APPENDIX I - ANNEX 1
CERTIFICATE OF THE CONTRACTOR'S DESIGN
OF PERMANENT WORKS
Part 1
(To be signed by a professionally qualified member of Ihe Contractors slaff, or of hissub-contractor’s staff, responsible for the Contractors Design)
Contract No. & Name: Works Contract M767-4
Part of Works Designed:
Drawings as Listed In Attachment 1 (Number of Drawings:
- no.)
Calculations Title:
Prepared by:
Dated: No. of Pages - Rev.: -
Method Statement Title: -
Submission No: - Rev.: -
Certification
I certify that the part of the Permanent Works described above has been designed inaccordance with the Contract and that the design has been checked and foundsatisfactory by the undersigned.
Signed: Date:For and on behalf of the Contractor
Name and qualifications of signatory:
Contract M767-4 PS AII 1/4 AAA 27/06/14Design, Supply and Installation of Automated FOD Detection Systems (Electro-optical System)Particular Specification – Appendix I – Annex I
APPENDIX I - ANNEX 1
Part 2
(To be signed by the Checking Engineer)
Certification
I certify that the part of the Permanent Works described above has been designed
using all the skill and care to be expected of a professionally qualified and competent
designer experienced in work of a similar nature and scope and that I have checked
the design and drawings and found them satisfactory.
Signed: Date:
Name and qualifications of the CheckingEngineer:
Name of firm or company:
Refer to Attachment 1 (also to be endorsed by Contractor and Checking Engineer)
Contract M767-4 PS AII 2/4 AAA 27/06/14Design, Supply and Installation of Automated FOD Detection Systems (Electro-optical System)Particular Specification – Appendix I – Annex I
APPENDIX I - ANNEX 1
Attachment 1 to the Certificate of the Contractor’s Design of Permanent Works
Contract No. & Name :
Element of WorksDesigned :
Drawing No. Rev Tittle
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Signed: Date:For and on behalf of the Contractor
Signed: Date:Checking Engineer
Contract M767-4 PS AII 3/4 AAA 27/06/14Design, Supply and Installation of Automated FOD Detection Systems (Electro-optical System)Particular Specification – Appendix I – Annex I