MAIN MATERIAL LIST
LISTA DE MATERIALES
PROYECTO HIDROELCTRICO
COCA - CODO SINCLAIRDISE#O DE DETALLE
PROYECTISTA:
APROB&:
VERIFIC&:
REVIS&:
DISE#&:ESPECIALIDAD: NOMBRE/FIRMAMENG GUIXIAN
XIE ZUNDANG
QIAO ZHONGJUN
WANG WENXIANWEI PING
CASA DE M(QUINASPOWER HOUSE
GALER*A DE TRANSFORMADORESTRANSFORMER CORRIDOR
DISPOSICI&N GENERAL DE LAS TUBER*AS EMBEBIDAS DEL SISTEMA DE DRENAJE(2/2)
THE LAYOUTOF EMBEDDEDPIPES OF THE DRAINAGE SYSTEM(2/2)
ESCALA:
C,DIGO:
HOJA:
REVISION: 00
2 DE 21:20
ID-EQM-MEC-P-F-0066-00
ESTRUCTURA:
NOTE:
1.IN DRAWINGS,THE ELEVATION IS ABSOLUTE.
2.THE ELEVATION IS IN METER AND THE DIMENSION IS IN MILLIMETER.3.THE BOUNDARYOF CONSTRUCTION: .
NOTAS:
1.EN LOS PLANOS, LAS ELEVACIONES SON ABSOLUTAS.
2.LAS ELEVACIONES EST(N EN METROS, Y LASDIMENSIONESEN MIL*METROS.
3. L*MITE DE LA CONSTRUCCI&N: .
N. NATURALEZA DE LA REVISI,N
REVISIONES
FECHA
00 EMITIDO PARA CONSTRUCCI&N 25/04/2013