37
IEC IEC PROCESS & MONITORING SDN BHD (Co. Reg. No. 659239-A) Certified to ISO 9001:2008 MS ISO/IEC Guide 62:1999 QS 161220006 CB 05 MS No. 44 100 082371 Fabrication: Lot 3892, Jalan 4D, Kampung Baru Subang, 40150 Shah Alam. Tel/Fax : +603-7859 9263 IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 1 Office: The Centum Block C-03-21, Ara Damansara url : iecpm.com

IECPM Profile_ALL Updated March2016

  • Upload
    lw-wong

  • View
    137

  • Download
    2

Embed Size (px)

Citation preview

Page 1: IECPM Profile_ALL Updated March2016

IEC IEC PROCESS & MONITORING SDN BHD (Co. Reg. No. 659239-A)

Certified to ISO 9001:2008

MS ISO/IEC Guide 62:1999 QS 161220006 CB 05

MS No. 44 100 082371

Fabrication: Lot 3892, Jalan 4D, Kampung Baru Subang, 40150 Shah Alam. Tel/Fax : +603-7859 9263

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 1

Office: The Centum Block C-03-21, Ara Damansara url : iecpm.com

Page 2: IECPM Profile_ALL Updated March2016

Quality Policy Statement

n The Company is fully committed to meet any requirements ISO 9001 by providing :

TOTAL ENGINEERING SOLUTION MADE POSSIBLE THROUGH

The utilization of latest up-to-date technologies, reinforced by applying good engineering practices and continually improving the effectiveness of

our Quality Management System

ISO Certifications IECPM

62:1999 MS No. 44 100 QS 161220006 CB 05 082371

MS ISO/IEC Guide

10/16/2013 IECPM 2

Page 3: IECPM Profile_ALL Updated March2016

OUR CORE BUSINESS Design, Engineering, Build & Commissioning Services

E-House for FPSOs & Topside and- Structural Design & Analysis - Marine Onshore/Offshore HVAC Design -  Addressable Fire Alarm System -  Fire Suppression System (FM200/Inergen)

-  Local Equipment Room (LER) / Transportable Substations

-  Pre-Fabricated Building Technology - Process Safety Systems - Fire & Gas System

- Shutdown System

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 3

Page 4: IECPM Profile_ALL Updated March2016

EXECUTION SEQUENCE

ITB Design & Specifications

Reviews & Approvals

Process Input From Client

IEC PROCESS & MONITORING SDN BHD

Copyright Reserved © 20.0 5

Fabrication & Integration

Third Party Inspections /

Survey

Project Hand-Over

Class Endorsement (ABS/DNV/BV)

Final Documentation

Delivery & Site Installation

Functional Design Specifications

Site Commissioning

Operational Training

Page 5: IECPM Profile_ALL Updated March2016

PROJECT TRACKING & REPORTING

- Critical Path Method using MS Project - S-Curve with weighted percentage

completion summary - Fortnightly progress reports - Tracking SDRL - Photographic evidence during fabrication /

manufacturing - Document Transmittals

IEC PROCESS & MONITORING SDN BHD

Copyright Reserved © 20.0 ,

Page 6: IECPM Profile_ALL Updated March2016

E-HOUSE & CONTAINERISED SWITCHGEARS

STRUCTURAL DESIGN AND ANALYSIS The structure will be designed for a service life to be defined by the Client, without dry docking. The following load cases will be considered:-

- In Place Design Extreme (DEC) - In Place Design Operating Case - Environmental conditions (DOC) - Transportation (TRA) - Damage Case (DAM) - Lifting Condition (LC)

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 8

Page 7: IECPM Profile_ALL Updated March2016

E-HOUSES , CONTAINERISED & MOBILE SWITCHGEARS FOR

ONSHORE & OFFSHORE APPLICATIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 7

Page 8: IECPM Profile_ALL Updated March2016

A – Design Supply & Install B – Includes Switchgears C – Project Management & Supervision D – Upgrade & Modify

E-House Projects Implemented 1 of 2

Project Fabricated at Client Work Scope Year Complete d

East Fortune FPSO Nortechs Pte Ltd Dry Docks Singapore

A, B & C Nov 2008

E-House for Ruby 2 FPSO

A, B & C DPS Bristol MMHE Pasir Gudang

May 2009

Bukit Gambir Penang Modular Power Sub-Stations

Subang, Selangor A & C Schneider Electric Malaysia Sdn Bhd March

2011

MOPU Rubicone for Bekok-C Offshore

C & D Gryphon Energy/ Petronas Carigali Oct 2011 ST Marine Tuas

Singapore

Exxon Mobil Tapis-A EOR

Steelcon Port Klang A & C Offshore-Industries Malaysia Sdn Bhd Jan 2013

PTSC LamSon Vietnam

C WWE Batam Indonesia Dec 2012-

Kongsberg Marine Engineering Pte Ltd

Petrofac UDTP Petronas INSTEP Training Facility

A & C WWE Batam Indonesia Feb 2014

10/16/2013 IECPM 4

Page 9: IECPM Profile_ALL Updated March2016

A – Design Supply & Install B – Includes Switchgears C – Project Management & Supervision D – Upgrade & Modify

E-House Projects Implemented 2 of 2

Project Fabricated at Client Work Scope Year Complete d

Substation on Trailers Units

IECPM Fab-Yard A, C Toshiba Distribution/ Tenaga Nasional Berhad (TNB)

Dec 2013 -

10/16/2013 IECPM 4

Page 10: IECPM Profile_ALL Updated March2016

Offshore LERs by IECPM

LER – Local Equipment Room – Tapis A

IEC PROCESS & MONITORING SDN BHD 10/16/2013 Copyright Reserved © 2013 11

Page 11: IECPM Profile_ALL Updated March2016

MODULAR SUB-STATIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2014

Page 12: IECPM Profile_ALL Updated March2016

MODULAR ON-SHORE SUBSTATION

Page 13: IECPM Profile_ALL Updated March2016

E-Houses for Offshore & FPSO

LamSon E-House E-House Walk-Thru Video

http://www.youtube.com/watch?v= ytvc9SXToyM

IECPM-PT WWE © 2013 10/16/2013 12

Page 14: IECPM Profile_ALL Updated March2016

E-HOUSE & CONTAINERISED SWITCHGEARS

TYPICAL DESIGN AND CONFIGURATIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 9

Page 15: IECPM Profile_ALL Updated March2016

E-HOUSE & CONTAINERISED SWITCHGEARS

TYPICAL DESIGN AND CONFIGURATIONS

Click-on Videolink

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 10

Page 16: IECPM Profile_ALL Updated March2016

ER SUB

TRAILERSUB-STATIONS U B - S T A T I O N S

2600 • 6015 7600

WNW CWININ SOZ Axes ,"

D W G

3311/ C-06 2071(17000.1St zra

tro

M N N. EOUIPMENT SCHEDULC

71573 I W O 9 1 1111.

ACO 11w CNC 210117W050

Is

I t

IV

13

I .

11

1

>

I N V

GENERAL ARRANGEMENT—PLAN VIEW 33kV/11kV MOBILE SUBSTATION

O.Tour. .

WNW NO SRL POVER aT c110•400050 MOW 110 NIT A 010=i010 /0010- W11 NT II ITOZOOD)

ANOWAC 0002 ACW02215

CV 330 - A TO1W2213

C V 3 N f - I

·  IIPM. A WWITICW3

CV INF - I

Cf. INS - C WW02215 WC ' IKOW023)3

GWEN OWE I1111 •9101IS

ONW 0.0Of FI)C-3001 COT BARE - A

FCC-X02 CAT DTA( - I

AIC 0•002601t - A A/C CONENOR -

110-510 MUT OIl - A 3:0100202)

WNW DII - 2:010107)

1

I N .

N N W , 1610-300

I•1

X011092275

1Di ONSOC1215

TM

WC-GN1 WCW02

ITA 1111.

W.

“0400920 NICONCTIG)

93 • 5) V

A T

X V

JIl IM a l ITO

a . a .

15

IEC PROCESS & MONITORE% SD/4 BED Copyright Raerval 0 2014

Page 17: IECPM Profile_ALL Updated March2016

TRAILER SUB-STATIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2014

Click-on Videolink

Page 18: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

18

E-HOUSE & CONTAINERISED SWITCHGEARS

ADDRESSABLE FIRE DETECTION SYSTEM

n  Integrated into the E-house to enable early detection of fire and/or presence of combustible gas

n  E-House divided into different areas which controlled by individual loop drivers

n  A single point of failure of any loop driver will not affect the functionality of detectors located in other area

n  Safety Interlocking with HVAC system and Client’s F&G system

Page 19: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

19

E-HOUSE & CONTAINERISED SWITCHGEARS

FIRE SUPPRESSION SYSTEM

Source: NFPA (2003), ‘FIRE PROTECTION HANDBOOK’, pg. 2-83.

Page 20: IECPM Profile_ALL Updated March2016

TOTAL SOLUTIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

Page 21: IECPM Profile_ALL Updated March2016

IECPM 21

MOPU Rubicone

Page 22: IECPM Profile_ALL Updated March2016

IECPM 22

Online@ Bekok-C

Page 23: IECPM Profile_ALL Updated March2016

Capacity – Main Equipments SLUG CATCHER EXPORT BOOSTER COMPRESSORS A/B Design Press/Temp : 95 BARA/100 degr.C Operating Press/Temp : 66 BARA/34 degr.C Dimension s : Upper – 1829 (OD) x 9144 (S) mm PRODUCTION SEPARATOR Design Press/Temp : 100BARA/100 degr.C Operating Press/Temp. : 33.3 BARA/58degr.C Dimension : 1829 (ID) x 4572 (S/S) mm

Design Criteria GLYCOL CONTACTOR A/B Gas Processing up to 200 mmscfd @ 6 lbs/mmscfd water content Design Press/Temp : 100BARA/100 degr.C Gas Compressor up to 165 mmscfd @ min 85% reliability Operating Press/Temp. : 66 BARA/34degr.C Liquid Processing : 5 kbd Dimension : 1118 (ID) x 8382 (S/S) mm HEAT EXCHANGER Design Press/Temp : 95BARA/93 degr.C Operating Press/Temp. : 66 BARA/ 42(IN)/40(OUT) degr.C

IECPM

Page 24: IECPM Profile_ALL Updated March2016

IECPM

System Architecture

Page 25: IECPM Profile_ALL Updated March2016

IECPM

Layout – Main Deck Controls

Page 26: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

MCC Drawers Form IV-A

MCC Switchgears for Topside Process (Marine Grade)

Production Floor for Form IV-A Drawers

Page 27: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

Integrated Testing of PCS/SDS/FGS and

Remote Fiber-optic link to CCR SCADA

Servers

Typical Process MIMIC

Preparation for FAT at factory

SIL-3 FGS System

Page 28: IECPM Profile_ALL Updated March2016

IECPM

Layout – Roof Deck MTUs

Emergency Gen-Set Room

Page 29: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

29

GAS FIRED BURNERS &

HEATER SYSTEM

Page 30: IECPM Profile_ALL Updated March2016

Projects Installed in Malaysia by TFI S.R.l Milan, Italy

Year Project Client Equipment1997 EET Parigi F Technip Malaysia Flare Ignition & Control, Heaters & Flare

Tips 1998 Acetyl Project Acetyl Malaysia Flare Tip & Ignition Control

2004 Sarawak Shell Global Process System Duplex System & ACCE

2005 Sarawak Shell Global Process System Simplex Burners for WBH

2006 Sarawak Shell Global Process System Triplex Unit

2007 Miri Crude Oil Terminal IEC Process (IEC) Slop Oil Heater

2009 Vietnam IPS Malaysia Triplex 665AT

Page 31: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

31

GAS FIRED BURNERS & HEATER SYSTEM

TYPICAL BURNER TYPES

Tri-Fuel

Dual Fuel Heat Recovery System Slop Oil Heater

Page 32: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

32

GAS FIRED BURNERS & HEATER SYSTEM

FUEL GAS SKIDS & ACCESSORIES

Fuel Gas Skid System Burner System

SS310RadiantCoilSupport

PilotIgnitor PurgeBlowerSystem Burner Management System

Page 33: IECPM Profile_ALL Updated March2016

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010

33

GAS FIRED BURNERS & HEATER SYSTEM

SLOP OIL HEATER SYSTEM FABRICATION & INSTALLATION IN MALAYSIA

RadiantCoil

Radiant Section Convection Section c/w Coil Assembly Chimney Stack

Installation at Miri Sarawak Site

Page 34: IECPM Profile_ALL Updated March2016

PREFAB BUILDING APPLICATIONS

IEC PROCESS & MONITORING SDN BHD Copyright Reserved © 2010 7

Page 35: IECPM Profile_ALL Updated March2016

Modular Building Systems

Page 36: IECPM Profile_ALL Updated March2016

Pre-Fabricated Buildings (Typical Construction)

Page 37: IECPM Profile_ALL Updated March2016

Expanding the horizon….

• ValueAddedProductsandServices

• Training&creaBonofJobOpportunityforlocalContractors

• Compliancetolocalstatutoryrequirements

• SmartPartnershiptodeveloplocalpre-fabmarket

Pre-FabTechnology

Bomba&BuildingBy-lawsetc

Electrical&Fixtures,InteriorDesign&Materials

InstallaBon&ConstrucBons

atSite