IENG 217Cost Estimating for Engineers
Life Cycle
Life Cycle Costing
LCC is concerned with Pay Now or Pay Later
Examples Energy efficient building vs traditional heating/cooling Brick dormitory vs throw away Car buying Obsolete electronic components for airplane
Last time buy vs redesign
Life Cycle Costing
Design, development, and engineering Initial capital investment and financing Operation, maintenance, and functional use Replacement Alteration, refurbishing, and improvement Salvage and retirement
Life Cycle Costing
Two major concerns Annual Deterioration Obsolescence
What is the life cycle? Truck tires might be 30,000 miles Crane engine might be 50,000 hours of use Public works might be 30-60 years Product might be 5-10, 1-3, 0.5-1 year
Estimating Costs
(hrs) timeoperting scheduled SOH
timecyleemaintenancpreventive
where
timecyclePM
SOH
actionsPM
Estimating Costs
(hrs) timeoperting scheduled SOH
timecyleemaintenancpreventive
where
timecyclePM
SOH
actionsPM
repairtotimemean
failuresbetweentimemean
laboremaintenancofcost
)(MTBF
SOH
($) emaintenanc correctivefor cost
MTTR
MTBF
C
where
CMTTR
C
m
m
cm
LCC Estimates (Assumptions)
Cost Elements Concrete Pumping Equip. Element Amount Equipment Cost 1,000,000Service before Overhaul (yrs) 4Overhaul Cost 200,000Service life after Overhaul (yrs) 3Concrete Pumping hrs (annual) 3,000Salvage value (% of IC) 10.0%Periodic maintenance (% of IC) 3.0%Spare parts, tire replacement 10,000Hourly labor cost 30Fuel, Oil, (per oper hr) 15Cleanup material (annual $) 5,000MARR 15.0%
LCC Estimates (Analysis)
LCC Analysis for Concrete Pumping (175 yd3)
Element Yr 0 Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7Equipment 1,000,000Labor 90,000 90,000 90,000 90,000 90,000 90,000 90,000Equipment Operation 45,000 45,000 45,000 45,000 45,000 45,000 45,000Maintenance 30,000 30,000 30,000 30,000 30,000 30,000 30,000Tires, Spare parts 10,000 10,000 10,000 10,000 10,000 10,000 10,000Cleanup Material 5,000 5,000 5,000 5,000 5,000 5,000 5,000Overhaul 200,000Salvage Value (100,000)Total Cash Flow 1,000,000 180,000 180,000 180,000 380,000 180,000 180,000 80,000Discount Factor 1.00 0.87 0.76 0.66 0.57 0.50 0.43 0.38Discounted Cash Flow 1,000,000 156,522 136,106 118,353 217,266 89,492 77,819 30,075Total LCC (Cumulative) 1,000,000 1,156,522 1,292,628 1,410,981 1,628,247 1,717,739 1,795,558 1,825,632
LCC Estimates Cost Elements Concrete Pumping Equip. Element Amount Equipment Cost 1,300,000Service before Overhaul (yrs) 4Overhaul Cost 250,000Service life after Overhaul (yrs) 3Concrete Pumping hrs (annual) 3,000Salvage value (% of IC) 10.0%Periodic maintenance (% of IC) 2.0%Spare parts, tire replacement 10,000Hourly labor cost 30Fuel, Oil, (per oper hr) 15Cleanup material (annual $) 5,000MARR 15.0%
LCC Estimates
LCC Analysis for Concrete Pumping (200 yd3)
Element Yr 0 Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7Equipment 1,300,000Labor 90,000 90,000 90,000 90,000 90,000 90,000 90,000Equipment Operation 45,000 45,000 45,000 45,000 45,000 45,000 45,000Maintenance 20,000 20,000 20,000 20,000 20,000 20,000 20,000Tires, Spare parts 10,000 10,000 10,000 10,000 10,000 10,000 10,000Cleanup Material 5,000 5,000 5,000 5,000 5,000 5,000 5,000Overhaul 250,000Salvage Value (130,000)Total Cash Flow 1,300,000 170,000 170,000 170,000 420,000 170,000 170,000 40,000Discount Factor 1.00 0.87 0.76 0.66 0.57 0.50 0.43 0.38Discounted Cash Flow 1,300,000 147,826 128,544 111,778 240,136 84,520 73,496 15,037Total LCC (Cumulative) 1,300,000 1,447,826 1,576,371 1,688,148 1,928,285 2,012,805 2,086,300 2,101,338
LCC Estimates
LCC Analysis
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
0 2 4 6 8
Life Cycle
Dis
cou
nte
d C
ash
Flo
w
175 AOC
175 Cum
200AOC
200 Cum