iCER User M eeting. 3/26/10. Agenda. W hat’s new in iCER (Wolfgang) W hats new in HPCC (Bill) Results of the recent cluster bid Discussion of buy-in (costs, scheduling) Other. What’s New in iCER. New iCER Website. http:// icer.msu.edu. Part of VPRGS News Showcased Projects - PowerPoint PPT Presentation
Citation preview
iCER User Meeting
3/26/10
Agenda
• What’s new in iCER (Wolfgang)• Whats new in HPCC (Bill)• Results of the recent cluster bid• Discussion of buy-in (costs, scheduling)• Other
What’s New in iCER
New iCER Website• Part of VPRGS– News– Showcased
Projects– Supported
Funding– Recent
Publications
http://icer.msu.edu
User Dashboard• Common Portal to User Resources– FAQ– Documentation– Forums– Research
Opportunities– Known Issues
http://wiki.hpcc.msu.edu
Current Research Opportunities• NSF Postdoc Fellowships for Transformative
Computational Science using CyberInfrastructure• Website– Proposals– Classes– Seminars– Papers– Jobs
http://wiki.hpcc.msu.edu
• 50/50 match from iCER for a postdoc for large grant proposals (multi-investigator, inter-disciplinary)
• Currently only three matches picked up– Titus Brown– Scott Pratt– Eric Goodman
• Several other matches promised, but grants not decided yet
• More opportunities!
Postdoc Matching
• New Hire!• Eric McDonald– System Programmer– Partnership with NSCL (Alex Brown et al.)
Personnel
• Interdisciplinary graduate education in high-performance-computing & science
• Big Data• Leads:– Dirk Colbry– Bill Punch
IGERT Grant Proposal
• NSF STC– Funded, starting in June– $5M/year for 5 years
• New joint space with iCER & HPCC– First floor BPS– Former BPS library space
BEACON
What’s New in HPCC
Graphics Cluster
32 node cluster• 2 x Quad 2.4GHz• 18GB ram• Two Nvidia M1060• no Infinband (Ethernet
only)
Result of a Buyin
• 21 of the nodes were purchased by funds from users
• Can be used by any HPCC user
Each nVidia Tesla M1060• Number of Streaming Processor Cores 240• Frequency of processor cores 1.3 GHz• Single Precision peak floating point performance 933 gigaflops• Double Precision peak floating point performance 78 gigaflops• Dedicated Memory 4 GB GDDR3 • Memory Speed 800 MHz• Memory Interface 512-bit • Memory Bandwidth 102 GB/sec• System Interface PCIe
Example Script#!/bin/bash –login#PBS –l nodes=1:ppn=1:gfx10,walltime=01:00:00#PBS –l advres=gpgpu.6364,gres=gpu:1
cd ${PBS_O_WORKDIR}module load cudamyprogram myarguments
CELL Processor
2 Playstation 3’s• running linux• for experimenting
with CELL• dev-cell08 and test-
cell08 (see the web for more details)
Green Restrictions
• The machine Green is still up an running, especially after having removed some problematic memory
• Mostly replaced by AMD fat nodes• On April 1st, it will be reserved for jobs
requesting 32 cores (or more) and/or 250 GB of memory (or more)
• Hope to help people running larger jobs
HPCC Stats
• Ganglia (off the main web page, Status) is back and working. Gives you a snapshot of the present system
• We are nearly done with a database of all run jobs that can be queried for all kinds of information. Should be up in the next couple of weeks.
Cluster Bid Results
How it was done
• HPCC submitted a Request for Quotes for a new cluster system.
• Targeted:– performance vs. power main concern– Inifinband– 3GB per core of memory– approximately $500K of cluster
Results
• Received 13 bids from 8 vendors• Found 3 options that were suitable for the
power, space, cooling and performance we were looking for.
• Looking for some guidance from you on a number of issues
Choice 1: Infiniband config
Two ways to configure Infiniband:• series of smaller switches configured in a
hierarchy (leaf switches)• one big switch (director)• leaf switches are cheaper, harder to expand
(requires reconfiguration), more wires, more points of failure
• director is more expandable, convenient, expensive
Choice 2: Buyin Cost
• buyin cost could reflect just the cost of the compute nodes itself, HPCC provides infrastructure (switches, wires, racks, etc.)
• buyin cost could reflect the total hardware cost
• obviously, subsidizing costs means cheaper buyin costs, fewer general nodes.
Remember
• HPCC is still subsidizing costs, even if hardware is not subsidized
• still must buy air-conditioning equipment, OS licenses, MOAB (scheduling) licenses, software licenses (Not to mention salaries, power)
• Combined, “other” hardware will run to about $75K
• scheduler about $100K for 3 years.
Some Issues
• 1 node = 8 cores, 1 chassis = 4 nodes. • Buyin will be at the chassis level (32 cores)
For 1024 coresVendor/config Total Per
node/subsidized
Per node/full
Dell/leaf $418K $2,278 ($9,112)
$3,260 ($13,040)
HP/leaf $460K $2,482 ($9,928)
$3,594 ($14,376)
Dell/director $523K $2,278 ($9,112)
$4,086 ($16,344)
Scheduling
• We are working on some better scheduling methods. We think they have promise and would be very useful to the user base
• For the moment, it will be the Purdue model. We guarantee access to nodes within 8 hours of a request from a buyin user. Still a week max run time (though can be changed)