32
. ;k¡f=d foHkkx MECHANICAL DEPARTMENT Ikf'pe e/; jsy] tcyiqj WEST CENTRAL RAILWAY, JABALPUR twu &2014 dk ihlhMhvks PCDO FOR JUNE - 2014

Ikf'pe e/; jsy] tcyiqj...Sub: Performance of Mechanical Department - PCDO for the month of June-2014. 1. HIGHLIGHTS 1. 1 In June 2014, ROH outturn achieved of 882 wagons which is 15.2%

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • .

    ;k¡f=d foHkkx MECHANICAL DEPARTMENT

    Ikf'pe e/; jsy] tcyiqj

    WEST CENTRAL RAILWAY, JABALPUR

    twu &2014 dk ihlhMhvks PCDO FOR JUNE - 2014

  • vkyksd nos Ekq[; ;Wkf=d bathfu;j Alok Dave

    Chief Mechanical Engineer

    Ikf'pe e/; jsy

    West Central Railway

    Ekgkizca/kd dk;kZy; bfUnjk ekdsZV]

    tcyiqj - 482 001 General Manager’s Office

    Indira Market Jabalpur 482 001

    D.O. No. M.G.01-909 17th July-2014

    Dear Shri Alok Johri,

    Sub: Performance of Mechanical Department - PCDO for the month of June-2014.

    1. HIGHLIGHTS

    1.1 In June 2014, ROH outturn achieved of 882 wagons which is 15.2% higher than the ROH

    Outturn of June -2013 (765 wagons). For the period April – June 2014 ROH outturn is of

    2598 wagons which is 14 % higher than corresponding period of April – June 2013

    (2278).

    1.2 Out of NPOH arising of 382 BOXNs, 272 wagons (77.27%) were repaired in the sick

    lines during June- 2014.

    1.3 Kota workshop achieved an outturn of 445 VUs against the target of 440 VUs, which is

    1.13% higher than the target.

    1.4 In comparision to 2011-12, Kota workshop is continuously increasing POH of 8-wheeler

    wagons,

    year

    Average POH of

    8-wheeler wagons

    per month

    Percentage increase

    compared to 2011-12

    2011-12 237.2 ---

    2012-13 289.6 22.09%

    2013-14 357.3 50.63%

    2014-15 382.3 61.17%

  • 2. INNOVATIONS & SYSTEM IMPROVEMENT –

    2.1 Name of the innovation- Gauge for checking correct location of FIP on FIP support

    Innovation done by - Diesel Shed, NKJ

    There have been various failures due to misalignment in fuel jumper pipe and high

    pressure line. In some cases, FIP base of different thickness has been noticed and

    maintenance staff was negating this difference by using multi gasket and gasket of

    different thickness which were resulting into other failures. To avoid such failures, a

    gauge has been developed by NKJ shed for the purpose to select only these base which

    are within the recommended thickness band.

    2.2 Name of the innovation - Rotary switch replaced with modified MCOS used in

    standby inverter for AC Fuel Pump Motor Innovation done by - Diesel Shed, NKJ

    Shed had started modification for provision of additional standby inverter for AC fuel pump

    motor so that in case of failure of FPM inverter, driver can change the position of rotary

    switch to another position as per RDSO modification sheet no. MP.MOD.EM-01.01.11

    (REV.00) dated 17.02.2011.

  • RDSO has suggested using 25 Amp. 6 pole 2 way DC rotary switches. NKJ Shed has

    converted MCOS (Motor cut-out switch) removed from E-type locomotive during retro

    fitment of MEP to this rotary switch. For carrying out this modification shed has used

    rectangular shaft and some other component. By this modification, MCOS which was of

    no use after MEP conversion has become very useful in carrying out RDSO modification.

    MODIFIED MCOS

    ROTARY SWITCH 2.3 Name of the innovation- Installation of in-house turn table

    Innovation done by - CRWS/BPL CRWS/ BPL in wheel shop incoming wheel sets need to be placed on a different track

    for overhauling. Earlier placement of wheel set was done using EOT cranes. This

    activity was dependant on availability of single EOT crane in wheel shop, which is used

    for handling axles & wheel sets for machine/pressing etc.

  • To reduce dependence on EOT crane, Wheel shop has developed a turntable using

    released material. Axle box assembly with bearing and axle has been placed vertically

    on foundation to carry out the function of turn table effectively. Handling of wheel sets

    has become safe and easy in this manner.

    2.4 Name of the innovation- Outsourcing of transportation of store material ,

    Innovation done by - CRWS/BPL

    The stock items were being transported from main receiving store to sub store wards of

    concerned shop by store workers which engaged man power as well as Rly vehicle.

    There is shortage of manpower in store. The burden used to come on Production staff.

    Now CRWS/ BPL store department has given a contract to transport stock items from

    main receiving to store wards along with loading and unloading.

    3. Performance of Workshops

    3.1 CRWS/ BPL achieved an MLR outturn of 49 Coaches and carried out IOH of 22 Coach

    bogie set.

    3.2 During the month Kota workshop has turned out :-

    3.2.1 15 nos. BOXNR wagons & 16 nos BOXN ”C” wagons.

    3.2.2 10 nos BVZI wagons(Out of these 8 BVZI were retrofitted with twin pipe system)

    3.2.3 93 nos. BCN and 113 nos of BOXN ( total 206 nos BOXN and BCN wagon).

    3.2.4 09 nos BOXN wagons have been converted into BOXNHAM. A total of 495 wagons so

    far have been converted into BOXNHAM.

    3.2.5 85 wagons of BLC.

    3.2.6 15 BOM wagons.

    3.2.6 NPOH of 01 No BOXNHL wagon.

    4. Divisional Performance

    4.1 245 additional coaches have been provided in various trains to reduce the long waiting

    list in passenger trains. In addition to this, temporary augmentations of 119 coaches have

    been provided in trains.

    4.2 15 trips of 04 special trains comprising of total 259 coaches have been maintained by

    JBP division.

    4.3 During the month, 27 BOXNHL rakes were formed as CC rakes. The no. of NKJ based

    CC rakes on 30.06.14 was 151.

  • 4.4 Certification of rakes:

    During the month and Cumulative

    Rakes offered for examination at nominated TXR

    Rakes certified as Premium end to end

    and CC rakes

    % of rakes certified as Premium end to end and CC rakes

    June 2014 626* 537(411PEE+126CC) 85.8%

    June 2013 412 328 79.6%

    Cum 2014-15 1811 1585 87.5%

    Cum 2013-14 1430 1265 88.4%

    * 49 other base CC rakes examined as flying rakes with ordinary BPC as per Rly board

    instruction.

    5. Performance of Diesel Sheds

    5.1 Diesel loco outage (freight +coaching) during current month is 101.49 % of the target

    i.e 4.40 more locos/ day than the target. The average outage (freight and coaching) for

    the year 2014-15 is 103.10% of the target.

    6.0 Progress of Model Rakes:

    The remaining issues related to Bill of Material (BOM) & Drawings submitted by M/s

    HFGW has been discussed at HQrs. on 13.06.14 and has been resolved. Accordingly,

    the firm is expected to correct the BOM & Drawings and submit for approval by 15th of

    July. Meanwhile, the firm has applied for extension of delivery which is under

    consideration at COS office.

    The extended delivery period for M/s KIEL has been exhausted. Till date, there is no

    progress in preparation of mock-up for approval. However, representative of the firm

    Sh. Harsh Patel has telephonically informed CRWS that they will be responding soon.

    7.0 Utilisation of funds

    7.1 Utilisation of funds under Plan Head 41:

    Against Budget Grant (IR) of Rs 704 lakhs for 2014-15, al funds utilized up to May 14 are

    Rs 34.00 lakhs, which is 4.80% of Budget Grant (IR).

    7.2 Utilisation of funds under Plan Head 42:

    Against Budget Grant (IR) of Rs. 1615.00 lakhs for 2014-15,funds utilized up to May’14

    are Rs.372.00 lakhs, which 23.03.% of Budget Grant (IR).

  • 8.0 Status of Coaching items

    [ Status of coaching items as per Railway Board letter No. 2007/M(C)/139/9 dated

    30.04.10 is enclosed as ANNEXURE-IX.

    9.0 Workshop Portal: WCR has regularly fed data of POH out-turn, RSP work, over due POH,

    cycle time, unit cost, incentive performance, local passing and staff Strength in the

    workshop portal.

    10.0 Disciplining of errant Vendors – NIL

    11.0 Line haul cost – Necessary monitoring is being done.

    12.0 ASSISTANCE REQUIRED:

    12.1 A proposal for 72 Gr D post has been sent to Railway Board for sanctioning of post from

    Railway Board vacancy bank vide CPO/WCR’s letter no.WCR/P-

    Q/1260/Po.Cr/Cadre/Elect.(G)/JBP dated 04.06.2013.

    12.2 A proposal for grant of 15% teaching allowance to the instructor of Welding Training

    centre(RRWI),Bhopal has been sent to Railway board vide this office letter no.

    WCR/M/W/06/602 dated 07.01.2014.Railway Board are requested to communicate the

    sanction of teaching allowance at the earliest.

    12.3 At the time of formation of CRWS/BPL in Aug 1989, FA&CAO/CR had concurred creation of two posts for Elect. Organization.

    1.Dy.CEE, 2. AWM Elect.

    However Railway Board agreed for creation for only one post i.e AWM/Elect but post of

    WM (Elect.) by readjustment in cadre by Electrical department was operated as junior

    scale does not have power to deal tender cases in works matter.

  • At the time of inception of CRWS/BPL, it appears that MLR of AC coaches were not

    planned. Since then the workshop have been expanded and infrastrure have been created

    now for out turn of 750 coaches per annum. At present we are turning 05 AC coaches per

    month of all variants including RMPU coaches. Considering the present environment it is

    necessary to improve the gazetted supervision over CRWS complex and the colony etc

    spread over in 400 acre.

    Accordingly Rly Board is requested to communicate the sanction of creation of one junior

    scale post of AWM/Elect. (Ref-WCR/P-HQ/Gaz./creation /revenue post/Elect. Dated

    19.11.2012.)

    12.4 Commitment of Railway Board for availability of fund of 30 crore in the year 2014-15 for

    turnkey work of modernization of Kota workshop is needed .So that RVNL may start the

    work.(CME’s letter no.WCR/M/G/01/266 dated 18.12.2013. addressed to AMPU/Railway

    Board.)

    12.5 Proposal for replacing existing CLW pattern incentive scheme with Group Incentive

    Scheme in Wagon Repair Shop KTT has been submitted to Railway Board vide this office

    letter no.WCR/M/W/06/256 Pt-I dated 25.03.11 & followed by reminder of dated

    07.03.2012. Sanction is awaited

  • 12.6 Administration of factory act, 1948 through Railway administration. A proposal has been

    sent to AM (PU) vide this office letter no. WCR/M/W/06/914 dated 17.06.2013. for

    Administration of factory act by Ministry of Railway by incorporating suitable amendment to

    Indian Railway Act 1989 so that it implemented by Zonal Railway/ PU’s or alternatively

    defining Railway as a state within the preview of factory act ,1948. We have recommended

    for former option.

    12.7 16 nos. WDP4 & 05 WDG4 locos with Medha controls are required for proper mail express

    links + goods traffic.

    With kind regards,

    Yours sincerely,

    (Alok Dave)

    Shri Alok Johri Member (Mechanical) Railway Board

    New Delhi

    Copy:

    Shri Arvind Khare, AM (PU), Rly. Board, New Delhi

    Shri Rakesh Vatash, AM (ME), Rly. Board, New Delhi

    Shri K.Swaminathen, Adviser Mech. Engg. (Projects), Rly. Board, New Delhi

    Copy with relevant Annexure to:

    1. Shri Vivek Kumar, Executive Director Mech. Engg. (Tr.), Rly. Board, New Delhi

    2. Shri Ashesh Agarwal, Executive Director Mech. Engg. (Fr.), Rly. Board, New Delhi

    3. Shri Shailendra Singh, Executive Director Mech. Engg. (Chg.), Rly. Board, New Delhi

    4. Shri Sanjay Chadha, Executive Director Mech. Engg. (W), Rly. Board, New Delhi

  • ANNEXURE 'E' vuqyXud bZ

    fu"iknu dk dk;Zdkjh lkjka'k Executive Summary of Performance June- 2014

    Items of Performance en fu"iknu

    Current month bl ekg Cumulative lap;h y{;

    Target bl ekg This

    month

    fiNyk ekg Last

    month

    fiNys o"kZ dk bl ekg This

    month last year

    y{; Target

    bl o"kZ This year

    fiNyk o"kZ

    Last year

    Mhty yksdks fu"iknu DIESEL LOCO PERFORMANCE Availability (BG) Freight 177.6 131.1 143.1 125 176.77 142.37 125.06 Punctuality (WCR Locos on IR)- Direct cases 0 29 23 23 0 60 84 Punctuality (WCR Locos on IR)- Indirect cases 0 26 26 29 0 76 109 Equipment failures - WCR Locos in WCR 0 12 10 8 0 26 27 Equipment failures - FR Locos in WCR 0 18 20 14 0 46 36

    lokjh MCck fu"iknu COACHING PERFORMANCE Ineffective- AC coaches (%) 10 4.06 5.06 4.82 10 4.86 4.63 Ineffective- Non-AC coaches (%) 8.5 3.5 3.55 6.33 8.5 3.5 5.91

    Coach Detachments- Territorial 0.42 0 0 0 0.83 0 1 Coach Detachments- Ownership 0.08 0 0 0 0.17 0 0 Direct Punctuality loss cases 5 7 6 6 15 17 27 Total Punctuality loss cases 15 15 11 7 45 36 52

    eky MCck fu"iknu FREIGHT PERFORMANCE

    Ineffective percentage (BG) 5.10 6.35 5.46 5.78 5.1 5.56 5.91 Detachments 12.40 17 13 16 44.30 53 51 Parting 2.5 1 4 0 8.8 11 10 Spring Breakage 0.0 0 0 0 0.0 0 1 Poor Brake Power 0.0 0 0 0 0.0 0 0 ROH - Air Brake Stock 820 882 892 765 2460 2598 2278 ROH - Air Brake Stock (BTPN) 0 0 0 50 0 0 50 ROH - Vac. Brake 0 0 0 0 0 0 0

    Repairs to Unloadable - Category A 0 272 269 235 0 845 698

    Repairs to Unloadable - Category B 0 0 0 6 0 0 18

    dkj[kkuk fu"iknu WORKSHOP PERFORMANCE

    BG Coaches MLR Out Turn -only AC (VU) 5.67 5 5 5 17 14 13 BG Coaches MLR Out Turn including AC (VU) 57.17 49 52 49 171.51 147 148

    POH Out Turn Wagon POH+ ROH (VU) 440 445 445 442 1320 1300 1327 izf'k{k.k TRAINING

    No. of officers sent for training to IRIMEE NA 0 0 NA 0 * Out turn is less due to very poor feed of BTPN wagon and less working day.

    $ Coach perfomance target is 2013-14. Tgt has not recived 2014-15 yet.

  • LIST OF ANNEXURES

    vuqyXud I Annexure I

    nq?kZVukxzLr oSxuksa o dkspksa dk fuiVkjk DISPOSAL OF ACCIDENT INVOLVED WAGONS & COACHES

    vuqyXud II Annexure II

    Ok"kZ 2014&15 ds fy, ;kstuk 'kh"kZ fuf/k dk mi;ksx PLAN HEAD FUND UTILISATION OF YEAR 2014-15

    vuqyXud III Annexure III

    jktLo ekWaxksa ds [kpZ dh fLFkfr EXPENDITURE POSITION OF REVENUE DEMANDS

    vuqyXud IV Annexure IV

    eq[; foHkkx izeq[k@foHkkx izeq[kksa }kjk ;kaf=d vuqHkkxksa dk fujh{k.k INSPECTIONS CARRIED OUT BY PHOD/HODs OF MECHANICAL DISCIPLINE.

    vuqyXud V Annexure V

    dkjiksjsV laj{kk ;kstuk dh fLFkfr STATUS OF CORPORATE SAFETY PLAN

    vuqyXud VI Annexure VI

    bysDVªksfud bu eks’ku Hkkj lsrq dk fu"iknu PERFORMANCE OF ELECTRONIC IN MOTION WEIGHBRIDGES

    vuqyXud VII Annexure VII

    bysDVªksfud bu eks’ku Hkkj lsrq dk LFkkiuk ,oa dk;ZfLFkfr INSTALLATION & FUNCTIONING OF ELECTRONIC IN-MOTION WEIGHBRIDGES

    vuqyXud VIII Annexure VIII

    o"kZ 2012&13 gsrq ifjlaifRr;kWa] vtZu fuekZ.k ,oa izfrLFkkiu PROGRESS OF WORKS UNDER PLAN HEAD-42

    vuqyXud IX Annexure IX

    dksfpax enksa dh fLFkfr STATUS OF COACHING ITEMS.

    vuqyXud X Annexure X

    dksp ,oa oSxuksa ds egRoiw.kZ vkj,lih dk;Z dh orZeku fLFkfr PRESENT STATUS OF IMPORTANT RSP WORKS FOR COACHES AND WAGONS

  • vuqyXud &I Annexure- I

    nq?kZVukxzLr oSxuksa o dkspksa dk fuiVkjk DISPOSAL OF ACCIDENT INVOLVED WAGONS & COACHES

    VªSd ds fdukjs iM+s nq?kZVukxLr oSxuksa dk fooj.k DETAILS OF ACCIDENT INVOLVED WAGONS LYING ON TRACK SIDE

    e.My Div.

    ekg ds var esa j[ks dqy oSxuksa dh la-

    Total No. of wagons lying at the

    end of the month

    rhu ekg ls vf/kd le;iwoZ

    j[ks x, oSxuksa dh la-

    No. of wagons lying for more than 3 months

    N% ekg ls vf/kd le;iwoZ j[ks x, oSxuksa dh la-

    No. of wagons lying for more than 6 months

    vH;qfDr Remarks

    JBP 0 0 0 -

    BPL 0 0 0 -.

    KTT 0 0 0 - TOTAL 0 0 0 -

    VªSd ds fdukjs iM+s nq?kZVukxzLr lokjh fMCcksa dk fooj.k DETAILS OF ACCIDENT INVOLVED COACHES LYING ON TRACK SIDE

    e.My Div.

    lkbZV ij j[ks dqy dkspksa dh

    la- Total No. of

    coaches lying at site

    (a)

    iqu% bLrseky ;ksX; dkspksa dh

    la- No. of coaches

    Salvageable (b)

    fu"iknu gsrq la[;k tks ,d ekg ,oa vf/kd le; ij lkbZV

    ij IkM+s salvageable but lying for less than 1

    month (c)

    fMLikst gsrq la[;k tks ,d ekg ,oa vf/kd le; ij lkbZV ij IkM+s

    No. to be disposed awaiting

    at site but more than 1 month

    (d)

    ejEer gsrq ihMhlh

    PDC for

    salvaging of (c)

    fu"iknu gsrq gsrq ihMhlh

    PDC for

    disposal of (d)

    ekg ds nkSjku ejEer

    fd, x, dkspksa dh la-

    No. salvaged

    during the month

    AC Non- AC AC Non- AC AC Non- AC AC Non- AC AC Non- AC

    BPL 0 0 0 0 0 0 0 0 NA 0 0

    JBP 0 0 0 0 0 0 0 0 NA 0 0

    KTT 0 0 0 0 0 0 0 0 NA 0 0

    TOTAL 0 0 0 0 0 0 0 0 NA 0 0

  • vuqyXud &II Annexure-II

    Ok"kZ 2014&15 ds fy, ;kstuk 'kh"kZ fuf/k dk mi;ksx PLAN HEAD FUND UTILISATION OF YEAR 2014-15

    (Figs. in Rs.000s)

    ;kstuk 'kh"kZ Plan Head

    otV xzakV Budget Grant

    2014-15(IR)

    vizsy 2014 rd O;; ¼okLrfod ½ Expenditure

    up to April’2014 (Actual.)

    ebZ 2014 rd

    O;; ¼yxHkx ½

    Expenditure up to

    May’2014 (Approx.)

    ,Q th dk izfr’kr

    %age on BG

    Plan Head – 41

    70800 3600

    3400 4.8%

    Plan Head – 42

    161500

    21100

    37200 23.03 %

    Note: - Booking of PH-41&42 has been given as per FA&CAO office/WCR’s statement.

  • vuqyXud& III

    Annexure- III jktLo ekWaxksa ds [kpZ dh fLFkfr

    EXPENDITURE POSITION OF REVENUE DEMANDS (Figs. Rs.in Lakh)

    dz-la Sr. No.

    fdz;kdyki Activity

    chbZ 14&15

    BE 14-15

    chth 14&15

    BG 2014-15

    tqu ds var esa chih B.P. to the end of April’2014

    okLrfod [kpZ Actual

    Exp. April’2014

    vf/kd@deh dk laf{kIr dkj.k

    Brief Reasons for Excess/Short fall

    ekWax la[;k 5-C eksfVo ikoj dk vuqj{k.k ,oa ejEer DEMAND No. 5-C REPAIR AND MAINTENANCE OF MOTIVE POWER

    A ESST. IN OFFICES C-100 1830.92 - 152.58 148.17 Minor variation.

    B STEAM LOCOS C-200 0.00 - 0.00 0.00 ------

    C DIESEL LOCOS C-300 21595.62 - 1799.64 1280.11 Expenditure is less.

    TOTAL DEMAD No.5-C 23426.54 - 1952.21 1428.28

    CREDIT C-910 -104.40 - -8.70 0.00 No credit booked in April’14 ekWax la[;k 6-D dSjst ,oa oSxu dh vuqj{k.k ,oa ejEer DEMAND No. 6-D REPAIR AND MAINTENANCE OF CARRIAGE & WAGONS

    A ESST. IN OFFICES D-100 3225.24 - 268.77 347.21 More expenditure than proportionate provision for the month

    B CARRIAGE D-200 14822.74 -

    1253.23 683.40 Less expenditure booked than proportionate provision for the month.

    C WAGONS D-300 15879.26 -

    1323.27 848.37 less debits received from foreign Rly..

    D MISC. REP. & MAINT. D-600 -2284.57 -

    -190.38 0.14 Less credit received than proportionate provision for the month.

    E DMU COACHES D-700 0.00 - 0.00 0.00

    TOTAL DEMAD No.6-D 31642.67 - 2636.89 1879.12

    CREDIT D-910 -251.21 - -20.93 -1.69 Less credits received from foreign Rly.. ekWax la[;k 7-E la;a= midj.kksa dh vuqj{k.k ,oa ejEer DEMAND No. 7-E REPAIR & MAINTENANCE OF PLANT EQUIPMENT

    A PLANT & EQUIPMENT E-300 2059.84 - 171.65 146.27 Less expenditure .

    B EQUIPMENT E-810 315.67 - 26.31 17.98 Less expenditure .

    TOTAL DEMAND No. 7-E 2375.51 - 197.96 164.25

    ekWax la[;k 8-F ifjpkyu O;; py LVkWd ¼dSjst ,aM oSxu½ DEMAND No. 8-F OPERATING EXPENSES ROLLING STOCK(C&W)

    A OPERATING EXPENSES ROLLING STOCK

    F500 4595.79 - 382.96 369.53 Minor variation.

    TOTAL DEMAND No. 8-F 4595.79 - 382.96 369.53 * Distribution of BG 2014-15 is awaited at units.

  • vuqyXud -IV Annexure-IV

    ;kaf=d foHkkx

    eq[; foHkkx izeq[k@foHkkx izeq[kksa }kjk ;kaf=d vuqHkkxksa dk fujh{k.k INSPECTIONS CARRIED OUT BY PHOD/HODs of Mech. Discipline.

    lanHkZ & vfrfjDr lnL;] ;kaf=d jsyos cksMZ dk fnukad 10-11-1998 i=kad 98@,

    ,e¼,e½@fujh{k.k {Ref: Addl. Member (Mech), Railway Board’s letter no. 98/AM(M)/Inspection dated 10.11.1998}

    eq[; foHkkx izeq[k rFkk foHkkx izeq[kksa }kjk fd;s x;s fujh{k.k

    dzz- la- Iknuke

    Ekkg ds nkSjku fd;s x;s fujh{k.kksa dh la[;k

    e.My dkj[kkuk vU;

    1 eq[; ;kaf=d bath- 1 0 - 2 eq[; dkj[kkuk bath 0 1 - 3 eq[; py 'kfDr bath 5 0 - 4 eq[; py LVkWd bath 3 0 -

    e.My vf/kdkfj;ksa }kjk ;kaf=d vuqHkkxksa dk fujh{k.k

    dzz- la- fujh{k.k dk izdkj

    visf{kr okLrfod fujh{k.kksa dh l[a;k

    ekg esa Ok"kZ esa lafpr Ekkg esa

    Ok"kZ esa lafpr

    1 Mhty 'ksM 88 244 76 238 2 dSfjst ,aM oSxu fMiks 162 486 77 224 3. jsd fujh{k.k 81 243 78 214 4. QqVIysV fujh{k.k 48 144 47 120 5. QzsV yksM ij lqij psd 21 63 7 21 6. ,vkjVh@,vkj,ebZ 3 9 6 14 7. czsd Mkmu dzsu 6 18 1 4 8. jfuax :e 9 27 7 23 9. Q~;wfyax izfr"Bku 12 36 4 10

    10. Dzw cqfdax@ykWch 15 45 9 24 11. izf'k{k.k Ldwy tsM

    Vhlh@,lVhlh 7 21 * * 12. vU; dksbZ 0 0 16 42 Ikf”pe e/; jsy esa dksbZ izf'k{k.k Ldwy tsM Vhlh@,lVhlh ugha gSA

  • vuqyXud -V Annexure- V

    dkjiksjsV laj{kk ;kstuk dh fLFkfr STATUS OF CORPORATE SAFETY PLAN

    dkjiksjsV laj{kk ;kstuk 6.7 CORPORATE SAFETY PLAN 6.7 dksp i`Fkdhdj.k @chthVhds,e Coach Detachment /BGTKM o"kZ 14&15 gsrq

    y{; TARGET

    FOR 14-15

    ekg ds fy, fu"iknu PERFORMANCE FOR THE MONTH

    ekg ds var rd fu"iknu PERFORMANCE UP TO

    THE MONTH

    fVIi.kh REMARKS

    - 0 0 -

    dkjiksjsV laj{kk ;kstuk 6-8 CORPORATE SAFETY PLAN 6.8 oSxu i`Fkdhdj.k @chthVhds,e Wagon Detachment /BGTKM

    o"kZ 14&15 gsrq y{; TARGET FOR 14-15

    ekg ds fy, fu"iknu PERFORMANCE FOR THE MONTH

    ekg ds var rd fu"iknu PERFORMANCE UP TO

    THE MONTH

    fVIi.kh REMARKS

    - 1.959 1.992 .

    dkjiksjsV laj{kk ;kstuk 6-9 CORPORATE SAFETY PLAN 6.9 detksj czsd 'kfDr @chthVhds,e Poor Brake Power/BGTKM

    o"kZ 14&15 gsrq

    y{; TARGET

    FOR 14-15

    ekg ds fy, fu"iknu PERFORMANCE FOR THE MONTH

    ekg ds var rd fu"iknu PERFORMANCE UPTO

    THE MONTH

    fVIi.kh REMARKS

    - 0 0 -

    dkjiksjsV laj{kk ;kstuk 6-10 CORPORATE SAFETY PLAN 6.10 xkM+h foHkktu @chthVhds,e Train Parting/BGTKM

    o"kZ 14&15 gsrq

    y{; TARGET

    FOR 14-15

    ekg ds fy, fu"iknu PERFORMANCE FOR THE MONTH

    ekg ds var rd fu"iknu PERFORMANCE UPTO

    THE MONTH

    fVIi.kh REMARKS

    - 0.115 0.442 -

    dkjiksjsV laj{kk ;kstuk 6-11, CORPORATE SAFETY PLAN 6.11A ?kVuk,Wa izfr 10 yk[k vftZr fdeh- esa INCIDENCES PER MILLION EKMS (Diesel locomotive)

    o"kZ 14&15 gsrq

    y{; TARGET

    FOR 14-15

    ekg ds fy, fu"iknu PERFORMANCE FOR THE MONTH

    ekg ds var rd fu"iknu PERFORMANCE UP TO

    THE MONTH

    fVIi.kh REMARKS

    - 6.68 5.71 Total number of incidences during the month was 29

  • vuqyXud& VI Annexure- VI

    bysDVªksfud bu eks”ku Hkkj lsrq dk fu"iknu PERFORMANCE OF ELECTRONIC IN MOTION WEIGHBRIDGES

    Ref: - Railway Board’s letter No: 2004/ DEV. CELL/ IDEI/ 2 dt 18.06.07. dz-la S.N.

    jsyos ls izkjaHk Hkjs jsdksa dh dqy la- Total no. of

    loaded rakes originated on

    the railway

    bysDVªksfud bu eks’ku Hkkj lsrq ij otu fd, x, jsdksa dh dqy la- No. of rakes weighed on Electronic In motion weighbridge of

    otu ugh fd, x,

    jsdksa dh la-No. of rakes not

    weighed

    otu ugh fd, x, oSxuksa dk dkj.k Reasons for

    non- weighment

    okLrfod n.MkRed dk;Zokgh Penalty realized iejs WCR Railway xSj jsyos

    Non-railway

    1 2 3 4 5 6 7 8 1

    JBP-638

    NKJ 5

    414

    Weighment done as per

    requirement of Commercial department.

    2 Satna 11 3 Kachhpura

    11

    4 Khanna banjari 16 5 Mehgaon 15 6 Beohari 15 7 Gosalpur 0 8 JQSG* 35

    9 BSCW* 25 10 JBRT* 11 11 MSSG* 5

    12 PCL* 10

    13 Sakaria* 24

    14 DDCE* 1

    15 DDSG* 16

    16 NNV 12

    17 NWR 2

    18 MPTM* 20

    19 BPL-195 Itarsi 4 185

    20 BRSN* 6

    21 KTT-184 KTT 35 149

    22 SWM 0

    23 LKE 0

    *Private Weighbridge.

  • vuqyXud -VII Annesure- VII

    bysDVªksfud bu eks’ku Hkkj lsrq dk LFkkiuk ,oa dk;ZfLFkfr INSTALLATION & FUNCTIONING OF ELECTRONIC IN-MOTION

    WEIGHBRIDGES (Ref: Railway Board’s letter No: 2004/ DEV. CELL/ IDEI/ 2 dt. 18.06.07)

    eaMy Division LFky@LVs’ku Location /Station

    fVIi.kh Remarks Pkkyw gkyr esa ejEer gsrq os fczt ¼orZeku ekg esa miyC/krk½

    Weigh Bridge in working order (Availability in current month)

    JABALPUR NKJ Commissioned

    on 02.05.08 100%

    Satna Commissioned on 03.07.08

    100%

    Kachhpura Commissioned on 17.11.08

    100%

    Khanna banjari

    Commissioned on 11.05.08

    100%

    Mehgaon Commissioned on 07.01.09

    100%

    Beohari Commissioned on 01.11.09

    90%

    Niwar Commissioned on 06.09.13.

    100%

    Nunvara Commissioned on 16.02.12

    100%

    Gosalpur Commissioned on 04.11.08

    100%

    BHOPAL Itarsi Commissioned on 24.04.09

    100%

    KOTA Kota Commissioned on 24.09.08

    100%

    Sawai Madhopur

    Commissioned on 15.12.01

    100%

  • vuqyXud&VIII Annexure-VIII

    o"kZ 2014&15 gsrq ifjlaifRr;kWa] vtZu fuekZ.k ,oa izfrLFkkiu ASSETS, ACQUISITION, CONSRUCTION AND REPLACEMENT FOR 2013-14

    Ref. :- DME(W),Rly Board L. No. 2007/M/(W)/964/14 dated: 08.03.2007 Figures in 000’s of Rupees

    dz-la SN

    dk;Z dk uke Name of Work

    vuqeksnu o"kZ

    Year of approval

    D;k foLr`r izkDdyu Lohd`r

    fd;k x;k gS ;fn gkWa rks Lohd`fr

    frfFk Whether detailed estimate

    sanctioned, If yes the date of

    sanction

    Ukohure Lohd`r ykxr Latest

    sanctioned cost

    xr foRrh; o"kZ ds var rd O;;

    Expenditure till end of previous financial

    year

    'ks"k Balance

    Pkkyw foRrh; o"kZ gsrq ifjO;; Outlay for the current financial

    year BG

    14-15 (IR)

    Pkkyw foRrh; ekg rd dqy O;;

    Cumulative Expenditure till current

    month

    vfrfjDr jkf’k dh vko’;drk ;fn gks

    rks Additional

    funds required If

    any

    okLrfod izxfr Physical Progress

    (To be described in short)

    fVIi.kh Remarks

    1 2 3 4 5 6 7 8 9 10 11 12

    1.

    NKJ- Augmentation of ROH shed at C&W Depot to achieve ROH of 500 BOX-N wagons per month

    2003-04 28.11.03 50880 40995 9885 2745 409950 1300

    Civil & Elect: - Work completed. Mech: - All work completed except 01 no. EOT Crane Cap. 10T (M/s Krane Manufacturing Ltd. Thane, COFMOW tender no. OP-2208) received on 20.06.2014 & to be commissioned.

    2

    JBP Construction of coaching complex phase-II (Additional Pit Line).

    2004-05 09.12.04 32044 30853 1191 1021 30853 3479

    Civil, Elect& Mech:- Work completed Bill of Rs.15.00 lakhs is to be passed for Mechanical portion.Final variation is under A/cs concurrence.

    3.

    CRWS-BPL: Augmentation of capacity for mid-life rehabilitation of coaches from 500 to 750 per annum

    2005-06 21.08.2006 466365 401095 65270 15274 405769 45001

    Civil- All work completed except carpentry shop work & extension of traverse no 1 &2 are under process. Mech:- 44 M&Ps received. Coach Shot Blasting M/c under commissioning. Gas manifold system & compressed air pipeline system are under procurement at COS.

  • 4

    WRS/KTT- Modernization of Wagon Repair Shop

    2007-08 07.01.09 637046 71797 565249 54914 74224 430086

    Turnkey portion work transferred to RVNL by Rly. Board on 16.07.13 & RVNL has demanded fund of Rs. 30 Cr. In the year 2014-15 for tendering the turn-key portion., Board has requested for the same. As per Board’s instruction, for increasing the POH capacity of Kota workshop from 425 to 600 wagons per month vetted material modification estimate costing Rs. 22.07 Cr. Approved by GM has been sent to Railway Board on 03.04.2014 for sanction. . Non turnkey portion Civil: 90 % work completed. Mech: 13 M&Ps, received and rest 05 are under procurement.

    5 ELS/ET - Augmentation of capacity

    2007-08 06.08.07 45000 37046 7954 1 37046 0 Work completed.

    6

    ELS/NKJ - Augmentation of capacity from 100 to 120 locos

    2007-08 21.09.07 31533 21330 10203 1 21330 0 Work completed.

    7

    DSL/ET - Augmentation & up gradation of facilities

    2007-08 13.08.07 60108 51515 8593 2014 51536 5986 Civil: Work is completed. Elect: Work is in progress. Mech: Work is completed.

    8 JBP- Coaching complex at goods yard (phase-III)

    2007-08 04.12.07 218456 200006 18450 915 200534 17085

    CIVIL:- work physically completed but financially liability is to be cleared. Elect:-Work completed . Mech:- Work completed .

    9.

    CRWS/Bhopal- Complete PU painting system for passenger coaches.

    2008-09 12.12.08 221082 178275 42807 680 178955 47220

    Civil- work completed. Mech- Complete PU painting system received on 16.02.13. Commissioning work started from 23.09.2013. Elect- Work is in progress.

    10

    DSL/NKJ- Extension of LSR shed (25m) complete re-roofing by Al sheets and suitable flooring in

    2008-09 14.11.08 67071 35631 31440 2286 36530

    3812

    Civil: Flooring is yet to be done rest of work completed. Consolidate revised estimate is under progress. Elect- Work is in progress. Mech:- Work completed .

  • D/shed

    11

    Kota- Extension of freight sick line and up-gradation from D to A category

    2008-09 18.08.08 46715 35357 11358 5382 35357 6600

    Civil & Elect:- Work completed. Mech: All M&Ps received & commissioned except 02 EOT cranes-15 Ton received on 24.02.2014 & commissioned on 20.05.2014.

    12

    ELS/NKJ- Augmentation of holding capacity from 120 to 175 locos

    2008-09 01.08.08 97913 29307 68606 2000 29307 20000

    Civil- Contract terminated. Fresh tender invited & awarded on 24.04.2014. Electrical- Electrification power supply of shed and OHE modification work completed. All 71 indents sent to stores for procurement. 24 items received.

    13

    ELS/TKD-Augmentation of holding capacity from 120 to 175 locos

    2008-09 28.07.08 99959 61634 38325 2000 61634 12000

    Civil : Work is in progress S&T: Work completed. Electrical:- 80% work completed. Out of 44 no items. 38 received

    14

    DSL/ET- Up gradation, development & improvement in the existing facilities at Diesel loco shed.

    2009-10 17.03.10 39174 8067 31107 5383 13317 8511

    Civil- Tender opened on 10.09.13. & awarded on 01.01.2014.Work started from 15.01.2014. Mech. M&Ps indents under divisional accounts vetting.

    15

    NKJ- Creation of additional capacities for repair of unloadable wagons at new sick line, NKJ.

    2009-10 23.12.09 100765 7839 92929 8238 14254 61762

    Civil-Shed foundation completed. Columns fabrication & other fabrication work is in progress. G+1 building lean to roof casting of plinth beam in progress. DG room slab casted & further work in progress. Elect- Tender to be invited. Mech- M&Ps under procurement. S&T- Material procured through stores.

    16

    ELS/ET- Augmentation of homing capacity of electric locos to 175

    2009-10 08.03.10 164407 102185 62222 25000 102185 0

    Civil:- Work is in progress.(71%) Elect:- Work is in progress. Out of 87 indents 32 items received & rest are under procurement. Revised estimate sanctioned on 16.06.14.

  • 17

    CRWS/BPL:- Additional Infrastructure for Bogie intermediate overhauling

    2010-11 17.01.12 116123 6848 109275 1 6848 24999

    Civil- Tender awarded on 09.01.14. Mech- Out of 06 M&Ps – one M&Ps received, 03 M&Ps under procurement at COFMOW.

    18

    JBP- One 20 coach length pit line and stabling line at old loco shed

    2010-11 14.07.11 77249 33277 43972 226 33277 39774

    Civil- work completed. Elect-Work is in progress. Mech- M&Ps are under procurement. High pressure pipe line work completed & testing under progress.

    19 Kota- New washing pit line (24 coach length)

    2011-12 28.05.12. 75493 17071 58422 5296 17071 20000

    Revised ESP for 26 coach length has been approved on 06.07.12. Civil- Work is in progress. Elect. OHE work- Tender awarded on 13.05.13. Mech- Out of 08 M&P items- 05 M&P’s received 01 nos.PO placed & rests are under process of procurement.

    20 JBP- Sick line at old loco shed (50mx25m)

    2011-12 No 39300 1 39299 0 0

    Work dropped.

    21

    JBP-CAMETH design 20 coaches length pit line at old loco shed

    2012-13 21.11.12 44937 9176 35761 1830 11006 32165

    Civil – Tender awarded on 21.05.13. Concreting work in foundation & column casting work in progress. Elec – Tender to be invited . Mech. – Tender will be invited after near completion of Civil work.

  • vuqyXud &IX

    Annexure-IX

    jsyos cksMZ dk i= la[;k 2007/M(C)/139/9 fnukad 30.04.10. ds vuqlkj ihlhMhvks esa fjiksVZ dh xbZ dksfpax enksa dh fLFkfr Status of Coaching items reported through PCDO as per Railway Board letter No.

    1. xkfM+;ksa esa fyuu izca/ku Linen Management in trains:

    A. fMiks }kjk lapkfyr dk;ZHkkj Workload handled by the depots

    fMiks Depot

    /kqyh gqbZ fyuu lsVksa dh vkSlr nSfud vko’;drk Average daily requirement of washed linen sets

    1.1.2010 dks ;kaf=d fMiks esa dqy dk;ZHkkj dk izfr’kr % of the total workload with Mechanical dept as on 1.1.2010

    .(A)

    ekg ds var rd ;kaf=d foHkkx }kjk vU; foHkkxksa ls fy, x, dqy dk;ZHkkj % of the total workload taken over by Mechanical Department from other departments up to the end of month

    (B)

    dqy Total

    (A+B)

    JBP 5613 100% NIL 100.00% BPL 390 100% NIL 100.00% HBJ 1050 37% 63% 100.00% KTT 528 100% NIL 100.00%

    B. e’khuhd`r ykWaMªh dh LFkkiuk Setting up of Mechanised laundries

    fpfUgr fMiks@LFkku Identified Depots

    / location

    D;k foHkkxh; ;k cwV ekWMy gS

    Whether on Departmental or B.O.O.T.

    model

    {kerk izfr fnu

    Capacity per day

    fufonk o ihMhlh dh orZeku fLFkfr Current status of tender & PDC

    JBP/ ( Rly Premises)

    Mechanized laundry at

    railway premises.

    3 Ton

    Mechanized laundry commissioned on dated 01.06.2012 at railway premises under three years contract. Departmental laundry under GM’s power is sanctioned at the total cost Rs. 1.98 Crores, DE under Divisional vetting .

    BPL / (Contractor Premises)

    Mechanized laundry at Contractor Premises

    2 Ton

    1.Mechanised laundry is functional at contractor premises. 2. Proposal for BOOT model is under process.

    KTT/ (Contractor Premises)

    Mechanized laundry at Contractor Premises

    1 Ton

    Contract awarded & functioning satisfactorily.

  • 2. iqjh iSVuZ ij O;kolkf;d ,tsafl;ksa }kjk dksfpax jsdksa ,oa fMiks ifjlj dh e’khuhd`r lQkbZ

    Mechanised Cleaning of coaching rakes and depot premises by professional agencies on Puri pattern:

    dqy dksfpax fMiks dh la[;k Total

    No. of coaching depots

    fMiks dh la[;k tgkWa fufonkvksa dks vafre

    :i fn;k tk pqdk gS No of depots

    where tenders have been finalized

    'ks"k Balance

    fVIi.kh] ;fn dksbZ Remarks, if any

    03 (JBP,BPL,KTT)

    03 00 NIL

    3. vkWu cksMZ lkQ&lQkbZ gsrq fufonk dh fLFkfr Status of tenders for On–Board Housekeeping Services in trains:

    dz- la- S. N.

    fpfUgr xkfM+;ks ¼tksM+h½ dh dqy la[;k Total No. of trains (pairs) identified

    xkfM+;ks ¼tksM+h½ dh la[;k ftlds fy, fufonkvksa dks vafre :Ik fn;k tk pqdk gS No. of trains (pairs) for which

    tenders have been finalized

    'ks"k Balance

    fVIi.kh] ;fn dksbZ Remarks, if any

    1.

    2. 3. 4. 5. 6. 7.

    07 12181/82 Jabalpur - Jaipur

    Express 11447/48 Shaktipunj Express 12189/90 Mahakoshal Express 11463/64/65/66 Somnath Express 11449/50 JBP-JAT Express 12187/88 Garibrath Express 12059/60 KTT-NZM Janshatabdi

    Express

    07

    00

    NIL

    4. dksp vixzsMs’ku vkSj e’khuhd`r lQkbZ ds lkFk okf.kfT;d izpkj&izlkj Commercial publicity with coach up-gradation and mechanised cleaning:

    fpfUgr xkfM+;kWa@jsd Identified trains/rakes

    ekg ds var rd iw.kZ dh xbZ fufonk Tender finalized up to the end of the month

    fVIi.kh Remarks

    xkM+h la Train no. jsd dh la- No

    of rakes

    xkM+h la

    Train no.

    jsd dh la No

    of rakes

    Bsds dh vof/k

    Contract duration

    Okf"kZd ykbZlasl Qhl izfr jsd

    Annual licensed fee

    per rake

    1. 11463/64/65/66 2. 12155/56 3. 11449/50 4. 12121/22 5. 12191/92

    4 2 1 1 2

    Nil Nil Nil Nil

    Trains at S.N. 1, 2 & 3 have been taken over by Commercial department for publicity. Fixation of reserve price for the remaining 02 trains is

  • under process. 5. LoPN Vªsu LVs’ku Clean Train Stations (CTS):

    ukfer lhVh,l

    Nominated CTS

    Lakfonk dk;kZfUor djus okyh ,tsalh Agency

    executing the contract

    Lakfonk vof/k DOC and

    contract period

    PDC & status of tender if CTS not commissioned/previous contract has expired

    Itarsi - - Tender for new contract opened on 02.05.13. tender under finalization. As an interim arrangement tender for six months awarded on 31.03.2014. In this contract enroute cleaning of AC coaches is being done & passenger complaints are being are attended.

    Katni M/s Ultra clean

    17.08.2011 for two years.

    Work is being managed through extension of existing contract. Proposal for new contract under process.

    6. dhM+s&edksM+s o pwgs fu;a=.k dh fLFkfr Status of pest and rodent control:

    fMiks dh dqy la- Total No. of depots

    fMiks tgkWa vHkh Hkh Bsdk py jgk gS Depots where contracts are operational

    fMiks tgkWa vHkh Bsdk ugha py jgk gS

    Depots where contracts are not in place & PDC

    07 07 JBP & Rewa : Contract valid up to 22.11.2014. BPL, HBJ, BINA &ET: Contract valid up to14.09.2014. KTT : Contract is valid upto 21.09.2015.

    NIL

    7. lhMhVh,l dh fLFkfr Status of Control Discharge Toilet System (CDTS):

    lhMhVh,l lqfo/kk

    okys dkspksa dh dqy

    la- Total No. of

    coaches with

    CDTS

    No of coaches

    with one or more CDTS

    defective

    lhMhVh,l ;wfuV dh dqy la-

    Total no of CDTS units

    okjaVh ds rgr [kjkc bdkbZ dh la- No

    of defective

    units under

    warranty

    okjaVh nkok dh fLFkfr Status

    of warranty claims

    [kjkc bdkbZ dks 'kq: djus gsrq ihMhlh

    PDC for commissioning

    of defective units dk;Zjr Functioning

    [kjkc

    Defective

    05 NIL 17 NIL Nil Nil -

    8. th,llh,u ,oa th,lhlh,u dkspksa ds yaccr mijh cFkZ dks gVkus dk dk;Z Restoration of longitudinal upper berths in GSCN & GACCN coaches:

    (Which were retrofitted with longitudinal middle berths?)

  • The work has been completed. 9. vukjf{kr dkspksa dks dq’ku lhVksa dk izko/kku

    Retro fitment of cushioned seats in unreserved coaches: The work has been completed.

    10. okrkuqdwfyr Fzkh Vh;j dkspksa ds ,’ksYl esa insZ dk izko/kku Provision of curtains in aisles of AC3-T coaches:

    All AC 3 tier coaches of WCR have been provided with curtains in aisles. 11. Vªl ckj gSaxj dk ekxZ esa VwVuk En-route breakage of Truss Bar hangers: -

    Ekkg ds nkSjku ,sls izdj.kksa dh la- Total No. of

    cases during the month

    czsd vi izdj.k ¼LokfeRo ds vk/kkj ij ½ Break up of cases (ownership basis)

    LVhy dh Js.kh Class of steel

    Railway No. of cases Class I ------------ Nos. Class III ---------- Nos.

    02

    SWR 00

    CL-3A

    WCR 00 ER 00

    NCR 00 CR 00

    ECOR 00 SR 02

    12. dSjst ,aM oSxu ds dkj.k gqbZ le;ikyu gkfu ds ekeys Punctuality loss cases on

    C&W account: dz la- S. N.

    dkj.k Cause

    Ekkg ds nkSjku ekeyksa dh la- No. of cases during the month

    izR;{k Direct

    vizR;{k Indirect Coach account Wagon account

    1. Roller bearing failure / Hot axle 0 0 2 2. Hanging parts / under gear defects 4 0 0 3. Brake system defects, wheel flats 2 2 3 4. Passenger complaints (Watering,

    pest control etc.) 0 1 0

    5. Train parting / Draw & Buffing gear 0 0 0 6. Misc. and others 1 0 0

    Total 7 8 Grand Total 15

    13. ihvks,p dkspksa dh xq.koRrk Quality of POH coaches: (As per MM’s DO No. 2009/M (W)/814/35 safety Pt.dt. 22.02.2011.)

    Off-POH coaches are being inspected thoroughly on receipt. Amenity deficiencies are noted and these are sent to respective POH workshops in the prescribed feedback form. Representatives are sent to Ajmer to participate in calling in programme meeting in which quality related problems are sorted out.

  • 14. LoPNrk vfHk;ku Cleanliness Drive: The cleaning of coaches of through passing trains was carried out at “Clean Train Station, Itarsi, and Katni” as well as at important stations during their scheduled halts. Coaches were cleaned, as per details below:

    Division Station No. of trains No. of coaches cleaned

    Bhopal Itarsi (Clean Train Station) 0* 0* Bhopal 380 5096 Habibganj 227 3269

    Jabalpur Katni (Clean Train Station) 169 3033 WCR 776 11398

    *CTS work at ET stopped w.e.f. 21.10.2012.

    15. xkfM+;ksa dh LoPNrk gsrq ;kf=;ksa dh jk; Passenger opinion for cleanliness of trains: WCR is having a system of taking customer feedback about the quality of cleanliness on board. During June-2014, detail of customer feedback is as under:-

    e.My Division

    xkfM+;ksa dh la-No of trains

    mRd`"V@cgqr vPNk Excellent /

    very good

    Lakrks"ktud@vPNk Satisfactory /

    Good

    vlarks"ktud@[kjkc Unsatisfactory /

    Bad Bhopal 03 206 44 NIL Jabalpur 07 21 0 NIL Kota 00 00 00 NIL WCR 10 227 44 NIL Percentage 78.01% 16.24% 0%

  • dksp ,oa oSxuksa ds egRoiw.kZ vkj,lih dk;Z dh orZeku fLFkfr Present status of important RSP works for coaches and wagons

    ( Ref. :- AM(PU) DO No. 2012/M(C)/140/2 dated 02.04.2012.) vuqyXud &X Annexure-X

    dla S.N.

    vkj,lih dk fooj.k

    Description of RSP

    Lohd`fr o"kZ Year of

    sanction

    ihch en la- ,oa o"kZ PB item No.& year

    iejs dks vkafoVr dqy la- Total

    quantity allotted to

    WCR

    Lohd`r ykxr Sanctioned

    cost(`)

    dk;Z LFky Place of

    execution

    fu"iknu dk ek/;e Mode of

    execution

    izxfr dh fLFkfr Progress status(VU)

    dksfpax dk;Z Coaching Works

    1

    Supply, installation commissioning & maintenance of the microprocessor board display system with GPS in coaches.

    2009-10 608 of 11-12 709 of 10-11

    1031 of 09-10

    150

    ` 1.25 Lakh per coach. JBP, BPL Store Contract

    As per Board’s LN.2007/M ( C)/202/2 dated:23.09.2011 procurement stopped, since new specification is under finalization by RDSO.

    2

    Supply, installation commissioning & maintenance of the microprocessor board display system with GPS in coaches.

    2010-11 635 of 11-12 1166 of 10-11

    .

    200

    ` 1.25 Lakh per coach. JBP, BPL Store Contract

    As per Board’s LN.2007/M( C)/202/2 dated:23.09.2011 procurement stopped, since new specification is under finalization by RDSO.

    oSxu dk;Z Wagon Works

    1. Upgradation and Rehabilitation of BOXN wagon using IRSM 44 steel @ 12 lakhs

    2011-12 776/PD/11-12(884/10-11) 100

    ` 8,58,59,125

    WRS/KTT Departmentally

    Work Completed.

  • 2012-13 806/12-13(776/PD/11-12,(884/10-11)

    350 32,60,16842 WRS/KTT Departmentally

    PO issued on 04.02.13 for 350 sets of prefabricated body side/end arrangement with flap doors to N.F. forging Horhaw.DP 15.09.13. Work started.Full quality received

    2

    Rebuilding of BOXN wagons for

    CC+8/CC+ 10 2011-12 789/PD/11-12 (1179/10-11) 300 ` 14,05,13,657 WRS/KTT Departmentally Work Completed

    2012-13 819/12-13(789/PD/11-12) 200 ` 11,20,05704 WRS/KTT Departmentally

    (1) 120 set on. 3012.8048.1.41025 dtd. 29.04.13 on M/s Modern Hi-tech Products Ltd., Kolkata. Full supply received. (2) 80 set on. 3012.8048.1.41056 dtd 30.05.13 PO cancelled. Re-tender opened on 27.05.2014 and TC under finalisation

    3

    Conversion of BOXN to

    BOXNHAM

    2011-12 779/PD/11-12(886/10-11) 400 ` 4,20,24,972 WRS/KTT Departmentally Work Completed.

    2012-13 808/12-13(778/PD/11-12, 886/10-11)

    200 ` 2,10,40,208 WRS/KTT Departmentally

    Revised estimate sanctioned on 05.12.12. (1) 400 sets of springs has been received. (2) Full quantity of spring loaded side bearer assemblies received against case no. 30.13.8004 in April 2014..

    2013-14 848/13-14(808/12 400 39002583 WRS/KTT Departmentally Estimate sanctioned on

  • 13,778/PD/11-12,886/10-11)

    17.04.2013 1. 1600 npos of spring loaded side bearer assemblies against PO 30.13.8014.1.41337 dated 30.01.2014 DP 30.10.2014 on M/s Chaurasiya group. 2. 800 sets of spring against case no. 30.13.8015 opened on 11.03.2014

    4. Retrofitment of bogie mounted brake system in air brake wagon @ 2.25 lakhs

    2010-11 779/PD/11-12(887/PD/ 10-11)

    200 ` 5,10,27,360 WRS/KTT Departmentally Work completed.

    2012-13 809/12-13 (779/PD/11-12, 887/PD/10-11)

    200 5,16,95,573 WRS/KTT Departmentally Work completed

    2013-14

    849/13-14(809/12-13, 779/PD/11-12, 887/PD/10-11)

    600 WRS/KTT Departmentally

    Estimate sanctioned on 24.05.13. (1) 30 sets for BMBS on 30.13.8016.1.41311 dt 23.12.13 on M/s SIL Kolkata DP 30.09.14 (2) 371 sets for BMBS on 30.13.8016.1.41360 dt 24.01.14 on M/s Knorr Bremse, DP 30.07.14 (200 set received). (3) 199 sets of BMBS on 30.13.8016.1.41401 dt 13.02.14 on M/s Medha Railways. Full quantity received on 12.06.14.

    5.

    Retrofitment of twin pipe brake system(In BONHL,BCNHL and BVZI)wagons 2011-12 782/PD/11-12 220 WRS/KTT Departmentally

    RSP allotment of 1220 wagons in year 2011-12,work has been transfer to SR DME/JBP, but 220 nos twin pipe has been partially allotted to Kota workshop vide this office letter no. WCR.M.G.01.252 vol-II dated 01.11.12. for twin pipe in BVZI wagons.

  • 2013-14 852/PD/13-14(812/PD/12-13)

    120 WRS/KTT Departmentally

    Estimate prepared for 320 BCNHL wagons and sanctioned on 18.03.2014. Air brake hose coupling Case no. 38148022,tender opening date 10.07.14 and set of pipes case no. 38148022,tender opening date 10.07.2014.

    6. Modification of BCNHL wagons to make them safer and user friendly .

    2013-14 1215/NA/13-14 320 25,911,185

    WRS/KTT Departmentally

    Estimate has been sanctioned on 28.04.2014. 1. Case no. 30.13.8024 dated 04.12.2013 tender opened on 11.02.2014 for 200 sets of sliding doors.retender due on 05.08.2014. 2. Indent no. 9292563015 dated 11.04.2014 sent to cos for 600 sets of sliding doors. tender due on 05.08.2013.

    .