Industrial Engineering and Management Supervisor: Prof. Tânia Rute Xavier de Matos Pinto Varela Examination Committee Chairperson: Prof. Susana Isabel Carvalho Relvas Supervisor: Prof. Tânia Rute Xavier de Matos Pinto Varela Member of the Committee: Prof. Amílcar José Martins Arantes November 2018

Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

Impact of high-frequency Quality Cost Control

Kaizen Institute

Catarina Stepanov Bukovac

Thesis to obtain the Master of Science Degree in

Industrial Engineering and Management

Supervisor: Prof. Tânia Rute Xavier de Matos Pinto Varela

Examination Committee Chairperson: Prof. Susana Isabel Carvalho Relvas

Supervisor: Prof. Tânia Rute Xavier de Matos Pinto Varela Member of the Committee: Prof. Amílcar José Martins Arantes

November 2018

Page 2: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

II

Page 3: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

III

Acknowledgments

I wish to express my gratitude to Prof. Tânia Varela, for all the help and availability, not only to read my

work and propose improvements but also for the guidance and mentorship along this journey, that is so

important in my academic and professional life.

I would like to thank Kaizen Institute, especially to Rui Tenreiro and Alberto Bastos, not only for the

opportunity to do my internship and develop my master dissertation but for giving me the chance to do

so in a project abroad. I would also like to give a special thank you to Pedro Meira Ramos, for the

continuous support and friendship, since the begging of the work until the end. To my colleagues at

work, I also want to thank for the help and guidance in every step of the way. I would also like to give a

special thank you to Rui Palhais, that was an important support in this journey.

To my parents, a very special thank you, for the strength that they passed me and the continuous

support that they gave me. For all the patience, love and encouragement they provided and all the

opportunities that I had thanks to them. To my brother, a thank you for being there for me in this phase

of my life, and for always pushing me to be better.

I would like to thank all my friends, that were present since the beginning of this journey, for the support

and strength that they gave me to overcome one more step in this journey, that is so important to me.

Last, but not least, I want to thank and dedicate my work to my grandparents, Dusan and Dinka

Stepanov. For all the love that they gave to me and for always believing in me, giving me strength.

Page 4: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

IV

Page 5: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

V

Abstract

With the growing economy and development of new technologies, organizations must keep up with this

growing pace. Now, more than ever, it is important to reduce waste and costs. The markets are

becoming more competitive and there is no room for error. This is where, Kaizen appears, with Lean

methodologies, a map of the value chain of the company is made, and the value added of the company

becomes clear.

This dissertation presents a quality problem that is happening in Company X, a leader in the automotive

industry. There is a problem with scrap, where there has been a high number of products that have

been returned by the customer, because the specifications weren´t met, and there is no awareness of

the non-quality costs. The specific factory being studied assumes that rework steps are obligatory in

the process, this paradigm must change because it is a non-value-added activity.

With the support of Kaizen methodologies and study of researches already made in the quality field,

this dissertation aims to provide a method to solve quality problems and develop a quantification model,

that will allow top management to have a clear vision of the impact of the costs that this quality problem

and rework needed is having.

The final goal of this dissertation is that the factory gains knowledge of the impact of non-quality, which

will lead to a higher concern in solving the quality issues, and that there is a structured method that

should be applied in every project.

Keywords: Cost of Quality, Non-value added, Awareness, Problem Solving.

Page 6: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

VI

Page 7: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

VII

Resumo

Com o desenvolvimento das novas tecnologias as empresas veem-se obrigadas a acompanhar este

crescimento. Torna-se crucial diminuir o desperdício e custos nas empresas. O Mercado torna-se mais

competitivo e não há margem para erro. Aqui surge o Kaizen com as suas metodologias Lean,

mapeando a cadeia de valor, tornando claro o que é de facto valor acrescentado.

Esta dissertação apresenta um problema de qualidade na Empresa X, líder no mercado automóvel.

Não só tem havido um número elevado de peças que tem sido rejeitadas pelo cliente, devido a desvios

nas especificações, mas não há qualquer conhecimento dos custos associados à não qualidade. A

fábrica que está a ser estudada, assume que etapas de retrabalho existentes são obrigatórias no

processo, este paradigma tem que mudar, uma vez que é uma tarefa de não valor acrescentado, que

consome recursos, tempo e espaço.

Com o suporte das metodologias Lean e análise de estudos já realizados no campo da qualidade, esta

dissertação pretende não só providenciar uma metodologia estruturada para resolver problemas mas

também desenvolver um modelo de quantificação de custos associados à não qualidade, que permitirá

à gestão de topo ter uma visão mais realista dos custos que estão a ser incorridos.

O objetivo final é que a fábrica passe a ter uma maior precessão do impacto dos custos associados à

não qualidade, e o impacto dos mesmos na fábrica. Com isto, é pretendido que passe a haver uma

maior preocupação em resolver os problemas associados à qualidade usando um método estruturado.

Palavras-Chave: Custos da Qualidade, Não Valor Acrescentado, Perceção, Resolução de

Problemas.

Page 8: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

VIII

Page 9: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

IX

Contents Acknowledgments ............................................................................................................................... III Abstract .................................................................................................................................................. V Resumo ................................................................................................................................................ VII Contents ................................................................................................................................................ IX Figures Index ........................................................................................................................................ XI Tables Index ....................................................................................................................................... XIII Acronyms List .................................................................................................................................... XV 1 Introduction ................................................................................................................................... 1

1.1 Problem Contextualization ...................................................................................................... 1

1.2 Dissertation Objectives ........................................................................................................... 2

1.3 Research Methodologies ........................................................................................................ 3

1.4 Dissertation Outline ................................................................................................................. 4

2 Case Study .................................................................................................................................... 5 2.1 Kaizen Institute ........................................................................................................................ 5

2.2 Company X .............................................................................................................................. 7

2.2.1 Hungarian Factory – Company X, Steel/Tube Factory ................................................... 9 2.3 Main Indicators of the Project (KPI) ...................................................................................... 16

2.4 Conclusion ............................................................................................................................. 17

3 State of Art .................................................................................................................................. 19 3.1 Quality Costing ...................................................................................................................... 19

3.1.1 Life Cycle Cost .............................................................................................................. 27 3.1.2 Conclusions – Quality Costing ...................................................................................... 28

3.2 Quality Cost Tracking Tool .................................................................................................... 28

3.3 Total Quality Management (TQM) ........................................................................................ 29

3.4 Conclusion ............................................................................................................................. 38

4 Preliminary Phase and Planning ............................................................................................... 39 4.1 Identification and Characterization of the Quality Problem in Kovomo ................................. 39

4.2 Chapter Conclusion ............................................................................................................... 49

5 Procedure Manual ...................................................................................................................... 51 5.1 Step by Step Implementation Process – Kovomo ................................................................. 57

5.2 Development of the Non-Quality Costing Tool ...................................................................... 61

5.3 Conclusions ........................................................................................................................... 67

6 Presentation and Analysis of the Results Obtained ............................................................... 69 6.1 Description and Presentation of the results .......................................................................... 69

6.1.1 Overall Savings ............................................................................................................. 69 6.1.2 Scrap Cost per Part Produced ...................................................................................... 69 6.1.3 Personal Cost Saving .................................................................................................... 70

6.2 Chapter Conclusions ............................................................................................................. 71

7 Final Conclusions....................................................................................................................... 73 8 References .................................................................................................................................. 75 Attachments ........................................................................................................................................ 79

Attachment A – Ishikawa Diagram ............................................................................................... 79 Attachment B – Step by Step Procedure, applied to Kovomo ..................................................... 81

Page 10: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

X

Page 11: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XI

Figures Index Figure 1--Methodology used for Master´s Dissertation Development .................................................... 3 Figure 2- Company X presence Worldwide (Company X Website) ........................................................ 8 Figure 3- Company X´s Business Units .................................................................................................. 8 Figure 4- Revenue by Segment (Company C Website) ......................................................................... 9 Figure 5- Top 6 lines- Scrap level ......................................................................................................... 10 Figure 6- Current State vs. Target (Scrap Level) .................................................................................. 11 Figure 7-Savings per Production Line ................................................................................................... 11 Figure 8- Production Process................................................................................................................ 12 Figure 9- Model M ................................................................................................................................. 12 Figure 10- Jig Used in Shaping ............................................................................................................. 13 Figure 11-Client´s Engine ..................................................................................................................... 14 Figure 12- Kovomo´s Productivity ......................................................................................................... 14 Figure 13-Scrap Pieces ......................................................................................................................... 15 Figure 14- Defective Parts in Kovomo .................................................................................................. 15 Figure 15-Quality Cost Allocation ......................................................................................................... 21 Figure 16-Two-dimensional model of ABC [14] .................................................................................... 23 Figure 17-Fishbone diagram [36] .......................................................................................................... 34 Figure 18-SMED methodology .............................................................................................................. 37 Figure 19- 5W2H ................................................................................................................................... 37 Figure 20-Pareto of Scrap ..................................................................................................................... 40 Figure 21-Pareto of Reworked pieces .................................................................................................. 40 Figure 22-AB Product ............................................................................................................................ 41 Figure 23-Production Process (Kovomo) .............................................................................................. 42 Figure 24-Example1 .............................................................................................................................. 43 Figure 25-Example2 .............................................................................................................................. 43 Figure 26-Example3 .............................................................................................................................. 43 Figure 27-Jig used for Product AB ........................................................................................................ 43 Figure 29-5W2H for Excess Copper ..................................................................................................... 46 Figure 30-5W2H for Lack of Copper ..................................................................................................... 46 Figure 28-Ishikawa Diagram ................................................................................................................. 47 Figure 31-Methodology Suggested ....................................................................................................... 51 Figure 32-Priority Matrix ........................................................................................................................ 55 Figure 33-Step by Step Procedure - Kovomo ....................................................................................... 57 Figure 34-Ishikawa done with Company X ........................................................................................... 58 Figure 36- Poka-Yoke System .............................................................................................................. 59 Figure 35-Standard Work for Pasting ................................................................................................... 59 Figure 37-Results of the Testing Phase ................................................................................................ 60 Figure 38-Cost per Production Process ................................................................................................ 67 Figure 39-Overall Savings ..................................................................................................................... 69 Figure 40-Scrap Cost Saving ................................................................................................................ 70 Figure 41-Personal Saving Cost ........................................................................................................... 71

Page 12: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XII

Page 13: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XIII

Tables Index Table 1- Test Plan ................................................................................................................................. 59 Table 2-Implementation Plan ................................................................................................................ 60 Table 3- Machine Costs and Raw Material Costs ................................................................................. 64 Table 4-Production Cycle Characterization .......................................................................................... 64 Table 5-Input Variables ......................................................................................................................... 65 Table 6-Quality paths ............................................................................................................................ 65 Table 7-Quality Paths Kovomo May ..................................................................................................... 66

Page 14: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XIV

Page 15: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XV

Acronyms List KI- Kaizen Institute

CoQ- Cost of Quality

PoC- Price of Conformance

PoNC- Price of Non-Conformance

CoC- Cost of Conformance

CoNC- Cost of Non-Conformance

LCC- Life Cycle Costs

TFM- Total Flow Management

TPM- Total Productive Maintenance

TQM- Total Quality Management

VSM- Value Stream Mapping

TSM- Total Service Management

IDM- Innovation and Development Management

KPI – Key Performance Indicator

STD- Standard Work

Page 16: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

XVI

Page 17: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

1 Introduction

1.1 Problem Contextualization

In the modern economic system, car manufacturers need to focus on the development of products that

will meet the customers’ expectations and fulfill regulatory requirements. In the more premium segment

of the automotive industry, this challenge, with all the competition that exists in the market, takes on a

different proportion. This industry is competitive because nowadays there are different brands that

present to the customer a high number of options. As a consequence of this broad choice, the industries

are forced to deliver the products with the highest quality possible, while not losing sight of the costs

associated with achieving it.

With all of this change, the organizations, now more than ever, have to be very efficient in delivering

what, how and when the customer wants it. Having this in mind, it is important that the companies

produce with the highest efficiency possible and with the lowest costs.

Company X is an Austrian Management Holding company that is well positioned in the market because

of its extensive portfolio of products and its presence in 38 countries around the world. It has three

divisions: Automotive, Steel/Tube and Distribution. Its aim is to be present in the entire value chain, by

being proximate to the customer and expanding into growing markets. There have been forecasts made

by the company that points to growth in the global market this year, by a rise of production volumes.

This specific project will focus on one specific plant in Hungary. The current situation in this plant is a

high number of rejection parts from the customer due to defects in the final pieces. There were months

where 90% of the pieces were rejected by the customer. Not only is this critical from the client´s point

of view, as this type of errors can affect the relationship established between Company X and the client,

but also because these quality problems represent a big cost to the factory. The need for a rework task

is now seen as an obligatory step, but this paradigm has to change quickly. These non-quality issues

are being measured by the number of parts that are being returned, but there is no awareness about

the true cost of this necessity to have some pieces being redone. This lack of knowledge of all the

parameters that are involved in non-quality costs is what triggered the need for this dissertation work.

A more detailed study should be made to assess all the costs that are being incurred in the production

process, in order to understand what production steps should be tackled. A related issue that has been

identified is the need to have a structured method of solving problems. Company X doesn’t have a

methodology to be applied when quality problems appear, which means there is no settled approach

that the employees should follow. This fact brings more complexity to a process that already isn´t easy.

Page 18: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

2

Nowadays, the company is facing a negative EBITA of approximately 2M€ and now more than ever it

is imperative that the costs are reduced if this plant wants to follow the growth of the production volumes.

Therefore, the challenge for this dissertation will be not only to try to provide a structured method to

solve the quality problems but also to develop a model that will quantify the costs that are inherent to

these quality problems.

1.2 Dissertation Objectives

The goal of this Dissertation in Master’s Degree in Industrial Engineering and Management is to apply

scientific concepts alongside with Lean methodologies, in order to help Company X tackle the recurring

quality problems and quantify the costs associated with non-quality.

In order to accomplish the objectives established, a study is made about theoretical concepts and

methodologies that will be the base for the development of the solution to the problem that is being

tackled. The companies involved in the development of the project will be introduced and described to

contextualize the case study. Having this in mind, there will be four main sections that will have the

following objectives:

• Description of the case study:

o Presentation of the company that provides consulting services- Kaizen Institute (KI).

o Presentation and description of the client company – Company X.

o Explanation of the current situation of the Company X, focusing on the problem to be

solved.

• Literature Review of concepts will be made, which will allow an evaluation of the state of the art

in the following topics:

o Quality Costing – in order to understand what studies have already been made in this

field, to support the development of the model that will quantify more accurately the

quality costs;

o Total Quality Management – so that a structured methodology for solving problems is

developed.

This section has the objective to explore and expand the knowledge of the two topics above

based on scientific articles or studies done previously.

• Application of the concepts acquired to the case study of Company X.

• Evaluation of the benefits gained with the proposed solution.

Page 19: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

3

1.3 Research Methodologies

In this section, the steps taken for the developing of this dissertation will be presented, which are portrayed in Figure 1.

Step 1- Problem Definition

The first step consists of understanding the current state of the company, regarding the quality problems

that are faced. A characterization of the quality problem has been made to understand more in depth

what is happening in the factory.

Step 2- State of Art / Literature Review

In the following step, a Literature Review is made for the problem in question. The Quality concept will

be studied and the tools that are available to quantify quality and non-quality costs. The objective of this

study is to define the best practices that can be applied to this case study.

Step 3- Data Collection

The third step consists of collecting and analyzing data to have a better understanding of the current

situation. An adequate methodology must be selected to collect the necessary data.

Step 4- Model Development

A model will be developed in order to quantify the quality costs that are being incurred. The final

objective of this model is to not only bring awareness to this topic but also to advance continuous

improvements in the company. The current quality problem of high scrap will be tackled, and the tools

and methodologies used will be the base for future problem-solving.

Figure 1--Methodology used for Master´s Dissertation Development

Page 20: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

4

Step 5- Analyze of results

The results of the previous step will be studied and analyzed to understand the real impact of the tool

that has been developed.

1.4 Dissertation Outline

Chapter 1- Introduction

Introduction to the theme of the dissertation work, statement of the objectives and definition of the

structure and methodologies used in the development of this paper.

Chapter 2- Case Study

A description of the companies involved in order to comprehend better the problem that is being tackled.

Chapter 3- State of the Art/ Literature Review

State of the art description based on Literature review about Quality and Quality Cost methodologies

and Total Quality Management methodologies.

Chapter 4- Preliminary Phase and Planning

In this chapter, a more detailed analysis is made in order to understand the origin of the quality problems

that are being faced.

Chapter 5 – Procedure Manual

A structured method for solving problems is presented, and the quantification model is developed and

introduced.

Chapter 6- Presentation and Analysis of the Results Obtained

After presenting and developing the methodologies, the results and benefits obtained will be described.

Chapter 7- Final Remarks and Future Development

The last chapter will summarize the results and insights arising from this project, and a direction for the

work that will be developed in the Dissertation will be given.

Page 21: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

5

2 Case Study

In this chapter, the companies involved in the realization of this dissertation will be presented. A brief

introduction and history will be given about the consulting company, Kaizen, and Company X, which

will be the focus of study.

The structure of this chapter will be the following: a presentation of Kaizen Institute will be made,

following by an introduction of their fundaments. Next, the presentation of Company X and its structure

will be presented. The factory where the case study is taking place will also be described in more detail,

and a line was selected to explain the production process. The main Indicators established to track the

benefits of the project will be presented. The Chapter ends with a conclusion about the case study that

is being analyzed.

2.1 Kaizen Institute

Kaizen Institute is a multinational consulting company founded in 1985 by Masaaki Imai in a Toyota

factory in Japan. The Kaizen headquarters are in Switzerland, but nowadays there are offices in every

continent.

The first office in Portugal was opened in 1999 in Porto. The Portuguese office is present in all economic

sectors, contributing to their development and improvement.

The projects that are being developed by Kaizen have specific actions for each sector, but there has

been a greater focus on the following sectors: Services, Retail, Industry, Health and Information

Technologies, R&D and Engineering. (Imai, 2012)

Kaizen is defined as a project of continuous improvement focused on results, by using multifunctional

teams, in order to reach the targets established in their own work areas. In general, these targets,

consist of time reduction overall steps of the process. The Japanese word Kaizen can be divided into

two parts, the first one, Kai, stands for “change”, and the second part, Zen, means “better”.

The founder, Masaaki Imai, in 2012, added three keywords that represent of the Kaizen philosophy.

(Imai, 2012)

1. Everybody: The only way, to ensure a good application of the methodologies is to involve

everybody.

2. Everywhere: Continuous improvement can be implemented in the whole company, starting

with the production lines and ending in higher departments.

3. Everyday: Kaizen methodologies as the word says, are continuous improvements, and should

be implemented as long as the company exists.

Page 22: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

6

Kaizen Institute follows a business model, that is organized into three categories (Imai, 2012):

• Implementation and Consulting

• Training, Education and Kaizen Events

• Benchmarking and Guided Tours

In order to support Kaizen’s vision of continuous improvement, there are five fundaments that are the

core of the business (Kaizen Institute, 2013):

I. Create Value for the client- The main goal is that at the end of each day the target is to

guarantee service level (Delivery) and quality. It´s important not only to focus on the quality that

is presented to the final costumer but also to make sure that the number of defects is

decreasing. The company should try to spend time only on tasks that will add value in the end;

everything that does not add value is considered waste. (Taiichi, 1988)

II. Eliminate Waste (Muda) – As stated before, all activities that do not add value to the client are

considered waste and should be eliminated. Muda in Japanese stands for waste, and Kaizen

Institute took this concept to another level by including two other terms: Mura, which stands for

variability and Muri, which means overburden. These three types of waste should always be

eliminated when possible.

III. Go to Gemba (the actual place)- As adding value to the client is the most important thing to a

company, going to the actual place where the value is added is something that Kaizen strongly

defends, not only for the operators that are working every day in the lines but for the whole

organization. It is in the Gemba where the problems will appear and where they have to be

solved.

IV. People Engagement - In order to succeed with the Kaizen strategies, it´s important that

everybody is involved, and everybody has an important role in continuous improvement. From

the operator to the CEO, everyone has their role in the company, and it´s important for everyone

to understand what is happening in every department of their company.

V. Visual Management- Sight is one of the senses that the human being uses more to obtain

information that is needed in everyday life. Sight should be used to highlight some of the existing

problems of some processes, but also to underscore what has been done as expected. By

having everything visual, it will make people interested in what´s happening around them.

As already explained, one of the principal fundamentals of Kaizen is to eliminate Muda, and in order to

do this, it is important to understand the concept of Muda and the several types that can be found. We

can classify Muda in seven different types (Melton 2005):

1. Errors and Defects – When in production, something is not produced with the right

specifications and has to be redone.

2. Over Processing – Processes that don´t add value to the client.

Page 23: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

7

3. People´s Movements – Excessive movements of people, which lead to time loss with no value

added.

4. Movements of Material and Information – the Excessive flow of material and information leads

to time lost in the handling and in the execution of the tasks.

5. Waiting for materials and information – stock that is put on hold.

6. Waiting for people – When a worker is, for example, waiting for a machine to finish in order for

him to unload and load the machine.

7. Excess of Production – Products that are made just to stock, with no guarantee that they are

needed. This Muda is the most important of the 7 because this waste implies all the others.

Kaizen Institute developed five methodologies that are represented by five pillars to put into practice all

the theories and concepts.

1. Total Flow Management (TFM)

2. Total Productive Maintenance (TPM)

3. Total Quality Control (TQC)

4. Total Service Maintenance (TSM)

5. Innovation, Development, and Motivation (IDM)

This was the presentation of Kaizen Institute, the company that provides consulting services. The next

stage is the description of the case study and Company X, the client. Consequently, Section 2.2 focuses

on the development of the case study from the client´s point of view.

2.2 Company X

This master’s dissertation is being developed in collaboration with Company X and Kaizen Institute.

Although Company X is globally recognized as a market leader, in terms of the automotive industry, the

Hungarian factory is facing a negative EBITA of 2M US dollars. This specific factory is not delivering

what is expected, since it is an older factory, built in 1984, and it has not been renovated ever since.

The factory is facing low production due to poor planning and a high percentage of scrap level, in

comparison to last year. This is the reason why this factory was selected for the development of the

Kaizen project.

Founded in 1876, Company X started as a shop in Germany, and it has grown into a company that is

nowadays present in 38 countries, with 28, 166 people in 170 different factories. The goals of the

business have always stood side by side with corporate responsibility. It has always been important to

use the knowledge acquired from past generations and combine it with a future vision of growth and

innovation in this industry. Since 1876 competences in metal-based products, automotive and

engineering sectors have been developed and improved.

Page 24: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

8

Company X started as a small shop, and it was not until 1916 that the first factory in Germany was

opened. Early on, the specialization in drawn tubes started, and in 1935 the first order for the automotive

industry was placed. An important step was taken in 1955 when the company started to produce its

own steel started, which was relevant for its growth.

The first internationalization was to the USA in 1980, with the opening of the first automotive factory.

Company X started to gain visibility in the automotive industry, which guaranteed them the first major

contract, where they produced the rear axle and suspension arms for Adam Opel. 1991 was an

important date because the specialization in prefinished components started and supply was made just-

in-time. From 2007 on Company X has started to acquire several factories all around the world and has

become the empire as it is known today. (Figure 2).

Figure 2- Company X presence Worldwide (Company X Website)

Company X is organized into three business units, as can be seen in Figure 3, and in Figure 4 the

revenue per sector is presented. (Company X, 2018)

Figure 3- Company X´s Business Units

Page 25: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

9

Figure 4- Revenue by Segment (Company X Website)

As can be seen in Figure 4, almost 80% of the revenue of Company X, comes from the Automotive

sector, this being the principal reason why a greater focus has been laid on the development of that

specific sector, and the Distribution and Steel/Tube sector are more behind in terms of development.

This dissertation will focus on a Hungarian factory, which belongs to the Steel/Tube division of Company

X. The factory and its production process will be explained in more detail in the next section.

2.2.1 Hungarian Factory – Company X, Steel/Tube Factory

Today the factory, with approximately 20,000 m2 of area, has a annual revenue of 70M euros and has

close to 500 employees. There are 15 project-based production lines, operating three shifts, with eight

hours each.

This specific factory has been struggling with quality problems. In comparison to last year, the scrap

costs have been increasing. There has been a high number of products rejected by the client, and this

resulted in a high amount of backlog, which now the factory must fulfill while delivering the normal

quantity established with the client. In addition, a lot of parts with defects are detected in the Quality

Control, which implies that the product must be sent back to Rework areas to be corrected.

Every line usually works three shifts:

• Morning Shift – 6.00am until 2.00pm

• Evening Shift – 2.00pm until 10.00pm

• Night Shift – 10.00pm until 6.00am

Every shift runs for 8 hours, and the operators have a twenty-minute lunch break, and two ten-minute

breaks. The number of shifts needed may change, depending on the customer´s orders or backlog that

needs to be fulfilled. Every line has different specifications and needs, so the number of operators varies

depending on its complexity. There are lines with only two operators, but more complex lines can have

up to 20 operators.

Page 26: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

10

For the purpose of the work that is being developed in this dissertation work, it was necessary to choose

one production line, to serve as a pilot for the present study. The objective at the end of this work is to

apply to all the production lines in this factory the approach matured in this dissertation.

A structured quantification model is needed for understanding what is the reason for the high scrap

level and what´s the path that the company should follow, in order to identify the critical problems and

solve them. The model that will be developed will quantify the costs that are being incurred and give a

clear picture of how quality is affecting the costs of the products.

Considering the 2M€ negative EBITA, it is imperative to reduce the scrap level and quality costs. The

choice of the production line that would serve as the pilot for this project was made through the 80-20

principle, by Pareto, that will be explained in more detail in the Literature Review.

For this analysis, Company X was requested to gather data about the Scrap level of all production lines.

After this data collection, and when the data from all 15 production lines was analyzed, a graph (Fig.

5) was built, focusing on the top 6 lines regarding Scrap levels.

The graph above, also known as Pareto, is a useful tool when there is a need to prioritize something.

In this case, there is a need to choose just one line among the six top lines in terms of scrap level. This

choice is relevant because this line will serve as an example to future projects and choosing a wrong

line can mean the failure of this project. By looking at the graph, it is clear that the Kovomo line is the

one with the highest scrap level, so it would be logical to choose that line over the others, as resolving

Kovomo´s quality issues will bring a bigger impact to Company X and more savings.

Figure 5- Top 6 lines- Scrap level

Page 27: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

11

0,00%

1,00%

2,00%

3,00%

4,00%

5,00%

6,00%

Kovomo Auto A Auto B Auto C Auto D Auto E

SCR

AP

%

PRODUCTION LINES

Current State Target

Company X’s top management was questioned in order to understand what the goals of the company

were regarding the scrap level, and what the possible savings were for each line if a reduction of the

scrap level was achieved. In this situation, there was already a clear vision of what the target of scrap

level was for each line.

The following two graphs, Fig 6 and Fig 7, resulted from the discussion, having in mind the top 6 lines

identified above.

The graph in Figure 6,was built, after the current state of each production line had been identified, in

terms of scrap level percentage and a target state was defined with the top management of the

Hungarian factory of Company X.

Figure 6- Current State vs. Target (Scrap Level)

Figure 7-Savings per Production Line

-0.12%

-0.49%

-0.70%

-1.50%

-0.81%

-0.50%

Page 28: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

12

After defining the target state for each production line, the savings were calculated, in order to quantify

the gains that would be achieved. This analysis allows the understanding of which line would bring more

benefits to the project.

With all of the information above, it was clear that the Kovomo line should be the one to be tackled first,

as it is the one with a higher scrap level and that will generate higher savings for the company.

All the 15 based projects have similar modus operandi, as it can be seen Figure 8, which represents

the macro production process. The Kovomo line also follows these production steps, which will be

explained in more detail in this chapter.

The Kovomo line produces three types of products, AC, AB, and M. As explained before, regardless of

the product, every phase has to be performed in order to ensure a good quality product, that is delivered

according to the customer´s specifications.

Cutting

The process begins with steel tubes, that arrive at the factory, with a certain measure, depending on

the product that will be produced. This phase uses an automatic machine, that picks the tubes, and cuts

them into the right size.

Bending

After being cut, the tube goes to another machine, that will bend the tubes to fit the specifications of the

products.

Figure 8- Production Process

Figure 9- Model M

Page 29: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

13

Welding

In the welding phase, different components are joined, with high enough temperatures to cause fusion,

but not high enough to melt the metal.

Manual Assembly

The final product is normally composed of different parts, that need to be assembled. Let´s consider

product M, for this specific product, three different tubes and some small pieces are needed, which will

be assembled by a machine, with an operator´s help.

Brazing

After the assembly of the final product is carried out, every piece has to go through a Brazing oven,

where a copper paste is inserted previously, and then go through the Brazing Process, which is similar

to the Welding process but this time with higher temperatures.

Shaping

Following the brazing process, comes a process that in the automotive industry is called Shaping. This

phase is a pure rework operation. This operation is needed because once the piece exits the oven, it

features a deviation. This deviation is corrected by a use of a tool, called JIG, as can be seen in Figure

10. This jig replicates the engine of the customer, where the final product will be placed. Once the piece

is put into the jig, and the operator sees that there are some misalignments, a tool similar to a hammer

is used, to align the tubes.

Leakage Testing

When the operator is certain that the product fits the client´s expectations, regarding the alignments of

the tubes, it has to be put through a Leakage Test. For this phase, a machine is used to test if the

product endures all the pressure that it will take when placed into the engine of a car.

Figure 10- Jig Used in Shaping

Page 30: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

14

Quality Control

Making sure that the tube is exactly as the client wants it, is the most important issue for this industry.

There are deadlines that must be met and everything needs to have a 100% quality score. Therefore,

a final quality station before packing must exist. Here the operator uses an actual engine of the client

to test if the product is exactly as it is supposed to be. A visual check is also made, to make sure that

the tube doesn´t have any kind of defect or dirt.

Packaging

Finally, there is the packing station, where the final product is put into boxes and sent to the warehouse.

As it was mentioned previously, this specific plant is having a problem with production output as seen

in Figure 12. The red line represents the baseline of production and the green line represents the

target of production established for the Kovomo line.

Kovomo line, like all the other lines in the plant, have been struggling, in producing according to the

target established, as can be seen in Figure 12, because of the increase in scrap level, as is seen in

Figure 13, which represents in five months the scrap generated, compared to the average of 2017.

Figure 11-Client´s Engine

Figure 12- Kovomo´s Productivity

Page 31: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

15

1%

6%

10%

8%

0%

2%

4%

6%

8%

10%

12%

0

20

40

60

80

100

120

140

160

180

W28 W29 W30 W31

De

fect

ive

Par

ts

Weeks

Defective Parts %

Figure 13-Scrap Pieces

Figure 14- Defective Parts in Kovomo

By analyzing the graph above, it is evident that Kovomo is producing scrap above the average reached

in 2017, and that the scrap problem is aggravating.

Another data collection was made, to understand better the current situation, in what scrap level is

concerned. The engineering team, responsible for this specific line, was asked to check the output of

the line, in order to categorize parts in OK parts or Defective parts. With this information, the following

graph was built (Fig. 14):

Page 32: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

16

By analyzing the graph above, a high variability in the process is evident, which brings more force for

the need of this quantification model.

2.3 Main Indicators of the Project (KPI)

With the goal to create a system that enables tracking and evaluating the results that were obtained

with the work that was developed in this dissertation in Company X, two-time horizons were defined

where the actual measurements were made. These two horizons are:

1. Beginning- When the Kaizen project began with Company X. This stands for the time when no

alterations had been made in the factory; it was the current situation of the Hungarian factory,

as described in Chapter 2.

2. Final – At the end of the Kaizen project, after the development and implementation of new tools

and methodologies.

This dissertation began with observations of the current situation of the Hungarian factory, more

specifically, the production lines, with the goal to identify opportunities for improvement. This initial

observation was made with the help of employees of Company X and with data gathered from the

information systems, namely the management software of the company, SAP.

When this dissertation started, in February, the Kaizen project in Company X had already started, and

some results and observations had already been made. At the beginning of the project, it was necessary

to understand what the critical areas in the factory were, so as to understand what the projects should

focus on. After doing a Value Stream Mapping, three workshop packages were identified as needed:

I. Productivity

II. Quality

III. Logistics

Each one of them, had an important role, in eliminating the EBITA.

Benefit tracking is a very important aspect in these types of projects, it is crucial to track the evolution

of each project and comprehend what is the impact that each project is having, in what savings are

concerned. Even though this dissertation is regarding the quality department problem, it is relevant to

understand what is happening in the entire factory. Even if, there are three different work packages,

they are all linked and affect each other.

Page 33: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

17

The following indicators where defined, in order to track the benefits and savings of the overall, because

they were identified as crucial for the factory and for the Kaizen projects. All of the indicators listed

below will be affected by the projects that are being developed.

• Overall Savings

• Personal Cost Saving

• Scrap Cost Saving

It is relevant to mention that the Hungarian factory is dealing with several issues that will be reflected in

the indicators. The factory is facing a negative EBITA due to several aspects, the productivity has been

decreasing and the orders of the customers aren’t delivered. This causes a high level of backlog, which

means that each day that the client doesn´t get the amount that was asked for, it goes to a backlog list

that will have to be satisfied. The issue with this backlog list is that since the productivity isn’t 100%, the

backlog amount is always growing. The big consequence of this is that instead of the orders being

shipped Tuesdays and Fridays as usually, they have to be released as soon as a certain amount is

reached. These shipments are much more expensive than the normal ones. On top of all of these

factors, the factory is facing quality problems in almost every line.

In this project developed with Company X, there were three important aspects that the top management

was concerned about regarding Quality:

o Scrap Cost Saving

o Overall Saving

o Personal Cost Saving

2.4 Conclusion

In this chapter, the entities involved in this dissertation were presented in more detail, to allow a better

understanding of the case study presented. On the one side, we have Company X, an automotive

industry player, which is a market leader, but it is facing some quality problems that are the basis for

this dissertation. On the other side, the Kaizen Institute is the consulting company that provides

continuous improvement consulting with Lean methodologies.

After analyzing in more detail the Hungarian factory, some gaps were identified. Considering that, on

average Kovomo line should have a 5% scrap level, and that Company X has a target of 3.5%, in order

to have 33 000€ savings, it is evident that the line isn´t operating as it is supposed to, once in these four

weeks, there was an average of 6.5% scrap level.

Another alarming situation is that there is no method to quantify the costs that are being incurred. Top

management doesn´t have any knowledge of how much the quality problems are harming the business.

A big paradigm was also identified, rework stations are present all over the factory. Instead of solving

the quality problems, quality gates are being settled in order to correct the problem. The issue with this

Page 34: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

18

strategy is that the real root cause isn´t being solved, and the results of this are the recurring quality

problems.

Alongside this fact, Company X doesn´t have a structured method to attack the quality problems that

have been recurring in the past months. There is a need to develop a method to support top

management in solving these types of problems and this is the goal of this dissertation.

The limitations in this case are clear: there are no methodologies that enable the organization to tackle

the quality issues in the production lines, by identifying them, understanding the root cause and finally

solving the problems. There is also a lack of awareness with regard to quality costs, which means there

is no proper quantification of these costs.

The literature review that is made in Chapter 3 will address the limitations that were identified. Scientific

articles and studies will be investigated in order to develop a structured method for problem-solving and

provide a model for quantification of quality costs. The literature review will be based on Lean

methodologies and Quality Costing since these are the two main topics of this dissertation.

Page 35: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

19

3 State of Art

The aim of this section is to, based on a literature review, clarify concepts and methodologies, that are

relevant, as a response to the limitations that were found in the case study presented in the previous

section. As already explained, the main problem of Company X is that there is no awareness of the

costs associated with quality and existing quality problems. With this in mind, some scientific articles

and studies were analyzed to allow a better comprehension of this topic.

The Literature Review will be concluded with the presentation of some comments regarding the topic

developed.

3.1 Quality Costing

In 1945 Armand V. Feigenbaum of General Electric introduced for the first time the concept of quality

costing, by developing a dollar-based system that would report the costs associated to quality, which

nowadays is known as Costs of Quality (CoQ). Four categories were defined with regard to quality

costing (Feigenbaum, 1956):

• Prevention

• Appraisal

• Internal Defect

• External Defect Cost

Following Feigenbaum’s studies, Philip Crosby was another contributor to the development of quality

costing. Cutting the COQ (1965), a book published in 1965 focused on the explanation of different

measurements used for developing prevention activities. Crosby wrote the second book, Quality is Free

(Crosby, 1979), where it was emphasized that there should be no extra cost when the company is

aiming to produce quality products. At this stage, Crosby was aligned with the four categories of costs

that Feigenbaum defined, but in 1984 there was a simplification to two categories(N.M. Vaxevanidis, G.

Petropoulos, J. Avakumovic, 2009) :

• Price of Conformance (POC)

• Prince of Non-Conformance (PONC)

In 1998 the Juran Quality Handbook (Juran, 1988) came out with a different perspective on this concept.

After several studies, Juran understood that the PAF should not only include activities but also the

indirect costs associated with products produced with defects. The following costs were considered:

• Tangible factory costs- scrap, rework and inspections

• Tangible sales costs- handling customers

• Intangible costs- loss of customer goodwill, delays in deliveries

Page 36: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

20

Harrington developed a study where it was concluded that if some investments were made in prevention

activities, the percentage of non-quality would decrease, and there would be a reduction in the cost per

piece. (Harrington, 1987) Further studies and analyses were performed and it was concluded that the

quality costing system has to include not only direct costs but also indirect quality costs. (Harrington,

1999).

Laszlo in 1997 made a link between quality costing and Total Quality Management (TQM). A study was

carried out that highlighted the importance of quality costing when trying to implement TQM. In fact,

quality costing provides a system of monitoring the relevance of the projects that are being developed

within an organization. An improvement project should have a decrease in quality costs if it is done

effectively. (Laszlo, 1997) An explanation of Total Quality Management (TQM) will be given in the next

section.

When a company is trying to improve quality levels, it is important that tracking is made regarding the

costs associated with quality, because the objective is not only to deliver what the clients expect but

also to do it with the lowest cost possible. To achieve this reduction of costs associated with quality,

they first need to be identified and measured. In fact, if the organization´s goal is to achieve quality

excellence, the costs of quality should be measured and reported. (Schiffauerova, Thomson, Omar, &

Murgan, 2006) In order to collect quality costs, a framework to classify the different types of costs is

needed. Although there is no fixed definition of quality costs, what usually is considered is the sum of

conformance plus non-conformance costs.

• Conformance costs: costs that are made in order to prevent poor quality, such as product

inspection.

• Non-conformance: costs are the costs incurred when there is a defect in the product, and there

is a need for rework or even return.

All in all, there is an evident link between quality and costs, and therefore the quality management

system should be connected to the system that monitors the costs of quality. Unfortunately, in many

organizations, this link doesn´t work as it should. (Weinstein, Vokurka, & Graman, 2009)

It is safe to conclude, that controlling quality principles is related to total quality management, and

therefore, monitoring and controlling costs of quality should be a tool that supports the Total Quality

Management (TQM) methodology. (Lari & Asllani, 2013)

In the past years, models for quality cost have been developed, and today there are five different

categories, P-A-F, Crosby´s model, Opportunity Cost Models, Process Cost Models, and ABC models.

A more detailed description of each model will be given, for a better understanding.

Page 37: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

21

Feigenbaum differentiated quality costs, in prevention, appraisal, and failure, and this is what today is

known as PAF model. (Feigenbaum, 1956) This classification has been accepted worldwide as a model

for quality costing. In this model, the costs are described in the following way:

• Prevention Costs- gather all the costs that are incurred when the design, implementation, and

maintenance of the total quality management system are carried out. These costs are planned

to happen, even before the production process happens.

• Appraisal Costs- all the costs related to ensuring that the customer and supplier are satisfied

with regard to conformance to requirements.

• Internal Failure Costs- when the product is not produced with the customer´s requirements,

rework must be made.

• External Failure Costs- products or services that fail the customer´s requirements but are only

detected when transferred to the client need to be covered externally.

There is a correlation between these four types of cost categories, that can be seen in Figure 15

(Giakatis & Rooney, 2000):

This model defends that it´s better to ensure prevention and appraisal costs, in order to avoid further

investments in failures. (Plunkett & Dale, 1988). The P-A-F model, that Feigenbaum´s and also Juran

advocated, was adopted by the American Society for Quality Control and has been used by most

companies that work with quality costing. (British Standard, 1992)

Even though the PAF Model is the most common costing model, unfortunately, it is still not able to

integrate the costs associated with quality and the benefits resulting from quality improvements because

the prevision of future returns is not possible. (L.J. Porter & Raynor, 1999)

Figure 15-Quality Cost Allocation

Page 38: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

22

This model provides a guide for the identification of costs, consisting of the following steps, according

to the British Standards Institute (British Standards Institute, 1981):

1. Calculation of the costs that are directly related to quality

2. Calculation of the costs that are indirectly related to quality, but should be considered when

measuring the total cost incurred in quality

3. Identification of internal costs, which resulted from failures in the production process

4. Identification of the costs related to failures, after there was a change of ownership.

The principal limitation of this model is that even though it provides a tool for measuring quality costs,

which can be used as a strategic tool by top management for improving processes, it doesn´t provide

a direction for the improvement. (Giakatis & Rooney, 2000)

On the other hand, the definition of quality for Crosby is the “conformance to requirements”, and

therefore, the cost of quality (CoQ), is the sum of the price of conformance (PoC), and price of non-

conformance (PoNC). (Satanova & Sedliacikova, 2015) The definition of the price of conformance

stands for all the costs that are insured in order to be certain that the product is immediately produced

according to specifications. These costs will include the prevention and appraisal costs. On the other

hand, the price of non-conformance is the sum of all expenses made when the product has some defect

and needs to be corrected; it takes into consideration the cost of rework and scrap.

Process Cost Model has the particularity of emphasizing the measurement of process cost. Similar to

the Crosby model, cost of conformance (CoC) and cost of non-conformance (CoNC), are taken into

consideration, but this time linked to a process. By using this model, more relevance is given to the

processes, and the organizations become more aware of the concept of quality costing.

With this in mind, the cost of conformance is the cost of the actual process that will produce the desired

product with the right specifications. On the other hand, the cost of non-conformance is the cost

associated with the process that is not delivering according to the standards. (Leslie J. Porter & Rayner,

1992) With this definition, we can establish some similarity between this model and the Crosby model,

but there are different points of view.

Process Cost model can be applied to any process in an organization. To ensure that the model is

correctly applied, the following steps must be taken into consideration:

1. Elaborate a flowchart of the overall process- all the activities and parameters within the

organization will be identified

2. Categorize the activities as CoC or CoNC- the cost of quality at each phase is estimated.

3. Study the opportunities

4. Define next steps - where some improvements will be implemented, by redesigning the

processes and investing in prevention, in order to reduce the CoNC and CoC.

Page 39: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

23

Although the PAF model and Process Cost Model are the most common approaches, they still don’t

provide methodologies to include overhead costs in cost of quality systems(Tsai, 1998). The ABC

Model comes as a response to this weakness. This model was studied and developed by Cooper and

Kaplan at Harvard Business School (Cooper & Kaplan, 1992).

The ABC methodology is broken down into 2 stages. The first stage is to understand the monetary

value associated with various cost objects (such as departments, products, customers, and channels)

and tracing resource costs (including overhead costs) to activities. The second stage is to then trace

the costs of activities to cost objects. (N.M. Vaxevanidis, G. Petropoulos, J. Avakumovic, 2009)

The traditional costing models usually distribute overhead costs by using allocation based on volumes,

such as direct material costs or labor hours. The disadvantage of the ABC method is the distortion of

the product´s cost. For products with a high volume, it will overcost them, on the other hand, for products

with low volume it will undercost them.

Cooper and Kaplan suggested that this methodology is used to enhance the accuracy of the products’

costs. The first approach focused on trying to assign with the highest accuracy possible the overhead

costs to the products presented a weakness: the costs that occurred outside the organization weren't

taken into consideration. After more studies, a new ABC model was proposed, this time two dimensions

were present, the cost assignment and the process view. (Tsai, 1998) To facilitate the understanding

of these two subsystems, a scheme is presented in Figure 16. (Kumar, Shah, & Fitzroy, 1998)

After this model was proposed in 1988, an important statement was released: costs and information

gathered by ABC system will help to clearly identify the quality of improvements that can be

implemented and also plan a continuous improvement(Tsai, 1998).

All in all, after analyzing the main Cost of Quality (CoQ) models, and the ABC model now presented, it

can be concluded that the PAF model is an approach of quality costing that is activity-oriented, whereas

Figure 16-Two-dimensional model of ABC [14]

Page 40: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

24

the Process Cost model is process-oriented, and finally the ABC model combines both views in one

single model.

Quality Costing is not a tool exclusively for measuring costs; it has an important role in showing to top

management the need for improvement projects. The biggest impact for the managers of a company is

when data is expressed in monetary terms. Having the percentage of scrap level doesn´t have enough

impact and it will not trigger the need for improvement, On the other hand, if it´s known that the company

is losing thousands of dollars because of quality problems, this will definitely bring an urgent need for

change. Once the commitment of top managers is achieved, they will have an important role in the

success of Total Quality Management (TQM) initiatives.

In fact, quality costing will work as a link between the production line and top management, because it

translates the data gathered from the line into language that is very familiar to the managers. It will

provide a tool for measuring efficiency and effectiveness of the quality activities present in the

organization. Another big advantage of quality costing is that it forces the company to evaluate the

performance of the entire company in terms of quality. It provides a clear picture of the organization´s

situation and the need for improvements to reduce costs. In case there is no quality system already

implemented, quality costing can be a great starting point to implement it.

Different studies about quality costing were been undertaken by Crosby, Deming, and Juran, and each

one had a different assessment of this matter. (Oliver & Qu, 1999) Crosby believed that the need for

the development of quality costing is not for managers to control, but the whole organization must

understand the quality concept, and this understanding is achieved by measurements. On the other

hand, Deming defended that measuring and analyzing costs of quality is a mistaken waste of time, and

it provides only an evidence that the problem wasn´t understood. Juran, being the most popular

approach, stated that the measuring of costs is an important tool for managers.

The remarkable evolution in terms buyer´s power has become evident in the industry. Before we had a

customer that had to deal with production times of factories. If a car was ordered, it had to be paid in

advance and the customer had to wait for months or years to have the car.

Nowadays, it´s totally the opposite: there is more than one company that sells cars, so the customer

has a choice, and when the choice is made the car is immediately delivered.

We have gone from a market where the demand was higher than the supply and the industry had all

the power, to a buyer´s market today, where the supply is higher than the demand, therefore the

customer has all the power. (Kärnä, 2004)

Crosby had already given a definition that quality is Conformance to Specification, but Yasuthosi

Washio, when addressing to National Institution for Quality and Reliability in 2015, said quality should

be described as Conformance to Requirements. The focus should be on what the clients want and how.

The perception that the customer has of quality is different from the company´s perspective. There are

Page 41: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

25

some points that need to be considered when evaluating the client´s point of view (Sheikholeslam &

Emamian, 2016).

• Performance: defined as “Fitness for use” by Juran, performance is the reliability to serve the

client´s purpose.

• Features: everything that is an extra to the primary characteristics

• Aesthetics: this is the visual component, how the product looks when delivered to the customer

• Durability: the product should not only meet the customer´s requirements and specifications,

but it should have the longest life possible without failures, or if small failures occur the customer

should be able to solve the problem without having to contact the company services

• Serviceability: after the product is purchased the customer has access to some services;

serviceability is what measures the quality and speed of this services

• Warranty: it´s the guarantee that is given to the customer: for a certain part of the lifetime of the

product, the customer has access to services to repair the product if needed

• Reputation: this concept stands for the brand that the company creates in the eyes of the

customer, and it is what gives the customer the confidence to buy one particular product and

not another one from a different brand

• Price: this is always a relevant point to the customer; the lowest price is always preferred, but

without harming the product´s quality.

In short, the customer´s satisfaction plays a big role in the strategy of the business. Managing the

satisfaction of the client is extremely relevant, and therefore, there should be established indicators

that will allow to track it and act on time if needed.

The best way to measure quality is by analyzing the cost of quality that results from the costs incurred

by nonconformance problems. Philip Crosby defends that all the costs that arise in addition to those

that would arise if the product was produced in perfect conditions are considered the quality costs due

to nonconformance.

When companies face high levels of scrap level, the usual reaction is to hire more labor to inspect all

parts, in order to guarantee that only products with 100% of quality are delivered to the client. But this

will not completely eliminate the scrap level and the costs due to quality will still remain high.

It was in the 1950´s that the cost of quality first emerged, the concern that quality should be improved

and that the costs associated with it should be reduced. These costs do not take into account the costs

of producing the products but also all the indirect costs, the costs of losing customers due to poor quality

products and costs of losing market share.

Page 42: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

26

Juran also studied quality and defended that there are four aspects that lead to the concept explained

above:

i. When there is a growth in the complexity of the products, a bigger precision is required and this

will result in the growth of the quality costs

ii. There is a greater need for products with a longer lifetime, which will result in higher

maintenance costs to ensure that the products keep their original features as long as possible

iii. The necessity of top management to express the quality of monetary values results in the need

to hire quality specialists that will present their studies and recommendations in the common

language: money

iv. Having higher quality and ensuring a longer lifetime sometimes can have the downside of

having bigger costs associated with the product

As presented in section 3.1, quality costs can be divided into three types of costs: Prevention, Appraisal,

and Failure (PAF model). There can also be a more general categorization. There can be internal failure

costs, which represent all the costs that are usually discovered in the development and testing. Below

are the costs that are known as internal(Kiran, 2017a):

o Scrap – the loss that is encountered when there are defective parts

o Rework- the cost of having a process to fix the error in the product

o Retest- after doing the rework the pieces needed to be retested, and a cost is implied in

this step

o Downtime- when a defect is found, the machines have to be stopped to encounter the root

cause of the problem. This downtime has also a cost because it is time that should result

in production.

o Yield losses- when there is an increase in work time due to inefficient control operations

o Disposition- when nonconforming parts are found, it should be verified if the parts can be

reintroduced again in the process.

External costs are the ones that are found once the product has already left the factory for the client:

o Complaints

o Warranty Costs

o Recall costs

o Concessions

o Loss of Sales

o Litigation

Page 43: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

27

3.1.1 Life Cycle Cost

Life Cycle Cost represents a method used in cost management, with the purpose of evaluating all

economical trade-offs that occur during the life cycle of one product. (Bierer, Götze, Meynerts, &

Sygulla, 2014)

This analysis allows to evaluate in an economic point a view different alternatives in a process. (Okano,

2001) All the costs associated with a process are assessed, by looking at the product´s life, from cradle-

to-grave. (Peças, Ribeiro, & Henriques, 2009a) With this vision, all costs are taken into consideration

when calculating the cost, since the research and development until costs associated with the final

customer. (Okano, 2001) What happens in most cases, is that some of the costs are not expressed in

the price given to the market, as for example costs incurred during disposal phases. (Peças, Ribeiro, &

Henriques, 2009b)

If the overall life cycle of one product is analyzed, and all the costs are taken into consideration, the

final cost will be the sum of the all different parameters that are inherent to the several stages of a

process. Each stage includes different materials used, several types of equipment, labor, energy, and

waste are generated. (Folgado, Peças, & Henriques, 2010)

It is important to refer, that this is not a standard analysis, there are several approaches that can be

made, using different methodologies and scopes. A guide for Life Cycle Cost analysis was proposed

by Greene and Shaw (1990), which gave principle for this analysis, and various authors have used it in

their studies. (Greene & Shaw, 1990)

General steps for this analysis where defined:

1. Characterization of the object of study

2. Definition of boundaries of the life cycle

3. Development of the costing model

4. Gathering of data

5. Evaluation of the veracity of the results obtained

6. Discussion of the results

To summarize, this tool can be used when evaluation and comparison are needed, it will support the

decision of a set of alternatives, based on the most effective solution in what costs is concerned. The

goal is the support of the decisions based on the costs that are incurred, taking into consideration all

the stages in the life cycle of a product. It can be applied for cost evaluation, as well as designs

processes and to compare strategies. (Bierer et al., 2014)

Page 44: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

28

3.1.2 Conclusions – Quality Costing

In order to improve the quality of a company, the costs have to be measured and analyzed, so that the

opportunities appear, and the next steps are defined. This concept is relevant because the final goal of

a company is to not only deliver the product according to customer´s specifications but to do so with

the lowest cost possible. This mindset matches the objectives of Total Quality Management, which also

focuses on eliminating waste in order to improve processes. Having the data analysis of the real quality

costs will be a fundamental tool for Total Quality Management.

Even though there is a high number of papers published on the importance of quality costing, there are

just a few organizations that use these methods.

As concluded before, quality costing is not only important for top managers because it gives them a

clear view of the quality department in values they understand well, but it also helps to identify and

select improvement projects that need to be done at an operational level. (Evans JR, 2005)

Although the PAF model is the one that has higher recognition internationally, it is mainly a model for

categorizing costs and has some serious limitations. Because of this, the model isn’t the most suitable

for the Total Quality Management system and Process cost model should be used instead.

Another important aspect was the one approached in section 3.1.1, the Life Cost Cycle, which gives

the importance to look to the costs of a product from cradle-to-grave. There are many costs along the

production process that are not always took into consideration.

Finally, there are several studies to confirm the relevance and the usefulness of these quality costing

methods. The methods provide not only a tool for controlling quality systems but also bring awareness

to the need for continuous improvement, which is related to the limitations encountered in the case

study. Despite all of these facts, the cost of quality is still not an extensively used concept. (N.M.

Vaxevanidis, G. Petropoulos, J. Avakumovic, 2009).

3.2 Quality Cost Tracking Tool

As explained in the previous section, there are some limitations to the models presented in there: it is

still difficult to identify at an operational level the costs associated with quality. There are the traditional

costing models, but simulation could be used as a better solution for the monitorization of costs. What

normally happens in manufacturing plants is that there is an operator that is responsible for the quality

inspection. By doing quality control with self-inspection, an instantaneous feedback is provided, and an

immediate improvement can be made. The problem with this method is that there is still room for errors.

A simulation model could be developed to try to understand the errors that are being made and that are

resulting in an increase in quality costs.

Page 45: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

29

With the case study of Company X and the Hungarian plant in mind, in the production process, there is

the self-inspection mentioned above. Following the assembly of the parts, the product passes through

a Shaping workstation, where the operator has to check if the product is according to the requirements;

if not, there has to be rework. By having this station, it is guaranteed that there is an intermediate step

where the quality is checked. The advantage of this step is that it allows an earlier acknowledgment of

a possible defect. However, it is not 100% reliable, because this inspection relies on the common sense

of the operator. Shingo recommended that there should be further tools to support this control. Either

an adoption of some physical way to measure the conditions or an automatic system to do the inspection

(poka-yoke). One of the limitations of traditional costing models is that this inspection error isn’t

considered, even though these errors have a significant impact on outgoing quality. Some models

consider this type of error, and there are two types of errors:

• Type 1 error – when a good part is mistaken for a defective part

• Type 2 error- when a defective part is mistaken for a good part

In a study developed by Ballou and Paperan investigation was carried out on the specific effect that

these types of errors have in different environments of production. The discovery was that

environments with higher penalty costs or a higher probability to produce defects have a higher

sensitivity to inspection errors. (Ballou & Pazer, 1982)

Shingo proposed in his study that every time a defective part is encountered, the operator should try to

understand the reason behind this error. The problem with this assumption is that the root cause is not

always random, and sometimes the occurrence of errors is high. In this case, the operator would have

to constantly interrupt the production process to analyze the problem, generating significant downtime.

There was a study done by Sinclair, where an operator was observed during inspections. The discovery

was that the operator would stick to the control regime installed, without questioning the effects of the

costs. (Sinclair, 1978) There is an important aspect that needs to be well present: every defect

represents an opportunity for improvement, where the operator has to understand the error that leads

to the defect.

There needs to be a clear vision of the effect of the quality controls and the effect of quality costing. A

model for the industry should be developed to facilitate this process, and this is where the motivation of

this dissertation arises from.

3.3 Total Quality Management (TQM)

As discussed previously, the limitation of the case study is quality: not only is there no quantification of

the costs associated, but there also no efficient methodologies and tools to solve the high level of scrap

and the costs associated with it. The development of a tool that will quantify the costs will be useful to

bring awareness to this topic, but there is a need to decrease the scrap percentage, and here is where

the Total Quality Management methodology comes in.

Page 46: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

30

In order to understand the TQM philosophy, it is important to comprehend the quality concept is. As

already discussed, quality is the capability of a product to fully satisfy the requirements.

The quality concept not only comprises the design of the product and its conformance, but also the

customer´s needs and the support that it may require through the lifetime of the product. With this

concept in mind, Total Quality Management (TQM) consists of the principles, methodologies, and tools

that will allow the implementation of a system that will focus on continuously improving this ability to

fulfill the client´s requirements. (Garvin D., 1988)

Taguchi defined quality as the conformance of the product to its final requirements with a low deviation

that may occur. On the basis of this, the Taguchi Loss Function was developed, which represents the

variation of the scrap parts that lead to costs. These costs can be originated from production,

malfunctioning, the need for maintenance, repair, redesign or rework. What this function came to

underline is the need to think about the quality of the product before production. It is mainly from the

design stage that the quality deviations originate. (Eia, 1998)

Taguchi´s loss function gains a lot of credits because it increases the focus on continuous improvement

in organizations. Taguchi´s design strategy follows three stages:

1. System Design- this can be known as the conceptual stage for marketing and engineering

2. Parameter Design- in this stage, the detailed design begins. Values are attributed to dimensions

and design parameters need to be set. It is an important work of analysis, in defining how the

final product should behave compared to the parameters established and considering a balance

between cost and effectiveness.

3. Tolerance Design- the final stage consists of the reduction of the variations in the critical

dimensions.

Even if the broad tolerance is specified when the design stage is taking place, it doesn´t mean that the

rejections will be lower in the manufacturing stage and this is where Taguchi made a significant

difference, by pointing out the importance of continuous improvement, in order to make sure that, in the

future, the losses due to dissatisfaction of the customer don’t increase.

As it was emphasized before, Kaizen represents a continuous improvement, and it cannot be compared

to innovation because innovation stands for an improvement made in one exact moment, and not

something that has continuity.

Continuous improvement has been the stamp of TQM, and it´s present every day and everywhere.

Juran in his book strongly defends that continuous improvement was what made the Japanese

industries thrive and in order to implement this philosophy, eight steps were defined (Juran, 1988):

1. Proof of need: the problem has to be identified

2. Diagnosis organization: establishing the tools to be used

Page 47: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

31

3. Diagnosis: the root cause must be found

4. Breakthrough in the knowledge: solutions are developed

5. Remedial action in findings: implementation of solutions designed

6. Breakthrough in cultural resistance: getting people involved and accepting the solution

7. Control at a new level: monitorization

8. Holding on to the gains: define a standard to assure the continuous gains

A very important step after the improvement is implemented is that continuous monitorization is done,

in order to ensure the results. Resistance to change will always occur, but it must be overcome; it´s the

only way to achieve high-performance levels. After the results are achieved, it is extremely important

that a system of control is installed, to prevent reversible changes.

Seven methods were developed for analyzing TQM problems by Kaory Ishikawa, the father of the

Fishbone diagram and other tools. These methods and tools are known as the seven tools of Total

Quality Management, and as more tools have been developed since, which will be described in the next

chapter, section 3.3.4.2, these tools are known as the Seven Traditional Tools:

I. Checksheet and Checklists

II. Histogram or bar graph

III. Scatter diagram

IV. Control chart

V. Cause and Effect, Fishbone or Ishikawa diagram

VI. Pareto Principle

VII. Flowchart

These seven tools can be allocated to two different categories, Statistical tools: check sheet, histogram,

scatter diagram and control chart, and Analytical tools: Pareto analysis, flowchart and cause and effect

analysis. The tools are now going to be described in more detail so that their purpose is better

understood.

I. CHECK SHEETS AND CHECKLISTS

This tool is used for recording data that allows the information to be read in a very effective way. It is a

tool that can and should be adapted to the type of information that it represents. This adaptability means

a very easy and quick interpretation of data, no matter what is displayed. Check sheets should not be

mistaken for checklists, which is a tool that creates a list of important steps or issues that have to be

considered in a specific situation. This means that checklists are a guiding tool in operations, they don’t

allow collecting data, and this is where check sheets come in.

Check sheets are considered one of the basic tools of Ishikawa´s quality tools that help with the process

of gathering relevant information in a visual and organized way.

Page 48: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

32

All in all, check sheets allow to identify in a clear way what is being observed and to simplify the

observation process. It offers a way to gather all the information that was collected in categories, which

will make its reading even more accessible. It is also a way to create a form that allows the collection

of data without any great effort. There are four types of check sheets:

o Distribution check sheet

o Location check sheet

o Cause check sheet

o Classification check sheet

II. HISTOGRAM OR BAR GRAPH

What this tool allows is to represent in a visual way the frequency of occurrence of a specific event.

There are some principles that should be always followed when the histogram is built:

1. A clear and objective title should be given

2. The class intervals should be reasonable, and too much information should be avoided

3. The axes must have proper labels

4. An independent variable should always be placed on the X axis

5. The vertical scale should begin in zero

6. If needed, the vertical scale can be doubled

7. The class intervals should be the same: this is represented by the width of the bars is the

same for every class.

III. SCATTER DIAGRAM

The scatter diagram is another statistical representation that uses cartesian coordinates to show values

for two different variables. The purpose of this tool is to display how one variable impacts the other.

Usually, the y-axis is used for the variable for which a prediction is going to be made. In other words, it

is a graph that will give a visual explanation of the relation between the two variables.

There are different types of relations, uncorrelated, correlated negatively related and positively related.

When the plot is designed, if the points almost form a line, this means that the two variables that are

being studied have a high correlation. On the other hand, if the points are scattered through the plot,

there is no existing relation.

IV. CONTROL CHART

The control chart was introduced as a tool for distinguishing chance-cause variability and assignable

cause.

Page 49: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

33

After some studies, Shewhart concluded that every process has variations, but some processes have

variations that are normal and are controlled, while other processes display variations that are not

controlled.

There are some important aspects to consider when control charts are used:

o The quality characteristics that are taken from the process at different times are

represented by a point in the chart

o For all the samples, the mean should be calculated

o The mean is represented in the graph- Centerline

o Lower and Upper control limits are also established and displayed in the graph

o The space between the control limits should be divided into zones, in accordance with

the requirement that is being used.

o When the chart is being analyzed, it is important to establish that whenever the points

are within the limits, the process is going as expected, and when the points are above

or below the limits, something occurred in the process.

V. PARETO PRINCIPLE

Also known, as 80-20 rule, it states that, 80% of the effect comes from 20% of the causes. In the case

of a TQM application, when a Pareto is developed for a machine breakdown, it can be concluded that

20% of the effects cause 80% of the machine downtime. Therefore, making an effort to solve the 20%

can result in the solving of the 80% of all problems. The aim of this tool is to easily identify which

products or processes tend to fail more often, and considering this, a prioritization can be made.

VI. CAUSE AND EFFECT DIAGRAM

The first step to solve a problem is to identify the real root cause. This step should be done in the first

place; only when the clear root cause is identified the solutions can begin to be developed. To facilitate

this process, Kaoru Ishikawa developed the Ishikawa diagram or the fishbone diagram.

This tool can be applied to any type of problem and can be adapted to fit in the best way the problem

in question. The benefits of this tool are as follows: it is a very visual and straightforward tool, it involves

the workforce in the resolution of the problem and it gives organization for the discussion of the possible

causes. (Mizuno, n.d.)

When a Cause and Effect Diagram is being developed, there are some categories that need to be taken

into consideration(Kaizen Institute, 2018b):

o The 6Ms – used mostly in manufacturing industries

▪ Machine ▪ Method ▪ Material ▪ Manpower ▪ Measurement ▪ Mother Nature (Environment)

Page 50: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

34

o The 7Ps- used mostly in the marketing industry ▪ Product ▪ Price ▪ Place ▪ Promotion ▪ People ▪ Positioning ▪ Packaging

o The 4Ps- used mostly in-service industry ▪ Policies ▪ Procedures ▪ Process technology ▪ People

In Figure 17, a fishbone tail can be seen, as an example of the application of this tool to a manufacturing industry.

VII. FLOW CHARTS

With this tool, it is possible to represent in a diagram a possible solution to a specific problem. It is a

diagram that represents the flow of a product along with several operations that take place in a process.

In other words, this tool provides a general view of the operations that a product is subject to. It is

composed of boxes that represent the specific operations, and with the use of arrows, the order is also

displayed(Kaizen Institute, 2018c).

There are three types of flowcharts:

I. Process Flow Charts

II. Operations Process charts

III. Flow Diagrams

The biggest advantage of this tool is the visual representation of the steps of a process. This should be

the first activity when improvement is being implemented. It is extremally important to understand well

the process that is being studied, and the flowchart will help in this step. Not only does it facilitate the

understanding of the process, but it provides everyone involved in this stage a clear understanding of

what is being analyzed.

Figure 17-Fishbone diagram(Kaizen Institute, 2018c).

Page 51: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

35

VSM, Value Stream Mapping is one of the tools that is used more frequently in Kaizen projects.

Identification of non-value-added activities is much easier and most importantly, it facilitates

communication and ensures that all of the involved parts are on the same page.

In conclusion, there is no doubt on how important it is to have a visual representation of the problem

that is being studied or the solutions that are being developed. The development of these tools was

very important because an international standard was provided, which allows everybody to speak the

same language.

After the initial seven tools were developed, there was still a need to create other management tools,

to simplify and improve the traditional ones. With this in mind, the Union of Japanese and Engineers

(JUSE), developed the following tools(Kiran, 2017b):

A. Affinity Diagram

B. Interrelationship diagraph

C. Tree Diagram

D. Prioritization matrix

E. Process decision program chart

F. Activity Network Diagram

G. Single Minute Exchange of Die

H. 5W2H

A. AFFINITY DIAGRAM

This tool, developed in the 1960s, also known as KJ Method, named after its founder, Jiro Kawakita, is

an auxiliary to project managers. It provides a method for brainstorming and for the organization for

data, ideas, and concepts, by grouping everything having in consideration the relationship between

them. The goal is to provide in a visual way all the information that is relevant for some project.

After brainstorming with a team a lot of concepts and ideas will appear. The step that should follow is

to display all the ideas on small cards or post-it notes and try to sort them in groups, depending on the

nature of each idea. A title to each group should be attributed, and this title will represent the relationship

between the several cards that were grouped.

B. INTERRELATIONSHIP DIAGRAPH

When analyzing problems, it can happen sometimes that several events with some relationship

between them were somehow responsible for the problem.

Page 52: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

36

It can be hard to understand all the relationships involved, so trying to put it in a visual way can be the

best solution, and this is what the Interrelationship Diagraph is for. In other words, it represents the

cause and effect relations that exist, to help to analyze the current problem.

C. TREE DIAGRAM

A tree diagram is a tool used for representing in systematic way ideas, goals or activities that are linked.

It displays the different paths or tasks that are needed to achieve sub-goals and the final goal. It is

usually used when decisions must be made. On the top of the graph, there is a primary node, that has

branches that lead to other nodes. The tree diagram tool is frequently used in TQM applications when

there is a need to follow in more detail some tasks that need to be done, in order to accomplish the

target.

This tool can have different applications: it can help in the identification of root causes of a problem that

is being analyzed, display the different relationships between different components or tasks and show

the right path to achieve the goal.

D. PRIORITIZATION MATRIX

Typically, this tool is used to show the existing relationships between several items. It is usually used

as a complementary tool of the tree diagram when project planning is ongoing. With this tool, it is

possible to prioritize the list of items and understand which ones should be tackled first because not

only the relationship between items is identified but the strength of its relationship is shown.

E. PROCESS DECISION PROGRAM CHART

This specific tool is used when there is a need to identify what could go wrong in a plan that was

developed. It displays the several tasks that are needed to achieve the desired target, and it helps to

create backup plans to limit the risks. It will show the possible events that could fail, the consequences

of this failure and some countermeasures that can be taken to mitigate the risks. In fact, this is an

extension of the tree diagram; it follows the same methodology, it only includes more levels where risks

and solutions are described.

F. ACTIVITY NETWORK DIAGRAM

The sixth tool of TQM is a tool that has the objective to analyze the different task that depends on each

other. It is frequently used in project management and also in managing quality.

As already said, it displays in a visual and simple way, the different existing relations between several

operations or tasks, that in the end will all have some impact on the project.

Page 53: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

37

Figure 19- 5W2H

G. SINGLE MINUTE EXCHANGE OF DIES (SMED)

This particular tool, known as SMED, is a process that wants to reduce the downtime of machines, due

to its changeovers (Kaizen Institute, 2018a). When the machines need setup times, this means that the

machine isn´t producing, it isn’t adding value to the customer. By reducing this downtime, the lot sizes

are also reduced and production flow is optimized. Shigeo Shingo, in his book called A revolution in

Manufacturing: The SMED system (Shingo, 1985), explains the methodology he developed to reduce

the downtime of the machines, to increase productivity. The process starts by the identification of

internal and external tasks, which consist of the tasks that can be done only when the machine is

stopped, and the tasks that can be done parallel to the machine work. In Figure 18, the steps to

implement SMED can be seen.

H. 5W2H

This specific tool was developed to be used when dealing with an improvement of a process. This tool

has the function to help in the organization of ideas and to push the improvement opportunities. The

figure below (Fig.19), shows, that each letter stands for a question that has to be answered in order to

reach the wanted conclusions.

Figure 18-SMED methodology

Page 54: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

38

3.4 Conclusion

The literature review of some main concepts was made in this section in order to provide a

contextualization of the case study and the problem that is being tackled. A more theoretical point of

view was given about costing models and total quality management (TQM) for a better understanding

of the work that is going to be developed in the following chapters.

In short, concepts related to quality and non-quality were addressed, followed by some tools and

methodologies that can be used when tackling quality problems.

With the literature review done, it was confirmed that although there are studies developed about quality

and the importance of measuring quality, it is still something that most organizations don´t pay the

attention it requires, such as Company X.

With all the information that was gathered, it is now possible to develop a structured method for tackling

quality problems, not only to identify the root causes but also to properly quantify the costs associated

to non-quality.

The concepts about quality costing introduced in the Literature Review clarified what are the important

pieces of information that need to be considered once the quantification model is being developed. The

goal is to have a clear picture of every aspect that is impacting on the costs of quality, that nowadays

are invisible to the company. Especially, the need to look at the entire production process, stage by

stage.

On the other hand, the Lean methodologies that were identified will allow developing a structured

method to be used when tackling quality problems that Company X can use, no matter what production

line is being handled. The following tools will be the base for the development of the structured method:

• Pareto

• Fishbone Diagram

• Process Flow Charts

• 5W2H

The final objective is to provide all the necessary methodologies to Company X so that whenever a

problem appears in the lines, everyone is aligned in what the path to the solution is.

Page 55: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

39

4 Preliminary Phase and Planning

In this chapter, there will be data gathering and an analysis of the current situation of the Hungarian

factory of Company X, since Kaizen Institute has started the project in February 2018. A bigger focus

will be made on the Kovomo line, as already mentioned above, which will represent a pilot in terms of

Quality Cost measuring and Quality problem-solving.

Considering the literature review made in Chapter 3, the methodologies will be applied to this specific

case study of the Kovomo line. The goal is to quantify the costs that are incurred in the production

process, focusing on the quality aspect.

This chapter will be divided into two main sectors. First, a characterization of the production line will be

made, focusing in more detail on operational aspects, and in the end, a conclusion of all the information

gathered in this chapter will be presented.

4.1 Identification and Characterization of the Quality Problem in Kovomo

This project addresses the Quality field and it is important to study the production process in order to

realize which types of quality problems may occur in this production line and understand which are the

ones that have a higher impact. For this step, data was collected from SAP, from 1st of January until the

30th of June, in order to identify all the types of quality problems that may lead to scrap.

There is one important fact that needs to be explained in order to understand the categorization made

in the following graph. When scrap for this specific line was analyzed, there was a need to categorize

scrap into two different categories, Reworked parts and Scrap parts. Reworked parts are all the parts

that at some point of the production process have been put aside due to some misalignment to the

customer´s specifications but can still be corrected with some rework from the operators. In other words,

reworks stands for all the parts that have to go back some steps in the production process and have to

repeat them. This involves extra work and time that will have a cost at the end of the day. These types

of costs are the ones that Company X isn´t tracking. On the other hand, Scrap parts are all the parts

that somewhere along the production line have been identified as not meeting customer´s requirements

and having no solution have to go to waste. This type of waste is tracked but only in quantity, without

any cost associated with it. This is the major reason why this dissertation is so relevant for Company X.

With this categorization of Rework parts and Scrap parts, data was collected, and the following graphs

were developed, Fig 20 and 21:

Page 56: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

40

Figure 21-Pareto of Reworked pieces

To facilitate the analysis of the data, two Pareto graphs were built to understand what the quality

problems were that most often occurred and whether they originated Scrap or Rework. Two of the most

frequent issues are both related to copper, lack or excess of it. The reason behind the considerable

difference between the amount of rework that results from the different amount of copper is due to the

fact that a piece with lack of material is much easier to solve than a piece with an excess. These types

of pieces usually have to go back to the production process in order to correct the problem.

After figuring out what the principal causes for the high percentage of scrap in the Kovomo are, the next

step is to study the production process in more detail, in order to understand where this lack or excess

of copper can occur and where it can be detected. For this particular step, one product was taken into

consideration, to facilitate the process of identifying the deviations. The figure below (Fig. 22) represents

the product selected, product AB.

Figure 20-Pareto of Scrap

Page 57: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

41

One of the five fundaments that Kaizen strongly defends is that if there is a problem that has to be

solved, the most important thing to do is to Go to the Gemba, where the true value for the client is

added. As a result of this fundament, in order to truly understand the production process, it was

necessary to go to the line and make some observations, so that all the steps and mechanisms are

understood.

After making the observations in the Gemba, and as already explained in Chapter 2, the Kovomo´s

production line follows the following steps:

1. Cutting

2. Bending

3. Welding

4. Manual Assembly

5. Brazing

6. Visual Check

7. Shaping

8. Leakage Test

9. Quality Control (Final Visual Check)

10. Packaging

After understanding the whole production process that product AB has to go through, it was important

to characterize the process, this time developing a characterization in the quality perspective. The goal

is to apprehend where exactly in the production process these deviations are spotted, and what

happens once the operator perceives that there is something wrong with a piece. So as to reach a

better knowledge of the entire process and deviations, an organigram was built. (Fig.23)

Figure 22-AB Product

Page 58: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

42

When the production process was observed, there were several steps that could originate scrap or

rework. The first quality wall is the Visual Check station, after Brazing. It is in the Brazing station where

the copper is put into the pieces and placed on a conveyor belt. This belt leads through an oven, where

the Brazing actually occurs. In this station, there are several operators that are injecting the copper;

every part has its own necessity in terms of location and amount of copper. The amount of copper that

is injected in each location is now up to the operator, as there is no standard for the amount that should

be put in order to reach the requirements.

When the pieces arrive at the Visual Check station, the operator has to inspect all the pieces and look

for lacking or excess of copper. The information that the operator has in this station is that there should

be at least 65% of copper in the pieces. This is another alert relating to quality. There is no physical

measure to guarantee that all the pieces have the correct amount of copper. This judgment is left to the

operator, and since the operators are always rotating, this increases the variability in the process. In

the next pictures, there is an example of some pieces that were put aside. As it can be seen in the

Figure 23-Production Process (Kovomo)

Page 59: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

43

Figure 24-Example1 Figure 25-Example2 Figure 26-Example3

Figure 27-Jig used for Product AB

figures below (24, 25 and 26), there is an excess of copper in the pieces, as the material has not stayed

in the right positions.

After the quality problem is spotted, the operator has to decide if the piece can be reworked or if it has

to go to scrap. There can be two possibilities: in case that the piece has lack of copper, the operator

has to send the piece back to the brazing, in order to fill up the locations that are lacking the material,

or, if the piece has too much copper, there is also a rework process to be done in order to recover the

piece. It is always possible that the pieces are too damaged or the deviation of the requirements is too

high, and so scrap is created.

The following quality control station is the Leakage Test. This process is performed by a machine,

handled by an operator that loads and unloads the machine. If a certain piece fails the leakage test it is

immediately sent to scrap parts. On the other hand, if the part passes the test without any alerts, it

proceeds to the final steps, Quality Control and Packaging. One of the reasons that a piece fails the

Leakage test is that the piece has lack of copper, and there is some gap between parts, and this

originates leaks that are detected in this test machine.

In the final stage, an operator has to do a final visual check, where the piece is inspected, in order to

guarantee that there aren´t any scratches on the final product. After the visual check, in this final quality

control, the part is put into a jig, as explained in chapter 2, to check if all the tubes are aligned correctly.

The jig used in this specific product can be seen in the picture below (Fig.27) Once the product has

passed all these stages, it is ready to be packed and sent to the customer.

Page 60: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

44

Once the production process was understood and the quality walls were identified, it was necessary to

understand what the scientific consequences are that result from the lack or excess of copper. Firstly,

it was important to understand what is the phenomenon behind the consequences.

Alongside the engineering team of Company X, analyses and observations were made, in order to

understand the consequences of this lack or excess of copper. This deviation affected the Brazing of

the pieces, due to the Capillary Effect. There is a need to understand what this capillary effect stands

for, in order to examine the production process in more detail, to figure out where this quality problem

originated from.

The Capillary effect stands for the ability of a liquid, when confined in narrow spaces to flow, without

any help from external sources, such as for example gravity. The reason behind this phenomenon is

the intermolecular forces that exist between the solid surfaces that surround the liquid.

Some specific conditions are necessary for that effect to occur. The tube has to have a diameter small

enough in order to combine the surface tension that is caused by the cohesion effect within the liquid

with the adhesive forces between the tube and the liquid. These conditions are the ones that will make

the liquid propel. (Marios Sophocleous, 2010)

Once the Kovomo´s production process was fully understood, the quality gates identified and the

consequences pointed out, it was necessary to investigate in more detail every production step, in order

to comprehend where in fact the problem could originate from and what the true root cause is for this

quality problem. Having this in mind, the Gemba was once again the right place. Every step of the

process was analyzed, and these were the observations made in each one:

• Manual Assembly

o In this step, there is a copper ring that has to be assembled, with the help of a tool, in

a metal piece. The problem in this stage is that sometimes the copper ring isn´t

assembled in the right way, and when the piece is handled, the copper ring falls out.

There is also another scenario that might happen if the operator isn´t focusing on the

task: two copper rings might be assembled instead of one. Both cases will interfere with

the Brazing process and affect the Capillary effect.

o Before the Assembly of the tubes, they must be calibrated. This process is also carried

out with the help of a tool. The tube has two ends, and it needs to be calibrated in

separate machines, with different specifications. In case the tubes aren´t calibrated

correctly, there could be a gap between the tube and the piece that has to be

assembled. The gap can have a deviation between 0.05 mm and 0.2 mm. If the

deviation is bigger than the above values, the necessary conditions will not be reached.

The issues encountered in this stage were:

Page 61: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

45

▪ There is a high variation within this process, as it depends on the focus of the

operator in calibrating the tube the right way.

▪ The calibration tool presents signs of wear.

▪ Missing specifications of calibrated diagrams – there is no way for the operator

to certify if the tube is calibrated correctly

▪ The existence of a wrong setting of calibration.

• Welding

o The operator before doing the actual welding should do a visual check, in order to

guarantee that everything is according to the specifications. After observing the line

and the standard work of several operators, it was concluded that this step isn´t

followed. Without this procedure, improper bending, for example, is not detected, since

the welding equipment has no mechanisms to prevent the piece from moving along the

production process without being 100% accurate.

o The welding machine is worn out due to the low maintenance of the equipment.

• Brazing

o It is in this station that the copper paste is placed in the parts. The principal issues in

this are stage are:

▪ Wrong copper paste position – operators don´t have a clear and visual

standard work to follow, in order to know for each product how much and where

the paste is needed.

▪ To ensure that the Brazing is done correctly, the parts need to be in a specific

layout on the belt, but once again, there is no standard for the operators to

follow.

• Visual Check + Shaping

o This is the first quality wall, where the operator has the responsibility of analyzing the

piece and determining if it can move along the production process, or if it needs to be

reworked, and in the worst case scenario, it is considered scrap. Once again, there are

no standards for the operator to follow, so the operator has to rely only on the visual

aspect and common sense.

• Final Visual Check + Packaging

o In this final stage, the problem remains as in the previous step explained above. There

are no standards or guides for the operator. What may happen because of this lack of

standards is that a piece may pass through the Visual Check+ Shaping stage, and it

can come to this final stage, and the operator may think that this part isn´t within the

requirements. These types of errors can´t occur, as this signifies high variability in the

process.

Page 62: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

46

Figure 28-5W2H for Excess Copper

Figure 29-5W2H for Lack of Copper

The 5W2H tool was used to describe the quality problem that is being tackled, that is the Excess and

Lack of Copper in the pieces. This is another tool used in Total Quality Management, as explained in

the Literature Review. This tool consists in answering the following questions:

• WHERE? – Where is the problem most frequently detected?

• WHEN? – When does the problem occur? At what stage of the production process?

• WHO? – Who can detect the problem? Who can originate it?

• WHAT? – What is the trend of the problem?

• WHICH? -

• HOW and HOW MUCH? – How does the problem affect the flow? How is detected?

Considering the causes that are being tackled, here are the answers to the previous questions:

Root Cause: Excess of Copper

Root Cause: Lack of Copper

Page 63: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

47

Figure 30-Ishikawa Diagram

The Cause and Effect Diagram, also known as Ishikawa or Fishbone Diagram (Figure 28), as explained

in Chapter 2, is a very useful tool when tackling a complicated problem. The following diagram can be

seen in more detail in the Attachments, at the end of this dissertation.

The reason behind the Fishbone diagram is because there is a need to identify all the possible causes

to the problem and categorize them so that the path to the solution is much clearer. In order to construct

this diagram, for the specific problem that is being tackled in the Kovomo line, all the data that was

collected so far was grouped, analyzed and divided into the categories. In order to have a better

understanding and easiness of reading, the causes compiled in the Ishikawa Diagram presented above

are listed below:

Fishbone Diagram - Root Cause: Missing or Excess Copper

• Mother Nature/ Environment

o Airflow within the tubes, when the pieces are in the conveyer belt, passing through the

oven.

o Maintenance and cleaning of the operator´s gloves and the workstation

• Manpower

o Lack of training of the operators

o The ability to paste the copper in the right places in a certain amount

o The operator doesn´t follow the standards (in most cases they don´t even exist)

• Method

o The correct procedure isn´t being followed by the operators

Page 64: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

48

o Lack of accuracy in the pasting process

o Ability to position the pieces in the right layout in the conveyer belt

o The lack of a visual check before and after the brazing process

o Lack of standards for visual checking

o Lack of maintenance of the calibration and welding machine

o Missing dedicated operators for crucial operations

o Missing specification for calibration of the diameter

o Improper validation of documentation

o Checklist between processes doesn´t exist

o Already assembled ring can fall out if not assembled correctly

o Missing paste preparation

• Measurement

o Unknown control limits in the crucial steps of the process

▪ Brazing

▪ Welding

▪ Visual Check

▪ Shaping

o Lack of measurement of the gap between assembled parts

• Material

o The existence of surface tension

o Poor quality of the pasting material (copper)

o The existence of a gap between welded parts

o Storage place of pasted parts and welded parts isn´t ideal to conserve their conditions.

If a piece isn´t stored right, it can origin deviations

o Different heat absorption, due to the layout of the pieces on the conveyor not being the

ideal one

• Machine

o There may be some deviations in the setting of the Oven, such as speed and

temperature. If the conditions aren´t the right ones, the Brazing process won´t go as it

ought to

o The feeding of the copper paste to the products is done by a type of gun with a needle.

Even if the locations and requirements of copper change from product to product, the

gun, and needle used is always the same

o The improper capability of bending machine and tools

Page 65: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

49

4.2 Chapter Conclusion

In the present chapter, the Planning Phase, for a specific production line of Company X, a

characterization of the current state was made and causes for the quality problems were identified.

For the characterization of the line, it was important first to understand the current state of the line, such

as its productivity and the level of scrap. A study was conducted to comprehend what the principal

causes are of the high level of scrap parts and rework that has to be done. The target state was identified

and the objective was clear, as a result, the savings and benefits were evident. Following this analysis,

a study of the production process was conducted and for this several tools of Total Quality Management

were used.

With the analysis made in this chapter, the quality problem is fully comprehended, and the gaps are

once again evident. There is no structured method to use in order to tackle this type of situations, and

there is no visibility of the costs that these defects are causing.

At this time, the following information has been gathered:

• Characterization of the Kovomo line

• Characterization of the production process

• Identification of all the critical steps in the production process

• Understanding the root causes that are causing the high level of crap (Lack and Excess of

copper)

• Information about the phenomenon that is caused by the quality problem (Capillary Effect)

• Categorization of the possible causes that lead to the principal root causes

Considering all the work that has been done so far, all the conditions are met to execute the

implementation phase that will consist of two stages:

I. Design of a structured methodology that should be used in order to tackle these types of

problems. A method should be defined, so that whenever these types of problems occur, there

is a path that should be followed, in order to reach the solutions in the best possible way.

II. Development of a quantification model that will quantify the costs that are incurred during the

production process, with respect to quality (Rework and Scrap)

The disruptive aspect of this dissertation is the development of methodologies that will help Company

X, not only in this specific situation that is being analyzed but also for future problems that may occur.

With this quantification model and problem-solving methodology, no matter what the quality problem,

the Company’s team, will have no difficulty to find the solutions and bring benefits and savings to the

firm.

Page 66: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

50

This is directly related to the limitations that were identified in Chapter 2, the lack of knowledge regarding

the costs associated to quality and the entire production process, and the need for a structured method

to address these types of situations, in order to guarantee that the problems are solved as efficiently as

possible and future problems are prevented.

Page 67: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

51

Figure 31-Methodology Suggested

5 Procedure Manual

The goal of this dissertation is to provide tools that will enable Company X, to tackle future problems.

What can be seen in Figure 31 is the Methodology that is suggested in this dissertation. Once Company

X faces a certain quality problem, the quantification model should be used for the calculation of the

costs and the Procedure Manual to reach a solution to the problem at hand.

The aim of the manual proposed in this dissertation is to provide Company X with a method to address

whatever quality problems appear. Most frequently problems are ignored or they have been pushed

aside because there isn´t enough time to deal with them. The biggest consequence of this is that when

problems aren´t being tackled, there is no room for improvement. This structured procedure comes as

an answer to this gap.

The manual consists of 9 Steps that have to be taken so that the solution is reached in the fastest

possible way but guaranteeing a good result. All steps will be identified and explained in detail.

Every project that will be made should follow the following steps:

1. Clarify the Purpose

2. Characterize the Initial State

3. Set the Target State

4. Find the Root Causes

5. Design Solutions

6. Test Solutions

7. Update Action Plan

8. Confirm Results and Standardize

9. Lessons Learned

Page 68: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

52

1. Characterization of the Purpose of the Project

In every project, it is important to have a clear understanding of the final goal. The purpose of the project

has to be defined, in order to understand what is the path to it.

In order to have a good characterization of the objective of the project, the following steps have to be

followed:

I. Identification of the Problem to be solved

II. Definition of the boundaries of the project

III. Objectives to be Reached

2. Characterization of the Initial State

Once the scope of the project is defined and clear for the whole team, it is important to understand what

is the current situation of the production line. The problem can only be defined if a good characterization

of the initial state is made.

For this step, an analysis has to be made to establish the initial state. To complete the analysis the

following tools have to be used:

• 5W2H- guarantee that the problem is correctly defined

• Pareto graph- analyze the data collected.

• Observation - there is nothing better than going to the Gemba, the place where the value is

added, and observe what is happening. Some time should be spent observing what is

occurring in the production line and identifying opportunities. Inputs from the operators are also

important, as they are the ones that are in the line every day adding value.

For this step, the quantification model, that will be explained in the following section, should be used, in

order to give a more accurate vision of the costs incurred in the production line, which will characterize

the initial state, and in the end the evolution of costs can be seen.

3. Set Target State

Once the purpose of the project is identified and the current state is characterized, the problem is

evident. The problem consists of the existing gap between the initial state and the target state,

considering the purpose defined. The target is the goal that is reached at the end of the project, it should

be well defined and it should be SMART:

Page 69: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

53

• Specific - the area for improvement should be a specific one, and the goal should be clear

• Measurable- concrete criteria should be established to measure the progress of the project

• Attainable- the goal that is being pursued has to be acceptable for all the team involved

• Relevant- the project has to bring benefits to the organization and have impact

• Time-Bounded- a time frame should be established, so that there is a sense of commitment

These characteristics are important when the target state is defined. A poorly defined target can lead

to the team’s lack of motivation and the failure of the project. There are some aspects that should be

also included, metrics that will measure the accomplishment of the project, the time limit of the project

and what is the value of the target defined. With all these characteristics met, the path to the objective

is clear and well defined. This target, which is defined at this stage, will be used as the major KPI of this

project that will allow top management to track the evolution of the project and calculate the benefits

and gains.

4. Find Root Causes

By this stage, there is an awareness of the quality problem, but there isn´t an explanation or root cause.

In order to find the root causes of the quality problem, there are several steps that need to be taken:

I. Understand the production process – characterization of every step that the product has to

go through until is packed to be delivered to the client

• VSM tool will help to map the entire production process in a visual and organized

way.

II. Study the production process, in order to identify where the quality problem is spotted

III. Develop a Root Cause Analysis, to identify the possible causes for the quality problem

• Ishikawa Diagram, which will allow us to categorize all the causes identified, and

reach the real root cause

• 5 Why Analysis, which will guide us through the process of going in depth into the

quality true root cause

IV. Return to the production process, to determine where the quality problem originates

For the identification of the root causes, Kaizen has developed tools that will guide us through this

process:

• Ishikawa Diagram

As already explained in Chapter 3, the Ishikawa Diagram is a useful tool for the identification of causes

and also facilitates the process of brainstorming. This tool consists of a backbone of a fish, with its fish

bones representing the most likely causes. If the causes are not easily identified, the best method is to

begin by going through the 6Ms:

Page 70: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

54

o Manpower – people that are involved in the production process (e.g.: Operators)

o Methods - how is the process done, and all the requirements that are involved, such

as rules, procedures, and regulations

o Machines – equipment that is required for the process (e.g.: Brazing Oven)

o Materials – raw materials and parts needed (e.g.: copper paste)

o Measurements – data that is generated that will allow evaluating the quality

o Mother nature – conditions that the production process is put through

• 5 Whys Analysis

After a brainstorming is done to gather all the possible causes that can originate the quality problem,

this tool can be used, in order to understand the effect of each cause on the problem. The idea is to

answer each question with a single statement, then choose a why question with a direct relation to the

previous answer given. This questioning process should be done until the root cause is done, and in

the end, there should be a verification of the truthiness of each why. The number of questions will

depend on the complexity of the problem.

“Recognizing the problem is more important than finding a solution

because the exact description of the problem leads almost automatically to

the correct solution.”

Albert Einstein

5. Define Next Steps

The next steps to take to improve the process and guarantee a scrap reduction will be defined. A list all

the possible solutions that will lead to the concretization of the vision should be prepared, because the

solution may not be a single action, but a group of actions that will have to be implemented. A Priority

Matrix should be built to assess the implementation impact and effort for each action. The actions can

be grouped into four categories:

o Low Effort / High Impact – Quick-Wins

o High Impact / High Effort - Major Projects

o Low Impact / High Effort - Thankless Tasks

o Low Effort / Low Impact - Actions Cancelled

Page 71: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

55

Figure 32-Priority Matrix

6. Implementation of Solutions

Once all the actions and solutions are listed and prioritized, the next step in this process is to validate

that each and every possible solution will be successful and produce the desired benefits. For this step,

there is a need to go to the Gemba and test the possible solutions. For each solution that will be tested

there are several important aspects that must be defined:

o A responsible for the testing process

o List of all processes/ task standards that will be changed

o The timeframe for the solution testing

o Resources that will be necessary for the tests

o Success criteria to, later on, evaluate the test as successful or not

o A test plan that should be validated with all areas that will be involved in the testing

It´s important to have the testing phase well planned, to guarantee that the testing of the possible

solutions is well executed and delivers concrete results, which will define what is the path that should

be followed in the future. Establishing dates and responsible ensures that there is a due date for testing

and implementation of the solutions and that someone is guiding the team throughout the process.

7. Implementation Plan

Once the solutions are tested, the purpose of the project is almost accomplished. The following step is

the implementation of the actions defined. Once more, there is a need to organize the team to make

sure that everything goes according to plan. For this step:

• All the actions to be executed should be listed

• An owner and a due date should be assigned.

Page 72: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

56

By attributing ownership of an action to a member of a team, not only is the team encouraged to

participate in the solution, but there is also someone who will be responsible to ensure that a certain

task is carried out. Despite the fact that there is an owner to each action, it is important to monitor the

development of the action plan on a regular basis.

8. Results Confirmation and Standardization

By the end of the implementation of all the actions that were defined as necessary to reach the target

state, defined in Step 3, the results should be confirmed. This confirmation is made by comparing the

initial state and final state: the gap that existed between the initial situation and the target state should

have been eliminated with the implementation of the actions defined by the team. It is important to

quantify the gains made with this gap elimination.

In case the target goal wasn´t reached, it is necessary to go back to Step 2 of this process and

reevaluate the situation, in order to understand why the objective wasn´t reached. Sometimes the cause

that was identified as the root cause in Step 4 wasn´t, in fact, the real root cause, and in these cases,

a new analysis should be performed.

To ensure that the indicator, in this case, the scrap level, stays in the percentage that was defined, the

processes must be standardized, to guarantee that the new procedures are followed by everyone.

Standards have to be developed and the teams and operators have to be trained according to the new

methods. For this step, a responsible should also be appointed that will lead the team in performing and

sustaining the newly developed methods. It is advisable, in order to support this process, to develop a

skill matrix that will help the person responsible to train the team and develop their competences.

9. Rollout and Lessons Learned

The final step is an evaluation of the project that has been developed, in order to determine what the

aspects that went well were and the major difficulties felt. This stage is important because in every

project there is something new that the teams learn and that can be used in later projects, and analyzing

the difficulties and obstacles felt may help avoid mistakes in the future.

During this process, as it was explained, it can happen that once step 6, Implementation of Solutions,

is reached, some solutions won´t yield the results that were expected. In case this happens, an analysis

should be made to understand the reason behind this failure. This process is important so that these

errors aren´t repeated.

The purpose of this Step by Step Process is to provide a tool to Company X to tackle future issues in

the factories. This dissertation applied this process to a specific production line, Kovomo, for a specific

purpose, reduction of Scrap level due to Lack and Excess of Copper.

Page 73: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

57

Figure 33-Step by Step Procedure - Kovomo

5.1 Step by Step Implementation Process – Kovomo

The procedure explained previously was applied to the production line that was studied in this

dissertation. In this section, the manual will be used for the scrap problem that was present in the

Kovomo. All the steps will be explained in more detail, but in the figure below (Fig.33), a summary can

be seen of the use of this procedure manual. For a more detailed view, Figure 33 is present in the

Attachments.

1. Characterization of the Purpose of the Project

In case of Company X, once the whole factory is dealing with a high-level of scrap, an analysis has to

be made, as it was shown in Chapter 3, to determine what the priority lines are in terms of scrap level.

A cost analysis was made with the help of the tool developed previously to determine the lines that incur

more quality costs. Considering the scope of the project, which in this case is the reduction of the Scrap

level in the Hungarian factory of Company X, and with this two analyses done, a path to reducing non-

quality is clear.

2. Characterization of the Initial State

For the characterization of the initial states, all the data that was gathered in Chapter 4 regarding Pareto

for the quality issues and the quantification of the associated costs should be presented in this step, as

it can be seen in Figure 33, in the second step.

Page 74: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

58

Figure 34-Ishikawa done with Company X

3. Set Target State

The purpose of this specific project was to reduce the scrap level of the production line: considering a

5% of scrap level, in the beginning, the target was set to 3.5%, which would lead to a saving of 11,000€.

For the calculation of the benefits, the data that is generated by the tool developed in this dissertation

is used to understand, once the scrap level is reduced, how much the savings are due to the reduction

of the cost of non-quality.

4. Find Root Causes

For the identification of all the root causes involved, tools such as 5 Whys and the Ishikawa Diagram

were used:

• 5 Whys:

o Why was the product rejected in the Leakage test? – It presented signs of leaking

o Why did the product have leakage products? – There were holes between the

assembled parts

o Why were there holes in the part? – There wasn´t enough copper in the product

o Why was there not enough copper in the part? – The operator forgot to put the copper

paste

• Ishikawa Diagram was developed in a workshop with operators from the production line,

engineering and quality team, and top management. An analysis of all root causes,

identified:

5. Define Solutions

There were two problems that were identified as critical, once the Ishikawa Diagram was analyzed:

• Incorrect copper pasting in the pieces, due to lack of standardization in this process

• Improper calibration in the tubes, since there is no system that would alert the operator to

this problem.

Page 75: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

59

Figure 36-Standard Work for Pasting

Figure 35- Poka-Yoke System

Table 1- Test Plan

For these two problems, two solutions were developed:

• Standard Work for the operators in the copper pasting station, as it can be seen in the figure

below (Fig.35). A draft was made to represent the idea: it should be clear for the operator

where the paste should go and in what amount.

• Poka Yoke mechanism, as seen in Figure 36, should be implemented in the calibration

station, so that the operator can test each piece and guarantee that only pieces 100%

calibrated continue along the production process.

6. Testing Solutions

In order to test the solutions presented in the previous step, a Test plan had to be defined, as can be

seen in the following table:

Page 76: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

60

Table 2-Implementation Plan

Figure 37-Results of the Testing Phase

7. Implementation Plan

Once the solutions are tested and proved successful, the implementation plan is triggered:

8. Results Confirmation and Standardization

During the week of testing made for each solution, the data was gathered and the following analysis

was made (Fig.37):

Page 77: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

61

Before any solution was tested, the Kovomo line had a percentage of 5% of Scrap, which represented

an average of 10 pieces per day of defective parts, parts that went to Scrap. With the implementation

of the Standard Work in the pasting station and the poka-yoke system, as it can be seen in the graph

above, a 33% reduction was achieved.

9. Rollout and Lessons Learned

After testing the solutions developed, the target of 3% of Scrap for the entire Kovomo line wasn´t

reached; therefore, it was necessary to go back to the root cause analysis and understand what other

causes could be affecting the quality of the production line. The idea is to go back to Step 4 and analyze

the data gathered to reach the real root cause. When this is solved, it will bring the desired results.

This work was left to Company X’s team to develop internally, with the help of the procedure manual

and the quantification model developed.

5.2 Development of the Non-Quality Costing Tool

The factory located in Hungary is dealing with quality problems manifesting as a high level of Scrap.

Every production line is producing with a high percentage of scrap, which led to the implementation of

Rework stations, for example, Shaping. These stations are pure non-value adding activities that had to

be created due to the high percentage of scrap production.

In the current situation of the factory, the productivity is so low that the volume produced isn´t enough

to cover the orders, which makes the scrap levels an even more relevant subject.

When the data was started to be gathered and analyzed, in order to start the projects, more specifically

the Quality workshops, a clear gap was identified. When the scrap costs are calculated, the only factor

that is being taken into consideration is the value of the raw material that is lost. This means that when

this analysis was done, the only factor used was the cost of the parts that are rejected and considered

as scrap in each production line, meaning that they didn´t return to the production process. All the

pieces that at some point of the production cycle were identified as defective and went back some steps

along the production process, so that the problem could be corrected, weren´t included into the non-

quality costs.

Considering that a high percentage of the volume produced had to be reworked, this was an alarming

factor, which Company X wasn’t even paying attention to. Combining the negative EBITA and the high

percentage of scrap, it was imperative to develop a tool that calculates the true cost of Non-Quality, in

order to bring awareness to this factor and show the importance of the improvements that need to be

made in the production lines.

Page 78: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

62

A quality costing model is a very important asset when projects associated with quality are being

developed. It allows us to track the gains that are being reached with the improvements that are being

made, and also shows the relevance of these types of projects. This is the reason why Total Quality

Management has to go hand in hand with Quality Costing.

The drive for this dissertation work was to develop a model that will quantify all the costs that are

incurred in terms of non-quality, and that have until now been invisible to the company.

There are two types of quality costs:

• Price of Conformance (PoC)- includes all the costs that are incurred to prevent poor Quality in

the products, as for example, inspections and visual controls

• Price of Non-Conformance (PoNC) - represents the costs that are incurred when a product

presents some defect

This is some of the costs that he pointed as relevant:

• Tangible Factory – Scrap, Rework and Inspections

• Tangible Sales Costs – the costs associated with handling customers

• Intangible Costs – costs of losing customer´s goodwill, penalties for delays in deliveries

The aim of this model is to change the current mentality with regard to quality costing. This awareness

will bring a vision of the real situation of the costs associated with quality. With this knowledge, Company

X will know what the more critical production lines are in terms of costs, and what the specific production

process to be improved is. The goal is to break the current paradigm of only considering the costs of

the lost material due to defects and include all the other costs that are currently hidden.

The costs of quality have to be calculated according to equation 1:

∑ 𝑄𝑢𝑎𝑙𝑖𝑡𝑦 𝐶𝑜𝑠𝑡𝑠 = ∑ 𝐶𝑜𝑛𝑓𝑜𝑟𝑚𝑎𝑛𝑐𝑒 𝐶𝑜𝑠𝑡𝑠 + ∑ 𝑁𝑜𝑛 − 𝐶𝑜𝑛𝑓𝑜𝑟𝑚𝑎𝑛𝑐𝑒 𝐶𝑜𝑠𝑡𝑠 (1)

In order to develop the accurate quality costing model there are some data that need to be gathered:

• Cost per hour per FTE (operator)

• Cost per hour per machine time usage (which includes the energy costs)

• Total Costs of raw material used in the production process

• Cycle times for all the production steps

• Percentage of rework (an average based on the last months)

• The volume produced by the production line

Page 79: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

63

All parts have to pass through a Rework station in order to check if the part is according to specifications;

if not, a shaping process takes place to correct the piece.

In Company X, and in most of the automotive industry, this Rework station is seen as necessary, and

as a result, the costs of this step aren´t taken into consideration, because they are seen as just another

step in the production process.

With this new vision, the cost of each piece will be calculated in a different way than the one that has

been done so far. With the help of the quality costing model, it will be able to estimate the cost of non-

quality of each piece. The logic behind this is that a piece has two options regarding the production

process. The piece can run through the entire production process without any error, and this will

represent the ideal cost of a piece. On the other hand, as explained in Chapter 2, a piece can be rejected

at some point of the production process and has to be sent back to be reworked. In this case, to the

ideal cost of the piece, the cost of non-quality should be added. This cost of non-quality will contemplate

all the costs that are incurred in the rework process, such as:

o The cost of having operators that are allocated to these rework stations; instead of

producing new products, their time is spent correcting errors that occur along the process.

o The cost of having the machines running for these reworked parts, in case the piece needs

to go back to a certain machine, considering the energy that is used.

o The cost of raw material that needs to be replaced, if that is the case.

The ideal cost of a piece can be calculated with equation 2:

𝐼𝑑𝑒𝑎𝑙 𝐶𝑜𝑠𝑡 = ∑ (𝐹𝑇𝐸 𝐶𝑜𝑠𝑡 𝑗 + 𝑀𝑎𝑐ℎ𝑖𝑛𝑒 𝐶𝑜𝑠𝑡 𝑗 + 𝑅𝑎𝑤 𝑀𝑎𝑡𝑒𝑟𝑖𝑎𝑙 𝐶𝑜𝑠𝑡 𝑗)𝑚𝑗=1 (2)

The letter j represents all the different production processes that can exist in a production line.

In order to calculate the final cost of a piece produced, contemplating the non-quality, the model will

take into consideration all the costs explained above. All the values presented in this chapter are not

real, due to confidential reasons.

Another disruptive aspect that this quality costing model brings, is that with the help of this model, it is

possible to quantify the costs of each production process. When using this model, there will not only be

a vision of the total quality costs, including the ideal cost and the non-quality cost, but also a clear vision

of all the costs that are incurred in each step. Nowadays there is no knowledge of this aspect because

quality costs aren´t being seen in this detail. This could be useful if a more detailed analysis of the

process was made, in order to understand which are the processes are that cost more. This costing

method will support the need to reduce and eliminate all rework stations since they only bring extra

costs to the company. It is important to refer, that for the usage of this quantification model, cooperation

between the financial department and management control, for accuracy of all data.

Page 80: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

64

CUTTING BENDING WELDING

MANUAL

ASSEMBLY

1

MANUAL

ASSEMBLY

2

CALIBRATION BRAZINGVISUAL

CHECKREWORK 1 SHAPPING

LEAKAGE

TEST

QUALITY

CONTROLPACKAGING TOTAL COST

FTE Time(s) 25.00 8.00 12.00 10.00 10.00 15.00 15.00 30.00 35.00 30.00 15.00

NºFTE 1 1 1 1 2 1 1 1 1 1 1FTE Cost 0.04 € 0.01 € 0.02 € 0.02 € 0.03 € 0.02 € 0.02 € 0.05 € 0.06 € 0.05 € 0.02 € 0.34 €

Machine Time(s) 10.00 18.00 13.00 2400.00 13.00

Machine Time Cost 0.06 € 0.08 € 0.07 € 1.33 € 0.09 € 1.63 €

Raw Material Cost 1.00 € 0.02 € 0.50 € 0.60 € 0.40 € 2.52 €

PRODUCTION CLYLEPRODUCTION STEPS

Table 3- Machine Costs and Raw Material Costs

Table 4-Production Cycle Characterization

Cost/ hour Cost/second

20.00 € 0.01 €

15.00 € 0.00 €

20.00 € 0.01 €

100.00 € 0.03 €

25.00 € 0.01 € 0.20 €

0.50 €

0.60 € Brazing

Leakage Test

RAW MATERIAL COSTS PER PIECE

Material

Tube

Copper Rings

Joints

Copper Paste

Safety Caps

Cost

1.00 €

0.02 €

Machines

MACHINE COSTS PER PIECE

Cutting

Bending

Welding

What´s the process behind the Quality Costing tool? The first step for this quality costing is to

characterize the production process, by identifying all the steps that one piece has to go through until it

is ready to be delivered to the client.

When all the steps are characterized, the data for each step is gathered, regarding, FTE time, Machine

time, Raw material needed, and all the costs associated with these parameters. The tables below (Table

3), show the data gathered for the Kovomo Line:

The cost of labor that is calculated in the table below (Table 4), considers the cost per hour per operator

(𝑐𝑜𝑠𝑡 𝑒𝑚𝑝𝑙𝑜𝑦𝑒𝑒), the cycle time of each piece to be produced in a production step (𝑡𝑒𝑚𝑝𝑙𝑜𝑦𝑒𝑒−𝑛) and the

number of operators involved in the process (𝑛). With this in mind, the cost of FTE is calculated, per

production process, with the following equation:

𝐹𝑇𝐸 𝐶𝑜𝑠𝑡 = ∑ (𝑛=1 𝑡𝑒𝑚𝑝𝑙𝑜𝑦𝑒𝑒−𝑛 ∗ 𝑐𝑜𝑠𝑡 𝑒𝑚𝑝𝑙𝑜𝑦𝑒𝑒) (3)

The machine cost is calculated with the same method as the FTE cost. It considers the machine cost

per piece (𝑖) being produced ( 𝑚𝑎𝑐ℎ𝑖𝑛𝑒 𝑐𝑜𝑠𝑡 𝑖) and the machine time per piece (𝑚𝑎𝑐ℎ𝑖𝑛𝑒 𝑡𝑖𝑚𝑒 𝑖).

Therefore, the machine cost, allocated to the production of one product, can be calculated with the

following equation:

𝑀𝑎𝑐ℎ𝑖𝑛𝑒 𝐶𝑜𝑠𝑡 𝑖 = 𝑚𝑎𝑐ℎ𝑖𝑛𝑒 𝑡𝑖𝑚𝑒 𝑖 ∗ 𝑐𝑜𝑠𝑡 𝑚𝑎𝑐ℎ𝑖𝑛𝑒 𝑖 (4)

After having all the necessary data, the following table can be completed with the information necessary,

as can be seen in Table 4.

Page 81: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

65

Input Variables

DEMAND 1000 (per shift)

OPERATOR COST 5.70 € (per hour)

SHIFT 7.33 (hours)

VOLUME PRODUCED 700 (per hour)

SCRAP % 30% (pieces)

Table 5-Input Variables

Table 6-Quality paths

Legend

Rework

Scrap

CUTTING BENDING WELDING

MANUAL

ASSEMBLY

1

MANUAL

ASSEMBLY

2

CALIBRATIONREWORK

1REWORK 2 BRAZING

VISUAL

CHECKREWORK SHAPPING

LEAKAGE

TEST

QUALITY

CONTROLPACKAGING

Cost per Process 1.06 € 0.08 € 0.11 € 0.03 € 0.52 € 0.02 € 0.25 € 0.20 € 1.97 € 0.02 € 0.36 € 0.05 € 0.15 € 0.05 € 0.42 €

TOTAL

COST

NON

QUALITY

COST

%

OCURRED

Too much Copper X X X X X X X X

Rework X X X X X X X X X

Lack of Coper X X X X X X X X

X X X X X X X

Scrap X X X X X X X X 3.80 € 3.80 € 12%

Leakage Problems X X X X X X X X X X

X X X X X X

Scrap Final X X X X X X X X X X X 4.46 € 4.46 € 2%

7.26 € 23%

6.65 €

6.65 €

52%

11%

2.80 €

2.19 €

2.19 €

QUALITY PATHS

Alongside this information, the volume produced should also be collected, as well as the percentage of

scrap produced and the cost per FTE. This data represents the input variables that are needed for the

quantification of the quality costs.

As it was explained in Chapter 2, with the help of the Organigram (Fig. 23), a piece can have different

paths in the production process, depending on the existence of quality problems. By studying the

production process, and understanding where the locations are, where a defect can occur, the following

table, can be built (Table 6).

From the table 6, it is clear that each type of defect can originate different paths that will represent

different costs. This step is fundamental for the quality costing and it is important that the study

developed in Chapter 4 is well performed, because it will be the base for this tool. There are two points

that are relevant in this process and need to be identified by the user of the tool. The Detection point,

where in the process the operator detects that there is a defect in a certain product, and the first Rework

process, in other words, how far in the production process does the piece need to go in order to be

corrected, according to the customer´s requirements.

The following step is to understand from the volume produced in a certain month what the percentages

are of each quality path that occurred. For the month of May, these were the results for the Kovomo

line:

Page 82: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

66

%

OCURRED

23%

52%

12%

11%

2%

Leakage Problems

Scrap Final

QUALITY PATHS

Too much Copper

Lack of Copper

Scrap

Table 7-Quality Paths Kovomo May

Having the percentage of the volume that goes through each quality path, and with all the data gathered

previously, it is possible to determine the costs associated to quality, in a certain month, taking into

consideration all the quality problems that occurred, and including all the parameters that are relevant

to consider in this type of analysis.

The final non- quality cost will be calculated by the Quality Costing Model, but it can be expressed in

the following mathematical equation:

𝑁𝑜𝑛 − 𝑄𝑢𝑎𝑙𝑖𝑡𝑦 𝐶𝑜𝑠𝑡𝑠 = ∑ 𝑇𝑜𝑡𝑎𝑙 𝑂𝑢𝑡𝑝𝑢𝑡𝑛𝑖=1 ∗ %𝑂𝑐𝑢𝑟𝑟𝑒𝑛𝑐𝑒 𝑖 ∗ ∑ 𝑋𝑎,𝑦

𝑐𝑦=𝑏 (4)

The letter i stands for all the quality paths that are possible, depending on the defects that may occur.

Variable b is the 1st Rework process that a certain product has to go back to if an error appears. Finally,

variable c is the Detection point, where the defect is in fact detected, and X is the cost associated with

that Rework path taken.

All in all, the final cost of a piece that is produced in the Kovomo line will take in to account the following

parameters:

• The cost of a piece that is produced with no defects, that is:

• The cost for the FTE time

• The cost of the usage of a machine to produce a specific piece

• The cost of the raw material that is needed

• The Non-Quality Cost, which includes:

• All the possible quality paths that a piece can take, depending on the defect that is

originated, and the cost associated with it, considering all the rework and corrections

that need to be made

With this new perspective, the cost of a product is calculated with the following mathematical formula:

𝐹𝑖𝑛𝑎𝑙 𝑄𝑢𝑎𝑙𝑖𝑡𝑦 𝐶𝑜𝑠𝑡 = 𝑁𝑜𝑛 − 𝑄𝑢𝑎𝑙𝑖𝑡𝑦 𝐶𝑜𝑠𝑡 ∗ 𝑂𝑢𝑡𝑝𝑢𝑡 ∗ %𝑆𝑐𝑟𝑎𝑝 + 𝐼𝑑𝑒𝑎𝑙 𝑐𝑜𝑠𝑡 (5)

Page 83: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

67

Figure 38-Cost per Production Process

What this quantification model gives as an output is the clear picture of the quality costs involved in a

production line, by specifying the costs incurred in each step of the process and with all the rework

included, as can be seen in Figure 38:

5.3 Conclusions

The vision developed in this dissertation, and in this Chapter 5, is a totally disruptive vision for this

industry. Until today Company X, has calculated quality costs assuming only the losses of material due

to scrap, all the rework and corrections made weren´t even taken into consideration. The principle drive

for this dissertation work was to alert Company X to all the costs that are being incurred and aren´t even

visible to the top management.

This quality costing tool isn´t only meant to evidence the costs and the losses that occur, but also to

evidence the opportunities for improvement that exist and the need for continuous improvement.

As already mentioned, the model developed in this dissertation allows Company X not only to evaluate

the costs that are being incurred in a specific production line, but also to go in depth, and understand

within the process which are the steps that are causing more costs. This was a vision that wasn´t

available to the top management because this type of analysis was never performed. With this analysis,

it becomes clear which the processes are that need to be improved in terms of costs.

In this chapter, it was also explained step by step how Company X should act in case future quality

problems occur. With the gap identified in Chapter 2, without a structured way to tackle these types of

issues, the necessity arose to develop a methodology that could be used in these cases. A step by step

procedure was developed for future use. This way, no matter what type of problem occurs, every

member of the company has the right tools and structure to be able to solve a problem.

This chapter represents the important contribution of this dissertation work to Company X: a

quantification model that represents the reality of each process, bringing awareness to all the costs that

are incurred in a production process and a structured methodology for problem-solving.

Page 84: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

68

Page 85: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

69

- € 74 243 € 119 655 € 172 332 € 223 626 € 264 525 € - € 21 550 € 77 100 €

146 625 € 222 975 €

322 600 €

442 925 €

581 050 €

726 000 €

873 250 €

1 046 950 €

1 220 650 €

- €

200 000 €

400 000 €

600 000 €

800 000 €

1 000 000 €

1 200 000 €

1 400 000 €

Months

Real Monthly Saving Ac Target Saving

Figure 39-Overall Savings

6 Presentation and Analysis of the Results Obtained

This chapter is divided into two different parts. The first one, section 6.1, presents the indicators that

were used and the description of the results obtained is demonstrated, where a comparison of the initial

and final situation is made in order to track the benefits and savings that were made throughout the

development of the project, explained in Chapter 5.

The second part, section 6.2, a conclusion of the results is made, having in consideration the

quantification model developed.

6.1 Description and Presentation of the results

6.1.1 Overall Savings

Overall Savings is the principle indicator of the Kaizen project in the Hungarian factory of Company X.

This indicator combines all the savings in every department that is dealt with: Quality, Productivity, and

Logistics. This indicator represents a sum of all the savings that are made each month. The other

indicators, which will be explained next, combined, are what originates this major indicator.

6.1.2 Scrap Cost per Part Produced

The evaluation of the Scrap costs is the principal indicator of the Quality work package. As already

explained previously, the Hungarian factory of Company X, is facing high percentages of scrap, and

this was the reason why this specific indicator was chosen. This indicator considers the reduction

associated with scrap costs made in the Kovomo line since this was the line tackled in this dissertation

work. This cost only considered the reduction in a number of parts that went to scrap, in other words,

material that was wasted.

Page 86: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

70

This indicator was used until the tool developed in this dissertation wasn´t ready. The increase of

savings in each line was due to work developed with teams from Company X and Kaizen. One of the

principle projects developed was the definition of a structured method to solve quality problems in the

lines, as I explained in Chapter 5. There were several iterations made, and the final version is the one

presented in Chapter 5. From the graph in the Figure below the impact of having a structured way to

solve quality problems becomes clear. Just by defining a method to tackle this situation, the costs

associated with scrap decreased.

In this indicator, only the reduction in costs made with the reduction of parts that were considered as

scrap was taken into consideration. From this point on, the new tool will present a more detailed and

accurate way to track Non-Quality Costs.

Figure 40-Scrap Cost Saving

6.1.3 Personal Cost Saving

This indicator is mostly based on the Productivity work package. Since the begging of the project, a

crucial work has been done in several lines that were identified as critical. In the case of the Kovomo

line, the production line tackled in this dissertation, before beginning to work on the scrap, the

productivity had to be improved. A new line design had to be implemented in order to guarantee that

the demand is fulfilled every day. The operator´s work had to be balanced in order to guarantee that

every operator has the same amount of work.

One crucial change in terms of productivity, but also for quality issues, was to create a Mura Station.

Mura station stands for variability and the goal of this change is to concentrate all the processes that

bring high variability to the line in only one place.

117 116

103112

9081 80

0

20

40

60

80

100

120

140

0

10 000

20 000

30 000

40 000

50 000

60 000

70 000

AVG2017 Q4

2018/01 2018/02 2018/03 2018/04 2018/05 2018/06 2018/07 2018/08 2018/09 2018/10 2018/11 2018/12

Co

st o

f Sc

rap

pe

r P

iece

Pro

du

ctiv

ity

(pie

ces)

Months

Scrap/pc (HUF) Prod (qtty)

Page 87: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

71

In the Kovomo´s case, the Shaping workstation was taken from the production line and a place and

operators were established that would only focus on this task. With this change, we can guarantee that

all parts that leave that station to the Leak Testing machine are 100%.

For the calculation of this indicator the following formula was used:

𝑃𝑒𝑟𝑠𝑜𝑛𝑎𝑙 𝐶𝑜𝑠𝑡 𝑆𝑎𝑣𝑖𝑛𝑔 = ∆(𝑁º𝑂𝑝𝑒𝑟𝑎𝑡𝑜𝑟𝑠) ∗ 𝑁º𝑆ℎ𝑖𝑓𝑡𝑠 ∗ 𝐷𝑎𝑦𝑠 𝑜𝑓 𝑊𝑜𝑟𝑘 ∗ 𝑊𝑎𝑔𝑒 (3)

Figure 41-Personal Saving Cost

6.2 Chapter Conclusions

In Chapter 6 the indicators used in the project developed with Company X were explained and

presented, describing the benefits tracking that was made during the development of the present

dissertation work.

In Section 6.1 the main KPIs of the project was presented, with the needs and concerns of Company X

in mind: Overall Savings, Scrap Cost Savings and Personal Cost Savings.

In the following section, the evolution of the KPIs was presented, as well as its explanation and result

interpretation. The principal results obtained were:

• An accumulated value of 264,480€ in what Overall Savings is concerned

• An accumulated value of 14,625€ in Scrap Cost Savings

• An accumulated value of 27,600€ in Personal Cost Savings

4 600 €

27 600 € 27 600 € 27 600 €

46 000 €

66 700 €

74 750 € 74 750 €

77 050 €

103 500 € 103 500 €

0

20000

40000

60000

80000

100000

1 2 3 4 5 6 7 8 9 10 11 12

Months

501 E 497A KoVOMo 497 F Target Monthly Saving

Page 88: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

72

Despite these values, with this dissertation, a new KPI has been developed that from now on should be

the indicator to track. The costing tool should be applied to all production lines in Company X, an actual

cost of quality should be established, and this is the value that should be tracked on a daily basis. This

new indicator is the most important output of this dissertation work.

The new indicator was applied to one production line, which serves as a pilot for all the other lines.

These are the values, calculated with the newly developed tool, for the Kovomo:

• Cost of one Piece to be produced: 4.80€

• Cost per Production Process:

o Cutting: 1.06€

o Bending: 0.08€

o Welding: 0.11€

o Manual Assembly 1: 0.03€

o Calibration: 0.02€

o Brazing: 1.95€

o Visual Check: 0.02€

o Rework: 0.36

o Shaping: 0.05€

o Leakage Test: 0.15€

o Quality Control: 0.05€

o Packaging: 0.42€

Once again, it is important to state that these values are not real, due to confidential reasons.

Page 89: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

73

7 Final Conclusions

This dissertation work focused on the development of a quality costing model that would take into

consideration all the parameters that in fact affect this type of costs. Since the beginning of the project,

it was clear that that the method used until then wasn´t adequate and it didn´t reflect the reality of the

factory. The factory was losing money, and top management didn’t even understand where all the

losses came from.

With this in mind, this dissertation focused on the development of this model, so that from this day on a

clear picture of each production process is possible. There is now the possibility to evaluate each

production process, not only considering all the costs that are incurred, but also to look within a

production process, and analyze each step of the cycle. Until now, there wasn´t any tool that allowed

this type of visibility, and the quality costs were purely based on the Scrap cost, material that due to

defects had to be wasted.

As explained, this dissertation focused on the development of the concept of this new quality costing

model, in the future this model, that now it´s an excel, should be developed with an IT team, in order to

make this process more automatic and easier for any user.

Another important contribution of this work is a step by step manual, that provides a structured method

for problem-solving. All the steps are explained in detail, and a pilot line was used, to show not only the

costing model working but also how should this methodology for solving problem work. As it was seen

in Chapter 4 and 5, there was a step by step procedure that was followed in order to do a proper

characterization of the production process, identify what are the root causes of the defect originated

and where are this defects originated in the production process. This part is the difficult one when this

types of projects are being developed, there is always a struggle to identify the real root cause of the

problem. With this manual and the correct tools, it is guaranteed that the real causes are identified.

From here, an engineering and maintenance team should be gathered to come with the ideal solution

for the cause identified. In this particular case, standardization of the processes may be required and

implementation of quality systems, known as poka-yoke, should be implemented, in order to guarantee

that once a piece finishes a step in the production process, it only proceeds to the next step if 100%

quality is guaranteed. The quality costing model should be incorporated in this structured method that

is proposed.

For the future, the goal is that Company X starts using this quality costing model, in every production

line, in every factory in the world. This quantification should represent a new indicator that should be

followed by the top management on every meeting that is made to discuss results. Each line should

have visual what´s the cost per piece produced, and what are the costs when defects are produced.

Page 90: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

74

The final objective of this new indicator, it to not only bring visibility to the processes, but also to show

the importance of constantly improving the system, in order to reduce costs, and also it allows to track

the benefits and savings that are being achieved with the projects that will be developed in the future.

The work developed in this dissertation, although it was made in the automotive industry, it can be

applied to all kinds of industries. There are many factories that are not considering the rework costs in

the costs of their products, so this quantification model could be applied to evidence the costs that are

being incurred and show the importance of the importance of eliminating non-added-value activities in

the line.

Page 91: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

75

8 References

Ballou, D. P., & Pazer, H. L. (1982). The Impact of Inspector Fallibility on the Inspection Policy in

Serial Production Systems. Management Science, 28(4), 387–399.

https://doi.org/10.1287/mnsc.28.4.387

Bierer, A., Götze, U., Meynerts, L., & Sygulla, R. (2014). Integrating life cycle costing and life cycle

assessment using extended material flow cost accounting. Journal of Cleaner Production.

https://doi.org/10.1016/j.jclepro.2014.08.036

British Standard. (1992). Guide to the economics of quality —part 1 Process cost model. Bsi,

(November), 16.

British Standards Institute. (1981). BS 6143: The Determination and Use of Quality-related Costs.

BSI.

Cooper, R., & Kaplan, R. S. R. S. (1992). Activity-Based Systems: Measuring the Costs of Resource

Usage. Harvard Business Review, 6(3), 96–103. Retrieved from

http://search.proquest.com/openview/8040ad6739806645ffcbf8977e7bb6bf/1?pq-

origsite=gscholar

Crosby, P. B. (1979). Quality is free: The art of making quality certain. New York: New American

Library. https://doi.org/10.2172/1025774

Eia, N. B. C. (1998). Soumaya Yacout , Jacqueline Boudreau Department of bzdustrial Engineering

Ecole de g ~ nie , Universit ~ de Moncton. Science, 35(98), 229–232.

Evans JR, L. W. (2005). The managment and control of quality. OH: Thomson South Western

Publication.

Feigenbaum, A. V. (1956). Total quality control. Harvard Business Review, 34(6), 93–101. Retrieved

from http://search.ebscohost.com/login.aspx?direct=true&db=bth&AN=6770392&site=eds-

live&authtype=ip,uid,cookie

Folgado, R., Peças, P., & Henriques, E. (2010). Life Cost Cycle for technology selection: A Case

study in the manufacturing of injection moulds. International Journal of Production Economics,

128, 368–378.

Garvin D. (1988). Managing Quality: The Strategic and competitive edge. New York: Free Press.

Giakatis, G., & Rooney, E. M. (2000). The use of quality Costing to trigger process improvement in

automotive company. Carfax Publishing.

Greene, L. E. ., & Shaw, B. L. (1990). The steps for succesfull life cycle cost analysis.

Harrington, H. . (1987). Poor Quality Cost. New York: NY: ASQC Quality Press.

Harrington, H. . (1999). Performance Improvement : a total poor-quality cost system. The TQM

Magazine, 11(4), 221–230.

Imai, M. (2012). Gemba Kaizen: A Commonsense Approach to a Continous Improvement Strategy.

New York City: McGraw-Hill.

Juran, J. M. (1988). Quality Control Handbook. 5th Ed McGrawHill 1998.

https://doi.org/10.1177/004057368303900411

Kaizen Institute. (2013). KBS- Kaizen Business System.

Page 92: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

76

Kaizen Institute. (2018a). TFM- Introduction to Total Flow Managment, Value Added and Muda.

Kaizen Institute. (2018b). TQM- Introduction to Total Quality Managment.

Kaizen Institute. (2018c). VSP- Montagem e Produção Discreta.

Kärnä, S. (2004). Analysing customer satisfaction and quality in construction – the case of public and

private customers. Nordic Journal of Surveying and Real Estate Research, 2, 67–80.

Kiran, D. R. (2017a). Cost of Quality. Total Quality Management, 99–111.

https://doi.org/10.1016/B978-0-12-811035-5.00008-8

Kiran, D. R. (2017b). The Seven Modern Tools of TQM. Total Quality Management, 291–311.

https://doi.org/10.1016/B978-0-12-811035-5.00021-0

Kumar, K., Shah, R., & Fitzroy, P. T. (1998). A review of quality cost surveys. Total Quality

Management, 9(6), 479–486. https://doi.org/10.1080/0954412988406

Lari, A., & Asllani, A. (2013). Quality cost management support system: an effective tool for

organisational performance improvement. Total Quality Management & Business Excellence,

24(3–4), 432–451. https://doi.org/10.1080/14783363.2012.733258

Laszlo, G. P. (1997). The role of quality cost in TQM. The TQM Magazine, 9(6), 410–413.

Marios Sophocleous. (2010). Understanding and explaining surface tension and capillarity: An

introduction to fundamental physics for water professionals. Hydrogeology Journal, 18.

Mizuno, P. S. (n.d.). Prof Ishikawa and Quality Control. Prof Ishikawa and Quality Control,

(September 1949), 173–212.

N.M. Vaxevanidis, G. Petropoulos, J. Avakumovic, A. M. (2009). Cost of Quality Models and Their

Implementation in Manufacturing Firms. International Journal for Quality Research, 3(1), 27–36.

Okano, K. (2001). An approach to life cost cycle managment: A consideration from historical

development. Asia Pacific Managment Review, 6, 317–341.

Oliver, J., & Qu, W. (1999). Cost of quality reporting: Some Australian evidence. International Journal

of Applied Quality Management, 2(2), 233–250. https://doi.org/10.1016/S1096-4738(99)80092-X

Peças, P. ;, Ribeiro, I., & Henriques, E. (2009a). A Life Cycle Engineering model for technology

selection: a case study on plastic injection moulds for low production volumes. Journal of

Cleaner Production, 17, 846–856.

Peças, P. ;, Ribeiro, I., & Henriques, E. (2009b). Life Cycle Engineering applied to design decisions, a

case study.

Plunkett, J. J., & Dale, B. G. (1988). Quality costs: A critique of some ‘economic cost of quality’

models. International Journal of Production Research, 26(11), 1713–1726.

https://doi.org/10.1080/00207548808947986

Porter, L. J., & Rayner, P. (1992). Quality costing for total quality management. International Journal

of Production Economics, 27(1), 69–81. https://doi.org/10.1016/0925-5273(92)90127-S

Porter, L. J., & Raynor, P. (1999). Quality Costing for total quality management. International Journal

of Production Economics, 27, 69–81.

Satanova, A., & Sedliacikova, M. (2015). Model for Controllinng the Total Costs of Quality. Procedia

Economics and Finance, 26(15), 2–6. https://doi.org/10.1016/S2212-5671(15)00792-3

Schiffauerova, A., Thomson, V., Omar, M. K., & Murgan, S. (2006). A review of research on cost of

Page 93: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

77

quality models and best practices. International Journal of Quality & Reliability Management

International Journal of Quality & Reliability Management The TQM Magazine International

Journal of Quality & Reliability Management, 23(4), 647–669. Retrieved from

http://dx.doi.org/10.1108/02656710610672470%5Cnhttp://%5Cnhttp://dx.doi.org/10.1108/09544

780610685502

Sheikholeslam, M. N., & Emamian, S. (2016). TQM and Customer Satisfaction towards Business

Shingo, S. (1985). A Revolution in Manufacturing: The SMED System. Productivity Press.

Sinclair, M. A. (1978). A collection of modelling approaches for visual inspection on industry.

International Journal of Production Research, 16, 275–292.

Taiichi, O. (1988). Toyota Production System: Beyond Large-Scale Production. Productivity Press.

Tsai, W.-H. (1998). Quality cost measurement under activity-based costing. International Journal of

Quality & Reliability Management (Vol. 15). https://doi.org/10.1108/02656719810218202

Weinstein, L., Vokurka, R. J., & Graman, G. A. (2009). Costs of quality and maintenance:

Improvement approaches. Total Quality Management & Business Excellence, 20(5), 497–507.

https://doi.org/10.1080/14783360902863648

Page 94: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

78

Page 95: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

79

Attachments

Attachment A – Ishikawa Diagram

Page 96: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

80

Page 97: Impact of high-frequency Quality Cost Control · been returned by the customer, because the specifications weren´t met, and there is no awareness of the non-quality costs. The specific

81

Attachment B – Step by Step Procedure, applied to Kovomo