8
ICAO Performance Based Communication and Surveillance Workshop 20 to 22 February 2013 Paris, France

ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

ICAO Performance Based Communication and Surveillance Workshop

20 to 22 February 2013 Paris, France

Page 2: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

COM NAV SUR ATM

ICAO GLOBAL AIR NAVIGATION PLAN and ATM CONCEPT

Performance Based ATM Concept

Page 3: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

NAVIGATION

APPLICATION

NAVAID

INFRASTRUCTURE

NAVIGATION

SPECIFICATION

COM NAV SUR ATM

PBN

ICAO GLOBAL AIR NAVIGATION PLAN and ATM CONCEPT

Performance Based ATM Concept

Page 4: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

NAT

Region EUR

Region

NAM

Region

Air traffic services are becoming

more dependent on communication

and surveillance capabilities

Page 5: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

Worldwide Data Link Coverage

Page 6: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

Background in the NAT Region

• NAT SPG/43 (2007) – Identified communication service problem needing urgent attention (43/29)

• Special NAT SPG (2007) – Established RCP Task Force (SP2007/6)

• NAT SPG/44 (2008) – Agreed to mandate RCP by 2015 (44/11)

• NAT SPG/46 (2010) – Endorsed GOLD (46/8)

• NAT SPG/47 (2011) – Endorsed NAT PBCS Implementation Plan (47/5)

• NAT SPG/48 (2012) – RCP – RSP Applicability (48/7)

Page 7: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

NAT PBCS Implementation Plan

• 2015 implementation

• 17 tasks on track

• Key items

– PfA for Doc 7030

– Flight plan

– ATC automation

– Post-implementation monitoring

Page 8: ICAO Performance Based Communication and Surveillance Workshop Meetings Seminars... · Operations Implementation Plan (Paragraph 4.2.11 refers) Associated with the NAT data link services

Safety promotion

• NAT PBCS Workshop

– Task 4 of NAT PBCS Implementation Plan

– Training and education - Safety communication

– Exchange information and promote global harmonization