1 -1- IEEE/PES Substation Committee - GIS Subcommittee T&D Chicago GIS IEEE/PES Substation Committee - GIS Subcommittee Substations Committee GIS Subcommittee K2 Module Gas Insulated Substation (GIS) Basics Development and Manufacturing IEEE -2- IEEE/PES Substation Committee - GIS Subcommittee T&D Chicago GIS IEEE/PES Substation Committee - GIS Subcommittee Contents GIS Basics A Development and Manufacturing B Typical GIS Layout C Testing D Installation and Commissioning E Operation and Maintenance

IEEE Substations Committee GIS Subcommittee K2 Module Gas ...ewh.ieee.org/conf/tdc/D_08TD-GIS-Manufacturing-2008-04-15-Mark.pdf · Substations Committee GIS Subcommittee K2 Module

Embed Size (px)

Citation preview

1

- 1 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Substations CommitteeGIS Subcommittee K2

ModuleGas Insulated Substation (GIS)

BasicsDevelopment and Manufacturing

IEEE

- 2 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

A Development and ManufacturingB Typical GIS LayoutC TestingD Installation and CommissioningE Operation and Maintenance

2

- 3 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

A Development and Manufacturing

- 4 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Development and ManufacturingSteps of development

Manufacturing processAssemblyQuality assurance

Production and design testsMechanicalGas tightnessElectrical

3

- 5 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Steps of DevelopmentMore than 40 Years of Experience

• 1995: First 420 kV circuit-breaker with only one interruptingchamber per pole

• 1976: Delivery of first 550 kV GIS

• 1974: Delivery of first 420 kV GIL Gas-Insulated Busbar (GIL)

• 1968: Delivery of first GIS

• 1960: Start of fundamental studies in research and development of SF6-technology

• 1979: Delivery of first 800 kV GIS

more than 60.000 bays in over 6.000 substations installed world-wide

- 6 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Steps of DevelopmentEvolution of GIS Design

550 kV in1983

420 kV in 2007230 kV in 1995

345 kV in 1970

4

- 7 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Huge reduction in size of equipment 245kV

B105

F35/B65

- 8 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Steps of DevelopmentProgress of GIS Development (145 kV)

0

10

20

30

40

50

60

70

80

90

100

110

68 70 72 74 76 78 80 82 84 86 88 90 92 94 96 98Year

[%]

Size of buildingSpace requirementShipping volume

5

- 9 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

GISGIS

AISAIS

GIS vs. AIS

- 10 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

National Grid-Ward Hill

Interrupting Current: 50 kA

Continuous Current: 3000 A

Max Rated Voltage: 362 kV

# of CB: 11

6

- 11 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessGIS Factory

Production of maincomponents:

Insulating Parts/Vessels/DriveComponents

• Assembly(clean area)

• Test lab• Training center

- 12 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessInsulating Parts: Cast Resin

Preparation of ElectrodesVacuum Casting

7

- 13 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Machining:Computer-controlledmachine center CMCfor GIS housings

Manufacturing ProcessPrefabrication – Housings/Components (1)

- 14 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessGIS Hydro Static Factory Testing

8

- 15 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Painting• Inside and outside• Colour outside

acc. to customersspecification

Example:Aluminum-pressure vessel

Manufacturing ProcessPrefabrication – Painting

- 16 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessPreassembly – Interrupter Units

PreassemblyExample:GIS-interrupter unit 420 kV

9

- 17 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessPreassembly – Hydraulic Drive Unit

PreassemblyPreassembled and pretested components

Example:Hydraulic drive forGIS 420 kV

- 18 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Manufacturing ProcessAssembly – Main Assembly Hall

Main AssemblyCircuit-breaker and switchgearassembly“clean room“

Example:GIS Bays 245 kV

10

- 19 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

B Typical GIS Layout

- 20 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

66 ’

13 ’

Typical GISRing Bus Arrangement, indoor

Typical Ring 4 Arrangement Single Phase Insulated138 kV, 40 kA, 3150 ASF6/Air Bushings

30 ’

40 ’

11

- 21 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Typical GISRing Bus Arrangement, outdoor

Typical Ring 4 Arrangement Three Phase Insulated138 kV, 40 kA, 3150 ASF6/Air Bushings

25 ’

42 ’

- 22 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Typical Ring 4 Arrangement Three Phase Insulated138 kV, 40 kA, 3150 ACable Connections

Typical GISCompact Ring Bus Arrangement

12

- 23 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

C Testing

- 24 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Design TestsHigh Voltage and Mechanical tests

Dielectric testing of a transportation unit

245 kV/50 kA, 4000 A

1998

13

- 25 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Design TestsTemperature Rise

High VoltageTemperature-riseTestingby applying current to theconductors• up to 6 kA • 1 and 3-phase• 16 2/3 Hz up to 60 Hz

Example:170 kV GIS

- 26 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Type TestingSeismic Test

Three axis seismic testingof a transportation unit

550 kV/63 kA, 4000 A

1992

14

- 27 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Design TestsLong Duration

Long-duration tests on post insulators withincreased voltagestress

- 28 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

D Installation and Commissioning

15

- 29 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Installation and CommissioningShipping and Transportation

Complete Bay foroperating voltage245 kV being unloadedat site

245 kV/40 kA, 4000 A

1998

- 30 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Installation and CommissioningShipping and Transportation

Example:GIS Double-Bay Unit 170 kV as onetransportation unit

16

- 31 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Unloading at site and transport to the switchgear room

Installation and CommissioningUnloading

- 32 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Placing into the switchgear room with two simple lift trucks

Installation and CommissioningUnloading

17

- 33 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

ContentsGIS Basics

E Operation and Maintenance

- 34 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

OperationsDisconnect Switch Position Indicator (1)

18

- 35 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

OperationsTypical View Port of 550 kV GIS

- 36 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

OperationsView Port with Endoscope

19

- 37 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

SF6 Density Monitor Example: Trafag

Arun

Dilo Type

- 38 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

20

- 39 -

IEEE/PES Substation Committee - GIS Subcommittee

T&D Chicago GIS

IEEE/PES Substation Committee - GIS Subcommittee

Thank you for your attention.Any Questions?