156
III. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan taman m2/bulan 11,300 3.1.1.2 Jasa Pengambilan & pembuangan sampah di rumah-rumah dinas/ wisma kantor, wisma pemda & pool kendaraan Kegiatan 254,300 3.1.1.3 Jasa Cuci Pakaian potong 18,300 3.1.1.4 Jasa Cuci Karpet m2 16,800 3.1.1.5 Jasa Dekorasi taman m2 186,600 3.1.1.6 Jasa Dekorasi Kegiatan kegiatan 644,500 3.1.1.7 Jasa Penerangan Baliho maks. 900 watt/bulan unit/bulan 635,800 3.1.1.8 Jasa Bongkar dan Muat Kayu m2 53,000 3.1.2 Pengasaman arsip tekstual 3.1.2.1 Sistem modern (menggunakan cairan bookeper) 3.1.2.1.1 Ukuran kertas AO (842x1189mm) lembar 31,100 3.1.2.1.2 Ukuran kertas A1 (594x841mm) lembar 18,600 3.1.2.1.3 Ukuran kertas A2 (420x594mm) lembar 12,300 3.1.2.1.4 Ukuran kertas A3 (297x420mm) lembar 12,300 3.1.2.1.5 Ukuran kertas A4 (210x297mm) lembar 9,200 3.1.2.1.6 Ukuran kertas F4 (folio) lembar 12,300 3.1.2.2 Sistem konvensional 3.1.2.2.1 Ukuran kertas AO (842x1189mm) lembar 25,000 3.1.2.2.2 Ukuran kertas A1 (594x841mm) lembar 18,600 3.1.2.2.3 Ukuran kertas A2 (420x594mm) lembar 15,500 3.1.2.2.4 Ukuran kertas A3 ( 297x420mm) lembar 12,300 3.1.2.2.5 Ukuran kertas A4 (210x297mm) lembar 9,200 3.1.2.2.6 Ukuran kertas F4 (folio) lembar 12,300 3.1.3 Laminasi arsip 3.1.3.1 Ukuran kertas AO (842x1189mm) lembar 37,300 3.1.3.2 Ukuran kertas A1 (594x841mm) lembar 31,100 3.1.3.3 Ukuran kertas A2 (420x594mm) lembar 18,600 3.1.3.4 Ukuran kertas A3 (297x420mm) lembar 12,300 3.1.3.5 Ukuran kertas A4 (210x297mm) lembar 9,200 3.1.3.6 Ukuran kertas F4 (folio) lembar 12,300 3.1.4 Proses Alih Media 3.1.4.1 Proses Alih Media Arsip Film ke Video 400 ft 249,000 HARGA Rp. NO SATUAN URAIAN KEGIATAN SPESIFIKASI 74

III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

III. BIAYA JASA DAN PEMELIHARAAN

III. A. BIAYA JASA DAN SEWA

3.1 JASA

3.1.1 Jasa

3.1.1.1 Jasa Perawatan taman m2/bulan 11,300

3.1.1.2 Jasa Pengambilan & pembuangan

sampah di rumah-rumah dinas/ wisma

kantor, wisma pemda & pool kendaraan

Kegiatan 254,300

3.1.1.3 Jasa Cuci Pakaian potong 18,300

3.1.1.4 Jasa Cuci Karpet m2 16,800

3.1.1.5 Jasa Dekorasi taman m2 186,600

3.1.1.6 Jasa Dekorasi Kegiatan kegiatan 644,500

3.1.1.7 Jasa Penerangan Balihomaks. 900

watt/bulanunit/bulan 635,800

3.1.1.8 Jasa Bongkar dan Muat Kayu m2 53,000

3.1.2 Pengasaman arsip tekstual

3.1.2.1 Sistem modern (menggunakan cairan bookeper)

3.1.2.1.1 Ukuran kertas AO (842x1189mm) lembar 31,100

3.1.2.1.2 Ukuran kertas A1 (594x841mm) lembar 18,600

3.1.2.1.3 Ukuran kertas A2 (420x594mm) lembar 12,300

3.1.2.1.4 Ukuran kertas A3 (297x420mm) lembar 12,300

3.1.2.1.5 Ukuran kertas A4 (210x297mm) lembar 9,200

3.1.2.1.6 Ukuran kertas F4 (folio) lembar 12,300

3.1.2.2 Sistem konvensional

3.1.2.2.1 Ukuran kertas AO (842x1189mm) lembar 25,000

3.1.2.2.2 Ukuran kertas A1 (594x841mm) lembar 18,600

3.1.2.2.3 Ukuran kertas A2 (420x594mm) lembar 15,500

3.1.2.2.4 Ukuran kertas A3 ( 297x420mm) lembar 12,300

3.1.2.2.5 Ukuran kertas A4 (210x297mm) lembar 9,200

3.1.2.2.6 Ukuran kertas F4 (folio) lembar 12,300

3.1.3 Laminasi arsip

3.1.3.1 Ukuran kertas AO (842x1189mm) lembar 37,300

3.1.3.2 Ukuran kertas A1 (594x841mm) lembar 31,100

3.1.3.3 Ukuran kertas A2 (420x594mm) lembar 18,600

3.1.3.4 Ukuran kertas A3 (297x420mm) lembar 12,300

3.1.3.5 Ukuran kertas A4 (210x297mm) lembar 9,200

3.1.3.6 Ukuran kertas F4 (folio) lembar 12,300

3.1.4 Proses Alih Media

3.1.4.1 Proses Alih Media Arsip Film ke Video 400 ft 249,000

HARGA Rp.

NO SATUANURAIAN KEGIATAN SPESIFIKASI

74

Page 2: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO SATUANURAIAN KEGIATAN SPESIFIKASI

3.1.4.2 Proses Alih Media Arsip Video ke VCD disk 186,600

3.1.4.3 Proses Alih Media Arsip Kertas ke

Microfilm 16mm

reel/1200

ekspose

435,700

3.1.4.4 Alih media arsip foto ke digital record 3,000

3.1.4.5 Alih media ke negatif foto expose 18,600

3.1.5 Penggandaan Kaset Arsip C-60

3.1.5.1 Penggandaan Kaset Arsip C-60 buah 49,800

3.1.6 Pendataan ulang Arsip Non Tekstual

3.1.6.1 Film reel/1200

ekspose

6,200

3.1.6.2 Video kaset 3,100

3.1.6.3 Kaset/Rekaman Suara kaset 500

3.1.6.4 VCD keping 500

3.1.6.5 Foto/Slide lembar 300

3.1.7 Seleksi arsip yang akan dialihmedia

3.1.7.1 Film judul 12,300

3.1.7.2 Video kaset 9,200

3.1.7.3 Kaset/Rekaman Suara kaset 6,100

3.1.7.4 Foto/Slide lembar 500

3.1.8 Kompilasi data arsip non tekstual

3.1.8.1 Film menit 31,100

3.1.8.2 Video menit 6,200

3.1.8.3 Kaset/Rekaman Suara menit 6,200

3.1.8.4 VCD menit 6,200

3.1.8.5 Foto/Slide lembar 500

3.1.8.6 Reproduksi arsip foto lembar 31,100

3.1.8.7 Alih media arsip dan bahan

perpustakaan tekstual ke digital

lembar 6,200

3.1.9 Alih media arsip non tekstual ke digital

3.1.9.1 Film 10 menit 435,700

3.1.9.2 Video 1 jam 249,000

3.1.9.3 Kaset/Rekaman Suara 30 menit 25,000

3.1.9.4 Foto/Slide (scanning foto) lembar 6,100

3.1.9.5 Pembuatan skrip/narasi film

dokumenter

paket 4,359,000

3.1.9.6 Pembacaan Narasi/Narator (dubbing) paket 3,113,600

3.1.9.7 Pengetikan alih huruf naskah kuno halaman 6,100

3.1.9.8 Seleksi bahan pustaka yang akan

dtranslit

halaman 2,300

75

Page 3: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO SATUANURAIAN KEGIATAN SPESIFIKASI

3.1.9.9 Pengetikan hasil translit halaman 3,000

3.1.9.10 Alih media/Scan naskah kuno record 3,100

3.1.9.11 Seting cetak naskah lembar 300

3.1.9.12 Editing liputan dokumenter paket 498,100

3.1.9.13 Desain cover buku terjemahan lay out 311,300

3.1.9.14 Desain cover DVD transfer film / video lay out 124,500

3.1.9.15 Pendataan dan check ulang khasanah

arsip

books 500

3.1.9.16 Digitalisasi kliping media massa books/bln 1,300

3.1.10 Biaya Penggandaan VCD/DVD

3.1.10.1 Biaya penggandaan VCD keping 28,100

3.1.10.2 Biaya penggandaan DVD keping 42,400

3.1.10.3 Biaya edit foto dalam album beserta

pembuatan Caption

kegiatan 70,500

3.1.11 Biaya Pembuatan Klasifikasi Naskah

3.1.11.1 Biaya Editing keping VCD 496,600

3.1.11.2 Biaya Pembuatan ke pita Selekta Hasil

Liputan (shooting video)

paket 7,095,300

3.1.12 Jasa Pemasangan

3.1.12.1 MMT Baliho m2 49,600

3.1.12.2 Gambar Indoor m2 42,500

3.1.12.3 Design Visual Slide gbr 70,900

3.1.12.4 Akustik Kedap Suara m2 365,900

3.1.12.5 Background lbr/org 159,100

3.1.13 Jasa Sistem Komputerisasi, Informasi dan Publikasi Peta

Hardprint

3.1.13.1 Peta Potensi Sumber Daya Mineral

Logam

Uk. A3 /

Kabupaten

Lembar 74,100

3.1.13.2 Peta Potensi Sumber Daya Mineral Non

Logam

Uk. A3 /

Kabupaten

Lembar 74,100

3.1.14 Jasa Sistem Komputerisasi, Informasi dan Publikasi Peta Digital

3.1.14.1 Peta Potensi Sumber Daya Mineral

Logam

kabupaten CD 530,400

3.1.14.2 Peta Potensi Sumber Daya Mineral Non

Logam

kabupaten CD 530,400

3.1.14.3 Peta Potensi Sumber Daya Mineral

Pulau Jawa

Pulau Jawa CD 10,609,000

3.1.15 Jasa Peta Digitasi

3.1.15.1 Peta Hidrogeologi kabupaten Lembar 529,900

3.1.15.2 Peta Geologi Teknik kabupaten Lembar 529,900

3.1.15.3 Peta Geologi Lingkungan Lembar 529,900

76

Page 4: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO SATUANURAIAN KEGIATAN SPESIFIKASI

3.1.15.4 Peta Lingkungan Pertambangan Lembar 529,900

3.1.16 Jasa Layanan Digitasi

3.1.16.1 Digitasi Peta Line dan Poligon layer/cm2 cm2 300

3.1.16.2 Digitasi peta point layer/poin titik 100

3.1.16.3 Pengisian data base item record record 2,000

3.1.17 Jasa Analisis Laboratorium Analisis Gas

3.1.17.1 Jasa Analisis Laboratorium Analisis

Gas

sample 715,800

3.1.17.2 Jasa Uji Laboratorium paket up

3.1.18 Jasa Instalasi Studio Broadcast

3.1.18.1 Instalasi Pemancar orang/hari 4,774,000

3.1.18.2 Instalasi Kamera Kabel titik 158,600

3.1.18.3 Instalasi Sound Studio Kabel titik 158,600

3.1.18.4 Instalsi Peralatan Video titik 954,800

3.1.19 Jasa Kalibrasi Alat Kesehatan

3.1.19.1 Suction Pump unit/keg 227,832

3.1.19.2 Sterilisator unit/keg 416,886

3.1.19.3 ECG unit/keg 276,306

3.1.19.4 Baby Incubator unit/keg 445,968

3.1.19.5 Nebulizer unit/keg 252,066

3.1.19.6 Fetal Doppler unit/keg 247,218

3.1.19.7 Vacum Extraktor unit/keg 227,832

3.1.19.8 Centifuge unit/keg 271,458

3.1.19.9 Bedside Monitor unit/keg 412,039

3.1.19.10 Treadmil unit/keg 271,458

3.1.19.11 Infant Warmer unit/keg 445,968

3.1.19.12 Blue Light unit/keg 257,975

3.1.19.13 SWD unit/keg 581,700

3.1.19.14 X-Ray Panoramic unit/keg 1,260,354

3.1.19.15 USG unit/keg 407,190

3.1.19.16 X-Ray Mobile unit/keg 921,023

3.1.19.17 Defibrilator unit/keg 259,817

3.1.19.18 Ventilator unit/keg 552,612

3.1.19.19 Anasthesi Ventilator unit/keg 1,400,927

3.1.19.20 Mikropipet unit/keg 334,476

3.1.19.21 ESU unit/keg 431,424

3.1.19.22 UST unit/keg 310,272

3.1.19.23 Elektro terapi unit/keg 373,248

3.1.19.24 Pulse Oxsimetri unit/keg 290,820

77

Page 5: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO SATUANURAIAN KEGIATAN SPESIFIKASI

3.1.19.25 Lampu Operasi unit/keg 436,272

3.1.19.26 Spirometri unit/keg 353,965

3.1.19.27 Meja Operasi unit/keg 287,971

3.1.19.28 Echo unit/keg 814,379

3.1.19.29 Microscope Operasi Mata unit/keg 436,260

3.1.19.30 CPAP unit/keg 552,612

3.1.19.31 CTG unit/keg 266,519

3.1.19.32 Dental Unit unit/keg 322,574

3.1.19.33 Traksi Lumbal unit/keg 334,452

3.1.19.34 EEG unit/keg 630,119

3.1.19.35 ENT unit/keg 538,068

3.1.19.36 Incubator Transport unit/keg 479,886

3.1.19.37 Infuse Pump unit/keg 453,870

3.1.19.38 Pompa Asi Elektrik unit/keg 412,080

3.1.19.39 Syringe Pump unit/keg 456,779

3.1.19.40 C-Arm unit/keg 1,575,600

3.1.19.41 Infant Blending Resusitator unit/keg 850,824

3.1.20 Jasa Analisis Sanitasi

3.1.20.1 Analisis sampel udara dan kebisingan paket 2,500,000

3.1.20.2 Analisis sampel air bersih paket 2,500,000

3.1.20.3 Analisis sampel air limbah paket 2,500,000

3.1.20.4 Analisis sampel flora fauna paket 2,500,000

3.1.20.5 Analisis sampel plangton dan bentos paket 2,500,000

3.1.20.6 Analisis sampel mikrobiologi udara paket 2,500,000

3.1.21 Jasa Publikasi

3.1.21.1 Karangan Bunga Buah 1,000,000

3.1.22 Jasa Asuransi3.1.22.1 Jasa Asuransi Barang Milik Daerah barang up3.1.22.2 Jasa Asuransi Jiwa orang up

3.1.23 Jasa Kegiatan Ketahanan Pangan

3.1.23.1 Jasa pemprosesan gabah menjadi beras kg 500

3.1.23.2 Jasa pengemasan beras kg 100

3.1.23.3 Jasa bongkar muat gabah / beras kg 100

3.1.24 Jasa Konsultansi dan Apraisal

3.1.24.1 Jasa Konsultansi kegiatan up

3.1.24.2 Jasa Apraisal kegiatan up

78

Page 6: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.2 BIAYA SEWA

3.2.1 Alat Kantor

3.2.1.1 Sewa AC Split Pk/hari 350,000

3.2.1.2 Sewa AC Standing Floor Pk/hari 520,000

3.2.1.3 Sewa Foto Copy unit/bulan 750,000

3.2.1.4 Sewa Blower kipas angin Pk/hari 550,000

3.2.2 Sewa Alat Besar

3.2.2.1 Genset

3.2.2.1.1 Genset 5 - 25 Kva ( + BBM ) unit/12 jam 2,200,000

3.2.2.1.2 Genset 26 - 50 Kva ( + BBM ) unit/12 jam 3,400,000

3.2.2.1.3 Genset 51 - 100 Kva ( + BBM ) unit/12 jam 4,100,000

3.2.2.1.4 Genset 101 - 250 Kva ( + BBM ) unit/12 jam 9,400,000

3.2.2.1.5 Genset 251 - 500 Kva ( + BBM ) unit/12 jam 35,000,000

3.2.2.2 Angkut

3.2.2.2.1 Dump Truck 3-4 M3 unit/hari 2,997,000

3.2.2.2.2 Truk Engkel unit/hari 1,332,000

3.2.2.2.3 Truk Double unit/hari 1,865,000

3.2.2.3 CRANE

3.2.2.3.1 Crane 20 ton 8 jam 3,500,000

3.2.2.3.2 Crane 35 ton 8 jam 4,800,000

3.2.2.3.3 Crane 45 ton 8 jam 5,000,000

3.2.3 SEWA KENDARAAN

3.2.3.1 Di Jateng dan DIY

3.2.3.1.1 Bus 40 - 60 seat unit/hari 4,500,000

3.2.3.1.2 Bus 35 seat unit/hari 4,000,000

3.2.3.1.3 Bus 25 - 30 seat unit/hari 3,500,000

3.2.3.1.4 Minibus < 15 seat unit/hari 2,500,000

3.2.3.1.5 Pick Up < 1500 CC unit/hari 480,000

3.2.3.1.6 Sedan < 2000 CC unit/hari 850,000

3.2.3.1.7 Sedan > 2000 CC unit/hari 1,500,000

3.2.3.1.8 Station Wagon < 2000 CC unit/hari 550,000

3.2.3.1.9 Station Wagon > 2000 CC unit/hari 650,000

3.2.3.1.10 Jeep 2 wheel Drive unit/hari 1,030,000

3.2.3.1.11 Jeep 4 wheel Drive unit/hari 1,800,000

3.2.3.2 Luar Provinsi

3.2.3.2.1 Bus 40 - 60 seat unit/hari 4,574,000

3.2.3.2.2 Bus 35 seat unit/hari 3,921,200

3.2.3.2.3 Bus 25 - 30 seat unit/hari 3,267,300

3.2.3.2.4 Sedan < 2000 CC unit/hari 717,100

3.2.3.2.5 Sedan > 2000 CC unit/hari 1,711,600

3.2.3.2.6 Station Wagon < 2000 CC unit/hari 428,400

3.2.3.2.7 Station Wagon > 2000 CC unit/hari 3,210,100

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

79

Page 7: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.4 SEWA KENDARAAN KHUSUS

3.2.4.1 Di Jateng dan DIY

3.2.4.1.1 Ambulance Unit Standart unit/hari 496,000

3.2.4.1.2 Ambulance Unit Gawat Darurat unit/hari 900,000

3.2.4.1.3 Pick Up Single Cabin unit/hari 322,000

3.2.4.1.4 Pick Up Double Cabin unit/hari 753,000

3.2.4.2 Sewa Kendaraan Khusus

3.2.4.2.1 Sewa Perahu P: 14, L: 3m hari 1,358,700

3.2.4.2.2 Sewa Perahu P: 12, L: 2m hari 951,100

3.2.4.2.3 Sewa Kapal / Boat Kap. 4 orang hari 3,397,000

3.2.4.2.4 Sewa Kapal / Boat Kap. 10 orang hari 4,076,300

3.2.4.2.5 Sewa Helicopter Kap. 4 orang jam 36,688,000

3.2.4.2.6 Sewa Helicopter Kap. 6 orang jam 61,146,800

3.2.4.2.7 Sewa Tronton unit/hari 5,000,000

3.2.4.2.8 Sewa Truck unit/hari 3,000,000

3.2.4.2.9 Becak Hias unit/hari 150,000

3.2.4.3 Biaya Sewa Sarana Mobilitas ( Sewa mobil )

3.2.4.3.1 Sewa Sarana Mobilitas/Sewa Mobil di Eropa Per hari 9,127,900

3.2.4.3.2 Sewa Sarana Mobilitas/Sewa Mobil di Asia Per hari 2,863,600

3.2.4.3.3 Sewa Sarana Mobilitas/Sewa Mobil di Asean Per hari 2,863,600

3.2.4.3.4 Sewa Sarana Mobilitas/Sewa Mobil di Timur Tengah Per hari 6,729,600

3.2.4.3.5 Sewa Sarana Mobilitas/Sewa Mobil di Afrika Per hari 4,295,600

3.2.4.3.6 Sewa Sarana Mobilitas/Sewa Mobil di Australia Per hari 2,147,600

3.2.4.4 KENDARAAN LAINNYA

3.2.4.4.1 Voreder/Pengawalan Jakarta kali/hr 6,794,000

3.2.4.4.2 Voreder/Pengawalan Dalam Kota kali/hr 1,358,700

3.2.4.4.3 Voreder/Pengawalan Luar Kota kali/hr 3,736,600

3.2.4.4.4 Voreder/Pengawalan Sepeda Motor kali/hr 1,018,900

3.2.4.4.5 Komando Tamu Asing/VIP OK 4,076,300

3.2.5

3.2.5.1 Asphalt Finisher jam 325,700

3.2.5.2 Asphalt Mixing Plant jam 8,441,800

3.2.5.3 Asphalt Sprayer jam 132,600

3.2.5.4 Baby Roller hari 259,300

3.2.5.5 Bore Pile Machine jam 1,261,100

3.2.5.6 Bulldozer 100-150 HP jam 644,200

3.2.5.7 Cold Milling Machine jam 1,104,900

3.2.5.8 Compresor (electrik) hari 129,400

3.2.5.9 Compressor 4000-6500 L\M jam 293,700

3.2.5.10 Concrete Cutter jam 36,200

SEWA ALAT PENDUKUNG BANGUNAN

80

Page 8: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.5.11 Concrete Mixer 0.3-0.6 M3 jam 73,800

3.2.5.12 Concrete Paver jam 192,700

3.2.5.13 Concrete Vibrator jam 52,400

3.2.5.14 Excavator 80-140 HP jam 609,500

3.2.5.15 Flat Bed Truck 3-4 M3 jam 402,100

3.2.5.16 Jack Hammer jam 32,600

3.2.5.17 Jack Hammer (elektrik) hari 129,400

3.2.5.18 Molen 350 liter hari 148,300

3.2.5.19 Motor Grader >100 HP jam 589,500

3.2.5.20 P. Tire Roller 8-10 T jam 457,000

3.2.5.21 Pedestrian/Baby Roller jam 107,100

3.2.5.22 Pile Driver/Hammer jam 147,200

3.2.5.23 Pulvi Mixer jam 252,800

3.2.5.24 Stamper hari 167,100

3.2.5.25 Stamper jam 38,200

3.2.5.26 Stamper Paving hari 167,100

3.2.5.27 Stone Crusher jam 825,000

3.2.5.28 Tandem Roller 6-8 T jam 342,300

3.2.5.29 Three Wheel Roller 6-8 T jam 153,600

3.2.5.30 Track Loader 75-100 HP jam 496,100

3.2.5.31 Vibrator hari 167,100

3.2.5.32 Vibratory Roller 5-8 T jam 466,000

3.2.5.33 Water Pump 70-100 mm jam 35,900

3.2.5.34 Water Tank Water jam 264,300

3.2.5.35 Wheel Loader 1.0-1.6 M3 jam 252,800

3.2.6 SCAFFOLDING

3.2.6.1 Main Frame 170-190 cm unit 10,900

3.2.6.2 Leader Frame 0.90 cm unit 10,900

3.2.6.3 Crose Brase Uk. 2.20 cm unit 7,500

3.2.6.4 Crose Brase Uk. 1.90 cm unit 6,900

3.2.6.5 Jack Base Uk. 40 cm unit 6,900

3.2.6.6 Jack Base Uk. 60 cm unit 8,000

3.2.6.7 U Head Jack Uk. 40 cm unit 6,900

3.2.6.8 U Head Jack Uk. 60 cm unit 8,000

3.2.6.9 Pipe Sapport unit 37,900

3.2.6.10 Cat Walk unit 37,900

3.2.6.11 Join Pint unit 5,300

3.2.6.12 Roller Catter/Roda unit 37,900

3.2.6.13 Swippel Clamp unit 5,300

3.2.7

3.2.7.1 Sewa Gedung Pertemuan Kap. s/d 100 orang hari 2,000,000

3.2.7.2 Sewa Gedung Pertemuan Kap. s/d 250 orang hari 3,750,000

3.2.7.3 Sewa Gedung Pertemuan Kap. s/d 500 orang hari 5,000,000

3.2.7.4 Sewa Gedung Pertemuan Kap. > 500 orang hari 6,990,000

3.2.7.5 Sewa Gedung / Meeting Room hari 1,332,000

3.2.7.6 Sewa outlet kegiatan 5,929,900

SEWA GEDUNG DAN PERLENGKAPANNYA

81

Page 9: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.7.7 Sewa Tempat Min 9 m2 m2 3,365,600

3.2.7.8 Sewa Hall Untuk Seminar OL / PKL /

Lab. Lapangan

Hari 1,495,700

3.2.7.9 Sewa Ruang Paket Fullboard orang/hari 799,200

3.2.7.10 Sewa Ruang Full Day orang/hari 266,400

3.2.7.11 Sewa Ruang Half day orang/hari 159,800

3.2.8 Sewa Stand

3.2.8.1 Stand Partisi Coating/Polyester m2 61,000

3.2.8.2 Stand Partisi Laminasi/Supercone m2 47,400

3.2.8.3 Stand Partisi Cat Putih m2 36,600

3.2.8.4 Ticket Box 2 Tiket event 1,358,700

3.2.8.5 Sewa Perlengkapan Pameran Di Luar

Provinsi

Paket 20,382,300

3.2.8.6Sewa Stand Pameran kegiatan up

3.2.9 Sewa Stand/Tempat Pameran Di Luar Negeri

3.2.9.1 Di Eropa

3.2.9.1.1 Milan ( Italia ) m2/hari 3,865,900

3.2.9.2 Di Asia

3.2.9.2.1 China m2/hari 11,454,700

3.2.9.3 Di Asean

3.2.9.3.1 Vietnam m2/hari 4,295,600

3.2.9.4 Di Timur Tengah

3.2.9.4.1 Dubai 12m2/hari 75,029,100

3.2.9.5 Di Afrika

3.2.9.5.1 Afrika Selatan m2/hari 34,135,400

3.2.9.6 Di Australia

3.2.9.6.1 Sydney m2/hari 2,863,600

3.2.10Sewa Kamar Hotel / Penginapan di Dalam Negeri

3.2.10.1 Tipe kamar Presidential Suite ( VVIP ) Pejabat Negara 2,810,800

3.2.10.2 Tipe kamar Junior Suite ( VIP ) Eselon I 1,855,600

3.2.10.3 Tipe kamar Deluxe Eselon II/III 989,100

3.2.10.4 Tipe kamar Superior Staf / Eselon IV 852,700

3.2.11 Sewa Kamar Hotel / Penginapan

3.2.11.1 Sewa Kamar Hotel / Penginapan di Eropa Kmr/hr 12,671,900

3.2.11.2 Sewa Kamar Hotel / Penginapan di Asia Kmr/hr 6,443,200

3.2.11.3 Sewa Kamar Hotel / Penginapan di Asean Kmr/hr 5,369,400

3.2.11.4 Sewa Kamar Hotel / Penginapan di Timur Tengah Kmr/hr 8,591,000

3.2.11.5 Sewa Kamar Hotel / Penginapan di Afrika Kmr/hr 4,295,600

3.2.11.6 Sewa Kamar Hotel / Penginapan di Australia Kmr/hr 15,034,300

3.2.12 Belanja Dekorasi Pameran

3.2.12.1 Belanja Dekorasi ( Kontruksi )

Pameran

di Eropa m2 (sqm) 4,295,600

82

Page 10: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.12.2 Belanja Dekorasi ( Kontruksi )

Pameran

di Asia m2 (sqm) 4,295,600

3.2.12.3 Belanja Dekorasi ( Kontruksi )

Pameran

di Asean m2 (sqm) 4,295,600

3.2.12.4 Belanja Dekorasi ( Kontruksi )

Pameran

di Timur Tengah m2 (sqm) 6,013,600

3.2.12.5 Belanja Dekorasi ( Kontruksi )

Pameran

di Afrika m2 (sqm) 6,443,200

3.2.12.6 Belanja Dekorasi ( Kontruksi )

Pameran

di Australia m2 (sqm) 42,955,600

3.2.12.7 Belanja Jasa Dekorasi Pameran lokal paket up

3.2.12.8 Belanja Jasa Dekorasi Pameran jawa tengah paket up

3.2.13

Belanja paket / Pengiriman Barang Pameran Ke Luar Negeri

3.2.13.1 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Eropa Cbm 6,443,200

3.2.13.2 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Asia Cbm 3,150,000

3.2.13.3 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Asean Cbm 2,863,600

3.2.13.4 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Timur Tengah Cbm 5,727,400

3.2.13.5 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Afrika Cbm 7,159,200

3.2.13.6 Belanja paket / Pengiriman Barang

Pameran Ke Luar Negeri

di Australia Cbm 5,727,400

3.2.14 Perlengkapan Gedung

3.2.14.1 Sewa Alat Pengharum Ruangan unit 179,100

3.2.15 Perlengkapan Rumah Tangga

3.2.15.1 Cover Kursi hari 3,700

3.2.15.2 Karpet M2 hari 7,400

3.2.15.3 Lampu HPIT / halogen 1000 watt hari 156,200

3.2.15.4 Lampu penerangan 40 watt hari 38,700

3.2.15.5 Meja bh/hari 5,000

3.2.15.6 Meja bundar / kotak bh/ hari 62,000

3.2.15.7 Meja bundar / kotak + cover bh/ hari 75,000

3.2.15.8 Meja Lipat + Cover Uk. 60 x 90 cm bh/ hari 20,400

3.2.15.9 Meja Prasmanan Uk. 80 x 120 cm bh/ hari 82,000

3.2.15.10 Panggung 3 x 4 m hari 650,000

3.2.15.11 Panggung 4 x 4 m hari 750,000

3.2.15.12 Panggung 3 x 6 m hari 975,000

3.2.15.13 Panggung 4 x 6 m hari 1,050,000

3.2.15.14 Panggung + karpet 3 x 4 m hari 1,270,000

3.2.15.15 Panggung + karpet 4 x 4 m hari 1,375,000

3.2.15.16 Panggung + karpet 3 x 6 m hari 1,660,000

3.2.15.17 Panggung + karpet 4 x 6 m hari 1,870,000

3.2.15.18 Panggung + karpet + Hiasan Taman 3 x 4 m hari 2,250,000

3.2.15.19 Panggung + karpet + Hiasan Taman 4 x 4 m hari 2,450,000

3.2.15.20 Panggung + karpet + Hiasan Taman 3 x 6 m hari 2,765,000

83

Page 11: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.15.21 Panggung + karpet + Hiasan Taman 4 x 6 m hari 2,980,000

3.2.15.22 Panggung katrol 4 x 6 m hari 3,550,000

3.2.15.23 Panggung katrol 5 x 6 m hari 4,760,000

3.2.15.24 Kursi susun bh/ hari 7,700

3.2.15.25 Kursi lipat bh/ hari 3,000

3.2.15.26 Kursi Plastik bh/ hari 2,500

3.2.15.27 Solar airfresh unit 293,700

3.2.15.28 Sound system 1000 watt hari 1,563,200

3.2.15.29 Sound system 3000 watt hari 3,126,500

3.2.15.30 Sound system 5000 watt hari 4,689,800

3.2.15.31 Tenda kerucut uk. 5 X 5 M hari 937,700

3.2.15.32 Tenda Polos 5 X 5 M hari 355,000

3.2.15.33 Tenda Plavon 5 X 5 M hari 462,000

3.2.15.34 Tenda Plavon, Tutup Tiang 5 X 5 M hari 633,500

3.2.15.35 Tenda Rhodes/Modul hari UP

3.2.15.36 Orgen Tunggal set / hari 2,950,000

3.2.15.37 Orgen Tunggal + 2 Penyanyi set / hari 3,760,000

3.2.15.38 Orgen Tunggal lesehan set / hari 4,660,000

3.2.15.39 Orgen Orkes set / hari 5,865,500

3.2.15.40 Orgen orkses + panggung set / hari 9,347,000

3.2.15.41 Layos set / hari 670,000

3.2.16 Sewa Ruang Reklame

3.2.16.1 Sewa Billboard m2 24,000

3.2.16.2 Sewa Baliho 4x6m, single pool, lok. Jl.

Kabupaten

3 bln 13,588,200

3.2.16.3 Sewa Baliho 4x6m, single pool, lok. Jl.

Provinsi

3 bln 33,970,400

3.2.16.4 Sewa Baliho 5x10m, single pool, lok.

Terminal/bandara/stasiun

3 bln 50,955,700

3.2.16.5 Sewa Baliho 5x10m, single pool, lok.

Strategis/tengah kota

3 bln 40,764,600

3.2.16.6 Sewa Colocation set up awal, sewa hardware,

pemeliharaan rutin

bulan 19,430,900

3.2.17 Sewa Tanaman

3.2.17.1 Tanaman hidup/hias T.100 cm bulan 75,000

3.2.17.2 Tanaman hidup/hias T.150 cm bulan 87,500

3.2.17.3 Tanaman hidup/hias 1 x 3 m set / hari 1,075,000

3.2.17.4 Tanaman hidup/hias 1 x 4 m set / hari 1,200,000

3.2.17.5 Tanaman hidup/hias 2 x 3 m set / hari 1,300,000

3.2.17.6 Tanaman hidup/hias 2 x 4 m set / hari 1,375,000

3.2.17.7 Jasa dekorasi taman m2 252,500

3.2.17.8 Jasa dekorasi kegiatan kegiatan 1,110,000

3.2.18 Komputer

3.2.18.1 PC Standart Usage hari 176,600

3.2.18.2 PC Highly Spec hari 217,300

84

Page 12: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.18.3 Laptop Working hari 407,500

3.2.18.4 Laptop Mobile Middle Spec hari 543,400

3.2.18.5 Laptop for Design Graphic (Macbook) hari 679,300

3.2.18.6 Monitor LCD 15" hari 101,800

3.2.18.7 Monitor LCD 17" hari 169,700

3.2.18.8 Monitor LCD 19" hari 203,700

3.2.19 LCD Projector

3.2.19.1 LCD Projector 5 sVGA-XGA 2000 ANSI (100 - 200 orang) unit/hari 466,200

3.2.19.2 LCD Projector 6 sVGA-XGA 2500 ANSI (200 - 300 orang) unit/hari 582,800

3.2.19.3 LCD Projector 7 sVGA-XGA 3000 ANSI (300 - 400 orang) unit/hari 999,000

3.2.19.4 LCD Projector 8 sVGA-XGA 5000 ANSI (300 - 400 orang) unit/hari 1,998,100

3.2.19.5 LCD Projector 9 sVGA-XGA 10000 ANSI (300-400 orang) unit/hari 7,992,300

3.2.20 Screen

3.2.20.1 Tripod Screen 60" sekitar 50 orang unit/hari 285,400

3.2.20.2 Tripod Screen 70" (1,5x1,5 m) ~ sekitar 60

orang

unit/hari 333,000

3.2.20.3 Fast Fold Front Screen 84" (2x2m) ~ sekitar 70

orang

unit/hari 532,200

3.2.20.4 Fast Fold Front Screen 96" (2,4x2,4m) ~ sekitar 70-

100 org

unit/hari 650,600

3.2.20.5 Fast Fold Front Screen 3x2m ~ sekitar 100 -150

orang

unit/hari 709,900

3.2.20.6 Fast Fold Front Screen 4x3m ~ sekitar 150 - 200

orang

unit/hari 945,600

3.2.21 Over Head Projector (OHP)

3.2.21.1 Over Head Projector 2500 lumens unit/hari 925,100

3.2.21.2 Over Head Projector 2700 lumens unit/hari 1,017,600

3.2.21.3 Over Head Projector 3200 lumens unit/hari 1,202,900

3.2.22 Printer

3.2.22.1 Printer Dot Matriks A4 80 colom; 24pin impact dot

matrix; 240 cps

unit/hari 100,600

3.2.22.2 Printer Dot Matriks A4 80 colum; 24 pin impact dot

matrix; 240 cps

unit/minggu 201,200

3.2.22.3 Printer Dot Matriks A3 136 colum; 24pin impact dot

matrix; 529 cps

unit/hari 150,800

3.2.22.4 Printer Dot Matriks A3 136 colum; 24pin impact dot

matrix; 529 cps

unit/minggu 301,900

3.2.22.5 Printer Dot Matriks A3 136 colum; 24pin impact dot

matrix; 529 cps

unit/bulan 602,700

3.2.22.6 Ink Jet Color A4 (tidak termasuk

Tinta)

4800 x 1200 dpi;16/12 ppm unit/hari 100,600

3.2.22.7 Ink Jet Color A4 (tidak termasuk

Tinta)

4800 x 1200 dpi;16/12 ppm unit/minggu 201,200

3.2.22.8 Ink Jet Color A4 (tidak termasuk

Tinta)

4800 x 1200 dpi;16/12 ppm unit/bulan 402,700

85

Page 13: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO NAMA BARANG SPESIFIKASI SATUAN

3.2.22.9 Ink Jet Color A3 (tidak termasuk

Tinta)

4800 x 1200 dpi; 14/11 ppm unit/hari 301,900

3.2.22.10 Ink Jet Color A3 (tidak termasuk

Tinta)

4800 x 1200 dpi; 14/11 ppm unit/minggu 602,700

3.2.22.11 Ink Jet Color A3 (tidak termasuk

Tinta)

4800 x 1200 dpi; 14/11 ppm unit/bulan 1,206,900

3.2.22.12 LaserJet Monochrome A4 (tidak

termasuk Toner)

1020 - 600 x 600 dpi; 1x 150

Tray; 15 ppm

unit/hari 301,900

3.2.22.13 LaserJet Monochrome A4 (tidak

termasuk Toner)

1020 - 600 x 600 dpi; 1x 150

Tray; 15 ppm

unit/minggu 602,700

3.2.22.14 LaserJet Monochrome A4 (tidak

termasuk Toner)

1020 - 600 x 600 dpi; 1x 150

Tray; 15 ppm

unit/bulan 1,206,900

3.2.23 Sound System

3.2.23.1 Portable Sound System 1 2 microphones ~ sekitar 20

orang

unit/hari 1,507,600

3.2.23.2 Portable Sound System 2 2 microphones ~ sekitar 50

orang

unit/hari 1,910,000

3.2.23.3 Medium Sound System 4 microphones ~ sekitar 100

orang

unit/hari 2,413,400

3.2.23.4 Sound System 1000 watt 4 microphones~8x12 m unit/hari 2,915,500

3.2.23.5 Sound System 2000 watt 5 microphones~10x15 m unit/hari 4,424,900

3.2.23.6 Sound System 3000 watt 5 microphones ~12x18 m unit/hari 5,430,400

3.2.23.7 Sound System 4000 watt 6 microphones~15x20 m unit/hari 6,436,100

3.2.23.8 Sound System 5000 watt 8 microphones~20x25 m unit/hari 7,441,700

3.2.24 Seni dan Budaya

3.2.24.1 Pakaian Penari unit/orang 335,500

3.2.25 Internet

3.2.25.1 Sewa Jalur Streaming/band with

internet

64Kbps/bln 3,355,400

3.2.25.2 Sewa Hosting www.bptikp-jateng.net Sewa Space 10Gb IIX+

Domain

kegiatan 6,710,800

3.2.25.3 Sewa Hosting www.sibeo.org Sewa Space 10Gb IIX+

Domain

kegiatan 6,710,800

3.2.25.4 Sewa Hosting www.videoedukasi.net Sewa Space 10Gb IIX+

Domain

kegiatan 6,710,800

3.2.25.5 Sewa Hosting pendaftaran on Line Sewa Space 10Gb IIX+

Domain

kegiatan 6,710,800

3.2.26 Sewa Hewan

3.2.26.1 Sewa Hewan Peraga per hewan 200,000

86

Page 14: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

III.B. BIAYA PEMELIHARAAN BARANG 1

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.3 PEMELIHARAAN ALAT KANTOR

3.3.1 Pemeliharaan Alat Kantor

3.3.1.1 Mesin Cash Register unit 705,000 1,411,000 2,116,000

3.3.1.2 Mesin Fax unit 333,000 666,000 999,000

3.3.1.3 Mesin Foto Copy unit 999,000 1,998,000 2,997,000

3.3.1.4 Mesin Ketik Manual bh/thn 200,000 400,000 599,000

3.3.1.5Mesin Ketik Elektronik bh/thn 400,000 799,000 1,199,000

3.3.1.6 Mesin Hitung bh/thn 213,000 426,000 639,000

3.3.1.7 Mesin Micro Film set/thn 231,000 346,000 436,000

3.3.1.8Mesin Penghancur Kertas unit/thn 107,000 213,000 320,000

3.3.1.9 Mesin Stensil bh/thn 1,332,000 2,664,000 3,996,000

3.3.1.10 Perawatan Meubelair m2/thn 37,000 62,000 68,000

3.3.1.11Peti Uang (pembersihan) unit/thn 33,000 67,000 84,000

3.3.1.12FOTOCOPY CANON IRA

C3520i

PENGGANTIAN

DRUM IRA C

3520i BLACK

unit 3,500,000

3.3.1.13FOTOCOPY CANON IRA

C3520i

PENGGANTIAN

DRUM IRA C

3520i YELLOW

unit 4,500,000

3.3.1.14FOTOCOPY CANON IRA

C3520i

PENGGANTIAN

DRUM IRA C

3520i MAGENTA

unit 4,500,000

3.3.1.15FOTOCOPY CANON IRA

C3520i

PENGGANTIAN

DRUM IRA C

3520i CYAN

unit 4,500,000

3.3.2 PERALATAN KOMPUTER

3.3.2.1 Base Platen Assy buah 3,283,000 9,380,000 11,819,000

3.3.2.2 Bateray Backup UPS buah 490,000 1,400,000 1,764,000

3.3.2.3 Bateray Control Panel buah 269,000 770,000 970,000

3.3.2.4 Bateray Mother Board buah 269,000 770,000 970,000

3.3.2.5 Biaya Service unit/thn 780,000 2,227,000 2,806,000

3.3.2.6 Biaya Service Card unit/bln 334,000 955,000 1,203,000

3.3.2.7 DC Module card buah 3,014,000 8,611,000 10,849,000

3.3.2.8 DC pawer supply buah 2,817,000 8,050,000 10,143,000

3.3.2.9 Desk Jet/Laser Jet unit/thn 150,000 428,000 539,000

3.3.2.10 Ethernet unit/thn 334,000 668,000 842,000

3.3.2.11 Hammer Bank Assy buah 3,307,000 9,450,000 11,907,000

3.3.2.12 Hammer Comb buah 1,348,000 3,850,000 4,851,000

3.3.2.13 Hammer Control Card buah 2,695,000 7,700,000 9,703,000

3.3.2.14 Lap Top unit/thn 653,000 1,484,000 1,870,000

3.3.2.15 Logic Card buah 3,406,000 9,731,000 12,260,000

3.3.2.16 Main Storage buah 2,695,000 7,700,000 9,703,000

3.3.2.17Personal Komputer (PC) unit/thn 698,000 1,401,000 1,765,000

3.3.2.18 Platen Assy buah 2,826,000 8,075,000 10,175,000

3.3.2.19 Tape Cleaning buah 171,000 490,000 617,000

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

87

Page 15: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.3.2.20 Tape Drive buah 3,430,000 9,800,000 12,348,000

3.3.3

3.3.3.1 IBM 3488 info windows II

dump terminal

unit/thn 986,000 1,479,000 1,864,000

3.3.3.2 IBM 8235 unit/thn 1,163,000 1,743,000 2,196,000

3.3.3.3 IBM AS 400 9406-170 unit/thn 22,659,000 64,740,000 81,573,000

3.3.3.4 Mesin UPS 600-1200 VA unit/thn 301,000 451,000 568,000

3.3.3.5 Mesin UPS 10-15 KVA unit/thn 5,011,000 7,517,000 9,472,000

3.3.3.6 Printer Dotmatrik unit/thn 535,000 2,138,000 5,345,000

3.3.3.7 Printer inkjet unit/thn 178,000 713,000 1,782,000

3.3.3.8 Printer Laser unit/thn 285,000 1,140,000 2,851,000

3.3.3.9 Printer Linemetrix unit/thn 2,138,000 8,552,000 21,381,000

3.3.4 Projector

3.3.4.1 Deplector Projector type G.601.E unit/thn 1,002,000 1,502,000 1,893,000

3.3.4.2 Ideo Out Projector G.601.E unit/thn 1,002,000 1,502,000 1,893,000

3.3.5 Spare Part Printer IBM 6262

3.3.5.1 Traktor Kanan Atas P/N 68F3925 buah 4,772,000 7,159,000 9,021,000

3.3.5.2 Traktor Kanan Bawah P/N 68F3930 buah 5,345,000 8,018,000 10,103,000

3.3.5.3 Traktor Kiri Atas P/N 68F3925 buah 4,455,000 6,682,000 8,419,000

3.3.5.4 Traktor Kiri Bawah P/N 68F3930 buah 5,058,000 7,588,000 9,561,000

3.3.6

3.3.6.1 Can Raptor RT-RS unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.2DV Cable (6 Fest, 4 Pin) unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.3

DV Codec, Canopus

Raptor Video and Plug

Infor

unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.4DV Raptor RT PCI Card unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.5DV Raptor RT Without

Adobe Premiere 6.0

unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.6Inst & Driver CD, Inst &

User Guldeunit/thn

5,011,000 7,517,000 9,472,000

3.3.6.7 Kaca Bening unit/thn 36,000 46,000 58,000

3.3.6.8 Package Include unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.9Raptor RT Software merk

Canopuse

unit/thn 5,011,000 7,517,000 9,472,000

3.3.6.10 Screen unit/thn 125,000 163,000 205,000

3.3.7 Pemeliharaan Alat Kantor Lainnya

3.3.7.1 Almari Besi bh/thn 21,000 36,000 107,000

3.3.7.2 Camera Digital Buah 418,000 1,194,000 1,253,000

3.3.7.3 Dispenser bh/thn 113,000 159,000 340,000

3.3.7.4 Filling Cabinet bh/thn 18,000 25,000 36,000

3.3.7.5 Jam Dinding bh/thn 4,000 8,000 14,000

PERALATAN PENDUKUNG KOMPUTER

Peralatan Video Editing Card

88

Page 16: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.3.7.6 Kereta makan Buah 256,000 733,000 923,000

3.3.7.7 Kipas angin bh/thn 41,000 53,000 108,000

3.3.7.8 Kompor 4 burner Buah 85,000 244,000 308,000

3.3.7.9 Lemari Es 1 pintu bh/thn 157,000 371,000 730,000

3.3.7.10 Lemari Es 2 pintu bh/thn 330,000 737,000 1,240,000

3.3.7.11 Mesin cuci Buah 341,000 1,194,000 2,089,000

3.3.7.12 Mesin cuci besar Buah 1,069,000 3,054,000 3,848,000

3.3.7.13 OHP Buah 290,000 435,000 548,000

3.3.7.14 Orbit Fan Buah 208,000 596,000 750,000

3.3.7.15 Perbaikan DVR Buah 320,000 448,000 627,000

3.3.7.16 Refrigerator Buah 214,000 611,000 770,000

3.3.7.17 Slide Projector bh/thn 313,000 469,000 640,000

3.3.7.18Jasa Service Moving

Banner

Buah 1,332,000 1,865,000 2,611,000

3.3.7.19 Sound System bh/thn 1,396,000 2,380,000 4,187,000

3.3.7.20 Televisi Tabung 14 Inchi bh/thn 53,000 214,000 342,000

3.3.7.21 Televisi Tabung 17 Inchi bh/thn 75,000 299,000 479,000

3.3.7.22 Televisi Tabung 21 Inchi bh/thn 105,000 419,000 670,000

3.3.7.23 Televisi LCD 17 Inchi bh/thn 120,000 449,000 718,000

3.3.7.24 Televisi LCD 21 Inchi bh/thn 168,000 628,000 1,006,000

3.3.7.25 Televisi LCD 29 Inchi bh/thn 235,000 880,000 1,408,000

3.3.7.26 Televisi LED 17 Inchi bh/thn 132,000 494,000 790,000

3.3.7.27 Televisi LED 21 Inchi bh/thn 185,000 691,000 1,106,000

3.3.7.28 Televisi LED 29 Inchi bh/thn 258,000 968,000 1,549,000

3.3.7.29 Televisi Plasma 17 Inchi bh/thn 138,000 518,000 830,000

3.3.7.30 Televisi Plasma 21 Inchi bh/thn 152,000 570,000 913,000

3.3.7.31 Televisi Plasma 29 Inchi bh/thn 167,000 627,000 1,004,000

3.3.7.32 Tustel bh/thn 53,000 133,000 266,000

3.3.7.33 Wereless Buah 120,000 342,000 431,000

3.3.8 Lampu Robyong

3.3.8.1 Pemeliharaan Lampu

Robyong

6 lampu set/thn 127,000 194,000 244,000

3.3.8.2 Pemeliharaan Lampu

Robyong

12 lampu set/thn 140,000 220,000 278,000

3.3.8.3 Pemeliharaan Lampu

Robyong

24 lampu set/thn 154,000 220,000 278,000

3.3.9 Air Conditioner (AC)

3.3.9.1 AC Floor Unit/thn 647,000 970,000 1,222,000

3.3.9.2 AC Mobil ND Unit/thn 252,000 941,000 1,390,000

3.3.9.3 AC Mobil Sanden Unit/thn 217,000 749,000 955,000

3.3.9.4 AC split < 2 Pk Unit/thn 428,000 1,069,000 1,710,000

3.3.9.5 AC split 2 - 5 Pk Unit/thn 855,000 2,138,000 3,421,000

3.3.9.6 Celler AC Unit/thn 2,910,000 4,366,000 5,501,000

3.3.9.7 Central AC < 5 Pk Unit/thn 2,264,000 3,396,000 4,279,000

3.3.9.8 Central AC 5 - 10 Pk Unit/thn 6,414,000 10,691,000 17,105,000

89

Page 17: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.3.9.9 Central AC 10 - 20 Pk Unit/thn 8,552,000 27,795,000 34,210,000

3.3.9.10 Window AC < 1 Pk Unit/thn 237,000 356,000 529,000

3.3.9.11 Window AC 1 - 2 Pk Unit/thn 475,000 712,000 756,000

3.3.10 Service Fire Alarm System

3.3.10.1 Bell bh/thn 8,000 12,000 16,000

3.3.10.2 Break Glass Detector bh/thn 4,000 6,000 8,000

3.3.10.3Fire Alarm Control Panel 10 Zone unit/thn 668,000 434,000 547,000

3.3.10.4Fire Alarm Control Panel 20 Zone unit/thn 1,002,000 651,000 821,000

3.3.10.5Fire Alarm Control Panel 40 Zone unit/thn 869,000 1,336,000 1,684,000

3.3.10.6 Fixed Temp. Detector bh/thn 4,000 6,000 8,000

3.3.10.7 Instalasi Bell line/thn 42,000 64,000 80,000

3.3.10.8 Instalasi Detector line/thn 8,000 12,000 16,000

3.3.10.9 Rate of Rise Detector unit/thn 4,000 6,000 8,000

3.3.10.10 Smoke Detector bh/thn 8,000 12,000 16,000

3.3.11 Service Fire Hidrant System-1

3.3.11.1 Electrical Fire Pump KSB

ETA

75 HP/500

USGPM

unit/thn 1,002,000 1,670,000 2,104,000

3.3.11.2 Diesel Fire Pump 75 HP/500

USGPM

unit/thn 2,605,000 3,141,000 3,957,000

3.3.11.3 Jockey Fire Pump 5 HP unit/thn 601,000 2,873,000 3,620,000

3.3.11.4 Priming Tank 500 liter unit/thn 207,000 311,000 391,000

3.3.12 Service Fire Hidrant System-2

3.3.12.1 Hydrant Pillar Two Way unit/thn 53,000 361,000 455,000

3.3.12.2 Hydrant Box Out Door unit/thn 201,000 321,000 404,000

3.3.12.3 Hydrant Box In Door unit/thn 42,000 601,000 758,000

3.3.12.4 Siamese Connection unit/thn 20,000 468,000 589,000

3.3.12.5 Control Panel Fire

Hydrant

bh/thn 214,000 1,269,000 1,599,000

3.3.12.6 Presure Switch bh/thn 20,000 87,000 109,000

3.3.12.7 Presure Gauge unit/thn 20,000 87,000 109,000

3.3.12.8 Sumur Artetis unit/thn 1,470,000 2,205,000 2,778,000

3.3.13 Pemeliharaan Mesin

3.3.13.1 Kamar Pendingin (Colling

Unit)

unit/thn 2,873,000 4,310,000 5,430,000

3.3.13.2 Lift unit/thn 25,360,000 63,401,000 126,801,000

3.3.13.3 Listrik Titik 58,000 290,000 365,000

3.3.13.4 Mesin Absensi unit/thn 152,000 355,000 517,000

3.3.13.5 Mesinpembersih/vacum

cleaner

unit/thn 47,000 95,000 190,000

3.3.13.6 Mesin Potong Rumput

Dorong

Buah 455,000 1,300,000 1,881,000

90

Page 18: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.3.13.7 Mesin Potong Rumput

Gendong

Buah 303,000 867,000 1,170,000

3.3.13.8 Mortuary 2 bodies Buah 214,000 611,000 770,000

3.3.13.9 Pompa Air 5-10 PK unit/thn 287,000 431,000 788,000

3.3.13.10 Pompa Air 285 PK unit/thn 5,679,000 8,519,000 10,734,000

3.3.13.11 Service Pintu Automatic unit/thn 618,000 927,000 1,168,000

3.3.13.12 Drone unit/thn 1,000,000 2,000,000 4,000,000

91

Page 19: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.4

3.4.1 Telepon/Sentral Telepon (PABX)

3.4.1.1 Key Telepon Sigma V/KT 208 unit 104,000 178,000 522,000

3.4.1.2 Key Telepon Sigma V/KT 848 unit 104,000 178,000 522,000

3.4.1.3 Pesawat PABX Buah 1,054,000 3,011,000 4,718,000

3.4.1.4 Repeter unit 104,000 178,000 522,000

3.4.1.5 Rig and all band unit/bln 173,000 347,000 866,000

3.4.1.6 Sentral Telepon PABX DK 28 unit/bln 608,000 851,000 2,431,000

3.4.1.7 Sentral Telepon PABX DK 56 unit/bln 608,000 851,000 2,431,000

3.4.1.8 Telepon Buah 137,000 181,000 190,000

3.4.1.9Telepon PABX ESK 400-

E.2/100

unit 157,000 266,000 784,000

3.4.1.10Telepon PABX EMS 601-

30/100

unit 261,000 444,000 1,306,000

3.4.1.11Telepon PABX HICOM 130-

4/50

unit 157,000 266,000 784,000

3.4.1.12Telepon PABX Kapasitas 4/32 unit/thn 1,806,000 2,889,000 7,222,000

3.4.1.13Telepon PABX Kap. 400/24/40 unit 313,000 533,000 1,567,000

3.4.1.14 Telepon PABX Kap. 8/60 unit 167,000 284,000 836,000

3.4.1.15 Telepon PABX Kap. 8/32 unit 157,000 266,000 784,000

3.4.1.16 Telepon PABX Kap. 4/24 unit 157,000 266,000 784,000

3.4.1.17 Telepon Langsung unit 16,000 27,000 45,000

3.4.1.18 Telepon Lokal unit 16,000 27,000 45,000

3.4.2 Telex

3.4.2.1 Telex Dial T 1200 CT unit/thn 426,000 596,000 1,703,000

3.4.2.2 Telex AMS unit/thn 1,754,000 2,455,000 7,015,000

3.4.3 Radio

3.4.3.1 Facsimile (service & spare

part)

unit/thn 1,316,000 1,842,000 5,263,000

3.4.3.2 Instrument Meter unit/thn 1,398,000 1,957,000 5,591,000

3.4.3.3 Mesin Sandi SN-200 XC 35 unit/thn 6,265,000 8,771,000 25,059,000

3.4.3.4 Mesin Sandi 110 unit/thn 4,556,000 6,379,000 18,225,000

3.4.3.5 Pemancar Radio FM Stereo Paket 506,000 1,011,000 2,528,000

3.4.3.6 Radio Comunikasi VHF FM Transreceiver unit/thn 5,055,000 6,319,000 9,478,000

3.4.3.7 Radio HF SSB 1,6 MHz-30 MHz unit/thn 2,022,000 2,831,000 8,088,000

3.4.3.8 Radio Mobil UHF/FM unit/thn 526,000 736,000 2,103,000

3.4.3.9 Radio UHF/FM unit/thn 1,002,000 1,403,000 4,009,000

3.4.3.10 Repeater UHF/FM dan

VHF/FM

unit/thn 2,088,000 2,923,000 8,352,000

3.4.3.11 Single Side Band (SSB) unit/thn 528,000 740,000 2,113,000

3.4.3.12 Siskomdagri unit/thn 15,821,000 22,149,000 63,282,000

3.4.3.13 Studio Siaran FM Stereo Paket 253,000 506,000 2,022,000

3.4.3.14 Walky Talky (HT) unit/thn 84,000 307,000 447,000

PEMELIHARAAN SARANA KOMUNIKASI

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

92

Page 20: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.4.4 Service

3.4.4.1 Panasonic KXTA 6/24 bulan 233,000 326,000 932,000

3.4.4.2Rangka Baliho 4x6m paket/ unit 607,000 10,110,000 11,526,000

3.4.4.3Roll Backdrope paket/ unit 404,000 6,740,000 7,684,000

3.4.4.4Servis PABX HB Series 308 unit/bln 437,000 612,000 1,747,000

3.4.4.5 Servis PABX KX TA - 624 unit/bln 437,000 612,000 1,747,000

3.4.4.6Stand Banner paket/ unit 632,000 2,106,000 2,275,000

3.4.4.7 Toshiba HB 308 bulan 291,000 408,000 1,165,000

3.4.5 Pemeliharaan Kamera

3.4.5.1 Kamera Shooting Digital Paket/bln 606,000 908,000 1,210,000

3.4.5.2 Kamera Shooting Mini DV Paket/bln 908,000 1,210,000 1,817,000

3.4.5.3 Kamera SLR/Tustel Digital Paket/bln 302,000 606,000 908,000

3.4.5.4 Kamera SLR/Tustel Roll Paket/bln 606,000 908,000 1,210,000

3.4.5.5 DVR Paket/bln 2,421,000 3,632,000 4,843,000

3.4.5.6 Pemancar UHF / VHF Paket/bln 6,054,000 12,109,000 24,219,000

3.4.5.7 Microwavelink Paket/bln 2,421,000 3,632,000 4,843,000

3.4.5.8 Lensa unit/thn 300,000 500,000 1,000,000

3.4.5.9 Lampu Blizt unit/thn 300,000 500,000 1,000,000

3.4.6 Service Perangkat Radio

3.4.6.1 Microphone Unit 100,000 250,000 500,000

3.4.6.2 Power Headphone Unit 1,000,000 1,250,000 2,500,000

3.4.6.3 Headphone Unit 100,000 200,000 300,000

3.4.6.4 Tuner Monitor Unit 500,000 1,500,000 2,500,000

3.4.6.5 Hybrid Unit 1,000,000 2,000,000 3,000,000

3.4.6.6 Mixer Unit 250,000 500,000 1,000,000

3.4.6.7 Modem SMS Unit 1,000,000 2,000,000 3,000,000

3.4.6.8 Exciter Unit 2,500,000 5,000,000 10,000,000

3.4.6.9 Audio Processor Unit 3,000,000 5,000,000 8,000,000

3.4.6.10 Power Amply Unit 1,000,000 2,000,000 2,500,000

3.4.6.11 Digital Recorder Unit 50,000 100,000 200,000

3.4.6.12 Radio Monitor Unit 200,000 500,000 800,000

3.4.6.13 Tape Recorder Manual Unit 500,000 1,000,000 1,250,000

3.4.6.14 Antena/Tower Unit 3,000,000 5,000,000 8,000,000

3.4.6.15 Power Supply Unit 500,000 2,000,000 3,000,000

3.4.6.16 Pemancar Radio FM Unit 3,000,000 5,000,000 10,000,000

3.4.6.17 Penangkal Petir Radio Unit 2,000,000

3.4.6.18 Power Ampli Unit 2,000,000

3.4.6.19 Exiter FM Unit 2,000,000 5,000,000 7,000,000

93

Page 21: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.5 PEMELIHARAAN KENDARAAN DINAS

3.5.1 B u s

3.5.1.1 Solar : 20 lt/hari Bus Sedang Kap.30 Seat tahun UP

3.5.1.2 Solar : 25 lt/hari Bus Besar Kap.40 Seat tahun UP

3.5.1.3 Olie : 2 lt /bln tahun UP

3.5.1.4 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun 3,757,000

3.5.1.5 Doorsmeer Lengkap : 4 bulanan (3kali/tahun) tahun 4,697,000

3.5.1.6Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun 7,071,000

3.5.1.7 Perbaikan ringan/suku cadang tahun 5,226,000

3.5.1.8 Perbaikan berat tahun UP

3.5.1.9 Accu tahun UP

3.5.1.10 Ban luar : 4 (empat) buah tahun UP

3.5.1.11 Ban dalam : 4 (empat) buah tahun UP

3.5.1.12 Flaps/Sliwer : 4 (empat) buah tahun UP

3.5.1.13 Bea Administrasi Kendaraan - Kir/Uji Kendaraan kali UP

3.5.1.14 Bea Administrasi Kendaraan - Daftar Ulang buah/tahun UP

3.5.2 Jeep / Sejenis

3.5.2.1 Bahan Bakar Non Subsidi : 10 lt/hari tahun UP

3.5.2.2 Olie : 2 lt/bulan tahun UP

3.5.2.3 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun 3,090,000

3.5.2.4 Doorsmeer Lengkap : 4 bulanan (3kali/tahun) tahun 3,709,000

3.5.2.5 Perbaikan ringan/suku cadang tahun 4,609,000

3.5.2.6 Perbaikan berat tahun UP

3.5.2.7 Accu tahun UP

3.5.2.8 Ban luar : 2 (dua) buah tahun UP

3.5.2.9 Ban dalam : 2 (dua) buah tahun UP

3.5.2.10Bea Administrasi Kendaraan : Daftar Ulang (tambahan Bea

SWDKLLJ)

buah/tahun UP

3.5.3 Pick Up/Station Wagon/sejenis

3.5.3.1 Bahan Bakar Non Subsidi : 10 lt/hari tahun UP

3.5.3.2 Olie : 2 lt/bulan tahun UP

3.5.3.3 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun 3,090,000

3.5.3.4 Doorsmeer Olie Mesran 4 bulanan (3kali /tahun) tahun 3,090,000

3.5.3.5 Doorsmeer Lengkap Union 4 bulanan (3kali /tahun) tahun 3,709,000

3.5.3.6 Doorsmeer : Olie Union 4 bulanan (3kali /tahun) tahun 3,090,000

3.5.3.7Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun 4,960,000

3.5.3.8 Perbaikan ringan/suku cadang tahun 4,609,000

3.5.3.9 Perbaikan berat tahun UP

3.5.3.10 Accu tahun UP

3.5.3.11 Ban luar : 2 (dua) buah tahun UP

3.5.3.12 Ban dalam : 2 (dua) buah tahun UP

3.5.3.13 Bea Administrasi Uji Kendaraan kend/tahun UP

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

94

Page 22: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

3.5.3.14

Bea Administrasi Daftar Ulang (tambahan Bea Materai Uji

dilaksanakan 1 tahun sebanyak 2 kali Daftar Ulang ditambah

Asuransi Kecelakaan Dalam Perjalanan (AKDP) ditambah

PPPK.

buah/tahun UP

3.5.4 T r u c k

3.5.4.1 Ber BBM Solar : 15 lt/hari tahun UP

3.5.4.2 Ber BBM Premium Non Subsidi : 20 lt/hari tahun UP

3.5.4.3 Olie : 2 lt/bln tahun UP

3.5.4.4 Doorsmeer Biasa 4 (bl) tahun 3,757,000

3.5.4.5 Doorsmeer : Lengkap 4 (bl) tahun 4,697,000

3.5.4.6Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun 7,356,000

3.5.4.7 Perbaikan ringan/suku cadang tahun 5,102,000

3.5.4.8 Perbaikan berat tahun UP

3.5.4.9 Accu tahun UP

3.5.4.10 Ban luar : 4 (empat) buah tahun UP

3.5.4.11 Ban lam : 4 (empat) buah tahun UP

3.5.4.12 Flaps/Sliwer : 4 (empat) buah tahun UP

3.5.4.13 Bea Administrasi Kendaraan Uji Kendaraan kend/tahun UP

3.5.4.14

Bea Administrasi Kendaraan :Daftar Ulang (tambahan Bea Test

Pump dan Materai Uji dilaksanakan 1 tahun sebanyak 2 kali

Daftar Ulang ditambah Asuransi Kecelakaan Dalam Perjalanan

(AKDP) ditambah PPPK.

buah/tahun UP

3.5.5 Sedan/sejenis

3.5.5.1 Bahan Bakar Non Subsidi : 10 lt/hari tahun UP

3.5.5.2 Olie : 2 lt/bulan tahun UP

3.5.5.3 Doorsmeer Biasa tahun 1,863,000

3.5.5.4 Doorsmeer Olie Mesran 4 (bl) tahun 1,112,000

3.5.5.5 Doorsmeer Lengkap Union 4 (bl) tahun 1,297,000

3.5.5.6 Doorsmeer Olie Union 4 (bl) tahun 1,977,000

3.5.5.7Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun 4,507,000

3.5.5.8 Perbaikan ringan / suku cadang tahun 5,226,000

3.5.5.9 Perbaikan berat tahun UP

3.5.5.10 Accu tahun UP

3.5.5.11 Ban luar : 4 (empat) buah tahun UP

3.5.5.12 Ban dalam : 4 (empat) buah tahun UP

3.5.5.13 Daftar ulang buah/tahun UP

3.5.6 Sepeda Motor/Kendaraan Bermotor Roda Dua

3.5.6.1 Bahan Bakar Non Subsidi : 2 lt/hari tahun UP

3.5.6.2 Olie : 1 (lt) x 12 (hr) tahun UP

3.5.6.3 Doorsmeer : 12 (lt) tahun 648,000

3.5.6.4 Perbaikan ringan/suku cadang tahun 678,000

3.5.6.5 Perbaikan berat tahun UP

3.5.6.6 Accu tahun UP

3.5.6.7 Ban luar : 1 (satu) buah tahun UP

3.5.6.8 Ban dalam : 1 (satu) buah tahun UP

95

Page 23: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

3.5.6.9 Bea Administrasi Kendaraan Daftar Ulang buah/tahun UP

3.5.6.10Bea Administrasi Kendaraan Tambahan bea materai dan

langganan parkir/tahun

buah/tahun UP

3.5.6.11 SWDKLLJ buah/tahun UP

3.5.7Kendaraan Ambulance/Mobil Jenazah/Mobil Perpustakaan Keliling

3.5.7.1 Bahan Bakar Non Subsidi : 15 lt/hari tahun UP

3.5.7.2 Olie : 2 lt/bln tahun UP

3.5.7.3 Doorsmeer : 6 x tahun UP

3.5.7.4 Perbaikan ringan/suku cadang tahun 4,005,000

3.5.7.5 Perbaikan berat tahun UP

3.5.7.6 Accu tahun UP

3.5.7.7 Ban luar : 1 (satu) buah tahun UP

3.5.7.8 Ban dalam : 1 (satu) buah tahun UP

3.5.7.9 Bea Administrasi Kendaraan Daftar Ulang buah/tahun UP

3.5.7.10 Bea Administrasi Kendaraan Uji Kendaraan kend/tahun UP

3.5.8 Car Lift

3.5.8.1 Pergantian Olie : 400 lt unit/tahun 8,925,000

3.5.8.2 Biaya tehnisi Car Lift unit/tahun 226,000

3.5.9 Jasa Perbaikan / Penggantian

3.5.9.1 Jasa Service AC unit 365,000

3.5.9.2 Jasa Service Ganti Mesin Compresor AC unit 732,000

3.5.9.3 Jasa Service 4 Pintu set 244,000

3.5.10 Dump Truck buah/tahun 1,255,000

3.5.11 Kendaraan Dinas Bupati dan Wakil Bupati

3.5.11.1 Jeep / Sejenis

3.5.11.1.1 Bahan Bakar Non Subsidi : 20 lt/hari tahun UP

3.5.11.1.2 Olie : 4 lt/bulan tahun UP

3.5.11.1.3 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun 3,090,000

3.5.11.1.4 Doorsmeer Lengkap : 4 bulanan (3kali/tahun) tahun 3,709,000

3.5.11.1.5 Perbaikan ringan/suku cadang tahun 31,371,000

3.5.11.1.6 Perbaikan berat tahun UP

3.5.11.1.7 Accu tahun UP

3.5.11.1.8 Ban luar : 4 (empat) buah tahun UP

3.5.11.1.9 Ban dalam : 4 (empat) buah tahun UP

3.5.11.1.10Bea Administrasi Kendaraan : Daftar Ulang (tambahan Bea

SWDKLLJ)

buah/tahun UP

3.5.11.2 Sedan/sejenis

3.5.11.2.1 Bahan Bakar Non Subsidi : 20 lt/hari tahun UP

3.5.11.2.2 Olie : 4 lt/bulan tahun UP

3.5.11.2.3 Doorsmeer Biasa tahun 1,845,000

3.5.11.2.4 Doorsmeer Olie Mesran 4 (bl) tahun 1,101,000

3.5.11.2.5 Doorsmeer Lengkap Union 4 (bl) tahun 1,285,000

96

Page 24: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

3.5.11.2.6 Doorsmeer Olie Union 4 (bl) tahun 1,958,000

3.5.11.2.7Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun 4,463,000

3.5.11.2.8 Perbaikan ringan / suku cadang tahun 31,371,000

3.5.11.2.9 Perbaikan berat tahun UP

3.5.11.2.10 Accu tahun UP

3.5.11.2.11 Ban luar : 4 (empat) buah tahun UP

3.5.11.2.12 Ban dalam : 4 (empat) buah tahun UP

3.5.11.2.13 Daftar ulang buah/tahun UP

3.5.12 Kendaraan Dinas Pimpinan DPRD

3.5.12.1 Jeep / Sejenis

3.5.12.1.1 Bahan Bakar Non Subsidi : 20 lt/hari tahun UP

3.5.12.1.2 Olie : 4 lt/bulan tahun UP

3.5.12.1.3 Olie gardan : 1 lt/6 bulan tahun UP

3.5.12.1.4 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun UP

3.5.12.1.5 Doorsmeer Lengkap : 4 bulanan (3kali/tahun) tahun UP

3.5.12.1.6 Perbaikan ringan/suku cadang tahun 4,040,000

3.5.12.1.7 Perbaikan berat tahun UP

3.5.12.1.8 Accu tahun UP

3.5.12.1.9 Ban luar : 4 (empat) buah tahun UP

3.5.12.1.10Bea Administrasi Kendaraan : Daftar Ulang (tambahan Bea

SWDKLLJ)

buah/tahun UP

3.5.12.2 Pick Up/Station Wagon/sejenis

3.5.12.2.1 Bahan Bakar Non Subsidi : 20 lt/hari tahun UP

3.5.12.2.2 Olie : 4 lt/bulan tahun UP

3.5.12.2.3 Olie gardan : 1 lt/6 bulan tahun UP

3.5.12.2.4 Doorsmeer Biasa : 4 bulanan (3kali/tahun) tahun UP

3.5.12.2.5 Doorsmeer Olie Mesran 4 bulanan (3kali /tahun) tahun UP

3.5.12.2.6 Doorsmeer Lengkap Union 4 bulanan (3kali /tahun) tahun UP

3.5.12.2.7 Doorsmeer : Olie Union 4 bulanan (3kali /tahun) tahun UP

3.5.12.2.8Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun UP

3.5.12.2.9 Perbaikan ringan/suku cadang tahun 4,040,000

3.5.12.2.10 Perbaikan berat tahun UP

3.5.12.2.11 Accu tahun UP

3.5.12.2.12 Ban luar : 4 (empat) buah tahun UP

3.5.12.2.13 Ban dalam : 4 (empat) buah tahun UP

3.5.12.2.14 Bea Administrasi Uji Kendaraan kend/tahun UP

3.5.12.2.15

Bea Administrasi Daftar Ulang (tambahan Bea Materai Uji

dilaksanakan 1 tahun sebanyak 2 kali Daftar Ulang ditambah

Asuransi Kecelakaan Dalam Perjalanan (AKDP) ditambah

PPPK.

buah/tahun UP

3.5.12.3 Sedan/sejenis

Olie : 4 lt/bulan tahun UP

Olie gardan : 1 lt/6 bulan tahun UP

UP3.5.12.3.1 Bahan Bakar Non Subsidi : 20 lt/hari tahun

3.5.12.3.2

97

Page 25: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

Doorsmeer Biasa tahun UP

Doorsmeer Olie Mesran 4 (bl) tahun UP

Doorsmeer Lengkap Union 4 (bl) tahun UP

Doorsmeer Olie Union 4 (bl) tahun UP

Doorsmeer lengkap (termasuk Olie Mesin, Persneleng &

Gardan)

tahun UP

Perbaikan ringan / suku cadang tahun 4,712,000

Perbaikan berat tahun UP

Accu tahun UP

Ban luar : 4 (empat) buah tahun UP

Ban dalam : 4 (empat) buah tahun UP

Daftar ulang buah/tahun UP

3.5.13 Pemeliharaan Suku Cadang Bus

3.5.13.1 Kampas Rem Depan set 439,000

3.5.13.2 Kampas Rem Belakang set 512,000

3.5.13.3 Keep Rem Depan set 439,000

3.5.13.4 Keep Rem Belakang set 512,000

3.5.13.5 Filter Udara unit 256,000

3.5.13.6 Filter Solar unit 280,000

3.5.13.7 Oli Rem botol 48,000

3.5.13.8 Packing Silinder Heat set 1,585,000

3.5.13.9 Kabel Versneleng set 1,037,000

3.5.13.10 Water Inlet Atas set 353,000

3.5.13.11 Packing Manipol + Knalpot set 390,000

3.5.13.12 Fanbelt Dynamo set 390,000

3.5.13.13 Tutup Radiator pcs 72,000

3.5.13.14 Slang Radiator set 341,000

3.5.13.15 Ganti Grill Depan set 2,012,000

3.5.13.16 Sleep Cilinder set 365,000

3.5.13.17 Power Stering unit 20,740,000

3.5.14 Pemeliharaan Suku Cadang Sedan

3.5.14.1 Kampas Rem Depan set 878,000

3.5.14.2 Kampas Rem Belakang set 708,000

3.5.14.3 Filter Udara unit 512,000

3.5.14.4 Filter Bensin unit 475,000

3.5.14.5 Busi set 170,000

3.5.14.6 Sleep Disbrike set 244,000

3.5.14.7 Plendes set 1,183,000

3.5.14.8 Kampas Kopling set 1,067,000

3.5.14.9 Drug Lager set 646,000

3.5.14.10 Pangkon Versneleng set 341,000

3.5.14.11 Rotax set 415,000

3.5.14.12 Fanbelt Alternator set 213,000

3.5.14.13 Fanbelt Power AC set 146,000

3.5.14.14 Shock Beker Depan set 5,612,000

3.5.14.15 Shock Beker Belakang set 5,612,000

3.5.12.3.6

3.5.12.3.7

3.5.12.3.8

3.5.12.3.3

3.5.12.3.4

3.5.12.3.5

98

Page 26: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp. NO JENIS / NAMA BARANG SATUAN

3.5.15 Pemeliharaan Suku Cadang Jeep

3.5.15.1 Filter Udara unit 499,000

3.5.15.2 Filter Bensin unit 268,000

3.5.15.3 Lager Roda Depan set 1,195,000

3.5.15.4 Fanbelt Power AC set 341,000

3.5.15.5 Busi set 170,000

3.5.15.6 Shock Beker Depan set 1,902,000

3.5.15.7 Shock Beker Belakang set 878,000

3.5.15.8 Fanbelt Alternator set 232,000

3.5.15.9 Fanbelt Kecil set 170,000

3.5.15.10 Cross Joint set 1,037,000

3.5.15.11Transmisi Assy (Plat Kopling, Pompa Oli, Sensor, Bola

Versneleng)unit 24,400,000

3.5.16 Truck untuk Operasional Sampah

3.5.16.1 Solar 25 liter/ hari tahun UP

3.5.17 Buldoser

3.5.17.1 Solar 33 liter/ hari tahun UP

3.5.18 Biaya Perpanjangan STNK unit UP

3.5.19 Biaya Balik Nama unit UP

99

Page 27: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SEDANG RINGAN BERAT

Rp. Rp. Rp.

3.6 PEMELIHARAAN ALAT KESEHATAN

3.6.1 ALAT KESEHATAN

3.6.1.1 Audiometri + Audiometri

portebel

Unit/thn 2,594,000 5,188,000 8,487,000

3.6.1.2 Autoclave Unit/thn 942,000 2,594,000 3,631,000

3.6.1.3 Automatic processor Unit/thn 2,121,000 7,073,000 10,610,000

3.6.1.4 Autoscope Unit/thn 517,000 1,727,000 2,594,000

3.6.1.5 Bed Lithotomi Unit/thn 847,000 2,828,000 4,243,000

3.6.1.6 Bed Rehabilitasi Unit/thn 679,000 2,266,000 3,399,000

3.6.1.7 Bera Unit/thn 6,226,000 20,754,000 51,887,000

3.6.1.8 Biometri Unit/thn 5,188,000 9,053,000 22,636,000

3.6.1.9 Brancard Unit/thn 339,000 1,132,000 1,700,000

3.6.1.10 Cat Proyektor Unit/thn 2,262,000 7,544,000 18,861,000

3.6.1.11 Centrifuge Tabung Unit/thn 283,000 396,000 593,000

3.6.1.12 Combination Beauty,

Combination Skinmate 8

Fuction, Luxurious System

Unit/thn 1,413,000 4,714,000 7,073,000

3.6.1.13 Deluxe Bed Unit/thn 847,000 2,828,000 4,243,000

3.6.1.14 Dental Unit Unit/thn 5,658,000 7,923,000 11,883,000

3.6.1.15 Drying Sterilisator Unit/thn 141,000 197,000 296,000

3.6.1.16 ECG Unit/thn 1,700,000 5,666,000 8,500,000

3.6.1.17 ECT Unit/thn 2,075,000 6,918,000 10,376,000

3.6.1.18 Elektro Cauter Unit/thn 471,000 659,000 988,000

3.6.1.19 Endoscopy washer model EWD Unit/thn 9,430,000 14,146,000 21,221,000

3.6.1.20 ENT Unit Unit/thn 5,093,000 16,975,000 25,464,000

3.6.1.21 Fotometer Unit/thn 1,413,000 4,714,000 7,073,000

3.6.1.22 Hematologi analizer Unit/thn 1,034,000 3,448,000 5,174,000

3.6.1.23 Pesawat sinar X Unit/thn 310,000 1,037,000 1,555,000

3.6.1.24 Iluminator Unit/thn 295,000 985,000 1,477,000

3.6.1.25 Infra Red Unit/thn 985,000 3,284,000 4,927,000

3.6.1.26 Keratometri Unit/thn 1,886,000 4,323,000 6,485,000

3.6.1.27 Kursi hidrolis Unit/thn 452,000 1,508,000 3,772,000

3.6.1.28 Kursi roda Unit/thn 295,000 985,000 1,477,000

3.6.1.29 Lampu Kepala Unit/thn 55,000 188,000 283,000

3.6.1.30 Lampu Loop Unit/thn 367,000 1,225,000 1,838,000

3.6.1.31 Lensmeter Unit/thn 1,297,000 2,640,000 3,960,000

3.6.1.32 Meja Periksa Pasien Unit/thn 295,000 985,000 1,477,000

3.6.1.33 Microdermabrasi Unit/thn 471,000 659,000 988,000

3.6.1.34 Microlab 200 Unit/thn 1,696,000 5,658,000 8,487,000

3.6.1.35 Microscope Binokular Unit/thn 1,130,000 3,772,000 5,658,000

3.6.1.36 Microscope Operasi Unit/thn 2,594,000 8,647,000 12,972,000

3.6.1.37 Microscope Operasi mata Unit/thn 424,000 1,413,000 2,121,000

HARGA

PEMELIHARAAN NO JENIS / NAMA BARANG SATUAN

SPESIFIKA

SI

100

Page 28: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SEDANG RINGAN BERAT

Rp. Rp. Rp.

HARGA

PEMELIHARAAN NO JENIS / NAMA BARANG SATUAN

SPESIFIKA

SI

3.6.1.38 Microscope THT Unit/thn 1,696,000 5,658,000 8,487,000

3.6.1.39 Mycrolap 200 Unit/thn 1,037,000 3,459,000 5,188,000

3.6.1.40 Nebulizer Unit/thn 865,000 1,319,000 4,681,000

3.6.1.41 Needle Burner Unit/thn 2,828,000 9,430,000 14,146,000

3.6.1.42 OAE/Instrumentasi screning

Pendengaran The Otoread

Unit/thn 2,262,000 7,544,000 11,316,000

3.6.1.43 Optalmuscope / Funduscopi Unit/thn 566,000 791,000 1,187,000

3.6.1.44 Otopus Unit/thn 14,146,000 47,157,000 70,735,000

3.6.1.45 Otoscope Unit/thn 283,000 396,000 593,000

3.6.1.46 Pesawat sinar X Unit/thn 5,188,000 17,295,000 25,943,000

3.6.1.47 Pipet Unit/thn 113,000 376,000 566,000

3.6.1.48 Refraktometer Unit/thn 1,886,000 5,188,000 7,782,000

3.6.1.49 Sentrifuge Tabung Unit/thn 648,000 2,162,000 3,242,000

3.6.1.50 Slit lamp Unit/thn 847,000 2,828,000 4,243,000

3.6.1.51 Spektrofotometer Unit/thn 2,828,000 9,430,000 14,146,000

3.6.1.52 Spirometer Unit/thn 2,125,000 7,699,000 11,548,000

3.6.1.53 SPO2 Unit/thn 1,413,000 4,714,000 7,073,000

3.6.1.54 Stetoscope Unit/thn 277,000 368,000 553,000

3.6.1.55 Sterilisator Unit/thn 283,000 396,000 2,836,000

3.6.1.56 Suction Unit/thn 471,000 659,000 1,939,000

3.6.1.57 SWD Unit/thn 1,724,000 5,748,000 8,623,000

3.6.1.58 Tensimeter air raksa Unit/thn 193,000 271,000 1,297,000

3.6.1.59 Tensimeter Jarum Unit/thn 198,000 664,000 1,658,000

3.6.1.60 Tensimeter Mobile Unit/thn 258,000 865,000 1,297,000

3.6.1.61 Timpanometri Unit/thn 942,000 1,319,000 5,188,000

3.6.1.62 Tonometri non kontak Unit/thn 622,000 2,075,000 5,188,000

3.6.1.63 Tonsilektomy Unit/thn 197,000 659,000 988,000

3.6.1.64 USG mata Unit/thn 1,555,000 5,188,000 28,294,000

3.6.1.65 Vestibulometry Unit/thn 754,000 1,727,000 2,594,000

101

Page 29: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.6.2 PEMELIHARAAN ALAT LABORATORIUM (UPAH)

3.6.2.1 AAS unit/thn 11,973,000

3.6.2.2 AAS unit 3,076,000

3.6.2.3 AAS ( 2 Unit x 12 Bln ) keg 1,353,000

3.6.2.4 ABX Pentra unit/thn 8,551,000

3.6.2.5 ABX Pentra ( 2 Unit x 12 Bln ) keg 890,000

3.6.2.6 Air Compresor unit 184,000

3.6.2.7 Air Sampler unit 306,000

3.6.2.8Alat Sampling Udara/Air Sampler Kimia

unit306,000

3.6.2.9 Almari Asam ( 1 Unit x 12 Bln ) keg 281,000

3.6.2.10 Almari Asam/Fume house unit 2,835,000

3.6.2.11 Aspirator Whith Cooling Unit unit 614,000

3.6.2.12 Auto Analizer unit 3,076,000

3.6.2.13 Autoclave unit 1,757,000

3.6.2.14 Autometic Hematologi unit 368,000

3.6.2.15 Bio Containment Centrifuge unit 184,000

3.6.2.16 Biosafety Cabinet class II unit 491,000

3.6.2.17 Blood Sel Counter unit 461,000

3.6.2.18 Buchi Schrubeer unit 215,000

3.6.2.19 Buchi Schruber unit/thn 3,950,000

3.6.2.20 Buchi Schruber ( 1 bh x 12 bln) keg 342,000

3.6.2.21 Bunsen Burner unit 368,000

3.6.2.22 Cabinet Laminer Flow UV For PCR unit 1,475,000

3.6.2.23 Centrifuge unit/thn 1,804,000

3.6.2.24 Centrifuge unit 184,000

3.6.2.25 Centrifuge ( 10 bh x 12 bln) keg 125,000

3.6.2.26 Centrifuge digital unit 215,000

3.6.2.27 Centrifuge Dinac unit 215,000

3.6.2.28 Centrifuge Hematokrit unit 215,000

3.6.2.29 Centrifuge Rotatix 32 unit 215,000

3.6.2.30 Centrifuge Termo unit 294,000

3.6.2.31 Centrifuge Thermo unit/thn 3,385,000

3.6.2.32 Centrifuge Thermo ( 1 bh x 12 bln) keg 281,000

3.6.2.33 Clinipette Stand unit 184,000

3.6.2.34 CN. Ion Destilation Unit With Heater unit 861,000

3.6.2.35 CO Incubator unit 368,000

3.6.2.36 CO. Analiser unit 215,000

3.6.2.37 COD Aparatus unit 184,000

3.6.2.38 COD Reaktor unit 371,000

3.6.2.39 COD Reaktor keg 371,000

3.6.2.40 Colony Counter unit 6,615,000

3.6.2.41 Conductivitimeter unit 245,000

3.6.2.42 Cooling Water Circu Lation Unit unit 337,000

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

102

Page 30: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.2.43 Cromatografi Tipis (TLC) unit 676,000

3.6.2.44 Deep Freezer -86 C unit 1,845,000

3.6.2.45 Deminaliser unit 491,000

3.6.2.46 Desolvet Oxigenmeter (do) unit 461,000

3.6.2.47 Distilation Unit B 324 unit 491,000

3.6.2.48 Dry Oven unit/thn 3,950,000

3.6.2.49 Dry Oven ( 4 bh x 12 bln) keg 269,000

3.6.2.50 Dysystem M 435 unit 922,000

3.6.2.51 Electro Cardiograf unit 922,000

3.6.2.52 Filter System For Suspendit Solid unit 614,000

3.6.2.53 Finifier unit/thn 1,127,000

3.6.2.54 Finifier ( 1 bh x 12 bln) keg 97,000

3.6.2.55 Flor Destilation Unit With Heater unit 368,000

3.6.2.56 Flow Meter unit 91,000

3.6.2.57 Frezzer unit/thn 1,691,000

3.6.2.58 Frezzer ( 2 bh x 12 bln) keg 147,000

3.6.2.59 Fume House unit/thn 3,385,000

3.6.2.60 Fume House unit 294,000

3.6.2.61 Fume House ( 2 bh x 12 bln) keg 294,000

3.6.2.62 Furnace unit/thn 1,804,000

3.6.2.63 Furnace unit 156,000

3.6.2.64 Furnace ( 2 bh x 12 bln) keg 156,000

3.6.2.65 Gas Chromatografi unit 17,579,000

3.6.2.66 GC unit/thn 8,551,000

3.6.2.67 GC ( 1 Unit x 12 Bln ) keg 878,000

3.6.2.68Gel Imaging, Analisis sistim c/w Gel Elektro

phoresis unit1,537,000

3.6.2.69 Heater Dry blok unit 147,000

3.6.2.70 Heather unit/thn 1,691,000

3.6.2.71 Heather ( 1 bh x 12 bln) keg 147,000

3.6.2.72 Heating Blood unit 245,000

3.6.2.73 Hibrida Vapor Generator unit 1,537,000

3.6.2.74 Horyba ABX unit 2,460,000

3.6.2.75 Hotplate + Magnetic Stirrer unit 153,000

3.6.2.76 Humalizer 3000 unit 2,460,000

3.6.2.77 Humaset 20 unit 1,537,000

3.6.2.78 HVG - 1Hydride Vaporgeneral unit 922,000

3.6.2.79 HVS ( High Volum Sample) unit 6,670,000

3.6.2.80 Hygro Temperaturmeter unit 245,000

3.6.2.81 Incenerator unit 184,000

3.6.2.82 Incenerator ( 1 Unit x 12 Bln ) keg 168,000

3.6.2.83 Incubator unit 245,000

3.6.2.84 Incubator unit/thn 1,051,000

3.6.2.85 Incubator CO2 unit 306,000

103

Page 31: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.2.86 Inkobator CO2 unit/thn 5,078,000

3.6.2.87 Inkobator Co2 ( 2 bh x 12 bln) keg 397,000

3.6.2.88 Inkubator unit/thn 3,385,000

3.6.2.89 Inkubator (4 bh x 12 bln) keg 294,000

3.6.2.90 Intelligen Line Power Conditioner unit 184,000

3.6.2.91 Ion Selektivemeter/ PH unit 306,000

3.6.2.92 Laminar Flow unit 297,000

3.6.2.93 LED Automatic unit/thn 737,000

3.6.2.94 Lemari Es / Refregerator unit 184,000

3.6.2.95 Lemari Es Freser unit 184,000

3.6.2.96 Lemari Es Mini unit 184,000

3.6.2.97 Level Recorder unit 245,000

3.6.2.98 Luxmeter unit 122,000

3.6.2.99 Magnetic Stirrer With hot Plate unit 245,000

3.6.2.100Micro Sentrifuge Refigerated/Bio Fuge

unit306,000

3.6.2.101 Microskop Binokuler unit 184,000

3.6.2.102 Mikro Ellisa unit 1,845,000

3.6.2.103 Mikroskop unit/thn 1,127,000

3.6.2.104 Mikroskop ( 14 bh x 12 bln) keg 97,000

3.6.2.105 Mixer unit/thn 1,466,000

3.6.2.106 Mixer ( 1 bh x 12 bln) keg 126,000

3.6.2.107 Mixer / Vortex unit 126,000

3.6.2.108 MVU - I A Merquri Vaporizer unit unit 553,000

3.6.2.109 Nephelometer unit 306,000

3.6.2.110 Neraca Analitic unit 215,000

3.6.2.111 Neraca Analitis unit/thn 1,918,000

3.6.2.112 Neraca Analitis ( 3 bh x 12 bln) keg 166,000

3.6.2.113 Oil Analyser unit 245,000

3.6.2.114 Pentra XL 80 unit 3,076,000

3.6.2.115 PH Meter unit 196,000

3.6.2.116 PH - Meter unit/thn 2,256,000

3.6.2.117 PH - meter ( 1 bh x 12 bln) keg 195,000

3.6.2.118 Piston Phon unit 178,000

3.6.2.119Precisian Intergreating Sound Level Meter

unit553,000

3.6.2.120 Pure Water Supply Unit unit 799,000

3.6.2.121 Reader Mikro Elisa unit 2,728,000

3.6.2.122 Refrigerator unit/thn 1,127,000

3.6.2.123 Refrigerator (11 bh x 12 bln) keg 97,000

3.6.2.124 Rotary Sheker unit 245,000

3.6.2.125 Rotator unit 245,000

3.6.2.126 Rotor unit/thn 1,241,000

3.6.2.127 Rotor ( 1 bh x 12 bln) keg 108,000

3.6.2.128 Rotor / Evaporator Kordena Denis unit 245,000

104

Page 32: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.2.129 Scrubber B. 414 unit 306,000

3.6.2.130 Seker unit 245,000

3.6.2.131 Show Case unit/thn 2,821,000

3.6.2.132 Show Case (4 bh x 12 bln) keg 245,000

3.6.2.133 Showcase unit 245,000

3.6.2.134 Spectrofotometer unit/thn 4,617,000

3.6.2.135 Spectrofotometer ( 2 Unit x 12 Bln ) keg 401,000

3.6.2.136 Spectrofotometer / Reader unit 306,000

3.6.2.137 Spektrofotometer unit 306,000

3.6.2.138 Stardust MC 15 unit 2,956,000

3.6.2.139 Sterilisator unit/thn 1,051,000

3.6.2.140 Stomacher unit/thn 2,821,000

3.6.2.141 Stomacher ( 1 bh x 12 bln) keg 245,000

3.6.2.142T O C ( Total Organic Carbon Analyser )

unit263,000

3.6.2.143 Tensi Meter biasa unit 245,000

3.6.2.144 Thermal Cycler System unit 553,000

3.6.2.145 Timbangan Badan unit 91,000

3.6.2.146 Timbangan Electrik unit 184,000

3.6.2.147 Tube Mixer unit 91,000

3.6.2.148 Turbidimeter unit 184,000

3.6.2.149 Ultra Sonic Cleaning But unit 368,000

3.6.2.150 Ultra Sonic Pipet Clener unit 368,000

3.6.2.151 UV Visible Spektro Fotometer unit 306,000

3.6.2.152 Vacum Pump unit 184,000

3.6.2.153 Vortex Mixer unit 148,000

3.6.2.154 Water Bath unit/thn 2,256,000

3.6.2.155 Water Bath unit 156,000

3.6.2.156 Water Bath ( 6 bh x 12 bln) keg 156,000

3.6.2.157 Water Monitoring Equipmen unit 430,000

3.6.2.158 Zoom Stereo Mikroskop unit 306,000

3.6.3

3.6.3.1 Adjustable Mikropipette Type 50c825,

100-1000 ul

unit/thn 8,034,000

3.6.3.2 Analitycal Balance unit/thn 1,042,000

3.6.3.3 Autoclave unit/thn 258,000

3.6.3.4 Autosampler Attachment System unit/thn 195,662,000

3.6.3.5 BOD Incubator unit/thn 126,921,000

3.6.3.6 Centrifuge unit/thn 1,490,000

3.6.3.7 Colony Counter bh/thn 930,000

3.6.3.8 Conducting Orion -100 ml bh/thn 859,000

3.6.3.9 Conductivity meter unit/thn 19,106,000

3.6.3.10 Cooling Circulation Aspirator bh/thn 906,000

3.6.3.11 Current Meter (Flowmeter mt aliran

terbuka)

Type FP 101 unit/thn 28,507,000

PEMELIHARAAN ALAT LABORATORIUM

105

Page 33: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.3.12 Deep Freezer 70 Derajat

Celcius

unit/thn 234,537,000

3.6.3.13 Densitometer Type DMA 35 N unit/thn 61,483,000

3.6.3.14 Digital Thermometer bh/thn 1,845,000

3.6.3.15 Dissolved Oxigen -100 ml bh/thn 859,000

3.6.3.16 Dust Air Sampler Type HV 500 F unit/thn 259,156,000

3.6.3.17 Flameless Analysis System unit/thn 385,170,000

3.6.3.18 Gas Chromatograpy bh/thn 15,996,000

3.6.3.19 Haematology Analiser unit/thn 2,591,000

3.6.3.20 Heating Mantle bh/thn 1,845,000

3.6.3.21 HPLC (High Performance Liquid

Chromatography) bh/thn17,579,000

3.6.3.22 HPLC Quatenary Low Gradient uv V15 ditector unit/thn 680,934,000

3.6.3.23 Hy yro Thermometer Type RM R-132

HGH

unit/thn 2,526,000

3.6.3.24 Hygrometer 10-70% unit/thn 318,000

3.6.3.25 Incubator unit/thn 1,107,000

3.6.3.26 Kompresor Vacum Pump bh/thn 499,000

3.6.3.27 Lampu Deuterium AA Spektrofotometer Buah 3,886,000

3.6.3.28 Lampu Digital AAS bh/thn 11,453,000

3.6.3.29 Lampu Iodide Tungsten Buah 3,886,000

3.6.3.30 Micro Buret Automatic bh/thn 1,288,000

3.6.3.31 Micro Pipet unit/thn 595,000

3.6.3.32 Microbial ID System unit/thn 193,071,000

3.6.3.33 Microscope Binocular unit/thn 1,862,000

3.6.3.34 Microscope Digital Camera unit/thn 157,991,000

3.6.3.35 Microscope Monocular unit/thn 3,463,000

3.6.3.36 Microscope Teaching (5 or) unit/thn 196,988,000

3.6.3.37 Microscope Trinocular unit/thn 2,010,000

3.6.3.38 Microskop Binoculer unit/thn 4,306,000

3.6.3.39 Microskop Binoculer cx 21 unit/thn 15,548,000

3.6.3.40 Mufle Furnace bh/thn 1,845,000

3.6.3.41 Oven unit/thn 1,712,000

3.6.3.42 Pemanas / Climate Chamber 300 - 1200 °C bh/thn 1,101,000

3.6.3.43 Pemeliharaan Alat AAS bh/thn 16,406,000

3.6.3.44 Penangas bh/thn 1,101,000

3.6.3.45 PH Meter unit/thn 20,464,000

3.6.3.46 Photometer unit/thn 2,235,000

3.6.3.47 Portable Turbiditymeter Type 966-IR unit/thn 34,921,000

3.6.3.48 Refractometer bh/thn 1,599,000

3.6.3.49 Refrigerator unit/thn 4,226,000

3.6.3.50 Rotary Evaporator bh/thn 1,845,000

3.6.3.51 Safety Cabinet unit/thn 1,490,000

3.6.3.52 Smoking Machine bh/thn 75,610,000

3.6.3.53 Sokes Type L864 unit/thn 5,101,000

3.6.3.54 Spectrofotometer UV-VIS bh/thn 15,996,000

106

Page 34: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.3.55 Spektrofotometer bh/thn 1,066,000

3.6.3.56 Spektrofotometer UV VIS 1600 bh/thn 5,726,000

3.6.3.57 Tensile Strengh Tester bh/thn 1,845,000

3.6.3.58 Thermomagnestir bh/thn 906,000

3.6.3.59 Timbangan Neraca unit/thn 1,116,000

3.6.3.60 Total Organic Carbon ( TOC ) bh/thn 5,182,000

3.6.3.61 Turbidi Meter 300 - 1200 °C bh/thn 859,000

3.6.3.62 Urin Analiser unit/thn 3,886,000

3.6.3.63 Water Bath unit/thn 2,235,000

3.6.4 SPARE PART ALAT LABORATORIUM

3.6.4.1 AAS unit 57,047,000

3.6.4.2 ABX Pentra 400 unit 3,790,000

3.6.4.3 Buchi Schruber unit 3,164,000

3.6.4.4 Centrifuge unit 1,179,000

3.6.4.5 Centrifuge Hematocrit unit 2,259,000

3.6.4.6 Centrifuge Hemolisat unit 3,113,000

3.6.4.7 Centrifuge Rotation unit 2,161,000

3.6.4.8 Centrifuge Thermo unit 1,728,000

3.6.4.9 Clinipette unit 239,000

3.6.4.10 COD Reaktor unit 632,000

3.6.4.11 Colony Counter unit 302,000

3.6.4.12 Conductivitimeter unit 1,060,000

3.6.4.13 Dry Oven unit 2,711,000

3.6.4.14 Elektroforesis unit 264,000

3.6.4.15 Filter Spectrofotometer unit 7,958,000

3.6.4.16 Finifier unit 1,316,000

3.6.4.17 Frezzer unit 1,691,000

3.6.4.18 Fume House unit 5,643,000

3.6.4.19 Furnace unit 1,965,000

3.6.4.20 GC unit 54,145,000

3.6.4.21 Heater unit 1,127,000

3.6.4.22 Humaliser 3000 unit 2,804,000

3.6.4.23 HVS (High Volum Sample) unit 6,670,000

3.6.4.24 Hygrothermometer unit 90,000

3.6.4.25 Inkobator Co2 unit 4,519,000

3.6.4.26 Inkubator unit 2,161,000

3.6.4.27 Kulkas unit 408,000

3.6.4.28 Kuvet Spectrofotometer unit 795,000

3.6.4.29 Laminar Flow unit 4,020,000

3.6.4.30 Lampu Spectrofotometer unit 615,000

3.6.4.31 Mikroskop unit 1,965,000

3.6.4.32 Mixer unit 981,000

3.6.4.33 Neraca Analitis unit 3,616,000

3.6.4.34 Pentra 80 unit 1,137,000

107

Page 35: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.4.35 PH - meter unit 4,519,000

3.6.4.36 Reader Mikro Elisa unit 2,728,000

3.6.4.37 Refrigerator unit 1,571,000

3.6.4.38 Rotor unit 751,000

3.6.4.39 Showcase unit 2,034,000

3.6.4.40 Sismex unit 2,122,000

3.6.4.41 Stardust MC 15 unit 2,956,000

3.6.4.42 Stomacher unit 2,445,000

3.6.4.43UV dan Data pock look Spectrofotometer unit 5,210,000

3.6.4.44 Vortex mixer unit 669,000

3.6.4.45 Water Bath unit 5,895,000

3.6.5

3.6.5.1 AAS lampu, filter,

board unit57,047,000

3.6.5.2 Air Compresor oil unit 60,000

3.6.5.3 Air Sampler filter, motor unit 3,076,000

3.6.5.4 Alat Sampling Udara/Air Sampler Kimia filter, motor unit

3,076,000

3.6.5.5 Almari Asam lampu, blower unit 1,845,000

3.6.5.6 Aspirator Whith Cooling Unit unit 614,000

3.6.5.7 Auto Analizer mikro needle,

pipa kapiler unit18,457,000

3.6.5.8 Autoclave heater,

temperatur

control

unit 2,472,000

3.6.5.9 Automatic Film Processor unit 7,418,000

3.6.5.10 Autometic Hematologi unit 922,000

3.6.5.11 Bed Set Monitor unit 6,358,000

3.6.5.12 Bio Containment Centrifuge motor, IC unit 614,000

3.6.5.13 Biosafety Cabinet class II RH filter, lampu unit 1,845,000

3.6.5.14 Blancar unit 647,000

3.6.5.15 Buchi Schrubeer pump micro,

pipa capilair unit3,164,000

3.6.5.16 Bunsen Buner heater,

temperatur

control

unit 922,000

3.6.5.17 C O D Aparatus unit 614,000

3.6.5.18 C O D Reaktor unit 632,000

3.6.5.19 C O. Analiser unit 614,000

3.6.5.20 Cabinet Laminer Flow UV For PCR UV-lampu unit 922,000

3.6.5.21 Centrifuge rotor/motor,

timer unit1,845,000

3.6.5.22 Centrifuge digital rotor/motor,

timer unit1,845,000

3.6.5.23 Centrifuge Dinac rotor/motor,

timer unit1,845,000

PEMELIHARAAN ALAT KESEHATAN PENGGANTIAN SPARE PART

108

Page 36: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.5.24 Centrifuge Hematokrit temperature

control,

rotor/motor,

timer

unit

2,259,000

3.6.5.25 Centrifuge Rotatix 32 temperature

control,

rotor/motor,

timer

unit

2,259,000

3.6.5.26 Centrifuge Termo temperature

control,

rotor/motor,

timer

unit

2,259,000

3.6.5.27 Clinipette Stand shell, pegas unit 306,000

3.6.5.28 CN. Ion Destilation Unit With Heater heater,

temperatur

control

unit 2,460,000

3.6.5.29 CO Incubator IC control,

heater,

temperature

control

unit 2,768,000

3.6.5.30 Colony Counter unit 3,999,000

3.6.5.31 Condhitivitimeter unit 1,599,000

3.6.5.32 Cooling Water Circu Lation Unit unit 891,000

3.6.5.33 Deep Freezer -86 C filter, pipa

laminair, IC,

control

temperature

unit

3,691,000

3.6.5.34 Deminaliser unit 1,475,000

3.6.5.35 Desolvet Oxigenmeter (do) unit 3,383,000

3.6.5.36 Diathermi unit 1,942,000

3.6.5.37 Distilation Unit B 324 unit 922,000

3.6.5.38 Doppler unit 1,294,000

3.6.5.39 Dry Oven heater,

temperatur

control

unit 2,472,000

3.6.5.40 Dysystem M 435 unit 768,000

3.6.5.41 ECG Portable unit 3,885,000

3.6.5.42 Electro Cardiograf unit 2,338,000

3.6.5.43 Electro Surgical Unit unit 6,641,000

3.6.5.44 Filter System For Suspendit Solid unit 2,338,000

3.6.5.45 Flor Destilation Unit With Heater heater,

temperatur

control unit

922,000

3.6.5.46 Flow Meter unit 1,129,000

3.6.5.47 Fotometer (cuvet & Filter) unit 8,422,000

3.6.5.48 Freezer - 80o filter, pipa

laminair, IC,

control

temperature

unit

3,691,000

3.6.5.49 Frezer filter, pipa

laminair, IC,

control

temperature

unit

922,000

109

Page 37: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.5.50 Furnace heater,

temperatur

control

unit 1,965,000

3.6.5.51 Gas Cromatograf VGA card,

board, filter,

instalasi gas unit

54,145,000

3.6.5.52 Hematologi Analyzer unit 2,979,000

3.6.5.53 Hotplate + Magnetic Stirrer heater,

temperatur

control unit

1,175,000

3.6.5.54 Humalizer 3000 unit 2,804,000

3.6.5.55 HVS ( High Volum Sample) filter, motor unit 3,076,000

3.6.5.56 Incenerator asbes, blower,

burner,

membran,

injection pump,

batu/semen

tahan api

unit

6,153,000

3.6.5.57 Incubator filter, pipa

laminair, IC,

control

temperature

unit

2,161,000

3.6.5.58 Incubator CO2 filter, pipa

laminair, IC,

control

temperature

unit

4,519,000

3.6.5.59 Ion Selektivemeter/ PH unit 922,000

3.6.5.60 Kursi Roda unit 906,000

3.6.5.61 Laminar Flow unit 4,020,000

3.6.5.62 Lampu Mikroskop Binokuler unit 306,000

3.6.5.63 Lampu Operasi unit 2,591,000

3.6.5.64 Lampu Spectrofotometer unit 676,000

3.6.5.65 Lampu Tindakan unit 1,942,000

3.6.5.66 Lemari Es / Refregerator filter, pipa

laminair, IC,

control

temperature

unit

614,000

3.6.5.67 Lemari UV UV-lampu unit 153,000

3.6.5.68 Level Recorder unit 306,000

3.6.5.69 Lux meter unit 368,000

3.6.5.70 Magnetic Stirrer With hot Plate stirer, heater unit 245,000

3.6.5.71 Mercury Vaporizer unit 245,000

3.6.5.72 Mesin Anesthesi unit 6,478,000

3.6.5.73 Micro Sentrifuge Refigerated / Bio Fuge rotor/motor,

timer unit1,845,000

3.6.5.74 Microskop Binokuler CX - 31 lampu, lensa

okuler unit

614,000

3.6.5.75 Mikro Ellisa unit 922,000

3.6.5.76 Mikroskop unit 1,554,000

3.6.5.77 Mikroskop Binokuler unit 1,965,000

3.6.5.78 Mixer / Vortex unit 981,000

110

Page 38: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.5.79 MVU - I A Merquri Vaporizer unit unit 614,000

3.6.5.80 Nebulizer unit 2,591,000

3.6.5.81 Nephelometer unit 3,076,000

3.6.5.82 Neraca analitic unit 614,000

3.6.5.83 Oil Analyser unit 614,000

3.6.5.84 Oven heater,

temperatur

control

unit 922,000

3.6.5.85 Oven / Mikrowave heater,

temperatur

control

unit 922,000

3.6.5.86 Pentra XL 80 unit 36,916,000

3.6.5.87 Pesawat Radiologi unit 7,773,000

3.6.5.88 PH Meter unit 4,519,000

3.6.5.89 Reader Mikro Elisa unit 2,728,000

3.6.5.90 Rotary Sheker unit 645,000

3.6.5.91 Rotator unit 245,000

3.6.5.92 Rotor / Evaporator Kordena Denis unit 184,000

3.6.5.93 Scrubber B. 414 unit 891,000

3.6.5.94 Showcase unit 2,034,000

3.6.5.95 Spectrofotometer / Reader lampu, cuvet unit 1,906,000

3.6.5.96 Spektrofotometer lampu, cuvet unit 1,906,000

3.6.5.97 Spektrofotometri unit 2,591,000

3.6.5.98 Standart Infus unit 128,000

3.6.5.99 Stardust MC 15 unit 2,956,000

3.6.5.100 Suction pump unit 1,229,000

3.6.5.101 T O C ( Total Organic Carbon Analyser ) unit

1,107,000

3.6.5.102 Tempat Tidur unit 518,000

3.6.5.103 Tensi Meter Hg air raksa, man

set unit 614,000

3.6.5.104 Tensimeter unit 63,000

3.6.5.105 Thermal Cycler System unit 399,000

3.6.5.106 Timbangan Badan unit 245,000

3.6.5.107 Timbangan Electric unit 306,000

3.6.5.108 Troly O2 unit 128,000

3.6.5.109 Tube Mixer unit 891,000

3.6.5.110 Turbidimeter unit 430,000

3.6.5.111 Ultra Sonic Cleaning But unit 91,000

3.6.5.112 Ultra Sonic Pipet Clener unit 91,000

3.6.5.113 Ultrasonografi unit 4,535,000

3.6.5.114 UV Visible Spektro Fotometer UV-lampu unit 922,000

3.6.5.115 Vacum Pump unit 140,000

3.6.5.116 Vortex Mixer unit 669,000

3.6.5.117 Water Bath heater,

temperatur

control

unit 922,000

3.6.5.118 Water Monitoring Equipment steak unit 645,000

111

Page 39: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.5.119 Zoom Stereo Mikroskop unit 614,000

3.6.6 Jasa Service

3.6.6.1 Tensimeter Air Raksa buah 300,000

3.6.6.2 Suction Pump buah 750,000

3.6.6.3 Sterilisator buah 1,000,000

3.6.6.4 ECG buah 1,000,000

3.6.6.5 Baby Incubator buah 2,000,000

3.6.6.6 Nebulizer buah 750,000

3.6.6.7 Fetal Doppler buah 1,000,000

3.6.6.8 Vacum Extraktor buah 750,000

3.6.6.9 Centifuge buah 1,000,000

3.6.6.10 Bedside Monitor buah 5,000,000

3.6.6.11 Treadmill buah 7,000,000

3.6.6.12 Infant Warmer buah 2,000,000

3.6.6.13 Blue Ligh buah 750,000

3.6.6.14 SWD buah 3,000,000

3.6.6.15 X-Ray Panoramic buah 10,000,000

3.6.6.16 USG buah 8,000,000

3.6.6.17 X-Ray Mobile buah 10,000,000

3.6.6.18 X-Ray Unit buah 10,000,000

3.6.6.19 Defibrilator buah 5,000,000

3.6.6.20Ventilator buah 8,000,000

3.6.6.21 Anasthesi Ventilator buah 8,000,000

3.6.6.22 Mikropipet buah 500,000

3.6.6.23 ESU buah 5,000,000

3.6.6.24 UST buah 1,000,000

3.6.6.25 Elektro terapi buah 1,000,000

3.6.6.26 Pulse Oximetri buah 1,000,000

3.6.6.27 Lampu Operasi buah 5,000,000

3.6.6.28 Spirometri buah 3,000,000

3.6.6.29 Meja Operasi buah 5,000,000

3.6.6.30 Echo buah 8,000,000

3.6.6.31 Microscope Operasi Mata buah 8,000,000

3.6.6.32 CPAP buah 5,000,000

3.6.6.33 CTG buah 2,000,000

3.6.6.34 Dental Unit buah 1,000,000

3.6.6.35 Traksi Lumbal buah 5,000,000

3.6.6.36 EEG buah 5,000,000

3.6.6.37 ENT buah 1,000,000

3.6.6.38 Incubator Transport buah 2,000,000

3.6.6.39 Infuse Pump buah 5,000,000

3.6.6.40 Pompa Asi Elektrik buah 2,000,000

3.6.6.41 Syringe Pump buah 5,000,000

112

Page 40: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.6.42 C-Arm buah 10,000,000

3.6.6.43 Infant Blendig Resusitator buah 2,000,000

3.6.7 ALAT KEDOKTERAN

3.6.7.1 Bed Rehabilitasi Unit/thn 1,593,000

3.6.7.2 Bera Unit/thn 36,478,000

3.6.7.3 Brancard Unit/thn 796,000

3.6.7.4 ECG Unit/thn 3,983,000

3.6.7.5 Infra Red Unit/thn 2,770,000

3.6.7.6 Kursi roda Unit/thn 692,000

3.6.7.7 Meja Periksa Pasien Unit/thn 692,000

3.6.7.8 Nebulizer Unit/thn 2,632,000

3.6.7.9 Spirometer Unit/thn 1,593,000

3.6.7.10 Steoscope Unit/thn 207,000

3.6.7.11 Sterilisator Unit/thn 1,731,000

3.6.7.12 Suction Pump Unit/thn 1,454,000

3.6.7.13 Tensimeter Mobile Unit/thn 607,000

3.6.7.14 Timbangan Badan Unit/thn 346,000

3.6.8 ALAT LABORATORIUM

3.6.8.1 Analitycal Balance unit/thn 1,344,000

3.6.8.2 Autoclave unit/thn 442,000

3.6.8.3 Automatic Photometer unit/thn 23,707,000

3.6.8.4 Biosafety Cabinet unit/thn 2,214,000

3.6.8.5 Centrifuge unit/thn 2,547,000

3.6.8.6 Haematology Analiser unit/thn 7,678,000

3.6.8.7 Incubator unit/thn 1,893,000

3.6.8.8 LED Analizer unit/thn 2,509,000

3.6.8.9 Micro Pipet unit/thn 678,000

3.6.8.10 Microscope unit/thn 2,591,000

3.6.8.11 Microscope Binocular unit/thn 2,398,000

3.6.8.12 Oven unit/thn 2,207,000

3.6.8.13 Photometer unit/thn 3,321,000

3.6.8.14 Timbangan Neraca unit/thn 1,274,000

3.6.8.15 Urin Analiser unit/thn 2,953,000

3.6.8.16 Water Bath unit/thn 2,547,000

3.6.9 ALAT RADIOLOGI

3.6.9.1 Automatic Processor set 3,119,000

3.6.9.2 Biaya film bedge+ film kontrol unit/thn 1,771,000

3.6.9.3 ijin Pesawat Sinar X unit/thn 1,229,000

3.6.9.4 Pesawat Rontgen Mobile set 11,517,000

3.6.9.5 Pesawat Rontgen Stationer set 31,673,000

3.6.10 Belanja Pemeliharaan Alkes

3.6.10.1 Bed side monitor unit 24,180,000

3.6.10.2 Cell Dyne 1800 unit 18,481,000

3.6.10.3 DC shock unit 3,108,000

113

Page 41: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.10.4 Dental Unit unit 21,345,000

3.6.10.5 EEG unit 9,815,000

3.6.10.6 Oksigen Concentrator unit 17,323,000

3.6.10.7 Oksigen consentrator unit 1,554,000

3.6.10.8 Phtometer unit 1,004,000

3.6.10.9 Suction Pump unit 1,595,000

3.6.10.10 Tempat tidur beroda unit 582,000

3.6.10.11 Tensimeter Air Raksa unit 65,000

3.6.11 Kalibrasi Peralatan Laboratorium

3.6.11.1 KIMIA

3.6.11.1.1 AAS unit 4,244,000

3.6.11.1.2 Autoclave unit 273,000

3.6.11.1.3 Automatic Photometer unit 136,000

3.6.11.1.4 Buret buah 614,000

3.6.11.1.5 CO Analiser unit 2,037,000

3.6.11.1.6 COD reaktor unit 2,037,000

3.6.11.1.7 Conductivitimeter unit 1,017,000

3.6.11.1.8 ECG unit 156,000

3.6.11.1.9 Hematology Analizer unit 596,000

3.6.11.1.10 Hygrothermometer unit 296,000

3.6.11.1.11 LED Analiser unit 516,000

3.6.11.1.12 Lux unit 1,528,000

3.6.11.1.13 Micro Pipet unit 614,000

3.6.11.1.14 Multi Burrete unit 614,000

3.6.11.1.15 Nebulizer buah 191,000

3.6.11.1.16 Oven buah 933,000

3.6.11.1.17 Ph meter unit 678,000

3.6.11.1.18 Photometer unit 122,000

3.6.11.1.19 Pipette Gondok unit 614,000

3.6.11.1.20 Refrigerator/Lemari Es unit 922,000

3.6.11.1.21 Sand Levelmeter unit 1,017,000

3.6.11.1.22 Spektrofotometer unit 3,056,000

3.6.11.1.23 Spirometer unit 129,000

3.6.11.1.24 Tensimeter unit 79,000

3.6.11.1.25 Thermometer unit 799,000

3.6.11.1.26 Timbangan Analitik buah 593,000

3.6.11.1.27 Timbangan Neraca buah 474,000

3.6.11.1.28 Tranfer Pipette unit 614,000

3.6.11.1.29 Turbidimeter buah 721,000

3.6.11.1.30 Urin Analizer unit 430,000

3.6.11.1.31 UV lamp unit 127,000

3.6.11.1.32 UV-Visible Spectrofotometer unit 922,000

3.6.11.1.33 Volt pipet 10 ml buah 184,000

3.6.11.1.34 Volt pipet 100 ml buah 184,000

114

Page 42: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN HARGA

RP.

3.6.11.1.35 Volt pipet 15 ml buah 184,000

3.6.11.1.36 Volt pipet 20 ml buah 184,000

3.6.11.1.37 Volt pipet 25 ml buah 184,000

3.6.11.1.38 Volt pipet 5 ml buah 184,000

3.6.11.1.39 Volt pipet 50 ml buah 184,000

3.6.11.1.40 Volumetric Pipette unit 614,000

3.6.11.2 MIKROBIOLOGI

3.6.11.2.1 Air sampler unit 1,642,000

3.6.11.2.2 Analitic Balance buah 958,000

3.6.11.2.3 Autoclave buah 1,505,000

3.6.11.2.4 Boi Safety Cabinet unit 1,916,000

3.6.11.2.5 Centrifuge unit 1,389,000

3.6.11.2.6 Clinipatte buah 684,000

3.6.11.2.7 Electronic Balance unit 991,000

3.6.11.2.8 Fin Pipette unit 991,000

3.6.11.2.9 Freezer buah 1,786,000

3.6.11.2.10 Geaduated Pipette unit 991,000

3.6.11.2.11 Health Scale unit 1,897,000

3.6.11.2.12 Inkubator buah 1,488,000

3.6.11.2.13 Inkubator 44oC buah 958,000

3.6.11.2.14 Laminar Air Flow unit 1,368,000

3.6.11.2.15 Mikroskop buah 546,000

3.6.11.2.16 Oven buah 958,000

3.6.11.2.17 Show Case buah 958,000

3.6.11.2.18 Vortex unit 1,368,000

3.6.11.2.19 Waterbath unit 309,000

3.6.11.3 PATOLOGI

3.6.11.3.1 Centrifuge Hematokrit unit 593,000

3.6.11.3.2 Centrifuge Refregerator unit 593,000

3.6.11.3.3 Centrifuge Sigma unit 593,000

3.6.11.3.4 Clinipatte buah 382,000

3.6.11.3.5 EKG buah 1,697,000

3.6.11.3.6 Minividas unit 62,000

3.6.11.3.7 Show Case buah 593,000

3.6.11.3.8 Spektrofotometer unit 3,056,000

3.6.11.3.9 Tensimeter buah 168,000

3.6.11.3.10 Timbangan BB buah 509,000

115

Page 43: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.7

3.7.1 Pemeliharaan Prasarana LLAJ

3.7.1.1 Tera :

3.7.1.1.1Jembatan Timbang

Elektronik

50-80 ton unit/thn 2,239,000 11,200,000 UP

3.7.1.1.2Jembatan Timbang

Elektronik Portable

set/thn 1,521,000 7,605,000 UP

3.7.1.1.3Sertifikasi Alat

Penimbangan

unit/thn - 1,050,000 -

3.7.1.1.4

Sewa Truk Pengangkut

Peralatan Service Alat

Penimbangan

unit/thn - 1,750,000 -

3.7.1.2 Service :

3.7.1.2.1Jembatan Timbang

Elektronik 1 set

unit/thn 13,437,000 18,323,000 UP

3.7.1.2.2Jembatan Timbang

Elektronik Portable

unit/thn 10,383,000 14,658,000 UP

3.7.1.2.3Komputer Jembatan

Timbang

unit/thn 1,832,000 7,329,000 UP

3.7.1.2.4Pemeliharaan Alat

Penimbangan

unit/thn 12,215,000 54,968,000 UP

3.7.1.2.5

Pemeliharaan Generator

Set Jembatan Timbang

unit/thn 1,832,000 6,108,000 UP

3.7.1.2.6Pemeliharaan Traffic Light unit/thn 6,108,000 12,215,000 UP

3.7.1.2.7Pembersihan Saringan (

Sumur Bor )

Kedalaman 70 m,

dia. 4"

unit/thn - 3,275,000 -

3.7.1.3

3.7.1.3.1 Kecil unit/thn 183,000 489,000 UP

3.7.1.3.2 Besar unit/thn 1,222,000 - UP

3.7.1.3.3

Marka Jalan/Zebra Cross

Meter = Meter Marka

m'/thn 5,000 27,000 UP

3.7.1.3.4Mobil Unit Pengujian (PKB)

Portable

unit/thn - - UP

3.7.1.3.5 Guard Rail m/thn 550,000 1,222,000 UP

3.7.1.3.6 Detinator unit/thn 30,000 - UP

3.7.1.4 Kalibrasi :

3.7.1.4.1Kalibrasi Alat Uji

Kendaraan Bermotor

unit 3,500,000 14,001,000 UP

3.7.1.4.2Sertifikasi Alat Uji

Kendaraan Bermotor

unit - 1,050,000

3.7.1.4.3Service Alat Uji Kendaraan

Bermotor

unit 3,500,000 14,001,000 UP

NO

HARGA

JENIS PEMELIHARAAN

Rambu-rambu Lalu-lintas :

PEMELIHARAAN PRASARANA LLAJ, PEKERJAANUMUM, DAN DINAS CIPKATARU

JENIS / NAMA BARANG SATUAN

116

Page 44: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO

HARGA

JENIS PEMELIHARAANJENIS / NAMA BARANG SATUAN

3.7.1.4.4

Service Dan Kalibrasi Alat

Uji Kendaraan Bermotor

unit 15,269,000 30,538,000 UP

117

Page 45: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO

HARGA

JENIS PEMELIHARAANJENIS / NAMA BARANG SATUAN

3.7.2

3.7.2.1 Air Compressor unit - 4,886,000 -

3.7.2.2 Aspalt Sprayer unit - 4,886,000 -

3.7.2.3 Baby Roller 0,75 T unit - 3,664,600 -

3.7.2.4 Backhoe Loader unit - 18,322,800 -

3.7.2.5 Buldoser unit - 18,322,800 -

3.7.2.6 Cold Mining unit - 61,075,900 -

3.7.2.7 Crane Tadano 15 T unit - 18,322,800 -

3.7.2.8 Dump truck unit - 12,215,200 -

3.7.2.9 F.B. truck with Crane unit - 12,215,200 -

3.7.2.10 Loadcell 30 ton unit - 2,320,100 13,366,700

3.7.2.11 Motor Grader unit - 24,430,300 -

3.7.2.12 Road Roller 6 - 8 T unit - 9,161,400 -

3.7.2.13 Tandem Roller 3 T unit - 9,161,400 -

3.7.2.14 Tire Roller 6 T unit - 18,322,800 -

3.7.2.15 Trailler Truck unit - 18,322,800 -

3.7.2.16 Vibration Roleer 8 T unit - 18,322,800 -

3.7.2.17 Wheel Loader unit - 18,322,800 -

3.7.2.18 Mesin Concrete Block

Testerunit 5,000,000 20,000,000

3.7.2.19 Mesin Core Drill unit 2,000,000 5,000,000

3.7.2.20 Hammer Test unit 700,000 1,500,000

3.7.2.21 Ekstraktor Aspal unit 500000 1,300,000

3.7.3 Kalibrasi

3.7.3.1 Autoclave bh/th - - 684,500

3.7.3.2Automatic Marshal

Hammer

bh/th - - 12,215,200

3.7.3.3 Buret 100 ml bh/th - - 289,600

3.7.3.4 Conductivity bh/th - - 631,800

3.7.3.5Daktilitas (Tensionmeter) bh/th - - 1,264,300

3.7.3.6 DWT 1 Piston 0-120 Bar bh/th - - 2,106,000

3.7.3.7 Electric Oven bh/th - - 3,053,800

3.7.3.8 Electric Pump bh/th - - 366,500

3.7.3.9 Ellen Meyer 100 ml bh/th - - 268,500

3.7.3.10 Furnace 3000C bh/th - - 763,600

3.7.3.11 Furnace 300-12000C bh/th - - 954,600

3.7.3.12 Gelas Ukur < 499 ml bh/th - - 232,000

3.7.3.13 Gelas Ukur 500-1000 ml bh/th 263,300

3.7.3.14 Indicator Dial - CBR 0-10 mm bh/th - - 1,421,600

3.7.3.15 Inkubator 0-1000C bh/th - - 895,100

3.7.3.16 Kondensor Reflux bh/th - - 3,359,200

Pemeliharaan Prasarana Pekerjaan Umum

118

Page 46: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO

HARGA

JENIS PEMELIHARAANJENIS / NAMA BARANG SATUAN

3.7.3.17 Manometer/DialGauge bh/th - - 2,369,300

3.7.3.18Manometer/Pressure

Gauge200-600 Kg/cm

2 bh/th - - 545,200

3.7.3.19Manometer/Pressure

Gauge300-600 Kg/cm2 bh/th - - 545,200

3.7.3.20 Mesin Tekan 500-1000 Kgf bh/th - - 2,000,700

3.7.3.21Mesin Tekan - Dial Force

Indicator

100-500 Kgf bh/th - - 2,632,500

3.7.3.22Mesin Tekan - Force Gauge 500-1000 Kgf bh/th - -

2,000,700

3.7.3.23 Oven - 3000C bh/th - - 895,100

3.7.3.24 Oven 300-12000C bh/th - - 947,700

3.7.3.25 Penetrasi bh/th - - 986,400

3.7.3.26 Penetrasi Aspal bh/th - - 1,316,300

3.7.3.27 Penetrometer bh/th - - 1,316,300

3.7.3.28 pH Meter 1 proof bh/th - - 696,100

3.7.3.29 pH Meter 2 proof bh/th - - 684,500

3.7.3.30 Pignometer <100 ml bh/th - - 232,000

3.7.3.31 Pignometer 101 - 500 ml bh/th - - 221,100

3.7.3.32 Pipet Volume 100 ml bh/th - - 268,500

3.7.3.33 Proving Ring 0-200 kN bh/th - - 1,842,800

3.7.3.34 Proving Ring - CBR bh/th - - 1,316,300

3.7.3.35 Proving Ring + Dial bh/th - - 1,832,300

3.7.3.36 Saringan bh/th - - 1,842,800

3.7.3.37Spektrofotometer Portable bh/th - -

789,800

3.7.3.38 Stopwatch bh/th - - 684,500

3.7.3.39 Tension Meter 0-500 kg bh/th - - 1,316,300

3.7.3.40 Test Gauge 0-2000 bar bh/th - - 986,000

3.7.3.41 Thermohygrometer bh/th - - 2,053,400

3.7.3.42 Thermometer Digital 0-4000C bh/th - - 842,400

3.7.3.43 Thermometer Gelas 0-2500C bh/th - - 738,200

3.7.3.44 Thermometer Gelas 0-4000C bh/th - - 895,100

3.7.3.45Timbangan Analitik

Elektronik

0-6000 gr bh/th - - 895,100

3.7.3.46Timbangan Analitik

Mekanik

0-20 kg bh/th - - 842,400

3.7.3.47 Turbidity bh/th - - 895,100

3.7.3.48 Vacum Gauge 76 Vac Hg bh/th - - 794,000

3.7.3.49 Vacuum Pump bh/th - - 631,800

3.7.3.50 Viscometer bh/th - - 552,800

3.7.3.51 Viscosiry Test bh/th - - 916,200

3.7.3.52 Water Bath bh/th - - 895,100

3.7.3.53Water Pas 00,02-0,5 mm/m bh/th - - 651,900

119

Page 47: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO

HARGA

JENIS PEMELIHARAANJENIS / NAMA BARANG SATUAN

3.7.3.54 Water Pump bh/th - - 1,842,800

3.7.4 Peralatan Elektrik

3.7.4.1 Aquarius bh/th - - 870,100

3.7.4.2Autoclave (Bejana

Bertekanan)

bh/th - - 754,000

3.7.4.3 Circulating Aspirator bh/th - - 754,000

3.7.4.4CN Ion Distillation Unit

with Heater

bh/th - - 754,000

3.7.4.5Cooling Circulation

Aspirator

bh/th - - 1,247,200

3.7.4.6 Heat Tracer bh/th - - 1,160,100

3.7.4.7Hydride Vapor Generator bh/th - - 696,100

3.7.4.8 Inkubator 0-1000C bh/th - - 684,500

3.7.4.9 Magnetic Stimer bh/th - - 870,100

3.7.4.10 Oven 0-3000C bh/th - - 842,400

3.7.4.11 Oven 300-12000C bh/th - - 1,044,000

3.7.4.12Pemanas/Climate

Chambers

300-1200°C bh/th - - 895,100

3.7.4.13 Penangas 300-1200°C bh/th - - 895,100

3.7.4.14 Refrigerator bh/th - - 812,000

3.7.4.15 Tanur 3000C bh/th - - 870,100

3.7.4.16 Tanur 300-12000C bh/th - - 1,044,000

3.7.4.17 Thermomagnestir bh/th - - 737,100

3.7.4.18 Universal Shakers bh/th - - 812,000

3.7.4.19 Water Bath bh/th - - 789,800

3.7.5 Alat Berat

3.7.5.1 Mesin Tekan/Soil Test

Machine

> 3000 Kn bh/th - - 3,490,700

3.7.5.2 Mesin Tekan/Soil Test

Machine

< 3000 Kn bh/th - - 2,610,100

3.7.5.3 CBR Proving Ring bh/th - - 1,744,800

3.7.5.4 Marshall bh/th - - 1,163,600

3.7.5.5 Direct ShearDial

(Monometer) Proving Ring

bh/th - - 1,104,600

3.7.6 Portable

3.7.6.1 COD Reaktor Portable - 100 ml bh/th - - 698,100

3.7.6.2 Dissolved Oxigen - 100 ml bh/th - - 698,100

3.7.6.3 Conducting Orion - 100 ml bh/th - - 698,100

3.7.6.4 Conductivity Meter 3000C bh/th - - 698,100

3.7.6.5 Turbiditimeter 300-12000C bh/th - - 698,100

3.7.6.6Spektrofotometer Portable bh/th - -

866,600

120

Page 48: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SPESIFIKASI

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO

HARGA

JENIS PEMELIHARAANJENIS / NAMA BARANG SATUAN

3.7.6.7 pH Meter bh/th - - 698,100

3.7.6.8 Colony Counter bh/th - - 756,100

3.7.7 Pemeliharaan Prasarana Permukiman dan Tata Ruang

3.7.7.1 Spektrofotometer bh/th - - 4,654,300

3.7.7.2 Lampu iodide tungsten buah - - 3,159,000

3.7.7.3 lampu deuterium buah - - 3,159,000

3.7.7.4 Pemeliharaan Alat AAS bh/th - - 5,235,500

3.7.7.5Nebulizer EME Atomic

Absorbtion

bh/th - - 3,818,500

3.7.7.6 Lampu Digital AAS bh/th - - 9,308,500

3.7.7.7Total Organic Carbon (TOC) bh/th - -

4,212,000

3.7.7.8 Vacum Pump bh/th - - 406,500

3.7.7.9 Unvil Test ASTM C-05 bh/th - - 1,221,500

3.7.7.10 Extra Display bh/th - 2,552,100 15,950,500

3.7.7.11 Digital Indicator 0,1 % Accurasy bh/th - 3,190,100 15,950,500

3.7.7.12 Hammatzu Photonics bh/th - - 3,480,200

3.7.7.13Monitor Alat Pantau

Gerakan Tanah

bh/th - - 53,452,700

3.7.7.14 Alat Geolistik Single Channel Paket 526,500 1,053,000 2,106,000

3.7.7.15 Alat GeolistikMulti Channel

(16 Channel)

Paket 789,800 1,579,500 2,632,500

121

Page 49: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.8 PEMELIHARAAN DOKUMEN DAN BARANG DI GUDANG

3.8.1 Pemeliharaan Dokumen

3.8.1.1 Perpustakaan unit/tahun 500

3.8.1.2 Membersihkan dan menata kembali arsip buku/tahun 2,100

3.8.1.3 Barang Kenang-kenangan buah/tahun 1,300

3.8.1.4 Termite Control m2 44,500

3.8.1.5 Fumigasi m3 26,800

3.8.1.6 Pest Control m2 44,500

3.8.1.7 House Spraying Berkas/Arsip m2 40,500

3.8.1.8 Buku Perpustakaan buku/tahun 3,800

3.8.1.9 Membersihkan dan penataan katalok buku/tahun 1,900

3.8.1.10 Majalah judul/hal 17,800

3.8.1.11 Surat Kabar bulan 31,900

3.8.1.12 Pemeliharaan Katalog Lembar/tahun 3,100

3.8.1.13 Pemeliharaan Majalah eks/tahun 28,600

3.8.1.14 Pemeliharaan Surat Kabar eks/tahun 51,300

3.8.2 Pemeliharaan Barang di Gudang

3.8.2.1 Belum dipakai 1% dari biaya pembelian buah/tahun UP

3.8.2.2 Setengah pakai buah/tahun UP

3.8.2.3 Tidak dipakai 1,5% dari biaya pembelian buah/tahun UP

3.8.2.4 Pemeliharaan Pallet Unit 183,300

3.8.2.5 Pemeliharaan / penataan barang di Gudang Koli 4,300

3.8.2.6 Pemeliharaan Terpal m2 12,100

3.8.3 Pemeliharaan Bahan Perpustakaan :

3.8.3.1 Perbaikan dan Penjilidan Buku Perpustakaan Daerah eksemplar 17,800

3.8.3.2 Penjilidan Koran bendel 89,100

3.8.3.3 Penjilidan Tabloid / Majalah bendel 53,400

3.8.3.4 Perbaikan buku langka lembar 3,600

3.8.3.5 Pembersihan & Perawatan Buku/Koran/Majalah eksemplar/bendel 1,700

3.8.3.6 Penyiangan koleksi eksemplar 3,100

3.8.3.7 Pencatatan koleksi eksemplar 1,700

3.8.3.8 Penyiapan Bahan Perpustakaan Siap Dilayankan eksemplar 8,900

3.8.4 Pembersihan dan Perawatan Arsip

3.8.4.1 Pembersihan dan Perawatan Arsip Film 400 ft 11,600

3.8.4.2 Pembersihan dan Perawatan Negatif/Positif Film ekspose 900

3.8.5 Pemeliharaan Arsip tekstual

3.8.5.1 Pembersihan Arsip boks 1,800

3.8.5.2 Labelisasi Boks Arsip boks 1,200

3.8.5.3 Registrasi Arsip Tekstual berkas 1,800

3.8.6 Perawatan/Restorasi Arsip Non Tekstual

3.8.6.1 Film reel/1200ekspose 37,400

3.8.6.2 Video kaset 28,500

3.8.6.3 Kaset/Rekaman Suara kaset 26,800

3.8.6.4 VCD keping 1,700

3.8.6.5 Foto/Slide lembar 1,700

3.8.6.6 Seleksi arsip tekstual yang akan dilaminasi lembar 2,000

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN

122

Page 50: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG

Rp. Rp.

3.9 PEMELIHARAAN PERLENGKAPAN RUMAH TANGGA

3.9.1 Dispencer Unit/thn 127,000 318,000

3.9.2 Insect Killer MIK 9612 Buah/thn 64,000 191,000

3.9.3 Kompor Gas Buah/thn 64,000 191,000

3.9.4 Kompor gas Auto Gas R.Cooker Buah/thn 114,000 254,000

3.9.5 Mesin Jahit Kaki Buah/thn 382,000 955,000

3.9.6 Pompa Air type Manual Buah/thn 38,000 127,000

3.9.7 Pompa Air type Automatic Buah/thn 254,000 573,000

3.9.8 Sumur Artesis type ST 5A-28 Buah/thn 1,909,000 3,309,000

3.9.9 Water Heater 150 lt (duo) unt 6-10km Buah/thn 191,000 445,000

NO SPESIFIKASI JENIS / NAMA BARANG SATUAN

HARGA

JENIS PEMELIHARAAN

123

Page 51: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG

Rp. Rp.

3.10

3.10.1 Alat Peraga SLTP dan SMU

3.10.1.1 Alat Kesenian/Seni Musik

3.10.1.1.1 Angklung 1 oktaf set/thn 18,000 62,000

3.10.1.1.2 Angklung Melodi (2 Tb) 31 pcs set/thn 37,000 185,000

3.10.1.1.3 Bass pukul arumba+STD set/thn 62,000 247,000

3.10.1.1.4 Calung standart set/thn 62,000 123,000

3.10.1.1.5 Drum band cymbal laser 16" buah 37,000 154,000

3.10.1.1.6 Gambang pengiring I set 62,000 247,000

3.10.1.1.7 Gendang 1 set set 123,000 247,000

3.10.1.2 KIT SMP

3.10.1.2.1 Listrik buah 175,000 313,000

3.10.1.2.2 Mekanik buah 175,000 313,000

3.10.1.2.3 Optik buah 175,000 313,000

3.10.1.2.4 Panas buah 175,000 313,000

3.10.1.3 KIT SMA

3.10.1.3.1 Listrik dan Power Supply buah 175,000 313,000

3.10.1.3.2 Mekanika dan Timbangan RRT buah 175,000 313,000

3.10.1.3.3 Optik buah 175,000 313,000

3.10.1.3.4Mikroskop lanjutan XSZ-104

NOVEL

buah 175,000 313,000

3.10.1.4 Laboratorium Bahasa

3.10.1.4.1 Dina Lab Electronic Language

System 20 siswa thn 1,968,000 5,247,000

3.10.1.4.2 Dina Lab Electronic Language

System 24 siswa thn 1,968,000 5,247,000

3.10.1.4.3 Dina Lab Electronic Language

System 30 siswa thn 1,968,000 5,247,000

3.10.1.4.4 Dina Lab Electronic Language

System 40 siswa thn 1,968,000 5,247,000

3.10.1.4.5 Dina Lab Electronic Language

System 46 siswa thn 1,968,000 5,247,000

3.10.1.4.6 Dina Lab Electronic Language

System 50 siswa thn 1,968,000 5,247,000

3.10.1.4.7 Laboratorium Bahasa Techno-pro 20 siswa set/thn 2,624,000 6,559,000

3.10.1.4.8 Laboratorium Bahasa Techno-pro 30 siswa set/thn 2,624,000 6,559,000

3.10.1.4.9 Laboratorium Bahasa Techno-pro 40 siswa set/thn 2,624,000 6,559,000

3.10.2 Alat Olah Raga

3.10.2.1 Permainan Luar Kelas

3.10.2.1.1 Ayunan double besar buah/th 66,200 141,900

3.10.2.1.2 Ayunan double kecil buah/th 67,200 145,400

3.10.2.1.3 Ayunan double keranjang besar buah/th 197,800 330,000

NO JENIS / NAMA BARANG SATUANSPESIFIKASI

HARGA

JENIS PEMELIHARAAN

PEMELIHARAAN ALAT KETRAMPILAN SEKOLAH

124

Page 52: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG

Rp. Rp.

NO JENIS / NAMA BARANG SATUANSPESIFIKASI

HARGA

JENIS PEMELIHARAAN

3.10.2.1.4 Ayunan double keranjang kecil buah/th 131,500 264,000

3.10.2.1.5 Ayunan double rantai buah/th 67,200 144,100

3.10.2.1.6 Ayunan engkel buah/th 67,200 144,700

3.10.2.1.7 Ayunan engkel keranjang buah/th 67,200 143,700

3.10.2.1.8 Ayunan isi 3 buah/th 659,900 1,980,900

3.10.2.1.9 Ayunan kombinasi buah/th 67,200 145,000

3.10.2.1.10 Dorong-dorongan buah/th 67,200 143,700

3.10.2.1.11 Droumolen buah/th 659,900 1,980,900

3.10.2.1.12 Jingkitan kecil buah/th 67,200 144,800

3.10.2.1.13 Kuda pir buah/th 67,200 144,100

3.10.2.1.14 Lingkaran tupai buah/th 197,800 660,300

3.10.2.1.15 Mangkok putar besar buah/th 69,200 149,100

3.10.2.1.16 Mangkok putar kecil buah/th 67,200 144,300

3.10.2.1.17 Peluncur besar kombinasi atap buah/th 197,800 660,300

3.10.2.1.18 Peluncur cabang 3 buah/th 659,900 1,980,900

3.10.2.1.19 Peluncur fiber besar buah/th 67,200 143,800

3.10.2.1.20 Peluncur fiber kecil buah/th 67,200 143,900

3.10.2.1.21 Peluncur mini rumah buah/th 197,800 660,300

125

Page 53: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.11

3.11.1 Alat Kesenian

3.11.1.1 Amplification Bass unit/th 83,000 166,000 249,000

3.11.1.2 Amplification Gitar unit/th 104,000 186,000 269,000

3.11.1.3 Amplification Keyboard unit/th 62,000 145,000 228,000

3.11.1.4 Amplifier buah/th 30,000 74,000 96,000

3.11.1.5 Bass Besar ( Bethot ) buah/th 104,000 124,000 145,000

3.11.1.6 Bass Gitar buah/th 62,000 104,000 311,000

3.11.1.7 Biola buah/th 62,000 104,000 145,000

3.11.1.8 Contra Bass buah/th 62,000 83,000 104,000

3.11.1.9 Drums set/th 71,000 266,000 346,000

3.11.1.10 Drums + Cymbal set/th 166,000 311,000 621,000

3.11.1.11 Flute buah/th 62,000 124,000 186,000

3.11.1.12 Gamelan BaliGanti pluntur

dan Klanteset 2,762,000 - -

3.11.1.13 Gamelan BaliMbraso dan

Plitur ulangset 3,452,000 - -

3.11.1.14 Gamelan Bali Tabuh Gamelan kotak 1,381,000 - -

3.11.1.15 Gamelan BaliGanti

bumbunganset 4,833,000 - -

3.11.1.16 Gamelan Bali Gong Gede Nglaras set 6,904,000 - -

3.11.1.17Gamelan Bali Kebyar

TrompongNglaras set 6,214,000 - -

3.11.1.18Gamelan Bali Semar

PagulinganNglaras set 2,071,000 - -

3.11.1.19Gamelan Jawa

Pakurmatan Cara BalenNglaras set 2,762,000 - -

3.11.1.20Gamelan Jawa

Pakurmatan Cara Balen

Mbraso dan

Plitur ulangset 2,071,000 - -

3.11.1.21Gamelan Jawa

Pakurmatan Kodok NgorekNglaras set 3,452,000 - -

3.11.1.22Gamelan Jawa

Pakurmatan Kodok Ngorek

Mbraso dan

Plitur ulangset 2,762,000 - -

3.11.1.23Gamelan Jawa

Pakurmatan MonggangNglaras set 3,452,000 - -

3.11.1.24Gamelan Jawa

Pakurmatan Monggang

Mbraso dan

Plitur ulangset 4,833,000 - -

3.11.1.25Gamelan Jawa

Pakurmatan SekatenNglaras set 6,904,000 - -

3.11.1.26Gamelan Jawa

Pakurmatan Sekaten

Mbraso dan

Plitur ulangset 2,762,000 - -

3.11.1.27Gamelan Jawa Slendro dan

Pelog

Mbraso dan

Plitur ulangset 4,833,000 - -

3.11.1.28Gamelan Jawa Slendro dan

Pelog

Ganti pluntur

dan Klanteset 2,071,000 - -

PEMELIHARAAN ALAT KESENIAN

NO JENIS / NAMA BARANG SATUANSPESIFIKASI

HARGA

JENIS PEMELIHARAAN

126

Page 54: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SATUANSPESIFIKASI

HARGA

JENIS PEMELIHARAAN

3.11.1.29Gamelan Jawa Slendro dan

PelogTabuh Gamelan kotak 1,105,000 - -

3.11.1.30Gamelan Jawa Slendro dan

Pelog

Ganti

bumbunganset 3,452,000 - -

3.11.1.31 Gamelan Slendro Pelog Kuningan set/th 10,356,000 14,499,000 18,642,000

3.11.1.32 Gamelan Slendro Pelog Besi set/th 1,864,000 1,958,000 2,545,000

3.11.1.33 Gitar MelodySexito Costar

Fenderbuah/th 29,000 146,000 190,000

3.11.1.34 Gitar Rytem Sexito Costar

Fenderbuah/th 29,000 127,000 165,000

3.11.1.35 Kabel Set unit/th 14,000 31,000 41,000

3.11.1.36 Ketipung Dangdut buah/th 31,000 41,000 52,000

3.11.1.37 Keyboard unit/th 186,000 269,000 352,000

3.11.1.38 Kolintang set/th 1,243,000 1,864,000 2,486,000

3.11.1.39 Lead Guitar unit/th 62,000 104,000 269,000

3.11.1.40 Mangkis Kendhang Ciblon buah 621,000 - -

3.11.1.41 Mangkis Kendhang Gede buah 829,000 - -

3.11.1.42Mangkis Kendhang

Ketipungbuah 276,000 - -

3.11.1.43 Mic buah/th 15,000 59,000 77,000

3.11.1.44 Monitor Bass HK RB 400 HTC set/th 123,000 370,000 481,000

3.11.1.45 Monitor Gitar Melody JCM HTC

Marshallbuah/th 123,000 370,000 481,000

3.11.1.46 Monitor Gitar Rytem Roland JC 120 buah/th 123,000 370,000 481,000

3.11.1.47 Nglebur Bilahan buah 242,000 - -

3.11.1.48 Nglebur Bonang buah 690,000 - -

3.11.1.49 Nglebur Gong Gede buah 13,809,000 - -

3.11.1.50 Nglebur Kemphul buah 2,762,000 - -

3.11.1.51 Nglebur Kenong buah 2,762,000 - -

3.11.1.52Pengecatan/ perbaikan

rancak gamelanbuah/th 39,000 154,000 200,000

3.11.1.53 Piano buah/th 96,000 181,000 235,000

3.11.1.54 Saxophone buah/th 145,000 207,000 373,000

3.11.1.55 Sound System Kecil (Vocal) set/th 41,000 124,000 249,000

3.11.1.56 Stick Drum set/th 3,000 5,000 8,000

3.11.1.57Tabuh Gamelan Sekaten

(bh tanduk hewan)kotak 2,762,000 - -

3.11.1.58 Alat Korsik 150,000 250,000 350,000

3.11.2 KOSTUM

3.11.2.1 Kostum Tari Klasik stel/th - 82,500 115,400

127

Page 55: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SATUANSPESIFIKASI

HARGA

JENIS PEMELIHARAAN

3.11.2.2 Kostum Tari Kreasi stel/th - 49,400 82,500

3.11.2.3 Kain Prada Lbr/th - 6,500 8,200

3.11.2.4 Kebaya Tari Lbr/th - 8,200 9,800

3.11.2.5 Sampur Lbr/th - 1,700 2,500

3.11.2.6 Kain Batik Lbr/th - 8,200 13,200

3.11.2.7 Beskap stel/th - 16,500 19,700

3.11.3 Benda Bercorak Budaya Bernilai Historis/Arkeologis

3.11.3.1

Koleksi Organik Ukuran

Kecil (Kayu, kertas, kulit,

kain, tanduk)

> 50th; 2 s/d

10cm; 0 s/d

5kg

buah - 103,200 -

3.11.3.2

Koleksi Organik Ukuran

Sedang (Kayu, kertas,

kulit, kain, tanduk)

> 50th; 15 s/d

25cm; 6 s/d

15kg

buah - 143,300 -

3.11.3.3

Koleksi Organik Ukuran

Besar ( Kayu, kertas, kulit,

kain, tanduk )

> 50th; > 25cm;

>15kgbuah - 257,900 -

3.11.3.4

Koleksi An Organik Ukuran

Kecil (Emas, Perak, Besi,

Tembaga, Kuningan,

Perunggu)

> 50th; 2 s/d

10cm; 0 s/d 5kgbuah - 114,500 -

3.11.3.5

Koleksi An Organik Ukuran

Sedang (Emas, Perak, Besi,

Tembaga, Kuningan,

Perunggu)

> 50th; 15 s/d

25cm; 6 s/d

15kg

buah - 154,800 -

3.11.3.6

Koleksi An Organik Ukuran

Besar (Emas, Perak, Besi,

Tembaga, Kuningan,

Perunggu)

> 50th; > 25cm;

>15kgbuah - 280,700 -

3.11.3.7Koleksi An Organik Ukuran

Kecil (Keramik, Batu, Fosil)

> 50th; 2 s/d

10cm; 0 s/d

5kg

buah - 103,200 -

3.11.3.8Koleksi An Organik Ukuran

Kecil (Keramik, Batu, Fosil)

> 50th; 15 s/d

25cm; 6 s/d

15kg

buah - 143,300 -

3.11.3.9Koleksi An Organik Ukuran

Kecil (Keramik, Batu, Fosil)

> 50th; > 25cm;

>15kgbuah - 257,900 -

128

Page 56: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.12 ALAT MESIN PERTANIAN

3.12.1 MESIN PENGGERAK DIESEL

3.12.1.1 Diesel 5,5 PK type Hopper Unit 1,838,000 2,200,000 3,301,000

3.12.1.2 Diesel 5,5 PK type Radiator Unit 1,816,000 2,182,000 3,273,000

3.12.1.3 Diesel 6,5 PK type Hopper Unit 1,973,000 2,366,000 3,549,000

3.12.1.4 Diesel 6,5 PK type Radiator Unit 1,972,000 2,111,000 3,169,000

3.12.1.5 Diesel 6,5 PK type Radiator Unit 395,000 475,000 715,000

3.12.1.6 Diesel 7,0 PK type Hopper Unit 1,561,000 1,873,000 2,809,000

3.12.1.7 Diesel 7,0 PK type Radiator Unit 1,426,000 1,711,000 2,569,000

3.12.1.8 Diesel 7,5 PK type Radiator Unit 1,536,000 1,843,000 2,764,000

3.12.1.9 Diesel 8,5 PK type Hopper Unit 1,755,000 2,106,000 3,160,000

3.12.1.10 Diesel 8,5 PK type Radiator Unit 1,565,000 1,877,000 2,816,000

3.12.1.11 Diesel 8,5 PK type Radiator dengan lampu Unit 1,706,000 2,048,000 3,072,000

3.12.1.12 Diesel 10,5 PK type Hopper Unit 1,530,000 1,837,000 2,756,000

3.12.1.13 Diesel 10,5 PK type

Radiator

Unit 1,938,000 2,325,000 3,488,000

3.12.1.14 Diesel 10,5 PK type

Radiator

dengan lampu Unit 2,106,000 2,529,000 3,795,000

3.12.1.15 Diesel 11,5 PK type

Radiator

Unit 2,241,000 2,690,000 4,034,000

3.12.1.16 Diesel 13,0 PK type Hopper Unit 2,801,000 3,362,000 5,043,000

3.12.1.17 Diesel 13,5 PK type

Radiator

Unit 2,571,000 3,086,000 4,629,000

3.12.1.18 Diesel 14,0 PK type Hopper Unit 646,000 773,000 1,161,000

3.12.1.19 Diesel 15,5 PK type

Radiator

Unit 2,914,000 3,495,000 5,243,000

3.12.1.20 Diesel 16,0 PK type Hopper Unit 2,887,000 3,463,000 5,195,000

3.12.1.21 Diesel 19,0 PK type Hopper Unit 3,251,000 3,902,000 5,853,000

3.12.1.22 Diesel 22,0 PK type Hopper Unit 3,495,000 4,195,000 6,293,000

3.12.1.23 Diesel 23,0 PK type Hopper Unit 720,000 864,000 1,296,000

3.12.1.24 Diesel 25,0 PK type Hopper Unit 3,799,000 4,560,000 6,840,000

3.12.2 MESIN PENGGERAK BENSIN

3.12.2.1 Mesin Bensin 3,5 PK Unit 217,000 261,000 392,000

3.12.2.2 Mesin Bensin 5,5 PK Unit 258,000 309,000 464,000

3.12.2.3 Mesin Bensin 6,0 PK Unit 353,000 424,000 636,000

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

129

Page 57: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

3.12.2.4 Mesin Bensin 6,5 PK Unit 461,000 554,000 830,000

3.12.3 ALSINTAN PENGOLAH TANAH

3.12.3.1 Traktor roda 4 45 PK Unit 30,186,000 36,213,000 54,320,000

3.12.3.2 Traktor roda 4 65 PK Unit 37,733,000 45,281,000 67,921,000

3.12.3.3 Cultivator Unit 6,451,000 7,716,000 11,575,000

3.12.3.4 Farm Traktor Power

Stering

65 Pk Unit 10,563,000 17,607,000 26,410,000

3.12.3.5 Midi Tractor 35 Pk Unit 6,338,000 10,563,000 15,846,000

3.12.3.6 Traktor Roda-2 type Rotary; 8,5

PK

Unit 7,154,000 8,587,000 12,880,000

3.12.3.7 Traktor Roda-2 type Rotary;

10,5 PK

Unit 10,351,000 12,423,000 18,634,000

3.12.3.8 Traktor Roda-2, Steering

Cluch

type singkal;

6,5 PK

Unit 3,164,000 4,176,000 6,265,000

3.12.3.9 Traktor Roda-2, Steering

Cluch

type singkal;

8,5 PK

Unit 4,563,000 5,475,000 8,213,000

3.12.3.10 Traktor Roda-2, Tanpa

Steering Cluch

type singkal;

6,5 PK

Unit 3,549,000 4,259,000 6,388,000

3.12.3.11 Traktor Roda-2, Tanpa

Steering Cluch

type singkal;

8,5 PK

Unit 4,563,000 5,475,000 8,213,000

3.12.4 ALSINTAN PENANAMAN PADI

3.12.4.1 Mesin Tanam Padi Unit 10,564,000 12,676,000 19,014,000

3.12.4.2 Mesin Pembibitan Padi Unit 4,553,000 5,465,000 8,197,000

3.12.4.3 Kotak pembibitan padi Unit 3,700 4,200 6,400

3.12.5 ALSINTAN PENYIANG

3.12.5.1 Mesin Penyiang Padi Unit 1,058,000 1,267,000 1,901,000

3.12.6 ALSINTAN IRIGASI

3.12.6.1 Pompa Air 2", Kopel

Langsung

Motor bensin Unit 632,000 757,000 1,137,000

3.12.6.2 Pompa Air 2", Kopel

Langsung

Motor Diesel Unit 2,372,000 2,846,000 4,270,000

3.12.6.3 Pompa Air 2" Transmisi V-

belt

tanpa

Penggerak &

landasan

Unit 254,000 306,000 457,000

3.12.6.4 Pompa Air 3", Kopel

Langsung

Motor bensin Unit 684,000 822,000 1,233,000

3.12.6.5 Pompa Air 3", Kopel

Langsung

Motor Diesel Unit 1,068,000 1,281,000 1,922,000

3.12.6.6 Pompa Air 3", Tranmisi V-

belt

tanpa

Penggerak &

landasan

Unit 268,000 323,000 483,000

3.12.6.7 Pompa Air 4"; Tranmisi V-

belt

tanpa

Penggerak &

landasan

Unit 380,000 455,000 683,000

3.12.6.8 Pompa Air 6"; Tranmisi V-

belt

tanpa

Penggerak &

landasan

Unit 998,000 1,198,000 1,798,000

130

Page 58: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

3.12.6.9 Pompa Air 8"; Tranmisi V-

belt

tanpa

Penggerak &

landasan

Unit 1,093,000 1,311,000 1,969,000

3.12.6.10 Pompa Sumur Dalam Unit 3,573,000 4,285,000 6,427,000

3.12.6.11 Landasan Pompa Air 2" Bh 3,573,000 4,285,000 6,427,000

3.12.6.12 Landasan Pompa Air 3" Bh 3,573,000 4,285,000 6,427,000

3.12.6.13 Landasan Pompa Air 4" Bh 3,573,000 4,285,000 6,427,000

3.12.6.14 Landasan Pompa Air 6" Bh 3,573,000 4,285,000 6,427,000

3.12.6.15 Landasan Pompa Air 8" Bh 3,573,000 4,285,000 6,427,000

3.12.7 ALSINTAN PENYEMPROT

3.12.7.1 Hand Sprayer Otomatis 14 liter Unit 99,000 119,000 178,000

3.12.7.2 Hand Sprayer 16 liter Unit 70,000 84,000 126,000

3.12.7.3 Hand Sprayer Semi

Otomatis

12 liter Unit 80,000 96,000 144,000

3.12.7.4 Power Mist Blower Unit 497,000 597,000 896,000

3.12.7.5 Power Sprayer Unit 587,000 933,000 1,399,000

3.12.8 ALSINTAN PASCA PANEN

3.12.8.1 Dryer, penggerak diesel 7,5

PK

type box 3,2 ton Unit 3,040,000 4,561,000 6,841,000

3.12.8.2 Dryer, penggerak genset 30

KVA

Vertical, Kap 6

ton

Unit 5,529,000 67,247,000 100,871,000

3.12.8.3 Dryer, penggerak genset 30

KVA

Vertical, Kap 10

ton

Unit 81,957,000 98,350,000 147,525,000

3.12.8.4 Impuls Sealler 30 cm Unit 75,000 91,000 137,000

3.12.8.5 Mesin Panen Unit 59,000 71,000 106,000

3.12.8.6 Mesin Pecah Kulit exclude.

Penggerak

Unit 1,751,000 2,102,000 3,152,000

3.12.8.7 Mesin Pemipil Jagung exclude.

Penggerak

Unit 2,802,000 3,362,000 5,043,000

3.12.8.8 Mesin Penyosoh exclude.

Penggerak

kap. 750

kg/jam

Unit 2,102,000 2,522,000 3,782,000

3.12.8.9 Mesin Penyosoh exclude.

Penggerak

kap. 1 ton/jam Unit 2,802,000 3,362,000 5,043,000

3.12.8.10 Mesin Perontok Type

Dorong Besar

exclude.

Penggerak

Unit 365,000 438,000 657,000

3.12.8.11 Mesin Perontok Type

Dorong Kecil

exclude.

Penggerak

Unit 73,000 87,000 131,000

3.12.8.12 Mesin Perontok Type

Mobil Besar

exclude.

Penggerak

Unit 2,802,000 3,362,000 5,043,000

3.12.8.13 Mesin Perontok Type

Mobil Kecil

exclude.

Penggerak

Unit 1,891,000 2,270,000 3,405,000

3.12.8.14 Paddy Cleaner exclude.

Penggerak

Unit 3,051,000 3,661,000 5,492,000

3.12.8.15 Seed Cleaner exclude.

Penggerak

Unit 621,000 932,000 1,398,000

3.12.8.16 Timbangan kapasitas 100

kg

Unit 374,000 447,000 671,000

3.12.8.17 Timbangan Kasar Kap. 20 - 50

gram

Unit 211,000 - -

131

Page 59: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

3.12.8.18 Hypotan dan

perlengkapannya

Unit 23,000 - -

3.12.8.19 Wrapping Machine Unit 867,000 1,039,000 1,559,000

3.12.8.20 Peralatan Sarungisasi

buah kakao

Unit 155,000 - -

3.12.9 MESIN PENEPUNG

3.12.9.1 Mesin Penepung tanpa

Penggerak

Kap. 15

kg/jam

Unit 628,000 756,000 1,134,000

3.12.9.2 Mesin Penepung tanpa

Penggerak

Kap. 50

kg/jam

Unit 835,000 1,001,000 1,503,000

3.12.9.3 Mesin Penepung tanpa

Penggerak

Kap. 500

kg/jam

Unit 8,113,000 9,737,000 14,606,000

3.12.10 MESIN PERAJANG

3.12.10.1 Mesin Perajang 6 Pisau Unit 940,000 1,027,000 1,541,000

3.12.10.2 Mesin Perajang 8 Pisau Unit 977,000 1,067,000 1,600,000

3.12.10.3 Mesin Perajang 10 Pisau Unit 1,035,000 1,128,000 1,690,000

3.12.10.4 Perajang singkong manual Unit 115,000 138,000 207,000

3.12.10.5 Perajang singkong dng motor

listrik

Unit 170,000 205,000 307,000

3.12.10.6 Perajang tempe manual Unit 138,000 165,000 248,000

3.12.10.7 Perajang pisang manual Unit 127,000 151,000 228,000

3.12.10.8 Perajang pisang dng motor

listrik

Unit 159,000 191,000 287,000

3.12.10.9 Perajang cabe / bawang Unit 147,000 177,000 266,000

3.12.11 MESIN PENGGILING KEDELAI

3.12.11.1 Mesin Penggiling Kedelai Type 8" Unit 723,000 868,000 1,302,000

3.12.11.2 Mesin Penggiling Kedelai Type 12" Unit 1,493,000 1,790,000 2,685,000

3.12.11.3 Pisau Okulasi Unit 500,000 602,000 902,000

3.12.12 PENGUKUR KADAR AIR

3.12.12.1 Pengukur Kadar Air Type TA - 5

(Gabah)

Unit 339,000 408,000 610,000

3.12.12.2 Pengukur Kadar Air Type TM - 10

(Jagung)

Unit 622,000 746,000 1,120,000

3.12.12.3 Pengukur Kadar Air Type PM - 400

(Biji)

Unit 2,370,000 2,844,000 4,267,000

3.12.13 ALAT PEMBUAT EMPING

3.12.13.1 Alat Pembuat Emping,

hentakan (manual)

kap. 2,5 kg/jam Unit 1,275,000 1,532,000 2,296,000

3.12.13.2 Alat Pembuat Emping Type

Injak

Uk.

Super/lebar

Unit 904,000 1,085,000 1,629,000

3.12.13.3 Alat Pembuat Emping Type

Jepit

kap.10 kg/jam Unit 1,502,000 1,803,000 2,706,000

3.12.13.4 Alat Pembuat Emping Type

Jepit Manual

kap. 2 - 5

kg/jam

Unit 1,051,000 1,261,000 1,891,000

132

Page 60: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

3.12.14 ALAT PENGOLAH HASIL PERTANIAN

3.12.14.1 Alat Parut Kelapa dng motor

bensin 5 pk

Unit 1,491,000 1,789,000 2,685,000

3.12.14.2 Alat Pemecah Kulit Biji

Jarak

Unit 1,051,000 1,261,000 1,891,000

3.12.14.3 Alat Pemecah Pala dng pengg. 5 pk Unit 1,051,000 1,261,000 1,891,000

3.12.14.4 Alat Pengering Buah Panili Unit 1,051,000 1,261,000 1,891,000

3.12.14.5 Alat Penghancur Plastik Unit 1,051,000 1,261,000 1,891,000

3.12.14.6 Alat Pengolah bubuk kopi Unit 1,051,000 1,261,000 1,891,000

3.12.14.7 Alat Pengolah gula

kelapa/gula merah

Unit 1,051,000 1,261,000 1,891,000

3.12.14.8 Alat Pengolah kacip mete Unit 1,051,000 1,261,000 1,891,000

3.12.14.9 Alat Pengolah kolang

kaling manual

Unit 1,051,000 1,261,000 1,891,000

3.12.14.10 Alat Pengolah Minyak

Astiri

Unit 1,051,000 1,261,000 1,891,000

3.12.14.11 Alat Pengolah Minyak

Kelapa

Unit 1,051,000 1,261,000 1,891,000

3.12.14.12 Alat Pengolah Minyak

Wijen

Unit 1,051,000 1,261,000 1,891,000

3.12.14.13 Alat Pengolah Perajang

Empon2

Unit 1,051,000 1,261,000 1,891,000

3.12.14.14 Alat Pengolah Sangrai Kopi Unit 1,051,000 1,261,000 1,891,000

3.12.14.15 Alat Penyosoh Kopi Unit 1,051,000 1,261,000 1,891,000

3.12.14.16 Alat Perajang Tembakau Unit 1,051,000 1,261,000 1,891,000

3.12.14.17 Alat Pres Serba Guna Unit 1,051,000 1,261,000 1,891,000

3.12.14.18 Mesin Pengasapan Unit 1,051,000 1,261,000 1,891,000

3.12.14.19 Rool Plastik Buah 1,051,000 1,261,000 1,891,000

3.12.14.20 Vacum Crying kap. 5 kg Unit 1,523,000 1,789,000 2,685,000

3.12.14.21 Waste Crusher kap. 10 ton Unit 1,051,000 1,261,000 1,891,000

3.12.15 Pemeliharaan Tanaman

3.12.15.1 Tanaman Koleksi specimen per thn 83,000 168,000 253,000

3.12.15.2 Pembibitan pcs/thn 845,000 1,689,000 2,535,000

3.12.15.3 Medical Garden unit/thn 2,464,000 4,929,000 7,395,000

133

Page 61: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG

Rp. Rp.

3.13 PEMELIHARAAN ALAT PERTUKANGAN

3.13.1 Mesin Pemotong Rumput Gendong unit/thn 87,000 173,000

3.13.2 Mesin Pemotong Rumput Dorong unit/thn 719,000 1,439,000

3.13.3 Stemper MTR 80 HR unit/thn 461,000 1,153,000

3.13.4 Mesin Gergaji tangan unit/thn 20,000 33,000

HARGA

JENIS PEMELIHARAANNO JENIS / NAMA BARANG SATUANSPESIFIKASI

134

Page 62: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.14 Pemeliharaan Jaringan

3.14.1 Biaya Perawatan Software

Aplikasi Kas Daerah dan

Pengelolaan Asset Daerah

Bulan 990,500 1,320,900 2,640,900

3.14.2 Biaya Perawatan Sofware

Aplikasi

Bulan 1,131,200 1,508,600 3,017,300

3.14.3 Maintenance software

program aplikasi dan

jaringan

Orang

/bulan

1,131,200 1,508,600 3,017,300

3.14.4 Pemeliharaan

Jaringan/Intranet

Titik

/User

1,200 1,500 3,200

3.14.5 Pemeliharaan

Jaringan/Intranet

Komputer

Jaringan

LAN/WAN

tahun 19,917,400 59,753,300 UP

3.14.6 Pemeliharaan

Jaringan/Intranet

Server Komputer

untuk Jateng on

Line

tahun 49,492,100 59,149,400 UP

3.14.7 Pemeliharaan

Jaringan/Intranet

Jaringan

Komunikasi

Komputer u/

Jateng Online

tahun 66,392,100 82,326,100 UP

3.14.8 Pemeliharaan Jaringan

internet

Server untuk

Jateng on Line

tahun 59,149,400 68,806,700 UP

3.14.9 Pemeliharaan Jaringan

internet

interaneksa tahun 6,035,800 12,070,800 UP

3.14.10Pengembangan Sistem / Aplikasi

aplikasi UP

HARGA

JENIS PEMELIHARAANNO JENIS BARANG SATUANSPESIFIKASI

135

Page 63: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.15 PEMELIHARAAN PEMADAM KEBAKARAN

3.15.1 Pemadam Kebakaran

3.15.1.1 ABC Dry Power Store Pressure 1 kg 46,000

3.15.1.2 ABC Dry Power Store Pressure 1.5 kg 55,000

3.15.1.3 ABC Dry Power Store Pressure 2 kg 102,000

3.15.1.4 ABC Dry Power Store Pressure 2.5 kg 92,000

3.15.1.5 ABC Dry Power Store Pressure 3 kg 107,000

3.15.1.6 ABC Dry Power Store Pressure 3.5 kg 133,000

3.15.1.7 ABC Dry Power Store Pressure 4 kg 135,000

3.15.1.8 ABC Dry Power Store Pressure 4.5 kg 229,000

3.15.1.9 ABC Dry Power Store Pressure 5 kg 166,000

3.15.1.10 ABC Dry Power Store Pressure 6 kg 267,000

3.15.1.11 ABC Dry Power Store Pressure 7 kg 311,000

3.15.1.12 ABC Dry Power Store Pressure 8 kg 269,000

3.15.1.13 ABC Dry Power Store Pressure 9 kg 332,000

3.15.1.14 ABC Dry Power Store Pressure 10 kg 352,000

3.15.1.15 ABC Dry Power Store Pressure 12 kg 413,000

3.15.1.16 ABC Dry Power Store Pressure 20 kg 620,000

3.15.1.17 ABC Dry Power Store Pressure 25 kg 796,000

3.15.1.18 ABC Dry Power Store Pressure 40 kg 1,263,000

3.15.1.19 ABC Dry Power Store Pressure 45 kg 1,414,000

3.15.1.20 ABC Dry Power Store Pressure 50 kg 1,564,000

3.15.1.21 ABC Dry Power Store Pressure 60 kg 1,861,000

3.15.1.22 ABC Dry Power Store Pressure 68 kg 2,111,000

3.15.1.23 ABC Dry Power Store Pressure 120 kg 3,686,000

3.15.1.24 ABC Dry Power Store Pressure 160 kg 500,000

3.15.1.25 AFFF (AF3) 9 liter 92,000

3.15.1.26 AFFF (AF3) 30 liter 339,000

3.15.1.27 AFFF (AF3) 40 liter 452,000

3.15.1.28 AFFF (AF3) 60 liter 678,000

3.15.1.29 AFFF (AF3) 80 liter 854,000

3.15.1.30 AFFF (AF3) 90 liter 904,000

3.15.1.31 CO2 NAF PIV kg 31,000

3.15.1.32 CO2 NAF PIV kg 1,193,000

3.15.2 Pengisian Botol Pemadam Kebakaran

3.15.2.1 YAM-2SS ; 0,6 kg buah 13,000

3.15.2.2 YA-4EL ; 1,2 kg buah 25,000

3.15.2.3 YA-4 ; 1,2 kg buah 26,000

3.15.2.4 YAM-4L ; 2 kg buah 33,000

3.15.2.5 YA/YAM-10Y ; 3,5 kg buah 132,000

3.15.2.6 YA-15L ; 4,5 kg buah 84,000

3.15.2.7 YA/YAM-20L; 6 kg buah 215,000

3.15.2.8 YA/YAM-30L; 9 kg buah 118,000

PENGISIAN Rp.

NO JENIS / NAMA BARANG SATUAN

136

Page 64: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

PENGISIAN Rp.

NO JENIS / NAMA BARANG SATUAN

3.15.3 HFC 227 (GAS)

3.15.3.1 HFC 227 (GAS) 1 Kg 685,000

3.15.3.2 HFC 227 (GAS) 2 Kg 1,085,000

3.15.3.3 HFC 227 (GAS) 3 Kg 1,275,000

3.15.3.4 HFC 227 (GAS) 4 Kg 1,510,000

3.15.3.5 HFC 227 (GAS) 5 Kg 1,735,000

3.15.3.6 HFC 227 (GAS) 6 Kg 1,985,000

3.15.3.7 HFC 227 (GAS) 9 Kg 2,485,000

3.15.4 DRY CHEMICAL (POWDER)

3.15.4.1 DRY CHEMICAL (POWDER) 1 Kg 485,000

3.15.4.2 DRY CHEMICAL (POWDER) 2 Kg 785,000

3.15.4.3 DRY CHEMICAL (POWDER) 3 Kg 985,000

3.15.4.4 DRY CHEMICAL (POWDER) 4 Kg 1,185,000

3.15.4.5 DRY CHEMICAL (POWDER) 5 Kg 1,385,000

3.15.4.6 DRY CHEMICAL (POWDER) 6 Kg 1,585,000

3.15.4.7 DRY CHEMICAL (POWDER) 9 Kg 2,035,000

3.15.4.8 DRY CHEMICAL (POWDER) 12 Kg 3,385,000

3.15.4.9 DRY CHEMICAL (POWDER) 25 Kg 9,350,000

3.15.4.10 DRY CHEMICAL (POWDER) 68 Kg 15,850,000

3.15.5 CARBON DIOXSIDA (CO2)

3.15.5.1 CARBON DIOXSIDA (CO2) 2 Kg 975,000

3.15.5.2 CARBON DIOXSIDA (CO2) 3 Kg 1,275,000

3.15.5.3 CARBON DIOXSIDA (CO2) 4 Kg 1,535,000

3.15.5.4 CARBON DIOXSIDA (CO2) 5 Kg 1,875,000

3.15.5.5 CARBON DIOXSIDA (CO2) 7 Kg 2,575,000

3.15.6 FOAM (BUSA) 9 Liter 450,000

3.15.7 PENGISIAN TABUNG

3.15.7.1 HFC 227 (GAS)

3.15.7.1.1 HFC 227 (GAS) 1 Kg 280,000

3.15.7.1.2 HFC 227 (GAS) 2 Kg 485,000

3.15.7.1.3 HFC 227 (GAS) 3 Kg 690,000

3.15.7.1.4 HFC 227 (GAS) 4 Kg 895,000

3.15.7.1.5 HFC 227 (GAS) 5 Kg 1,110,000

3.15.7.1.6 HFC 227 (GAS) 6 Kg 1,310,000

3.15.7.1.7 HFC 227 (GAS) 9 Kg 1,760,000

3.15.7.2 DRY CHEMICAL ( POWDER )

3.15.7.2.1 DRY CHEMICAL ( POWDER ) 1 Kg 160,000

3.15.7.2.2 DRY CHEMICAL ( POWDER ) 2 Kg 260,000

3.15.7.2.3 DRY CHEMICAL ( POWDER ) 3 Kg 360,000

3.15.7.2.4 DRY CHEMICAL ( POWDER ) 4 Kg 440,000

3.15.7.2.5 DRY CHEMICAL ( POWDER ) 5 Kg 510,000

3.15.7.2.6 DRY CHEMICAL ( POWDER ) 6 Kg 570,000

3.15.7.2.7 DRY CHEMICAL ( POWDER ) 9 Kg 720,000

3.15.7.2.8 DRY CHEMICAL ( POWDER ) 12 Kg 1,200,000

3.15.7.2.9 DRY CHEMICAL ( POWDER ) 25 Kg 2,500,000

3.15.7.2.10 DRY CHEMICAL ( POWDER ) 68 Kg 4,250,000

3.15.7.3 CARBON DIOXSIDA ( CO2 )

3.15.7.3.1 CARBON DIOXSIDA ( CO2 ) 2 Kg 450,000

137

Page 65: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

PENGISIAN Rp.

NO JENIS / NAMA BARANG SATUAN

3.15.7.3.2 CARBON DIOXSIDA ( CO2 ) 3 Kg 675,000

3.15.7.3.3 CARBON DIOXSIDA ( CO2 ) 4 Kg 900,000

3.15.7.3.4 CARBON DIOXSIDA ( CO2 ) 5 Kg 1,125,000

3.15.7.3.5 CARBON DIOXSIDA ( CO2 ) 7 Kg 1,525,000

3.15.7.4 FOAM (BUSA) 9 Liter 250,000

3.15.8 PERSONAL PROTECTIVE EQUIPMENT

3.15.8.1 Suit GUNNEBO NOMEX IIIA Red+WR6oz BS-EN 14,731,200

3.15.8.2 Suit NOMEX III-A Coverall 4,5 oz 2,292,400

3.15.8.3 Helmet Fire EN Standard PAB, HT-04 4,473,700

3.15.8.4 Glove Aluminized GUNNEBO 682,000

3.15.8.5 Boot Fire EN Standard HARVIK #9687 2,715,900

3.15.8.6 Approach Suit ZETEX 150-BA Series 25,078,900

3.15.8.7 Approach Suit ZETEX 550-BA Series 26,941,200

3.15.8.8 Proximity Suit ZETEX 750-BA Series 38,373,500

3.15.8.9 Klin Suit ZETEX 850-BA Series 62,065,300

3.15.8.10 Fire Entry Suit ZETEX 2000-BA Seriez 65,788,800

3.15.8.11 Fire Entry Suit ZETEX 3000-BA Seriez 73,750,600

3.15.8.12 SCBA SPIROMATIC 90U+hatch 346190586-GI 28,494,400

3.15.8.13 Cyl SCBA yellow-steel 6L-300Bar M18-90d 8,806,600

3.15.8.14 Cyl Spirolite Composite 3.4L300Bar+gauge 20,048,600

3.15.8.15 Cyl Spirolite Composite 6.7L300Bar+gauge 29,734,100

3.15.8.16 Cyl Alu-Liner Composite 9L 300Bar M18 22,976,800

3.15.8.17 EBA SPIROSCAPE, 15min_200bar empty 12,058,200

3.15.9 HIGH QUALITY FIRE HOSE

3.15.9.1 Hose FIREBREAK Machino cpl 1,5" x 30M 22,5 bar 4,632,100

3.15.9.2 Hose FIREBREAK Machino cpl 2" x 20M 22,5 bar 6,609,900

3.15.9.3 Hose EUROLINE BS-Instan cpl 2,5"x30M 20 bar 4,331,800

3.15.9.4 Hose EUROLINE BS-Instan cpl 1,5"x30M 20 bar 3,113,000

3.15.9.5 Hose Reel GUNNEDO Floor Mounted 1,5"x30M 15 bar 19,170,800

3.15.9.6 Hose Reel SWING 1"x36M 12 bar 5,229,400

3.15.9.7 Hose Reel SWING 3/4"x36M 12 bar 5,028,100

3.15.9.8 Suction Hose PVC 1,5"x6M, Italy 4 bar 6,196,300

3.15.9.9 Suction Hose PVC 3"x6M, By Alfagoma 3 bar 13,679,600

010 Hose Suction PVC 4"x6M, By Alfagoma 2 bar 17,099,500

3.15.10 FIRE ACCESORIES & FIRE NOZZEL

3.15.10.1 Kunci Hydrant Pilar Lokal 205,700

3.15.10.2 Kapak (Axe Fire) 985,600

3.15.10.3 Mobile Foam Trolly GUNNEBO 120L 42,887,900

3.15.10.4 Water Tank Portable BESTWAY Cap 5000L 4,851,000

3.15.10.5 Nozzel Protek M-Furpose #332.MACH 1,5" 7,687,900

3.15.10.6 Nozzel Protek M-Furpose #333.MACH 2,5" 10,062,800

3.15.10.7 Nozzel ZR 1-S-F KTRL+CURTAIN Mac 2,5" (Foam) 2,750,000

Ket : Point 3.15.3 s.d 3.15.10 Harga belum termasuk PPN

138

Page 66: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

3.16

3.16.1 PERALATAN BENGKEL BANGUNAN

3.16.1.1 Blander las welding unit/th 67,000 135,000 204,000

3.16.1.2Fakum Pembersih Nozzle 0,5m-2,75m unit/th 676,000 2,032,000 2,303,000

3.16.1.3Manipol Gas Economizer unit/th 676,000 2,032,000 2,303,000

3.16.1.4 Mesin Amplas unit/th 408,000 882,000 1,222,000

3.16.2

3.16.2.1 Amplas Tank Sander unit/th 1,182,000 1,774,000 2,366,000

3.16.2.2Asah Pisau / Universal Tool

Grinding

unit/th 4,141,000 4,732,000 5,324,000

3.16.2.3 Benso unit/th 8,283,000 8,874,000 9,465,000

3.16.2.4 Blower unit/th 590,000 1,182,000 3,549,000

3.16.2.5Bor Bangku ZMM metalik NC-

203

unit/th 1,513,000 2,422,000 3,878,000

3.16.2.6 CNC Milling Siemen 802 S unit/th 13,572,000 16,963,000 25,954,000

3.16.2.7CNC Milling Fanuc Twinhand 500-

02MC

unit/th 16,963,000 28,501,000 44,413,000

3.16.2.8 CNC Turing Siemen 802 S unit/th 12,213,000 19,001,000 32,300,000

3.16.2.9CNC Turing Siemen 820ZD unit/th 12,335,000 19,191,000 32,623,000

3.16.2.10 CNC Turning Fanuc Series Oi unit/th 11,101,000 17,272,000 29,360,000

3.16.2.11 CNC Wirecutting Troop-TP 32 ZT unit/th 10,242,000 15,211,000 26,938,000

3.16.2.12Cone Roiling Machine 16

swg

unit/th 1,015,000 1,355,000 2,015,000

3.16.2.13 Cylinder Grinder MA-1420A unit/th 1,388,000 3,302,000 4,629,000

3.16.2.14Dapur Pengering Elektrode

120C

unit/th 2,032,000 2,439,000 3,802,000

3.16.2.15Diep Thoetply Press 100-6 unit/th 338,000 1,355,000 1,440,000

3.16.2.16 Diesel Engine unit/th 1,774,000 2,366,000 2,958,000

3.16.2.17EDM ( Elektrical Discharge

Machine )

unit/th 10,176,000 13,572,000 20,186,000

3.16.2.18Hand Pallet Roda Double unit/th 678,000 1,697,000 2,716,000

3.16.2.19Hydraulic Press BMI, Kap. 100 ton unit/th 8,951,000 21,247,000 44,456,000

3.16.2.20 Kompresor unit/th 683,000 1,725,000 3,863,000

3.16.2.21Kompresor 12 HP Dinamo 3

PH

unit/th 2,366,000 2,958,000 3,549,000

3.16.2.22Mesin Autopower Feeder unit/th 6,507,000 7,099,000 7,691,000

3.16.2.23Mesin Bending/Tekuk Plat Kap. 100 ton; 2,4

m

unit/th 17,372,000 25,063,000 57,570,000

3.16.2.24 Mesin Boor Lantai Cap 5m unit/th 406,000 1,219,000 1,381,000

3.16.2.25 Mesin Boor Meja Cap 13m unit/th 849,000 1,188,000 2,037,000

3.16.2.26Mesin Booring Horizontal unit/th 814,000 1,833,000 2,445,000

3.16.2.27 Mesin Bor Bobok unit/th 3,904,000 4,259,000 4,614,000

3.16.2.28 Mesin Bubut CO 630A unit/th 1,828,000 5,391,000 12,843,000

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

PERALATAN BENGKEL MESIN

PERALATAN BENGKEL

HARGA

JENIS PEMELIHARAAN

139

Page 67: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.16.2.29 Mesin Bubut langkah 0,75 m unit/th 4,119,000 8,262,000 13,519,000

3.16.2.30 Mesin Bubut langkah 1 m unit/th 4,577,000 9,180,000 15,022,000

3.16.2.31 Mesin Bubut langkah 1,5 m unit/th 6,810,000 11,651,000 19,708,000

3.16.2.32 Mesin Bubut langkah 2 m unit/th 9,778,000 16,146,000 25,666,000

3.16.2.33 Mesin Bubut unit/th 8,874,000 9,465,000 10,057,000

3.16.2.34 Mesin Bubut TU CNC 2A unit/th 12,893,000 19,338,000 27,397,000

3.16.2.35 Mesin Bubut TU CNC 3A unit/th 13,572,000 20,356,000 28,839,000

3.16.2.36 Mesin Bubut Maro 5 VA 380-75 kw unit/th 7,326,000 8,793,000 13,702,000

3.16.2.37 Mesin Bubut Maro 6 VA 600mm unit/th 8,140,000 9,769,000 15,224,000

3.16.2.38Mesin Bubut Maximat SP

11

unit/th 5,427,000 5,651,000 9,418,000

3.16.2.39 Mesin Bubut semi ET 120 unit/th 13,572,000 16,286,000 25,379,000

3.16.2.40 Mesin Frais unit/th 2,034,000 8,140,000 8,649,000

3.16.2.41 Mesin Frais HMT unit/th 2,713,000 4,070,000 5,768,000

3.16.2.42 Mesin Frais Milling M HMT 2 FA unit/th 1,695,000 6,784,000 7,208,000

3.16.2.43 Mesin Frais PU CNC 3A unit/th 13,572,000 16,286,000 25,379,000

3.16.2.44 Mesin Frais Semi ET 120 unit/th 8,481,000 33,928,000 36,048,000

3.16.2.45 Mesin Gergaji Cap 075 unit/th 813,000 1,084,000 1,613,000

3.16.2.46 Mesin Gerinda Alat 2m unit/th 508,000 2,035,000 2,162,000

3.16.2.47 Mesin Gerinda AMC 12SPL 2Hp unit/th 5,427,000 8,140,000 11,534,000

3.16.2.48 Mesin Gerinda Perata unit/th 5,088,000 20,356,000 21,629,000

3.16.2.49 Mesin Gerinda Silinder HMT 12m unit/th 2,543,000 10,176,000 10,814,000

3.16.2.50 Mesin Las Stick KW 14-34 unit/th 174,000 641,000 1,260,000

3.16.2.51 Mesin Las TG KW 14-149 unit/th 1,729,000 3,715,000 6,604,000

3.16.2.52 Mesin Las Titik AC Cap 310mm

klasifikasi 2-2mm

unit/th 338,000 1,355,000 1,440,000

3.16.2.53 Mesin Las Titik AC Cap 220mm type

(DN 52 Ex RI)

unit/th 270,000 1,083,000 1,152,000

3.16.2.54Mesin Milling Horizontal SM 836 unit/th 3,390,000 6,716,000 12,406,000

3.16.2.55 Mesin Milling Universal X-8130 unit/th 4,431,000 9,294,000 15,216,000

3.16.2.56 Mesin Pasah/Planner unit/th 6,507,000 7,099,000 7,691,000

3.16.2.57Mesin Penekuk/Pelipat

16swg

unit/th 2,543,000 10,176,000 10,814,000

3.16.2.58 Mesin Plasma Cutting unit/th 3,034,000 8,108,000 14,873,000

3.16.2.59Mesin Portable Dust

Collector

unit/th 6,507,000 7,099,000 7,691,000

3.16.2.60 Mesin Potong unit/th 2,366,000 2,958,000 3,549,000

3.16.2.61 Mesin Potong Plat Kap. 2,4 m unit/th 5,502,000 18,519,000 31,595,000

3.16.2.62 Mesin Punch Kap. 100 ton unit/th 4,213,000 17,572,000 30,358,000

3.16.2.63 Mesin Punch Kap. 5 ton unit/th 1,479,000 6,941,000 13,792,000

3.16.2.64 Mesin Sekrap Kap. 350 mm unit/th 4,083,000 8,947,000 16,402,000

3.16.2.65 Mesin Sekrap Kap. 400 mm unit/th 2,832,000 6,371,000 12,158,000

3.16.2.66 Mesin Sirkel unit/th 1,774,000 2,366,000 2,958,000

3.16.2.67 Mesin Spindle unit/th 1,774,000 2,366,000 2,958,000

3.16.2.68Metalurgi Microscope 6x100

uller

unit/th 677,000 2,711,000 2,881,000

3.16.2.69MTU ( Mobil Training Unit ) unit/th 16,284,000 23,749,000 34,028,000

3.16.2.70 Pasah Mesin unit/th 3,372,000 4,732,000 7,454,000

3.16.2.71 Penyedot Debu unit/th 1,774,000 2,366,000 2,958,000

140

Page 68: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.16.2.72 Pesawat Las Listrik CTC 180 amp unit/th 10,856,000 13,029,000 20,304,000

3.16.2.73 Pesawat Las Listrik CTC 380 amp unit/th 13,026,000 15,634,000 24,364,000

3.16.2.74Pesawat Las Potong IK-12 unit/th 2,711,000 3,254,000 5,072,000

3.16.2.75 Surface Grinder PF-618 unit/th 2,006,000 4,843,000 9,165,000

3.16.2.76 Tekuk Pipa Manual unit/th 1,036,000 2,195,000 4,609,000

3.16.2.77 Tensimeter Machine Cap 1500 unit/th 675,000 811,000 1,264,000

3.16.2.78Universal Hardnes Testing unit/th 675,000 811,000 1,264,000

3.16.2.79Wire Cutting GS 2032

x8412

unit/th 2,034,000 4,070,000 6,920,000

3.16.3

3.16.3.1 Air Compressor 15 kg/cm2 unit/th 949,000 2,711,000 3,111,000

3.16.3.2 Air Compressor 4,5 kw, ES 3 unit/th 405,000 1,015,000 1,208,000

3.16.3.3 Air Condition Sanyo 565 unit/th 1,015,000 2,032,000 2,591,000

3.16.3.4 Alat Turning Tool unit/th 676,000 1,084,000 1,497,000

3.16.3.5Amature Tester/Growler unit/th 542,000 2,711,000 2,767,000

3.16.3.6 Are Welding Mix/Max 160 220V/50HZ unit/th 676,000 4,748,000 4,611,000

3.16.3.7 Auto Body Tool Fender unit/th 270,000 676,000 805,000

3.16.3.8 Auto Body Tool Fender 7 PC unit/th 270,000 676,000 805,000

3.16.3.9Auto Lift/past type laylock 3

ton/2,5m

unit/th 473,000 2,033,000 2,131,000

3.16.3.10 Badan Mobil Lengkap unit/th 1,355,000 2,711,000 3,457,000

3.16.3.11Badan Mobil Lengkap 3 kh

16

unit/th 1,355,000 2,711,000 3,457,000

3.16.3.12Badan Spd Motor Lengkap

V 80

unit/th 134,000 338,000 401,000

3.16.3.13Badan Spd Motor Lengkap,

Vespa

unit/th 270,000 542,000 690,000

3.16.3.14 Ball Joint Puller Walter unit/th 270,000 542,000 690,000

3.16.3.15 Ball Joint Puller Walter 172/1 OTC unit/th 270,000 542,000 690,000

3.16.3.16Bearing Pres Snap On C4-

91-D

unit/th 676,000 2,711,000 2,881,000

3.16.3.17Boor Tangan Listrik Pistol Cap 13mm unit/th 202,000 542,000 633,000

3.16.3.18Broke Master Cylinder

4009020

unit/th 270,000 542,000 690,000

3.16.3.19Broke Wheel Cylinder Lat,

Double Piston

unit/th 202,000 338,000 459,000

3.16.3.20Came Shaft Insenter &

Remv 4 tak, 4cyl

unit/th 542,000 1,015,000 1,324,000

3.16.3.21Caster Combarking Ping 30-

10

unit/th 270,000 676,000 805,000

3.16.3.22 Chasis Lubricator 800mm unit/th 270,000 542,000 690,000

3.16.3.23 Cluth Aligner unit/th 134,000 338,000 401,000

3.16.3.24Cluth Aligner Sykes 13710 unit/th 202,000 338,000 459,000

3.16.3.25 Coil Tester unit/th 542,000 2,032,000 2,189,000

3.16.3.26Condensor Tester DC 12 V unit/th 676,000 1,355,000 1,727,000

PERALATAN BENGKEL OTOMOTIF

141

Page 69: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.16.3.27Cylinder Boring Machine

3ph 200W

unit/th 1,355,000 5,427,000 5,765,000

3.16.3.28 Cylinder Head unit/th 676,000 1,355,000 1,727,000

3.16.3.29Cylinder liner remover 75-

150mm

unit/th 542,000 1,355,000 1,612,000

3.16.3.30Diesel Comprision Gauge unit/th 676,000 2,032,000 2,303,000

3.16.3.31 Diesel Fuel Inject Pump 3750 rpm unit/th 2,711,000 8,140,000 9,226,000

3.16.3.32 Diesel Fuel Inject Pump 6 cyl unit/th 676,000 1,015,000 1,440,000

3.16.3.33Diesel Injection Timing

&RPM Tester

0 -200rpm unit/th 1,015,000 2,711,000 3,169,000

3.16.3.34Differential unit

37077306,125 HG

unit/th 542,000 2,032,000 2,189,000

3.16.3.35Differential unit 37077307 unit/th 542,000 2,032,000 2,189,000

3.16.3.36Differential unit 59468713 unit/th 542,000 2,032,000 2,189,000

3.16.3.37 Differential Unit, 21 HG unit/th 542,000 2,032,000 2,189,000

3.16.3.38Distributor Test Bach DC

747

unit/th 270,000 949,000 1,037,000

3.16.3.39 Electrical Test Bech unit/th 2,711,000 10,856,000 11,534,000

3.16.3.40Electrik Mica Under Cutter

400 kg/m2

unit/th 949,000 1,356,000 1,959,000

3.16.3.41Ely Press Hand Power,

Dufex no 6

unit/th 405,000 949,000 1,152,000

3.16.3.42Engine Analyzer Osciloscop

AC 120 K

unit/th 2,711,000 9,500,000 10,379,000

3.16.3.43Exhaust Gas Analyzer

Crypton

unit/th 2,032,000 8,140,000 8,648,000

3.16.3.44 Gas Analyser Bosh unit/th 2,032,000 4,069,000 5,187,000

3.16.3.45 Gergaji Besi Listrik 200-300mm unit/th 338,000 1,355,000 1,440,000

3.16.3.46 Gerinda Listrik Tangan 125x22mm unit/th 270,000 1,015,000 1,093,000

3.16.3.47Gerinda Listrik Tangan

79048271

unit/th 270,000 1,015,000 1,093,000

3.16.3.48Hand Tachometer Techdock

12 & 4 tak

unit/th 338,000 1,355,000 1,440,000

3.16.3.49 Hydraulic Press Type Hp 15 ton unit/th 270,000 2,032,000 1,958,000

3.16.3.50 Hydrolic Service Jack 3 ton unit/th 270,000 1,355,000 1,382,000

3.16.3.51Injection Pump Special Kit unit/th 270,000 1,355,000 1,382,000

3.16.3.52Injection Tester Complete unit/th 270,000 1,355,000 1,382,000

3.16.3.53Inspection Hand Lamp 6

Watt

unit/th 270,000 1,355,000 1,382,000

3.16.3.54Jembatan Belakang Gigi,

Differential

unit/th 270,000 1,355,000 1,382,000

3.16.3.55Jembatan Belakang Poros,

Full Flesing

unit/th 270,000 1,355,000 1,382,000

3.16.3.56Kunci Moment 0-150FTL unit/th 270,000 1,355,000 1,382,000

3.16.3.57Magnetic Crack Detector

220V/50HZ

unit/th 405,000 1,355,000 1,496,000

3.16.3.58Model Belahan Motor

4009020

unit/th 542,000 1,355,000 1,612,000

142

Page 70: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.16.3.59Model Belahan Motor, Fiat

615 diesel

unit/th 542,000 1,355,000 1,612,000

3.16.3.60Motor Block 4 Cylinder

4637, 500E

unit/th 542,000 1,355,000 1,612,000

3.16.3.61Motor Block 6 Cylinder

227687

unit/th 542,000 1,355,000 1,612,000

3.16.3.62Motor Block 6 Cylinder

444408

unit/th 542,000 1,355,000 1,612,000

3.16.3.63Motor Block 6 Cylinder

45328

unit/th 542,000 1,355,000 1,612,000

3.16.3.64Motor Block 6 Cylinder

640250D

unit/th 542,000 1,355,000 1,612,000

3.16.3.65Motor Hidup Bensin 2 tak unit/th 542,000 1,355,000 1,612,000

3.16.3.66Motor Hidup Bensin 4 tak

980

unit/th 676,000 1,355,000 1,727,000

3.16.3.67 Motor Hidup Diesel unit/th 676,000 1,355,000 1,727,000

3.16.3.68Motor Hidup Diesel Thames

5306204

unit/th 676,000 1,355,000 1,727,000

3.16.3.69Motor Hidup Diesel Turbo unit/th 676,000 1,355,000 1,727,000

3.16.3.70 Motor Mati 4 tak unit/th 270,000 676,000 805,000

3.16.3.71Nozzle Recoditioning

Machine

unit/th 2,711,000 5,427,000 6,918,000

3.16.3.72Overhead Proyektor

Hp3300

unit/th 542,000 1,626,000 1,844,000

3.16.3.73Piston Pin Honing Machine 3ph 200W unit/th 676,000 1,355,000 1,727,000

3.16.3.74Piston Ring Compressor 40-75mm unit/th 405,000 676,000 921,000

3.16.3.75Puller kedudukan Katup 30-70 mm unit/th 270,000 676,000 805,000

3.16.3.76Speak Plug Service Set

K685-30E

unit/th 405,000 1,084,000 1,267,000

3.16.3.77 Stand Jack Mite unit/th 270,000 1,355,000 1,382,000

3.16.3.78 Stering gear unit unit/th 270,000 676,000 805,000

3.16.3.79Tacho Duel Meter 1355

Bawzai

unit/th 270,000 676,000 805,000

3.16.3.80Timing Advance Tester

1043

unit/th 676,000 1,084,000 1,497,000

3.16.3.81Timing Light System

612VOC

unit/th 676,000 2,032,000 2,303,000

3.16.3.82To in/to out Indicator 0,1

mm

unit/th 676,000 1,355,000 1,727,000

3.16.3.83Turning Radius Bonzai 290

mm

unit/th 270,000 676,000 805,000

3.16.3.84Tyming Lyght L300 type unit/th 676,000 2,032,000 2,303,000

3.16.3.85Universal Wheel Puller,

Walter

unit/th 270,000 676,000 805,000

3.16.3.86Versneling Sinkrone 913 unit/th 405,000 1,355,000 1,496,000

3.16.3.87Versneling Sinkrone Lat

591907 6-4

unit/th 405,000 1,355,000 1,496,000

3.16.3.88Wheel Aligment Hand Tool

2023

unit/th 676,000 1,355,000 1,727,000

143

Page 71: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

RINGAN SEDANG BERAT

Rp. Rp. Rp.

NO JENIS / NAMA BARANG SPESIFIKASI SATUAN

HARGA

JENIS PEMELIHARAAN

3.16.4 MESIN PEMBANGKIT

3.16.4.1 Generator Set 20 KVA Unit 6,768,000 8,459,000 9,215,000

3.16.4.2Generator Set 20 KVA (Marathon) Unit 8,660,000 10,827,000 12,992,000

3.16.4.3 Generator Set 21,3 KVA Unit 8,660,000 10,827,000 12,992,000

3.16.4.4 Generator Set 27,5 KVA Unit 8,983,000 11,230,000 13,821,000

3.16.4.5 Generator Set 30 KVA Unit 9,311,000 11,639,000 14,324,000

3.16.4.6Generator Set 30 KVA (Marathon) Unit 9,716,000 12,145,000 14,574,000

3.16.4.7 Generator Set 100 Kva Unit 34,040,000 42,551,000 52,371,000

3.16.4.8 Generator 5,5 Pk Unit 653,000 720,000 915,000

3.16.4.9 Generator 7,5 Pk Unit 1,089,000 1,380,000 1,962,000

144

Page 72: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.17

3.17.1 Mesin Marine MTU Fuel Filter ME H34 WK MTU pcs 894,000

3.17.2 Mesin Marine MTU Fuel Pre Filter Sparator pcs 629,000

3.17.3 Mesin Marine MTU Oil Filter MTU pcs 432,000

3.17.4 Mesin Marine MTU Air Filter MTU pcs 1,633,000

3.17.5 Mesin Marineperkins Oil Filter Perkins Marine pcs 364,000

3.17.6 Mesin Marineperkins Oil Filter Perkins Marine pcs 277,000

3.17.7 Mesin Marineperkins Fuel Perkins Marine pcs 524,000

3.17.8Mesin Marineperkins Fuel Pre Filter Sparator Perkins

Marine

pcs 493,000

3.17.9 Mesin Marineperkins air filter inner donaldson pcs 555,000

3.17.10 Mesin Marineperkins Air filter perkins marine pcs 771,000

3.17.11 Mesin Marineperkins impeller jabsco pcs 684,000

3.17.12 Mesin Marineperkins alloy anoda ( 10 x 20) pcs 894,000

3.17.13 Mesin Marineperkins Oli castrol Seamex drum 7,398,000

HARGA

Rp.NO

Pemeliharaan Suku Cadang Kapal

JENIS / NAMA BARANG SATUAN SPESIFIKASI

145

Page 73: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.18

3.18.1 SUKU CADANG ALAT BESAR

3.18.1.1 Adapter 791-635-3220 PC 6,344,000

3.18.1.2 Air Cleaner pcs 1,606,000

3.18.1.3 Bucket Assy Excavator PC 200 m3 38,681,000

3.18.1.4 Contractor LC 1 D 8011 ; Coil

110V

buah 7,924,000

3.18.1.5 Contractor LC 1 D 40 004; 110

Vbuah

7,227,000

3.18.1.6 Control Valve Assy Excavator PC 200 96,705,000

3.18.1.7Controller GP PC 200-7, 7835-

26-1008

unit 108,430,000

3.18.1.8 Cylinder Ass 790-101-1300 PC 181,280,000

3.18.1.9 Fuse REF 757349 EG IN 16A UN 24KVA set 17,226,000

3.18.1.10 Guide 791-620-3270 PC 2,626,000

3.18.1.11Hydroulik Pump Assy Excavator PC 200

92,998,000

3.18.1.12 Lampu Control 24V 0.11A buah 142,000

3.18.1.13 Mechanical Seal diameter 60 mm set 12,889,000

3.18.1.14 Mobilitas darat Mob-Demob alat berat set 46,000

3.18.1.15 Nut 791-635-3170 PC 504,000

3.18.1.16 Pump Assy 790-101-1102 PC 208,549,000

3.18.1.17 Pusher 791-620-3260 PC 2,940,000

3.18.1.18 Rantai U/F Klep Baja 1/4" m 345,000

3.18.1.19 Rantai U/F Klep Besi 1/4" m 179,000

3.18.1.20 Screw 791-635-3180 PC 5,206,000

3.18.1.21 Selenoid Assy Excavator PC 200 Pc 7,413,000

3.18.2 Suku Cadang Buldozer

3.18.2.1 Barel plunjer pcs 505,000

3.18.2.2 Bolt sproket pcs 43,000

3.18.2.3 Bolt Track shoe pcs 28,000

3.18.2.4 Carrier Roller - pcs 6,748,000

3.18.2.5 Chain track set 50,515,000

3.18.2.6 Filter bahan bakar pcs 86,000

3.18.2.7 Filter hidrolik pcs 252,000

3.18.2.8 Filter Oli pcs 129,000

3.18.2.9 Filter Udara pcs 613,000

3.18.2.10 Idler - pcs 38,924,000

3.18.2.11 Nozle pcs 649,000

3.18.2.12 Pump Assy Priming ND 092130-0220 - pcs 17,470,000

3.18.2.13 roller track pcs 5,772,000

3.18.2.14 Rotor Assy Turbo GA 410382-0007 - pcs 30,877,000

3.18.2.15 slang hidrolik pcs 865,000

3.18.2.16 sproket set 7,215,000

HARGA Rp.

PEMELIHARAAN SUKU CADANG ALAT BESAR

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

146

Page 74: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.2.17 Starting Motor 600-813-3530 - pcs 36,241,000

3.18.2.18 Track Roller - pcs 8,760,000

3.18.2.19 Track Shoe pcs 1,947,000

3.18.2.20 Water Pump 6150-61 1101 - pcs 33,560,000

3.18.3 Stone Crusher

3.18.3.1 Barel plunjer buah 505,000

3.18.3.2 Belt compeyor meter 397,000

3.18.3.3 Filter bahan bakar buah 86,000

3.18.3.4 Filter Oli buah 129,000

3.18.3.5 Filter Udara buah 505,000

3.18.3.6 Jow buah 5,772,000

3.18.3.7 Nozle buah 649,000

3.18.3.8 Roll compeyor besar buah 1,082,000

3.18.3.9 Roll compeyor kecil buah 180,000

3.18.3.10 Screene buah 1,731,000

3.18.3.11 V belt buah 108,000

3.18.4 Wheel Loader

3.18.4.1 Alternator buah 5,772,000

3.18.4.2 Barel plunjer buah 324,000

3.18.4.3 Creese joint buah 1,226,000

3.18.4.4 Disk clute power ship buah 649,000

3.18.4.5 Filter bahan bakar buah 86,000

3.18.4.6 Filter hidrolik buah 324,000

3.18.4.7 Filter Oli buah 129,000

3.18.4.8 Filter Udara buah 505,000

3.18.4.9 Hose hidrolik buah 865,000

3.18.4.10 Kampas rem buah 793,000

3.18.4.11 Motor stater buah 7,215,000

3.18.4.12 Nozle buah 649,000

3.18.4.13 Reparkit brake master set 721,000

3.18.4.14 Reparkit wheel silinder set 649,000

3.18.4.15 V belt buah 108,000

3.18.4.16 Wheel silinder buah 4,329,000

3.18.5 Suku Cadang Excavator

3.18.5.1 Alternator 600-861-3410 - pc 18,105,000

3.18.5.2 Arm Cylinder (Blind Parts) Rep Kit - pc 5,628,000

3.18.5.3 Boom Rep Kit - pc 5,437,000

3.18.5.4 Bushing Piston - pc 516,000

3.18.5.5 Carrier Roller Assy 20Y-30-08050 - pc 6,874,000

3.18.5.6 Cutter R/L 205-70-74180/74190 - pc 9,988,000

3.18.5.7 Cylinder Bucket - Rep Kit - pc 5,437,000

147

Page 75: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.5.8 Deliveri Valve - pc 1,778,000

3.18.5.9 Fan Belt 04121-21744 - pc 3,565,000

3.18.5.10 Fan Belt 6732-81-3380 - pc 4,988,000

3.18.5.11 Flunger Injection Pump - pc 3,666,000

3.18.5.12 Fuse 064 0165 150 - pc 4,733,000

3.18.5.13 Hose - pc 731,000

3.18.5.14 Hose HDY D34120 F2 - pc 1,858,000

3.18.5.15 Hose Radiator Upper 20Y-03-28292 - pc 1,778,000

3.18.5.16 Hyd Hose - pc 4,168,000

3.18.5.17 Idle 20Y-30-08050 - pc 20,505,000

3.18.5.18 Motor Starter 600-863-4110 - pc 50,534,000

3.18.5.19 Oil Cooler Assy 20Y 03-21720 - pc 175,845,000

3.18.5.20 Oil Seal/O Ring Bomb - pc 404,000

3.18.5.21 Pin Piston - pc 516,000

3.18.5.22 Piston 6735-31-2110 - pc 10,766,000

3.18.5.23 Piston Ring 6732-31-2300 - pc 2,718,000

3.18.5.24 Radiator Cup 20Y-03-22110 - pc 1,153,000

3.18.5.25 Ring Back Up 130140.2 - pc 3,218,000

3.18.5.26 Swits 08088 30 000 - pc 4,932,000

3.18.5.27 Swits 20Y 0165 160 - pc 7,747,000

3.18.5.28 Swits Oil 6732-81-3140 - pc 3,565,000

3.18.5.29 Tooth 205-70-19570 - pc 1,778,000

3.18.5.30 Track Link Assy - pc 146,043,000

3.18.5.31 Track Roller - pc 8,804,000

3.18.5.32 Track Shoe Triple - pc 3,469,000

3.18.5.33 Water Pump Assy 6735-61-1500/1100 - pc 12,720,000

3.18.6 Suku Cadang Vibro JV 100 WA

3.18.6.1 Ban Assy 23.1x26 (Tibles) - pc 38,016,000

3.18.6.2 Motor Starter 600-813-3280/2243 - pc 52,613,000

3.18.6.3 Oil Cooler 173-03-11140 - pc 177,182,000

3.18.6.4 Pump Priming DK 105210-4570 - pc 18,944,000

3.18.6.5 Radiator Assy 273-03-11100 - pc 215,916,000

3.18.6.6 Rotor Assy Turbo 6137-82-8200 - pc 37,045,000

3.18.6.7 Swits 08088.30.000 - pcs 4,556,000

3.18.6.8 Swits 20Y.0615.160 - pcs 8,069,000

3.18.6.9 Vibration Rabber - pc 3,859,000

3.18.6.10 Water Pump 6316-61-1101 - pc 37,045,000

3.18.7 Bahan Pendukung Lainnya

3.18.7.1 Crank Shaft Bearing/Mainbearing set 10,325,000

3.18.7.2 Delivery Valve pcs 247,000

3.18.7.3 Vet/Grease (Rotary) - pc 262,000

148

Page 76: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.8 Electric

3.18.8.1 Altenator set 19,047,000

3.18.8.2 Battery 12V/100 AH pcs 2,035,000

3.18.8.3 Fan Belt pcs 2,401,000

3.18.8.4 Flunger Fuel Injection Pump pcs 2,968,000

3.18.8.5 Fuel Filter pcs 194,000

3.18.8.6 Fuse 064.0615.150 pcs 5,295,000

3.18.8.7 Membre pcs 1,365,000

3.18.8.8 Motor Starter set 38,722,000

3.18.8.9 Nozzle Kg 6,460,000

3.18.8.10 Oli Filter pcs 144,000

3.18.8.11 Packing Full Set set 6,072,000

3.18.8.12 Piston Unit 14,625,000

3.18.8.13 Piston Ring set 2,578,000

3.18.8.14 Radiator Cup pcs 931,000

3.18.8.15 Radiator Hose Upper/Lower set 1,972,000

3.18.8.16 Swits Oil pcs 691,000

3.18.9 Under Cariage

3.18.9.1 Bolt Wock Shoe pcs 40,000

3.18.9.2 Bucket set 6,477,000

3.18.9.3 Fan Belt Hyd Pump pcs 3,098,000

3.18.9.4 Hyd Hose pcs 2,592,000

3.18.9.5 Oil Filter Hyd pcs 435,000

3.18.9.6 Oil Seal/O Ring pcs 982,000

3.18.9.7 Toll Bucket pcs 237,000

3.18.9.8 Track Roller pcs 4,727,000

3.18.9.9 Water Pump Rep Kit kecil set 6,452,000

3.18.9 Crane On Wheel

3.18.9.1 Barel plunjer buah 619,000

3.18.9.2 Central rem buah 7,090,000

3.18.9.3 Filter bahan bakar buah 105,000

3.18.9.4 Filter hidrolik buah 397,000

3.18.9.5 Filter Oli buah 158,000

3.18.9.6 Filter Udara buah 619,000

3.18.9.7 Hose hidrolik buah 1,062,000

3.18.9.8 Kampas rem buah 1,771,000

3.18.9.9 Metal duduk set 3,545,000

3.18.9.10 Metal Jalan set 2,657,000

3.18.9.11 Nozle buah 973,000

3.18.9.12 Packing set set 6,381,000

3.18.9.13 Piston buah 2,480,000

3.18.9.14 Reparkit brake master set 1,506,000

149

Page 77: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.9.15 Reparkit Wheel silinder set 1,330,000

3.18.9.16 Ring piston set 1,771,000

3.18.9.17 Seal hidrolik buah 2,657,000

3.18.9.18 Silinder liner buah 2,657,000

3.18.9.19 V belt buah 131,000

3.18.9.20 Wheel silinder buah 3,545,000

3.18.10 Crane On Track

3.18.10.1 Barel plunjer buah 665,000

3.18.10.2 Bearing as penggerak buah 1,240,000

3.18.10.3 Brake shoe buah 1,330,000

3.18.10.4 Chain penggerak track set 26,594,000

3.18.10.5 Chain track set 70,918,000

3.18.10.6 Filter bahan bakar buah 105,000

3.18.10.7 Filter Oli buah 158,000

3.18.10.8 Filter Udara buah 619,000

3.18.10.9 Nozle buah 796,000

3.18.10.10 Reparkit brake master set 885,000

3.18.10.11 Reparkit wheel silinder set 796,000

3.18.10.12 Roller track buah 3,545,000

3.18.10.13 V belt buah 131,000

3.18.11 Tire Roller

3.18.11.1 Barel plunjer buah 665,000

3.18.11.2 Chain penggerak roda buah 4,431,000

3.18.11.3 Control valve steer buah 12,410,000

3.18.11.4 Filter bahan bakar buah 105,000

3.18.11.5 Filter Oli buah 158,000

3.18.11.6 Filter Udara buah 619,000

3.18.11.7 Hidro vac. buah 7,090,000

3.18.11.8 Nozle buah 796,000

3.18.11.9 Pompa air buah 3,988,000

3.18.11.10 Reparkit brake master set 1,594,000

3.18.11.11 Slang hidrolik buah 1,062,000

3.18.11.12 V belt buah 131,000

3.18.11.13 Wheel silinder buah 1,417,000

3.18.12 Vibration Roller

3.18.12.1 Barel plunjer buah 708,000

3.18.12.2 Filter bahan bakar buah 78,000

3.18.12.3 Filter Oli buah 105,000

3.18.12.4 Filter Udara buah 619,000

3.18.12.5 Hose hidrolik buah 1,062,000

3.18.12.6 Nozle buah 575,000

150

Page 78: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.12.7 Pompa hidrolik buah 17,728,000

3.18.12.8 V belt buah 87,000

3.18.12.9 Wheel mounting buah 1,062,000

3.18.13 Motor Grader

3.18.13.1 Barel plunjer buah 665,000

3.18.13.2 Control valve buah 13,296,000

3.18.13.3 Filter bahan bakar buah 105,000

3.18.13.4 Filter Oli buah 158,000

3.18.13.5 Filter Udara buah 752,000

3.18.13.6 Hose hidrolik buah 1,062,000

3.18.13.7 Nozle buah 973,000

3.18.13.8 Pompa hidrolik buah 29,253,000

3.18.13.9 Reparkit brake master set 1,417,000

3.18.13.10 Seal hidrolik set 2,657,000

3.18.13.11 V belt buah 131,000

3.18.13.12 Water pump buah 5,850,000

3.18.13.13 Wheel silinder buah 1,330,000

3.18.14 Road Roller

3.18.14.1 Air fiter assy set 2,436,000

3.18.14.2 Atomiser holder nozzel buah 488,000

3.18.14.3 Barel Plunyer buah 437,000

3.18.14.4 Baut Ring Gear buah 18,000

3.18.14.5 Bearing 30207 DIN 720 buah 131,000

3.18.14.6 Bearing 30208 DIN 720 buah 131,000

3.18.14.7 Bearing 32207 DIN 720 buah 619,000

3.18.14.8 Bearing Druk Lager buah 876,000

3.18.14.9 Bearing Gear Pinion buah 1,364,000

3.18.14.10 Bolt cyl head panjang buah 176,000

3.18.14.11 Bolt cyl head pendek buah 131,000

3.18.14.12 Bush Pen Piston buah 174,000

3.18.14.13 Bush Roda Belakang buah 488,000

3.18.14.14 Bush Roda Depan buah 308,000

3.18.14.15 Chain Timing buah 1,506,000

3.18.14.16 Control Rek buah 1,364,000

3.18.14.17 Disk Coupling buah 146,000

3.18.14.18 Dudukan Segment buah 6,824,000

3.18.14.19 Engine Diesel 30 Pk unit 14,624,000

3.18.14.20 Fuel Filter buah 87,000

3.18.14.21 Gear Pinion buah 1,506,000

3.18.14.22 Gigi Nanas buah 10,723,000

3.18.14.23 Half Universal Joint buah 340,000

3.18.14.24 Hardi Coupling buah 539,000

151

Page 79: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.14.25 Housing Bearing buah 779,000

3.18.14.26 Housing Gear Pinion buah 4,874,000

3.18.14.27 Kopling unit 7,800,000

3.18.14.28 Lever MV6P 04.00.21 buah 114,000

3.18.14.29 Lever MV6P 04.00.23 buah 140,000

3.18.14.30 Link buah 19,000

3.18.14.31 Membran buah 291,000

3.18.14.32 Metal Duduk set 1,899,000

3.18.14.33 Metal Jalan set 965,000

3.18.14.34 Nozle buah 308,000

3.18.14.35 Oil Filter buah 105,000

3.18.14.36 Oil Seal 105x130x13 buah 78,000

3.18.14.37 Oil Seal 60x85x13 buah 43,000

3.18.14.38 Oil Seal 40x60x10 buah 30,000

3.18.14.39 Paking Set set 731,000

3.18.14.40 Piece Coupling buah 539,000

3.18.14.41 Pin Lever buah 25,000

3.18.14.42 Pin Lever buah 29,000

3.18.14.43 Pin Link buah 17,000

3.18.14.44 Pin Slide buah 34,000

3.18.14.45 Piston buah 796,000

3.18.14.46 Plate Cluth Front buah 796,000

3.18.14.47 Plate Cluth Rear buah 796,000

3.18.14.48 Polly buah 488,000

3.18.14.49 Ring Gear buah 19,501,000

3.18.14.50 Ring Piston set 308,000

3.18.14.51 Seal Crankshaf buah 77,000

3.18.14.52 Seal Gear Pinion buah 146,000

3.18.14.53 Seal Oil 50x65x10 buah 77,000

3.18.14.54 Seal Oil Depan 50x72x10 buah 34,000

3.18.14.55 Seal Timing Case buah 61,000

3.18.14.56 Segment buah 2,145,000

3.18.14.57 Shaf Gear Pinion buah 3,410,000

3.18.14.58 Shaf Piece Coupling buah 1,070,000

3.18.14.59 Shafs roker arm assy set 1,557,000

3.18.14.60 Silinder liner buah 534,000

3.18.14.61 Slide buah 38,000

3.18.14.62 Tensioner timing chain assy set 849,000

3.18.14.63 Tutup Roda Belakang buah 682,000

3.18.14.64 Universal Joint buah 388,000

3.18.14.65 V. Belt buah 87,000

3.18.14.66 Valve Inlet buah 176,000

3.18.14.67 Valve Outlet buah 176,000

3.18.14.68 Water Pump buah 1,654,000

152

Page 80: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.14.69 Worm Spindle buah 1,754,000

3.18.15 Suku Cadang Alat Berat DPU Kab. Pekalongan

3.18.15.1 BACKHOE LOADER

3.18.15.1.2 Ban Depan (Luar) Buah 10,500,000

3.18.15.1.3 Ban Depan (Dalam) Buah 1,500,000

3.18.15.1.4 Ban Belakang (Luar) Buah 17,000,000

3.18.15.1.5 Ban Belakang (Dalam) Buah 2,000,000

3.18.15.1.6 Alternator Buah 4,800,000

3.18.15.1.7 Seal Piston Set 500,000

3.18.15.1.8 Seal Teflon Set 200,000

3.18.15.1.9 Oil Filter Buah 105,000

3.18.15.1.10 Fuel Filter Buah 80,000

3.18.15.1.11 Kuku Bucket Buah 470,000

3.18.15.1.12 Adaptor Bucket Buah 580,000

3.18.15.1.13 Selang Hidrolis 3/4" P. 125 Cm Buah 700,000

3.18.15.1.14 Motor Stater Buah 5,000,000

3.18.15.1.15 Filter Udara Buah 405,000

3.18.15.2 SUKU CADANG MESIN GILAS (THREE WHEEL ROLLES) MERK BARATA

3.18.15.2.1 Ring Gear (Gigi Roda) Buah 17,000,000

3.18.15.2.2 Pinyon Gear (Roda Gigi Pinion) Buah 1,250,000

3.18.15.2.3 Kampas Kopling Buah 1,550,000

3.18.15.2.4 Gigi Handel Buah 2,050,000

3.18.15.2.5 Nozel Buah 600,000

3.18.15.2.6 Alternator Buah 3,950,000

3.18.15.2.7 Motor Stater Buah 4,100,000

3.18.15.2.8 Pin Kecil Buah 17,000

3.18.15.2.9 Pin Sedang Buah 19,500

3.18.15.2.10 Pin Besar Buah 22,000

3.18.15.2.11 Pin Sepatu Buah 55,000

3.18.15.2.12 Pin Ulir Buah 70,000

3.18.15.3 EXCAVATOR

3.18.15.3.1 Kuku Bucket Buah 290,000

3.18.15.3.2 Adaptor Bucket Buah 380,000

3.18.15.3.3 Sealkit Hydraulic Pump Buah 1,500,000

3.18.15.3.4 Sealkit Bucket Set 800,000

3.18.15.3.5 Sealkit Handel Set 350,000

3.18.15.3.6 Bushing 3080 Set 250,000

3.18.15.4 Suku Cadang UPT Laboratorium dan Bengkel DPU Kab. Pekalongan

3.18.15.4.1 MESIN POTONG RUMPUT

3.18.15.4.2 - Block Silinder set 200,000

153

Page 81: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

HARGA Rp.

NO JENIS / NAMA BARANG SATUAN SPESIFIKASI

3.18.15.4.3 - Kampas kopling set 50,000

3.18.15.4.4 - Karburator unit 200,000

3.18.15.4.5 - piston bh 45,000

3.18.15.4.6 - Re Parkit Karburator set 300,000

3.18.15.4.7 - Karburator unit 500,000

3.18.15.4.8 - CDI Honda unit 300,000

3.18.15.4.9 - Recoil Starter bh 300,000

3.18.15.4.10 - Fleksible Cam Shaf unit 30,000

3.18.15.4.2 CONCRETE MIXER ( MOLEN BETON )

3.18.15.4.2.1 - Gigi pinion bh 400,000

3.18.15.4.2.2 - As Bearing bh 100,000

3.18.15.4.3 MESIN PENGGERAK DIESEL

3.18.15.4.3.1 - Piston bh 105,000

3.18.15.4.3.2 - Ring Piston set 425,000

3.18.15.4.3.3 - Bos Pump unit 165,000

3.18.15.4.3.4 - Nozzle unit 115,000

3.18.15.4.3.5 - Block Silinder bh 166,000

3.18.15.4.4 MESIN PENGGERAK BENSIN

3.18.15.4.4.1 - Piston bh 70,000

3.18.15.4.4.2 - Ring piston set 30,000

3.18.15.4.4.3 - Gasket set 20,000

3.18.15.4.4.4 - Karburator unit 300,000

3.18.15.4.4.5 - CDI unit 175,000

154

Page 82: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.19 Biaya Penambahan Daya Listrik, Biaya Pemasangan Telepon Baru, Biaya

Pemasangan PDAM, dan Biaya Pemasangan

CCTV

3.19.1 Biaya Penyambungan Listrik Baru

3.19.1.1 R1 Daya 450 VA unit UP

3.19.1.2 R1 Daya 900 VA unit UP

3.19.1.3 R1 Daya 1300 VA unit UP

3.19.1.4 R1 Daya 2200 VA unit UP

3.19.1.5 R1 diatas 2200 VA unit UP

3.19.1.6 S2-TR Daya 450 VA unit UP

3.19.1.7 S2-TR Daya 900 VA unit UP

3.19.1.8 S2-TR Daya 1300 VA unit UP

3.19.1.9 S2-TR Daya 2200 VA unit UP

3.19.1.10 S2-TR diatas Daya 2200 VA unit UP

3.19.2 Biaya Penambahan Daya Listrik

3.19.2.1 R1-TR 450 VA menjadi 900 VA unit UP

3.19.2.2 R1-TR 450 VA menjadi 1300 VA unit UP

3.19.2.3 R1-TR 450 VA menjadi 2200 VA unit UP

3.19.2.4 R1-TR 900 VA menjadi 1300 VA unit UP

3.19.2.5 R1-TR '900 VA menjadi 2200 VA unit UP

3.19.2.6 R1-TR 1300 VA menjadi 2200 VA unit UP

3.19.2.7 R1-TR diatas 2200 VA unit UP

3.19.2.8 S2-TR 450 VA menjadi 900 VA unit UP

3.19.2.9 S2-TR 450 VA menjadi 1300 VA unit UP

3.19.2.10 S2-TR 450 VA menjadi 2200 VA unit UP

3.19.2.11 S2-TR 900 VA menjadi 1300 VA unit UP

3.19.2.12 S2-TR '900 VA menjadi 2200 VA unit UP

3.19.2.13 S2-TR 1300 VA menjadi 2200 VA unit UP

3.19.2.14 S2-TR diatas 2200 VA unit UP

3.19.3 Biaya Pemasangan Instalasi Rumah

3.19.3.1 Pemasangan di dalam rumah Titik UP

3.19.3.2 Pemasangan di luar rumah Titik UP

3.19.4 Biaya Penyambungan Telepon Baru

3.19.4.1 Bisnis :

3.19.4.1.1 Biaya Penyambunganunit

sambungan

UP

3.19.4.1.2 Biaya Instalasiunit

sambungan

UP

KETERANGANNO PERINCIAN KEGIATAN SATUAN HARGA

155

Page 83: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

KETERANGANNO PERINCIAN KEGIATAN SATUAN HARGA

3.19.4.2 Perumahan :

3.19.4.2.1 Biaya Penyambunganunit

sambungan

UP

3.19.4.2.2 Biaya Instalasiunit

sambungan

UP

3.19.5 Biaya Pemasangan PDAM

UP Disesuaikan dengan

standar PDAM

setempat

3.19.6 Biaya Pemasangan Listrik

3.19.6.1 Biaya Conecting Titik 66,000

3.19.6.2 Biaya Programing Lot 3,300,000

3.19.7 Biaya Pemasangan CCTV

3.19.7.1 Jasa Pemasangan Kabel CCTV lusin 9,900

3.19.7.2 Jasa Pemasangan Kamera CCTV lusin 132,000

3.19.7.3 Jasa Setting dan Pemindahan DVR lusin 924,000

3.19.7.4 Pemeliharaan CCTV titik 1,000,000

156

Page 84: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

III.C. STANDARDISASI BIAYA LANGSUNG PERSONIL (BILLING RATE)

JASA KONSULTANSI, KONSTRUKSI DAN NON KONSTRUKSI

3.20 BESARAN MAKSIMAL BIAYA LANGSUNG PERSONIL (REMUNERASI/BILLING RATE)

3.20.1 TENAGA AHLI PENDIDIKAN (SI,S2,S3)

Rupiah

Perbulan

Rupiah

Perbulan

Rupiah

Perbulan

S1 S2 S3

Rp. Rp. Rp.

3.20.1.1 Ahli pertama I-A 1 10,812,500 - - - -

I-B 2 12,200,000 - - - -

I-C 3 13,650,000 - - - -

I-D 4 15,150,000 - - - -

3.20.1.2 Ahli Muda II-A 5 16,650,000 1 17,550,000 - -

II-B 6 18,150,000 2 19,350,000 - -

II-C 7 19,650,000 3 21,150,000 - -

II-D 8 21,150,000 4 22,950,000 - -

3.20.1.3 Ahli Madya III-A 9 22,650,000 5 24,750,000 1 27,300,000

III-B 10 24,150,000 6 26,550,000 2 29,250,000

III-C 11 25,650,000 7 28,500,000 3 31,200,000

III-D 12 27,150,000 8 30,300,000 4 33,150,000

3.20.1.4 Ahli Utama IV-A 13 28,600,000 9 32,100,000 5 35,250,000

IV-B 14 30,100,000 10 33,900,000 6 37,200,000

IV-C 15 31,600,000 11 35,700,000 7 39,150,000

IV-D 16 33,100,000 12 37,650,000 8 41,100,000

3.20.1.5 Ahli Kepala V-A 17 34,650,000 13 39,450,000 9 43,200,000

V-B 18 36,150,000 14 41,250,000 10 45,150,000

V-C 19 37,650,000 15 43,050,000 11 47,100,000

V-D 20 39,150,000 16 44,850,000 12 49,050,000

3.20.1.6Ahli Pembina

KepalaVI-A 21 40,650,000 17 46,650,000 13 51,150,000

VI-B 22 42,150,000 18 48,600,000 14 53,100,000

VI-C 23 43,650,000 19 50,400,000 15 55,050,000

VI-D 24 45,150,000 20 52,200,000 16 57,000,000

VI-E 25 46,650,000 21 54,000,000 17 59,100,000

KeteranganBiaya langsung personil yang dihitung merupakan gaji dasar yang sudah dikalikan 4Biaya langsung personil yang dihitung belum mencakup Beban Biaya Sosial (SocialCost), Beban BiayaUmum (Overhead Cost), Tunjangan (Allowance) dan Keuntungan (Profit).

Tahun

Pengalaman

Tahun

Pengalaman

Kelompok Keahlian

No.Tahun

Pengalaman

GolKlasifikasi

157

Page 85: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.20.2 TENAGA PENDUKUNG

NO KELOMPOK KEAHLIANTAHUN

PENGALAMAN

BESARNYA BIAYA

BEBAN PERSONIL

PER BULAN (Rp.)

3.20.2.1 Office Manager *) - 7,894,000

3.20.2.2 Sekretaris - 4,848,000

3.20.2.3 Sekretaris Bilingual - 7,808,000

3.20.2.4 Juru Gambar - 3,604,000

3.20.2.5 Operator Komputer - 4,290,000

3.20.2.6 Sopir - 2,746,000

3.20.2.7 Pesuruh / Office Boy - 2,317,000

3.20.2.8 Penjaga - 2,488,000

3.20.2.9 Teknisi

3.20.2.9.1 S.I 0 - 3 th 7,979,000

3.20.2.9.2 S.0 / D.3 > 3 th 7,979,000

3.20.2.9.3 S.2 0 - 1 th 7,979,000

3.20.2.10 Inspector

3.20.2.10.1 S.I 0 - 3 th 7,979,000

3.20.2.10.2 S.0 / D.3 > 3 th 7,979,000

3.20.2.10.3 S.2 0 - 1 th 7,979,000

3.20.2.11 Surveyor

3.20.2.11.1 S.I 0 - 3 th 7,207,000

3.20.2.11.2 S.0 / D.3 > 3 th 7,207,000

3.20.2.11.3 S.2 0 - 1 th 7,207,000

3.20.2.12 Operator Computer

3.20.2.12.1 S.I 0 - 3 th 7,979,000

3.20.2.12.2 S.0 / D.3 5 - 10 th 7,979,000

3.20.2.12.3 S.2 0 - 1 th 7,979,000

3.20.2.13

3.20.2.13.1 S.I 3 - 5 th 10,296,000

3.20.2.13.2 S.0 / D.3 > 6 th 10,296,000

3.20.2.13.3 S.2 1 - 3 th 10,296,000

3.20.2.14

3.20.2.14.1 S.I 0 - 3 th 9,695,000

3.20.2.14.2 S.0 / D.3 3 - 6 th 9,695,000

3.20.2.14.3 S.2 0 - 1 th 9,695,000

3.20.2.15 Special Technician

3.20.2.15.1 S.I 0 - 3 th 9,438,000

3.20.2.15.2 S.0 / D.3 > 3 th 9,438,000

3.20.2.15.3 S.2 0 - 1 th 9,438,000

3.20.2.16 Pembantu Juru Ukur STM/SLTA Sederajat 3,604,000

3.20.2.17 Koordinator Survey Lalu Lintas S1 (≥ 3 th ) 7,207,000

3.20.2.18 Ketua Kelompok Pencacah Lalu STM/SLTA Sederajat 3,604,000

3.20.2.19 Petugas Pencacah Lalu Lintas STM/SLTA Sederajat 2,746,000

Catatan*) Digunakan untuk konsultan konstruksi / non konstruksi dengan jumlah pendukung minimal 20 orangBiaya langsung personil yang dihitung belum mencakup Beban Biaya Sosial (Social Cost), Beban BiayaUmum (Overhead Cost), Tunjangan (Allowance) dan Keuntungan (Profit).

Senior Assisten Profesional Staf/Site Engineer

Asistant Profesional Staff/Quality/Quantity Engineer

158

Page 86: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.20.3 PENILAI BERIZIN PROPERTI SEDERHANA

NOTAHUN

PENGALAMAN

GAJI DASAR

(Rp.)SBOB (Rp.) SBOH(Rp.)

I Penilai Berizin Properti dan/atau Bisnis (S)

1.Penilai Berizin Properti

dan/atau Bisnis (S) I> 20 Tahun 63,600,000 189,051,000 9,500,000

2.Penilai Berizin Properti

dan/atau Bisnis (S) II> 10 - 20 Tahun 49,000,000 145,652,000 7,300,000

3.Penilai Berizin Properti

dan/atau Bisnis (S) IIIs.d 10 Tahun 32,800,000 97,498,000 4,900,000

II Penilai Berizin Personal Properti (P)

1.Penilai Berizin Personal

Properti (P) I> 20 Tahun 45,000,000 133,762,000 6,700,000

2.Penilai Berizin Personal

Properti (P) II> 10 - 20 Tahun 34,450,000 101,902,000 5,100,000

3.Penilai Berizin Personal

Properti (P) IIIs.d 10 Tahun 24,500,000 72,826,000 3,600,000

III Penilai Berizin Properti Sederhana (PS)

1.Penilai Berizin Properti

Sederhana (PS) I> 10 Tahun 26,400,000 78,474,000 3,900,000

2.Penilai Berizin Properti

Sederhana (PS) II> 5 - 10 Tahun 19,900,000 58,152,000 3,000,000

3.Penilai Berizin Properti

Sederhana (PS) IIIs.d 5 Tahun 16,200,000 48,154,000 2,400,000

IV Penilai Madya (T)

1. Penilai Madya (T) I > 10 Tahun 12,600,000 37,453,000 1,900,000

2. Penilai Madya (T) II > 5 - 10 Tahun 10,200,000 30,319,000 1,500,000

3. Penilai Madya (T) III s.d 5 Tahun 7,500,000 23,482,000 1,200,000

V Penilai Pratama (P)

1. Penilai Pratama (P) I > 10 Tahun 6,900,000 20,510,000 1,030,000

2. Penilai Pratama (P) II > 5 - 10 Tahun 5,900,000 17,537,000 900,000

3. Penilai Pratama (P) III s.d 5 Tahun 5,100,000 15,159,000 800,000

VI Tenaga Administrasi 1-5 Tahun 4,500,000 13,376,000 670,000

VII Pelaksana iNspeksi 1-3 Tahun 4,100,000 12,187,000 610,000

VIII Operator Komputer 1-3 Tahun 3,700,000 10,988,000 550,000

IX Drafter 1-3 Tahun 3,700,000 10,988,000 550,000

KUALIFIKASI

159

Page 87: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

III.D

3.21 INDEKS HARGA SATUAN BANGUNAN GEDUNG NEGARA, RUMAH NEGARA DAN PAGAR BANGUNAN.

KABUPATEN PEKALONGAN

PROVINSI JAWA TENGAH

PERIODE 2019

TAHUN ANGGARAN 2019(DALAM RUPIAH)

5,140,000 4,620,000 3,850,000

1,870,000

1,210,000

1,140,000

1,860,000

5,280,000 3,970,000

BELAKANG

2,040,000

1,790,000

INDEKS HARGA SATUAN BANGUNAN GEDUNG NEGARA, RUMAH

NEGARA DAN PAGAR BANGUNAN.

DEPAN

SAMPING

TIPE B TIPE C,D,E

PAGAR GEDUNG DAN RUMAH NEGARA

GEDUNG NEGARA RUMAH NEGARA

HARGA SATUAN BANGUNAN GEDUNG NEGARA

GEDUNG DAN RUMAH NEGARA

RUMAH NEGARA

TIPE A

GEDUNG NEGARA

TIDAK SEDERHANA SEDERHANA

160

Page 88: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SEDERHANA TIDAK SEDERHANA

A.

1 Jarak antar bangunan minimal 3 m minimal 3 m, untuk bangunan

bertingkat dihitung berdasarkan

pertimbangan keselamatan,

kesehatan, dan kenyamanan

2 Ketinggian bangunan maksimun 2 lantai maksimun 8 lantai (diatas 8 lantai

harus mendapat rekomendasi

Menteri Kimpraswil

3 Ketinggian langit-langit min. 2,60 m min. 2,80 m

4 Koefisian dasar bangunan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

5 Koefisian lantai bangunan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

6 Koefisian dasar hijau sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

7 Garis sempadan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

8 Wujud arsitektur sesuai fungsi & kaidah arsitektur

sederhana

sesuai fungsi & kaidah arsitektur

9 Pagar halaman **) menggunakan bahan dinding batu

bata/bataco (1/2 batu), besi, baja,

kayu, dan bahan lainnya yang

disesuaikan dengan rancangan wujud

arsitektur bangunan.

menggunakan bahan dinding batu

bata/bataco (1/2 batu), besi, baja,

kayu, dan bahan lainnya yang

disesuaikan dengan rancangan

wujud arsitektur bangunan.

10 Kelengkapan sarana dan

prasarana Lingkungan *)

- parkir kendaraan minimal 1 parkir kendaraan untuk 60

m2 luas bangunan gedung

minimal 1 parkir kendaraan untuk

60 m2 luas bangunan gedung

- aksesibilitas tersedia sarana aksesibilitas bagi

penyandang cacat.

tersedia sarana aksesibilitas bagi

penyandang cacat.

- drainase tersedia drainase sesuai SNI yang

berlaku

tersedia drainase sesuai SNI yang

berlaku

- pembuangan sampah tersedia tempat pembuangan sampah

sementara

tersedia tempat pembuangan

sampah sementara

- pembuangan limbah tersedia sarana pengolahan limbah,

khususnya untuk limbah berbahaya

tersedia sarana pengolahan limbah,

khususnya untuk limbah

berbahaya

- penerangan halaman tersedia penerangan halaman tersedia penerangan halaman

B. Persyaratan Bahan Bangunan

1 Bahan penutup lantai Keramik, vinil, tegel PC Marmer lokal, keramik, vinil, kayu

2 Bahan dinding luar Bata, batako diplester dan dicat, kaca Bata, batako diplester dicat/dilapis

keramik, kaca, panil beton ringan

3 Bahan dinding dalam Bata, batako diplester dan dicat, kaca,

partisi kayu lapis

Bata, batako diplester dicat/dilapis

keramik, kaca, partisi gipsum

4 Bahan penutup plafond Kayu lapis dicat Gipsum, kayu lapis dicat

5 Bahan penutup atap Genteng, asbes, seng, sirap Genteng keramik, alumunium

gelombang dicat

6 Bahan kusen dan daun pintu kayu dicat/alumunium Kayu dipelitur, anodized

aluminium

3.22. TABEL SPESIFIKASI TEKNIS BANGUNAN GEDUNG PEMERINTAH

NO URAIANKLASIFIKASI BANGUNAN

LingkunganPersyaratan Tata Bangunan dan

161

Page 89: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SEDERHANA TIDAK SEDERHANANO URAIAN

KLASIFIKASI BANGUNAN

Persyaratan Tata Bangunan dan LingkunganC.

1 Pondasi Batu belah, kayu, beton-bertulang K-

200

Batu belah, kayu, beton-bertulang

K-255 atau lebih

2 Struktur lantai (khusus

untuk bangunan gedung

bertingkat)

Beton bertulang K-200, baja, kayu

kelas kuat II

Beton bertulang K-255 atau lebih,

baja, kayu kelas kuat II

3 Kolom Beton bertulang K-200, baja, kayu

kelas kuat II

Beton bertulang K-255 atau

lebih,baja,kayu kls kuat II

4 Balok Beton bertulang K-200, baja, kayu

kelas kuat II

Beton bertulang K-255 atau

lebih,baja,kayu kls kuat II

5 Rangka Atap Kayu kelas kuat II, baja Kayu kelas kuat II, baja dilapis anti

karat

6 Kemiringan atap Genteng min. 300, sirap min. 22.50,

seng min 150

Genteng min. 300, sirap min. 22.50,

seng min 150

D. Utilitas Prasarana dan Sarana Dalam Bangunan

1 Air bersih PAM, sumur pantek PAM, sumur pantek

2 Saluran air hujan Talang, saluran lingkungan Talang, saluran lingkungan

3 Pembuangan air kotor bak penampung bak penampung

4 Pembuangan kotoran bak penampung bak penampung

5 Bak SeptikTank & resapan berdasarkan kebutuhan berdasarkan kebutuhan

6 Sarana pengamanan

terhadap bahaya kebakaran

*)

Mengikuti ketentuan dalam Kep.

Meneg PU No. 10/KPTS/2000 dan

Kep. Meneg PU No. 11/KPTS 2000,

standar nasioanl Indonesia (SNI) yang

berlaku

Mengikuti ketentuan dalam Kep.

Meneg PU No. 10/KPTS/2000 dan

Kep. Meneg PU No. 11/KPTS 2000,

standar nasioanl Indonesia (SNI)

yang berlaku

7 Sumber Daya Listrik *) PLN, generator PLN, generator

8 Penerangan 100-215 lux/m2, dihitung

berdasarkan kebutuhan dan fungsi

bangunan serta SNI yang berlaku

100-215 lux/m2, dihitung

berdasarkan kebutuhan dan fungsi

bangunan serta SNI yang berlaku

9 Tata Udara 6-10% bukaan atau dengan tata udara

buatan (AC*)

6-10% bukaan atau dengan tata

udara buatan (AC*)

10 Sarana transportasi vertikal

*)

tidak diperlukan untuk bangunan di atas 4 lantai

dapat menggunakan lift sesuai SNI

yang berlaku

11 Aksesibilitas bagi

penyandang cacat *)

Sesuai ketentuan dalam Kep.Men PU

No.468/KPTS/1998, minimal ramp

untuk bangunan klasifikasi sederhana

Sesuai ketentuan dalam Kep.Men

PU No.468/KPTS/1998, minimal

ramp untuk bangunan klasifikasi

sederhana

12 Telepon *) sesuai kebutuhan sesuai kebutuhan

13 Panangkal petir penangkal petir lokal penangkal petir lokal

Persyaratan Struktur Bangunan

162

Page 90: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

SEDERHANA TIDAK SEDERHANANO URAIAN

KLASIFIKASI BANGUNAN

Persyaratan Tata Bangunan dan Lingkungan E.

1 Tangga penyelamatan

(khusus untuk bangunan

bertingkat)

lebar minimal = 1,20m, dan bukan

tangga putar

lebar minimal = 1,20m, dan bukan

tangga putar

2 Tanda penunjuk arah jelas, dasar putih huruf hijau jelas, dasar putih huruf hijau

3 Pintu Lebar min.=0,90 m, satu ruang

minimal 2 pintu dan membuka keluar

Lebar min.=0,90 m, satu ruang

minimal 2 pintu dan membuka

keluar

4 Koridor/selasar Lebar min.=1,80 m Lebar min.=1,80 m

*)

**)

dan dianggarkan tersendiri sesuai dengan harga satuan tertinggi per-m2 bagunan pagar gedung negara

Pembiayaan tidak termasuk dalam standar harga satuan tertinggi per m2, dan dianggarkan tersendiri

sebagai biaya non-standar

Pembiayaan tidak termasuk dalam standar harga satuan tertinggi per m2 bangunan gedung negara,

Sarana Penyelamatan

163

Page 91: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

KHUSUS DAN TIPE A TIPE B TIPE C, D dan E KETERANGAN

A. Persyaratan Tata Bangunan dan Lingkungan

1 Jarak antar bangunan minimal 3 m, untuk bangunan

bertingkat dihitung berdasarkan

pertimbangan keselamatan, kesehatan,

dan kenyamanan

minimal 3 m, untuk bangunan

bertingkat dihitung berdasarkan

pertimbangan keselamatan, kesehatan,

dan kenyamanan

minimal 3 m, untuk bangunan

bertingkat dihitung berdasarkan

pertimbangan keselamatan, kesehatan,

dan kenyamanan

2 Ketinggian bangunan

3 Ketinggian langit-langit min. 2,70 m min. 2,70 m min. 2,70 m

4 Koefisian dasar bangunan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

5 Koefisian lantai bangunan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

6 Koefisian dasar hijau sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

7 Garis sempadan sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

sesuai ketentuan peraturan daerah

setempat

8 Wujud arsitektur sesuai fungsi & kaidah arsitektur sesuai fungsi & kaidah arsitektur sesuai fungsi & kaidah arsitektur

9 Pagar halaman menggunakan bahan dinding batu

bata/bataco (1/2 batu), besi, baja,

kayu, dan bahan lainnya yang

disesuaikan dengan rancangan wujud

arsitektur bangunan rumah negara

menggunakan bahan dinding batu

bata/bataco (1/2 batu), besi, baja,

kayu, dan bahan lainnya yang

disesuaikan dengan rancangan wujud

arsitektur bangunan rumah negara

menggunakan bahan dinding batu

bata/bataco (1/2 batu), besi, baja,

kayu, dan bahan lainnya yang

disesuaikan dengan rancangan wujud

arsitektur bangunan rumah negara

10 Tandon Air bersih min. 3 m3 min. 2 m3 min. 1 m3

3.23. TABEL SPESIFIKASI TEKNIS BANGUNAN RUMAH NEGARA

KLASIFIKASI BANGUNAN

Terutama berdasarkan

ketentuan dalam

Peraturan Daerah

setempat tentang

Bangunan atau Rencana

Tata Ruang Wilayah

Kabupaten/Kota untuk

lokasi yang bersangkutan

Biayanya mengikuti

-standart harga satuan per

m' pagar.

NO URAIAN

164

Page 92: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

KHUSUS DAN TIPE A TIPE B TIPE C, D dan E KETERANGAN

KLASIFIKASI BANGUNANNO URAIAN

B. Persyaratan Bahan Bangunan

1 Bahan penutup lantai Marmer lokal, keramik, vinil, kayu keramik, vinil keramik, vinil, tegel PC

2 Bahan dinding bata, batako diplester dan dicat tembok bata, batako diplester dan dicat tembok bata, batako diplester dan dicat tembok

3 Bahan penutup plafond Gipsum, asbes semen/kayu-lapis dicat asbes semen/kayu-lapis dicat asbes semen/kayu-lapis dicat

4 Bahan penutup atap Genteng keramik berglazuur, asbes,

seng, sirap

Genteng, asbes, seng, sirap Genteng, asbes, seng, sirap

5 Bahan kusen & daun pintu Kayu dipelitur/dicat kayu dicat kayu dicat

C. Persyaratan Struktur Bangunan

1 Pondasi Batu belah, kayu klas kuat II, beton-

bertulang

Batu belah, kayu klas kuat II, beton-

bertulang

Batu belah, kayu klas kuat II, beton-

bertulang

2 Struktur lantai (khusus untuk

bangunan gedung bertingkat)

Beton bertulang K-200, baja, kayu kelas

kuat II

Beton bertulang K-200, baja, kayu klas

kuat II

Beton bertulang K-175, baja, kayu klas

kuat II

3 Kolom Beton bertulang K-200, baja, kayu kelas

kuat II

Beton bertulang K-200, baja, kayu kelas

kuat II

Beton bertulang K-175, baja, kayu klas

kuat II

4 Balok Beton bertulang K-200, baja, kayu kelas

kuat II

Beton bertulang K-200, baja, kayu kelas

kuat II

Beton bertulang K-175, baja, kayu klas

kuat II

5 Rangka Atap Kayu kelas kuat II, baja Kayu kelas kuat II, baja Kayu kelas kuat II, baja

6 Kemiringan atap Genteng min. 300, sirap min. 22.50,

seng min 150

Genteng min. 300, sirap min. 22.50,

seng min 150

Genteng min. 300, sirap min. 22.50,

seng min 150

D. Utilitas

1 Air bersih PAM, sumur pantek PAM, sumur pantek PAM, sumur pantek

2 Saluran air hujan Talang, saluran lingkungan Talang, saluran lingkungan Talang, saluran lingkungan

3 Pembuangan air kotor bak penampung bak penampung bak penampung

4 Pembuangan kotoran bak penampung bak penampung bak penampung

5 Bak SeptikTank & resapan 6 m3 5 m3 2-4 m3

6 Sarana pengamanan terhadap

bahaya kebakaran *)

Mengikuti ketentuan dalam Kep. Meneg

PU No. 10/KPTS/2000 dan Kep. Meneg

PU No. 11/KPTS 2000, standar nasioanl

Indonesia (SNI) yang berlaku

Mengikuti ketentuan dalam Kep. Meneg

PU No. 10/KPTS/2000 dan Kep. Meneg

PU No. 11/KPTS 2000, standar nasioanl

Indonesia (SNI) yang berlaku

Mengikuti ketentuan dalam Kep. Meneg

PU No. 10/KPTS/2000 dan Kep. Meneg

PU No. 11/KPTS 2000, standar nasioanl

Indonesia (SNI) yang berlaku

7 Sumber Daya Listrik *) PLN, 2200-4400 VA PLN, 1350-2200 VA PLN, 450-1350 VA

Diupayakan

menggunakan bahan

bangunan

setempat/produksi dalam

negeri, termasuk bahan

bangunan sebagai bagian

dari sistem pabrikasi

komponen.

Khusus untuk daerah

gempa, harus

direncanakan sebagai

struktur bangunan tahan

gempa.

165

Page 93: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

KHUSUS DAN TIPE A TIPE B TIPE C, D dan E KETERANGAN

KLASIFIKASI BANGUNANNO URAIAN

8 Penerangan (alam natural) 100-215 lux/m2 100-215 lux/m2 100-215 lux/m2

9 Tata Udara 6-10% bukaan atau dengan tata udara

buatan (AC*)

6-10% bukaan 6-10% bukaan

10 Telepon *) sesuai kebutuhan sesuai kebutuhan tidak disyaratkan

11 Penangkal petir penangkal petir lokal penangkal petir lokal tidak disyaratkan

E. Sarana Penyelamatan

1 Tangga penyelamatan (khusus

untuk bangunan bertingkat)

lebar minimal = 1,20m lebar minimal = 1,20m lebar minimal = 1,20m

2 Tanda penunjuk arah keluar tidak dipersyaratkan tidak dipersyaratkan tidak dipersyaratkan

3 Pintu Lebar min.=0,90 m Lebar min.=0,90 m Lebar min.=0,90 m

4 Koridor/selasar Lebar min.=1,80 m Lebar min.=1,80 m Lebar min.=1,80 m

*)

-

-

- apabila bahan-bahan tersebut sukar diperoleh atau harganya tidak sesuai, dapat diganti dengan bahan lain yang sederajat tanpa mengurangi persyaratan fungsi dan mutu dengan

pengesahan Instansi Teknis setempat.

pembiayaannya tidak termasuk dalam standar harga satuan tertinggi per m2, dan harus dianggarkan tersendiri sebagai biaya non standart

untuk Perumahan Dinas Klas C,D, dan E, pelaksanaan pembangunannya disamping seperti ketentuan pada tabel tersebut diatas, dibangun berdasarkan "Dokumen Pelelangan Disain

Prototip Setempat" yang dikeluarkan olehDirektorat Jenderal Perumahan dan Permukiman atau menggunakan disain Perum Perumnas yang telah disetujui oleh Direktorat Jenderal

Perumahan dan Permukiman.

untuk bangunan rumah negara yang dibangun dalam bangunan gedung bertingkat banyak (rumah susun), maka ketentuan-ketentuan teknisnya mengikuti ketentuan teknis untuk

bangunan gedung negara sesuai ketentuan yang berlaku.

166

Page 94: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

I UPAH TENAGA KERJA

1 Pekerja OH 87,800.00

2 Tukang OH 100,300.00

3 Mandor OH 112,800.00

4 Operator OH 125,300.00

5 Pembantu operator OH 87,800.00

6 Supir / Driver OH 156,600.00

7 Pembantu Supir/Kenek OH 87,800.00

8 Juru ukur/mekanik alat berat OH 125,300.00

9 Pembantu Juru ukur & mekanik alat berat OH 87,800.00

10 Kepala Tukang OH 125,300.00

11 Buruh tak terlatih OH 87,800.00

12 Buruh semi terlatih OH 87,800.00

13 Buruh terlatih OH 156,600.00

14 Pekerja aspal OH 87,800.00

15 Tukang aspal OH 100,300.00

16 Penjaga malam OH 100,300.00

17 Tukang listrik OH 112,800.00

18 Tukang kayu OH 112,800.00

19 Kepala Tukang kayu OH 125,300.00

20 Tukang batu OH 100,300.00

21 Kepala Tukang Batu OH 125,300.00

22 Tukang besi OH 100,300.00

23 Kepala Tukang Besi OH 125,300.00

24 Tukang cat OH 100,300.00

25 Kepala Tukang Cat OH 125,300.00

26 Tukang Pipa OH 100,300.00

II BAHAN / MATERIAL

A KELOMPOK MATERIAL ALAM

1 Agr.Base Kelas A M3 329,900.00

2 Agr.Base Kelas B M3 320,800.00

3 Agr.Base Kelas S M3 323,100.00

4 Agr.Base Kelas C M3 314,700.00

5 Agregat Lolos # 1 " M3 231,000.00

6 Agregat Pecah Kasar M3 259,500.00

7 Agregat Pecah Mesin 0-5 mm M3 310,700.00

8 Agregat Pecah Mesin 20-30 mm M3 249,200.00

9 Agregat Pecah Mesin 5-10 & 10-20 mm M3 276,500.00

10 Batubara KG 800.00

11 Batu Belah / Kerakal M3 255,800.00

12 Batu Kali M3 236,800.00

13 Bahan Aditif (Caldbon, Strorox, dll) LITER 37,500.00

14 Batu bata BUAH 1,200.00

15 Batu candi 30x40, t=30 M2 150,000.00

16 Batu candi tempel 20x20, 5/20 M2 125,000.00

17 Batu muka BH 50,000.00

18 Chipping M3 310,700.00

19 Chipping (kg) KG 200.00

20 F i l l e r KG 1,600.00

21 G r a v e l M3 330,400.00

22 Kapur M3 268,800.00

23 Pasir Beton (Kasar) M3 515,400.00

24 Pasir Halus (untuk HRS) M3 202,700.00

25 Pasir Pasang (Sedang) M3 323,200.00

26 Pasir Urug M3 202,700.00

27 Sirtu M3 208,300.00

28 Semen / PC (50kg) ZAK 68,800.00

3.24. DAFTAR HARGA DASAR SATUAN TENAGA, BAHAN DAN PERALATAN WILAYAH DAERAH

BAWAH

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

167

Page 95: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

29 Semen / PC (kg) KG 1,400.00

30 Semen Instant (acian) KG 4,300.00

31 Semen Instant (perekat bata ringan) KG 3,800.00

32 Semen Instant (perekat keramik) KG 5,000.00

33 Tanah Bahan Pilihan M3 177,800.00

34 Tanah Timbunan M3 120,800.00

35 Tanah urug di lokasi M3 100,000.00

36 Bata Ringan 7 cm BUAH 8,800.00

37 Bata Ringan 10 cm BUAH 11,300.00

B KELOMPOK PABRIKASI

1 AC - BASE TON 1,364,700.00

2 AC - BC TON 1,411,000.00

3 AC - WC TON 1,443,800.00

4 HRS - WC TON 1,546,000.00

5 HRSS TON 1,404,400.00

6 SAND SHEET TON 1,687,500.00

7 Buis Beton dia 30 cm tanpa tulang, pjg 0,5m BUAH 81,300.00

8 Buis Beton dia 40 cm tanpa tulang, pjg 0,5m BUAH 150,000.00

9 Buis Beton dia 50 cm tanpa tulang, pjg 0,5m BUAH 175,000.00

10 Buis Beton dia 60 cm tanpa tulang, pjg 0,5m BUAH 231,300.00

11 Buis Beton grevel dia 20 cm tanpa tulang, pjg 1 m BUAH 59,400.00

12 Buis Beton grevel dia 30 cm tanpa tulang, pjg 1 m BUAH 93,800.00

13 Buis Beton grevel dia 40 cm tanpa tulang, pjg 1 m BUAH 115,700.00

14 Buis Beton U dia 20 cm , pjg 1 m BUAH 56,300.00

15 Buis Beton U dia 30 cm , pjg 1 m BUAH 100,000.00

16 Beton Ready Mixed K-100 M3 1,025,000.00

17 Beton Ready Mixed K-125 M3 1,025,000.00

18 Beton Ready Mixed K-150 M3 1,037,500.00

19 Beton Ready Mixed K-175 M3 1,058,400.00

20 Beton Ready Mixed K-200 M3 1,062,500.00

21 Beton Ready Mixed K-225 M3 1,089,600.00

22 Beton Ready Mixed K-250 M3 1,120,900.00

23 Beton Ready Mixed K-275 M3 1,125,000.00

24 Beton Ready Mixed K-300 M3 1,175,000.00

25 Beton Ready Mixed K-325 M3 1,187,500.00

26 Beton Ready Mixed K-350 M3 1,241,700.00

27 Beton Ready Mixed K-375 M3 1,259,400.00

28 Beton Ready Mixed K-400 M3 1,300,000.00

29 Beton Ready Mixed K-425 M3 1,331,300.00

30 Beton Ready Mixed K-450 M3 1,368,800.00

31 Beton Ready Mixed K-475 M3 1,406,300.00

32 Beton Ready Mixed K-500 M3 1,443,800.00

33 Beton Ready Fs - 45 M3 1,475,000.00

34 Beton Ready Mixed B - O M3 979,200.00

35 PCI Girder L=10,6 m, H = 90 cm, CTC = 1,85 m BUAH 38,775,000.00

36 PCI Girder L=11,6 m, H = 90 cm, CTC = 1,85 m BUAH 41,662,500.00

37 PCI Girder L=12,6 m, H = 90 cm, CTC = 1,85 m BUAH 50,462,500.00

38 PCI Girder L=13,6 m, H = 90 cm, CTC = 1,85 m BUAH 56,100,000.00

39 PCI Girder L=14,6 m, H = 90 cm, CTC = 1,85 m BUAH 61,600,000.00

40 PCI Girder L=15,6 m, H = 90 cm, CTC = 1,85 m BUAH 72,325,000.00

41 PCI Girder L=16,6 m, H = 125 cm, CTC = 1,40 m BUAH 72,875,000.00

42 PCI Girder L=16,6 m, H = 125 cm, CTC = 1,85 m BUAH 77,275,000.00

43 PCI Girder L=17,6 m, H = 125 cm, CTC = 1,85 m BUAH 81,950,000.00

44 PCI Girder L=18,6 m, H = 125 cm, CTC = 1,85 m BUAH 89,925,000.00

45 PCI Girder L=19,6 m, H = 125 cm, CTC = 1,85 m BUAH 95,975,000.00

46 PCI Girder L=20,6 m, H = 125 cm, CTC = 1,85 m BUAH 104,362,500.00

47 PCI Girder L=21,6 m, H = 125 cm, CTC = 1,85 m BUAH 114,675,000.00

48 PCI Girder L=22,6 m, H = 125 cm, CTC = 1,40 m BUAH 121,137,500.00

49 PCI Girder L=23,6 m, H = 125 cm, CTC = 1,40 m BUAH 133,787,500.00

50 PCI Girder L=22,6 m, H = 160 cm, CTC = 1,85 m BUAH 148,362,500.00

51 PCI Girder L=23,6 m, H = 160 cm, CTC = 1,85 m BUAH 153,725,000.00

52 PCI Girder L=24,6 m, H = 160 cm, CTC = 1,85 m BUAH 161,700,000.00

168

Page 96: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

53 PCI Girder L=25,6 m, H = 160 cm, CTC = 1,85 m BUAH 171,050,000.00

54 PCI Girder L=26,6 m, H = 160 cm, CTC = 1,85 m BUAH 180,812,500.00

55 PCI Girder L=27,6 m, H = 160 cm, CTC = 1,85 m BUAH 190,850,000.00

56 PCI Girder L=28,6 m, H = 160 cm, CTC = 1,85 m BUAH 202,675,000.00

57 PCI Girder L=29,6 m, H = 160 cm, CTC = 1,85 m BUAH 211,750,000.00

58 PCI Girder L=30,6 m, H = 160 cm, CTC = 1,40 m BUAH 214,225,000.00

59 PCI Girder L=31,6 m, H = 160 cm, CTC = 1,40 m BUAH 226,737,500.00

60 PCI Girder L=30,6 m, H = 170 cm, CTC = 1,85 m BUAH 273,075,000.00

61 PCI Girder L=31,6 m, H = 170 cm, CTC = 1,85 m BUAH 286,825,000.00

62 PCI Girder L=32,6 m, H = 170 cm, CTC = 1,85 m BUAH 302,362,500.00

63 PCI Girder L=33,6 m, H = 170 cm, CTC = 1,85 m BUAH 315,150,000.00

64 PCI Girder L=34,6 m, H = 170 cm, CTC = 1,85 m BUAH 333,162,500.00

65 PCI Girder L=35,6 m, H = 170 cm, CTC = 1,85 m BUAH 359,837,500.00

66 PCI Girder L=36,6 m, H = 170 cm, CTC = 1,85 m BUAH 382,250,000.00

67 PCI Girder L=37,6 m, H = 170 cm, CTC = 1,85 m BUAH 409,062,500.00

68 PCI Girder L=38,6 m, H = 170 cm, CTC = 1,85 m BUAH 429,550,000.00

69 PCI Girder L=39,6 m, H = 170 cm, CTC = 1,85 m BUAH 417,312,500.00

70 PCI Girder L=40,6 m, H = 170 cm, CTC = 1,40 m BUAH 437,112,500.00

71 PCI Girder L=35,6 m, H = 210 cm, CTC = 1,85 m BUAH 347,600,000.00

72 PCI Girder L=36,6 m, H = 210 cm, CTC = 1,85 m BUAH 359,700,000.00

73 PCI Girder L=37,6 m, H = 210 cm, CTC = 1,85 m BUAH 375,100,000.00

74 PCI Girder L=38,6 m, H = 210 cm, CTC = 1,85 m BUAH 389,950,000.00

75 PCI Girder L=39,6 m, H = 210 cm, CTC = 1,85 m BUAH 410,075,000.00

76 PCI Girder L=40,6 m, H = 210 cm, CTC = 1,85 m BUAH 431,612,500.00

77 PCI Girder L=41,8 m, H = 210 cm, CTC = 1,85 m BUAH 455,262,500.00

78 PCI Girder L=42,8 m, H = 210 cm, CTC = 1,85 m BUAH 476,712,500.00

79 PCI Girder L=43,8 m, H = 210 cm, CTC = 1,85 m BUAH 502,975,000.00

80 PCI Girder L=44,8 m, H = 210 cm, CTC = 1,85 m BUAH 533,362,500.00

81 PCI Girder L=45,8 m, H = 210 cm, CTC = 1,85 m BUAH 564,575,000.00

82 PCI Girder L=46,8 m, H = 210 cm, CTC = 1,85 m BUAH 551,100,000.00

83 PCI Girder L=47,8 m, H = 210 cm, CTC = 1,85 m BUAH 567,600,000.00

84 PCI Girder L=48,8 m, H = 210 cm, CTC = 1,85 m BUAH 599,087,500.00

85 PCI Girder L=49,8 m, H = 210 cm, CTC = 1,85 m BUAH 631,400,000.00

86 PCI Girder L=50,8 m, H = 210 cm, CTC = 1,85 m BUAH 554,262,500.00

87 Panel beton tulang pre-cast 240x40x5 cm BUAH 150,000.00

88 Panel beton tulang pre-cast 240x40x8 cm BUAH 231,300.00

89 Sheet Piles W.325.1000 M' 935,000.00

90 Sheet Piles W.350.1000 M' 1,100,000.00

91 Sheet Piles W.400.1000 M' 1,223,800.00

92 Sheet Piles W.450.1000 M' 1,395,700.00

93 Sheet Piles W.500.1000 M' 1,526,300.00

94 Sheet Piles W.600.1000 M' 1,828,800.00

95 Sheet Piles FPC.PS.220 M' 629,100.00

96 Sheet Piles FPC.PS.320 M' 838,800.00

97 Tiang Pancang Baja dia 30 cm M' 625,000.00

98 Tiang Pancang Baja kotak 30 x 30 cm M' 718,800.00

99 Tiang Pancang Beton Pratekan M3 531,300.00

100 Tiang pancang beton segitiga 28x28x28 cm M' 244,100.00

101 Tiang pancang beton segitiga 32x32x32 cm M' 306,000.00

102 Tiang pancang beton kotak 20x20 cm M' 254,400.00

103 Tiang pancang beton kotak 25x25 cm M' 371,300.00

104 Tiang pancang beton kotak 30x30 cm M' 488,200.00

105 Tiang pancang beton kotak 35x35 cm M' 660,000.00

106 Tiang pancang beton kotak 40x40 cm M' 818,200.00

107 Tiang pancang beton kotak 45x45 cm M' 1,045,000.00

108 Tiang pancang beton kotak 50x50 cm M' 1,251,300.00

109 Tiang pancang beton dia 20 cm M' 372,500.00

110 Tiang pancang beton dia 30 cm M' 400,500.00

111 Tiang pancang beton dia 35 cm M' 501,900.00

112 Tiang pancang beton dia 40 cm M' 646,300.00

113 Tiang pancang beton dia 45 cm M' 778,300.00

114 Tiang pancang beton dia 50 cm M' 968,000.00

115 Tiang pancang beton dia 60 cm M' 1,277,400.00

169

Page 97: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

116 Tiang pancang beton dia 80 cm M' 2,934,300.00

117 Turap baja profi larsen lebar 350 mm M' 175,000.00

118 Turap beton tulang pre-cast 30x12 cm M 187,500.00

119 Turap beton tulang pre-cast 40x15 cm M 281,300.00

120 Turap beton tulang pre-cast 50x22 cm M 493,800.00

121 Turap beton pre-cast ukuran 40x20 cm M 150,000.00

122 Turap beton tulang pre-cast 30x12 cm M 68,800.00

U-Ditch (Kapasitas Gandar < 5 Ton) (LD)

123 U 300x300x1200 mm, 5 cm BUAH 373,800.00

124 U 300x400x1200 mm, 5 cm BUAH 421,300.00

125 U 300x500x1200 mm, 5 cm BUAH 488,400.00

126 U 400x400x1200 mm, 6 cm BUAH 521,300.00

127 U 400x500x1200 mm, 6 cm BUAH 617,900.00

128 U 400x600x1200 mm, 6 cm BUAH 636,100.00

129 U 500x500x1200 mm, 6 cm BUAH 718,800.00

130 U 500x600x1200 mm, 6 cm BUAH 812,200.00

131 U 500x700x1200 mm, 6 cm BUAH 935,400.00

132 U 600x600x1200 mm, 8 cm BUAH 959,200.00

133 U 600x700x1200 mm, 8 cm BUAH 1,058,400.00

134 U 600x800x1200 mm, 8 cm BUAH 1,141,700.00

135 U 800x800x1200 mm, 10 cm BUAH 1,508,000.00

136 U 800x900x1200 mm, 10 cm BUAH 1,543,800.00

137 U 800x1000x1200 mm, 10 cm BUAH 1,715,900.00

138 U 1000x1000x1200 mm, 10 cm BUAH 1,817,900.00

139 U 1000x1000x1200 mm, 12 cm BUAH 2,302,500.00

140 U 1000x1200x1200 mm, 10 cm BUAH 2,325,800.00

141 U 1000x1200x1200 mm, 12 cm BUAH 2,647,500.00

142 U 1200x1200x1200 mm, 12 cm BUAH 2,857,500.00

143 U 1200x1500x1200 mm, 15 cm BUAH 3,800,000.00

144 U 1500x1500x1200 mm, 15 cm BUAH 5,730,000.00

Cover / Tutup U-Ditch (LD)

145 CU 300x1200x60 mm BUAH 231,800.00

146 CU 400x1200x80 mm BUAH 285,500.00

147 CU 500x1200x80 mm BUAH 401,300.00

148 CU 500x1200x100 mm BUAH 429,800.00

149 CU 600x1200x80 mm BUAH 485,000.00

150 CU 600x1200x100 mm BUAH 559,600.00

151 CU 800x1200x100 mm BUAH 634,500.00

152 CU 1000x1200x100 mm BUAH 837,500.00

153 CU 1000x1200x120 mm BUAH 900,000.00

154 CU 1200x1200x120 mm BUAH 975,000.00

155 CU 1500x1200x150 mm BUAH 1,050,000.00

U-Ditch (Kapasitas Gandar 10 Ton) (HD)

156 U 400x400x1200 mm, 6 cm BUAH 562,500.00

157 U 400x500x1200 mm, 6 cm BUAH 641,300.00

158 U 400x600x1200 mm, 6 cm BUAH 720,000.00

159 U 500x500x1200 mm, 6 cm BUAH 832,500.00

160 U 500x600x1200 mm, 6 cm BUAH 933,800.00

161 U 500x700x1200 mm, 6 cm BUAH 1,035,000.00

162 U 600x600x1200 mm, 10 cm BUAH 1,017,000.00

163 U 600x700x1200 mm, 10 cm BUAH 1,091,300.00

164 U 600x800x1200 mm, 10 cm BUAH 1,192,500.00

165 U 800x800x1200 mm, 10 cm BUAH 1,775,000.00

166 U 800x1000x1200 mm, 10 cm BUAH 1,808,700.00

167 U 1000x1000x1200 mm, 12 cm BUAH 2,342,900.00

168 U 1000x1200x1200 mm, 12 cm BUAH 2,622,400.00

169 U 1200x1200x1200 mm, 12 cm BUAH 2,761,500.00

170 U 1500x1500x1200 mm, 15 cm BUAH 4,314,200.00

Cover / Tutup U-Ditch

171 CU 400x1200x100 mm BUAH 303,200.00

172 CU 500x1200x100 mm BUAH 359,700.00

173 CU 600x1200x100 mm BUAH 466,000.00

174 CU 600x1200x120 mm BUAH 557,900.00

170

Page 98: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

175 CU 800x1200x120 mm BUAH 695,700.00

176 CU 800x1200x150 mm BUAH 904,400.00

177 CU 1000x1200x120 mm BUAH 865,000.00

178 CU 1000x1200x150 mm BUAH 1,080,200.00

179 CU 1200x1200x150 mm BUAH 1,376,900.00

180 CU 1500x1200x150 mm BUAH 1,568,500.00

Box Culvert

181 BC 500x500x1200 mm. 10 cm BUAH

182 BC 600x600x1200 mm. 10 cm BUAH 1,710,200.00

183 BC 800x800x1200 mm. 10 cm BUAH 2,595,000.00

184 BC 1000x1000x1200 mm. 12 cm BUAH 4,575,000.00

185 BC 1200x1200x1200 mm. 12 cm BUAH 6,000,000.00

186 BC 1500x1500x1200 mm. 15 cm BUAH 8,221,500.00

187 BC 1500x1500x1200 mm. 20 cm BUAH 9,000,000.00

188 BC 2000x2000x1200 mm. 20 cm BUAH 9,225,000.00

U-Ditch (Kapasitas Gandar 20 Ton)

189 U 400x400x1200 mm, 10 cm BUAH 904,400.00

190 U 400x500x1200 mm, 10 cm BUAH 1,022,500.00

191 U 400x600x1200 mm, 10 cm BUAH 1,147,200.00

192 U 500x500x1200 mm, 10 cm BUAH 1,084,200.00

193 U 500x600x1200 mm, 10 cm BUAH 1,195,700.00

194 U 500x700x1200 mm, 10 cm BUAH 1,321,700.00

195 U 600x600x1200 mm, 10 cm BUAH 1,261,400.00

196 U 600x700x1200 mm, 10 cm BUAH 1,383,400.00

197 U 600x800x1200 mm, 10 cm BUAH 1,501,500.00

198 U 800x800x1200 mm, 12 cm BUAH 1,988,500.00

199 U 800x900x1200 mm, 12 cm BUAH 2,135,500.00

200 U 800x1000x1200 mm, 12 cm BUAH 2,278,500.00

201 U 1000x1000x1200 mm, 12 cm BUAH 2,420,300.00

202 U 1000x1000x1200 mm, 15 cm BUAH 3,109,400.00

203 U 1000x1200x1200 mm, 15 cm BUAH 3,470,300.00

204 U 1200x1200x1200 mm, 15 cm BUAH 3,651,400.00

205 U 1500x1500x1200 mm, 15 cm BUAH 4,521,600.00

Cover / Tutup U-Ditch

206 CU 400x1200x120 mm BUAH 410,900.00

207 CU 500x1200x120 mm BUAH 513,200.00

208 CU 600x1200x120 mm BUAH 586,700.00

209 CU 800x1200x120 mm BUAH 834,800.00

210 CU 800x1200x150 mm BUAH 1,043,500.00

211 CU 1000x1200x150 mm BUAH 1,191,800.00

212 CU 1200x1200x150 mm BUAH 1,375,500.00

213 CU 1500x1200x150 mm BUAH 1,627,500.00

214 CU 1500x1200x200 mm BUAH 2,086,900.00

Box Culvert

215 BC 500x500x1200 mm. 10 cm BUAH 1,669,500.00

216 BC 600x600x1200 mm. 10 cm BUAH 1,947,800.00

217 BC 800x800x1200 mm. 10 cm BUAH 2,434,700.00

218 BC 1000x1000x1200 mm. 12 cm BUAH 3,403,400.00

219 BC 1000x1000x1200 mm. 15 cm BUAH 4,173,800.00

220 BC 1200x1200x1200 mm. 12 cm BUAH 4,417,500.00

221 BC 1500x1500x1200 mm. 15 cm BUAH 6,221,300.00

222 BC 1500x1500x1200 mm. 20 cm BUAH 8,654,700.00

223 BC 2000x2000x1200 mm. 20 cm BUAH 11,057,900.00

224 Voided Slab 57x97 cm, L = 6,6 m BUAH 60,500,000.00

225 Voided Slab 57x97 cm, L = 7,6 m BUAH 65,312,500.00

226 Voided Slab 57x97 cm, L = 8,6 m BUAH 73,425,000.00

227 Voided Slab 57x97 cm, L = 9,6 m BUAH 81,400,000.00

228 Voided Slab 57x97 cm, L = 10,6 m BUAH 93,087,500.00

229 Voided Slab 57x97 cm, L = 11,6 m BUAH 102,025,000.00

230 Voided Slab 62x97 cm, L = 6,6 m BUAH 62,425,000.00

231 Voided Slab 62x97 cm, L = 7,6 m BUAH 70,400,000.00

232 Voided Slab 62x97 cm, L = 8,6 m BUAH 78,237,500.00

233 Voided Slab 62x97 cm, L = 9,6 m BUAH 86,212,500.00

171

Page 99: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

234 Voided Slab 62x97 cm, L = 10,6 m BUAH 96,662,500.00

235 Voided Slab 62x97 cm, L = 11,6 m BUAH 105,737,500.00

236 Voided Slab 62x97 cm, L = 12,6 m BUAH 115,087,500.00

237 Voided Slab 66x97 cm, L = 6,6 m BUAH 65,037,500.00

238 Voided Slab 66x97 cm, L = 7,6 m BUAH 73,150,000.00

239 Voided Slab 66x97 cm, L = 8,6 m BUAH 81,262,500.00

240 Voided Slab 66x97 cm, L = 9,6 m BUAH 89,512,500.00

241 Voided Slab 66x97 cm, L = 10,6 m BUAH 100,100,000.00

242 Voided Slab 66x97 cm, L = 11,6 m BUAH 109,037,500.00

243 Voided Slab 66x97 cm, L = 12,6 m BUAH 117,562,500.00

244 Voided Slab 66x97 cm, L = 13,6 m BUAH 125,125,000.00

245 Voided Slab 74x97 cm, L = 6,6 m BUAH 65,037,500.00

246 Voided Slab 74x97 cm, L = 7,6 m BUAH 73,150,000.00

247 Voided Slab 74x97 cm, L = 8,6 m BUAH 81,262,500.00

248 Voided Slab 74x97 cm, L = 9,6 m BUAH 89,512,500.00

249 Voided Slab 74x97 cm, L = 10,6 m BUAH 100,100,000.00

250 Voided Slab 74x97 cm, L = 11,6 m BUAH 109,037,500.00

251 Voided Slab 74x97 cm, L = 12,6 m BUAH 117,562,500.00

252 Voided Slab 74x97 cm, L = 13,6 m BUAH 125,125,000.00

253 Voided Slab 74x97 cm, L = 14,6 m BUAH 134,750,000.00

254 Voided Slab 74x97 cm, L = 15,6 m BUAH 142,037,500.00

255 Voided Slab 74x97 cm, L = 16,6 m BUAH 150,012,500.00

256 Lubang Angin/Roster Beton 10 X 20 cm BUAH 8,800.00

257 Lubang Angin/Roster Beton 20 X 20 cm BUAH 10,000.00

258 Lubang Angin/Roster Beton 25 X 25 cm BUAH 13,800.00

259 Lubang Angin/Roster Beton 30 X 30 cm BUAH 18,800.00

260 Lubang Angin/Roster Beton 15 X 25 cm BUAH 12,500.00

261 Lubang Angin/Roster Beton 15 X 30 cm BUAH 15,000.00

C KELOMPOK LOGAM

1 Anchorage

- hidup BUAH 937,500.00

- mati BUAH 500,000.00

2 Anchorage BUAH 750,000.00

3 Anti strpping agent KG 66,300.00

4 Baja Bergelombang KG 15,700.00

5 Baja Prategang KG 12,500.00

6 Baja Struktur KG 13,200.00

7 Baja Tulangan (Polos) KG 12,500.00

8 Baja Tulangan (Ulir) KG 13,200.00

9 Bondek M2 187,500.00

10 Baja Pelat tebal 2 mm M2 634,400.00

11 Baja Pelat tebal 3 mm M2 1,013,800.00

12 Baja Pelat tebal 5 mm M2 1,690,700.00

13 Baja Pelat tebal 6 mm M2 2,013,800.00

14 Baja Pelat tebal 8 mm M2 2,681,900.00

15 Baja Pelat setrip KG 13,200.00

16 Baja Profil CNP KG 13,200.00

17 Baja Profil DN SII KG 13,200.00

18 Baja Profil INP KG 13,200.00

19 Baja Profil IWF Ex. DN SII KG 13,200.00

20 Baja Profil IWF Ex. Jepang KG 13,200.00

21 Baja Profil siku KG 13,200.00

22 Baja Profil UNP KG 13,200.00

23 Baut dia 12 mm panjang 5 cm BUAH 4,200.00

24 Baut dia 12 mm panjang 10 cm BUAH 16,700.00

25 Baut dia 12 mm panjang 20 cm BUAH 38,200.00

26 Ducting ( Kabel prestress) M 187,500.00

27 Ducting ( Strand Prestress) M 62,500.00

28 Expansion Tipe Joint Asphaltic Plug M 1,250,000.00

29 Expansion Join Tipe Rubber M 1,500,000.00

30 Expansion Join Baja Siku M 343,800.00

31 Expansion Join Tipe Torma M 1,500,000.00

172

Page 100: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

32 Joint Sealent KG 86,000.00

33 Joint Socket Pile 35x35 SET 759,400.00

34 Joint Socket Pile 16x16x16 SET 84,400.00

35 Kawat Beton KG 24,900.00

36 Kawat bronjong Ø 4 mm (manual) KG 27,200.00

37 Kawat bronjong pabrikasi Ø 3 mm

Ukuran 2 x 1 x 0.5 UNIT 375,000.00

Ukuran 2 x 1 x 1 UNIT 525,000.00

Ukuran 1.5 x 1 x 1 UNIT 400,000.00

Ukuran 3 x 1 x 0.5 UNIT 437,500.00

Ukuran 3 x 1 x 1 UNIT 650,000.00

Ukuran 3 x 1.5 x 0.5 UNIT 625,000.00

Ukuran 3 x 2 x 0.5 UNIT 712,500.00

Ukuran 3 x 2 x 1 UNIT 1,000,000.00

Ukuran 4 x 1 x 0.5 UNIT 612,500.00

Ukuran 4 x 1 x 1 UNIT 900,000.00

Ukuran 4 x 2 x 0.5 UNIT 962,500.00

Ukuran 4 x 2 x 1 UNIT 1,225,000.00

Ukuran 5 x 2 x 0.5 UNIT 1,125,000.00

Ukuran 6 x 2 x 0.5 UNIT 1,312,500.00

38 Kawat bronjong pabrikasi Ø 2,7 mm

Ukuran 2 x 1 x 0.5 UNIT 312,500.00

Ukuran 2 x 1 x 1 UNIT 475,000.00

Ukuran 1.5 x 1 x 1 UNIT 350,000.00

Ukuran 3 x 1 x 0.5 UNIT 437,500.00

Ukuran 3 x 1 x 1 UNIT 600,000.00

Ukuran 3 x 1.5 x 0.5 UNIT 562,500.00

Ukuran 3 x 2 x 0.5 UNIT 650,000.00

Ukuran 3 x 2 x 1 UNIT 937,500.00

Ukuran 4 x 1 x 0.5 UNIT 550,000.00

Ukuran 4 x 1 x 1 UNIT 725,000.00

Ukuran 4 x 2 x 0.5 UNIT 875,000.00

Ukuran 4 x 2 x 1 UNIT 1,162,500.00

Ukuran 5 x 2 x 0.5 UNIT 1,062,500.00

Ukuran 6 x 2 x 0.5 UNIT 1,237,500.00

39 Kawat bronjong Ø 2,7 mm ( Pabrikasi ) PVC Coated

Ukuran 2 x 1 x 0.5 UNIT 412,500.00

Ukuran 2 x 1 x 1 UNIT 562,500.00

Ukuran 1.5 x 1 x 1 UNIT 437,500.00

Ukuran 3 x 1 x 0.5 UNIT 537,500.00

Ukuran 3 x 1 x 1 UNIT 812,500.00

Ukuran 3 x 1.5 x 0.5 UNIT 750,000.00

Ukuran 3 x 2 x 0.5 UNIT 975,000.00

Ukuran 3 x 2 x 1 UNIT 1,437,500.00

Ukuran 4 x 1 x 0.5 UNIT 737,500.00

Ukuran 4 x 1 x 1 UNIT 987,500.00

Ukuran 4 x 2 x 0.5 UNIT 1,237,500.00

Ukuran 4 x 2 x 1 UNIT 1,687,500.00

Ukuran 5 x 2 x 0.5 UNIT 1,525,000.00

Ukuran 6 x 2 x 0.5 UNIT 1,775,000.00

40 Kawat Las DOS 75,000.00

41 Kabel Prategang

- Selongsong M' 15,000.00

- Baja Prategang KG 12,500.00

- Grouting M2 11,400.00

42 Kabel baja/sling KG 28,200.00

43 Mikro Pile 16x16x16 M1 76,000.00

44 Mini Timber Pile BUAH 33,800.00

45 Paku biasa 1 cm - 3 cm KG 20,700.00

46 Paku biasa 4 cm - 7 cm KG 19,600.00

47 Paku seng gelombang KG 47,200.00

48 P a k u Jembatan/Baut Lawa-Lawa BUAH 20,000.00

49 Pipa Baja KG 18,800.00

173

Page 101: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

50 Strip Bearing BUAH 286,900.00

51 Seng gelombang uk. 0,9 x 1,8, t=0,02 LEMBAR 51,100.00

52 Seng gelombang uk. 0,9 x 1,8, t=0,025 LEMBAR 59,700.00

53 Seng pelat lebar 0,9 m' t=0,02 M1 37,500.00

54 Seng pelat lebar 0,9 m' t=0,025 M1 42,500.00

55 Stang besi polos diameter 12 mm BUAH 34,400.00

56 Stang besi ulir diameter 16 mm BUAH 78,200.00

57 Stang besi ulir diameter 16 mm + gear BUAH 109,400.00

58 Stang besi ulir diameter 20 mm BUAH 156,300.00

59 Stang ulir diameter 20 mm + gear BUAH 187,500.00

60 Wiremesh untuk pelat lantai beton KG 31,000.00

61 Wiremesh utk bronjong dia 10 mm (buatan pabrik) KG 33,000.00

62 Wiremesh utk bronjong dia 6 mm (buatan pabrik) KG 33,000.00

63 Wiremesh utk bronjong dia 8 mm (buatan pabrik) KG 33,000.00

64 Naco per Daun bh 25,000.00

65 Rolling door Besi M2 406,300.00

66 Rolling door Almunium M2 562,500.00

67 Awning Galvalum M2 437,500.00

68 Kusen Almunium 4" natural, ex. Alexindo M' 100,000.00

69 Kusen Almunium 4" warna, ex. Alexindo M' 112,500.00

70 Kusen Almunium 4" natural, ex. YKK M' 187,500.00

71 Kusen Almunium 4" warna, ex. YKK M' 212,500.00

72 profil Almunium natural M' 112,500.00

73 profil Almunium warna M' 125,000.00

D KELOMPOK KAYU

1 Bambu dia 7 - 10 M 5,000.00

2 Bambu dia 10 - 12 M 6,300.00

3 Dolken kayu galam dia 8-10 cm, M 8,000.00

4 Dolken kayu galam dia 12 cm, M 9,700.00

5 Dolken kayu klas III 5 – 7 cm , M 3,900.00

6 Dolken kayu klas III 7 – 10 cm, M 7,500.00

7 Formwork plate (Sewa) M 15,000.00

8 Ijuk tebal 5 cm KG 22,500.00

9 Kayu Perancah M3 1,875,000.00

10 Kayu Acuan M3 2,500,000.00

11 Kayu bakar M3 250,000.00

12 Kayu balok 5/7 klas 3 M3 2,812,500.00

13 Kayu papan bekisting kelas 3 M3 3,125,000.00

14 Kayu gelondongan dia 20 cm M' 437,500.00

15 Tiang pancang glugu dia 20 - 30 cm M' 156,300.00

16 Kayu Jati Papan M3 32,500,000.00

17 Kayu Jati Balok/pesagen M3 31,250,000.00

18 Kayu Kampas Papan M3 8,000,000.00

19 Kayu Kampas Balok/pesagen M3 7,500,000.00

20 Kayu Lokal Keras Papan M3 4,375,000.00

21 Kayu Lokal Keras Balok/pesagen M3 3,750,000.00

22 Kayu Bengkirai Papan M3 13,750,000.00

23 Kayu Bengkirai Balok/pesagen M3 13,000,000.00

24 Seseg Bambu M2 56,300.00

25 Teak wood

. 90 X 210 X 3 mm LEMBAR 60,000.00

. 120 X 240 X 3 mm LEMBAR 118,800.00

. 90 X 210 X 4 mm LEMBAR 75,000.00

. 90 X 210 X 9 mm LEMBAR 193,800.00

. 90 X 210 X 12 mm LEMBAR 231,300.00

. 90 X 210 X 15 mm LEMBAR 287,500.00

. 90 X 210 X 18 mm LEMBAR 350,000.00

26 Tripleks

. 120 X 240 X 3 mm LEMBAR 65,000.00

. 120 X 240 X 4 mm LEMBAR 80,000.00

. 120 X 240 X 6 mm LEMBAR 93,800.00

27 Multipleks

174

Page 102: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

. 120 X 240 X 9 mm LEMBAR 150,000.00

. 120 X 240 X 12 mm LEMBAR 206,300.00

. 120 X 240 X 15 mm LEMBAR 272,500.00

. 120 X 240 X 18 mm LEMBAR 318,800.00

28 Formika ukuran pintu LEMBAR 80,000.00

E KELOMPOK PIPA

1 Pipa Black Steel dia 1/2" M 3,700.00

2 Pipa Black Steel dia 3/4" M 4,200.00

3 Pipa Black Steel dia 1" M 5,500.00

4 Pipa Black Steel dia 1,5" M 10,500.00

5 Pipa Black Steel dia 2" M 15,500.00

6 Pipa Black Steel dia 2,5" M 21,300.00

7 Pipa Black Steel dia 3" M 45,400.00

8 Pipa Black Steel dia 4" M 69,700.00

9 Pipa Black Steel dia 6" M 110,400.00

10 Pipa Black Steel dia 8" M 190,400.00

11 Pipa DCI dia 4" M 122,000.00

12 Pipa DCI dia 6" M 274,400.00

13 Pipa DCI dia 8" M 488,300.00

14 Pipa DCI dia 10" M 687,500.00

15 Pipa DCI dia 12" M 915,000.00

16 Pipa DCI dia 14" M 1,175,000.00

17 Pipa DCI dia 400mm M 2,162,500.00

18 Pipa DCI dia 600mm M 3,231,300.00

19 Pipa DCI dia 800mm M 4,325,000.00

20 Pipa DCI dia 1000mm M 5,400,000.00

21 Pipa DCI dia 8" M 488,300.00

22 Pipa Porus M 50,000.00

23 Screen 4'' low carbon BUAH 937,500.00

24 Screen 6'' low carbon BUAH 1,875,000.00

25 Screen 8'' low carbon BUAH 4,062,500.00

26 Pipa PVC - 10 bar (1,0 Mpa)

Pipa PVC DN 20 ( ½" ) Type AW BATANG 29,200.00 panjang 4 m

Pipa PVC DN 25 ( ¾" ) Type AW BATANG 39,700.00 panjang 4 m

Pipa PVC DN 32 ( 1" ) Type AW BATANG 54,200.00 panjang 4 m

Pipa PVC DN 40 ( 1½" ) Type S BATANG 175,500.00 panjang 6 m

Pipa PVC DN 63 ( 2" ) Type S BATANG 222,800.00 panjang 6 m

Pipa PVC DN 90 ( 3" ) Type S BATANG 466,500.00 panjang 6 m

Pipa PVC DN 110 ( 4" ) Type S BATANG 677,300.00 panjang 6 m

Pipa PVC DN 160 ( 6" ) Type S BATANG 1,452,000.00 panjang 6 m

Pipa PVC DN 200 ( 8" ) Type S BATANG 2,291,300.00 panjang 6 m

Pipa PVC DN 250 ( 10" ) Type S BATANG 3,576,000.00 panjang 6 m

Pipa PVC DN 315 ( 12" ) Type S BATANG 5,712,000.00 panjang 6 m

27 Pipa GI Medium B Galvanis

Pipa Medium B Galvanis DN ½" BATANG 127,500.00 panjang 6 m

Pipa Medium B Galvanis DN 25 ( ¾" ) BATANG 163,800.00 panjang 6 m

Pipa Medium B Galvanis DN 32 ( 1" ) BATANG 250,000.00 panjang 6 m

Pipa Medium B Galvanis DN 50 ( 1½" ) BATANG 378,800.00 panjang 6 m

Pipa Medium B Galvanis DN 63 ( 2" ) BATANG 516,300.00 panjang 6 m

Pipa Medium B Galvanis DN 2½" BATANG 658,800.00 panjang 6 m

Pipa Medium B Galvanis DN 90 ( 3" ) BATANG 851,300.00 panjang 6 m

Pipa Medium B Galvanis DN 110 ( 4" ) BATANG 1,231,300.00 panjang 6 m

Pipa Medium B Galvanis DN 160 ( 6" ) BATANG 1,973,800.00 panjang 6 m

Pipa Medium B Galvanis DN 200 ( 8" ) BATANG 3,496,300.00 panjang 6 m

F KELOMPOK PENUTUP ATAP

1 Genteng Sirap M2 231,300.00

2 Genteng Beton Warna standard BUAH 8,200.00

3 Genteng Beton Warna Special BUAH 10,000.00

4 Genteng Beton Warna Khusus BUAH 8,200.00

5 Kerpus Beton Warna Standard BUAH 7,500.00

6 Kerpus Beton Warna Special BUAH 9,400.00

175

Page 103: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

7 Kerpus Beton Warna Khusus BUAH 15,000.00

8 Genteng plentong kecil BUAH 3,500.00

9 Genteng Kodok BUAH 3,400.00

10 Genteng Plentong Glasur BUAH 4,800.00

11 Genteng Nok kerpus Kodok BUAH 7,500.00

12 Genteng Nok kerpus Plentong Glasur BUAH 11,300.00

13 Genteng Keramik Glasur (Kanmuri) BUAH 12,500.00

14 Genteng Plentong super/Morando BUAH 6,500.00

15 Genteng Nok kerpus plentong super BUAH 10,700.00

16 Genteng Kaca Vlaam tebal 2 mm BUAH 10,700.00

17 Genteng Kaca Vlaam tebal 3 mm BUAH 11,900.00

18 Genteng Kaca Kodok tebal 2 mm BUAH 12,900.00

19 Genteng Kaca Kodok tebal 3 mm BUAH 15,800.00

20 Asbes Gelombang Besar

. 225 cm X 102 cm X 5 mm LEMBAR 96,900.00

. 250 cm X 102 cm X 5 mm LEMBAR 107,900.00

. 210 cm X 108 cm X 6 mm LEMBAR 106,300.00

. 240 cm X 108 cm X 6 mm LEMBAR 118,800.00

. 270 cm X 108 cm X 6 mm LEMBAR 137,500.00

21 Asbes Gelombang Kecil

. 150 cm X 105 cm X 4 mm LEMBAR 55,700.00

. 180 cm X 105 cm X 4 mm LEMBAR 61,300.00

. 210 cm X 105 cm X 4 mm LEMBAR 70,700.00

. 240 cm X 105 cm X 4 mm LEMBAR 85,700.00

. 270 cm X 105 cm X 4 mm LEMBAR 92,500.00

. 300 cm X 105 cm X 4 mm LEMBAR 102,500.00

. 180 cm X 105 cm X 3 mm LEMBAR 38,800.00

22 Jabes nok

. Kerpus Genteng BUAH 39,300.00

. Stel Besar BUAH 53,800.00

. Paten Besar BUAH 50,000.00

23 Nokstel gelombang harflex

. Stel Besar BUAH 52,500.00

. Patent Besar BUAH 31,300.00

. Plat besar BUAH 61,300.00

24 Nok Genteng metal butir pasir BUAH 68,800.00

25 Nok Genteng bitumen BUAH 137,500.00

26 Fibre Glass 180 X 92 cm LEMBAR 81,300.00

27 Fibre Glass 200 X 92 cm LEMBAR 93,800.00

28 Fibre Glass 250 X 92 cm LEMBAR 106,300.00

29 Fibre Glass 180 X 105 cm LEMBAR 96,300.00

30 Fibre Glass 210 X 105 cm LEMBAR 106,300.00

31 Fibre Glass 250 X 105 cm LEMBAR 122,500.00

32 Seng Plat BJLS 0,18 lebar 55 cm LEMBAR 26,300.00

33 Seng Plat BJLS 0,20 lebar 55 cm LEMBAR 36,300.00

34 Seng Plat BJLS 0,28 lebar 55 cm LEMBAR 46,300.00

35 Seng Plat BJLS 0,30 lebar 55 cm LEMBAR 52,500.00

36 Seng Gelombang BJLS 0,18 panjang 180 cm LEMBAR 65,000.00

37 Seng Gelombang BJLS 0,20 panjang 180 cm LEMBAR 72,500.00

38 Seng Gelombang BJLS 0,30 panjang 180 cm LEMBAR 83,800.00

39 Seng Gelombang BJLS 0,40 panjang 180 cm LEMBAR 93,800.00

40 Genteng metal Berpasir LEMBAR 81,300.00

41 Genteng bitumen motif genteng uk. 40 X 106 cm LEMBAR 68,800.00

42 Genteng bitumen (line/gelombang) uk. 95 X 200 cm LEMBAR 220,000.00

43 Atap Galvalume M2 77,500.00

G KELOMPOK PENUTUP LANTAI/DINDING

1 Tegel PC abu-abu 30 X 30 cm M2 43,400.00

2 Tegel PC abu-abu 20 X 20 cm M2 40,800.00

3 Tegel PC warna 30 X 30 cm M2 47,300.00

4 Tegel PC warna 20 X 20 cm M2 44,700.00

5 Teraso 30 X 30 cm M2 76,200.00

6 Tegel PC abu-abu 10 X 20 cm BUAH 7,300.00

176

Page 104: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

7 Tegel PC warna 15 x 20 cm BUAH 7,900.00

8 Ubin Porselin 11 X 11 putih DOS 47,300.00

9 Ubin Porselin 11 X 11 warna DOS 49,900.00

10 Ubin Porselin 15 X 15 putih DOS 48,700.00

11 Ubin Porselin 15 X 15 warna DOS 53,900.00

12 Mozaik Porselin 10 X 20 cm M2 67,500.00

13 Mozaik Porselin15 X 15 cm M2 70,000.00

14 Mozaik Porselin 20 X 20 cm M2 65,000.00

15 Mozaik Porselin 20 X 25 cm M2 66,300.00

16 Keramik 30 X 30 cm Polos M2 50,000.00

17 Keramik 30 X 30 cm Motif M2 56,300.00

20 Keramik 20 X 20 cm Polos M2 65,000.00

21 Keramik 20 X 20 cm Motif M2 68,800.00

22 Keramik 33 x 33 cm M2 56,300.00

23 Keramik 25 x 25 cm M2 68,800.00

24 Keramik 40 x 40 cm Polos M2 56,300.00

25 Keramik 40 x 40 cm Motif M2 62,200.00

28 Keramik 20 X 20 cm anti slip/tekstur M2 62,500.00

29 Keramik 30 X 30 cm anti slip/tekstur M2 87,500.00

30 Keramik 40 x 40 cm anti slip/tekstur M2 97,500.00

31 Keramik 20 x 25 cm M2 81,300.00

32 Keramik 25 x 40 cm M2 100,000.00

33 Keramik 10 X 20 cm BUAH 7,500.00

34 Keramik 10 X 25 cm BUAH 10,000.00

35 Keramik 5 X 20 cm BUAH 6,900.00

36 Parquet Jati M2 312,500.00

37 Batu Paros M2 156,300.00

38 Batu Tempel Hitam/andesit M2 150,000.00

39 Granite Tile ex Granito/Niro M2 281,300.00

40 Granite Tile ex Garuda M2 187,500.00

41 Marmer M2 562,500.00

H KELOMPOK LANGIT-LANGIT

1 Akustik 30 X 30 LEMBAR 7,500.00

2 Akustik 30 X 60 LEMBAR 18,200.00

3 Akustik 60 X 120 LEMBAR 57,000.00

4 List Kayu Profil M' 15,000.00

5 List Gypsum M' 18,800.00

6 Tepung Gypsum/Kompon LEMBAR 3,800.00

7 Softboard/Gypsumboard tebal 9 mm LEMBAR 93,800.00

8 Hardboard/GRC uk. 100cm x 100cm x 4mm LEMBAR 31,300.00

9 Hardboard/GRC uk. 120cm x 240cm x 4mm LEMBAR 100,000.00

10 Hardboard/GRC uk. 122cm x 244cm x 4mm LEMBAR 106,300.00

11 Hardboard/GRC uk.122cm x 244cm x 5mm LEMBAR 131,300.00

12 Hardboard/GRC uk.122cm x 244cm x 6mm LEMBAR 162,500.00

13 Hardboard/GRC uk.122cm x 244cm x 8mm LEMBAR 275,000.00

14 Hardboard/GRC uk.122cm x 244cm x 10mm LEMBAR 362,500.00

15 Besi Hollow □ 20.40.400 BATANG 27,500.00

16 Besi Hollow □ 40.40.400 BATANG 40,000.00

I KELOMPOK BAHAN FINISHING

1 Finishing Kayu

Menie KG 28,200.00

Dempul plamur KG 31,300.00

Ambril/amplas LEMBAR 5,000.00

Batu Apung KG 37,500.00

Cat dasar KG 50,000.00

Cat ex. Emco KG 73,800.00

Cat ex. Yunior 66 (nippon paint) KG 68,800.00

Kuas BUAH 21,300.00

Deculux KG 112,500.00

Siralax ONS 18,000.00

Spiritus LITER 16,300.00

177

Page 105: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

Plitur jadi LITER 74,800.00

Wood filler KG 50,000.00

Woodstain KG 87,500.00

Sanding KG 75,000.00

Melamic KG 75,000.00

2 Finishing Tembok/Dinding

Kalkarium KG 6,300.00

Kapur sirih KG 5,000.00

Plamur KG 37,500.00

Cat Tembok klas B exterior (ex. Catylac) KG 47,500.00

Cat Tembok klas A exterior (ex. Dulux/Propan, Mowilex)KG 95,000.00

Cat Tembok klas B interior (ex. Catylac) KG 31,300.00

Cat Tembok klas A interior (ex. Dulux/Propan, Mowilex)KG 65,000.00

Cat Genteng klas A KG 106,900.00

Cat Genteng klas B KG 61,300.00

Cat Batu Alam KG 92,500.00

Cat Kayu klas B (ex. Avian) KG 65,700.00

Cat Kayu klas A (ex. Emco) KG 75,800.00

3 Finishing Besi

Menie KG 33,800.00

Cat mengkilat KG 65,000.00

Cat KG 65,000.00

Thinner A LITER 26,300.00

Minyak cat LITER 18,800.00

Thinner Super LITER 31,300.00

Residu (teer/aspal) LITER 15,000.00

J KELOMPOK BAHAN KACA

Kaca Bening/Polos 3 mm M2 100,000.00

Kaca Bening/Polos 5 mm M2 121,900.00

Kaca Bening/Polos 8 mm M2 262,500.00

Kaca Bening/Polos 12 mm M2 368,800.00

Kaca Buram/Es Kabur 3 mm M2 106,300.00

Kaca Buram/Es Kabur 5 mm M2 125,000.00

Kaca Rayben 3 mm M2 100,000.00

Kaca Rayben 5 mm M2 125,000.00

Kaca Tempered 6 mm M2 364,400.00

Kaca Tempered 8 mm M2 529,400.00

Kaca Tempered 10 mm M2 563,800.00

Kaca Tempered 12 mm M2 632,500.00

Cermin tebal 3 mm M2 106,300.00

Cermin tebal 5 mm M2 156,300.00

Cermin tebal 8 mm M2 262,500.00

K KELOMPOK ALAT-ALAT PENGUNCI & PENGGANTUNG

Kunci Tanam 2 slag ex. Union 87,500.00

Kunci Tanam 2 slag ex. Yale BUAH 187,500.00

Kunci Tanam 2 slag ex. Kuda BUAH 100,000.00

Kunci Tanam Antik BUAH 250,000.00

Kunci Kamar Mandi BUAH 62,500.00

Engsel Angin BUAH 18,800.00

Kupu-kupu biasa BUAH 6,300.00

Nylon kupu-kupu BUAH 15,000.00

Espagnoled BUAH 187,500.00

Grendel Tanam/Flush Bolt BUAH 112,500.00

Grendel biasa BUAH 15,000.00

Kait Angin BUAH 18,800.00

Door Stop BUAH 50,000.00

Handel kunci PASANG 212,500.00

Springknip BUAH 26,300.00

Engsel pintu BUAH 31,300.00

Engsel Jendela BUAH 18,800.00

Door Closer BUAH 212,500.00

178

Page 106: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

Kunci selot BUAH 125,000.00

Door holder BUAH 31,300.00

Rel Pintu Dorong BUAH 250,000.00

Kunci lemari BUAH 18,800.00

L KELOMPOK BAHAN SANITAIR

Kloset Duduk ex. Toto UNIT 2,500,000.00

Kloset Jongkok ex. Toto UNIT 325,000.00

Washtafel UNIT 562,500.00

Urinoir UNIT 1,750,000.00

Bak Fiber 1 M3 UNIT 375,000.00

Bak Fiber 0,3 M3 UNIT 250,000.00

Bak Mandi Teraso UNIT 1,625,000.00

Water Drain/Floor Drain BUAH 100,000.00

Kran 1/2" Stainlessteel BUAH 100,000.00

Septictank (Pabrikasi) 5 Pemakai UNIT 4,500,000.00

Septictank (Pabrikasi) 10 Pemakai UNIT 8,125,000.00

Fibre glass (tanki air) kapasitas 500 liter UNIT 1,250,000.00

Fibre glass (tanki air) kapasitas 1000 liter UNIT 2,250,000.00

M LAIN-LAIN

1 Ajir acuan tanaman BUAH 1,900.00

2 Aditif anti pengelupasan KG 37,500.00

3 Air M3 62,500.00

4 Amplas LEMBAR 5,500.00

5 Arbocell KG 40,000.00

6 Asbuton Halus TON 406,300.00

7 Aspal (curah) KG 11,100.00

8 Aspal (drum) KG 12,400.00

9 Aspal Emulsi KG 8,800.00

10 Aspal Modifikasi KG 10,000.00

11 Assetilline BOTOL 286,900.00

12 Bahan Modifikasi KG 1,300.00

13 Bahan pengawet: kreosot LITER 6,300.00

14 Bunker Oil LITER 3,800.00

15 Bensin/Premiun/BBM bersubsidi LITER 8,200.00

16 Bensin/Premiun/BBM non subsidi LITER 11,900.00

17 Bibit Mangrove POHON 93,800.00

18 Cat Marka (Non Thermoplas) KG 28,200.00

19 Cat Marka (Thermoplastic) KG 34,400.00

20 Curing Compound LITER 48,200.00

21 Cetakan armor KG 31,300.00

22 Cuka Bibit LITER 12,500.00

23 Elastomer Bearing (30x40x5) cm BUAH 2,406,300.00

24 Elastomer Bearing (35x40x5) cm BUAH 2,887,500.00

25 Elastomer Bearing (40x40x5) cm BUAH 3,616,300.00

26 Elastomer Bearing (45x50x5) cm BUAH 4,812,500.00

27 Elastomer Bearing (50x60x5) cm BUAH 6,022,500.00

28 Epoxy Bahan Penutup (sealant) KG 86,000.00

29 Expansion Cap M2 48,200.00

30 Gebalan Rumput M2 37,500.00

31 Geotekstil A M2 75,000.00

32 Geotekstil B (Polyfelt,dll) M2 150,700.00

33 Geotekstil C M2 281,300.00

34 Glass Bead KG 35,800.00

35 Geotekstil tali M 4,400.00

36 Karung plastik / bagor BUAH 3,200.00

37 Karung goni/terpal M2 1,900.00

38 Kerb jenis 1 (15x25x50) BUAH 18,800.00

39 Kerb jenis 2 (15x30x50) BUAH 28,200.00

40 Kerb jenis 3 (15x40x50) BUAH 33,200.00

41 Kerb Type A BUAH 562,500.00

42 Minyak bekisting LITER 12,500.00

179

Page 107: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

43 Minyak Tanah LITER 16,300.00

44 Marmer (Nomenklatur) BUAH 687,500.00

45 Mata Kucing BUAH 100,000.00

46 Matras Concrete BUAH 506,300.00

47 Minyak Fluks LITER 21,300.00

48 Minyak Pelumas / Olie LITER 50,000.00

49 Olie mesin (Mesran 40 SAE) LITER 41,200.00

50 Oli hidraulic LITER 51,300.00

51 Oli transmisi LITER 51,300.00

52 Oxygen BOTOL 143,500.00

53 Paving Block 6 ccm K.175 (sekelas muntilan) M2 93,800.00

54 Pelat Rambu (Eng. Grade) BUAH 220,000.00

55 Pelat Rambu (High I. Grade) BUAH 270,700.00

56 Plastik Filter M2 18,800.00

57 Polytene (plastik cor) M2 13,800.00

58 Solar bersubsidi LITER 6,500.00

59 Solar industri LITER 13,200.00

60 Rel Pengaman M' 515,700.00

61 Thinner LITER 33,200.00

62 Tali pengikat/Tambang Nylon M' 6,300.00

63 Waterstop PVC.150 M' 68,800.00

64 Waterstop PVC.200 M' 93,800.00

65 Waterstop PVC.270 M' 156,300.00

66 Waterstop Rubber lebar 150mm - 200mm M' 218,800.00

67 Lem ex Aica Aibon KG 112,500.00

68 Alumunium Foil M2 10,000.00

69 Sealent KG 100,000.00

70 Wallpapper lebar 50 cm M' 62,500.00

71 Wallpapper M2 125,000.00

III.DAFTAR PERALATAN

1 ASPHALT MIXING PLANT JAM 8,932,300.00

2 ASPHALT FINISHER JAM 802,900.00

3 ASPHALT SPRAYER JAM 101,200.00

4 BULLDOZER 100-150 HP JAM 884,100.00

5 COMPRESSOR 4000-6500 L\M JAM 233,300.00

6 CONCRETE MIXER 0.3-0.6 M3 JAM 219,200.00

7 CRANE 10-15 TON JAM 837,000.00

8 DUMP TRUCK 3.5 TON JAM 354,600.00

9 DUMP TRUCK 10 TON JAM 644,500.00

10 EXCAVATOR 80-140 HP JAM 501,800.00

11 FLAT BED TRUCK 3-4 M3 JAM 653,200.00

12 GENERATOR SET JAM 544,900.00

13 MOTOR GRADER >100 HP JAM 991,700.00

14 TRACK LOADER 75-100 HP JAM 382,800.00

15 WHEEL LOADER 1.0-1.6 M3 JAM 746,500.00

16 THREE WHEEL ROLLER 6-8 T JAM 554,000.00

17 TANDEM ROLLER 6-8 T. JAM 628,200.00

18 TIRE ROLLER 8-10 T. JAM 670,600.00

19 VIBRATORY ROLLER 5-8 T. JAM 403,900.00

20 CONCRETE VIBRATOR JAM 58,400.00

21 STONE CRUSHER JAM 1,216,000.00

22 WATER PUMP 70-100 mm JAM 55,500.00

23 WATER TANKER 3000-4500 L. JAM 378,900.00

24 PEDESTRIAN ROLLER JAM 115,500.00

25 TAMPER JAM 58,000.00

26 JACK HAMMER JAM 47,100.00

27 FULVI MIXER JAM 1,316,100.00

28 CONCRETE PUMP JAM 786,000.00

29 TRAILER 20 TON JAM 702,700.00

30 PILE DRIVER + HAMMER JAM 128,600.00

31 CRANE ON TRACK 35 TON JAM 1,010,100.00

32 WELDING SET JAM 147,800.00

180

Page 108: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

( Rp.)

1 2 3 4 5

No. U R A I A N

HARGA (PPn+

Overhead)SATUAN KETERANGAN

33 BORE PILE MACHINE JAM 1,478,900.00

34 ASPHALT LIQUID MIXER JAM 1,141,300.00

35 TRONTON JAM 743,800.00

36 COLD MILLING JAM 2,156,100.00

37 ROCK DRILL BREAKER JAM 78,500.00

38 COLD RECYCLER JAM 3,386,600.00

39 HOT RECYCLER JAM 1,166,400.00

40 AGGREGAT (CHIP) SPREADER JAM 454,500.00

41 ASPHALT DISTRIBUTOR JAM 410,900.00

42 SLIP FORM PAVER JAM 2,006,300.00

43 CONCRETE PAN MIXER JAM 929,600.00

44 CONCRETE BREAKER JAM 867,500.00

45 ASPAHLT TANKER JAM 609,700.00

46 CEMENT TANKER JAM 559,700.00

47 CONDRETE MIXER (350) JAM 95,700.00

48 VIBRATING RAMMER JAM 72,300.00

49 TRUK MIXER (AGITATOR) JAM 760,900.00

50 BORE PILE MACHINE JAM 1,798,200.00

51 CRANE ON TRACK 75-100 TON JAM 1,262,300.00

52 BLENDING EQUIPMENT JAM 347,800.00

53 ASPHALT LIQUID MIXER JAM 1,237,500.00

54 BAR BENDER JAM 51,100.00

55 BAR CUTTER JAM 44,900.00

56 BREAKER JAM 264,300.00

57 GROUTING PUMP JAM 313,600.00

58 JACK HIDROLIC JAM 46,200.00

59 MESIN LAS JAM 52,200.00

60 PILE DRIVER LEADER, 75 kw JAM 234,400.00

61 PILE HAMMER JAM 146,100.00

62 PILE HAMMER, 2,5 Ton JAM 45,600.00

63 STRESSING JACK JAM 282,000.00

64 WELDING MACHINE, 300 A JAM 51,100.00

65 CHAINSAW JAM 45,700.00

Keterangan :

1 .

2 . Untuk Daerah atas harga material bertambah 5 %

3 . Daerah ekstrim harga material bertambah 7 %

Kec. Petungkriyono : Simego, Songgodadi, Curugmuncar, Gumelem, Tlogohendro, Tlogopakis

Kec. Paninggaran : Botosari, Notogiwang, Lambanggelun, Bedagung

Kec. Lebakbarang : Tembelenggunung, Depok, Wonosido, Timbangsari, Kapundutuan'

Kec. Talun : Jolotigo, Sengare

Kec. Doro : Pungangan, Sidoharjo

Kec. Kajen : Brengkolang

Kec. Kesesi : Windurojo dan Ujungnegoro ( Bagian Atas)

4 . Pekerjaan swakelola merujuk pada peraturan yang berlaku dan dilakukan survey

5 . Untuk menentukan HPS harus melakukan survey

Kec. Kandangserang : Bodas, Klesem, Gembong, Sukoharjo, Garungwiyoro, Bubak, Bojongkoneng,

Luragung, Wangkelang, Trajumas, Karanggondang

Daerah bawah meliputi Kecamatan Tirto, Kecamatan Wonokerto, Kecamatan Siwalan, Kecamatan

Wiradesa, Kecamatan Bojong, Kecamatan Kedungwuni, Kecamatan Wonopringgo, Kecamatan Kesesi,

Kecamatan Kajen, Kecamatan Buaran, Kecamatan Karangdadap dan Kecamatan Sragi

Daerah atas meliputi Kecamatan Kandangserang, Kecamatan Lebakbarang, Kecamatan Petungkriyono,

Kecamatan Paninggaran, Kecamatan Talun dan Kecamatan Doro

181

Page 109: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

A.

3.25. PERSYARATAN BANGUNAN GEDUNG NEGARA

KLASIFIKASI BANGUNAN GEDUNG NEGARA.

A.1. BANGUNAN SEDERHANA

Klasifikasi bangunan sederhana adalah bangunan gedung Negara dengan karakter sederhana serta memiliki kompleksitas dan teknologi sederhana, atau bangunan gedung Negara yang sudah ada disain prototipenya. Masa penjaminan kegagalan bangunannya adalah selama 10 (sepuluh) tahun.

Yang termasuk klasifikasi Bangunan Sederhana, antara lain :

A.1.1. gedung kantor yang sudah ada disain prototipenya, atau bangunan gedung

kantor dengan jumlah lantai s.d. 2 lantai dengan luas sampai dengan 500 m²;

A.1.2. bangunan rumah dinas tipe C, D, dan E. yang tidak bertingkat;

A.1.3. gedung pelayanan kesehatan (Puskesmas);

A.1.4. gedung pendidikan tingkat dasar dan atau lanjutan dengan jumlah lantai

s.d. 2 lantai.

A.2. BANGUNAN TIDAK SEDERHANA

Klasifikasi bangunan tidak sederhana adalah bangunan gedung negara dengan karakter tidak sederhana serta memiliki kompleksitas dan atau teknologi tidak sederhana. Masa penjaminan kegagalan bangunannya adalah selama 10 (sepuluh)

tahun.

Yang termasuk klasifikasi Bangunan Tidak Sederhana, antara lain :

A.2.1. gedung kantor yang belum ada disain prototipenya, atau gedung kantor

dengan dengan luas diatas 500 m² atau gedung kantor bertingkat diatas 2 lantai;

A.2.2. bangunan rumah dinas tipe A, dan B. atau rumah dinas C, D, dan E yang

bertingkat;

A.2.3. gedung rumah sakit klas A, B, C, dan D;

A.2.4. gedung pendidikan tinggi universitas/akademi atau gedung pendidikan

dasar/lanjutan bertingkat diatas 2 lantai.

A.3. BANGUNAN KHUSUS

Klasifikasi bangunan khusus adalah bangunan gedung Negara yang memiliki penggunaan dan persyaratan khusus, yang dalam perencanaan dan pelaksanaannya memerlukan penyelesaian/teknologi khusus. Masa penjaminan kegagalan bangunannya minimum adalah 10 (sepuluh) tahun.

Yang termasuk klasifikasi Bangunan Khusus, antara lain :

A.3.1. Istana Negara dan rumah jabatan Presiden dan Wakil Presiden;

A.3.2. Wisma Negara;

A.3.3. Gedung instalasi nuklir;

A.3.4. Gedung laboratorium;

A.3.5. Gedung terminal udara/laut/darat;

A.3.6. Stasiun kereta api;

A.3.7. Stadion olah raga;

A.3.8. Rumah tahanan;

A.3.9. Gudang benda berbahaya;

A.3.10. Gedung bersifat monumental;

182

Page 110: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

183

A.3.11. Gedung untuk pertahanan;

A.3.12. Gedung kantor perwakilan Negara R.I. diluar negeri;

A.3.13. Gedung rumah sakit klas A, B, C, dan D..

B. PEMBIAYAAN BANGUNAN / KOMPONEN BANGUNAN TERTENTU.

1. HARGA SATUAN TERTINGGI RATA-RATA PER M2 BANGUNAN BERTINGKAT

UNTUK BANGUNAN GEDUNG NEGARA.

Harga satuan tertinggi rata-rata per-m2 bagunan gedung bertingkat adalah

didasarkan pada harga satuan lantai dasar tertinggi per m2 untuk bangunan gedung

bertingkat, kemudian dikalikan dengan koefisien/faktor pengali untuk jumlah lantai

yang bersangkutan, sebagai berikut :

No. Jumlah Lantai

Bangunan Harga Satuan per m2 Tertinggi

1. Bangunan 2 lantai 1,090 standar harga gedung bertingkat

2. Bangunan 3 lantai 1,120 standar harga gedung bertingkat

3. Bangunan 4 lantai 1,135 standar harga gedung bertingkat

4. Bangunan 5 lantai 1,162 standar harga gedung bertingkat

5. Bangunan 6 lantai 1,197 standar harga gedung bertingkat

6. Bangunan 7 lantai 1,236 standar harga gedung bertingkat

7. Bangunan 8 lantai 1,265 standar harga gedung bertingkat

Untuk bangunan yang lebih dari 8 lantai, koefisien/faktor pengalinya

dikonsultasikan dengan instansi Teknis setempat.

2. HARGA SATUAN TERTINGGI RATA-RATA PER M2 BANGUNAN / RUANG

DENGAN FUNGSI KHUSUS UNTUK BANGUNAN GEDUNG NEGARA.

Untuk bangunan / ruang yang mempunyaifungsi khusus, yang karena

persyaratannya memerlukan penyelesaian khusus, harga satuan tertinggi untuk per

m2 nya didasarkan pada harga satuan tertinggi untuk klasifikasi bangunan yang

bersangkutan setelah dikalikan koefisien seperti berikut ;

No. Fungsi Bangunan/Ruang Koefisien Fungsi Khusus

1. ICU/ICCU/UGD/CMU RS 1,10 standar harga bangunan Rumah Sakit

2. Ruang Operasi RS 1,20 standar harga bangunan Rumah Sakit

3. Ruang Radiologi RS 1,25 standar harga bangunan Rumah Sakit

4. Loundry/CSSD RS 1,10 standar harga bangunan Rumah Sakit

5. Perawatan/Dapur RS 1,00 standar harga bangunan Rumah Sakit

6. Asrama Perawat RS 1,00 standar harga bangunan Rumah Sakit

7. Laboratorium RS 1,10 standar harga bangunan Rumah Sakit

8. Workshop 1,00 standar harga bangunan

9. Power House 1,25 standar harga bangunan

10. Laboratorium SLTP/SMU 1,15 standar harga bangunan

11. UGB dan prasarananya 1,05 standar harga bangunan

12. Selasar Luar Beratap

Bangunan 0,50

standar harga bangunan klasifikasi

yang sama

Page 111: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

184

Untuk bangunan gedung/ruang yang mempunyai fungsi khusus lainnya yang

memerlukan standar harga yang khusus, agar pada tahap penyusunan anggaran

berkonsultasi dengan instansi Teknis setempat.

C. STANDAR LUAS BANGUNAN GEDUNG NEGARA

B.1 GEDUNG KANTOR

Dalam menghitung luas ruang bangunan gedung kantor yang diperlukan, dihitung

berdasarkan ketentuan sebagai berikut :

(i) Standar luas ruang gedung kantor pemerintah yang termasuk klasifikasi tidak

sederhana rata-rata sebesar 9,60 m² per-personil.

(ii) Standar luas ruang gedung kantor pemerintah yang termasuk klasifikasi

sederhana rata-rata sebesar 8 m² per-personil.

Kebutuhan total luas gedung kantor dihitung berdasarkan jumlah personil yang

akan ditampung dikalikan standar luas sesuai dengan klasifikasi bangunannya.

Untuk bangunan gedung kantor yang memerlukan ruang-ruang khusus atau ruang

pelayanan masyarakat, kebutuhannya dihitung secara tersendiri diluar luas

ruangan untuk seluruh personil yang akan ditampung. Standar Luas Ruang Kerja

Kantor Pemerintah dapat dilihat pada tabel berikut :

B.1.1. Ruang Kerja

JABATAN

LUAS RUANG (M2) KETERANG

AN

RG.

KERJA

RG.

TAM

U

RG.

RAPAT

RG.

RAPAT

UTAMA

RG.

SEKR

ET

RG.

TUNG

GU

RG.

SIMP

AN

RG.

ISTIRA

HAT

RG.

TOIL

ET

JUMLA

H

1 2 3 4 5 6 7 8 9 10 11 12

1. Menteri 28.00 40.00 40.00 140.00 58.00 60.00 14.00 20.00 6.00 406.00 Standar

luas ruang

tersebut

merupakan

acuan

dasar, yang

dapat

disesuaikan

berdasarkan

fungsi/sifat

tiap

eselon/jabat

an

2. Eselon IA 16.00 14.00 20.00 90.00 20.00 18.00 5.00 10.00 4.00 197.00

3. Eselon IB 16.00 14.00 20.00 0.00 10.00 9.00 5.00 5.00 3.00 82.00

4. Eselon IIA 14.00 12.00 14.00 6.00 10.00 12.00 3.00 5.00 3.00 73.00

5. Eselon IIB 14.00 12.00 10.00 6.00 4.00 6.00 3.00 5.00 3.00 58.00

6. Eselon IIIA 12.00 6.00 0.00 6.00 0.00 0.00 3.00 0.00 0.00 24.00

7. Eselon IIIB 12.00 6.00 0.00 6.00 0.00 0.00 3.00 0.00 0.00 21.00

8. Eselon IV 8.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 10.00

9. Eselon V 4.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 6.00

10. Staf 2.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00

B.1.2. Ruang Penunjang

1. Ruang Rapat = 1,2 M2/orang

2. Ruang Arsip = 0,4 M2/orang

3. WC/Urinoir = 2 M2/25 orang

4. Mushola = 0,8 m2/orang

5. Ruang Sirkulasi = 25% total luas ruang

Page 112: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

185

B.2 RUMAH NEGARA

Standar luas Rumah Negara ditentukan sesuai dengan tipe peruntukannya, sebagai

berikut;

Tipe Luas Bangunan Luas Lahan *)

A 250 m2 600 m2

B 120 m2 350 m2

C 70 m2 200 m2

D 50 m2 120 m2

E 36 m2 100 m2

Jenis dan jumlah ruang minimum yang harus ditampung dalam tiap tipe Rumah

Negara, sesuai dengan yang tercantum dalam table berikut, dimana luas teras

beratap dihitung 50,00 %, sedangkan luas teras tidak beratap dihitung 30,00 %.

*) Luas lahan disesuaikan dengan kondisi daerah/ketentuan yang diatur dalam RTRW

yang dituangkan dalam Peraturan Daerah.

NO URAIAN

TIPE

KETERANGAN Khusus A/250

m2

B/120

m2

C/70

m2

D/50

m2

E/36

m2

1 Ruang Tamu 1 1 1 1 1 1 Di dalam Hasil

Rancangan

dimungkinkan

adanya

penggabungan

beberapa fungsi

dalam satu

ruang, misalnya

fungsi ruang

duduk dan

ruang makan

2 Ruang Kerja 1 1 1 - - -

3 Ruang Duduk 1 1 1 - - -

4 Ruang Makan 1 1 1 1 1 1

5 Ruang Tidur 4 4 3 3 2 2

6 Kamar

Mandi/WC

2 2 1 1 1 1

7 Dapur 1 1 1 1 1 1

8 Gedung 1 1 1 1 1 1

9 Garasi 2 2 1 - - -

10 Ruang Tidur

Pembantu

2 2 1 - - -

11 Raung Cuci 1 1 1 1 1 1 Tidak dihitung

dalam luas

bangunan

standar

12 KM Pembantu 1 1 1 - - -

B.3 STANDAR LUAS GEDUNG NEGARA LAINNYA

Standar luas gedung Negara lainnya, seperti ; sekolah/universitas, rumah sakit,

dan lainnya mengikuti ketentuan - ketentuan luas ruang yang dikeluarkan oleh

instansi yang bersangkutan.

Page 113: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

III.E

3.26

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

1 < 50 6.83 4.44 5.81 82.93

2 50 - 100 6.83 4.44 5.81 82.93

3 100 - 150 6.83 4.44 5.81 82.93

4 150 - 200 6.83 4.44 5.81 82.93

5 200 - 250 6.83 4.44 5.81 82.93

6 250 - 300 6.83 4.44 5.81 82.93

7 300 - 350 6.64 4.35 5.51 83.50

8 350 - 400 6.45 4.25 5.21 84.08

9 400 - 450 6.26 4.16 4.91 84.67

10 450 - 500 6.06 4.06 4.60 85.27

11 500 - 600 5.87 3.97 4.29 85.87

12 600 - 700 5.69 3.87 4.04 86.40

13 700 - 800 5.52 3.77 3.78 86.93

14 800 - 900 5.34 3.66 3.52 87.47

15 900 - 1,000 5.17 3.56 3.26 88.02

16 1,000 - 1,100 4.99 3.45 2.99 88.57

17 1,100 - 1,200 4.94 3.42 2.92 88.72

18 1,200 - 1,300 4.89 3.39 2.85 88.87

19 1,300 - 1,400 4.84 3.36 2.78 89.02

20 1,400 - 1,500 4.79 3.33 2.71 89.18

21 1,500 - 1,600 4.74 3.30 2.64 89.33

22 1,600 - 1,700 4.69 3.26 2.56 89.48

23 1,700 - 1,800 4.64 3.23 2.49 89.64

24 1,800 - 1,900 4.59 3.20 2.42 89.79

25 1,900 - 2,000 4.54 3.17 2.35 89.95

26 2,000 - 2,100 4.48 3.14 2.28 90.10

27 2,100 - 2,200 4.43 3.10 2.20 90.26

28 2,200 - 2,300 4.38 3.07 2.13 90.42

29 2,300 - 2,400 4.33 3.04 2.06 90.58

30 2,400 - 2,500 4.28 3.01 1.98 90.73

31 2,500 - 2,600 4.23 2.97 1.91 90.89

32 2,600 - 2,700 4.20 2.95 1.89 90.96

33 2,700 - 2,800 4.18 2.94 1.86 91.02

34 2,800 - 2,900 4.15 2.92 1.84 91.09

35 2,900 - 3,000 4.13 2.90 1.82 91.15

36 3,000 - 3,100 4.10 2.88 1.79 91.22

37 3,100 - 3,200 4.08 2.87 1.77 91.28

TABEL BIAYA PERENCANAAN, PENGAWASAN, PENGELOLAAN KEGIATAN DAN FISIK PADA KEGIATAN FISIK KLASIFIKASI SEDERHANA, TIDAK SEDERHANA, KHUSUS, KEGIATAN FISIK SELAIN BANGUNAN GEDUNG KANTOR/RUMAH DINAS/PAGAR SERTA PADA KEGIATAN NON FISIK

Tabel Biaya Perencanaan, Pengawasan, Pengelolaan Kegiatan dan Fisik pada Kegiatan Fisik Klasifikasi Sederhana

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

186

Page 114: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

38 3,200 - 3,300 4.06 2.85 1.75 91.35

39 3,300 - 3,400 4.03 2.83 1.72 91.42

40 3,400 - 3,500 4.01 2.81 1.70 91.48

41 3,500 - 3,600 3.98 2.80 1.68 91.55

42 3,600 - 3,700 3.96 2.78 1.65 91.61

43 3,700 - 3,800 3.93 2.76 1.63 91.68

44 3,800 - 3,900 3.91 2.74 1.60 91.74

45 3,900 - 4,000 3.88 2.72 1.58 91.81

46 4,000 - 4,100 3.86 2.71 1.56 91.88

47 4,100 - 4,200 3.83 2.69 1.53 91.94

48 4,200 - 4,300 3.81 2.67 1.51 92.01

49 4,300 - 4,400 3.78 2.65 1.49 92.08

50 4,400 - 4,500 3.76 2.63 1.46 92.14

51 4,500 - 4,600 3.73 2.62 1.44 92.21

52 4,600 - 4,700 3.71 2.60 1.41 92.28

53 4,700 - 4,800 3.68 2.58 1.39 92.34

54 4,800 - 4,900 3.66 2.56 1.37 92.41

55 4,900 - 5,000 3.63 2.54 1.34 92.48

56 5,000 - 5,100 3.61 2.53 1.32 92.55

57 5,100 - 5,200 3.60 2.52 1.31 92.57

58 5,200 - 5,300 3.59 2.51 1.30 92.60

59 5,300 - 5,400 3.58 2.50 1.29 92.63

60 5,400 - 5,500 3.57 2.50 1.29 92.65

61 5,500 - 5,600 3.56 2.49 1.28 92.68

62 5,600 - 5,700 3.55 2.48 1.27 92.71

63 5,700 - 5,800 3.54 2.47 1.26 92.73

64 5,800 - 5,900 3.53 2.46 1.25 92.76

65 5,900 - 6,000 3.52 2.46 1.24 92.79

66 6,000 - 6,100 3.50 2.45 1.23 92.81

67 6,100 - 6,200 3.49 2.44 1.23 92.84

68 6,200 - 6,300 3.48 2.43 1.22 92.87

69 6,300 - 6,400 3.47 2.42 1.21 92.89

70 6,400 - 6,500 3.46 2.42 1.20 92.92

71 6,500 - 6,600 3.45 2.41 1.19 92.95

72 6,600 - 6,700 3.44 2.40 1.18 92.97

73 6,700 - 6,800 3.43 2.39 1.18 93.00

74 6,800 - 6,900 3.42 2.39 1.17 93.03

75 6,900 - 7,000 3.41 2.38 1.16 93.05

76 7,000 - 7,100 3.40 2.37 1.15 93.08

77 7,100 - 7,200 3.39 2.36 1.14 93.11

78 7,200 - 7,300 3.38 2.35 1.13 93.14

79 7,300 - 7,400 3.37 2.35 1.12 93.16

80 7,400 - 7,500 3.36 2.34 1.12 93.19

81 7,500 - 7,600 3.35 2.33 1.11 93.22

187

Page 115: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

82 7,600 - 7,700 3.34 2.32 1.10 93.24

83 7,700 - 7,800 3.33 2.31 1.09 93.27

84 7,800 - 7,900 3.31 2.31 1.08 93.30

85 7,900 - 8,000 3.30 2.30 1.07 93.32

86 8,000 - 8,100 3.29 2.29 1.06 93.35

87 8,100 - 8,200 3.28 2.28 1.06 93.38

88 8,200 - 8,300 3.27 2.27 1.05 93.41

89 8,300 - 8,400 3.26 2.27 1.04 93.43

90 8,400 - 8,500 3.25 2.26 1.03 93.46

91 8,500 - 8,600 3.24 2.25 1.02 93.49

92 8,600 - 8,700 3.23 2.24 1.01 93.51

93 8,700 - 8,800 3.22 2.24 1.00 93.54

94 8,800 - 8,900 3.21 2.23 1.00 93.57

95 8,900 - 9,000 3.20 2.22 0.99 93.60

96 9,000 - 9,100 3.19 2.21 0.98 93.62

97 9,100 - 9,200 3.18 2.20 0.97 93.65

98 9,200 - 9,300 3.17 2.20 0.96 93.68

99 9,300 - 9,400 3.15 2.19 0.95 93.71

100 9,400 - 9,500 3.14 2.18 0.94 93.73

101 9,500 - 9,600 3.13 2.17 0.94 93.76

102 9,600 - 9,700 3.12 2.16 0.93 93.79

103 9,700 - 9,800 3.11 2.16 0.92 93.81

104 9,800 - 9,900 3.10 2.15 0.91 93.84

105 9,900 - 10,000 3.09 2.14 0.90 93.87

106 10,000 - 10,100 3.08 2.13 0.89 93.90

107 10,100 - 10,200 3.08 2.13 0.89 93.90

108 10,200 - 10,300 3.07 2.13 0.89 93.91

109 10,300 - 10,400 3.07 2.13 0.89 93.92

110 10,400 - 10,500 3.07 2.12 0.88 93.92

111 10,500 - 10,600 3.07 2.12 0.88 93.93

112 10,600 - 10,700 3.06 2.12 0.88 93.94

113 10,700 - 10,800 3.06 2.12 0.88 93.94

114 10,800 - 10,900 3.06 2.12 0.87 93.95

115 10,900 - 11,000 3.06 2.11 0.87 93.96

116 11,000 - 11,100 3.05 2.11 0.87 93.96

117 11,100 - 11,200 3.05 2.11 0.87 93.97

118 11,200 - 11,300 3.05 2.11 0.87 93.98

119 11,300 - 11,400 3.05 2.10 0.86 93.99

120 11,400 - 11,500 3.04 2.10 0.86 93.99

121 11,500 - 11,600 3.04 2.10 0.86 94.00

122 11,600 - 11,700 3.04 2.10 0.86 94.01

123 11,700 - 11,800 3.03 2.10 0.86 94.01

124 11,800 - 11,900 3.03 2.09 0.85 94.02

125 11,900 - 12,000 3.03 2.09 0.85 94.03

188

Page 116: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

126 12,000 - 12,100 3.03 2.09 0.85 94.03

127 12,100 - 12,200 3.02 2.09 0.85 94.04

128 12,200 - 12,300 3.02 2.09 0.85 94.05

129 12,300 - 12,400 3.02 2.08 0.84 94.05

130 12,400 - 12,500 3.02 2.08 0.84 94.06

131 12,500 - 12,600 3.01 2.08 0.84 94.07

132 12,600 - 12,700 3.01 2.08 0.84 94.07

133 12,700 - 12,800 3.01 2.08 0.83 94.08

134 12,800 - 12,900 3.01 2.07 0.83 94.09

135 12,900 - 13,000 3.00 2.07 0.83 94.09

136 13,000 - 13,100 3.00 2.07 0.83 94.10

137 13,100 - 13,200 3.00 2.07 0.83 94.11

138 13,200 - 13,300 2.99 2.07 0.82 94.12

139 13,300 - 13,400 2.99 2.06 0.82 94.12

140 13,400 - 13,500 2.99 2.06 0.82 94.13

141 13,500 - 13,600 2.99 2.06 0.82 94.14

142 13,600 - 13,700 2.98 2.06 0.82 94.14

143 13,700 - 13,800 2.98 2.06 0.81 94.15

144 13,800 - 13,900 2.98 2.05 0.81 94.16

145 13,900 - 14,000 2.98 2.05 0.81 94.16

146 14,000 - 14,100 2.97 2.05 0.81 94.17

147 14,100 - 14,200 2.97 2.05 0.80 94.18

148 14,200 - 14,300 2.97 2.05 0.80 94.18

149 14,300 - 14,400 2.97 2.04 0.80 94.19

150 14,400 - 14,500 2.96 2.04 0.80 94.20

151 14,500 - 14,600 2.96 2.04 0.80 94.20

152 14,600 - 14,700 2.96 2.04 0.79 94.21

153 14,700 - 14,800 2.95 2.04 0.79 94.22

154 14,800 - 14,900 2.95 2.03 0.79 94.23

155 14,900 - 15,000 2.95 2.03 0.79 94.23

156 15,000 - 15,100 2.95 2.03 0.79 94.24

157 15,100 - 15,200 2.94 2.03 0.78 94.25

158 15,200 - 15,300 2.94 2.03 0.78 94.25

159 15,300 - 15,400 2.94 2.02 0.78 94.26

160 15,400 - 15,500 2.94 2.02 0.78 94.27

161 15,500 - 15,600 2.93 2.02 0.77 94.27

162 15,600 - 15,700 2.93 2.02 0.77 94.28

163 15,700 - 15,800 2.93 2.01 0.77 94.29

164 15,800 - 15,900 2.93 2.01 0.77 94.29

165 15,900 - 16,000 2.92 2.01 0.77 94.30

166 16,000 - 16,100 2.92 2.01 0.76 94.31

167 16,100 - 16,200 2.92 2.01 0.76 94.31

168 16,200 - 16,300 2.91 2.00 0.76 94.32

169 16,300 - 16,400 2.91 2.00 0.76 94.33

189

Page 117: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

170 16,400 - 16,500 2.91 2.00 0.76 94.34

171 16,500 - 16,600 2.91 2.00 0.75 94.34

172 16,600 - 16,700 2.90 2.00 0.75 94.35

173 16,700 - 16,800 2.90 1.99 0.75 94.36

174 16,800 - 16,900 2.90 1.99 0.75 94.36

175 16,900 - 17,000 2.90 1.99 0.74 94.37

176 17,000 - 17,100 2.89 1.99 0.74 94.38

177 17,100 - 17,200 2.89 1.99 0.74 94.38

178 17,200 - 17,300 2.89 1.98 0.74 94.39

179 17,300 - 17,400 2.88 1.98 0.74 94.40

180 17,400 - 17,500 2.88 1.98 0.73 94.40

181 17,500 - 17,600 2.88 1.98 0.73 94.41

182 17,600 - 17,700 2.88 1.98 0.73 94.42

183 17,700 - 17,800 2.87 1.97 0.73 94.42

184 17,800 - 17,900 2.87 1.97 0.73 94.43

185 17,900 - 18,000 2.87 1.97 0.72 94.44

186 18,000 - 18,100 2.87 1.97 0.72 94.45

187 18,100 - 18,200 2.86 1.97 0.72 94.45

188 18,200 - 18,300 2.86 1.96 0.72 94.46

189 18,300 - 18,400 2.86 1.96 0.71 94.47

190 18,400 - 18,500 2.86 1.96 0.71 94.47

191 18,500 - 18,600 2.85 1.96 0.71 94.48

192 18,600 - 18,700 2.85 1.96 0.71 94.49

193 18,700 - 18,800 2.85 1.95 0.71 94.49

194 18,800 - 18,900 2.84 1.95 0.70 94.50

195 18,900 - 19,000 2.84 1.95 0.70 94.51

196 19,000 - 19,100 2.84 1.95 0.70 94.51

197 19,100 - 19,200 2.84 1.94 0.70 94.52

198 19,200 - 19,300 2.83 1.94 0.70 94.53

199 19,300 - 19,400 2.83 1.94 0.69 94.54

200 19,400 - 19,500 2.83 1.94 0.69 94.54

201 19,500 - 19,600 2.83 1.94 0.69 94.55

202 19,600 - 19,700 2.82 1.93 0.69 94.56

203 19,700 - 19,800 2.82 1.93 0.68 94.56

204 19,800 - 19,900 2.82 1.93 0.68 94.57

205 19,900 - 20,000 2.81 1.93 0.68 94.58

206 20,000 - 20,100 2.81 1.93 0.68 94.58

207 20,100 - 20,200 2.81 1.92 0.68 94.59

208 20,200 - 20,300 2.81 1.92 0.67 94.60

209 20,300 - 20,400 2.80 1.92 0.67 94.60

210 20,400 - 20,500 2.80 1.92 0.67 94.61

211 20,500 - 20,600 2.80 1.92 0.67 94.62

212 20,600 - 20,700 2.80 1.91 0.66 94.63

213 20,700 - 20,800 2.79 1.91 0.66 94.63

190

Page 118: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

214 20,800 - 20,900 2.79 1.91 0.66 94.64

215 20,900 - 21,000 2.79 1.91 0.66 94.65

216 21,000 - 21,100 2.79 1.91 0.66 94.65

217 21,100 - 21,200 2.78 1.90 0.65 94.66

218 21,200 - 21,300 2.78 1.90 0.65 94.67

219 21,300 - 21,400 2.78 1.90 0.65 94.67

220 21,400 - 21,500 2.77 1.90 0.65 94.68

221 21,500 - 21,600 2.77 1.90 0.65 94.69

222 21,600 - 21,700 2.77 1.89 0.64 94.69

223 21,700 - 21,800 2.77 1.89 0.64 94.70

224 21,800 - 21,900 2.76 1.89 0.64 94.71

225 21,900 - 22,000 2.76 1.89 0.64 94.72

226 22,000 - 22,100 2.76 1.88 0.63 94.72

227 22,100 - 22,200 2.76 1.88 0.63 94.73

228 22,200 - 22,300 2.75 1.88 0.63 94.74

229 22,300 - 22,400 2.75 1.88 0.63 94.74

230 22,400 - 22,500 2.75 1.88 0.63 94.75

231 22,500 - 22,600 2.74 1.87 0.62 94.76

232 22,600 - 22,700 2.74 1.87 0.62 94.76

233 22,700 - 22,800 2.74 1.87 0.62 94.77

234 22,800 - 22,900 2.74 1.87 0.62 94.78

235 22,900 - 23,000 2.73 1.87 0.62 94.78

236 23,000 - 23,100 2.73 1.86 0.61 94.79

237 23,100 - 23,200 2.73 1.86 0.61 94.80

238 23,200 - 23,300 2.73 1.86 0.61 94.81

239 23,300 - 23,400 2.72 1.86 0.61 94.81

240 23,400 - 23,500 2.72 1.86 0.60 94.82

241 23,500 - 23,600 2.72 1.85 0.60 94.83

242 23,600 - 23,700 2.72 1.85 0.60 94.83

243 23,700 - 23,800 2.71 1.85 0.60 94.84

244 23,800 - 23,900 2.71 1.85 0.60 94.85

245 23,900 - 24,000 2.71 1.85 0.59 94.85

246 24,000 - 24,100 2.70 1.84 0.59 94.86

247 24,100 - 24,200 2.70 1.84 0.59 94.87

248 24,200 - 24,300 2.70 1.84 0.59 94.87

249 24,300 - 24,400 2.70 1.84 0.58 94.88

250 24,400 - 24,500 2.69 1.84 0.58 94.89

251 24,500 - 24,600 2.69 1.83 0.58 94.90

252 24,600 - 24,700 2.69 1.83 0.58 94.90

253 24,700 - 24,800 2.69 1.83 0.58 94.91

254 24,800 - 24,900 2.68 1.83 0.57 94.92

255 24,900 - 25,000 2.68 1.82 0.57 94.92

256 25,000 - 25,100 2.68 1.82 0.57 94.93

257 25,100 - 25,200 2.68 1.82 0.57 94.93

191

Page 119: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

258 25,200 - 25,300 2.67 1.82 0.57 94.94

259 25,300 - 25,400 2.67 1.82 0.57 94.94

260 25,400 - 25,500 2.67 1.82 0.57 94.94

261 25,500 - 25,600 2.67 1.82 0.57 94.95

262 25,600 - 25,700 2.67 1.82 0.57 94.95

263 25,700 - 25,800 2.67 1.82 0.56 94.95

264 25,800 - 25,900 2.67 1.81 0.56 94.96

265 25,900 - 26,000 2.66 1.81 0.56 94.96

266 26,000 - 26,100 2.66 1.81 0.56 94.96

267 26,100 - 26,200 2.66 1.81 0.56 94.96

268 26,200 - 26,300 2.66 1.81 0.56 94.97

269 26,300 - 26,400 2.66 1.81 0.56 94.97

270 26,400 - 26,500 2.66 1.81 0.56 94.97

271 26,500 - 26,600 2.66 1.81 0.56 94.98

272 26,600 - 26,700 2.66 1.81 0.56 94.98

273 26,700 - 26,800 2.65 1.81 0.56 94.98

274 26,800 - 26,900 2.65 1.81 0.56 94.99

275 26,900 - 27,000 2.65 1.80 0.56 94.99

276 27,000 - 27,100 2.65 1.80 0.55 94.99

277 27,100 - 27,200 2.65 1.80 0.55 95.00

278 27,200 - 27,300 2.65 1.80 0.55 95.00

279 27,300 - 27,400 2.65 1.80 0.55 95.00

280 27,400 - 27,500 2.64 1.80 0.55 95.00

281 27,500 - 27,600 2.64 1.80 0.55 95.01

282 27,600 - 27,700 2.64 1.80 0.55 95.01

283 27,700 - 27,800 2.64 1.80 0.55 95.01

284 27,800 - 27,900 2.64 1.80 0.55 95.02

285 27,900 - 28,000 2.64 1.79 0.55 95.02

286 28,000 - 28,100 2.64 1.79 0.55 95.02

287 28,100 - 28,200 2.63 1.79 0.55 95.03

288 28,200 - 28,300 2.63 1.79 0.55 95.03

289 28,300 - 28,400 2.63 1.79 0.55 95.03

290 28,400 - 28,500 2.63 1.79 0.54 95.03

291 28,500 - 28,600 2.63 1.79 0.54 95.04

292 28,600 - 28,700 2.63 1.79 0.54 95.04

293 28,700 - 28,800 2.63 1.79 0.54 95.04

294 28,800 - 28,900 2.63 1.79 0.54 95.05

295 28,900 - 29,000 2.62 1.78 0.54 95.05

296 29,000 - 29,100 2.62 1.78 0.54 95.05

297 29,100 - 29,200 2.62 1.78 0.54 95.06

298 29,200 - 29,300 2.62 1.78 0.54 95.06

299 29,300 - 29,400 2.62 1.78 0.54 95.06

300 29,400 - 29,500 2.62 1.78 0.54 95.07

301 29,500 - 29,600 2.62 1.78 0.54 95.07

192

Page 120: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

302 29,600 - 29,700 2.61 1.78 0.54 95.07

303 29,700 - 29,800 2.61 1.78 0.53 95.07

304 29,800 - 29,900 2.61 1.78 0.53 95.08

305 29,900 - 30,000 2.61 1.78 0.53 95.08

306 30,000 - 30,100 2.61 1.77 0.53 95.08

307 30,100 - 30,200 2.61 1.77 0.53 95.09

308 30,200 - 30,300 2.61 1.77 0.53 95.09

309 30,300 - 30,400 2.61 1.77 0.53 95.09

310 30,400 - 30,500 2.60 1.77 0.53 95.10

311 30,500 - 30,600 2.60 1.77 0.53 95.10

312 30,600 - 30,700 2.60 1.77 0.53 95.10

313 30,700 - 30,800 2.60 1.77 0.53 95.11

314 30,800 - 30,900 2.60 1.77 0.53 95.11

315 30,900 - 31,000 2.60 1.77 0.53 95.11

316 31,000 - 31,100 2.60 1.76 0.53 95.11

317 31,100 - 31,200 2.59 1.76 0.52 95.12

318 31,200 - 31,300 2.59 1.76 0.52 95.12

319 31,300 - 31,400 2.59 1.76 0.52 95.12

320 31,400 - 31,500 2.59 1.76 0.52 95.13

321 31,500 - 31,600 2.59 1.76 0.52 95.13

322 31,600 - 31,700 2.59 1.76 0.52 95.13

323 31,700 - 31,800 2.59 1.76 0.52 95.14

324 31,800 - 31,900 2.58 1.76 0.52 95.14

325 31,900 - 32,000 2.58 1.76 0.52 95.14

326 32,000 - 32,100 2.58 1.75 0.52 95.15

327 32,100 - 32,200 2.58 1.75 0.52 95.15

328 32,200 - 32,300 2.58 1.75 0.52 95.15

329 32,300 - 32,400 2.58 1.75 0.52 95.15

330 32,400 - 32,500 2.58 1.75 0.51 95.16

331 32,500 - 32,600 2.58 1.75 0.51 95.16

332 32,600 - 32,700 2.57 1.75 0.51 95.16

333 32,700 - 32,800 2.57 1.75 0.51 95.17

334 32,800 - 32,900 2.57 1.75 0.51 95.17

335 32,900 - 33,000 2.57 1.75 0.51 95.17

336 33,000 - 33,100 2.57 1.75 0.51 95.18

337 33,100 - 33,200 2.57 1.74 0.51 95.18

338 33,200 - 33,300 2.57 1.74 0.51 95.18

339 33,300 - 33,400 2.56 1.74 0.51 95.19

340 33,400 - 33,500 2.56 1.74 0.51 95.19

341 33,500 - 33,600 2.56 1.74 0.51 95.19

342 33,600 - 33,700 2.56 1.74 0.51 95.19

343 33,700 - 33,800 2.56 1.74 0.50 95.20

344 33,800 - 33,900 2.56 1.74 0.50 95.20

345 33,900 - 34,000 2.56 1.74 0.50 95.20

193

Page 121: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

346 34,000 - 34,100 2.55 1.74 0.50 95.21

347 34,100 - 34,200 2.55 1.73 0.50 95.21

348 34,200 - 34,300 2.55 1.73 0.50 95.21

349 34,300 - 34,400 2.55 1.73 0.50 95.22

350 34,400 - 34,500 2.55 1.73 0.50 95.22

351 34,500 - 34,600 2.55 1.73 0.50 95.22

352 34,600 - 34,700 2.55 1.73 0.50 95.23

353 34,700 - 34,800 2.55 1.73 0.50 95.23

354 34,800 - 34,900 2.54 1.73 0.50 95.23

355 34,900 - 35,000 2.54 1.73 0.50 95.24

356 35,000 - 35,100 2.54 1.73 0.50 95.24

357 35,100 - 35,200 2.54 1.72 0.49 95.24

358 35,200 - 35,300 2.54 1.72 0.49 95.24

359 35,300 - 35,400 2.54 1.72 0.49 95.25

360 35,400 - 35,500 2.54 1.72 0.49 95.25

361 35,500 - 35,600 2.53 1.72 0.49 95.25

362 35,600 - 35,700 2.53 1.72 0.49 95.26

363 35,700 - 35,800 2.53 1.72 0.49 95.26

364 35,800 - 35,900 2.53 1.72 0.49 95.26

365 35,900 - 36,000 2.53 1.72 0.49 95.27

366 36,000 - 36,100 2.53 1.72 0.49 95.27

367 36,100 - 36,200 2.53 1.72 0.49 95.27

368 36,200 - 36,300 2.52 1.71 0.49 95.28

369 36,300 - 36,400 2.52 1.71 0.49 95.28

370 36,400 - 36,500 2.52 1.71 0.48 95.28

371 36,500 - 36,600 2.52 1.71 0.48 95.28

372 36,600 - 36,700 2.52 1.71 0.48 95.29

373 36,700 - 36,800 2.52 1.71 0.48 95.29

374 36,800 - 36,900 2.52 1.71 0.48 95.29

375 36,900 - 37,000 2.51 1.71 0.48 95.30

376 37,000 - 37,100 2.51 1.71 0.48 95.30

377 37,100 - 37,200 2.51 1.71 0.48 95.30

378 37,200 - 37,300 2.51 1.70 0.48 95.31

379 37,300 - 37,400 2.51 1.70 0.48 95.31

380 37,400 - 37,500 2.51 1.70 0.48 95.31

381 37,500 - 37,600 2.51 1.70 0.48 95.32

382 37,600 - 37,700 2.51 1.70 0.48 95.32

383 37,700 - 37,800 2.50 1.70 0.48 95.32

384 37,800 - 37,900 2.50 1.70 0.47 95.32

385 37,900 - 38,000 2.50 1.70 0.47 95.33

386 38,000 - 38,100 2.50 1.70 0.47 95.33

387 38,100 - 38,200 2.50 1.70 0.47 95.33

388 38,200 - 38,300 2.50 1.69 0.47 95.34

389 38,300 - 38,400 2.50 1.69 0.47 95.34

194

Page 122: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

390 38,400 - 38,500 2.49 1.69 0.47 95.34

391 38,500 - 38,600 2.49 1.69 0.47 95.35

392 38,600 - 38,700 2.49 1.69 0.47 95.35

393 38,700 - 38,800 2.49 1.69 0.47 95.35

394 38,800 - 38,900 2.49 1.69 0.47 95.36

395 38,900 - 39,000 2.49 1.69 0.47 95.36

396 39,000 - 39,100 2.49 1.69 0.47 95.36

397 39,100 - 39,200 2.48 1.69 0.46 95.36

398 39,200 - 39,300 2.48 1.68 0.46 95.37

399 39,300 - 39,400 2.48 1.68 0.46 95.37

400 39,400 - 39,500 2.48 1.68 0.46 95.37

401 39,500 - 39,600 2.48 1.68 0.46 95.38

402 39,600 - 39,700 2.48 1.68 0.46 95.38

403 39,700 - 39,800 2.48 1.68 0.46 95.38

404 39,800 - 39,900 2.48 1.68 0.46 95.39

405 39,900 - 40,000 2.47 1.68 0.46 95.39

406 40,000 - 40,100 2.47 1.68 0.46 95.39

407 40,100 - 40,200 2.47 1.68 0.46 95.40

408 40,200 - 40,300 2.47 1.68 0.46 95.40

409 40,300 - 40,400 2.47 1.67 0.46 95.40

410 40,400 - 40,500 2.47 1.67 0.45 95.40

411 40,500 - 40,600 2.47 1.67 0.45 95.41

412 40,600 - 40,700 2.46 1.67 0.45 95.41

413 40,700 - 40,800 2.46 1.67 0.45 95.41

414 40,800 - 40,900 2.46 1.67 0.45 95.42

415 40,900 - 41,000 2.46 1.67 0.45 95.42

416 41,000 - 41,100 2.46 1.67 0.45 95.42

417 41,100 - 41,200 2.46 1.67 0.45 95.43

418 41,200 - 41,300 2.46 1.67 0.45 95.43

419 41,300 - 41,400 2.45 1.66 0.45 95.43

420 41,400 - 41,500 2.45 1.66 0.45 95.44

421 41,500 - 41,600 2.45 1.66 0.45 95.44

422 41,600 - 41,700 2.45 1.66 0.45 95.44

423 41,700 - 41,800 2.45 1.66 0.45 95.45

424 41,800 - 41,900 2.45 1.66 0.44 95.45

425 41,900 - 42,000 2.45 1.66 0.44 95.45

426 42,000 - 42,100 2.45 1.66 0.44 95.45

427 42,100 - 42,200 2.44 1.66 0.44 95.46

428 42,200 - 42,300 2.44 1.66 0.44 95.46

429 42,300 - 42,400 2.44 1.65 0.44 95.46

430 42,400 - 42,500 2.44 1.65 0.44 95.47

431 42,500 - 42,600 2.44 1.65 0.44 95.47

432 42,600 - 42,700 2.44 1.65 0.44 95.47

433 42,700 - 42,800 2.44 1.65 0.44 95.48

195

Page 123: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

434 42,800 - 42,900 2.43 1.65 0.44 95.48

435 42,900 - 43,000 2.43 1.65 0.44 95.48

436 43,000 - 43,100 2.43 1.65 0.44 95.49

437 43,100 - 43,200 2.43 1.65 0.43 95.49

438 43,200 - 43,300 2.43 1.65 0.43 95.49

439 43,300 - 43,400 2.43 1.64 0.43 95.49

440 43,400 - 43,500 2.43 1.64 0.43 95.50

441 43,500 - 43,600 2.42 1.64 0.43 95.50

442 43,600 - 43,700 2.42 1.64 0.43 95.50

443 43,700 - 43,800 2.42 1.64 0.43 95.51

444 43,800 - 43,900 2.42 1.64 0.43 95.51

445 43,900 - 44,000 2.42 1.64 0.43 95.51

446 44,000 - 44,100 2.42 1.64 0.43 95.52

447 44,100 - 44,200 2.42 1.64 0.43 95.52

448 44,200 - 44,300 2.41 1.64 0.43 95.52

449 44,300 - 44,400 2.41 1.63 0.43 95.53

450 44,400 - 44,500 2.41 1.63 0.42 95.53

451 44,500 - 44,600 2.41 1.63 0.42 95.53

452 44,600 - 44,700 2.41 1.63 0.42 95.54

453 44,700 - 44,800 2.41 1.63 0.42 95.54

454 44,800 - 44,900 2.41 1.63 0.42 95.54

455 44,900 - 45,000 2.41 1.63 0.42 95.54

456 45,000 - 45,100 2.40 1.63 0.42 95.55

457 45,100 - 45,200 2.40 1.63 0.42 95.55

458 45,200 - 45,300 2.40 1.63 0.42 95.55

459 45,300 - 45,400 2.40 1.63 0.42 95.56

460 45,400 - 45,500 2.40 1.62 0.42 95.56

461 45,500 - 45,600 2.40 1.62 0.42 95.56

462 45,600 - 45,700 2.40 1.62 0.42 95.57

463 45,700 - 45,800 2.39 1.62 0.42 95.57

464 45,800 - 45,900 2.39 1.62 0.41 95.57

465 45,900 - 46,000 2.39 1.62 0.41 95.58

466 46,000 - 46,100 2.39 1.62 0.41 95.58

467 46,100 - 46,200 2.39 1.62 0.41 95.58

468 46,200 - 46,300 2.39 1.62 0.41 95.58

469 46,300 - 46,400 2.39 1.62 0.41 95.59

470 46,400 - 46,500 2.38 1.61 0.41 95.59

471 46,500 - 46,600 2.38 1.61 0.41 95.59

472 46,600 - 46,700 2.38 1.61 0.41 95.60

473 46,700 - 46,800 2.38 1.61 0.41 95.60

474 46,800 - 46,900 2.38 1.61 0.41 95.60

475 46,900 - 47,000 2.38 1.61 0.41 95.61

476 47,000 - 47,100 2.38 1.61 0.41 95.61

477 47,100 - 47,200 2.38 1.61 0.40 95.61

196

Page 124: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

478 47,200 - 47,300 2.37 1.61 0.40 95.62

479 47,300 - 47,400 2.37 1.61 0.40 95.62

480 47,400 - 47,500 2.37 1.60 0.40 95.62

481 47,500 - 47,600 2.37 1.60 0.40 95.63

482 47,600 - 47,700 2.37 1.60 0.40 95.63

483 47,700 - 47,800 2.37 1.60 0.40 95.63

484 47,800 - 47,900 2.37 1.60 0.40 95.63

485 47,900 - 48,000 2.36 1.60 0.40 95.64

486 48,000 - 48,100 2.36 1.60 0.40 95.64

487 48,100 - 48,200 2.36 1.60 0.40 95.64

488 48,200 - 48,300 2.36 1.60 0.40 95.65

489 48,300 - 48,400 2.36 1.60 0.40 95.65

490 48,400 - 48,500 2.36 1.59 0.39 95.65

491 48,500 - 48,600 2.36 1.59 0.39 95.66

492 48,600 - 48,700 2.35 1.59 0.39 95.66

493 48,700 - 48,800 2.35 1.59 0.39 95.66

494 48,800 - 48,900 2.35 1.59 0.39 95.67

495 48,900 - 49,000 2.35 1.59 0.39 95.67

496 49,000 - 49,100 2.35 1.59 0.39 95.67

497 49,100 - 49,200 2.35 1.59 0.39 95.67

498 49,200 - 49,300 2.35 1.59 0.39 95.68

499 49,300 - 49,400 2.34 1.59 0.39 95.68

500 49,400 - 49,500 2.34 1.58 0.39 95.68

501 49,500 - 49,600 2.34 1.58 0.39 95.69

502 49,600 - 49,700 2.34 1.58 0.39 95.69

503 49,700 - 49,800 2.34 1.58 0.39 95.69

504 49,800 - 49,900 2.34 1.58 0.38 95.70

505 49,900 - 50,000 2.34 1.58 0.38 95.70

506 50,000 - 51,000 2.34 1.58 0.38 95.70

507 51,000 - 52,000 2.33 1.58 0.38 95.71

508 52,000 - 53,000 2.33 1.57 0.38 95.73

509 53,000 - 54,000 2.32 1.57 0.37 95.74

510 54,000 - 55,000 2.31 1.56 0.37 95.75

511 55,000 - 56,000 2.31 1.56 0.37 95.76

512 56,000 - 57,000 2.30 1.55 0.37 95.77

513 57,000 - 58,000 2.30 1.55 0.36 95.79

514 58,000 - 59,000 2.29 1.55 0.36 95.80

515 59,000 - 60,000 2.29 1.54 0.36 95.81

516 60,000 - 61,000 2.28 1.54 0.35 95.82

517 61,000 - 62,000 2.28 1.53 0.35 95.83

518 62,000 - 63,000 2.27 1.53 0.35 95.85

519 63,000 - 64,000 2.27 1.53 0.35 95.86

520 64,000 - 65,000 2.26 1.52 0.34 95.87

521 65,000 - 66,000 2.26 1.52 0.34 95.88

197

Page 125: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO

PERENCANAAN FISIK

(%)

PENGAWASAN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

522 66,000 - 67,000 2.25 1.51 0.34 95.89

523 67,000 - 68,000 2.25 1.51 0.33 95.91

524 68,000 - 69,000 2.24 1.51 0.33 95.92

525 69,000 - 70,000 2.24 1.50 0.33 95.93

526 70,000 - 71,000 2.23 1.50 0.33 95.94

527 71,000 - 72,000 2.23 1.49 0.32 95.95

528 72,000 - 73,000 2.22 1.49 0.32 95.97

529 73,000 - 74,000 2.22 1.49 0.32 95.98

530 74,000 - 75,000 2.21 1.48 0.31 95.99

531 75,000 - 76,000 2.21 1.48 0.31 96.00

532 76,000 - 77,000 2.20 1.47 0.31 96.01

533 77,000 - 78,000 2.20 1.47 0.31 96.03

534 78,000 - 79,000 2.19 1.47 0.30 96.04

535 79,000 - 80,000 2.19 1.46 0.30 96.05

536 80,000 - 81,000 2.18 1.46 0.30 96.06

537 81,000 - 82,000 2.18 1.45 0.29 96.07

538 82,000 - 83,000 2.17 1.45 0.29 96.09

539 83,000 - 84,000 2.17 1.45 0.29 96.10

540 84,000 - 85,000 2.16 1.44 0.29 96.11

541 85,000 - 86,000 2.16 1.44 0.28 96.12

542 86,000 - 87,000 2.15 1.43 0.28 96.13

543 87,000 - 88,000 2.15 1.43 0.28 96.15

544 88,000 - 89,000 2.14 1.43 0.28 96.16

545 89,000 - 90,000 2.14 1.42 0.27 96.17

546 90,000 - 91,000 2.13 1.42 0.27 96.18

547 91,000 - 92,000 2.13 1.41 0.27 96.19

548 92,000 - 93,000 2.12 1.41 0.26 96.21

549 93,000 - 94,000 2.12 1.41 0.26 96.22

550 94,000 - 95,000 2.11 1.40 0.26 96.23

551 95,000 - 96,000 2.11 1.40 0.26 96.24

552 96,000 - 97,000 2.10 1.39 0.25 96.25

553 97,000 - 98,000 2.10 1.39 0.25 96.27

554 98,000 - 99,000 2.09 1.39 0.25 96.28

555 99,000 - 100,000 2.09 1.38 0.24 96.29

Catatan :

a.

b.

- Jarak 0 - 200 km sebesar 0,75 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak 200 - 300 km sebesar 0,86 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak > 300 km sebesar 1,04 dari harga Biaya Pengelolaan Kegiatan yang berlaku

Untuk pekerjaan diluar bangunan gedung, biaya perencanaan dan pengawasan dapat dihitung

tersendiri sesuai dengan kebutuhan waktu dan tenaga / billing rate.

Untuk biaya proyek dibawah 300 juta dapat diberlakukan nilai Biaya Pengelolaan Kegiatan khusus

dengan koefisien faktor pengali sesuai dengan jarak proyek

198

Page 126: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.27

Menggunakan

MK

Menggunakan

Pengawasan

1 < 50 7.29 5.87 5.04 5.83 81.00 81.83

2 50 - 100 7.29 5.87 5.04 5.83 81.00 81.83

3 100 - 150 7.29 5.87 5.04 5.83 81.00 81.83

4 150 - 200 7.29 5.87 5.04 5.83 81.00 81.83

5 200 - 250 7.29 5.87 5.04 5.83 81.00 81.83

6 250 - 300 7.29 5.87 5.04 5.83 81.00 81.83

7 300 - 350 7.11 5.75 4.94 5.53 81.62 82.42

8 350 - 400 6.92 5.62 4.83 5.22 82.24 83.03

9 400 - 450 6.74 5.49 4.72 4.90 82.87 83.63

10 450 - 500 6.55 5.35 4.61 4.58 83.51 84.25

11 500 - 600 6.35 5.22 4.50 4.26 84.17 84.88

12 600 - 700 6.19 5.09 4.40 4.02 84.70 85.39

13 700 - 800 6.03 4.96 4.29 3.78 85.24 85.91

14 800 - 900 5.86 4.83 4.18 3.53 85.78 86.43

15 900 - 1,000 5.69 4.70 4.07 3.28 86.33 86.96

16 1,000 - 1,100 5.52 4.56 3.95 3.03 86.89 87.50

17 1,100 - 1,200 5.47 4.53 3.92 2.97 87.04 87.64

18 1,200 - 1,300 5.42 4.49 3.89 2.90 87.19 87.79

19 1,300 - 1,400 5.37 4.45 3.86 2.84 87.33 87.93

20 1,400 - 1,500 5.33 4.42 3.82 2.77 87.48 88.08

21 1,500 - 1,600 5.28 4.38 3.79 2.71 87.63 88.22

22 1,600 - 1,700 5.23 4.35 3.76 2.64 87.78 88.37

23 1,700 - 1,800 5.18 4.31 3.72 2.58 87.93 88.52

24 1,800 - 1,900 5.13 4.27 3.69 2.51 88.08 88.67

25 1,900 - 2,000 5.08 4.24 3.66 2.45 88.23 88.81

26 2,000 - 2,100 5.04 4.20 3.62 2.38 88.39 88.96

27 2,100 - 2,200 4.99 4.16 3.59 2.31 88.54 89.11

28 2,200 - 2,300 4.94 4.12 3.55 2.25 88.69 89.26

29 2,300 - 2,400 4.89 4.09 3.52 2.18 88.85 89.41

30 2,400 - 2,500 4.84 4.05 3.49 2.11 89.00 89.56

31 2,500 - 2,600 4.79 4.01 3.45 2.05 89.15 89.71

32 2,600 - 2,700 4.76 3.99 3.43 2.02 89.23 89.79

33 2,700 - 2,800 4.74 3.97 3.41 1.99 89.30 89.86

34 2,800 - 2,900 4.71 3.95 3.39 1.96 89.38 89.93

35 2,900 - 3,000 4.69 3.93 3.37 1.94 89.45 90.00

36 3,000 - 3,100 4.66 3.90 3.36 1.91 89.53 90.08

37 3,100 - 3,200 4.64 3.88 3.34 1.88 89.60 90.15

38 3,200 - 3,300 4.61 3.86 3.32 1.85 89.68 90.22

39 3,300 - 3,400 4.58 3.84 3.30 1.82 89.75 90.29

40 3,400 - 3,500 4.56 3.82 3.28 1.80 89.83 90.37

41 3,500 - 3,600 4.53 3.79 3.26 1.77 89.90 90.44

42 3,600 - 3,700 4.51 3.77 3.24 1.74 89.98 90.51

43 3,700 - 3,800 4.48 3.75 3.22 1.71 90.06 90.59

44 3,800 - 3,900 4.46 3.73 3.20 1.68 90.13 90.66

45 3,900 - 4,000 4.43 3.71 3.18 1.66 90.21 90.73

Tabel Biaya Perencanaan, Pengawasan, Pengelolaan Kegiatan dan Fisik pada Kegiatan Fisik Klasifikasi Tidak Sederhana

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

199

Page 127: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

46 4,000 - 4,100 4.40 3.68 3.16 1.63 90.28 90.81

47 4,100 - 4,200 4.38 3.66 3.14 1.60 90.36 90.88

48 4,200 - 4,300 4.35 3.64 3.12 1.57 90.44 90.96

49 4,300 - 4,400 4.33 3.62 3.10 1.54 90.51 91.03

50 4,400 - 4,500 4.30 3.59 3.08 1.52 90.59 91.11

51 4,500 - 4,600 4.27 3.57 3.06 1.49 90.67 91.18

52 4,600 - 4,700 4.25 3.55 3.04 1.46 90.74 91.25

53 4,700 - 4,800 4.22 3.53 3.02 1.43 90.82 91.33

54 4,800 - 4,900 4.20 3.51 3.00 1.40 90.90 91.40

55 4,900 - 5,000 4.17 3.48 2.98 1.37 90.98 91.48

56 5,000 - 5,100 4.14 3.46 2.96 1.34 91.05 91.55

57 5,100 - 5,200 4.13 3.45 2.95 1.34 91.08 91.58

58 5,200 - 5,300 4.12 3.44 2.94 1.33 91.11 91.61

59 5,300 - 5,400 4.11 3.43 2.93 1.32 91.14 91.64

60 5,400 - 5,500 4.10 3.42 2.93 1.31 91.17 91.66

61 5,500 - 5,600 4.09 3.42 2.92 1.30 91.19 91.69

62 5,600 - 5,700 4.08 3.41 2.91 1.29 91.22 91.72

63 5,700 - 5,800 4.07 3.40 2.90 1.28 91.25 91.75

64 5,800 - 5,900 4.06 3.39 2.89 1.27 91.28 91.77

65 5,900 - 6,000 4.05 3.38 2.88 1.26 91.31 91.80

66 6,000 - 6,100 4.04 3.37 2.88 1.26 91.33 91.83

67 6,100 - 6,200 4.03 3.36 2.87 1.25 91.36 91.86

68 6,200 - 6,300 4.02 3.35 2.86 1.24 91.39 91.88

69 6,300 - 6,400 4.01 3.34 2.85 1.23 91.42 91.91

70 6,400 - 6,500 4.00 3.33 2.84 1.22 91.45 91.94

71 6,500 - 6,600 3.99 3.33 2.83 1.21 91.48 91.97

72 6,600 - 6,700 3.98 3.32 2.82 1.20 91.50 91.99

73 6,700 - 6,800 3.97 3.31 2.82 1.19 91.53 92.02

74 6,800 - 6,900 3.96 3.30 2.81 1.18 91.56 92.05

75 6,900 - 7,000 3.95 3.29 2.80 1.17 91.59 92.08

76 7,000 - 7,100 3.94 3.28 2.79 1.17 91.62 92.11

77 7,100 - 7,200 3.93 3.27 2.78 1.16 91.64 92.13

78 7,200 - 7,300 3.92 3.26 2.77 1.15 91.67 92.16

79 7,300 - 7,400 3.91 3.25 2.76 1.14 91.70 92.19

80 7,400 - 7,500 3.90 3.24 2.76 1.13 91.73 92.22

81 7,500 - 7,600 3.89 3.23 2.75 1.12 91.76 92.25

82 7,600 - 7,700 3.88 3.23 2.74 1.11 91.79 92.27

83 7,700 - 7,800 3.87 3.22 2.73 1.10 91.82 92.30

84 7,800 - 7,900 3.85 3.21 2.72 1.09 91.84 92.33

85 7,900 - 8,000 3.84 3.20 2.71 1.09 91.87 92.36

86 8,000 - 8,100 3.83 3.19 2.71 1.08 91.90 92.38

87 8,100 - 8,200 3.82 3.18 2.70 1.07 91.93 92.41

88 8,200 - 8,300 3.81 3.17 2.69 1.06 91.96 92.44

89 8,300 - 8,400 3.80 3.16 2.68 1.05 91.99 92.47

90 8,400 - 8,500 3.79 3.15 2.67 1.04 92.02 92.50

91 8,500 - 8,600 3.78 3.14 2.66 1.03 92.04 92.52

92 8,600 - 8,700 3.77 3.13 2.65 1.02 92.07 92.55

200

Page 128: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

93 8,700 - 8,800 3.76 3.12 2.64 1.01 92.10 92.58

94 8,800 - 8,900 3.75 3.12 2.64 1.00 92.13 92.61

95 8,900 - 9,000 3.74 3.11 2.63 0.99 92.16 92.64

96 9,000 - 9,100 3.73 3.10 2.62 0.99 92.19 92.67

97 9,100 - 9,200 3.72 3.09 2.61 0.98 92.22 92.69

98 9,200 - 9,300 3.71 3.08 2.60 0.97 92.24 92.72

99 9,300 - 9,400 3.70 3.07 2.59 0.96 92.27 92.75

100 9,400 - 9,500 3.69 3.06 2.58 0.95 92.30 92.78

101 9,500 - 9,600 3.68 3.05 2.58 0.94 92.33 92.81

102 9,600 - 9,700 3.67 3.04 2.57 0.93 92.36 92.83

103 9,700 - 9,800 3.66 3.03 2.56 0.92 92.39 92.86

104 9,800 - 9,900 3.65 3.02 2.55 0.91 92.42 92.89

105 9,900 - 10,000 3.64 3.01 2.54 0.90 92.45 92.92

106 10,000 - 10,100 3.63 3.01 2.53 0.89 92.47 92.95

107 10,100 - 10,200 3.62 3.00 2.53 0.89 92.48 92.95

108 10,200 - 10,300 3.62 3.00 2.53 0.89 92.49 92.96

109 10,300 - 10,400 3.62 3.00 2.53 0.89 92.50 92.97

110 10,400 - 10,500 3.61 3.00 2.52 0.89 92.50 92.98

111 10,500 - 10,600 3.61 2.99 2.52 0.88 92.51 92.98

112 10,600 - 10,700 3.61 2.99 2.52 0.88 92.52 92.99

113 10,700 - 10,800 3.61 2.99 2.52 0.88 92.53 93.00

114 10,800 - 10,900 3.60 2.99 2.51 0.88 92.53 93.00

115 10,900 - 11,000 3.60 2.98 2.51 0.88 92.54 93.01

116 11,000 - 11,100 3.60 2.98 2.51 0.88 92.55 93.02

117 11,100 - 11,200 3.59 2.98 2.51 0.87 92.56 93.03

118 11,200 - 11,300 3.59 2.97 2.50 0.87 92.56 93.03

119 11,300 - 11,400 3.59 2.97 2.50 0.87 92.57 93.04

120 11,400 - 11,500 3.59 2.97 2.50 0.87 92.58 93.05

121 11,500 - 11,600 3.58 2.97 2.50 0.87 92.58 93.05

122 11,600 - 11,700 3.58 2.96 2.50 0.86 92.59 93.06

123 11,700 - 11,800 3.58 2.96 2.49 0.86 92.60 93.07

124 11,800 - 11,900 3.57 2.96 2.49 0.86 92.61 93.08

125 11,900 - 12,000 3.57 2.96 2.49 0.86 92.61 93.08

126 12,000 - 12,100 3.57 2.95 2.49 0.86 92.62 93.09

127 12,100 - 12,200 3.57 2.95 2.48 0.85 92.63 93.10

128 12,200 - 12,300 3.56 2.95 2.48 0.85 92.64 93.10

129 12,300 - 12,400 3.56 2.95 2.48 0.85 92.64 93.11

130 12,400 - 12,500 3.56 2.94 2.48 0.85 92.65 93.12

131 12,500 - 12,600 3.55 2.94 2.47 0.85 92.66 93.12

132 12,600 - 12,700 3.55 2.94 2.47 0.84 92.66 93.13

133 12,700 - 12,800 3.55 2.94 2.47 0.84 92.67 93.14

134 12,800 - 12,900 3.55 2.93 2.47 0.84 92.68 93.15

135 12,900 - 13,000 3.54 2.93 2.47 0.84 92.69 93.15

136 13,000 - 13,100 3.54 2.93 2.46 0.84 92.69 93.16

137 13,100 - 13,200 3.54 2.93 2.46 0.83 92.70 93.17

138 13,200 - 13,300 3.54 2.92 2.46 0.83 92.71 93.17

139 13,300 - 13,400 3.53 2.92 2.46 0.83 92.72 93.18

201

Page 129: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

140 13,400 - 13,500 3.53 2.92 2.45 0.83 92.72 93.19

141 13,500 - 13,600 3.53 2.92 2.45 0.83 92.73 93.20

142 13,600 - 13,700 3.52 2.91 2.45 0.82 92.74 93.20

143 13,700 - 13,800 3.52 2.91 2.45 0.82 92.75 93.21

144 13,800 - 13,900 3.52 2.91 2.44 0.82 92.75 93.22

145 13,900 - 14,000 3.52 2.91 2.44 0.82 92.76 93.22

146 14,000 - 14,100 3.51 2.90 2.44 0.82 92.77 93.23

147 14,100 - 14,200 3.51 2.90 2.44 0.81 92.77 93.24

148 14,200 - 14,300 3.51 2.90 2.43 0.81 92.78 93.25

149 14,300 - 14,400 3.50 2.90 2.43 0.81 92.79 93.25

150 14,400 - 14,500 3.50 2.89 2.43 0.81 92.80 93.26

151 14,500 - 14,600 3.50 2.89 2.43 0.81 92.80 93.27

152 14,600 - 14,700 3.50 2.89 2.43 0.80 92.81 93.27

153 14,700 - 14,800 3.49 2.89 2.42 0.80 92.82 93.28

154 14,800 - 14,900 3.49 2.88 2.42 0.80 92.83 93.29

155 14,900 - 15,000 3.49 2.88 2.42 0.80 92.83 93.30

156 15,000 - 15,100 3.48 2.88 2.42 0.80 92.84 93.30

157 15,100 - 15,200 3.48 2.88 2.41 0.79 92.85 93.31

158 15,200 - 15,300 3.48 2.87 2.41 0.79 92.86 93.32

159 15,300 - 15,400 3.48 2.87 2.41 0.79 92.86 93.32

160 15,400 - 15,500 3.47 2.87 2.41 0.79 92.87 93.33

161 15,500 - 15,600 3.47 2.87 2.40 0.79 92.88 93.34

162 15,600 - 15,700 3.47 2.86 2.40 0.78 92.88 93.35

163 15,700 - 15,800 3.46 2.86 2.40 0.78 92.89 93.35

164 15,800 - 15,900 3.46 2.86 2.40 0.78 92.90 93.36

165 15,900 - 16,000 3.46 2.86 2.39 0.78 92.91 93.37

166 16,000 - 16,100 3.46 2.85 2.39 0.78 92.91 93.37

167 16,100 - 16,200 3.45 2.85 2.39 0.77 92.92 93.38

168 16,200 - 16,300 3.45 2.85 2.39 0.77 92.93 93.39

169 16,300 - 16,400 3.45 2.84 2.39 0.77 92.94 93.40

170 16,400 - 16,500 3.45 2.84 2.38 0.77 92.94 93.40

171 16,500 - 16,600 3.44 2.84 2.38 0.77 92.95 93.41

172 16,600 - 16,700 3.44 2.84 2.38 0.77 92.96 93.42

173 16,700 - 16,800 3.44 2.83 2.38 0.76 92.97 93.42

174 16,800 - 16,900 3.43 2.83 2.37 0.76 92.97 93.43

175 16,900 - 17,000 3.43 2.83 2.37 0.76 92.98 93.44

176 17,000 - 17,100 3.43 2.83 2.37 0.76 92.99 93.45

177 17,100 - 17,200 3.43 2.82 2.37 0.76 93.00 93.45

178 17,200 - 17,300 3.42 2.82 2.36 0.75 93.00 93.46

179 17,300 - 17,400 3.42 2.82 2.36 0.75 93.01 93.47

180 17,400 - 17,500 3.42 2.82 2.36 0.75 93.02 93.47

181 17,500 - 17,600 3.41 2.81 2.36 0.75 93.02 93.48

182 17,600 - 17,700 3.41 2.81 2.36 0.75 93.03 93.49

183 17,700 - 17,800 3.41 2.81 2.35 0.74 93.04 93.50

184 17,800 - 17,900 3.41 2.81 2.35 0.74 93.05 93.50

185 17,900 - 18,000 3.40 2.80 2.35 0.74 93.05 93.51

186 18,000 - 18,100 3.40 2.80 2.35 0.74 93.06 93.52

202

Page 130: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

187 18,100 - 18,200 3.40 2.80 2.34 0.74 93.07 93.52

188 18,200 - 18,300 3.39 2.80 2.34 0.73 93.08 93.53

189 18,300 - 18,400 3.39 2.79 2.34 0.73 93.08 93.54

190 18,400 - 18,500 3.39 2.79 2.34 0.73 93.09 93.55

191 18,500 - 18,600 3.39 2.79 2.33 0.73 93.10 93.55

192 18,600 - 18,700 3.38 2.79 2.33 0.73 93.11 93.56

193 18,700 - 18,800 3.38 2.78 2.33 0.72 93.11 93.57

194 18,800 - 18,900 3.38 2.78 2.33 0.72 93.12 93.57

195 18,900 - 19,000 3.37 2.78 2.32 0.72 93.13 93.58

196 19,000 - 19,100 3.37 2.78 2.32 0.72 93.14 93.59

197 19,100 - 19,200 3.37 2.77 2.32 0.72 93.14 93.60

198 19,200 - 19,300 3.37 2.77 2.32 0.71 93.15 93.60

199 19,300 - 19,400 3.36 2.77 2.32 0.71 93.16 93.61

200 19,400 - 19,500 3.36 2.77 2.31 0.71 93.17 93.62

201 19,500 - 19,600 3.36 2.76 2.31 0.71 93.17 93.62

202 19,600 - 19,700 3.35 2.76 2.31 0.71 93.18 93.63

203 19,700 - 19,800 3.35 2.76 2.31 0.70 93.19 93.64

204 19,800 - 19,900 3.35 2.75 2.30 0.70 93.19 93.65

205 19,900 - 20,000 3.35 2.75 2.30 0.70 93.20 93.65

206 20,000 - 20,100 3.34 2.75 2.30 0.70 93.21 93.66

207 20,100 - 20,200 3.34 2.75 2.30 0.70 93.22 93.67

208 20,200 - 20,300 3.34 2.74 2.29 0.69 93.22 93.67

209 20,300 - 20,400 3.33 2.74 2.29 0.69 93.23 93.68

210 20,400 - 20,500 3.33 2.74 2.29 0.69 93.24 93.69

211 20,500 - 20,600 3.33 2.74 2.29 0.69 93.25 93.70

212 20,600 - 20,700 3.33 2.73 2.28 0.69 93.25 93.70

213 20,700 - 20,800 3.32 2.73 2.28 0.68 93.26 93.71

214 20,800 - 20,900 3.32 2.73 2.28 0.68 93.27 93.72

215 20,900 - 21,000 3.32 2.73 2.28 0.68 93.28 93.73

216 21,000 - 21,100 3.31 2.72 2.28 0.68 93.28 93.73

217 21,100 - 21,200 3.31 2.72 2.27 0.68 93.29 93.74

218 21,200 - 21,300 3.31 2.72 2.27 0.67 93.30 93.75

219 21,300 - 21,400 3.31 2.72 2.27 0.67 93.31 93.75

220 21,400 - 21,500 3.30 2.71 2.27 0.67 93.31 93.76

221 21,500 - 21,600 3.30 2.71 2.26 0.67 93.32 93.77

222 21,600 - 21,700 3.30 2.71 2.26 0.67 93.33 93.78

223 21,700 - 21,800 3.29 2.71 2.26 0.66 93.34 93.78

224 21,800 - 21,900 3.29 2.70 2.26 0.66 93.34 93.79

225 21,900 - 22,000 3.29 2.70 2.25 0.66 93.35 93.80

226 22,000 - 22,100 3.29 2.70 2.25 0.66 93.36 93.80

227 22,100 - 22,200 3.28 2.70 2.25 0.66 93.37 93.81

228 22,200 - 22,300 3.28 2.69 2.25 0.65 93.37 93.82

229 22,300 - 22,400 3.28 2.69 2.24 0.65 93.38 93.83

230 22,400 - 22,500 3.27 2.69 2.24 0.65 93.39 93.83

231 22,500 - 22,600 3.27 2.69 2.24 0.65 93.40 93.84

232 22,600 - 22,700 3.27 2.68 2.24 0.65 93.40 93.85

233 22,700 - 22,800 3.27 2.68 2.23 0.64 93.41 93.85

203

Page 131: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

234 22,800 - 22,900 3.26 2.68 2.23 0.64 93.42 93.86

235 22,900 - 23,000 3.26 2.67 2.23 0.64 93.42 93.87

236 23,000 - 23,100 3.26 2.67 2.23 0.64 93.43 93.88

237 23,100 - 23,200 3.25 2.67 2.23 0.64 93.44 93.88

238 23,200 - 23,300 3.25 2.67 2.22 0.63 93.45 93.89

239 23,300 - 23,400 3.25 2.66 2.22 0.63 93.45 93.90

240 23,400 - 23,500 3.25 2.66 2.22 0.63 93.46 93.91

241 23,500 - 23,600 3.24 2.66 2.22 0.63 93.47 93.91

242 23,600 - 23,700 3.24 2.66 2.21 0.63 93.48 93.92

243 23,700 - 23,800 3.24 2.65 2.21 0.62 93.48 93.93

244 23,800 - 23,900 3.23 2.65 2.21 0.62 93.49 93.93

245 23,900 - 24,000 3.23 2.65 2.21 0.62 93.50 93.94

246 24,000 - 24,100 3.23 2.65 2.20 0.62 93.51 93.95

247 24,100 - 24,200 3.23 2.64 2.20 0.62 93.51 93.96

248 24,200 - 24,300 3.22 2.64 2.20 0.61 93.52 93.96

249 24,300 - 24,400 3.22 2.64 2.20 0.61 93.53 93.97

250 24,400 - 24,500 3.22 2.64 2.19 0.61 93.54 93.98

251 24,500 - 24,600 3.21 2.63 2.19 0.61 93.54 93.99

252 24,600 - 24,700 3.21 2.63 2.19 0.61 93.55 93.99

253 24,700 - 24,800 3.21 2.63 2.19 0.60 93.56 94.00

254 24,800 - 24,900 3.21 2.63 2.19 0.60 93.57 94.01

255 24,900 - 25,000 3.20 2.62 2.18 0.60 93.57 94.01

256 25,000 - 25,100 3.20 2.62 2.18 0.60 93.58 94.02

257 25,100 - 25,200 3.20 2.62 2.18 0.60 93.58 94.02

258 25,200 - 25,300 3.20 2.62 2.18 0.60 93.59 94.03

259 25,300 - 25,400 3.20 2.62 2.18 0.60 93.59 94.03

260 25,400 - 25,500 3.19 2.62 2.18 0.59 93.59 94.03

261 25,500 - 25,600 3.19 2.61 2.18 0.59 93.60 94.04

262 25,600 - 25,700 3.19 2.61 2.17 0.59 93.60 94.04

263 25,700 - 25,800 3.19 2.61 2.17 0.59 93.60 94.04

264 25,800 - 25,900 3.19 2.61 2.17 0.59 93.61 94.05

265 25,900 - 26,000 3.19 2.61 2.17 0.59 93.61 94.05

266 26,000 - 26,100 3.19 2.61 2.17 0.59 93.61 94.05

267 26,100 - 26,200 3.19 2.61 2.17 0.59 93.62 94.06

268 26,200 - 26,300 3.18 2.61 2.17 0.59 93.62 94.06

269 26,300 - 26,400 3.18 2.61 2.17 0.59 93.62 94.06

270 26,400 - 26,500 3.18 2.60 2.17 0.59 93.63 94.07

271 26,500 - 26,600 3.18 2.60 2.16 0.59 93.63 94.07

272 26,600 - 26,700 3.18 2.60 2.16 0.59 93.63 94.07

273 26,700 - 26,800 3.18 2.60 2.16 0.58 93.64 94.08

274 26,800 - 26,900 3.18 2.60 2.16 0.58 93.64 94.08

275 26,900 - 27,000 3.17 2.60 2.16 0.58 93.64 94.08

276 27,000 - 27,100 3.17 2.60 2.16 0.58 93.65 94.09

277 27,100 - 27,200 3.17 2.60 2.16 0.58 93.65 94.09

278 27,200 - 27,300 3.17 2.60 2.16 0.58 93.65 94.09

279 27,300 - 27,400 3.17 2.59 2.16 0.58 93.66 94.10

280 27,400 - 27,500 3.17 2.59 2.15 0.58 93.66 94.10

204

Page 132: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

281 27,500 - 27,600 3.17 2.59 2.15 0.58 93.66 94.10

282 27,600 - 27,700 3.16 2.59 2.15 0.58 93.67 94.11

283 27,700 - 27,800 3.16 2.59 2.15 0.58 93.67 94.11

284 27,800 - 27,900 3.16 2.59 2.15 0.58 93.67 94.11

285 27,900 - 28,000 3.16 2.59 2.15 0.57 93.68 94.12

286 28,000 - 28,100 3.16 2.59 2.15 0.57 93.68 94.12

287 28,100 - 28,200 3.16 2.59 2.15 0.57 93.68 94.12

288 28,200 - 28,300 3.16 2.58 2.15 0.57 93.69 94.13

289 28,300 - 28,400 3.15 2.58 2.15 0.57 93.69 94.13

290 28,400 - 28,500 3.15 2.58 2.14 0.57 93.69 94.13

291 28,500 - 28,600 3.15 2.58 2.14 0.57 93.70 94.14

292 28,600 - 28,700 3.15 2.58 2.14 0.57 93.70 94.14

293 28,700 - 28,800 3.15 2.58 2.14 0.57 93.70 94.14

294 28,800 - 28,900 3.15 2.58 2.14 0.57 93.71 94.15

295 28,900 - 29,000 3.15 2.58 2.14 0.57 93.71 94.15

296 29,000 - 29,100 3.15 2.58 2.14 0.57 93.71 94.15

297 29,100 - 29,200 3.14 2.57 2.14 0.56 93.72 94.15

298 29,200 - 29,300 3.14 2.57 2.14 0.56 93.72 94.16

299 29,300 - 29,400 3.14 2.57 2.13 0.56 93.72 94.16

300 29,400 - 29,500 3.14 2.57 2.13 0.56 93.73 94.16

301 29,500 - 29,600 3.14 2.57 2.13 0.56 93.73 94.17

302 29,600 - 29,700 3.14 2.57 2.13 0.56 93.73 94.17

303 29,700 - 29,800 3.14 2.57 2.13 0.56 93.74 94.17

304 29,800 - 29,900 3.13 2.57 2.13 0.56 93.74 94.18

305 29,900 - 30,000 3.13 2.57 2.13 0.56 93.74 94.18

306 30,000 - 30,100 3.13 2.56 2.13 0.56 93.75 94.18

307 30,100 - 30,200 3.13 2.56 2.13 0.56 93.75 94.19

308 30,200 - 30,300 3.13 2.56 2.12 0.56 93.75 94.19

309 30,300 - 30,400 3.13 2.56 2.12 0.56 93.76 94.19

310 30,400 - 30,500 3.13 2.56 2.12 0.55 93.76 94.20

311 30,500 - 30,600 3.12 2.56 2.12 0.55 93.76 94.20

312 30,600 - 30,700 3.12 2.56 2.12 0.55 93.77 94.20

313 30,700 - 30,800 3.12 2.56 2.12 0.55 93.77 94.21

314 30,800 - 30,900 3.12 2.56 2.12 0.55 93.77 94.21

315 30,900 - 31,000 3.12 2.55 2.12 0.55 93.78 94.21

316 31,000 - 31,100 3.12 2.55 2.12 0.55 93.78 94.22

317 31,100 - 31,200 3.12 2.55 2.12 0.55 93.78 94.22

318 31,200 - 31,300 3.11 2.55 2.11 0.55 93.79 94.22

319 31,300 - 31,400 3.11 2.55 2.11 0.55 93.79 94.23

320 31,400 - 31,500 3.11 2.55 2.11 0.55 93.79 94.23

321 31,500 - 31,600 3.11 2.55 2.11 0.55 93.80 94.23

322 31,600 - 31,700 3.11 2.55 2.11 0.54 93.80 94.24

323 31,700 - 31,800 3.11 2.55 2.11 0.54 93.80 94.24

324 31,800 - 31,900 3.11 2.54 2.11 0.54 93.81 94.24

325 31,900 - 32,000 3.10 2.54 2.11 0.54 93.81 94.25

326 32,000 - 32,100 3.10 2.54 2.11 0.54 93.81 94.25

327 32,100 - 32,200 3.10 2.54 2.10 0.54 93.82 94.25

205

Page 133: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

328 32,200 - 32,300 3.10 2.54 2.10 0.54 93.82 94.26

329 32,300 - 32,400 3.10 2.54 2.10 0.54 93.82 94.26

330 32,400 - 32,500 3.10 2.54 2.10 0.54 93.83 94.26

331 32,500 - 32,600 3.10 2.54 2.10 0.54 93.83 94.27

332 32,600 - 32,700 3.09 2.54 2.10 0.54 93.83 94.27

333 32,700 - 32,800 3.09 2.53 2.10 0.54 93.84 94.27

334 32,800 - 32,900 3.09 2.53 2.10 0.54 93.84 94.28

335 32,900 - 33,000 3.09 2.53 2.10 0.53 93.84 94.28

336 33,000 - 33,100 3.09 2.53 2.09 0.53 93.85 94.28

337 33,100 - 33,200 3.09 2.53 2.09 0.53 93.85 94.29

338 33,200 - 33,300 3.09 2.53 2.09 0.53 93.85 94.29

339 33,300 - 33,400 3.09 2.53 2.09 0.53 93.86 94.29

340 33,400 - 33,500 3.08 2.53 2.09 0.53 93.86 94.30

341 33,500 - 33,600 3.08 2.53 2.09 0.53 93.86 94.30

342 33,600 - 33,700 3.08 2.52 2.09 0.53 93.87 94.30

343 33,700 - 33,800 3.08 2.52 2.09 0.53 93.87 94.31

344 33,800 - 33,900 3.08 2.52 2.09 0.53 93.87 94.31

345 33,900 - 34,000 3.08 2.52 2.09 0.53 93.88 94.31

346 34,000 - 34,100 3.08 2.52 2.08 0.53 93.88 94.32

347 34,100 - 34,200 3.07 2.52 2.08 0.52 93.88 94.32

348 34,200 - 34,300 3.07 2.52 2.08 0.52 93.89 94.32

349 34,300 - 34,400 3.07 2.52 2.08 0.52 93.89 94.32

350 34,400 - 34,500 3.07 2.52 2.08 0.52 93.89 94.33

351 34,500 - 34,600 3.07 2.51 2.08 0.52 93.90 94.33

352 34,600 - 34,700 3.07 2.51 2.08 0.52 93.90 94.33

353 34,700 - 34,800 3.07 2.51 2.08 0.52 93.90 94.34

354 34,800 - 34,900 3.06 2.51 2.08 0.52 93.91 94.34

355 34,900 - 35,000 3.06 2.51 2.07 0.52 93.91 94.34

356 35,000 - 35,100 3.06 2.51 2.07 0.52 93.91 94.35

357 35,100 - 35,200 3.06 2.51 2.07 0.52 93.92 94.35

358 35,200 - 35,300 3.06 2.51 2.07 0.52 93.92 94.35

359 35,300 - 35,400 3.06 2.51 2.07 0.51 93.92 94.36

360 35,400 - 35,500 3.06 2.50 2.07 0.51 93.93 94.36

361 35,500 - 35,600 3.05 2.50 2.07 0.51 93.93 94.36

362 35,600 - 35,700 3.05 2.50 2.07 0.51 93.93 94.37

363 35,700 - 35,800 3.05 2.50 2.07 0.51 93.94 94.37

364 35,800 - 35,900 3.05 2.50 2.06 0.51 93.94 94.37

365 35,900 - 36,000 3.05 2.50 2.06 0.51 93.94 94.38

366 36,000 - 36,100 3.05 2.50 2.06 0.51 93.95 94.38

367 36,100 - 36,200 3.05 2.50 2.06 0.51 93.95 94.38

368 36,200 - 36,300 3.04 2.50 2.06 0.51 93.95 94.39

369 36,300 - 36,400 3.04 2.49 2.06 0.51 93.96 94.39

370 36,400 - 36,500 3.04 2.49 2.06 0.51 93.96 94.39

371 36,500 - 36,600 3.04 2.49 2.06 0.51 93.96 94.40

372 36,600 - 36,700 3.04 2.49 2.06 0.50 93.96 94.40

373 36,700 - 36,800 3.04 2.49 2.06 0.50 93.97 94.40

374 36,800 - 36,900 3.04 2.49 2.05 0.50 93.97 94.41

206

Page 134: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

375 36,900 - 37,000 3.04 2.49 2.05 0.50 93.97 94.41

376 37,000 - 37,100 3.03 2.49 2.05 0.50 93.98 94.41

377 37,100 - 37,200 3.03 2.49 2.05 0.50 93.98 94.42

378 37,200 - 37,300 3.03 2.48 2.05 0.50 93.98 94.42

379 37,300 - 37,400 3.03 2.48 2.05 0.50 93.99 94.42

380 37,400 - 37,500 3.03 2.48 2.05 0.50 93.99 94.43

381 37,500 - 37,600 3.03 2.48 2.05 0.50 93.99 94.43

382 37,600 - 37,700 3.03 2.48 2.05 0.50 94.00 94.43

383 37,700 - 37,800 3.02 2.48 2.04 0.50 94.00 94.44

384 37,800 - 37,900 3.02 2.48 2.04 0.49 94.00 94.44

385 37,900 - 38,000 3.02 2.48 2.04 0.49 94.01 94.44

386 38,000 - 38,100 3.02 2.48 2.04 0.49 94.01 94.45

387 38,100 - 38,200 3.02 2.47 2.04 0.49 94.01 94.45

388 38,200 - 38,300 3.02 2.47 2.04 0.49 94.02 94.45

389 38,300 - 38,400 3.02 2.47 2.04 0.49 94.02 94.46

390 38,400 - 38,500 3.01 2.47 2.04 0.49 94.02 94.46

391 38,500 - 38,600 3.01 2.47 2.04 0.49 94.03 94.46

392 38,600 - 38,700 3.01 2.47 2.03 0.49 94.03 94.47

393 38,700 - 38,800 3.01 2.47 2.03 0.49 94.03 94.47

394 38,800 - 38,900 3.01 2.47 2.03 0.49 94.04 94.47

395 38,900 - 39,000 3.01 2.47 2.03 0.49 94.04 94.48

396 39,000 - 39,100 3.01 2.46 2.03 0.48 94.04 94.48

397 39,100 - 39,200 3.00 2.46 2.03 0.48 94.05 94.48

398 39,200 - 39,300 3.00 2.46 2.03 0.48 94.05 94.49

399 39,300 - 39,400 3.00 2.46 2.03 0.48 94.05 94.49

400 39,400 - 39,500 3.00 2.46 2.03 0.48 94.06 94.49

401 39,500 - 39,600 3.00 2.46 2.03 0.48 94.06 94.50

402 39,600 - 39,700 3.00 2.46 2.02 0.48 94.06 94.50

403 39,700 - 39,800 3.00 2.46 2.02 0.48 94.07 94.50

404 39,800 - 39,900 2.99 2.46 2.02 0.48 94.07 94.51

405 39,900 - 40,000 2.99 2.45 2.02 0.48 94.07 94.51

406 40,000 - 40,100 2.99 2.45 2.02 0.48 94.08 94.51

407 40,100 - 40,200 2.99 2.45 2.02 0.48 94.08 94.52

408 40,200 - 40,300 2.99 2.45 2.02 0.48 94.08 94.52

409 40,300 - 40,400 2.99 2.45 2.02 0.47 94.09 94.52

410 40,400 - 40,500 2.99 2.45 2.02 0.47 94.09 94.53

411 40,500 - 40,600 2.98 2.45 2.01 0.47 94.09 94.53

412 40,600 - 40,700 2.98 2.45 2.01 0.47 94.10 94.53

413 40,700 - 40,800 2.98 2.45 2.01 0.47 94.10 94.54

414 40,800 - 40,900 2.98 2.44 2.01 0.47 94.10 94.54

415 40,900 - 41,000 2.98 2.44 2.01 0.47 94.11 94.54

416 41,000 - 41,100 2.98 2.44 2.01 0.47 94.11 94.54

417 41,100 - 41,200 2.98 2.44 2.01 0.47 94.11 94.55

418 41,200 - 41,300 2.97 2.44 2.01 0.47 94.12 94.55

419 41,300 - 41,400 2.97 2.44 2.01 0.47 94.12 94.55

420 41,400 - 41,500 2.97 2.44 2.00 0.47 94.12 94.56

421 41,500 - 41,600 2.97 2.44 2.00 0.46 94.13 94.56

207

Page 135: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

422 41,600 - 41,700 2.97 2.44 2.00 0.46 94.13 94.56

423 41,700 - 41,800 2.97 2.43 2.00 0.46 94.13 94.57

424 41,800 - 41,900 2.97 2.43 2.00 0.46 94.14 94.57

425 41,900 - 42,000 2.97 2.43 2.00 0.46 94.14 94.57

426 42,000 - 42,100 2.96 2.43 2.00 0.46 94.14 94.58

427 42,100 - 42,200 2.96 2.43 2.00 0.46 94.15 94.58

428 42,200 - 42,300 2.96 2.43 2.00 0.46 94.15 94.58

429 42,300 - 42,400 2.96 2.43 1.99 0.46 94.15 94.59

430 42,400 - 42,500 2.96 2.43 1.99 0.46 94.16 94.59

431 42,500 - 42,600 2.96 2.43 1.99 0.46 94.16 94.59

432 42,600 - 42,700 2.96 2.42 1.99 0.46 94.16 94.60

433 42,700 - 42,800 2.95 2.42 1.99 0.45 94.17 94.60

434 42,800 - 42,900 2.95 2.42 1.99 0.45 94.17 94.60

435 42,900 - 43,000 2.95 2.42 1.99 0.45 94.17 94.61

436 43,000 - 43,100 2.95 2.42 1.99 0.45 94.18 94.61

437 43,100 - 43,200 2.95 2.42 1.99 0.45 94.18 94.61

438 43,200 - 43,300 2.95 2.42 1.99 0.45 94.18 94.62

439 43,300 - 43,400 2.95 2.42 1.98 0.45 94.19 94.62

440 43,400 - 43,500 2.94 2.42 1.98 0.45 94.19 94.62

441 43,500 - 43,600 2.94 2.41 1.98 0.45 94.19 94.63

442 43,600 - 43,700 2.94 2.41 1.98 0.45 94.20 94.63

443 43,700 - 43,800 2.94 2.41 1.98 0.45 94.20 94.63

444 43,800 - 43,900 2.94 2.41 1.98 0.45 94.20 94.64

445 43,900 - 44,000 2.94 2.41 1.98 0.44 94.21 94.64

446 44,000 - 44,100 2.94 2.41 1.98 0.44 94.21 94.64

447 44,100 - 44,200 2.93 2.41 1.98 0.44 94.21 94.65

448 44,200 - 44,300 2.93 2.41 1.97 0.44 94.22 94.65

449 44,300 - 44,400 2.93 2.41 1.97 0.44 94.22 94.65

450 44,400 - 44,500 2.93 2.40 1.97 0.44 94.22 94.66

451 44,500 - 44,600 2.93 2.40 1.97 0.44 94.23 94.66

452 44,600 - 44,700 2.93 2.40 1.97 0.44 94.23 94.66

453 44,700 - 44,800 2.93 2.40 1.97 0.44 94.23 94.67

454 44,800 - 44,900 2.92 2.40 1.97 0.44 94.24 94.67

455 44,900 - 45,000 2.92 2.40 1.97 0.44 94.24 94.67

456 45,000 - 45,100 2.92 2.40 1.97 0.44 94.24 94.68

457 45,100 - 45,200 2.92 2.40 1.96 0.44 94.25 94.68

458 45,200 - 45,300 2.92 2.40 1.96 0.43 94.25 94.68

459 45,300 - 45,400 2.92 2.39 1.96 0.43 94.25 94.69

460 45,400 - 45,500 2.92 2.39 1.96 0.43 94.26 94.69

461 45,500 - 45,600 2.91 2.39 1.96 0.43 94.26 94.69

462 45,600 - 45,700 2.91 2.39 1.96 0.43 94.26 94.70

463 45,700 - 45,800 2.91 2.39 1.96 0.43 94.27 94.70

464 45,800 - 45,900 2.91 2.39 1.96 0.43 94.27 94.70

465 45,900 - 46,000 2.91 2.39 1.96 0.43 94.27 94.71

466 46,000 - 46,100 2.91 2.39 1.95 0.43 94.28 94.71

467 46,100 - 46,200 2.91 2.39 1.95 0.43 94.28 94.71

468 46,200 - 46,300 2.90 2.38 1.95 0.43 94.28 94.72

208

Page 136: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

469 46,300 - 46,400 2.90 2.38 1.95 0.43 94.29 94.72

470 46,400 - 46,500 2.90 2.38 1.95 0.42 94.29 94.72

471 46,500 - 46,600 2.90 2.38 1.95 0.42 94.29 94.73

472 46,600 - 46,700 2.90 2.38 1.95 0.42 94.30 94.73

473 46,700 - 46,800 2.90 2.38 1.95 0.42 94.30 94.73

474 46,800 - 46,900 2.90 2.38 1.95 0.42 94.31 94.74

475 46,900 - 47,000 2.89 2.38 1.95 0.42 94.31 94.74

476 47,000 - 47,100 2.89 2.38 1.94 0.42 94.31 94.74

477 47,100 - 47,200 2.89 2.37 1.94 0.42 94.32 94.75

478 47,200 - 47,300 2.89 2.37 1.94 0.42 94.32 94.75

479 47,300 - 47,400 2.89 2.37 1.94 0.42 94.32 94.75

480 47,400 - 47,500 2.89 2.37 1.94 0.42 94.33 94.76

481 47,500 - 47,600 2.89 2.37 1.94 0.42 94.33 94.76

482 47,600 - 47,700 2.89 2.37 1.94 0.41 94.33 94.76

483 47,700 - 47,800 2.88 2.37 1.94 0.41 94.34 94.77

484 47,800 - 47,900 2.88 2.37 1.94 0.41 94.34 94.77

485 47,900 - 48,000 2.88 2.37 1.93 0.41 94.34 94.77

486 48,000 - 48,100 2.88 2.36 1.93 0.41 94.35 94.78

487 48,100 - 48,200 2.88 2.36 1.93 0.41 94.35 94.78

488 48,200 - 48,300 2.88 2.36 1.93 0.41 94.35 94.78

489 48,300 - 48,400 2.88 2.36 1.93 0.41 94.36 94.79

490 48,400 - 48,500 2.87 2.36 1.93 0.41 94.36 94.79

491 48,500 - 48,600 2.87 2.36 1.93 0.41 94.36 94.79

492 48,600 - 48,700 2.87 2.36 1.93 0.41 94.37 94.80

493 48,700 - 48,800 2.87 2.36 1.93 0.41 94.37 94.80

494 48,800 - 48,900 2.87 2.35 1.92 0.40 94.37 94.80

495 48,900 - 49,000 2.87 2.35 1.92 0.40 94.38 94.81

496 49,000 - 49,100 2.87 2.35 1.92 0.40 94.38 94.81

497 49,100 - 49,200 2.86 2.35 1.92 0.40 94.38 94.81

498 49,200 - 49,300 2.86 2.35 1.92 0.40 94.39 94.82

499 49,300 - 49,400 2.86 2.35 1.92 0.40 94.39 94.82

500 49,400 - 49,500 2.86 2.35 1.92 0.40 94.39 94.82

501 49,500 - 49,600 2.86 2.35 1.92 0.40 94.40 94.83

502 49,600 - 49,700 2.86 2.35 1.92 0.40 94.40 94.83

503 49,700 - 49,800 2.86 2.34 1.91 0.40 94.40 94.83

504 49,800 - 49,900 2.85 2.34 1.91 0.40 94.41 94.84

505 49,900 - 50,000 2.85 2.34 1.91 0.40 94.41 94.84

506 50,000 - 51,000 2.85 2.34 1.91 0.40 94.41 94.84

507 51,000 - 52,000 2.85 2.34 1.91 0.39 94.43 94.85

508 52,000 - 53,000 2.84 2.33 1.90 0.39 94.44 94.87

509 53,000 - 54,000 2.84 2.33 1.90 0.39 94.45 94.88

510 54,000 - 55,000 2.83 2.32 1.90 0.38 94.47 94.89

511 55,000 - 56,000 2.82 2.32 1.89 0.38 94.48 94.90

512 56,000 - 57,000 2.82 2.31 1.89 0.38 94.49 94.92

513 57,000 - 58,000 2.81 2.31 1.88 0.37 94.51 94.93

514 58,000 - 59,000 2.81 2.30 1.88 0.37 94.52 94.94

515 59,000 - 60,000 2.80 2.30 1.88 0.37 94.53 94.95

209

Page 137: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

Menggunakan

MK

Menggunakan

Pengawasan

KONSTRUKSI FISIK (%) MANAJEMEN

KONSTRUKSI

(%)

PENGAWASAN

KONSTRUKSI (%)

PENGELOLAAN

KEGIATAN

(%)

NO

BIAYA TOTAL

PEMBANGUNAN

(Dalam Jutaan Rupiah)

PERENCANAAN

FISIK

(%)

516 60,000 - 61,000 2.80 2.29 1.87 0.37 94.55 94.96

517 61,000 - 62,000 2.79 2.28 1.87 0.36 94.56 94.98

518 62,000 - 63,000 2.79 2.28 1.86 0.36 94.57 94.99

519 63,000 - 64,000 2.78 2.27 1.86 0.36 94.59 95.00

520 64,000 - 65,000 2.78 2.27 1.86 0.35 94.60 95.01

521 65,000 - 66,000 2.77 2.26 1.85 0.35 94.61 95.03

522 66,000 - 67,000 2.77 2.26 1.85 0.35 94.63 95.04

523 67,000 - 68,000 2.76 2.25 1.84 0.35 94.64 95.05

524 68,000 - 69,000 2.76 2.25 1.84 0.34 94.65 95.06

525 69,000 - 70,000 2.75 2.24 1.84 0.34 94.67 95.07

526 70,000 - 71,000 2.75 2.24 1.83 0.34 94.68 95.09

527 71,000 - 72,000 2.74 2.23 1.83 0.33 94.69 95.10

528 72,000 - 73,000 2.74 2.23 1.82 0.33 94.71 95.11

529 73,000 - 74,000 2.73 2.22 1.82 0.33 94.72 95.12

530 74,000 - 75,000 2.72 2.22 1.82 0.32 94.73 95.14

531 75,000 - 76,000 2.72 2.21 1.81 0.32 94.75 95.15

532 76,000 - 77,000 2.71 2.21 1.81 0.32 94.76 95.16

533 77,000 - 78,000 2.71 2.20 1.80 0.32 94.77 95.17

534 78,000 - 79,000 2.70 2.20 1.80 0.31 94.79 95.18

535 79,000 - 80,000 2.70 2.19 1.80 0.31 94.80 95.20

536 80,000 - 81,000 2.69 2.19 1.79 0.31 94.81 95.21

537 81,000 - 82,000 2.69 2.18 1.79 0.30 94.83 95.22

538 82,000 - 83,000 2.68 2.18 1.78 0.30 94.84 95.23

539 83,000 - 84,000 2.68 2.17 1.78 0.30 94.85 95.25

540 84,000 - 85,000 2.67 2.17 1.77 0.30 94.87 95.26

541 85,000 - 86,000 2.67 2.16 1.77 0.29 94.88 95.27

542 86,000 - 87,000 2.66 2.16 1.77 0.29 94.89 95.28

543 87,000 - 88,000 2.66 2.15 1.76 0.29 94.91 95.30

544 88,000 - 89,000 2.65 2.14 1.76 0.28 94.92 95.31

545 89,000 - 90,000 2.64 2.14 1.75 0.28 94.93 95.32

546 90,000 - 91,000 2.64 2.13 1.75 0.28 94.95 95.33

547 91,000 - 92,000 2.63 2.13 1.75 0.27 94.96 95.34

548 92,000 - 93,000 2.63 2.12 1.74 0.27 94.98 95.36

549 93,000 - 94,000 2.62 2.12 1.74 0.27 94.99 95.37

550 94,000 - 95,000 2.62 2.11 1.73 0.27 95.00 95.38

551 95,000 - 96,000 2.61 2.11 1.73 0.26 95.02 95.39

552 96,000 - 97,000 2.61 2.10 1.73 0.26 95.03 95.41

553 97,000 - 98,000 2.60 2.10 1.72 0.26 95.04 95.42

554 98,000 - 99,000 2.60 2.09 1.72 0.25 95.06 95.43

555 99,000 - 100,000 2.59 2.09 1.71 0.25 95.07 95.44

Catatan :

a.

b.

- Jarak 0 - 200 km sebesar 0,75 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak 200 - 300 km sebesar 0,86 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak > 300 km sebesar 1,04 dari harga Biaya Pengelolaan Kegiatan yang berlaku

Untuk pekerjaan diluar bangunan gedung, biaya perencanaan dan pengawasan dapat dihitung tersendiri sesuai

dengan kebutuhan waktu dan tenaga / billing rate.

Untuk biaya kegiatan/pekerjaan dibawah 300 juta dapat diberlakukan nilai Biaya Pengelolaan Kegiatan khusus

dengan koefisien faktor pengali sesuai dengan jarak kegiatan/pekerjaan

210

Page 138: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.28

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

1 < 50 7.81 6.37 5.76 80.06

2 50 - 100 7.81 6.37 5.76 80.06

3 100 - 150 7.81 6.37 5.76 80.06

4 150 - 200 7.81 6.37 5.76 80.06

5 200 - 250 7.81 6.37 5.76 80.06

6 250 - 300 7.81 6.37 5.76 80.06

7 300 - 350 7.62 6.21 5.47 80.70

8 350 - 400 7.43 6.05 5.16 81.36

9 400 - 450 7.23 5.90 4.85 82.02

10 450 - 500 7.04 5.73 4.54 82.69

11 500 - 600 6.84 5.57 4.22 83.37

12 600 - 700 6.66 5.44 3.98 83.91

13 700 - 800 6.48 5.31 3.74 84.46

14 800 - 900 6.30 5.18 3.50 85.02

15 900 - 1,000 6.12 5.05 3.25 85.58

16 1,000 - 1,100 5.94 4.91 3.00 86.15

17 1,100 - 1,200 5.89 4.87 2.94 86.30

18 1,200 - 1,300 5.84 4.83 2.88 86.45

19 1,300 - 1,400 5.79 4.79 2.81 86.61

20 1,400 - 1,500 5.74 4.75 2.75 86.76

21 1,500 - 1,600 5.69 4.71 2.69 86.91

22 1,600 - 1,700 5.64 4.67 2.62 87.07

23 1,700 - 1,800 5.59 4.63 2.56 87.22

24 1,800 - 1,900 5.54 4.59 2.49 87.38

25 1,900 - 2,000 5.48 4.55 2.43 87.54

26 2,000 - 2,100 5.43 4.51 2.36 87.69

27 2,100 - 2,200 5.38 4.47 2.30 87.85

28 2,200 - 2,300 5.33 4.43 2.23 88.01

29 2,300 - 2,400 5.28 4.39 2.16 88.17

30 2,400 - 2,500 5.23 4.35 2.10 88.32

31 2,500 - 2,600 5.18 4.31 2.03 88.48

32 2,600 - 2,700 5.15 4.29 2.00 88.56

33 2,700 - 2,800 5.12 4.27 1.98 88.63

34 2,800 - 2,900 5.10 4.24 1.95 88.71

35 2,900 - 3,000 5.07 4.22 1.92 88.78

36 3,000 - 3,100 5.05 4.20 1.89 88.86

37 3,100 - 3,200 5.02 4.18 1.87 88.94

38 3,200 - 3,300 5.00 4.16 1.84 89.01

39 3,300 - 3,400 4.97 4.13 1.81 89.09

40 3,400 - 3,500 4.94 4.11 1.78 89.16

41 3,500 - 3,600 4.92 4.09 1.76 89.24

42 3,600 - 3,700 4.89 4.07 1.73 89.31

43 3,700 - 3,800 4.86 4.04 1.70 89.39

44 3,800 - 3,900 4.84 4.02 1.67 89.47

45 3,900 - 4,000 4.81 4.00 1.64 89.54

Tabel Biaya Perencanaan, Pengawasan, Pengelolaan Kegiatan dan Fisik pada Kegiatan Fisik Klasifikasi Khusus

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

211

Page 139: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

46 4,000 - 4,100 4.79 3.98 1.62 89.62

47 4,100 - 4,200 4.76 3.95 1.59 89.70

48 4,200 - 4,300 4.73 3.93 1.56 89.77

49 4,300 - 4,400 4.71 3.91 1.53 89.85

50 4,400 - 4,500 4.68 3.89 1.50 89.93

51 4,500 - 4,600 4.65 3.86 1.48 90.01

52 4,600 - 4,700 4.63 3.84 1.45 90.08

53 4,700 - 4,800 4.60 3.82 1.42 90.16

54 4,800 - 4,900 4.57 3.80 1.39 90.24

55 4,900 - 5,000 4.55 3.77 1.36 90.32

56 5,000 - 5,100 4.52 3.75 1.33 90.39

57 5,100 - 5,200 4.51 3.74 1.33 90.42

58 5,200 - 5,300 4.50 3.73 1.32 90.45

59 5,300 - 5,400 4.49 3.72 1.31 90.48

60 5,400 - 5,500 4.48 3.72 1.30 90.51

61 5,500 - 5,600 4.47 3.71 1.29 90.53

62 5,600 - 5,700 4.46 3.70 1.28 90.56

63 5,700 - 5,800 4.45 3.69 1.27 90.59

64 5,800 - 5,900 4.44 3.68 1.26 90.62

65 5,900 - 6,000 4.43 3.67 1.25 90.65

66 6,000 - 6,100 4.42 3.66 1.25 90.67

67 6,100 - 6,200 4.41 3.65 1.24 90.70

68 6,200 - 6,300 4.40 3.65 1.23 90.73

69 6,300 - 6,400 4.38 3.64 1.22 90.76

70 6,400 - 6,500 4.37 3.63 1.21 90.79

71 6,500 - 6,600 4.36 3.62 1.20 90.82

72 6,600 - 6,700 4.35 3.61 1.19 90.84

73 6,700 - 6,800 4.34 3.60 1.18 90.87

74 6,800 - 6,900 4.33 3.59 1.18 90.90

75 6,900 - 7,000 4.32 3.58 1.17 90.93

76 7,000 - 7,100 4.31 3.57 1.16 90.96

77 7,100 - 7,200 4.30 3.57 1.15 90.98

78 7,200 - 7,300 4.29 3.56 1.14 91.01

79 7,300 - 7,400 4.28 3.55 1.13 91.04

80 7,400 - 7,500 4.27 3.54 1.12 91.07

81 7,500 - 7,600 4.26 3.53 1.11 91.10

82 7,600 - 7,700 4.25 3.52 1.10 91.13

83 7,700 - 7,800 4.24 3.51 1.10 91.15

84 7,800 - 7,900 4.23 3.50 1.09 91.18

85 7,900 - 8,000 4.22 3.49 1.08 91.21

86 8,000 - 8,100 4.21 3.49 1.07 91.24

87 8,100 - 8,200 4.20 3.48 1.06 91.27

88 8,200 - 8,300 4.19 3.47 1.05 91.30

89 8,300 - 8,400 4.17 3.46 1.04 91.33

90 8,400 - 8,500 4.16 3.45 1.03 91.35

91 8,500 - 8,600 4.15 3.44 1.02 91.38

92 8,600 - 8,700 4.14 3.43 1.01 91.41

212

Page 140: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

93 8,700 - 8,800 4.13 3.42 1.01 91.44

94 8,800 - 8,900 4.12 3.41 1.00 91.47

95 8,900 - 9,000 4.11 3.40 0.99 91.50

96 9,000 - 9,100 4.10 3.40 0.98 91.53

97 9,100 - 9,200 4.09 3.39 0.97 91.55

98 9,200 - 9,300 4.08 3.38 0.96 91.58

99 9,300 - 9,400 4.07 3.37 0.95 91.61

100 9,400 - 9,500 4.06 3.36 0.94 91.64

101 9,500 - 9,600 4.05 3.35 0.93 91.67

102 9,600 - 9,700 4.04 3.34 0.92 91.70

103 9,700 - 9,800 4.03 3.33 0.92 91.73

104 9,800 - 9,900 4.02 3.32 0.91 91.76

105 9,900 - 10,000 4.00 3.31 0.90 91.78

106 10,000 - 10,100 3.99 3.31 0.89 91.81

107 10,100 - 10,200 3.99 3.30 0.89 91.82

108 10,200 - 10,300 3.99 3.30 0.88 91.83

109 10,300 - 10,400 3.99 3.30 0.88 91.84

110 10,400 - 10,500 3.98 3.29 0.88 91.84

111 10,500 - 10,600 3.98 3.29 0.88 91.85

112 10,600 - 10,700 3.98 3.29 0.88 91.86

113 10,700 - 10,800 3.97 3.29 0.87 91.86

114 10,800 - 10,900 3.97 3.28 0.87 91.87

115 10,900 - 11,000 3.97 3.28 0.87 91.88

116 11,000 - 11,100 3.97 3.28 0.87 91.89

117 11,100 - 11,200 3.96 3.27 0.87 91.89

118 11,200 - 11,300 3.96 3.27 0.87 91.90

119 11,300 - 11,400 3.96 3.27 0.86 91.91

120 11,400 - 11,500 3.96 3.27 0.86 91.92

121 11,500 - 11,600 3.95 3.26 0.86 91.92

122 11,600 - 11,700 3.95 3.26 0.86 91.93

123 11,700 - 11,800 3.95 3.26 0.86 91.94

124 11,800 - 11,900 3.94 3.25 0.85 91.95

125 11,900 - 12,000 3.94 3.25 0.85 91.95

126 12,000 - 12,100 3.94 3.25 0.85 91.96

127 12,100 - 12,200 3.94 3.25 0.85 91.97

128 12,200 - 12,300 3.93 3.24 0.85 91.98

129 12,300 - 12,400 3.93 3.24 0.84 91.98

130 12,400 - 12,500 3.93 3.24 0.84 91.99

131 12,500 - 12,600 3.93 3.24 0.84 92.00

132 12,600 - 12,700 3.92 3.23 0.84 92.01

133 12,700 - 12,800 3.92 3.23 0.84 92.01

134 12,800 - 12,900 3.92 3.23 0.83 92.02

135 12,900 - 13,000 3.91 3.22 0.83 92.03

136 13,000 - 13,100 3.91 3.22 0.83 92.04

137 13,100 - 13,200 3.91 3.22 0.83 92.04

138 13,200 - 13,300 3.91 3.22 0.83 92.05

139 13,300 - 13,400 3.90 3.21 0.82 92.06

213

Page 141: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

140 13,400 - 13,500 3.90 3.21 0.82 92.07

141 13,500 - 13,600 3.90 3.21 0.82 92.07

142 13,600 - 13,700 3.90 3.20 0.82 92.08

143 13,700 - 13,800 3.89 3.20 0.82 92.09

144 13,800 - 13,900 3.89 3.20 0.81 92.10

145 13,900 - 14,000 3.89 3.20 0.81 92.10

146 14,000 - 14,100 3.88 3.19 0.81 92.11

147 14,100 - 14,200 3.88 3.19 0.81 92.12

148 14,200 - 14,300 3.88 3.19 0.81 92.13

149 14,300 - 14,400 3.88 3.18 0.80 92.13

150 14,400 - 14,500 3.87 3.18 0.80 92.14

151 14,500 - 14,600 3.87 3.18 0.80 92.15

152 14,600 - 14,700 3.87 3.18 0.80 92.16

153 14,700 - 14,800 3.86 3.17 0.80 92.16

154 14,800 - 14,900 3.86 3.17 0.79 92.17

155 14,900 - 15,000 3.86 3.17 0.79 92.18

156 15,000 - 15,100 3.86 3.17 0.79 92.19

157 15,100 - 15,200 3.85 3.16 0.79 92.19

158 15,200 - 15,300 3.85 3.16 0.79 92.20

159 15,300 - 15,400 3.85 3.16 0.79 92.21

160 15,400 - 15,500 3.85 3.15 0.78 92.22

161 15,500 - 15,600 3.84 3.15 0.78 92.23

162 15,600 - 15,700 3.84 3.15 0.78 92.23

163 15,700 - 15,800 3.84 3.15 0.78 92.24

164 15,800 - 15,900 3.83 3.14 0.78 92.25

165 15,900 - 16,000 3.83 3.14 0.77 92.26

166 16,000 - 16,100 3.83 3.14 0.77 92.26

167 16,100 - 16,200 3.83 3.13 0.77 92.27

168 16,200 - 16,300 3.82 3.13 0.77 92.28

169 16,300 - 16,400 3.82 3.13 0.77 92.29

170 16,400 - 16,500 3.82 3.13 0.76 92.29

171 16,500 - 16,600 3.82 3.12 0.76 92.30

172 16,600 - 16,700 3.81 3.12 0.76 92.31

173 16,700 - 16,800 3.81 3.12 0.76 92.32

174 16,800 - 16,900 3.81 3.11 0.76 92.32

175 16,900 - 17,000 3.80 3.11 0.75 92.33

176 17,000 - 17,100 3.80 3.11 0.75 92.34

177 17,100 - 17,200 3.80 3.11 0.75 92.35

178 17,200 - 17,300 3.80 3.10 0.75 92.35

179 17,300 - 17,400 3.79 3.10 0.75 92.36

180 17,400 - 17,500 3.79 3.10 0.74 92.37

181 17,500 - 17,600 3.79 3.09 0.74 92.38

182 17,600 - 17,700 3.78 3.09 0.74 92.38

183 17,700 - 17,800 3.78 3.09 0.74 92.39

184 17,800 - 17,900 3.78 3.09 0.74 92.40

185 17,900 - 18,000 3.78 3.08 0.73 92.41

186 18,000 - 18,100 3.77 3.08 0.73 92.41

214

Page 142: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

187 18,100 - 18,200 3.77 3.08 0.73 92.42

188 18,200 - 18,300 3.77 3.07 0.73 92.43

189 18,300 - 18,400 3.77 3.07 0.73 92.44

190 18,400 - 18,500 3.76 3.07 0.72 92.44

191 18,500 - 18,600 3.76 3.07 0.72 92.45

192 18,600 - 18,700 3.76 3.06 0.72 92.46

193 18,700 - 18,800 3.75 3.06 0.72 92.47

194 18,800 - 18,900 3.75 3.06 0.72 92.47

195 18,900 - 19,000 3.75 3.05 0.71 92.48

196 19,000 - 19,100 3.75 3.05 0.71 92.49

197 19,100 - 19,200 3.74 3.05 0.71 92.50

198 19,200 - 19,300 3.74 3.05 0.71 92.50

199 19,300 - 19,400 3.74 3.04 0.71 92.51

200 19,400 - 19,500 3.73 3.04 0.70 92.52

201 19,500 - 19,600 3.73 3.04 0.70 92.53

202 19,600 - 19,700 3.73 3.04 0.70 92.53

203 19,700 - 19,800 3.73 3.03 0.70 92.54

204 19,800 - 19,900 3.72 3.03 0.70 92.55

205 19,900 - 20,000 3.72 3.03 0.69 92.56

206 20,000 - 20,100 3.72 3.02 0.69 92.57

207 20,100 - 20,200 3.72 3.02 0.69 92.57

208 20,200 - 20,300 3.71 3.02 0.69 92.58

209 20,300 - 20,400 3.71 3.02 0.69 92.59

210 20,400 - 20,500 3.71 3.01 0.68 92.60

211 20,500 - 20,600 3.70 3.01 0.68 92.60

212 20,600 - 20,700 3.70 3.01 0.68 92.61

213 20,700 - 20,800 3.70 3.00 0.68 92.62

214 20,800 - 20,900 3.70 3.00 0.68 92.63

215 20,900 - 21,000 3.69 3.00 0.68 92.63

216 21,000 - 21,100 3.69 3.00 0.67 92.64

217 21,100 - 21,200 3.69 2.99 0.67 92.65

218 21,200 - 21,300 3.68 2.99 0.67 92.66

219 21,300 - 21,400 3.68 2.99 0.67 92.66

220 21,400 - 21,500 3.68 2.98 0.67 92.67

221 21,500 - 21,600 3.68 2.98 0.66 92.68

222 21,600 - 21,700 3.67 2.98 0.66 92.69

223 21,700 - 21,800 3.67 2.98 0.66 92.69

224 21,800 - 21,900 3.67 2.97 0.66 92.70

225 21,900 - 22,000 3.67 2.97 0.66 92.71

226 22,000 - 22,100 3.66 2.97 0.65 92.72

227 22,100 - 22,200 3.66 2.96 0.65 92.72

228 22,200 - 22,300 3.66 2.96 0.65 92.73

229 22,300 - 22,400 3.65 2.96 0.65 92.74

230 22,400 - 22,500 3.65 2.96 0.65 92.75

231 22,500 - 22,600 3.65 2.95 0.64 92.76

232 22,600 - 22,700 3.65 2.95 0.64 92.76

233 22,700 - 22,800 3.64 2.95 0.64 92.77

215

Page 143: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

234 22,800 - 22,900 3.64 2.94 0.64 92.78

235 22,900 - 23,000 3.64 2.94 0.64 92.79

236 23,000 - 23,100 3.63 2.94 0.63 92.79

237 23,100 - 23,200 3.63 2.94 0.63 92.80

238 23,200 - 23,300 3.63 2.93 0.63 92.81

239 23,300 - 23,400 3.63 2.93 0.63 92.82

240 23,400 - 23,500 3.62 2.93 0.63 92.82

241 23,500 - 23,600 3.62 2.92 0.62 92.83

242 23,600 - 23,700 3.62 2.92 0.62 92.84

243 23,700 - 23,800 3.61 2.92 0.62 92.85

244 23,800 - 23,900 3.61 2.92 0.62 92.85

245 23,900 - 24,000 3.61 2.91 0.62 92.86

246 24,000 - 24,100 3.61 2.91 0.61 92.87

247 24,100 - 24,200 3.60 2.91 0.61 92.88

248 24,200 - 24,300 3.60 2.90 0.61 92.89

249 24,300 - 24,400 3.60 2.90 0.61 92.89

250 24,400 - 24,500 3.60 2.90 0.61 92.90

251 24,500 - 24,600 3.59 2.90 0.60 92.91

252 24,600 - 24,700 3.59 2.89 0.60 92.92

253 24,700 - 24,800 3.59 2.89 0.60 92.92

254 24,800 - 24,900 3.58 2.89 0.60 92.93

255 24,900 - 25,000 3.58 2.88 0.60 92.94

256 25,000 - 25,100 3.58 2.88 0.59 92.95

257 25,100 - 25,200 3.58 2.88 0.59 92.95

258 25,200 - 25,300 3.58 2.88 0.59 92.95

259 25,300 - 25,400 3.57 2.88 0.59 92.96

260 25,400 - 25,500 3.57 2.88 0.59 92.96

261 25,500 - 25,600 3.57 2.88 0.59 92.96

262 25,600 - 25,700 3.57 2.87 0.59 92.97

263 25,700 - 25,800 3.57 2.87 0.59 92.97

264 25,800 - 25,900 3.57 2.87 0.59 92.97

265 25,900 - 26,000 3.57 2.87 0.59 92.98

266 26,000 - 26,100 3.56 2.87 0.59 92.98

267 26,100 - 26,200 3.56 2.87 0.59 92.98

268 26,200 - 26,300 3.56 2.87 0.58 92.99

269 26,300 - 26,400 3.56 2.87 0.58 92.99

270 26,400 - 26,500 3.56 2.87 0.58 92.99

271 26,500 - 26,600 3.56 2.86 0.58 93.00

272 26,600 - 26,700 3.56 2.86 0.58 93.00

273 26,700 - 26,800 3.56 2.86 0.58 93.00

274 26,800 - 26,900 3.55 2.86 0.58 93.01

275 26,900 - 27,000 3.55 2.86 0.58 93.01

276 27,000 - 27,100 3.55 2.86 0.58 93.01

277 27,100 - 27,200 3.55 2.86 0.58 93.02

278 27,200 - 27,300 3.55 2.86 0.58 93.02

279 27,300 - 27,400 3.55 2.86 0.58 93.02

280 27,400 - 27,500 3.55 2.85 0.57 93.03

216

Page 144: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

281 27,500 - 27,600 3.54 2.85 0.57 93.03

282 27,600 - 27,700 3.54 2.85 0.57 93.03

283 27,700 - 27,800 3.54 2.85 0.57 93.04

284 27,800 - 27,900 3.54 2.85 0.57 93.04

285 27,900 - 28,000 3.54 2.85 0.57 93.04

286 28,000 - 28,100 3.54 2.85 0.57 93.04

287 28,100 - 28,200 3.54 2.85 0.57 93.05

288 28,200 - 28,300 3.53 2.85 0.57 93.05

289 28,300 - 28,400 3.53 2.84 0.57 93.05

290 28,400 - 28,500 3.53 2.84 0.57 93.06

291 28,500 - 28,600 3.53 2.84 0.57 93.06

292 28,600 - 28,700 3.53 2.84 0.57 93.06

293 28,700 - 28,800 3.53 2.84 0.56 93.07

294 28,800 - 28,900 3.53 2.84 0.56 93.07

295 28,900 - 29,000 3.53 2.84 0.56 93.07

296 29,000 - 29,100 3.52 2.84 0.56 93.08

297 29,100 - 29,200 3.52 2.84 0.56 93.08

298 29,200 - 29,300 3.52 2.83 0.56 93.08

299 29,300 - 29,400 3.52 2.83 0.56 93.09

300 29,400 - 29,500 3.52 2.83 0.56 93.09

301 29,500 - 29,600 3.52 2.83 0.56 93.09

302 29,600 - 29,700 3.52 2.83 0.56 93.10

303 29,700 - 29,800 3.51 2.83 0.56 93.10

304 29,800 - 29,900 3.51 2.83 0.56 93.10

305 29,900 - 30,000 3.51 2.83 0.55 93.11

306 30,000 - 30,100 3.51 2.82 0.55 93.11

307 30,100 - 30,200 3.51 2.82 0.55 93.11

308 30,200 - 30,300 3.51 2.82 0.55 93.12

309 30,300 - 30,400 3.51 2.82 0.55 93.12

310 30,400 - 30,500 3.50 2.82 0.55 93.12

311 30,500 - 30,600 3.50 2.82 0.55 93.13

312 30,600 - 30,700 3.50 2.82 0.55 93.13

313 30,700 - 30,800 3.50 2.82 0.55 93.13

314 30,800 - 30,900 3.50 2.82 0.55 93.14

315 30,900 - 31,000 3.50 2.81 0.55 93.14

316 31,000 - 31,100 3.50 2.81 0.55 93.14

317 31,100 - 31,200 3.50 2.81 0.55 93.15

318 31,200 - 31,300 3.49 2.81 0.54 93.15

319 31,300 - 31,400 3.49 2.81 0.54 93.15

320 31,400 - 31,500 3.49 2.81 0.54 93.16

321 31,500 - 31,600 3.49 2.81 0.54 93.16

322 31,600 - 31,700 3.49 2.81 0.54 93.16

323 31,700 - 31,800 3.49 2.81 0.54 93.17

324 31,800 - 31,900 3.49 2.80 0.54 93.17

325 31,900 - 32,000 3.48 2.80 0.54 93.17

326 32,000 - 32,100 3.48 2.80 0.54 93.18

327 32,100 - 32,200 3.48 2.80 0.54 93.18

217

Page 145: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

328 32,200 - 32,300 3.48 2.80 0.54 93.18

329 32,300 - 32,400 3.48 2.80 0.54 93.19

330 32,400 - 32,500 3.48 2.80 0.53 93.19

331 32,500 - 32,600 3.48 2.80 0.53 93.19

332 32,600 - 32,700 3.47 2.80 0.53 93.20

333 32,700 - 32,800 3.47 2.79 0.53 93.20

334 32,800 - 32,900 3.47 2.79 0.53 93.20

335 32,900 - 33,000 3.47 2.79 0.53 93.21

336 33,000 - 33,100 3.47 2.79 0.53 93.21

337 33,100 - 33,200 3.47 2.79 0.53 93.21

338 33,200 - 33,300 3.47 2.79 0.53 93.22

339 33,300 - 33,400 3.47 2.79 0.53 93.22

340 33,400 - 33,500 3.46 2.79 0.53 93.22

341 33,500 - 33,600 3.46 2.79 0.53 93.23

342 33,600 - 33,700 3.46 2.78 0.53 93.23

343 33,700 - 33,800 3.46 2.78 0.52 93.23

344 33,800 - 33,900 3.46 2.78 0.52 93.24

345 33,900 - 34,000 3.46 2.78 0.52 93.24

346 34,000 - 34,100 3.46 2.78 0.52 93.24

347 34,100 - 34,200 3.45 2.78 0.52 93.25

348 34,200 - 34,300 3.45 2.78 0.52 93.25

349 34,300 - 34,400 3.45 2.78 0.52 93.25

350 34,400 - 34,500 3.45 2.78 0.52 93.26

351 34,500 - 34,600 3.45 2.77 0.52 93.26

352 34,600 - 34,700 3.45 2.77 0.52 93.26

353 34,700 - 34,800 3.45 2.77 0.52 93.27

354 34,800 - 34,900 3.44 2.77 0.52 93.27

355 34,900 - 35,000 3.44 2.77 0.51 93.27

356 35,000 - 35,100 3.44 2.77 0.51 93.28

357 35,100 - 35,200 3.44 2.77 0.51 93.28

358 35,200 - 35,300 3.44 2.77 0.51 93.28

359 35,300 - 35,400 3.44 2.77 0.51 93.29

360 35,400 - 35,500 3.44 2.76 0.51 93.29

361 35,500 - 35,600 3.44 2.76 0.51 93.29

362 35,600 - 35,700 3.43 2.76 0.51 93.30

363 35,700 - 35,800 3.43 2.76 0.51 93.30

364 35,800 - 35,900 3.43 2.76 0.51 93.30

365 35,900 - 36,000 3.43 2.76 0.51 93.31

366 36,000 - 36,100 3.43 2.76 0.51 93.31

367 36,100 - 36,200 3.43 2.76 0.50 93.31

368 36,200 - 36,300 3.43 2.75 0.50 93.32

369 36,300 - 36,400 3.42 2.75 0.50 93.32

370 36,400 - 36,500 3.42 2.75 0.50 93.32

371 36,500 - 36,600 3.42 2.75 0.50 93.33

372 36,600 - 36,700 3.42 2.75 0.50 93.33

373 36,700 - 36,800 3.42 2.75 0.50 93.33

374 36,800 - 36,900 3.42 2.75 0.50 93.34

218

Page 146: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

375 36,900 - 37,000 3.42 2.75 0.50 93.34

376 37,000 - 37,100 3.41 2.75 0.50 93.34

377 37,100 - 37,200 3.41 2.74 0.50 93.35

378 37,200 - 37,300 3.41 2.74 0.50 93.35

379 37,300 - 37,400 3.41 2.74 0.50 93.35

380 37,400 - 37,500 3.41 2.74 0.49 93.36

381 37,500 - 37,600 3.41 2.74 0.49 93.36

382 37,600 - 37,700 3.41 2.74 0.49 93.36

383 37,700 - 37,800 3.40 2.74 0.49 93.37

384 37,800 - 37,900 3.40 2.74 0.49 93.37

385 37,900 - 38,000 3.40 2.74 0.49 93.37

386 38,000 - 38,100 3.40 2.73 0.49 93.38

387 38,100 - 38,200 3.40 2.73 0.49 93.38

388 38,200 - 38,300 3.40 2.73 0.49 93.38

389 38,300 - 38,400 3.40 2.73 0.49 93.39

390 38,400 - 38,500 3.40 2.73 0.49 93.39

391 38,500 - 38,600 3.39 2.73 0.49 93.39

392 38,600 - 38,700 3.39 2.73 0.48 93.40

393 38,700 - 38,800 3.39 2.73 0.48 93.40

394 38,800 - 38,900 3.39 2.73 0.48 93.40

395 38,900 - 39,000 3.39 2.72 0.48 93.41

396 39,000 - 39,100 3.39 2.72 0.48 93.41

397 39,100 - 39,200 3.39 2.72 0.48 93.41

398 39,200 - 39,300 3.38 2.72 0.48 93.42

399 39,300 - 39,400 3.38 2.72 0.48 93.42

400 39,400 - 39,500 3.38 2.72 0.48 93.42

401 39,500 - 39,600 3.38 2.72 0.48 93.43

402 39,600 - 39,700 3.38 2.72 0.48 93.43

403 39,700 - 39,800 3.38 2.72 0.48 93.43

404 39,800 - 39,900 3.38 2.71 0.48 93.43

405 39,900 - 40,000 3.37 2.71 0.47 93.44

406 40,000 - 40,100 3.37 2.71 0.47 93.44

407 40,100 - 40,200 3.37 2.71 0.47 93.44

408 40,200 - 40,300 3.37 2.71 0.47 93.45

409 40,300 - 40,400 3.37 2.71 0.47 93.45

410 40,400 - 40,500 3.37 2.71 0.47 93.45

411 40,500 - 40,600 3.37 2.71 0.47 93.46

412 40,600 - 40,700 3.36 2.70 0.47 93.46

413 40,700 - 40,800 3.36 2.70 0.47 93.46

414 40,800 - 40,900 3.36 2.70 0.47 93.47

415 40,900 - 41,000 3.36 2.70 0.47 93.47

416 41,000 - 41,100 3.36 2.70 0.47 93.47

417 41,100 - 41,200 3.36 2.70 0.46 93.48

418 41,200 - 41,300 3.36 2.70 0.46 93.48

419 41,300 - 41,400 3.36 2.70 0.46 93.48

420 41,400 - 41,500 3.35 2.70 0.46 93.49

421 41,500 - 41,600 3.35 2.69 0.46 93.49

219

Page 147: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

422 41,600 - 41,700 3.35 2.69 0.46 93.49

423 41,700 - 41,800 3.35 2.69 0.46 93.50

424 41,800 - 41,900 3.35 2.69 0.46 93.50

425 41,900 - 42,000 3.35 2.69 0.46 93.50

426 42,000 - 42,100 3.35 2.69 0.46 93.51

427 42,100 - 42,200 3.34 2.69 0.46 93.51

428 42,200 - 42,300 3.34 2.69 0.46 93.51

429 42,300 - 42,400 3.34 2.69 0.45 93.52

430 42,400 - 42,500 3.34 2.68 0.45 93.52

431 42,500 - 42,600 3.34 2.68 0.45 93.52

432 42,600 - 42,700 3.34 2.68 0.45 93.53

433 42,700 - 42,800 3.34 2.68 0.45 93.53

434 42,800 - 42,900 3.33 2.68 0.45 93.53

435 42,900 - 43,000 3.33 2.68 0.45 93.54

436 43,000 - 43,100 3.33 2.68 0.45 93.54

437 43,100 - 43,200 3.33 2.68 0.45 93.54

438 43,200 - 43,300 3.33 2.68 0.45 93.55

439 43,300 - 43,400 3.33 2.67 0.45 93.55

440 43,400 - 43,500 3.33 2.67 0.45 93.55

441 43,500 - 43,600 3.33 2.67 0.45 93.56

442 43,600 - 43,700 3.32 2.67 0.44 93.56

443 43,700 - 43,800 3.32 2.67 0.44 93.56

444 43,800 - 43,900 3.32 2.67 0.44 93.57

445 43,900 - 44,000 3.32 2.67 0.44 93.57

446 44,000 - 44,100 3.32 2.67 0.44 93.57

447 44,100 - 44,200 3.32 2.66 0.44 93.58

448 44,200 - 44,300 3.32 2.66 0.44 93.58

449 44,300 - 44,400 3.31 2.66 0.44 93.58

450 44,400 - 44,500 3.31 2.66 0.44 93.59

451 44,500 - 44,600 3.31 2.66 0.44 93.59

452 44,600 - 44,700 3.31 2.66 0.44 93.59

453 44,700 - 44,800 3.31 2.66 0.44 93.60

454 44,800 - 44,900 3.31 2.66 0.43 93.60

455 44,900 - 45,000 3.31 2.66 0.43 93.60

456 45,000 - 45,100 3.30 2.65 0.43 93.61

457 45,100 - 45,200 3.30 2.65 0.43 93.61

458 45,200 - 45,300 3.30 2.65 0.43 93.61

459 45,300 - 45,400 3.30 2.65 0.43 93.62

460 45,400 - 45,500 3.30 2.65 0.43 93.62

461 45,500 - 45,600 3.30 2.65 0.43 93.62

462 45,600 - 45,700 3.30 2.65 0.43 93.63

463 45,700 - 45,800 3.29 2.65 0.43 93.63

464 45,800 - 45,900 3.29 2.65 0.43 93.63

465 45,900 - 46,000 3.29 2.64 0.43 93.64

466 46,000 - 46,100 3.29 2.64 0.42 93.64

467 46,100 - 46,200 3.29 2.64 0.42 93.64

468 46,200 - 46,300 3.29 2.64 0.42 93.65

220

Page 148: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

469 46,300 - 46,400 3.29 2.64 0.42 93.65

470 46,400 - 46,500 3.29 2.64 0.42 93.65

471 46,500 - 46,600 3.28 2.64 0.42 93.66

472 46,600 - 46,700 3.28 2.64 0.42 93.66

473 46,700 - 46,800 3.28 2.64 0.42 93.66

474 46,800 - 46,900 3.28 2.63 0.42 93.67

475 46,900 - 47,000 3.28 2.63 0.42 93.67

476 47,000 - 47,100 3.28 2.63 0.42 93.67

477 47,100 - 47,200 3.28 2.63 0.42 93.68

478 47,200 - 47,300 3.27 2.63 0.42 93.68

479 47,300 - 47,400 3.27 2.63 0.41 93.68

480 47,400 - 47,500 3.27 2.63 0.41 93.69

481 47,500 - 47,600 3.27 2.63 0.41 93.69

482 47,600 - 47,700 3.27 2.63 0.41 93.69

483 47,700 - 47,800 3.27 2.62 0.41 93.70

484 47,800 - 47,900 3.27 2.62 0.41 93.70

485 47,900 - 48,000 3.26 2.62 0.41 93.70

486 48,000 - 48,100 3.26 2.62 0.41 93.71

487 48,100 - 48,200 3.26 2.62 0.41 93.71

488 48,200 - 48,300 3.26 2.62 0.41 93.71

489 48,300 - 48,400 3.26 2.62 0.41 93.72

490 48,400 - 48,500 3.26 2.62 0.41 93.72

491 48,500 - 48,600 3.26 2.61 0.40 93.72

492 48,600 - 48,700 3.25 2.61 0.40 93.73

493 48,700 - 48,800 3.25 2.61 0.40 93.73

494 48,800 - 48,900 3.25 2.61 0.40 93.73

495 48,900 - 49,000 3.25 2.61 0.40 93.74

496 49,000 - 49,100 3.25 2.61 0.40 93.74

497 49,100 - 49,200 3.25 2.61 0.40 93.74

498 49,200 - 49,300 3.25 2.61 0.40 93.75

499 49,300 - 49,400 3.24 2.61 0.40 93.75

500 49,400 - 49,500 3.24 2.60 0.40 93.75

501 49,500 - 49,600 3.24 2.60 0.40 93.76

502 49,600 - 49,700 3.24 2.60 0.40 93.76

503 49,700 - 49,800 3.24 2.60 0.39 93.76

504 49,800 - 49,900 3.24 2.60 0.39 93.77

505 49,900 - 50,000 3.24 2.60 0.39 93.77

506 50,000 - 51,000 3.24 2.60 0.39 93.77

507 51,000 - 52,000 3.23 2.59 0.39 93.79

508 52,000 - 53,000 3.22 2.59 0.39 93.80

509 53,000 - 54,000 3.22 2.58 0.38 93.82

510 54,000 - 55,000 3.21 2.58 0.38 93.83

511 55,000 - 56,000 3.20 2.57 0.38 93.84

512 56,000 - 57,000 3.20 2.57 0.38 93.86

513 57,000 - 58,000 3.19 2.56 0.37 93.87

514 58,000 - 59,000 3.19 2.56 0.37 93.89

515 59,000 - 60,000 3.18 2.55 0.37 93.90

221

Page 149: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

NO PERENCANAAN

FISIK (%)

MANAJEMEN KONSTRUKSI

(%)

PENGELOLAAN KEGIATAN

(%)

KONSTRUKSI FISIK

(%)

BIAYA TOTAL PEMBANGUNAN

(Dalam Jutaan Rupiah)

516 60,000 - 61,000 3.17 2.55 0.36 93.91

517 61,000 - 62,000 3.17 2.54 0.36 93.93

518 62,000 - 63,000 3.16 2.54 0.36 93.94

519 63,000 - 64,000 3.16 2.53 0.35 93.96

520 64,000 - 65,000 3.15 2.53 0.35 93.97

521 65,000 - 66,000 3.14 2.52 0.35 93.98

522 66,000 - 67,000 3.14 2.52 0.35 94.00

523 67,000 - 68,000 3.13 2.51 0.34 94.01

524 68,000 - 69,000 3.13 2.51 0.34 94.02

525 69,000 - 70,000 3.12 2.50 0.34 94.04

526 70,000 - 71,000 3.11 2.50 0.33 94.05

527 71,000 - 72,000 3.11 2.50 0.33 94.07

528 72,000 - 73,000 3.10 2.49 0.33 94.08

529 73,000 - 74,000 3.09 2.49 0.33 94.09

530 74,000 - 75,000 3.09 2.48 0.32 94.11

531 75,000 - 76,000 3.08 2.48 0.32 94.12

532 76,000 - 77,000 3.08 2.47 0.32 94.14

533 77,000 - 78,000 3.07 2.47 0.31 94.15

534 78,000 - 79,000 3.06 2.46 0.31 94.16

535 79,000 - 80,000 3.06 2.46 0.31 94.18

536 80,000 - 81,000 3.05 2.45 0.31 94.19

537 81,000 - 82,000 3.05 2.45 0.30 94.21

538 82,000 - 83,000 3.04 2.44 0.30 94.22

539 83,000 - 84,000 3.03 2.44 0.30 94.23

540 84,000 - 85,000 3.03 2.43 0.29 94.25

541 85,000 - 86,000 3.02 2.43 0.29 94.26

542 86,000 - 87,000 3.01 2.42 0.29 94.28

543 87,000 - 88,000 3.01 2.42 0.28 94.29

544 88,000 - 89,000 3.00 2.41 0.28 94.30

545 89,000 - 90,000 3.00 2.41 0.28 94.32

546 90,000 - 91,000 2.99 2.40 0.28 94.33

547 91,000 - 92,000 2.98 2.40 0.27 94.35

548 92,000 - 93,000 2.98 2.39 0.27 94.36

549 93,000 - 94,000 2.97 2.39 0.27 94.37

550 94,000 - 95,000 2.97 2.38 0.26 94.39

551 95,000 - 96,000 2.96 2.38 0.26 94.40

552 96,000 - 97,000 2.95 2.37 0.26 94.42

553 97,000 - 98,000 2.95 2.37 0.26 94.43

554 98,000 - 99,000 2.94 2.36 0.25 94.44

555 99,000 - 100,000 2.93 2.36 0.25 94.46

Catatan :

a.

b.

- Jarak 0 - 200 km sebesar 0,75 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak 200 - 300 km sebesar 0,86 dari harga Biaya Pengelolaan Kegiatan yang berlaku

- Jarak > 300 km sebesar 1,04 dari harga Biaya Pengelolaan Kegiatan yang berlaku

Untuk pekerjaan diluar bangunan gedung, biaya perencanaan dan pengawasan dapat dihitung tersendiri

sesuai dengan kebutuhan waktu dan tenaga / billing rate.

Untuk biaya kegiatan/pekerjaan dibawah 300 juta dapat diberlakukan nilai Biaya Pengelolaan Kegiatan

khusus dengan koefisien faktor pengali sesuai dengan jarak kegiatan/pekerjaan

222

Page 150: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.29 Tabel Prosentase Biaya Administrasi dan Persiapan dan Pelaksanaan

pada Kegiatan Fisik Selain Gedung Kantor/Rumah Dinas/Pagar

Pers + Adm Pelaksanaan Pers + Adm Pelaksanaan

SWAKELOLA Max 5% Min 95% Max 3,5% Min 96,5%

DIBORONGKAN Max 7% Min 93% Max 4% Min 96%

0 s/d 1 M > 1 MPola Penanganan

223

Page 151: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

3.30 Tabel Prosentase Biaya Administrasi, Persiapan dan Pelaksanaan pada Kegiatan Non Fisik

Pers+ Pelak- Pers+ Pelak- Pers+ Pelak- Pers+ Pelak-

Adm sanaan Adm sanaan Adm sanaan Adm sanaan

7% 6% 5% 4%

93% 94% 96% 96%

7% 6.5% 6% 5.5%

93% 93.5% 94% 94.5%

Pers+ Pelak- Pers+ Pelak- Pers+ Pelak- Pers+ Pelak- Pers+ Pelak-

Adm sanaan Adm sanaan Adm sanaan Adm sanaan Adm sanaan

4% 3% 2.5% 2% 1.5%

97% 97% 97.5% 98% 98.5%

5% 4.5% 4% 3.5% 3%

95% 95.5% 96% 96.5% 97%

>200 s/d 500 jt > 500 juta

Uraian Pekerjaan

> 50 s/d 75 juta>25 s/d 50 juta

Persiapan+

Administrasi Proyek

> 75 s/d 100 juta

Persiapan+

Administrasi Proyek

s/d 10 juta >10 s/d 25 juta

Pelaksanaan

> 100 s/d 150 jt >150 s/d 200 jt

Pelaksanaan

Pola

Pengelolaan

Pola

Pengelolaan

Swakelola

Diborongkan

(Pihak ke III)

Diborongkan

(Pihak ke III)

Swakelola

224

Page 152: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

A. UMUR BANGUNAN DAN PENYUSUTAN

a.

b.

c.

Umur bagunan adalah jangka waktu bangunan dapat tetap memenuhi fungsi dan keadaan

bangunan, sesuai dengan persyaratan yang telah ditetapkan. Untuk bangunan gedung negara

(termasuk bangunan rumah Negara) umur bangunan diperhitungkan 50 tahun.

3.31 PEMELIHARAAN BANGUNAN DAN PERAWATAN BANGUNAN GEDUNG/RUMAH DINAS/PAGAR

Penyusutan adalah nilai degradasi bangunan yang dihitung secara sama besar setiap tahunnya

selama jangka waktu umur bangunan. Untuk bangunan gedung negara, nilai penyusutan adalah

sebesar 2,00% per tahun untuk bangunan gedung dengan minimum nilai sisa (salvage value)

sebesar 20,00%.

Penyusutan bangunan gedung negara yang dibangun dengan konstruksi semi permanent,

penyusutannya sebesar 4,00 % per tahun, sedangkan untuk konstruksi darurat sebesar 10,00 %

per tahun dengan minimum nilai sisa (salvage value) sebesar 20,00%.

225

B. PEMELIHARAAN BANGUNAN

a.

b.

c.

Untuk lebih detailnya biaya pemeliharaan bisa disimpulkan sebagai berikut :

a. Biaya Pemeliharaan Bangunan Tidak Bertingkat (m2/tahun)

b.

Pemeliharaan bangunan juga merupakan upaya untuk menghindari kerusakan komponen/elemen

bangunan akibat keusangan/kelusuhan sebelum umurnya berakhir.

Besarnya biaya pemeliharaan bangunan gedung tergantung pada fungsi dan klasifikasi bangunan.

Biaya pemeliharaan per m² bangunan gedung setiap tahunnya maksimum adalah sebesar 2,00%

dari harga satuan per m² tertinggi yang berlaku.

Biaya Pemeliharaan Bangunan Tidak Bertingkat dengan Fungsi Khusus (m2/tahun)

Pemeliharaan bangunan adalah usaha mempertahankan kondisi bangunan agar tetap berfungsi

sebagaimana mestinya atau dalam usaha meningkatkan wujud bangunan, serta menjaga

terhadap pengaruh yang merusak.

2% x IHST

c. Biaya Pemeliharaan Bangunan Bertingkat (m2/tahun)

2% x IHST x Koefisien Fungsi Khusus

2% x IHST x Koefisien Tingkat

Page 153: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

d.

Catatan :

C. PERAWATAN / RENOVASI BANGUNAN

a.

1.

Perawatan bangunan adalah usaha memperbaiki dan atau mengganti kerusakan yang terjadi agar

bangunan dapat berfungsi dengan baik sebagaimana mestinya. Perawatan bangunan dapat

digolongkan sesuai dengan tingkat kerusakan pada bangunan yaitu;

Perawatan untuk tingkat kerusakan ringan.

Biaya Pemeliharaan Bangunan Bertingkat dengan Fungsi Khusus (m2/tahun)

Khusus untuk pemeliharaan gedung berupa pengecatan gedung, pelaksanaan untuk

pengecatan exterior adalah minimal 2 tahun sekali sedangkan untuk pengecatan interior

pelaksanaannya adalah minimal 3 tahun sekali.

2% x IHST x Koefisien Fungsi Khusus x Koefisien Tingkat

226

1.

2.

3.

b.

1. Tingkat Kerusakan Ringan

1.1

1.2

Besarnya biaya perawatan disesuaikan dengan tingkat kerusakannya, yang ditentukan sebagai

berikut ;

Perawatan untuk tingkat kerusakan ringan.

Kerusakan ringan adalah kerusakan terutama pada komponen non struktural, seperti

penutup atap, langit-langit, penutup lantai dan dinding pengisi

Perawatan untuk tingkat kerusakan sedang

Kerusakan sedang adalah kerusakan pada sebagian komponen non struktural, dan atau

komponen struktural seperti struktur atap, lantai dll.

Perawatan untuk tingkat kerusakan berat.

Kerusakan berat adalah kerusakan pada sebagian besar komponen bangunan, baik

struktural maupun non structural yang apabila setelah diperbaiki masih dapat berfungsi

dengan baik sebagaimana mestinya.

Penentuan tingkat kerusakan adalah setelah dilakukan penilaian oleh Dinas Ciptakaru.

Biaya Perawatan Bangunan untuk Tingkat Kerusakan Ringan (m2/tahun)

Biaya Perawatan Bangunan Tidak Bertingkat Dengan Fungsi Khusus Untuk Tingkat

Kerusakan Ringan (m2/tahun)

30% x IHST

1.3

Kerusakan Ringan (m2/tahun)

Biaya Perawatan Bangunan Bertingkat untuk Tingkat Kerusakan Ringan (m2/tahun)

30% x IHST x Koefisien Fungsi Khusus

30% x IHST x Koefisien Tingkat

Page 154: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

1.4

2. Tingkat Kerusakan Sedang

2.1

2.2

2.3

Biaya Perawatan Bangunan untuk Tingkat Kerusakan Sedang (m2/tahun)

Biaya Perawatan Bangunan Tidak Bertingkat Dengan Fungsi Khusus Untuk Tingkat

Kerusakan Sedang (m2/tahun)

Biaya Perawatan Bangunan Bertingkat untuk Tingkat Kerusakan Sedang (m2/tahun)

Biaya Perawatan Bangunan Bertingkat Dengan Fungsi Khusus Untuk Kerusakan

Ringan (m2/tahun)

30% x IHST x Koefisien Fungsi Khusus x Koefisien Tingkat

45% x IHST

45% x IHST x Koefisien Fungsi Khusus

227

2.4

3. Tingkat Kerusakan Berat

3.1

3.2

3.3

3.4

Biaya Perawatan Bangunan untuk Tingkat Kerusakan Berat (m2/tahun)

Biaya Perawatan Bangunan Tidak Bertingkat Dengan Fungsi Khusus Untuk Tingkat

Kerusakan Berat (m2/tahun)

Biaya Perawatan Bangunan Bertingkat untuk Tingkat Kerusakan Berat (m2/tahun)

Biaya Perawatan Bangunan Bertingkat Dengan Fungsi Khusus Untuk Kerusakan Berat

Biaya Perawatan Bangunan Bertingkat Dengan Fungsi Khusus Untuk Kerusakan

Sedang (m2/tahun)

45% x IHST x Koefisien Tingkat

45% x IHST x Koefisien Fungsi Khusus x Koefisien Tingkat

65% x IHST

65% x IHST x Koefisien Fungsi Khusus

65% x IHST x Koefisien Tingkat

3.4 Biaya Perawatan Bangunan Bertingkat Dengan Fungsi Khusus Untuk Kerusakan Berat

(m2/tahun)

Page 155: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

c.

Catatan :

1. IHST : Indeks Harga Satuan Tertinggi Bangunan

2. Indeks Bangunan Koefisien Khusus

No.

1

2

3

4

5

Koefisien Fungsi KhususBangunan Fungsi Khusus

1.20

1.10

1.10

1.25

ICU/ICCU/UGD/CMU RS

Ruang Operasi RS

Ruang Radiologi RS

Loundry/CSSD RS

Untuk perawatan yang memerlukan penanganan khusus atau dalam usaha meningkatkan wujud

bangunan, seperti melalui kegiatan renovasi atau restorasi (misal yang berkaitan dengan

perawatan bangunan gedung bersejarah), besarnya biaya perawatan dihitung sesuai dengan

kebutuhan nyata dan dikonsultasikan terlebih dahulu kepada Instansi Teknis yaitu Dinas

Ciptakaru.

228

5

6

7

8

9

10

11

12

3. Indeks Bangunan Koefisien Tingkat

No.

1

2

3

4

5

6

7

Laboratorium SLTP/SMU

UGB dan Prasarananya

Selasar Luar Beratap Bangunan

Bangunan 6 Lantai

Bangunan 7 Lantai

Bangunan 8 Lantai

1.197

1.236

1.265

Bangunan 2 Lantai

Bangunan 3 Lantai

Bangunan Berlantai

1.162

Bangunan 4 Lantai

Bangunan 5 Lantai

1.10

1.00

1.05

0.50

Power House 1.25

1.15

1.090

1.120

1.135

Koefisien Tingkat

Laboratorium RS

Workshop

Perawatan/Dapur RS

Asrama Perawat RS

1.00

1.00

Page 156: III. BIAYA JASA DAN PEMELIHARAANesbh.pekalongankab.go.id/download/file/Bab_III.pdfIII. BIAYA JASA DAN PEMELIHARAAN III. A. BIAYA JASA DAN SEWA 3.1 JASA 3.1.1 Jasa 3.1.1.1 Jasa Perawatan

D.

4.A Bangunan Pagar

a. Pemeliharaan Rutin/Tahun

b. Perawatan

1. Kerusakan Ringan

2. Kerusakan Sedang

3. Kerusakan Berat

Catatan :

IHST : Indeks Harga Satuan Tertinggi Bangunan Pagar

4.B Bangunan Rumah Dinas

Bangunan Rumah Dinas

7% IHST

30% IHST

45% IHST

60% IHST

6% IHST 8% IHST 7% IHST

30% IHST30% IHST30% IHST

45% IHST 45% IHST 45% IHST

60% IHST 60% IHST 60% IHST

PEMELIHARAAN DAN PERAWATAN PAGAR BANGUNAN GEDUNG DAN RUMAH DINAS

Depan Samp/Blk Depan Samp/Blk

Sederhana Tidak SederhanaKegiatan

Pagar Bangunan Gedung

229

a.

b. Perawatan

1. Kerusakan Ringan

2. Kerusakan Sedang

3. Kerusakan Berat

Catatan :

IHST : Indeks Harga Satuan Tertinggi Bangunan Rumah Dinas

E.

No.

1 Ground Cover

2 Pohon Perdu

3 Pohon

Catatan :

10.000 / m2

Harga hanya berlaku untuk pemeliharaan dan perawatan, tidak termasuk pembelian

bibit tanaman baru.

30% IHST

45% IHST

65% IHST

PEMELIHARAAN DAN PERAWATAN TAMAN M2/TAHUN

Jenis Taman Pemeliharaan dan Perawatan Rutin

45% IHST

65% IHST

30% IHST

45% IHST

65% IHST

30% IHST

45% IHST

65% IHST

30% IHST

45% IHST

65% IHST

30% IHST

45% IHST

65% IHST

30% IHST

60.000 / m2

20.000 / m2

Depan

7% IHST

Kegiatan

Bangunan Rumah Dinas

Tipe A Tipe B Tipe C

Pemeliharaan Rutin / Tahun 6% IHST 7% IHST

Samp/ Blk

DepanSamp/

BlkDepan

Samp/ Blk

6% IHST 7% IHST 6% IHST

Catatan :bibit tanaman baru.