Cyanide Management by SARTby
Janene Barter, Greg Lane - GRD Minproc LimitedRobert Dunne, Dean Mitchell, Roger Kelson - Newcrest Mining Limited
Chuong Trang - Lakefield Research LimitedDavid Dreisinger - University of British Columbia
NEWCREST MINING LIMITED
GRD Minproc Limited
Newcrest Mining Limited
This PresentationThis Presentation
Testwork and Design
Process SART Selection
Telfer
GRD Minproc Limited
Newcrest Mining Limited
Telfer LocationTelfer Location•Darwin
•Telfer
Process Telfer SART Selection
Testwork andDesign
GRD Minproc Limited
Newcrest Mining Limited
Copper ore body
Copper gold ore body
1977 Merrill Crowe Circuit
1986 Conventional CIL
Telfer Ore ProcessingTelfer Ore Processing
Testwork andDesign
Process Telfer SART Selection
GRD Minproc Limited
Newcrest Mining Limited
Sulfide ore
Flotation Flotationtails
Pyrite concentrate
Copper sulfide concentrate
To Market
Oxide ores
CILCIL tailings
Low grade oxide ores Elution
Telfer Ore ProcessingTelfer Ore Processing
Testwork andDesign
Process Telfer SART Selection
Heap Leach
GRD Minproc Limited
Newcrest Mining Limited
Telfer Ore ProcessingTelfer Ore Processing
Telfer Treatment ScheduleCIL Feed Rate and Cyanide Soluble Copper Grades
Year CIL Feedt/h
CIL Feed CNSolCu Gradeg/t
98/99 235 128
99/00 239 146
00/01 202 1418
Process Telfer SART Selection
Testwork andDesign
GRD Minproc Limited
Newcrest Mining Limited
Bench scale process• membrane technologies, solvent extraction, too risky,
operating and capital costs too high.
Ion flotation
• trialed twice
Cyanide destruction
• high operating cost, no cyanide or copper recovered
Cyanide recovery
• ammonia cyanide recovery, AVR, high operating costs, no copper recovered
Testwork andDesign
ProcessTelfer SART Selection
Telfer Testwork andDesign
Cyanide Management ProcessesCyanide Management Processes
GRD Minproc Limited
Newcrest Mining Limited
Cyanide and copper recovery• CRP and Acid and copper precipitation
– unmarketable copper products
• SART
– Merrill Crowe CCD, flotation plant, heap leach
– copper and cyanide recovered
– Cu2S easily marketed
Cyanide Management ProcessesCyanide Management Processes
Testwork andDesign
ProcessTelfer SART Selection
Telfer Testwork andDesign
GRD Minproc Limited
Newcrest Mining Limited Testwork andDesign
Process Telfer SART SelectionTelfer
SART Process at TelferSART Process at Telfer
CCD
SART
CIL Tails
Wash Water
Underflow (50 ppm WAD CN)
O/FOxide mill
Heap leach
Copper sulfide to existing flotation thickener
Cyanide in solution
GRD Minproc Limited
Newcrest Mining Limited
SART ProcessSART Process
2Na3Cu(CN)4 + 3.5 H2SO4 +NaSH Cu2S (s) + 3.5 Na2SO4 + 8 HCN
2HCN + Ca(OH)2 Ca(CN)2 + 2 H2O
SART Thickener
Underflow (Copper sulfide)
SART Reactor
Overflow (cyanide)
Neutralisation (cyanide)
Testwork andDesign
Process Telfer SART SelectionTelfer
GRD Minproc Limited
Newcrest Mining Limited
Reagent consumptions
Copper and cyanide recoveries
Expected performance• 5.4 t/d copper
• 2.5 t/d cyanide
• Operating cost down by 35%
Pilot plant testwork
Bench Scale TestworkBench Scale Testwork
Testwork andDesign
Process Telfer SART SelectionTelfer
GRD Minproc Limited
Newcrest Mining Limited
pH versus Copper and Cyanide Recovery
92
93
94
95
96
97
98
99
4 4.4 4.7 5.1
pH
Cop
per
reco
very
(%)
84
86
88
90
92
94
963.92 3.91 3.82 3.4
Acid Consumption (kg/Copper)
Cya
nide
Rec
over
y (%
)
Copper recoveryCyanide recovery
Telfer Testwork andDesign
ProcessTelfer SART Process
TelferTelfer
Pilot PlantPilot Plant
GRD Minproc Limited
Newcrest Mining Limited
Copper and Cyanide Recovery Versus NaSH Addition
90
91
92
93
94
95
93 99 112
Stoich. NaSH %
Cop
per
reco
very
(%
)
90
91
92
93
94
95
Cya
nide
rec
over
y (%
)
Copper recoveryCyanide recovery
Pilot PlantPilot Plant
Telfer Testwork andDesign
ProcessTelfer SART Process
TelferTelfer
GRD Minproc Limited
Newcrest Mining Limited
Copper Recovery Versus Residence time
94
95
96
97
98
5 10 15 20 25 30
Residence time (minutes)
Rec
over
y (%
)
Pilot PlantPilot Plant
Telfer Testwork andDesign
ProcessTelfer SART Process
TelferTelfer
GRD Minproc Limited
Newcrest Mining Limited
Pilot PlantPilot Plant
SART reactor agitation• Different agitators trialed, no effect
Copper sulfide thickening• High underflow density:
– minimise cyanide losses– limits copper dissolution– sulfide suppression
Neutralisation• Lime consumption 3.6 kg/t• Stand-by neutralisation tank, gypsum thickener
Telfer Testwork andDesign
ProcessTelfer SART Process
TelferTelfer
GRD Minproc Limited
Newcrest Mining Limited
Other ConsiderationsOther ConsiderationsLocation and control• Reduce operator interaction
• NaSH dosage:
– hydrogen sulfide gas and thiocyanate – copper is recirculated, consumes reagents– copper analyser
Water balance• Excess water to heap leach
• Operations without heap leach
Telfer Testwork andDesign
ProcessTelfer SART Process
TelferTelfer
GRD Minproc Limited
Newcrest Mining Limited
SummarySummary
Simple and robust
Cyanide and copper recovered
Existing CCD thickeners and flotation plant
Excess water used in heap leach
Adaptable to other operations
GRD Minproc Limited
Newcrest Mining Limited
Plant OperationPlant OperationDesign Actual
Sulfuric acid t/t Copper 3.6 2.80Lime t/t Copper 3.6 2.03NaSH usage t/t Copper 0.44 0.77
Operating pH 4-5 5.1Copper feed grade ppm 537 606WAD cyanide feed grade ppm 855 794Copper recovery % 95 87-99WAD CN to free cyanide % 93 72-93