2
 10 IEDC SSGI ShriShankaracharya Groupof Institutions InnovationandEntrepreneurshipDevelopme ntCentre  Download from www.iedcssgi.org Title of the Project: Name of Applicant(s) S.no Name Phone Email Team Leader  1. THE BUSINESS (A) The product/service/idea: (300 words) (B) Technology behind the product of the service: (700 words) (C) Possible innovation at a later stage: (200 words) (D) Scalability: (100 words) (E) The market (the size of the market and its growth potential(100 words) 2. THE TEAM (A) Brief description of each member of the team stating qualification and other details (i) Name of team members : 1. (ii)Details of team members:  Name College Branch Course pursuing Semester Participation/Achievements/awards interest/skills (B) Whether any mentor has been identified or not: Name & Designation of the Mentor: Relevant qualification & Experience: (C) Whether any preliminary discussion has been done with the mentor: (D) Whether any of the team members participated in any entrepreneu rship related programmes: - Annexure-1 Project Application Form (Phase I) 

Iedc Ssgi Guidelines 2013(1)_1

Embed Size (px)

Citation preview

7/23/2019 Iedc Ssgi Guidelines 2013(1)_1

http://slidepdf.com/reader/full/iedc-ssgi-guidelines-201311 1/2

 

10

IEDCSSGIShriShankaracharya Groupof Institutions

InnovationandEntrepreneurshipDevelopmentCentre

 

Download from www.iedcssgi.org

Title of the Project:

Name of Applicant(s)

S.no Name Phone EmailTeam Leader  

1. THE BUSINESS

(A) The product/service/idea: (300 words)

(B) Technology behind the product of the service: (700 words)

(C) Possible innovation at a later stage: (200 words)

(D) Scalability: (100 words)

(E) The market (the size of the market and its growth potential(100 words)

2. THE TEAM

(A) Brief description of each member of the team stating qualification and other details

(i) Name of team members : 1.

(ii)Details of team members:

 Name

College

Branch

Course pursuing

Semester

Participation/Achievements/awards

interest/skills

(B) Whether any mentor has been identified or not:

Name & Designation of the Mentor:

Relevant qualification & Experience:

(C) Whether any preliminary discussion has been done with the mentor:

(D) Whether any of the team members participated in any entrepreneurship related programmes: - 

Annexure-1Project Application Form (Phase I) 

7/23/2019 Iedc Ssgi Guidelines 2013(1)_1

http://slidepdf.com/reader/full/iedc-ssgi-guidelines-201311 2/2

 

11

IEDCSSGIShriShankaracharya Groupof Institutions

InnovationandEntrepreneurshipDevelopmentCentre

 

4. THE FINANCIAL REQUIREMENT 

(A) The cost of purchase of raw materials (provided break-up(*) below):

(B) The cost of contingencies:

(Electric charges, data transfer charges, stationary items etc)

(C) Product development cost:

(design and engineering, fabrication, tools etc)

(D) Any other expenditure:

(testing and commissioning of equipments and developed product, transport)

(E) Grand total:

(*) Break-up of budget for raw materials:(Please provide detailed justification of how you will use such device/ equipment in your

 project in separate sheet)

 Name of Equipment/material withspecifications

EstimatedCost

Justification

(also to be provided in brief in paragraphs)

(F) Justification in brief How every proposed component in above table will be used in

the project.(Be specific and to the point)