THE REPUBLIC OF THE UNION OF MYANMAR

U HAN ZAW IMMEDIATE PAST PRESIDENT

MYANMAR ENGINEERING SOCIETY

30th Japan Road Conference Toshi Center Hotel October 30~31,2013

Myanmar Profile

Current Practice of Bridge

Major Issues on Bridge

Establishment and operation of technical standard

2

Expected technical supports from Japan

1

2

3

4

5

6 Conclusion

3

Population

60 Million (2010-2011)

Area

676578 km2

936 km (East – West) 2051 km (North – South)

Road Length

1423956 km (2011)

Number of Registered Vehicles

• 2476672 ( June 2012)

Neighboring Countries • Bangladesh, India, China, Loas, Thailand

Myanmar Profile I

4

Myanmar Profile I

Official Language

Climate

Economy

•7 States & 7 Regions •138 National Races

Composition •Naypyitaw (Government) •Yangon (Economic) •Mandalay (Culture)

Capital City

•Myanmar

•Seasons ( Summer, Raining, Winner) •Temperature (Mean max: 31˚C) •Humidity (Mean ~ 70 %) •Avg. Annual rainfall (~ 1800 mm)

•Currency – Kyat ( 1 US $ ~ 900 kyats ) •Per capita GDP – 700 US $ (March 2011)

5

Current Practice in Bridge II

Background Data

No. Name Span(ft) Type of Bridge

River Ayeyarwaddy

1 Innwa Bridge(Sagaing) 3,960 Steel Truss

2 Nawaday Bridge 4,183 Steel Truss

3 Maubin Bridge 2,362 Steel Truss + RCC

4 Bala Min Htin Bridge 2,688 Steel Truss

5 Bo Myat Htun Bridge 8,544 Steel Truss

6 Anawrahtar Bridge 5,192 Steel Truss

7 Ayeyarwaddy Bridge(Magwe) 8,989 Steel Truss +

PC + RCC

8 Dadaye Bridge 4,088 Steel Truss+ RC

9 Ayeyarwaddy Bridge(Yadanarpon) 5,641 Steel Truss

10

Ayeyarwaddy Bridge(Naungdone) 7,201 Steel Truss

11 Ayeyarwaddy Bridge (Pakokku) 11,431 Steel Truss

12 Ayeyarwaddy Bridge (Sinkhan) 3,215 Steel Truss

13 Ayeyarwaddy Bridge (Malun ) 5839 Steel Truss

14 Yatana Theinga Bridge 2480 Steel Truss

Major Bridges

No. Name Span(ft) Type of Bridge

River Thanlwin

20 Kwan Lon Bridge 789 Steel Suspension

21 Tar Kaw Bridge 780 Steel Truss

22 Thanlwin Bridge (Pha An) 2,252 Steel Truss

23 Thanlwin Bridge(Tarsan) 900 Suspension

24 Thanlwin Bridge(Mawlamyine) 11,575 Steel Truss + PC +

RCC

25 Thanlwin Bridge(Tarpar) 600 Steel Suspension

26 Thanlwin Bridge(Tarkaw At) 600 Bailey

River Chindwin

27 Shinphyushin Bridge 4,957 Steel Truss

28 Chindwin Bridge(Monywa) 4,730 Steel Truss

Current Practice in Bridge II

Major Bridges

No. Name Span(ft) Type of Bridge

River Sittaung

15 Sittaung Bridge (Theinzatyat) 2,320 Steel Truss

16

Sittaung Bridge (Taungngu-Mawchi-Loikaw)

680

CH Steel Girder

17 Sittaung Bridge (Shwe Kyin-Madauk) 1,500 PC+RCC

18 Sittaung Bridge(Mokepalin)

2,393

Steel Truss + Plate Girder + RC

19 Sittaung Bridge (Natthankwin) 720 Steel Truss

8

Current Practice in Bridge II

State / Region Before 1988, 180 feet and above Length Bridges

After 1988, 180 Feet and above Length Bridges

Kachin State 27 23

Kayah State 6 2

Chin State 2 3

Sagaing Region 17 30

Magwe Region 20 38

Manadalay Region 18 22

Shan State (East) 4 4

Shan State (South) 5 8

Shan State (North) 15 8

Kayin State 8 10

Tanintharyi Region 8 7

Bago Region 36 25

Mon State 3 4

Rakhine State 11 38

Yangon Region 7 30

Ayeyarwady Region 11 78

Total 198 330

Grand Total 528

Bridge List in Myanmar ( As of 18.7.2013)

9

Major Issues on Bridge III

Bridge Design

Sub Structure

Well Foundation

1'-6"

6'

6'-6

"8'

-6"

3'

12'

7'-3

"4'

12'

2'-9

"

7' 1'-6"

6' 6'

14'

6'-1

1"3'

-1"

4'

12'

10'

7'1'-6"

14'

NGL

NGL

2'-0

"

4'

4'14

'

D20-5"c/c

D12

-6"c

/c

D20-10"c/c

D20-5"c/c

D12-6"c/c

D12

-6"c

/c

D20-18"c/cboth way

D10-18"c/cboth way

both wayD20-8"c/c

D12-6"c/cD20-5"c/c

D20-10"c/c

D10-24"c/cboth way

6'

D20

-8"c

/c

D20-8"c/c

HALF SECTIONAL FRONT VIEWSECTIONAL SIDE VIEW

PILE CAP SECTIONAL PLAN BACK WALL &WING WALL PLAN

WING WALL DETAIL

6' 16' 6'

28'

6' 16' 6'

28'

10

Current Practice in Bridge II

Bridge List in Myanmar ( As of 18.7.2013)

11

Current Practice in Bridge II

BETC ( Bridge Engineering

Training Center)

Design and Construction of Bridge

ASEAN Outstanding Awards for 2011 in CAFEO-30

Completion of Three Major Bridge Projects

across the Ayeyarwaddy River within Two Years' period (2009-2011)

Major Issues on Bridge III

Bridge Design

Sub Structure

• Foundation ( Open , Spun Pipe ,Bored Pile, Well ) • Cap , Shaft , Cross Beam

Super Structure

• Reinforced Concrete( R.C Girder , P.C Girder , Slab )

• Steel Truss • Cable Stayed • Suspension

We Can

We Can

We Can't

14

Major Issues on Bridge III

Bridge Design

Sub Structure

Open Foundation

D12-9"c/cD12-9"c/c

Stirrup

FRONT VIEWExp. Joint

D12-

6"c/c

1) Design strength of concrete 3000 psi Cube2) Yield strength of Re-bar 40,000-psi

Notes

3) Re-bar splice length = 44Ø.

D20-

6"c/c

D20-6"c/c

PILE CAP SECTIONAL PLAN BACK WALL &WING WALL PLAN

D12-6"c/c

D10-18"c/c

b/w

b/wD12-6"c/c

D12-6"c/c

WING WALL DETAIL

D12-6"c/c

SECTIONAL SIDE VIEW

15

Major Issues on Bridge III

Bridge Design

Sub Structure

Spun Pipe Foundation

1'-6"2'-0"

9'-0"

Note - Slab tk; = 1'-10" - Bearing = 0'-1" - Pavement= 0'-6" Total = 2'-5"

D12

-6"c

/c

2'-5

"4'

-0"

6'-0

"12

'-4"

2'-5

"

2'-0

"

1'-6

"

.

3"

HALF SECTIONAL FRONT VIEW

4'-0"4'-0"29'-0"

10'-6" 10'-6"

4'-0

"

D20-5"c/c19

'-0"

D12

-6"c

/c

SECTIONAL SIDE VIEW

1:1

2'-0"

2'-7

"3'

-0"

9'-2

"4'

-0"

6'-0" 4'-0"

D10-18"c/cboth way

D20-5"c/c

D10-18"c/cboth way

D20-10"c/c

D12-5"c/c

D12-6"c/cD12-6"c/c

N.G.L

D18-18"c/cboth way

both wayD20-8"c/c

AA

1:1

2'-7

"3'

-0"

9'-2

"4'

-0"

6'-0" 4'-0"

N.G.L

D12-6"c/c

10'-6"4'-0"

D20-8"c/c

D20

-8"c

/c

14'-6"

PILE CAP SECTIONAL PLAN BACK WALL &WING WALL PLAN

1'-6"

D20-10"c/c

D20-5"c/c

WING WALL DETAIL4'

-0"

29'-0"

7'-6"

16

Major Issues on Bridge III

Bridge Design

Sub Structure

Bored Pile Foundation