    ICAOs new Universal Safety Oversight Audit Programme Methodology theContinuous Monito ring Approach (CMA)

    ICAOs Universal Safety Oversight Audit Programme (USOAP) was initially launched in January 1999, in

    response to widespread concerns about the adequacy of aviation safety oversight around the world. Theultimate goal of USOAP is to promote global aviation safety through regular audits of safety oversightsystems in all ICAO Member States.

    USOAP audits focus on a States capability to provide safety oversight by assessing whether the State haseffectively and consistently implemented the critical elements of a safety oversight system and determiningthe State's level of implementation of ICAOs safety-related Standards and Recommended Practices(SARPs) and associated procedures and guidance material.

    The programme was expanded in 2005 to the USOAP Comprehensive Systems Approach (CSA) to includesafety-related provisions contained in all safety-related Annexes to the Chicago Convention. USOAP CSA

    audits that ended in December 2010 entailed about 40 safety oversight audits annually, with each ICAOMember State required to host an audit at least once during the cycle.

    In September 2007, the 36th Session of the Assembly adopted Resolution A36-4, directing the Council toexamine different options for the continuation of the USOAP beyond 2010, including the feasibility ofapplying a new approach, based on the concept of continuous monitoring and incorporating the analysis ofsafety risk factors. The systematic and more proactive conducting of monitoring activities in the newUSOAP Continuous Monitoring Approach (CMA) would make more effective and efficient use of ICAOresources and reduce the burden on States caused by repetitive audits. USOAP CMA would also increasethe role of other ICAO bureaux and the regional offices (ROs), include States commitment to theprogramme by providing ICAO with relevant safety information and expand and amend ICAOs agreements

    for the sharing of confidential safety information with international entities and organisations.

    In 2010, the 37th Session of the Assembly adopted Resolution A37-5, affirming that the evolution ofUSOAP to the CMA should continue to be a top priority for ICAO to ensure that information on the safetyperformance of Member States is provided to other Member States and to the travelling public on anongoing basis. This vital enhancement of international aviation safety requires the participation and supportof all Member States, particularly during the two-year transition period when the tools and guidancerequired for USOAP CMA will be developed and refined.

    Within ICAO and globally the transition to USOAP CMA started in 2010 and is currently in progress. It isexpected that the transition phase will continue until the end of 2012/ early 2013.

    South Africa is fully in support of the USOAP CMA methodology and its objectives which are global

    aviation safety enhancement and therefore at the end of 2011 the Memorandum of Understanding (MoU)

    with ICAO pertaining to USOAP CMA was signed by the Department of Transport on behalf of South Africa.

  • 8/12/2019 Icao Launch of Cma

    2/2

    Furthermore, the Acting Director of Civil Aviation, Mr Zakhele Thwala, has proactively mandated a projectplan that will ensure that South Africa is compliant with ICAO requirements in respect of the eight criticalelements of a state aviation safety oversight system. The Department of Transport is working with theSACAA in this regard. The project will be launched on 1 March 2012 and end December 2012. However,the essence of CMA is continuous monitoring, and so going forward constant monitoring and review will be

    taking place beyond 2013.

    In summary, the high level phases of the project are:

    1) SAAQ. Completion of the State Aviation Activity Questionnaire (SAAQ) during March;2) PQs. ICAO Audit Protocol Questions (PQs) which is in essence a detailed self-audit and which will

    take place from May to July. During this period all technical deficiencies which had been identifiedare to be addressed, such as policy and procedural review and amendment, including TGM.;

    3) Regulation Development. The fast tracking of any outstanding regulatory developments and newICAO Standards and Recommended Practices (SARPs). This will start immediately and runconcurrently with the other phases until approximately August;

    4) ICAO CC & EFOD. The review and update of the ICAO Compliance Checklists and the electronicFiling of Differences (CC and EFOD) during August and September;5) Significant Differences. Submission of all significant differences during October for publication in

    the AIP as per AIRAC; and6) Consolidation and Review. This will take place during October and November.