1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Jan. April 2013 Vol. X1 : No. 1&2 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-5 - Addition of Books - 6 - Reports - 7-22 Prepared by : Neeru Saini Librarian

ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

1

Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly Jan. – April 2013 Vol. X1 : No. 1&2

Contents

- Articles - Pages

(Subject wise alphabetically indexed) - 2-5

- Addition of Books - 6

- Reports - 7-22

Prepared by : Neeru Saini

Librarian

Page 2: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

2

Articles

Asphalt

1 CE : Asphalt mix plant : New Technologies in focus .. (Master Builder : Feb. 2013)

Aviation

1 Lighting Concept – Chennai Airport (Architecture +Design : March 2013)

Architecture

1 Beyond amazing the coolest new building of 2012 (Master Builder : Dec. 2012)

Building

1 Innovative design and resources for green buildings : (Architecture + Design April 2013)

2 Vibration control system in Tall Buildings (Master builder : Dec. 2012)

3 Waterproofing for durable and sustainable buildings and infrastructure in India : (Master builder : March 2012)

Bridge

1 Seismic response of RCC Dam including dam foundation interaction : (Journal of Structural Engineering : Feb.–March 2013)

2 Design implications of IS 456 : 2000 for high performance concrete : (Journal of Structural Engineering : Feb.–March 2013)

3 Strengthening of Mithi River Bridge Under NI Taxiway at Mumbai International Airport (NBM & CW : Feb. 2013)

4 A signature cable stayed bridge in India : the Yamuna Bridge at Wazirabad (Structural Engineering International : Feb. 2013)

5 Factors affecting priority of maintenance for bridges (Indian Concrete Journal : Feb. 2013)

Page 3: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

3

Business Development

1 Three rules for making a company truly great (Harvard Business Review : April 2013).

2 The best performing CEO’s in the World. (Harvard Business Review : Jan. Feb. 2013)

Concrete

1 Hear evolution of fly ash concrete : (Indian Concrete Journal : March 2013)

Environmental

1 Abatement for a better future (Environment Pollution control Journal : Jan. Feb. 2013)

2 Effect of biomedical waste generation and disposal on environmental status of Amravati City (Environment Pollution control

Journal : Jan. Feb. 2013)

Equipment

1 CE : Earthmoving Equipment : Road construction equipment continued policy thrust on road infrastructure development augurs

well for supplier … (Master Builder : Feb. 2013)

Human Resource

1 Make yourself an expert (Harvard Business Review : April 2013)

2 Working around a tight budget (Human Capital : April 2013)

Power

1 The well –know n lighting industry expert talks about the progress made by India in the area of energy efficient lighting (Energy

Next: : Feb. 2013)

Page 4: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

4

2 Reuse water for power plant : (Water Today : Jan. 2013)

Railways

1 Fatigue damage of railway plate girder bridges a case study : (Journal of Structural Engineering : Feb.–March 2013)

Steel

1 Seismic behavior of steel frames (Steel structural & Metal Buildings : Feb. 2013)

2 Advanced high strength steels (Steel structural & Metal Building: Jan. 2013)

3 Structural steel for building (Steel structural & Metal Building: Jan. 2013)

4

Structures

1 Green buildings : role of energy efficiency on supporting (Gujarat Infrastructure: Jan.- March 2013)

Soil

1 Ground Engineering : Soil reinforcement (Master builder : Jan. 2013)

Traffic

1 CE : Heavy commercial vehicle : Medium and heavy commercial vehicles (MHCVs) India Continues to be Marquee Market for

..(Master Builder : Feb. 2013)

2 Urban Collective : Traffic management systems for the urban environment (Traffic technology International : Feb. –March 2013)

Page 5: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

5

Water

1 Effective solution for recycle and reuse for treated wastewater (Environment Pollution Control Journal : Jan. Feb. 2013)

2 Solar Water Filter : Details about BARC’s foray into the field of clean and green energy technology (Energy Next L Feb. 2013)

3 Drinking Water Quality in Rural India (Water Today : Feb. 2013)

4 Industrial and municipal wastewater treatment (Water Today : Jan. 2013)

5 Nonlinear elastodynamics of concrete water tanks with shaft type staging (Indian Concrete Journal : Feb. 2013)

6 Building water proofing remediation applying (Master builder : Dec. 2012)

Page 6: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

6

ADDITIONAL OF BOOKS

1 16201 : Standard Handbook for Electrical Engineer 16th

Ed. 2 16202 : Handbook for concrete bridges Vol. I

3 16203 : Handbook for concrete bridges Vol. 2 4 16204 : BSEN –ISO 22476- 2 : 2005 +Ai : 2011 (Geotechnical field testing part 2: Dynamic… 5 16205 : NAPF : 241 : standard for safeguarding construction alternation and demolition 2009.. 6 16206 : NAPF : 251 : standard methods of tests of fire resistance of building construction 7 16207 : NAPF : 252 : standard methods of fire tests of assemblies 8 16208 : Journal of coastal conservation planning and management coastal flood management…. 9 16253 : ISO : 16204 : Durability service life design of concrete structures 10 16254 : ISO : 39001 : Road traffic safety management systems requirement for guidance with use … 11 16255 : Map of Uttarakhand 12 16256 : Central public works accounts code. 13 16257 : IRC : 37 : 2012 : Tentative guidelines for the design of flexible pavements… 14 16258 : Traffic signs manual Ch.- 8: Part – 2 operations traffic safety manual and …. 15 16259 : Hand book on important checks for buildings and allied works… 16 16342 : Chandigarh Urban Development laws…. 17 16351- 16403 : RDSO Drawing 18 16411 : Seminar on training skill up gradation and competence development in building industry : Jan. 2013 19 16451 : Central Public Work Dept. Code 20 16452 : 2013 TCDPAP & FIDIC /ASPACK Conference Bangkok climate change challenge 7-8, March 2013 21 16489 : Indian Unveiled text and photograph 22 16490 : Technological innovation in India Retrospect & Prospect Seminar …… 23 16491 : Principal and practices of highway engineers 24 16492 : IS : 1622 : Methods of sampling and micro biological examination of water… 25 16593 : IS : 3025 (Part-1) : Methods of sampling and test .. 26 16494 : IS : 3025 (Part-46) : Methods of sampling and test for water.. 27 16495 : IS: 3025 (Part -35) : Methods of sampling and test for water… 28 16496 : IS 3025 (Part -60 ) : Methods of sampling and test for water… 29 16578 : Ministry of local govt. and provincial councils and project Implementation of World Bank 30 16579 : ITT K RDSO Guidelines on seismic design of railways 31 16580 : Road maintenance manual Mongolia

Page 7: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

7

Project Report Sl. No. Projects Name Acc.

No. Title of the Report (Hard CopRe Soft

Copy Year

1 NH-77 (HM) : Four laning of Hajipur - Muzaffarpur section of …….

16187 Inspection Report : Dec. 2012

16226 MPR No. 25 : Nov. 2012

16260 MPR No. 26 : Dec. 2013

16261 Inspection Report : Jan. 2013

16465 MPR No.27: 2013

16466 Inspection Report : Feb. 2013

16531 MPR No. 28 : Feb. 2013

16532 Inspection Report : March 2013

16533 QPR No. 9 : Jan. 2013

2 VME : Preparation of Detailed engineering design of Vadodara Mumbai Expressway including …..

16467 FDPR : Vol. IX: Drawing part B-1 : Drawing of bridges/structures Sub : …..

16468 FDPR : Vol. IX: Drawing sub part 2 of 9 bridges over ….

16469 FDPR : Vol. IX: Drawing sub part 3 of 9 Minor bridges ….

16470 FDPR : Vol. IX: Drawing sub part 4 of 9 Minor bridges 2 ..….

16471 FDPR : Vol. IX: Drawing sub part 6 of 9 interchanges ….

16472 FDPR : Vol. IX: Drawing sub part 8 of 9 flyovers

3 NH-10 (Hary.) : Independent engineering services for 4/6 laning of Delhi/Haryana…….

16295 QPR : Dec. 2012

16296 MPR : Dec. 2012

16434 MPR : Jan. 2013

16435 MPR : Feb. 2013

Page 8: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

8

16562 QPR : March 2013

16577 MPR : March 2013

4 NH-15 (PA) : Independent engineer for 4 laning of Pathanko t- Amritsar section from …..

16227 Monthly Inspection Report No .19 : Dec. 2012

16322 QPR : No. 9 : Dec. 2012

16323 MPR No. 28 : Dec. 2013

16324 MPR No. 29 : Jan. 2013

16421 MPR No. 30 : Feb. 2013

16475 MIR : No. 21 : Feb. 2013

16565 MPR No. 31 : March 2013

16566 Monthly Inspection report No. 22 : March 2013

16583 QPR No. 10 : March 2013

5 NH-8 (SD) : Six laning of Surat –Dahisar section of NH-8 from km 263.000 to km. 502.000…..

16266 MPR : Dec. 2012

16448 MPR : Jan. 2013

16534 QPR : Feb. 2013

16535 MPR : Feb. 2013

16590 MPR : March 2013

6 NH-77 (MS) : Independent engineer services for two laning of Muzaffarpur –Sonbarsa section of NH-77 ……

16223 MPR : Nov. 2012

16224 Quarterly Inspection report No. 5 : Nov. 2012

16225 Monthly Inspection Report Nov. 2012

16262 MPR : Dec. 2012

16263 Monthly Inspection Report No. 16 : Dec. 2012

16463 MPR : Jan. 2013

16464 MIR No. 17 : Jan. 2013

16527 MIR No. 18 : Feb. 2013

16528 MPR : Feb. 2013

16529 Quarterly Inspection Report No. 6 :

Page 9: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

9

Feb. 2013

16530 Progress Report : April 2013

7 NH-2 (UP) : Consultancy Package GTRIP/SC/1 for the construction supervision for four laning and strengthening of the existing two ….

16301 Engineering Report No. 125 : Dec. 2012

16302 MPR : No. 130 : Dec. 2012

16303 QPR : Dec. 2012

16430 Engineering Report No. 126 : Jan. 2013

16431 MPR No. 131 : Jan. 2013

16432 MPR No. 132 : Feb. 2013

16556 MPR No. 133 : March 2013

16557 Engineering Report No. 127 : Feb. 2013

16584 Engineering Report No. 128 : March 2013

16585 QPR : March 2013

8 NH-21 (Punjab) :Independent consultancy services for 4 laning of Kurali) kiratpur section ……

16427 Monthly Report No. 65 : Feb. 2013

16554 Monthly Report No. 66 : March 2013

16555 QPR No. 22 : March 2013

9 NH-6 (Orissa) : Consultancy services for preparation of DPR for rehabilitation and upgradation of Baharagora to Sambalpur ……

16272 MPR : No. 12 : Nov. 2012

16328 Progress Report : Jan. 2013

16273 MPR No. 13 : Dec. 2012

16460 Progress report : Feb. 2013

16539 Progresso Report : March 2013

10 NH-1 A (2151) : Multi sector project for infrastructures rehabilitation in Jummu ….

16278 MPR : Jan. 2013

16425 MPR : Feb. 2013

16571 MPR : March 2013

11 NH-9 (HV) : Independent consultancy services for design, engineering, construction, development ….

16289 Monthly Report : Dec. 2012

16290 MPR. Dec. 2012

16291 MPR : Jan. 2013

Page 10: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

10

16337 Monthly Report : Jan. 2012

16436 Monthly Report : Feb. 2013

16476 Quarterly Report : Feb. 2013

16575 Monthly Report : March 2013

16576 MPR : Feb. 2013

12 NH-47 (KL-1) : 4/6 laning of NH from Thrissur to Edapally section of NH-47 …..

16190 MPR : Oct. 2012

16284 MPR : Nov. 2012

16285 MPR : Dec. 2012

16405 Operation & Maintenance Inspection Report : Jan. 2013

16567 Operation and maintenance inspection report : Feb. 2013

13 NH-47 (KL-3) : Independent engineering services for design, construction, development, finance, operation and maintenance of 6 laning of Vadakanchery t…..

16198 Monthly Inspection Report : Nov. 2012

16286 Monthly Inspection Report : Dec. 2012

16287 Quarterly Inspection Report : Dec. 2012

16288 Monthly Inspection Report : Jan. 2013

16420 Monthly Inspection Report : Feb. 2013

16550 MPR : March 2013

14 NH-50 (BH) : Four laning of Bijapur ……

16317 QPR : Dec. 2012

16318 Operation & Maintenance Report No. 6 : Dec. 2012

16319 Operation & Maintenance Report No. 7 : Jan. 2013

16426 Operation & Maintenance Report No. 8 : Feb. 2013

16581 Operation & Maintenance Report No. 9: Feb. 2013

15 MP : (2736) : Construction of ADB Assisted Nine highway corridors under ADB Loan No. 2736

16320 MPR No. 17 : Dec. 2012

16321 MPR No. 68 : Jan. 2013

16410 MPR No. 19 : Feb. 2013

16558 MPR No. 20 : March 2013

Page 11: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

11

16582 MPR No. 16 : Feb. 2013

16 NH-4 (TH) : NHAI Western Transport corridor …..

16299 Maintenance Manual 2012 Package 5

16300 Maintenance Manual 2012 Package 4

16335 MPR No. 50 : Dec. 2012 Package 4

16336 MPR No. 50 : Dec. 2012 Package 5

17 NH-22 : independent consultancy services for 4/6 laning of Zirakpur – Parwanoo section ….

16196 MPR No. 56 : Nov. 2012

16274 QPR : No. 19 : Dec. 2012

16275 MPR No. 57 : Dec. 2012

16428 MPR No. 58 : Jan. 2013

16429 MOR No. 59 : Feb. 2013

18 MP (2154) : Consultancy services for construction supervision of package No. 2…..

16244 MPR No. 70 : August 2012

19 NH-8 (D) : Independent engineering services for the four langin of Jetpur somnath section from …..

16199 MPR No. 13 : Nov. 2012

16311 QPR No. 4 : Dec. 2012

16313 MPR No. 14 : Dec. 2012

16450 MPR :No. 15 : Jan. 2013

16473 QPR : Dec. 2013

16474 MPR No. 76 : Feb. 2013

16563 MPR No.16 : Frb.2013

20 NH-30 (Mohani) : Independent engineering services for the work of four laning of Mohaniara section of NH-30 ………

16200 QPR : Sept. 2012

16292 MPR : Jan. 2012

16293 QPR : Dec. 2012

16294 MPR : Jan. 2013

16453 MPR : Feb. 2013

16572 MPR : March 2013

16588 QPR : March 2013

21 NH-47 (08) : Design, engineering, finance, construction, and maintenance of 6 laning from

16279 Various other report : Oct. 2012

16280 Various other report : Nov. 2012

Page 12: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

12

Chengapalli to start of Coimbatore …..

16281 Various other report : Dec. 2012

16282 MPR : Nov. 2012

16283 MPR : Dec. 2012

16568 Various other report : Feb. 20132

22 SH-80 (Bihar) : Bhabhua-Adhaura

16153 Bidding documents Vol. I : conditions of contract : Dec. 2012

16154 Bidding documents Vol. II : Technical specification : Dec. 2012

16155 Bidding documents Vol. III : Bill of quantities : Dec. 2012

16156 MFDPR: Vol. I : Main Report : Dec. 2012

CD

16157 MFDPR: Vol. I (A) : Appendices to main report : Dec. 2012

16158 MFDPR : Vol. II : Design Report : Dec. 2012.

16159 MFDPR : Vol. II(A) : Bridge design calculation : Dec. 2012

16160 MFDPR : Vol. II(B) : Sub-soil exploration report : Dec. 2012

16161 MFDPR : Vol. III : Material Report : Dec. 2012

16162 MFDPR : Vol. IV : Cost estimate : Dec. 2012

16163 MFDPR : Vol. V : Rate analysis : Dec. 2012

16164 MFDPR : Vol. VI I (B) : Environmental Impact assessment report : Dec. 2012

16165 MFDPR : Vol. VII (A) : Poverty and social assessment including resettlement plan report. : Dec. 2012

23 SH-82 (Bihar) : rehabilitation upgrading and strengthening of SH-82, Bhabhua –Adhaura …..

16166 Bidding documents : Vol. I : conditions of contracts : Dec. 2012

16167 Bidding documents : Vol. II : Technical specification : Dec. 2012

16168 Bidding documents : Vol. III : Bill of

Page 13: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

13

quantities : Dec. 2012

16169 MFDPR : Vol. I : Main Report : Dec. 2012

CD

16170 MFDPR : Vol. I (A) : Appendices to main report : Dec. 2012

16171 MFDPR : Vol. II : Design Report : Dec. 2012

16172 MFDPR : Vol. II(A) Bridge design calculation (Part 1 of II): Dec. 2012

16173 MFDPR : Vol. II(A) Bridge design calculation (Part II of II ) Dec. 2012

16174 MFDPR : Vol. II (B) : Sub soil exploration report : Dec. 2012

16175 MFDPR : Vol. III : Material Report : Dec. 2012

16176 MFDPR : Vol. IV : Cost estimate : Dec. 2012

16177 MFDPR : Vol. V : Rate Analysis : Dec. 2012

16178 MFDPR : Vol. VII(A) : Poverty and social assessment including resettlement plan. Dec. 2012

16179 MFDPR : Vol. II(B) : Environmental Impact assessment report : Dec. 2012

24 NH-43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 laning ….

16180 MPR : Dec. 2012.

16193 MPR : Nov. 2012

16462 MPR : Feb. 2013

16325 MPR : Jan. 2013

25 NH-15 (PJ) : Consultancy services for preparation of detailed project report for phalodi-jaisalmer section of …..

16182 MPR : Dec. 2012

16194 MPR : Nov. 2012

16461 MPR : Feb. 2013

16326 MPR : Jan .2013

16343 Final Feasibility Report : Vol. I Main Report : Feb. 2013

CD

Page 14: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

14

16344 Final Feasibility Report :Vol. II : Appendices to main report : Feb. 2013

16345 Final Feasibility Report :Vol. III : Traffic survey & Analysis : Feb. 2013

16346 Final Feasibility Report :Vol. IV : Technical Specification : Feb. 2013

16347 Final Feasibility Report : Vol. V : Rate Analysis : Feb. 2013

16348 Final Feasibility Report : Vol. VI : Cost Estimate : Feb. 2013

16349 Final Feasibility Report : Vol. VII : Civil work contract agreement EPC: Agreement : Feb. 2013

16350 Final Feasibility Report : Vol. VIII : Drawings. : Feb. 2013

16182 MPR : Dec. 2013

26 Bihar (SPUR) : Support programme for Urban reforms in Bihar …….City Business plan for Patna Town ….

16183 Final report : for Khagaul : Dec. 2012

16184 Final report : for Phulwarisharif : Dec. 2012

16185 Final report : for Dhanpur : Dec. 2012

16186 Final report : for Patna : Dec. 2012

27 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700 and km. 164 /080 to km. 165/400 Section of

16188 MPR : Nov. 2012

16457 MPR : Jan. 2013

16570 MPR : Dec. 2013

16589 MPR : March 2013

28 NH-25/26 : Jhansi to Lalitpur in the state of Uttar Pradesh ….

16189 MPR : Nov. 2012

16314 MPR : Dec. 2012

16315 QPR : Dec. 2012

16316 MPR : Jan. 2013

16573 MPR : March 2013

29 NH-58/72 (Haridwar) Independent engineering services 16191 MPR : Nov. 2012

Page 15: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

15

for 4 laning of Haridwar Dehradun section…. 16297 MPR : Sept. 2012

16298 QPR : Dec. 2012

16547 MPR : Jan. 2013

16548 MPR : Feb. 2013

16549 Alternate pavement design proposal with RBI Grande…..

30 NH-1 (Panipat) : Preparation of detailed project report of for safer greener highway on …..

16195 MPR : Nov. 2012

16215 Final Preliminary Project Report : Vol. I : Preliminary Design Report . Dec. 2012

16216 Final Preliminary Project Report : Vol. II : Design report : Dec. 2012

16217 Final Preliminary Project Report : Vol. II (A) : appendices to design report : Dec. 2012

16218 Final Preliminary Project Report : Vol. III : Drawings : Dec. 2012

16219 Final Preliminary Project Report : Vol. IV : utility relocation plan : hand pump, water tank, : Dec. 2012

16220 Final Preliminary Project Report : Vol. V : Cost estimate : Dec. 2012

16458 MPR : Feb. 2013

16327 MPR : Jan. 2013

16540 MPR : March 2013

31 Odisha (SRP –WB : 7577) Consultancy services for road sector institutional development ……

16197 Inception Report : June 2012

32 NH-15 (BSG) : consultancy services of preparation of detailed project report for upgrading of Barmer- Sanchar-Gujrat…..

16209 Final feasibility Vol. II : Appendices to main report : Dec 2012

CD

16210 Final feasibility Vol. III : Traffic survey and analysis : Dec. 2012

Page 16: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

16

16211 Final feasibility Vol. IV : Environment Impact assessment report : Dec. 2012

16212 Final feasibility Vol. V : Social impact screening report : Dec. 2012

16213 Final feasibility Vol. VI: Drawings : Dec. 2012

16214 Final Feasibility Vol. VII : Cost estimate : Dec. 2012

16228 Final Feasibility Vol. I : Main Report : Dec. 2012

33 Nippo : MSIL Proving Ground Project Rohtak ……

16221 MPR : Oct. 2012

16222 MPR : Nov. 2012

16540 MPR : Dec. 2012

16536 Jan. 2013

16537 Fen. 2013

34 NH-8 (Gomti): Independent engineering services for development and operation of beawar- gomti section of …..

16229 Q & M Inspection report No. 37 : Nov. 2012

16309 Q & M Inspection report No. 38 : Dec. 2012

16564 O & M Inspection Report No. 40 : Feb. 2013

35 NH-9 (PS) : Four laning of Pune –solapur section of NH-9 From km. 144.400 to km 249 . 000 in the state of Maharashtra under NHDAP…..

16230 QPR No .8 : Sept. 2012

16231 MPR No. 24 : Oct. 2012

16232 MPR : No. 25 : Nov. 2012

16437 O & M Inspection Report – 39 : Jan. 2013

16438 Quarterly/ Inspection -Progress Report No. 13 : Jan. 2013

16454 MPR No. 26 : Dec. 2012

36 NAM (AP) : Design construction finance operation and maintenance of found laning of narketpally ……

16233 QPR No. 7 : Sept. 2012

16234 MPR No. 21 : Nov, 2012

16446 QPR : No. 08 : Dec. 2012

37 NH-59 (MP) : Independent engineering services for 4 16235 QPR No. 8 : August 2012

Page 17: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

17

laning of Godhra to Gujarat/MP Section of NH-59 ….. 16236 MPR No. 24 : Oct. 2012

16237 Inspection Report No. 23 : Nov. 2012

16238 Inspection Report No. 21 : Dec. 2012

16407 QPR No. 9 : Dec. 2012

16408 MPR No. 26 : Dec. 2012

16423 Inspection Report No. 26 : Feb. 2013

16424 Inspection Report No. 25 : Jan. 2013

38 NH-5 (CN) : Independent engineer services for design engineering construction development finance operation and maintenance of chilakaluripet ….

16242 MPR : Oct. 2012

16243 MPR : Nov. 2012

16409 MPR : Jan. 2013

16443 QPR : Dec. 2012

16445 MPR : Dec. 2012

39 NH-45 (TK) : Independent engineer services for two laning with paved shoulder of ….

16245 MPR : Oct. 2012

16246 Inspection Report No.10 : Oct. 2012

16247 Inspection Report No .11: Nov. 2012

16248 MPR : Nov. 2012

16404 MPR : Dec. 2012

16441 QPR : Dec. 2013

16442 MPR : Jan. 2013

40 NH-4 (TC) : six laning of Tumkur Chitradurga section of NH- 4 ……

16249 MPR : Oct. 2012

16250 Monthly Inspection Report : Oct. 2012

16251 Monthly Inspection Report : Nov. 2012

16252 MPR : Nov. 2012

16422 Monthly Inspection Report : Dec, 2012

41 NH-54 (E) : 4 – laning of national highway from maibang …..

16264 MPR : Dec. 2012 EW-IIB (SC-I): Dec. 2012

16265 QPR : Dec. 2012 EW-IIB (SC-I) : Dec. 2012

Page 18: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

18

16449 MPR : Jan. 2013

42 SH-10 (Deh-ISH) : Intermediate/two laning with without paved shoudlers of

16267 MPR : Nov. 2012

16542 Lender’s engineer Report : Feb. 2013

43 SH-18 (MP) : Intermediate/two lanign with/without paved shoulders fo Thandla Limdi …..

16268 MPR : Jan. 2013

16545 MPR : Feb. 2013

16546 MPR : March 2013

44 SH-39 (Jhabua Jobat) : Two laning with/without paved shoudlers of Jhabua-Jobat Kukshi road ….

16269 MPR : Nov. 2012

16270 MPR : Dec. 2012

16271 MPR : Jan. 2013

16543 MPR : Feb. 2013

16544 MPR : March 2013

45 NH-54 (Assam) :

16276 MPR : Dec. 2012

16312 MPR : Jan. 2013

16277 QPR : Dec. 2012

46 NH-25 (EW-3B) : North-south & East West corridors

16304 MPR : August 2012

16305 MPR : Sept. 2012

16306 MPR : Oct. 2012

16307 MPR : Nov. 2012

16308 MPR : Dec. 2012

16559 MPR : Jan. 2013

16560 MPR : Feb. 2013

16561 MPR : March 2013

47 Bihar (SH) 16310 MPR : May 2012

48 Bihar (BSRDC) : Civil works contracts for Bihar State highways …….

16330 QPR : Sept. 2012

16331 MPR : Oct. 2012

16332 MPR : Nov. 2012

16333 MPR : Dec. 2012

Page 19: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

19

16334 QPR : Dec. 2012

16574 MPR : Feb. 2013

49 Metro : owner Delhi Metro Rail corporation (Jaipur Metro) :…..

16406 Design of pile foundation & Pile cap for ….

50 Ghana (NWAR) : Consultancy services for feasibility and detailed design studies for north west accra roads

16413 Draft Final Report : Vol. I : Engineering Report Part – I : Main Report : Dec. 2012

16414 Draft Final Report : Vol. I : – 2 : open space system design guidelines and recommendation report. Dec. 2012

16415 Draft Final Report : Vol. I Part 3 : annexures to main report : Dec. 2012

16416 Draft Final Report : Vol. II : Design Drawings: Dec. 2012

16417 Draft Final Report : Vol. III : Price bill of quantities report : Dec. 2013

16418 Draft Final Report : Vol. IV : Environmental Impact assessment report : Dec. 2012

16419 Draft Final Report : Vol. V : Demographic and sociological survey report : Dec. 2012

51 NH-26 (JB) : Maintenance and repair of existing two lane road from km . 0.000 to km. 28.135…..

16447 E-Tender (Nit, Bid documents & BOQ) : Jan. 2013

52 NH-31 (PB) : Consultancy services for the preparation of detailed project report for rehabilitation and up gradation of Pundibari to …..

16477 RFDPR : Vol. I : Main report : March 2013

CD

16478 RFDPR : Vol. 2 : Design report (Part I Design of road features) : March 2013

16479 RFDPR : Vol. 2 : Design report (Part- II Design of road features) : March 2013

16480 RFDPR : Vol. 2 (A) : Appendices to design report : March 2013 : March 2013

16481 RFDPR : Vol. 3 : Material Report :March 2013

16482 RFDPR : Vol. IV (A) : Environmental Impact assessment and management plan : March 2013

Page 20: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

20

16483 RFDPR : Vol. IV (B) : Social Impact assessment and resettlement action plan

16484 RFDPR : Vol. V : Technical specification. : March 2013

16485 RFDPR : Vol. VI : Rate Analysis : March 2013

16486 RFDPR : Vol. VII : Cost Estimate : March 2013

16487 RFDPR : Vol. VIII : Agreement and request for proposal : March : 2013

16488 RFDPR : Vol. X : Project Clearance : March 2013

53 NH-60 (A) Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 ……

16511 FDPR Vol. Main Report : April 2013 CD

16512 FDPR Vol.(A) : Appendices to main report : April 2013

16513 FDPR Vol. II : Design Report (Part I : Roads) : March 2013

16514 FDPR Vol. II : Design Report (Part II Bridge and structures) March 2013

16515 FDPR Vol. II : Design Report (Part III: Geotechnical investigations for bridges and structures) March 2013

16516 FDPR Vol. II : Part IV : Bridges design calculation (Part I of 2) : March 2013

16517 FDPR Vol. II : Part IV : Bridges design calculation (Part 2 of 2) : March 2013

16518 FDPR Vol. II (A) : Appendices to design report (Part I : Road) March 2013

16519 FDPR Vol. III : Material Report :

16520 FDPR Vol. IV : Environment Impact assessment and EMP : March 2013

16521 FDPR Vol. V : Social Impact Assessment studies and rehabilitation action plan: March 2013

16522 FDPR Vol. VI : Technical Specification . March 2013

Page 21: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

21

16523 FDPR Vol. VII : Rate Analysis : March 2013

16524 FDPR Vol. VIII : Cost Estimate : March 2013

16525 FDPR Vol. IX : Measurement Sheets. : March 2013

16526 FDPR Vol. XI : EPC Agreement : March 2013

16551 MPR : March 2013

16181 MPR : Dec. 2012.

16192 MPR : Nov. 2012

16329 MPR : Jan. 2013

16459 MPR : Feb. 2013

54 Ghana Kumasi Road …

16497 Details design report Ph.- II : (Draft) Vol. 1of 7 : Main Reports : March 2013

16498 Details design report : Vol. 2 of 7 : appendices to main report : March 2013

16499 Details design report : Vol. 3 of 7 : Cost estimates : March 2013

16500 Details design report : Vol. 4 of 7 : Environmental and social impact assessment report : March 2013

16501 Details design report : Vol. 5 of 7 : Environmental and social management plan : March 2013

16502 Details design report : Vol. 6 of 7 : Resettlement action plan: March 2013

16503 Details design report : Vol. 7 of 7 : Valuation Report : March 2013

16504 Vol. II : Preliminary environment and social impact assessment Ph.-I (Feasibility Report) March 2013

16505 Bidding documents Lot0 I : Lake road and Oforikram Ashowa Road Extension . March 2013

16506 Details cross sections drawings Lot I :

Page 22: ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan. 2013) Railways 1 Fatigue damage of railway plate girder bridges a case study

22

March 20132

16507 Bidding documents Lot : I Vol. 2 : Drawing : March 2013

16508 Bidding documents Lot 2…..

16509 Details cross section drawing lot1 Vol. 2 drawings : March 2013

16510 Bidding documents Lot 2: Drawing Vol.2 : March 2013

55 NH-31/28 (KT) : Independent engineering services for the project of development of greenfield bridge across river ganga and its approaches connecting …

16587 MPR : March 2013

56 NH-1 (JA): 6 laning of Jalandhar Amritsar section of NH-1 …..

16591 FDPR : Vol. I : Main Report : April 2013

16592 FDPR EPC : Agreement : April 2013

16593 FDPR EFC : Memorandum : April 2013

16594 FDPR Cost estimate : April 2013