1 ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page JRA1 web page http://www.unizar.es/ilias http://www.unizar.es/ilias Reminder of goals Reminder of goals Present status Present status Work in progress Work in progress JRA1. LBT-DUSL JRA1. LBT-DUSL Low background techniques for Low background techniques for deep underground sciences deep underground sciences

ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page 1 Reminder of goals Reminder of goals Present status Present status Work

Embed Size (px)

Citation preview

Page 1: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

11ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

• Reminder of goalsReminder of goals

• Present statusPresent status

• Work in progressWork in progress

JRA1. LBT-DUSLJRA1. LBT-DUSLLow background techniques for deep Low background techniques for deep underground sciencesunderground sciences

Page 2: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

22ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 1.WP 1.

Key objectivesKey objectives

To measure the environmental background components (neutrons, gammas, muons, Rn contamination in the air and in the water ...) in the four underground sites in a coherent and coordinated way. The joint research effort should optimise the know-how of the different participants.

This is extremely important for the interpretation of data and for planning future experiments.

Page 3: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

33ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 2.WP 2.

Key objectivesKey objectives

To produce a reliable Monte Carlo library of simulation codes to identify and quantify the backgrounds in the EU underground sites in a variety of experimental conditions for the interpretation of data and for planning future experiments.

The joint research effort should optimise the know-how of the different participants.

Experimental results from Task 1 will be useful as the input of the simulations.

Page 4: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

44ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 3.WP 3.

Key objectivesKey objectives

-Construction and upgrading of ultra low background facilities (ULBF) in the four underground labs forming an EU-coordinated service for applications in rare event physics and other fields of world-wide value.

-Implementation of new techniques to deal with the background: active and passive shielding, veto systems, particle discrimination techniques, fragmentation of calorimeter detectors, control and suppression of radon levels...

-Study of the feasibility of fabrication of detectors and materials underground.

Page 5: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

55ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP 4.WP 4.

Key objectivesKey objectives

-Collect new (and old) data on radioactive contamination and cosmogenic activation of materials used in rare-event physics experiments and ultra-low background instrumentation, using the new capabilities offered by the R&D and facilities of WP 3.

-Development and test of purification techniques to improve the radio-purity of materials.

Page 6: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

66ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

ManagementManagement structure of JRA1 structure of JRA1

Activity coordinatorActivity coordinatorJulio Morales/José M. Carmona (LSC)Julio Morales/José M. Carmona (LSC)Deputy coordinatorDeputy coordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)

WP1. Background measurements in the deep underground sites:WP1. Background measurements in the deep underground sites:CoordinatorCoordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)Deputy coordinatorsDeputy coordinators Marisa Sarsa/Gloria Luzón (LSC)Marisa Sarsa/Gloria Luzón (LSC)

WP2. Background simulations:WP2. Background simulations:CoordinatorCoordinator Gloria Luzón/Susana Cebrián (LSC)Gloria Luzón/Susana Cebrián (LSC)Deputy coordinatorDeputy coordinator Vitaly Kudriavtsev (IUS)Vitaly Kudriavtsev (IUS)

WP3. Low background facilities: WP3. Low background facilities: CoordinatorCoordinator Matthias Laubenstein (LNGS)Matthias Laubenstein (LNGS)Deputy coordinatorDeputy coordinator Jean Louis Reyss (LSM)Jean Louis Reyss (LSM)

WP4 . Radiopurity of the materials:WP4 . Radiopurity of the materials:Coordinator:Coordinator: Pia Loaiza (LSM)Pia Loaiza (LSM)Deputy coordinator:Deputy coordinator: Lino Miramonti (LNGS)Lino Miramonti (LNGS)

Page 7: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

77ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

ParticipantsParticipantsWP LNGS LSM LSC Boulby

WP1- Background measurements and monitoring in the deep underground sites

N. FerrariA. IanniC. BrogginiC. CattadoriW. PlastinoC. VignoliG.L. RaselliA. Cesana J. Kisiel

G. GerbierD. Lalanne

G. Luzon J.M. CarmonaJ. MoralesM.L. SarsaA. OrtizJ. Ruz

V. KudryavtsevJ. McMillanJ. LewinB. CamanziE. Tziaferi

WP2- Background simulations

L. PandolaS. Parlati

P. Loaiza G. GerbierM. De JesusF. Piquemal

S. CebriánG. Luzon J.M. CarmonaM. MartinezB. Beltran

V. KudryavtsevJ. DaviesB. CamanziC. Bungau

WP3- Low background facilities

M. LaubensteinN. FerrariC. TomeiM. BalataS. Shoenert H. Simgen

J.L. ReyssPh. HubertD. Lalanne

J.A. VillarJ. AmareM.L. SarsaJ.M. CarmonaM. MartinezJ. Ruz

S. PalingR. LuscherN. SmithC. BungauJ. McMillan

WP4- Radiopurity of the materials

L. Miramonti A. IanniB. CaccianigaM. Laubenstein C. TomeiJ. Kisiel

P. LoaizaC. GoldbachP. HubertR GurriaranC. Marquet

J. PuimedonM.L. SarsaJ.M. CarmonaL. Torres

S. PalingJ. McMillanJ. LewinB. Camanzi

Page 8: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

88ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

First JRA1 General MeetingFirst JRA1 General Meeting

Held on September 10, 2004 in EdinburghHeld on September 10, 2004 in EdinburghMain conclusions:Main conclusions:

Set-up of Working GroupsSet-up of Working Groups Coordinators of each WP will collect information from every Coordinators of each WP will collect information from every

laboratory aboutlaboratory aboutPlans of measurements (WP1)Plans of measurements (WP1)Simulation activities of each group (WP2)Simulation activities of each group (WP2)Status of low background facilities (WP3)Status of low background facilities (WP3)Data of activity of the materials (WP4)Data of activity of the materials (WP4)

This information will be used to elaborate the This information will be used to elaborate the Mid-term reportMid-term report Information will be updated at Information will be updated at http//www.unizar.es/iliashttp//www.unizar.es/ilias (WP1, WP2, WP3) and (WP1, WP2, WP3) and http://www-lsm.in2p3.fr/ilias/ilias.html (WP4)http://www-lsm.in2p3.fr/ilias/ilias.html (WP4)

Page 9: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

99ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Mid-term reportMid-term report

Already sent (see Already sent (see http://www.unizar.es/iliashttp://www.unizar.es/ilias and and the the ILIAS webpageILIAS webpage))

What we have learned:What we have learned: Not all contributions arrived in due timeNot all contributions arrived in due time Not all labs sent their economical informationNot all labs sent their economical information We received information:We received information:

sometimes from the lab about its activities on sometimes from the lab about its activities on each WPeach WPsometimes from the coordinator of a WP about sometimes from the coordinator of a WP about activities related to the WP in all labsactivities related to the WP in all labs

Page 10: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1010ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities((Background measurements in the deep underground sites)Background measurements in the deep underground sites)

Tasks for 1st semesterTasks for 1st semester

• Collecting existing dataCollecting existing data

• Planning new measurementsPlanning new measurements

• Gamma-ray: set-up instrumentation (start)Gamma-ray: set-up instrumentation (start)

• Neutrons: set-up instrumentation (start)Neutrons: set-up instrumentation (start)

Tasks for 2nd semesterTasks for 2nd semester

• Gamma-ray: set-up instrumentation (cont.)Gamma-ray: set-up instrumentation (cont.)

• Neutrons: set-up instrumentation (cont.)Neutrons: set-up instrumentation (cont.)

• Set-up of upgraded Radon monitoring systems (start)Set-up of upgraded Radon monitoring systems (start)

• Full survey of background components (start)Full survey of background components (start)

• Data analysis and interpretation (start)Data analysis and interpretation (start)

• Implementation of results in database (start)Implementation of results in database (start)

Page 11: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1111ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP2 activitiesWP2 activities((Background simulations)Background simulations)

Tasks for 1st semesterTasks for 1st semester

• Existing codes compared and discussedExisting codes compared and discussed

Tasks for 2nd semesterTasks for 2nd semester

• Platform, language and structure of the library fixedPlatform, language and structure of the library fixed

• First ‘test’ version of Monte-Carlo librariesFirst ‘test’ version of Monte-Carlo libraries

Page 12: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1212ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP3 activitiesWP3 activities((Low background facilities)Low background facilities)

Tasks for 1st semesterTasks for 1st semester

• Preparation of areas hosting new ULB facilities Preparation of areas hosting new ULB facilities

Tasks for 2nd semesterTasks for 2nd semester

• Implementation of different facilities at each underground lab (start)Implementation of different facilities at each underground lab (start)

Page 13: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1313ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP4 activitiesWP4 activities((Radiopurity of the materials)Radiopurity of the materials)

Tasks for 1st semesterTasks for 1st semester

• Collecting existing data into de database (start)Collecting existing data into de database (start)

• Defining new measurements (start)Defining new measurements (start)

Tasks for 2nd semesterTasks for 2nd semester

• Collecting existing data into de database (cont.)Collecting existing data into de database (cont.)

• Defining new measurements (cont.)Defining new measurements (cont.)

• Measurements of radio-purity of new materials (start)Measurements of radio-purity of new materials (start)

• R&D on purification techniques (start)R&D on purification techniques (start)

Page 14: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1414ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

JRA1: status of the activityJRA1: status of the activity

The official web page of the JRA1 activity has been The official web page of the JRA1 activity has been set-up. It contains:set-up. It contains:

A description of the JRA1 activity and general documentsA description of the JRA1 activity and general documents JRA1 list of participantsJRA1 list of participants Information on next and previous meetingsInformation on next and previous meetings Working group pagesWorking group pages: participants, documents, evolution : participants, documents, evolution

of the activities…of the activities…

http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 15: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1515ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 16: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1616ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 17: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1717ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Page 18: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1818ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP´s activitiesWP´s activities

Page 19: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

1919ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep

underground sites)underground sites) Completed & undergoing activitiesCompleted & undergoing activities

• Collecting existing data from each laboratory onCollecting existing data from each laboratory on

neutron background, environmental gammas, radio purity of rock, neutron background, environmental gammas, radio purity of rock, concrete, etc…, radon monitoring (in air, water, …), muon fluxesconcrete, etc…, radon monitoring (in air, water, …), muon fluxes

• Reports on these measurements are being collected by WP1 Reports on these measurements are being collected by WP1 coordinatorcoordinator

• Prepare contents for WP1 web page to be located on the main web Prepare contents for WP1 web page to be located on the main web page of JRA1 at LSCpage of JRA1 at LSC

• Survey of environmental gamma-ray background (all labs; Survey of environmental gamma-ray background (all labs; undergoing at LNGS, and undergoing at LNGS, and Boulby with TARI project)Boulby with TARI project)

• Measurement of radiopurity of rock, concrete, etc... (all labs; Measurement of radiopurity of rock, concrete, etc... (all labs; undergoing at LNGS, LSC, ---)undergoing at LNGS, LSC, ---)

Page 20: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2020ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep

underground sites)underground sites)

Neutron monitoring at the underground laboratoriesNeutron monitoring at the underground laboratories

• At LNGS a new measurement will be started by a Pavia INFN group in At LNGS a new measurement will be started by a Pavia INFN group in the next monthsthe next months

• A group from Baksan is interested to start a collaboration with ILIAS A group from Baksan is interested to start a collaboration with ILIAS for the measurement of neutron backgrounds with 3He liquid scintillator for the measurement of neutron backgrounds with 3He liquid scintillator detectordetector

• The same measurements will follows for other labs (TARI)The same measurements will follows for other labs (TARI)

• Rn monitoring in the air and water (ongoing since a few years at Rn monitoring in the air and water (ongoing since a few years at LNGS; soon at LSM, LSC, IUS)LNGS; soon at LSM, LSC, IUS)

Page 21: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2121ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP2 activitiesWP2 activities((Background simulations)Background simulations)

Completed & undergoing activitiesCompleted & undergoing activities

• At IDM04 a At IDM04 a joint meetingjoint meeting of of N3N3 BSNS and BSNS and JRA1JRA1 WP2 activities was WP2 activities was held, and work by every group presented and discussedheld, and work by every group presented and discussed

• A A mailing distribution listmailing distribution list has been created to optimize exchange of has been created to optimize exchange of ideas (info: ideas (info: http://webmail.unizar.es/mailman/listinfo/montecarlohttp://webmail.unizar.es/mailman/listinfo/montecarlo))

• An An FTP repositoryFTP repository for codes with (restricted) access through main for codes with (restricted) access through main JRA1 web page has been created (info: JRA1 web page has been created (info: [email protected]@unizar.es))

•Groups have been asked by WP coordinators to elaborate a Groups have been asked by WP coordinators to elaborate a reportreport on on the simulation codes they are using (comments, …)the simulation codes they are using (comments, …)

Next projectsNext projects

• Comparison of codes; problems, bug and open questions detectedComparison of codes; problems, bug and open questions detected

• Preparation of a first set of Monte Carlo libraries for background Preparation of a first set of Monte Carlo libraries for background simulationssimulations

• Design of strategies to compare results with experimental dataDesign of strategies to compare results with experimental data

Page 22: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2222ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP3 activitiesWP3 activities((Low background facilities)Low background facilities)

Completed & undergoing activitiesCompleted & undergoing activities

• LNGS operates very low background Ge detectors developed by a LNGS operates very low background Ge detectors developed by a collaboration between MPI and Canberracollaboration between MPI and Canberra

• A facility for electroforming copper at LSC is under developmentA facility for electroforming copper at LSC is under development

• Reports on low background facilities at each underground laboratory Reports on low background facilities at each underground laboratory are in preparationare in preparation

• The laboratory for low-level radioactivity measurements at LNGS was The laboratory for low-level radioactivity measurements at LNGS was presented by M. Laubenstein (see JRA1 web page)presented by M. Laubenstein (see JRA1 web page)

Next projectsNext projects

•To initiate the development of ultra-low background detectors, with the To initiate the development of ultra-low background detectors, with the establishment of a prototype for the growth of detector crystalsestablishment of a prototype for the growth of detector crystals

• A program of A program of cross calibrationcross calibration of the Ge detectors in the different labs of the Ge detectors in the different labs is under consideration through an exchange of reference materials. The is under consideration through an exchange of reference materials. The consistency of data on radioactive contamination obtained by the consistency of data on radioactive contamination obtained by the different labs will then be checked.different labs will then be checked.

Page 23: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2323ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Completed & undergoing activitiesCompleted & undergoing activities

• A web page (A web page (http://www-lsm.in2p3.fr/ilias/ilias.htmlhttp://www-lsm.in2p3.fr/ilias/ilias.html) has been set-up to ) has been set-up to contain a data base on radio-purity of materials. It will be linked to the JRA1 contain a data base on radio-purity of materials. It will be linked to the JRA1 main site.main site.

• Coordinators from each lab will collect data from measured materialsCoordinators from each lab will collect data from measured materials

0.001 0.001 ± ± 0.0000.00099

0.03 0.03 ± ± 0.010.01

<0.2<0.2<0.3<0.3<0.12<0.12< 0.3< 0.3VA VA 00105001056363

OFHCOFHCCooperCooper

5454MnMn5757CoCo6060CoCo4040KK137137CsCs210210PbPb235235UU208208TlTl212212PbPb228228AcAc214214BiBi214214PbPb234234Th Th

232232Th seriesTh series 238238U seriesU series

Radionuclide concentration in dpm/kg Radionuclide concentration in dpm/kg

ProvideProviderr

and and RefRef

TypeTypeMateriMaterialal

Mea

sure

d by

ED

EL

WE

ISS

Typ

e of

de

tect

or

Ge,

typ

e n

, 2

00

cc

@ L

SM

WP4 activitiesWP4 activities((Radio-purity of the materials)Radio-purity of the materials)

Page 24: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2424ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

2d JRA1 General Meeting2d JRA1 General Meeting

Held on January 12, 2005, hosted by LSM (Modane)Held on January 12, 2005, hosted by LSM (Modane)

Main conclusions:Main conclusions: All the Working groups are operatives (and in time)All the Working groups are operatives (and in time) Coordinators of each WP have collected information from every Coordinators of each WP have collected information from every

laboratory aboutlaboratory aboutStatus of the measurements (WP1)Status of the measurements (WP1)

Simulation activities of each group (WP2)Simulation activities of each group (WP2)

Status of low background facilities (WP3)Status of low background facilities (WP3)

Collection of Data of activity of the materials (WP4)Collection of Data of activity of the materials (WP4) This information will be used to elaborate the This information will be used to elaborate the First year reportFirst year report Information will be updated next week at Information will be updated next week at http//www.unizar.es/ilias (WP1, WP2, WP3) and http//www.unizar.es/ilias (WP1, WP2, WP3) and http://www-lsm.in2p3.fr/ilias/ilias.html (WP4)http://www-lsm.in2p3.fr/ilias/ilias.html (WP4)

Page 25: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2525ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP1 activitiesWP1 activities

Completed & undergoing activitiesCompleted & undergoing activities

• Environmental gamma background in the labs & MC to estimate Environmental gamma background in the labs & MC to estimate absolute gamma-ray fluxes, testsabsolute gamma-ray fluxes, tests

• (portable Ge’s, 3”x3” NaI, 5”x5” BGO detectors) (portable Ge’s, 3”x3” NaI, 5”x5” BGO detectors)

• Radio purity of rock & concrete in all the labs doneRadio purity of rock & concrete in all the labs done

• Radio purity of the rock in the Gran Sasso massive (TARI)Radio purity of the rock in the Gran Sasso massive (TARI)

• Radon monitoring in air (all the labs) and waterRadon monitoring in air (all the labs) and water

• (from 5 Bq/m(from 5 Bq/m33 (Bo) to <150 Bq/m3) since various years (Bo) to <150 Bq/m3) since various years

• Rn trapping facility at LSM (Sept04) 15 mBq/mRn trapping facility at LSM (Sept04) 15 mBq/m33

• muon fluxes in all the labsmuon fluxes in all the labs

• (from 0,2 (M) to 7,2 (C) m(from 0,2 (M) to 7,2 (C) m-2-2hh-1-1))

((Background measurements in the deep underground Background measurements in the deep underground sites)sites)

Page 26: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

2626ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

• neutron monitoring projects & measurementsneutron monitoring projects & measurementsLiquid Scintillator cells at LNGSLiquid Scintillator cells at LNGS66Li doped Liquid Scintillator at LSMLi doped Liquid Scintillator at LSMGd loaded scintillator detector started in Nov 04 at BoulbyGd loaded scintillator detector started in Nov 04 at BoulbyIndirect estimates from IGEX results at LSCIndirect estimates from IGEX results at LSC

Page 27: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

27

Energy (keV)

Rat

e (c

ps/k

eV)

Hall CHall B

OPERA BOX10 cm Pb shielding

(2) Ge portable detector

… Other measurements performed in Hall B and Hall A by J. Kisiel

ILIAS JRA1 meeting – Modane

Page 28: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

29

WP1.2 New Neutron Measurements at Boulby

A new detector has been built using Gd doped liquid scintillator viewed by two low background PMTs.

Now installed underground in a dedicated low background lead and copper castle.

Data is currently being acquired and preliminary results are expected in 1-2 months.

Page 29: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

30

Radon trapping facility

Time during which radon is trappedin the « filter » : Tr = K(T) M / Q

K(T) : dynamic adsorption coeff.M : charcoal massQ : Air rate

2 charcoal towers : T1 = -53 C, T2 = -45 CM = 2 x 450 kg

Vol. clean air : 150 m3/hActivity 222Rn = 15 mBq/m3

Radon purification by adsorption in charcoal

Page 30: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

3131ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP2 activitiesWP2 activities((Background simulations)Background simulations)

Completed & undergoing activitiesCompleted & undergoing activities

• A second A second joint meetingjoint meeting of of N3N3 BSNS and BSNS and JRA1JRA1 WP2 activities was held, WP2 activities was held, and work by every group presented and discussedand work by every group presented and discussed

• Comparison of experimental results (neutrons ,muons, gamma flux..) Comparison of experimental results (neutrons ,muons, gamma flux..) has been reportedhas been reported

• Comparison & modification of codes has been reported Comparison & modification of codes has been reported

• The platform, language and structure of the library is under discussionThe platform, language and structure of the library is under discussion

• First set of MC codes for relevant background components and First set of MC codes for relevant background components and instrumentation (alpha, beta and gamma, muons and neutrons and instrumentation (alpha, beta and gamma, muons and neutrons and other codes has been definedother codes has been defined

• A A mailing distribution listmailing distribution list has been created to optimize exchange of has been created to optimize exchange of ideas (info: ideas (info: http://webmail.unizar.es/mailman/listinfo/montecarlohttp://webmail.unizar.es/mailman/listinfo/montecarlo))

• An An FTP repositoryFTP repository for codes with (restricted) access through main for codes with (restricted) access through main JRA1 web page has been created (info: JRA1 web page has been created (info: [email protected]@unizar.es))

Page 31: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

32

Special Cross-linksJRA1-WP2JRA1-WP2

N3-N3-BSNSBSNS

JRA2(IDEA)JRA2(IDEA)WP3-B1WP3-B1

Development of a standard Development of a standard library of background library of background

simulation codessimulation codes

Background Background Simulation, Simulation,

Neutron-ShieldNeutron-Shield and Muon-Vetosand Muon-Vetos

Study on Study on CosmogenicCosmogenic

Induced ActivityInduced Activity

Page 32: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

3333ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP3 activitiesWP3 activities((Low background facilities)Low background facilities)

• A very impressive A very impressive development and strengthening of the ultra low-level development and strengthening of the ultra low-level background facilities at LNGS is under waybackground facilities at LNGS is under way

• Great progress has recently been made in the new ULBF laboratory at Great progress has recently been made in the new ULBF laboratory at Boulby. The Ge detector set-up will be upgraded after the completion of the Boulby. The Ge detector set-up will be upgraded after the completion of the laboratory infrastructurelaboratory infrastructure

• Improvement of the IRIS, 400 cc, low background Ge detector, the Improvement of the IRIS, 400 cc, low background Ge detector, the installation of a new planar Ge detector and the set-up of the installation of a new planar Ge detector and the set-up of the Cryogenerators is on-going at LSM. The construction of a Radon precision Cryogenerators is on-going at LSM. The construction of a Radon precision •measuring facility, with a sensitivity of ~ mBq/m3 (vol. 70 l) is projected.measuring facility, with a sensitivity of ~ mBq/m3 (vol. 70 l) is projected.

•Two new ULB Ge detectors for material testing will be installed in the LSCTwo new ULB Ge detectors for material testing will be installed in the LSC

Page 33: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

34

Development and strengthening of the ultra low-level background facilities (LNGS) Extension of the Low Level Laboratory at LNGS Development of new generation of HP-Ge detectors for ultra low-level applications Set-up of ultra low-level scintillation counter systems Ultra low-level gas counting (GNO counting lab)

GNO Ultra low-level gas counting Ultra low-level HPGe detector @ LNGS

Page 34: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

35

5.6

7.68m

0.8m

4.28m

11.96m

6.0m

Small Proj Bay

GE 1

GE 2

GE 3

GE 4

Desk

Sto

rag

e

DeskS

tora

ge

Sto

rag

e

EntranceClean-Off 6.0m

Plan for JIF Low BackgroundLab (Stub A)

0.5T swing crane(in place)

AC unit

Low Background Facility at Boulby

Page 35: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

36

On-going projects at the LSM

• Improvement of a low background Ge detector (IRIS, 400 cc).Prospective construction materials are being measured. Monte Carlo simulations are performed to get the distinct contribution to the background from the assembly materials and to determine the maximum acceptable radioactivities in order to get an improvement of a factor 5 in the detector background.We’ve found a high Th activity (0.13 Bq/kg @ 238 keV) in one of the insulators near the crystal, which need to be replaced by other material.

Page 36: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

3737ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

WP4 activitiesWP4 activities((Radiopurity of the materials)Radiopurity of the materials)

•The database is stored in a dedicated server of the Centre de Calcul de The database is stored in a dedicated server of the Centre de Calcul de Lyon. It is built using MySQL system combined with php scripts which Lyon. It is built using MySQL system combined with php scripts which allow to communicate from the web page to the database. allow to communicate from the web page to the database.

• http://www-lsm.in2p3.fr/ilias/database.html

• Till now, data has been collected from LSC (ANAIS, CAST & ROSEBUD) & Till now, data has been collected from LSC (ANAIS, CAST & ROSEBUD) & LSM (EDELWEISS)LSM (EDELWEISS)

•At LRT2004, SNO people proposed to make their measurements available At LRT2004, SNO people proposed to make their measurements available to be included in the database.to be included in the database.

•Systematic comparison of measurements in the different labs: cross-check Systematic comparison of measurements in the different labs: cross-check with one or more reference samples to compare instrumentation and with one or more reference samples to compare instrumentation and possible systematic in the analysis method is under discussionpossible systematic in the analysis method is under discussion

Page 37: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

38

Page 38: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

3939ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

Expected cost before Apr 2005Expected cost before Apr 2005

INFN used money (Sept-04)INFN used money (Sept-04)INFN Budget Used Available Travels 21000 1000 20000 Equipment, consummables and prototypes 60000 12000 48000 Total 81000 13000 68000

Travels Topical workshops on separate WP Background measurements at LNGS

5000 10000

Equipment, consummables and prototypes

Large Crystal for gamma ray background monitoring (Costs for installation of “Baksan” neutron detector at LNGS) Electronics and consummables for n and gamma ray detectors System for 3H enrichment Multiparametric DAQ for Ge/NaI

25000 (15000)

4000 15000 9000

Total 68000 Personnel 3 years post doc position C. Tomei (expected start Nov-04) 15000

Page 39: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

4040ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

LSC Budget Used Available Travels 11,000 3,400 7,600 Equipment, consummables and prototypes 59,000 0 59,000 Total 70,000 66,600 Personnel 50,000 0 50,000

Travels Topical workshops on separate WP Background measurements at LNGS (participation)

4,000 3,000

Equipment, consummables and prototypes

Upgrade computing facilities for Task 2 Complete ULBF at LSC (2 HpGe + 1 NaI + ACQ sys + shield)

6,000 54,000

Total 67,000 Personnel 1st. year post doc position (expected start Jan-Mar 05) 40,000 1st. year post tech. support (expected start Jan-Mar 05)? 30,000 Total 70,000

Expected cost before Apr 2005Expected cost before Apr 2005

LSC used money (Sept-04)LSC used money (Sept-04)

Page 40: ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page  1 Reminder of goals Reminder of goals Present status Present status Work

4141ILIAS 4 EB meeting. Paris. January 2005 ILIAS 4 EB meeting. Paris. January 2005 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias

LSM expected cost before Apr 2005LSM expected cost before Apr 2005

Total available CEA+CNRS : Total available CEA+CNRS : 129 k€129 k€Projected expenses : Projected expenses : 129 k€129 k€

•post doc post doc 30 k€ 30 k€

•support for one techsupport for one tech 11 k€ 11 k€

•equipment to buy :equipment to buy : anti-radon system (can be done asap if anti-radon system (can be done asap if OK)OK) 42 k€ 42 k€ planar Germaniumplanar Germanium

24 k€ 24 k€ •consumables (electronics, acquisition...)consumables (electronics, acquisition...)

16 k€ 16 k€•T&S (about 15 travels of .4 k€ in France T&S (about 15 travels of .4 k€ in France and out)and out) 6 k€ 6 k€