Divest i turesInc. E N E R G Y S E R V I C E S1649 Westmount Rd. NW Calgary, Alberta T2N 3M2 Phone: 403 860 8692 www.nrgdivestitures.com

Divest i turesInc.Care IndustriesCare Industries

Page 2: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

M a r k e t e d B y : NRG Divestitures Inc.

1649 Westmount Rd. NW Calgary, Alberta T2N 3M2 Phone: 403 860 8692

www.nrgdivestitures.com

T i m i n g : Review of Documents August 10, 2016 to September 28 2016 Bid Deadline: September 28, 2016 4:00 p.m. MDT

F o r f u r t h e r i n f o r m a t i o n c o n t a c t : Mr. Arno A. Keller, President Cell: 403 860 8692 Email: [email protected] Mr. Clem Baier, V P Business Development Cell: 587 877 9846 Email: [email protected]

Mr. Kirby Tindall, V P Business Development Cell: 780 243 5776 Email: [email protected]

D i s c l a i m e r The materials presented herein, reflect what is thought to be the current and accurate data, provided by the vendor. In the event that an inaccuracy is found, Company or NRG Divestitures Inc. may not be held liable. Included in the materials are statements based on interpretation and judgement. Anyone reviewing the marketing materials is encouraged to conduct their own investigations into the subject assets, in order to come to their own interpretations and conclusions, before proceeding.

EQ

UI

PM

EN

T D ivest i turesInc.

Page 3: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

Rig #9

C o n t e n t s

Backyard Equipment Package

Items Description

Section 1.0 Substructure & Accessories

Section 2.0 Catwalk

Section 3.0 Overhead Equipment

Section 4.0 Mud Pump

Section 5.0 Mud Tank

Section 6.0 Generators/Combination Building

Section 7.0 Well Control

Section 8.0 Casing Stabbing Board

Section 9.0 Water / Fuel Tanks

Section 10.0

Section 11.0

Tubulars

Handling Tools

Page 4: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 1 Te l e s c o p i n g S u b s t r u c t u r e & A c c e s s o r i e s

SECTION 1 ‐ TELESCOPING SUBSTRUCTURE & ACCESSORIES

1.1 TELESCOPING SUBSTRUCTURE API 4F 4th EDITIONP Rotary capacity 425,000 lbsP Setback capacity 300,000 lbsP Height 16’P Certified plaque engraved with A.P.I monogram 4F 4th Edition, PSL 1, E2/U2P Four hydraulic rams to raise and lower sub structureP Two hydraulic rams to raise and lower side floor wingsP Hydraulic controls six valve bank with flow dividerP Install two snub posts in between main hole and mouse holeP Install BOP handling system for 11” x 5000 PSI stack 1.2 ROTARY TABLEP Supply and install one 17 1/2”Hecker or American Block rotary tableP Rotary Table c/w split Master bushing and insert bowl.P Supply and install rotary torque system 1.3 CHAIN CASE FOR ROTARYP Supply and install drop down chain case from rotary 1.4 ELECTRICALP Supply and install (three) four foot explosion proof fluorescent lights in cellar area 1.5 T SILLP Fabricate and supply 40’ t sill with all lugs to support the free standing mast 1.6 RAMPP Fabricate and supply ramp with 4” welded pump line running down the side

Page 5: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 2 , 3 , C a t w a l k , B l o c k , S w i v e l

SECTION 2 - Catwalk/V-Door 2.1 CATWALK / V‐DOOR 2.1 CATWALK /V‐DOOR P Supply 45 ft. catwalk wit fold up v‐door with pipe cut out

SECTION 3 – Overhead Equipment 3.1 BLOCK / HOOKP Supply 160 TON TSM BLOCK / HOOK COMBINATIONP Four each 30” sheaves for 1” drill line

3.2 SWIVELP Supply 150 TON TSM Rotary SwivelP Swivel c/w Kelly spinner standP Quill sub 4 ½” Reg. left hand thread – 6 5/8” Reg. Left

Page 6: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 4 M u d P u m p

Page 7: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 4 M u d P u m p

SECTION 4 ‐ MUD PUMP

4.1 DIESEL ENGINEP Supply (1) one Caterpillar C‐15 series engines rated at 540 HP

4.2 PUMP DRIVEP Supply and install one Allison OFS 4700 Transmission

4.3 PUMP #1P Supply one new Gardner Denver PZ‐7 mud pump

4.4 MUD PUMPS SKID & ACCESSORIESP Total building dimensions to be 37’ long 12’ wideP Supply one oilfield skid 40’ X 12’ using 4 beam 12”@50 lbP Install ¾”X 7” strapping on bottom of skid runnersP Cross members 10” @ 33 LB flooring to be 3/16” checker plateP Supply and install pump with 4” valve, 2” pop valve, 2” bleeder valve and type D mud gaugeP Supply one precharge pumps 60 hp 6 X 5 X 11 with suction screensP Fabricate all precharge and suction lines from mud tankP Fabricate all high pressure lines on skids. Pressure test chart and x‐ray done on all high pressure linesP Supply 5000 PSI shock hose in between pump and ramp with integral endsP Supply one liner wash pump and liner wash tank with plumbingP Supply one K20 dampener and crossP Supply and install one diesel day tank with hosing for circulating system

4.5 ELECTRICALP Supply and install (4) four foot fluorescents in each buildingP Supply and install one distribution panel

4.6 PAINTP Mud Pump skid has been painted avocado green

Page 8: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 5 M u d Ta n k

Page 9: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 5 M u d Ta n k

SECTION 5 ‐ MUD TANK

5.1 MUD TANK SPECIFICATIONSP Total tank dimensions to be 50’ long 12’ wideP One oilfield skids 53’ X 7’10” using three beam 12” @ 50 lb.P Cross members 10” @ 33 lb with 1/4” formed plate flooringP Walls on tank corrugated 1/4” plate tank perimeter tbg frameP Fabricate 11 gauge building over top of mixing hopper and pumpsP Fabricate and install hopper door access on side of mix buildingP Supply and install exhaust fanP Fabricate and install two doors on front of mud mix buildingP All unions for piping on tanks will be hammer styleP All suction lines will have bridge gate valves and be sumpedP Supply and install 30” poor boy degasserP Suction lines inside tank 10” for pump and 6” for mixingP One 4” mud roll line with 2” mud gunsP One 6” hopper lines with buttery fly valvesP One discharge manifold for both pumps

5.2 TANK CAPACITIESP Pill tank 30 bbls.P Suction tank 120 bbls.P Settling tank 105 bbls.P Settling tank 110 bblsP Shaker tank 100 bbls.P Sand trap 10 bblsP Trip tank 25 bbls.

5.3 EQUIPMENTP One DFTS mud conditionerP Mud cleaner consist of 16 cone Desilter and 2 cone DesanderP Three MA – 10 hp 380 volt RG mud agitatorsP Supply and install five jet gunsP Supply and install single hopper mixing systemP One 8” X 6” X 14” 60 HP 460 volt overhead motor driven by belts for Mixing pumpP Two 6” x 5” x 11” 50 HP 380 volt overhead motor driven by belts (Desilter & Desander pumps)P One explosion proof 10 HP trip tank pump

5.4 ELECTRICALP Supply and install four fluorescent lighting on telescoping postsP Supply and install all electrical hard wiring and jumper cords ‐ 9 ‐P Supply and install distribution panel at mixing end of tankP Supply remote switch for trip tank pump to driller’s panel

5.5 PAINTP Mud Tank skid has been painted avocado green

Page 10: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 6 G e n e r a t o r s / C o m b i n a t i o n B u i l d i n g

Page 11: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 6 G e n e r a t o r s / C o m b i n a t i o n B u i l d i n g

SECTION 6 ‐ Generators / Combination Building

6.1 DIESEL ENGINEP Supply Two Caterpillar C‐15 engine rated at 540 HP

6.2 GENERATORSP Supply Caterpillar generator prime power is (50Hz) 355 kW

6.3 ELECTRICALP Supply one transfer switch 600 ampsP Supply one 380 Volt panels with pin and sleeve plugsP Supply one 380/222 panel with pin and sleeve plugs with 100 amp outlet for lease accommodation shacksP Supply and install plug box on building for cord endsP Supply spare starters and plug in for 60 HP and 30 HPP Supply and install four foot fluorescents inside buildingP Supply and install two sodium vapour lights on roofP Supply all extension cords from gen building to outside support buildings

6.4 BUILDING P Fabricate triple beam skid 48’ long x 16’‐6” wide from 12” beamP Install 6” roll ends and cover entire skid with 3/16” checker plateP Shear, form and stand building 45’ long x 12’‐6” wide x 8’6” highP Install tubing roof perimeter and sloped roof panelsP Install (3) divider walls inside building for (3) separate roomsP Supply and install steel doors/frames into each roomP Fabricate 2 ft. wide cable tray on top of combination buildingP Install 6x4 bumper posts on both ends of skid

6.5 LIGHTPLANT ROOMP Lightplant room is 12’ wide x 20” longP Supply and install (2) two Caterpillar C‐15 – 355 kW, 380V, 3 phase diesel generatorsP Fabricate and install 140 gallon fuel tank in corner of roomP Supply and install Sullivan Palatek 30 hp rotary screw air compressor with 120 gallon tankP Install hinged door on side of building for electrical cabling access.

6.6 ACCUMULATOR ROOMP Accumulator room is 12’ 6” long x 12’ wide and 8’ 6”P Supply and install 4 station 120 gallon Control Technology AccumulatorP 10 each 11 gallon accumulator bottlesP One T‐25 Weatherford triplex charge pumpP Two 8 ½”, 40:1 air pumps6.7 PAINTP Combination building has been painted gray

Page 12: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 7 ‐ W e l l C o n t r o l

SECTION 7 ‐ Well Control

7.1 CHOKE MANIFOLDP Oilfield skid dimensions to be 10’ long 6’ wide.P Supply one single gut 2” X 3” choke manifold c/w manual choke

7.2 BLOWOUT PREVENTORSP Supply one 11” 5000 PSI new Cameron Townsend T‐84 double ram preventer with one set 3 ½” rams and one set of blind rams

7.3 ANNULARP Supply one 11” 3000 PSI new Cameron (Townsend) T‐90 Annular

C h o k e M a n i f o l d

Page 13: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

S e c t i o n 7 ‐ W e l l C o n t r o l

7.4 BOP ACCESSORIESP Supply one 3 1/8” SS flanged 30’ 5000 PSI choke hoseP Supply one adapter spool 11” x 5,000 psi – 11” x 3,000 psiP Supply one 11” 5000 PSI drilling spool with 3 1/8” outletsP Supply one 3 1/8” 5000 PSI HCR gate valve (hydraulic)P Supply and install 3 1/8” 5000 PSI manual gate valveP Supply two 2 1/16” 5000 PSI manual gate valveP Supply one 2 1 /16” 5000 PSI check valveP Supply one DSA 2 1/16” X 3 1/8”P Supply all studs and ring gaskets

Page 14: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

SECTION 8 ‐ Casing Stabbing Board

8.1 CASING STABBING BOARDP Air operated casing stabbing board.

S e c t i o n 8 C a s i n g S t a b b i n g B o a r d

Page 15: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

SECTION 9 ‐ Water / Fuel /Change House Skid

9.1 WATER TANKP Supply 100 barrel skid mounted water tankP Supply and install two 4 x 3 Centrifugal transfer pumpsP Supply and install discharge and suction manifoldsP Tank will be built from ¼” plateP Tank access hatch and drain plug

9.2 FUEL TANKP Supply skid mounted fuel tank 100 barrelsP Supply and install two 3/4 hp 110v fuel pumps 1 ¼” X 1”P Supply and install discharge and suction manifoldsP Supply one fuel water and solids separatorP Tank will be built from 1/4” plateP Tank access hatch, drain plug and sight glass

9.3 CHANGE HOUSEP Change room is 12’ wide x 12’ 6” longP Fabricate and install fold down lunch tableP Supply and install padded benchP Supply and install 12 change lockers

S e c t i o n 9 W a t e r / F u e l / C h a n g e H o u s e S k i d

Page 16: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

SECTION 10 ‐ Kelly Bar & Bushings

10.1 KELLY BAR & KELLY DRIVE BUSHINGSP Supply 100 barrel skid mounted water tankP Supply and install two 4 x 3 Centrifugal transfer pumpsP Supply and install discharge and suction manifoldsP Tank will be built from ¼” plateP Tank access hatch and drain plug

SECTION 11 – Handling Tools

11.1 HANDLING TOOLSP Handling tools are located in Houston, TexasP Please see separate attached list

S e c t i o n 1 0 K e l l y B a r D r i v e B u s h i n g s

S e c t i o n 1 0 H a n d l i n g To o l s

Page 17: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

EQ

UI

PM

EN

T Divest i turesInc.C A R E I n d u s t r i e s

Page 18: iestitures In Industries... · P Supply and install 30” poor boy degasser P Suction lines inside tank 10” for pump and 6” for mixing P One 4” mud roll line with 2” mud guns

March 2019

D ivest i turesInc.E N E R G Y S E R V I C E S

1649 Westmount Rd. NWCalgary, Alberta T2N 3M2

Phone: 403 860 8692

www.nrgdivestitures.com