100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Waste Project
REGIONS OFCLIMATE ACTION
Summary
Mandating Authority :
Expected project CAPEX :
Main stakeholders
Project Type :
Social and environmental impact
Location and population
IMO PALM PLANTATION: integrated biogas production from combined waste materials
Reduction of fossil fuel consumption for Imo Palm and industrial energy off-takers; Elec-trifying the surrounding villages through the project operated micro-grid; Reducing the electricity production costs which are based on fossil fuels; Introduction of bio-methane based CNG as transport fuel.
This project involves utilizing selected and pre-treated biomass waste materials to gen-erate biogas energy for the Imo Palm Oil Plantation. Excess energy will be provided to the surrounding villages through a micro-grid as well as to commercial off-takers. The project will also establish electrification to surrounding villages and a bio-methane regional transport capacity.
Imo Palm
6'490'000 €
IMO Palm Plantation Nigeria, Sustainable Environmental Technologies – SET GmbH Austria, Imo State Government Nigeria, General Electrics – Clark Energy, Heineken (Awomama Breweries), Coca Cola bottling plant Imo State and other energy off-takers
Biogas
Imo State, Nigeria4 million inh.
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
STAGE 5 : Engineering / Construction / Commercial Operation
Waste stream data Comments
Operation and Maintenance Contractor
Engineering, Procurement and Construction Contractor
STAGE 3 : Feasibility Studies
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study :
Feasibility study :
Technology :
Site access :
Adequate road Rail access Port facilities
STAGE 1 : Concept Development, Site identification
Land identified
Expected capacity ( Input- Output )
Building permits signed
STAGE 4 : Permitting / Financing / Contracts
Land concession signed
Environmental impact study
Identified sources of fundings
Project maturity ( IFC / World Bank Categories )
✓
STAGE 1 : Concept Development, Site identification
STAGE 2 : Pre-Feasibility Studies
STAGE 3 : Feasibility Studies
STAGE 4 : Permit t ing / Financing / Contracts
STAGE 5 : Engineering/Construction/Commercial Operation
This biogas project represents a lighthouse project for integrated palm oil and agricultural production by introducing a closed circle and zero emission energy production technology that will reduce operational costs through energy independence.
Inlay material pre-treatment through SET biomass crusher. Multi-stage anaerobic fermentation with biogas utilisation for co-gen-eration of electricity and heat. Excess biogas refinery for vehicle utilisation in the form of bio-methane CNG.
Yes
No
Yes
No
SET is prepared to take overall responsibility for the tendering, selection process and oversight of the engineering, procurement and construction as implementing partner and one-stop-shop for the project SPV.
SET is prepared to act as the general operator and maintenance contractor for the SPV. General Electrics will provide for maintenance of the co- generation units of the project phases.
Partially
Co-investor identified
The expected installed capacity for project phase I will be 1 MWel/h plus 1,15 MWth/h and excess refined biogas for vehicle operation
Yes
Yes