60
http://www.gratisexam.com/ C9010-250 Number : C9010-250 Passing Score : 800 Time Limit : 120 min File Version : 1.0 http://www.gratisexam.com/

IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

C9010-250

Number: C9010-250Passing Score: 800Time Limit: 120 minFile Version: 1.0

http://www.gratisexam.com/

Page 2: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Exam D

QUESTION 1A customer plans to implement a web-based solution that requires 34 Power cores. Theywant to acquire a POWER8 solution with the best TCA. Assuming all otherconfiguration requirements are equal, which solution provides the best TCA?

A. OneE870

B. TwoS824s

C. Three S814s

D. OneS822

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:http://ibm.azlan.nl/html/stream_file.php?key=885tgf2sx

QUESTION 2Which product enables cloud functionality and is included in the AIX Enterprise Editionat no additional cost?

http://www.gratisexam.com/

A. IBM Cloud Orchestrator

B. WebSphere

C. IBM Cloud Manager with OpenStack

D. Cloud Network Security

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 3: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Reference:IBM SmartCloud Orchestrator includes services contract for IBM ImplementationServices for Power Systems AIX® V6.1 and IBM Migration Services for PowerSystems AIX V6.1.http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=an&subtype=ca&appname=gpateam&supplier=897&letternum=ENUS 213-375

QUESTION 3A customer is currently booting a 770 with internal storage, and wants to maintain alocal boot option on an E870. What local boot option is valid for the E870?

A. Storage on the SAN

B. Storage in the disk expansion drawer

C. Storage in the System Control Unit

D. Storage in the CEC

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:The local boot option for E870 is storage in the CEC.

QUESTION 4A customer has a 6TB database that needs a very high performance solution at thelowest cost. Which system is the more cost effective solution?

A. The S824 with attached FlashSystem 840.

B. The S824 with integrated SSDs and V5000.

C. An E870 with internal disk drives and SSDs.

D. The S824 with internal disk drives and SSDs with Easy Tier.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:

Page 4: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

http://www.slideshare.net/JuanRebes/ideal-storage-for-ibm-power-systems

QUESTION 5A credit card company is going to implement a new application for which security is amajor requirement. The company has been quoted a solution running in Windows. Whyshould the company consider a Power Systems solution?

A. IBM has superior firewalls.

B. IBM AIX and IBM i have security check points that make it nearly impossible to behacked.

C. Starting with POWER8 security is built into the processor.

D. PowerSC includes templates for PCI compliance

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/press/us/en/pressrelease/43702.wss

QUESTION 6A customer asks why they should investigate Open Source solutions as opposed tosingle vendor proprietary solutions. Which statement best summarizes the benefit of thesolutions?

A. Open Source solutions are not susceptible to security flaws due to peer reviewprocess.

B. The open community develops to all operating systems standards.

C. Open Source solutions are certified to execute on all operating systems since they aredeveloped in Java

D. The open community development model provides greater flexibility for applicationfunctional expansion.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:

Page 5: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

we look to provide ongoing and increasing support for complex competency basedcurricular models, for clinical and experiential learning modalities, and provide evergreater flexibility for interprofessional education.https://www.iliosproject.org/timeline

QUESTION 7Customers benefit from the OpenPOWER Foundation because:

A. OpenPOWER Foundation-developed solutions run on all POWER6, POWER7, andPOWER8.

B. OpenPOWER-developed solutions by the Foundation are provided at no charge

C. OpenPOWER Foundation-development teams creating new solutions for Powerarchitecture

D. OpenPOWER Foundation-developed solutions are all developed to utilize CAPI foroptimal performance.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:IBM's POWER architecture is the cornerstone of innovation for the OpenPOWERFoundation, creating a computing platform available to allhttp://openpowerfoundation.org/press-releases/openpower-foundation-technologyleaders-unveil-hardware- solutions-to-deliver-new-server-alternatives/

QUESTION 8What is a competitive advantage of a Power System compared to an Oracle Exadatasystem?

A. Granularity of cores and memory

B. Integration of processors and storage

C. Availability of SSD drives

D. Number of available cores

Correct Answer: ASection: (none)Explanation

Page 6: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation/Reference:Reference:http://www.oracle.com/us/products/servers-storage/servers/x86/x4-2l-faq- 2008606.pdf

QUESTION 9What is an advantage of the POWER8 Scale-out systems compared to a competitiveOracle T5 offering?

A. The option to run SUSE Linux.

B. The ability to connect to a SAN.

C. The ability to support internal drives.

D. The option to run multiple partitions.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:Power8 Scale-out systems support internal drives whereas Oracle T5 supports onlyexternal drives and SAN.

QUESTION 10A customer is concerned about Power Systems security in a virtualized environment.They want real time monitoring and a trusted firewall between LPARs. Which IBMproduct should be proposed?

A. PowerVM

B. PowerSC

C. Tivoli Security Policy Manager

D. IBM Security Access Manager for Enterprise Single Sign-On

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:PowerSC pass packets securely between LPARs without an external firewall.ftp://public.dhe.ibm.com/systems/power/community/aix/Switzerland_VUG/7_PowerSC

Page 7: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

_Ove rview.pdf (page 1)

QUESTION 11A customer wants to run an Oracle application that is available for POWER8 and othercompetitive platforms. The Oracle application is licensed per core. Which POWER8processor advantage provides a competitive TCO advantage?

http://www.gratisexam.com/

A. Processor Instruction Retry

B. 8 cores per processor

C. Level 3 memory cache

D. Core performance

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:POWER8 processing cores2 are the fastest in the industry for Enterprise Javaworkloads. It has 2x more performance per core than Intel E5-2697 v2 offerings and1.77x more performance per core than Oracle T5-2 offerings.https://www950.ibm.com/events/wwe/impact/impact2014cms.nsf/download/k7e19cd561ad41ad4145c4 e50051/$FILE/Impact2014_3407.pdf

QUESTION 12A customer with no in-house IT support needs to implement a solution that includes arelational database, industry leading security, standards based internet technology,networking and storage management capabilities. Which Operating System will satisfythe customer's requirements?

A. LINUX

B. AIX

C. Windows

D. IBM i

Page 8: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:IBM i integrates a trusted combination of a DB2 relational database, industry- leadingsecurity, standards- based Internet technology, networking, and storage managementcapabilities. For example, IBM installs and integrates the SQL standards- based DB2database for IBM i with advanced database management utilities, plus additionalmiddleware components such as multiple file system options, directory capability, anHTTP web server powered by Apache, a web application server, and a web- servicesenvironment.http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?subtype=ca&infotype=an&appname=iSource&supplier=897&letternum=ENUS 214-154

QUESTION 13A client wants a proposal for a POWER8 server to support deployment of a new mobileapplication. What information is most valuable to configure the new server?

A. Programming language

B. Types of mobile devices

C. Expected transaction volume

D. Security requirements

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 14Which management function is provided by IBM Cloud Manager with OpenStack?

A. Resource pooling and dynamic VM placement

B. Ongoing optimization and VM resilience

C. Electronic Service Agent for proactive hardware reporting

D. End-user self-service provisioning and automation

Page 9: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:IBM Cloud Manager with OpenStack, together with Platform Resource Scheduler, helpsto reduce the total cost of ownership of the cloud by using infrastructure moreefficiently, sharing resources between tenants, and automating tedious cloudmanagement tasks. By continuously monitoring the cloud and taking actions asnecessary to ensure that configurable policy objectives are being achieved, performanceand availability remain optimal even as the topology of the cloud infrastructure andworkloads inevitably change with time.http://www01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/7/897/ENUS214- 377/ index.html&lang=en&request_locale=en

QUESTION 15You are proposing a PowerHA solution to your customer who wants installationassistance. What resource can be proposed to perform the installation?

A. IBM Development team

B. Advanced Technical Support

C. Lab Services

D. Local Field Technical Sales Support

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www.redbooks.ibm.com/redbooks/pdfs/sg248167.pdf

QUESTION 16IBM is competing with Cisco for a large Oracle database opportunity. What advantageof POWER8 systems should an IBM Power reseller emphasize?

A. They can be virtualized.

B. They are managed by a single pane of glass.

Page 10: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

C. They run Linux.

D. They offer greater scalability.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_ca/7/897/ENUS214- 377/ index.html&lang=en&request_locale=en

QUESTION 17An existing IBM customer explains they cannot consider POWER8 because they have asmall application that requires AIX 5.2. Which of the following capabilities will allowthat application to run on a POWER8 server?

A. Little Endian support will allow AIX 5.2 to run on any POWER8 server.

B. Versioned Workload Partitions (WPARs) for AIX 7.1 EE can allow workloadsdependent on AIX 5.2 to run on POWER8.

C. Logical Partitions (LPARs) enable different versions of AIX to run simultaneously onone POWER8 system.

D. AIX binary compatibility allows applications created on earlier releases of AIX torun unchanged and without recompilation on POWER8.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:Support for little endian mode in the POWER8 processor enables a new generation ofapplications. While I plan to devote future blog entries to this topic, let me take amoment to address some basic facts about the technology. First, the traditional POWERoperating systems (AIX, and IBM i) are big endian and will continue to run as such onPOWER8 and future systems. Second, Linux operating systems over time will bemigrating from being big endian to little endian in an organized way that by no meanscompromises the support cycles for their existing releases. Third, as little endianoperating systems come to market, a new little endian application ecosystem will grow.Given that most applications today support one or more little endian operating systems(Windows or x86 Linux) and at least one big endian operating system (Linux on Power,

Page 11: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

AIX, or z/OS), this ecosystem should grow quickly. Finally, little endian mode onPOWER8 is not a magic bullet: compiled x86 Linux applications will still require arecompile at a minimum because the x86 and Power instruction set architectures are stilldifferent. With this new support, Power will simplify on step in the porting process fornew applications, but to develop the whole ecosystem will take time.https://www.ibm.com/developerworks/community/blogs/fe313521-2e95-46f2- 817d-44a4f27eba32/entry/ power8_propels_power_systems_into_the_future?lang=en

QUESTION 18A customer believes that virtualized x86 solutions offer a lower TCA than Powersolutions. Which of the following Power solutions generally has the lowest TCA?

A. S824

B. S824L

C. S812L

D. S822

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:https://www.ibm.com/developerworks/community/wikis/form/anonymous/api/wiki/61ad9cf2- c6a3-4d2c-b779- 61ff0266d32a/page/1cb956e8-4160-4bea-a956-e51490c2b920/attachment/cb2d4737-e8f5-4f96-9a74-71573b34b96d/media/VUG%20Why%20POWER8%20is%20the%20platform%20of%20ch oice%20for% 20Linux%20v1.4%20CLEAN.pdf

QUESTION 19A customer is migrating from a POWER6 570 to a POWER8 S824. Which technologywill have to be replaced?

A. FCoE

B. SAS

C. Fibre Channel

D. SCSI

Correct Answer: DSection: (none)

Page 12: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation

Explanation/Reference:Reference:http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=dd&subtype=sm&appname=pseries&htmlfid=897/ENUS9117-_h02

QUESTION 20In addition to one System Node, what is (are) the minimum E880 hardware feature(s)?

http://www.gratisexam.com/

A. One System Control Unit and two I/O drawers

B. One System Control Unit

C. One I/O drawer r

D. Two I/O drawers and one disk expansion drawer

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:The IBM Power System E880 with POWER8 system node uses 8-core symmetricmultiprocessing (SMP) processor chips with 512 KB of L2 and 8 MB of L3 cache percore, DDR3 CDIMM memory, dual memory controllers, and an industry-standard Gen3PCIe I/O bus designed to use 32 lanes organized in two sets of x16. The peak memoryand I/O bandwidths per system node have increased over 300% compared toPOWER7+TM servers. The two primary system building blocks are one system controlunit and one or more system nodes. Additional I/O support is provided with a 19-inchPCIe Gen3 I/O expansion drawer and an EXP24S SFF Gen2 expansion drawer. Theprocessors, memory, and base I/O are packaged within the system nodes. The systemnodes are rack based.New POWER8 processor single chip modules (SCM) are provided in each system node.Processors are interconnected by two sets of system buses. Each SCM contains twomemory controllers per processor module. Four 4.35 GHz 8-core SCMs are used in eachsystem node, providing 32 cores (#EPBB). As few as eight cores in the system can be

Page 13: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

activated or up to 100% of the cores in the system can be activated.Incrementing one core at a time is available through built-in capacity on demand (CoD)functions to the full capacity of the system.The Power E880 can have up to four system nodes per system. With 32-core nodes, themaximum is a 128- core system. In 2014, up to two system nodes per server aresupported or a maximum of 64 cores.The system control unit provides redundant system master clocks and redundant systemmaster service processors (FSPs). Additionally, it contains the Operator Panel, theSystem VPD, and the Base DVD.http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=an&subtype=ca&appname=gpateam&supplier=877&letternum=ENUS ZG14-0262

QUESTION 21Which POWER8 feature is available only on E870 and E880 models?

A. Enterprise Pools

B. Concurrent firmware updates

C. Dual HMCs

D. Hot Swap PCIe adapters

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:Each Power E870 or Power E880 system node provides eight half-length, half-high x16PCIe Gen3 slots. These PCIe slots can be used for either low profile PCIe adapters or forattaching a PCIe I/O drawer.A new form factor blind swap cassette (BSC) is used to house the low profile adapters,which go into these slots. All PCIe slots are hot swappable and support concurrentmaintenance.http://www.redbooks.ibm.com/redpapers/pdfs/redp5137.pdf

QUESTION 22A customer has many x86 systems running Linux and has run out of server rack space.Which statement indicates how a Power Systems provides a solution to resolve the spaceissue?

A. Power rack systems are 2U and 4U and have a much smaller footprint than x86

Page 14: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

systems.

B. Power rack systems are four sockets and therefore can reduce the space requirementsby two times.

C. Higher performance means fewer servers for same workload.

D. Lower energy consumption means less HVAC and therefore increases availabledatacenter space.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 23When implementing a 40TB NoSQL in-memory database on an x86 platform, acustomer needs 24 servers. The same database requirement can be satisfied on POWERwith a CAPI connected FlashSystem 840. How many Power S822L(s) is (are) needed?

A. 8

B. 16

C. 24

D. 1

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/hardware/s812l-s822l/specs.html

QUESTION 24The executive summary of a proposal should:

A. present the TCO of the proposal with financial details.

B. contrast the Power solution to the competitive offerings.

C. state an overview of all of the elements of the proposal.

D. provide the primary business objectives of the RFP.

Page 15: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:According to IBM, the executive summary of a proposal should have an overview of allthe elements of the proposal.

QUESTION 25Which PCI adapter(s) is (are) supported in POWER8?

A. PCI-X and PCIe Gen 3

B. PCIe Gen 3 only

C. PCIe Gen 1, PCIe Gen 2, and PCIe Gen 3

D. PCI-X, PCIe Gen 1, PCIe Gen 2, and PCIe Gen 3

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:As per IBM reference, Power8 supports only PCIe Gen 3 adapters. http://www-01.ibm.com/support/ knowledgecenter/8247-21L/p8eab/p8eab_83x_8rx_supported_pci.htm

QUESTION 26A customer wants to simplify virtualization management and specifically wants theability to capture and deploy virtual images. In addition to PowerVM, which softwareproduct will satisfy the requirement?

A. PowerVP

B. PowerKVM

C. PowerVC

D. PowerHA

Correct Answer: CSection: (none)

Page 16: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation

Explanation/Reference:Reference:IBM® PowerVC Virtualization Center is an advanced virtualization managementoffering, built on OpenStack, that provides simplified virtualization management forIBM AIX®, IBM i and Linux virtual machines (VMs) running on IBM PowerSystemsTM http://www-03.ibm.com/systems/power/software/virtualizationmanagement/

QUESTION 27A customer purchased a new POWER8 Scale-out server and wants three years of 24 by7 hardware. Which option satisfies this request?

A. Upgrade from one year 9 by 5 to 24 by 7 and one year to a three year warrantyextension.

B. Upgrade from one year 24 by 7 to three years.

C. The standard 24 by 7 warranty for three years

D. Upgrade from standard three years 9 by 5 to 24 by 7.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 28What resource should be used to assemble the sales material for a competitiveopportunity?

A. Knowledge Center

B. ibm.com

C. InfoCenter

D. FindIt

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 17: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Reference:FindIt ends the problem of matching sources to objects in a busy productionenvironment. FindIt locates sources or objects on a single AS/400 (System i) or across anetwork of many AS/400 systems, and lets you instantly match the version of a sourceagainst that live object.On a command line simply enter FIND followed by the name of the source member, andFindIt displays a complete list of all versions of that source, showing where the source islocated, giving source files, libraries and iSeries systems.

QUESTION 29Which RAS feature is available only on Power Enterprise Systems?

A. Dual FSPs (Flexible Service Processor)

B. Chipkill memory

C. FFDC (First Failure Data Capture)

D. ECC memory

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://www.ibmsystemsmag.com/power/businessstrategy/competitiveadvantage/power_vs_ intel/?page=3

QUESTION 30An existing customer wants to mitigate the risk of replacing their HP system running anOracle database with IBM Power Systems. Which resource should be reviewed with thecustomer?

http://www.gratisexam.com/

A. IBM Power System's ranking on the RPE website

B. IBM's participation in the OpenPOWER Foundation

C. IBM Migration Factory

Page 18: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

D. IBM Power Systems Roadmap

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:The IBM Migration Factory works across all industries and sectors. It provides supportfor all phases of an engagement, including customer presales presentation, RFP responseand proposal development. The Migration Factory formed at the end of 2003 followingthe acquisition of IBM Business Partner Sector7. The Migration Factory offers uniqueskill sets required for cross-platform work.http://www-03.ibm.com/systems/migratetoibm/migrationfactory/overview/

QUESTION 31A customer with an AS/400 running S/36 code needs to migrate to a new P0WER8system. They require a deskside solution. Which solution will satisfy the customer'srequirements?

A. S812L running IBM i 6.2

B. S814 running IBM i 7.1

C. S822 running IBM i 7.2

D. S814 running IBM i 6.1

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:S814 is deskside solution and with IBM I 7.1 it can execute S/36 code.http://www-03.ibm.com/systems/power/hardware/s814/specs.html

QUESTION 32A customer has an E870 and is installing IBM software products in a Red Hat partition.What PVU will the customer be charged per core?

A. 70PVUs

B. 100PVUS

Page 19: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

C. 120PVUs

D. 80PVUs

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 33Which POWER8 servers are NEBS (Network Equipment Building System) compliant?

A. S824L and S824

B. S822L and S812L

C. S822L and S822

D. S814 and S822

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:S822 and S822L conform to the Network Equipment Building Systems (NEBS) Level 3and the European Telecommunications Standards Institute (ETSI) standard.http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?subtype=WH&infotype=SA&appname=STGE_PO_PO_USEN&htmlfid=POW03132USEN&attachment=POW03132USEN.PDF

QUESTION 34A customer is considering the purchase of three IBM POWER8 Scale-out systems to runtheir AIX and IBM I applications. Their main concern is application uptime. Whatfeature of the POWER8 Scale-out systems should the IBM reseller discuss?

A. RAS features eliminate disk and memory failures

B. Live Partition Mobility

C. PowerVC

D. Hot swap memory and cores

Page 20: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:Demands for system uptime have consistently risen over the years, and while technologyfeatures such as high availability have largely minimized unplanned downtime, serversstill have to come down for routine maintenance to keep operations running smoothly.This is one of the key benefits of Live Partition Mobility for IBM i, which allows IT tomigrate a partition from one physical machine to another.

QUESTION 35Which feature is available on POWER8 Scale-out systems?

A. Solid-State disk drives

B. Redundant service processors

C. Processor Capacity on Demand

D. Memory Capacity on Demand

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://ibm.also.ch/fileadmin/Dateien/pdf/power8/POWER8_-_Deep_Dive_30042014.pdf (page 79)

QUESTION 36What P0WER8 availability feature is unique to the E870 and E880 models?

A. Redundant service processors

B. Hot swap I/O adapters

C. First failure data capture

D. PowerVM Live Partition Mobility

Correct Answer: ASection: (none)Explanation

Page 21: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation/Reference:Reference:The system control unit provides redundant system master clocks and redundant systemmaster service processors (FSPs). Additionally, it contains the Operator Panel, theSystem VPD, and the Base DVD. http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=an&subtype=ca&appname=gpateam&supplier=877&letternum=ENUS ZG14-0262

QUESTION 37Why is OpenPOWER strategically important for Power Systems customers?

A. To support IBM i solutions for hybrid clouds

B. To help integrate IBM Cloud with OpenStack for private cloud.

C. To collaborate with companies and develop new Power solutions

D. To enable community development of AIX and PowerVM.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/

QUESTION 38How does POWER8 technology contribute to lower TCO?

A. Software licensing and with Capacity on Demand allows software to be licensed tothe lowest core count.

B. Higher performance cores reduces software licensing.

C. RAS features mean the cost of failover systems can be eliminated.

D. The lower energy usage of Power Systems can reduce 20% of systems costs.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 22: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 39As a virtualization host, what is an advantage of VIOS compared to IBM i?

A. Virtual SCSI

B. Virtual Ethernet

C. Dual (redundant) management partitions

D. V3700 external disk virtualization

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/resources/systems_i_Virtualization_Open_Storage.pdf

QUESTION 40A customer has an E870 installed in one location and is going to upgrade a Power 770 toan E870 in a second location Which option describes whether a Technical DeliveryAssessment (TDA) is required on the Power 770 to E870 upgrade?

http://www.gratisexam.com/

A. A TDA is only required on the first POWER 770 to E870 upgrade at a customerlocation.

B. Since the customer already has an E870 installed in the enterprise, a TDA is notrequired.

C. A TDA is not required on a POWER 770 to E870 upgrade.

D. A TDA is required on all POWER 770 to E870 upgrades.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 23: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Reference:POWER7 processor-based servers, a TDA is required for the Power 770 and above.http://www-03.ibm.com/systems/power/hardware/770/

QUESTION 41Which P0WER8 technology features contribute the most to lower TCO?

A. CAPI and transactional memory

B. High performance cores and SMT

C. PCIe Gen3 support and Hot Plug adapters

D. First Failure Data Capture and Thermal Power Management Device

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:https://www.ibm.com/developerworks/community/wikis/form/anonymous/api/wiki/61ad9cf2- c6a3-4d2c-b779- 61ff0266d32a/page/f1abe75a-a2b2-43dd-9d75-7dae28f5bc5f/attachment/0b9be9c6-1d2b-44dc-9630- 384f47734c94/media/2014-01%20Intro%20to%20POWER8%20Processor%20%28JM%20Tendler%20to%20GA%20 Power%20User%20Group,%202014-01-16%29.pdf

QUESTION 42A customer is running an application that is licensed per core. What advantage doesPOWER8 have compared to x86 that could lower software costs?

A. Memory performance

B. Bandwidth performance

C. Processor performance

D. I/O performance

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:Power8 unique processor features provide lower software costs compared to x86

Page 24: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

processor infrastructure.

QUESTION 43A customer wants to run multiple workloads, and is considering an S824 or an E870.Under which condition would the E870 be more appropriate?

A. If the customer needs hot plug PCIe adapters.

B. If the customer expects to grow beyond 2TB of memory and more than 24 cores.

C. If the customer needs to support more than 1TB of memory.

D. If the customer needs to run AIX, IBM i, and Linux using internal disk.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:http://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf

QUESTION 44A customer is considering the E880 server with PowerVC to simplify virtualizationmanagement. Which software product includes PowerVC?

A. AIX 7 Standard Edition

B. AIX 7 Enterprise Edition

C. AIX 6 Express Edition

D. PowerVM Enterprise Edition

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-01.ibm.com/common/ssi/cgibin/ssialias?infotype=OC&subtype=NA&htmlfid=897/ENUS5765-G99&appname=System%20Storage

QUESTION 45A department chain IT manager stated that their E870 processing requirements can

Page 25: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

experience unexpected short peaks throughout the day. They need to automaticallyactivate cores and give them back when the processing requirements decrease. WhichCapacity on Demand offering will satisfy the customer's requirements?

A. Capacity Upgrade on Demand

B. Utility

C. Trial

D. Elastic

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:Utility Capacity on DemandUtility CoD is used when you have unpredictable, short workload spikes.http://www.unixmantra.com/2014/03/power-systems-capacity-on-demand- cod.html

QUESTION 46Which customer requirement would lead to a proposal of a 6-core S814 instead of a 4-core S814 server?

A. Large cache disk controllers

B. Fibre attached disk

C. 96GB memory

D. High speed Ethernet adapters

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:IBM S814 (6-core) has 18 Drive backplane with Dual raid controllers with a nice levelof cache. Can attach say at EXP24S and fill the 18 internal slots

QUESTION 47A prospective IBM POWER8 customer is worried about the longevity of RISCprocessors. Which response should help the customer be less concerned about their

Page 26: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

investment in a Power System?

A. With IBM's support for Little Endian, AIX and IBM i will run on x86.

B. Even if POWER is discontinued, all IBM applications and middleware have beenported to Linux.

C. IBM has guaranteed the OpenPOWER Foundation that IBM will continue POWERchip development for the next 10 years.

D. The IBM OS and Power technology roadmaps emphasize IBM's technologycommitment.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/software/i/strategy.html

QUESTION 48A customer is evaluating POWER8 and competitive servers to run multiple workloads ina dynamic environment. What should be emphasized in the Executive Summary of aproposal?

A. Energy consumption report details

B. Faster processors reduce software licensing expenses

C. Ability to run AIX. LINUX, and IBM i applications concurrently.

D. Acquisition cost details

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:If the customer is looking for multiple workloads being run in a dynamic environment,you can emphasize the ability of Power8 to run AIX, Linux and IBM I applicationconcurrently.

QUESTION 49A POWERS customer with disk expansion drawers needs a non-disruptive solution to

Page 27: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

improve the disk performance at the lowest cost. What should be proposed to satisfy thecustomer's requirement?

A. V7000 SAN Disk

B. 840 Flash Storage

C. DS5000 SAN Disk

D. SSD drives

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-05.ibm.com/cz/events/xtraining2012/prezentace/02_IBM_Storwize_V7000.pdf

QUESTION 50An existing POWER8 customer with an E870 recently acquired a small company withan x86 Linux server running a scripting Java application. They would like to run thatapplication on their E870, but are concerned about the porting effort. How should thesalesperson respond?

http://www.gratisexam.com/

A. Well-written Linux on x86 applications written in scripting Java or most interpretivelanguages will run as is, with no changes.

B. IBM Bluemix is a Platform as a Service (PaaS) offering that creates a hybridOpenStack environment of AIX, IBM i and Linux.

C. POWER8 systems come with Nvidia coprocessors designed specifically to run mostx86 Linux applications in their native modes.

D. PowerKVM is an open-source virtualization solution designed to run Linux-onlyapplications written in C++ and Java applications from x86.

Correct Answer: ASection: (none)

Page 28: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation

Explanation/Reference:Reference:IBM reports that 100 percent of hardware-agnostic Linux on x86 applications written inscripting (e.g., Java) or interpretive languages (e.g., PHP, Phyton, Perl, Ruby, etc.) willrun as is with no changes.

QUESTION 51In a very competitive situation, a business partner requested the assistance of an IBMField Technical Systems Specialist (FTSS) to help differentiate an E880 against HP. Theteam was successful and the client wants to acquire the proposed Power solution. Who isrequired to perform the Technical Delivery Assessment (TDA) in this situation?

A. The FTSS with the Business Partner assistance.

B. The IBM FTSS.

C. Only the customer. A TDA is not required because the FTSS was involved.

D. The Business Partner with FTSS assistance, if requested.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:IF the sales is successful, you can get business partner with FTSS assistance, however,FTSS is not necessary.

QUESTION 52A customer is evaluating infrastructure options in order to deploy IBM DB2 BLU. Whatis a benefit of running DB2 BLU on POWER8?

A. It exploits large caches and memory bandwidth, delivering better performance

B. It takes full advantage of 16 threads per core, delivering better performance.

C. It can be managed with PowerVP to simplify deployment of new images.

D. It minimizes the number of support contracts that the customer needs.

Correct Answer: ASection: (none)Explanation

Page 29: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation/Reference:Reference:Moving data from memory to disk and back again impacts query performance. But ifdata stays in memory, the response time is much faster. DB2 10.5 introduces BLUAcceleration for next generation in-memory computing. BLU Acceleration providesbreakthrough performance by delivering instant insight from operational data andhistorical data. IBM Power Systems, with the new POWER8 processor, providesindustry-leading capability to keep high volumes of data in memory because of its largecache sizes and memory bandwidth.Power Systems are designed to optimize analytics performance for big data. http://www-01.ibm.com/software/ data/db2/power-systems/

QUESTION 53A small retailer has a 4-core S814 with one processor license to run the productionworkload. During the busy holiday season in November and December, the averagedaily workload is doubled. Which solution will provide the required processing capacityfor the busy season?

A. Purchase an additional processor license.

B. Implement Elastic Capacity on Demand

C. Enable Active Memory Expansion

D. Purchase an additional processor activation

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:https://www.ibm.com/developerworks/mydeveloperworks/wikis/home/wiki/Power+Systems/ page/Active +Memory+Expansion+(AME)

QUESTION 54In a competitive situation, a customer wants to compare virtualization capabilities ofPOWER8 systems and x86 systems. Which response describes a competitive advantageof PowerVM compared to VMware?

A. PowerVM runs in a secure address space while VMware runs in application state

B. PowerVM can run dual VIO servers to provide higher availability

C. PowerVMprovide higher system utilization because it is implemented in the

Page 30: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

processor logic.

D. PowerVM has the ability to virtualize memory while VMware does not.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:https://www.ibm.com/developerworks/aix/library/au-aixhpvirtualization/

QUESTION 55A customer needs a 4-core S814 server with 1TB of available disk space to run an ERPapplication. Which disk storage technology meets the requirements?

A. Flash

B. SAN

C. Internal hard disk

D. Internal Solid-State disk

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/hardware/scale-out.html

QUESTION 56A customer is close to maximum energy consumption in their data center and wants tomeasure and predict energy use. Which POWER8 feature will provide the requiredfunction?

A. Power capping

B. Power saver mode

C. Power core nap mode

D. Power trending

Correct Answer: DSection: (none)

Page 31: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation

Explanation/Reference:Reference:EnergyScale provides continuous collection of real-time server energy consumption. Itenables administrators to predict power consumption across their infrastructure and toreact to business and processing needs. For example, administrators can use suchinformation to predict data center energy consumption at various times of the day, week,or month.http://www.redbooks.ibm.com/redpapers/pdfs/redp5102.pdf (page 95)

QUESTION 57A customer has 4U remaining in their rack. Adding a second rack is not an option. Theywill run a number of small instances of WebSphere Application Servers. It has beendetermined that the application will require a total of 38 cores and 1TB of memory.What is the lowest cost Linux option that will satisfy the requirement?

A. Two S822s

B. Two S824s

C. One S824L

D. Two S812Ls

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://public.dhe.ibm.com/common/ssi/ecm/po/en/pod03097usen/POD03097USEN.PDF

QUESTION 58A customer is running an Oracle database on Solaris and needs to replace their systems.They are considering offerings from both Oracle and IBM. Oracle is leading with M5.What advantage should the IBM reseller discuss to demonstrate the value of POWER8?

A. Total cores on a single systems

B. License cost per core

C. Number of threads per core

D. Core performance

Page 32: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www.oracle.com/us/products/servers-storage/solaris/solaris11/solaris- sparc-final-5-1931785.pdf

QUESTION 59A customer needs to support an HPC cluster, and needs the maximum number of coresin a standard 19 inch rack. The customer can run either AIX or Linux. Which POWER8server best satisfies the requirement?

A. S824

B. S822

C. S822L

D. S824L

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:The Power S822 is designed to mount in the 36U 7014-T00 (#0551), the 42U 7014-T42(#0553), or the IBM 42U Slim Rack (7965-94Y) racks. These racks are built to the 19-inch EIA 310D standard. http://www.redbooks.ibm.com/redbooks/pdfs/sg248171.pdf

QUESTION 60What is a performance monitoring product that is available on the E880?

http://www.gratisexam.com/

A. PowerSC

B. PowerVP

Page 33: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

C. PowerVC

D. PowerVM

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:The dynamic pace of change that is encountered with today's virtualized environmentsand workloads require flexible infrastructure. This flexible infrastructure allows virtualworkloads to be mobile and to dynamically contract and expand within the virtual datacenter as needed by the business. Performance is key to the benefit of this new flexibilityintroduced by server virtualization and cloud deployments which yields the benefits ofconsolidation, flexibility and reduction of risk. The ability to manage and monitor theperformance of both the virtualized workloads as well as the physical hardware mappingis critical. IBM PowerVPTM provides the performance intelligence to make keydecisions in the virtualized infrastructure such as VM placement and exploitation of keyserver resources for optimized workload performance.http://www-03.ibm.com/systems/power/software/virtualization-management/

QUESTION 61A customer is running an E870 and is considering running Linux in a partition. Whatshould be proposed to the customer to satisfy the requirement?

A. Red Hat free edition

B. Integrated Facility for Linux (IFL)

C. SUSE with KVM

D. Ubuntu

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:See the table at https://www-01.ibm.com/support/knowledgecenter/linuxonibm/liaam/liaamdistros.htm

QUESTION 62A customer needs to purchase a server to run their large Tivoli Storage Manager

Page 34: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

environment What POWER8 capability should they consider compared to an x86solution?

A. Dual FSPs ensure system availability

B. Active Memory Expansion

C. Chipkill memory reduces program errors

D. Higher system bandwidth

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:Large Tivoli storage manager requires higher system bandwidth for data transmission.IBM Power8 is the best processor to utilize the technology and provide higher systembandwidth compared to x86 solution.

QUESTION 63What benefit is provided by connecting FPGA cards to POWER8 via CAPI instead ofconnecting FPGA cards to x86 via PCIe?

A. There is no overhead from OS or drivers, providing improved response times andincreased throughput.

B. FPGA card attached via CAPI on POWER8 comes pre-installed with specific drivers.

C. The offload processor in CAPI speeds up I/O transfers from the FPGA card.

D. FPGA cards can be installed in PCIe or PCI-X slots on POWER8.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:When you connect FPGA card to Power8 via CAPI, no overhead fro OS or drivers willoccur. IT provides improved response time and increased throughput.

QUESTION 64A customer has a quote for running an Oracle database on a HP Itanium server. WhatPOWER8 competitive advantage should an IBM reseller discuss?

Page 35: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

A. Oracle no longer supports Itanium on Oracle's latest versions of their database.

B. HP Itanium only supports Oracle database with Windows.

C. The Oracle database cost has a multiplier of .5 on POWER8.

D. POWER8 requires fewer cores resulting in fewer Oracle licenses.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 65What is the PVU value for an IBM two socket Scale-out system?

A. 120 PVUs per system

B. 70 PVUs per core

C. 100 PVUs per socket

D. 50 PVUs per processor

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:You need 70 PVUs per core for a two socket scale-out system.https://www950.ibm.com/events/wwe/grp/grp019.nsf/vLookupPDFs/Vortrag%204%20L%C3%B6sunge n%20f%C3%BCr%20Linux%20on%20Power%202/$file/Vortrag%204%20L%C3%B6sungen%20f%C3%BCr% 20Linux%20on%20Power%202.pdf (page 7)

QUESTION 66A client running Oracle databases is considering a Power solution. They want thehighest level of reliability, performance, and support. Which operating system on Powershould be recommended?

A. Red Hat

B. IBMi

Page 36: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

C. AIX

D. SUSE

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:Businesses today need to maximize the return on investment in information technology.Their IT infrastructure should have the flexibility to quickly adjust to changing businesscomputing requirements and scale to handle ever expanding workloads--without addingcomplexity. But just providing flexibility and performance isn't enough; the ITinfrastructure also needs to provide rock-solid security and near-continuous availabilityand while managing energy and cooling costs.These are just some of the reasons why more and more businesses are choosing the AIXoperating system (OS) running on IBM systems designed with Power Architecture®technology. With its proven scalability, advanced virtualization, security, manageabilityand reliability features, the AIX OS is an excellent choice for building an ITinfrastructure. And, AIX is the only operating system that leverages decades of IBMtechnology innovation designed to provide the highest level of performance andreliability of any UNIX operating system. http://www-03.ibm.com/systems/power/software/aix/v71/

QUESTION 67A customer needing an analytics solution is comparing POWER8 with x86 servers fortheir infrastructure. What makes Power Systems a better value than the x86solution?

A. More supported analytic solutions providing more choices

B. Higher performance and faster response times

C. Greater storage capacity with encrypted data.

D. Stronger encryption capabilities and proprietary analytics algorithms

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:X86 solutions cannot provide high performance and faster response times during to theirarchitecture. Power8 processor is much faster and provide consistent performance

Page 37: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

throughout the service lifecycle.

QUESTION 68A customer wants to deploy a new private cloud infrastructure and is evaluating bothx86 and Power System technologies. What benefit can be achieved by IBM PowerSystems Solution Edition for Cloud?

A. It is pre-built and pre-installed based on customizable configurations.

B. It is pre-installed with fixed configurations.

C. It is packaged as an appliance for fast time to value and minimal risk.

D. It provides reference configurations so a customer can implement a solution withminimal risk.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:The IBM Power Systems Solution Edition for Cloud helps speed up and simplifies thedeployment of a cloud with OpenStack based cloud management software delivered on apre-built and pre-installed Power Systems enterprise platform. The Solution Edition iseasy to order, includes configurable hardware choices to address customer needs andpreferences, and ensures successful deployment with optional IBM Lab Servicesimplementation. Building on IBM PowerVM® virtualization and IBM PowerVCTMmanagement, the Solution Edition for Cloud provides cloud capabilities based on aflexible and extensible OpenStack platform with fast and automated installation, anintuitive and easy to use interface, automated deployment, image management,workload metering, and the self-service features of cloud.http://www-03.ibm.com/systems/power/hardware/solutioneditions/cloud/

QUESTION 69What elements of POWER8 technology can be exploited by software developers tooptimize performance on an E870?

A. Active Memory Expansion and storage keys

B. Hypervisor and Thermal Power Management Device (TPMD)

C. First Failure Data Capture (FFDC) and Service processor

D. Transactional memory and SMT

Page 38: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 70A customer has a requirement for analytics with structured and unstructured data. Theywant to use Open source products. What will satisfy the requirement?

http://www.gratisexam.com/

A. HortonWorks on a Linux on Power cluster

B. Veristorm on a Linux on Power cluster

C. Cloudera on a POWER8 IFL on an E870

D. Netezza on an S824

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:IBM Power Systems, built on the POWER8 processor and architecture, are specificallydesigned for optimum Big Data and cloud performance.Combined with Veristorm Data HubTM (VDH), you can deploy a robust, open-sourcedistribution of ApacheTM Hadoop® that is optimized for Linux on Power Systems. Thiscombination brings you the best of both worlds: The innovation of the vibrant Hadoopecosystem, and the performance and cost advantages of POWER8.With Veristorm Data Hub, Hadoop on Power Systems, you can deliver self-serviceanalytics with more intelligence, leveraging data volumes that exceed traditionalsystems.http://www.veristorm.com/sites/g/files/g960391/f/collateral/ds_VDHforPower_20150218b.pdf

QUESTION 71

Page 39: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Upon meeting in an elevator, a customer's senior executive asks an IBM sales agent toexplain in one sentence why POWER8 systems are superior to x86 solutions. Whichstatement best represents the Power Systems value proposition?

A. IBM POWER8 servers deliver a lower TCO with unparalleled system reliability.

B. x86 technology is reaching chip design limitations and x86 performance has notincreased proportionality to the chip core count, which results in higher software costs.

C. Regardless of the benchmark used, IBM POWER8 has proven to be the fastestperforming server chip in the industry.

D. The IBM POWER8 processor is Purpose Built resulting in premium performanceover x86, which results in lower TCA and TCO.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:Sandy Bridge EP E5-26xxIvy Bridge EP E5-26xx v2 Haswell EP E5-26xx v3 Ivy Bridge EX E7-88xx v2 POWER7+ POWER8Clock rates 1.83.6GHz1.7-3.7GHz1.7-3.7GHz1.9-3.4 GHz3.1-4.4 GHz3.0-4.15 GHzSMT options 1,2*1, 2*1, 2*1, 2*1, 2, 41, 2, 4, 8Cores per socket Max Threads / sock Max L1 Cache 32KB32KB*32KB*32KB*32KB64KBMax L2 Cache 256 KB256 KB

Page 40: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

256 KB256 KB256 KB512 KBMax L3 Cache 20 MB30 MB45 MB37.5 MB 80 MB 96 MBMax L4 Cache 128 MBMemory Bandwidth 31.4-51.2 GB/s42.6-59.7 GB/s51.2-68.3 GB/s68-85**GB/s100 180 GB/sec 230 - 410 GB/sechttp://thestgmarketplace.com/pdfs/COMP%20P8%20vs%20X86.ppt

QUESTION 72A customer offers mobile phone plans via a secure website. They requested a meeting toevaluate what IBM has to offer in terms of a hybrid cloud infrastructure and dataanalytics solution, which will allow them to increase sales of mobile phone plans. Whatsolution can be proposed to satisfy the requirements?

A. S814, PowerVM, PowerHA, Worklite, and IBM Cloud Orchestrator

B. S824, Cognos. IBM Cloud Orchestrator, PowerSC, and PowerVM

C. S822, ProtecTIER, Websphere, and IBM Cloud Manager with OpenStack

D. S822, PowerKVM, PowerHA, and Cloud Toolkit

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:With availability beginning June 10, the new scale-out S Class servers include twosystems that run Linux exclusively the Power Systems S812L and S822L servers. Thethree additional offerings, the Power Systems S814, S822 and S824 servers, provideclients the choice of running multiple operating systems including Linux, AIX and IBMi. Available in 1 and 2 socket and 2U and 4U configurations, the starting price of thenew servershttps://www-03.ibm.com/press/us/en/pressrelease/43702.wss

Page 41: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 73An IT manager has several P0WER5 servers and wants to consolidate them into a newP0WER8 server. The CFO (Chief Financial Officer) is asking for a financialjustification for the project. Which resource can be used to provide a rapid high-levelfinancial data overview?

A. IBM Global Financing

B. Scorpion study

C. Alineantool

D. Eagle study

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://expertintegratedsystemsblog.com/2012/07/alinean-tool-get-an-accurate- pictureof-the-benefits-of- expert-integrated-systems/#sthash.9yaC7Epj.dpuf

QUESTION 74A customer has an application that requires the following:21 cores24 by 7 operation High I/O bandwidth Lowest TCOWhich solution will satisfy the requirements?

A. TwoS822s

B. TwoS814s

C. TwoS824s

D. One E870 with two client partitions

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/hardware/e870/specs.html

Page 42: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 75Which RAS feature is available on both the Scale-out and Enterprise systems?

A. CoD memory and cores

B. CAPI

C. Redundant power supplies

D. Redundant FSPs

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:The Redundant power supplies are available for both scale-out and enterprise systems.

QUESTION 76A customer states that they requ.re N_ Port ID Virtualization (NPIV) for storageattachment. Which adapter will satisfy their requirement?

A. 4Gb Fibre Channel adapter

B. 8Gb Fibre Channel adapter

C. 40GbE Infiniband adapter

D. 12Gb Cache RAID SAS quad-port 6Gb adapter

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:The storage installed for this report was two 4 Gb Fibre Channel storage systems (a SunZFS Storage Appliance and a Sun Storage 6180 Array).http://www.oracle.com/technetwork/server-storage/networking/o11-085-stor- net-ciscofcoe-1914006.pdf

QUESTION 77A customer is running a large application on x86 Linux with an Oracle Enterprisedatabase. Which of the following can be used to financially justify migrating theapplication to POWER8 and DB2?

Page 43: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

A. POWER8 requires fewer cores to run the same workload.

B. POWER8 Active Memory Expansion reduces the cost of memory.

C. POWER8 cores exploit SMT6.

D. POWER8 hardware and software maintenance costs are lower.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:Comparing performance, the 740D 3.6ghz 16 core is rated at 197.7 rPerf (SMT4)whereas the S822 3.89ghz 12 core is rated at 220.1 rPerf (SMT4) or 235.6 rPerf(SMT8).So you can get 11 to 19 percent more performance, more memory, more disk bays andPCIe slots for about 40 percent less cost. Another point to note is that the memory andI/O bandwidth for the POWER8 servers (scale out and enterprise) is significantly higherthan all of the previous architectures. And there are additional follow- on savings forsoftware licensing--for our 740D versus S822, we need four fewer cores on thePOWER8, which allows for additional savings on software licensing.http://www.ibmsystemsmag.com/linuxonpower/ Trends/What-s-New/power8- time-isnow/

QUESTION 78Which P0WER8 RAS feature is available on all Scale-out and Enterprise systems?

A. Dual System Clocks

B. Hot Plug PCIe adapters

C. CoD cores

D. DualFSPs

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:Take a look at the following ras features: Processor instruction retryAlternate processor recovery Selective dynamic firmware updates Chip kill memoryError correcting code (ECC) L2 cache, L3 cache Service processor with fault monitoring

Page 44: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Hot-swappable disk baysHot-plug concurrent maintenance PCIe slotsHot-plug and redundant power supplies and cooling fans Dynamic processordeallocation Extended error handling on PCI slotshttp://www-03.ibm.com/systems/power/hardware/s824/specs.html

QUESTION 79A customer has a critical invoice application for which the system is mostlyunderutilized. During the last week of the month, response times become unacceptabledue to growth. The customer does not want to pay for a system that is idle most of thetime. What should be proposed?

A. Capacity Upgrade On Demand

B. Elastic Capacity On Demand

C. Power Enterprise Pools

D. Active Memory Expansion

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 80OpenPOWER Foundation is developing solutions for which environment(s)?

A. AIX and Linux

B. AIX, IBM i, and Linux

C. Linux only

D. AIX only

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:IBM OPENPOWER foundation develops solutions for open source environments. IBMI and AIX are propriety operating systems whereas Linux is open source.

Page 45: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 81What are key cost elements that should always be included in a POWER8 proposal?

A. Rack space and DR

B. Staffing and energy

C. Software and hardware

D. RAS and financing

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:Of course, you need to include the software and hardware implications of Power8 in theproposal so the customers can understand the performance of Power8 in hardware andsoftware environment.http://public.dhe.ibm.com/common/ssi/ecm/po/en/pob03046usen/POB03046USEN.PDF

QUESTION 82What is a major differentiator with the IBM Solution for Hadoop - Power SystemsEdition, compared to Hadoop on x86?

http://www.gratisexam.com/

A. The IBM solution provides fixed configurations for hardware and software for easydeployment.

B. The IBM solution uses MapReduce for scalability to thousands of servers.

C. The IBM solution uses SSDs and faster interconnects.

D. IBM hardware and software components are customizable for best price/performance

Correct Answer: DSection: (none)Explanation

Page 46: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Explanation/Reference:Reference:Advanced technology for performance and robustness. The hardware and softwarecomponents in this infrastructure are customizable to allow the best performance or thebest price/performance ratio.http://www-03.ibm.com/systems/power/solutions/bigdata-analytics/hadoop/

QUESTION 83A client is looking for a high availability solution for their existing Power environment.They have two locations, each with an E870 and DS8800. What solution provides thebest TCO?

A. IBM PowerHA

B. Vision Solutions MIMIX

C. IBM PowerVP

D. IBM Tivoli Manager for HA

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://www.rocketsoftware.com/sites/default/files/resource_files/IBM%20Systems%20iClust er%20Solution% 20Brief.pdf?flag=meta&product=rocket-icluster-business-continuity- software&family=rocket- icluster&solution=archive-and-backupmanagement&resourcetype=datasheet&resourcebn=rocket-software- and-ibm-isolution-editions-protect-data-and-complementpowerha&resourcefbn=IBM%20Systems%20iCluster%20Solution%20Brief.pdf (seehighlights, second last bullet)

QUESTION 84Which resource is used to determine if an adapter can move from the 570 to the S824?

A. Workload Estimator

B. Sales Manual

C. Alinean Tool

D. Fix Central

Correct Answer: B

Page 47: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:Reference:The sales manual provides details and resource that can help determine if the technicancan move an adapter on 570 to IBM S824. The compatibility matrix helps indetermining the choice and the transfer of hardware from one model to another.http://www01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_sm/2/760/ENUS8286- _h02/ index.html&lang=en&request_locale=en

QUESTION 85A customer states that up time is very critical in their environment. What should theIBM reseller tell the customer?

A. IBM's high availability solution has instant failover resulting in zero down time.

B. IBM's POWER8 Enterprise systems offer a fault tolerant solution.

C. Power Systems are the most reliable non-mainframe systems.

D. IBM POWER8 technology offers concurrent maintenance on all components.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:The reliability of the IBM Power SystemsTM starts with components, devices, andsubsystems that are designed to be fault-tolerant. IBM Power Systems uses lowervoltage technology in the processor Single Chip Modules (SCMs) that improvesreliability stacked latches to reduce soft error (SER) susceptibility. During thedesign and development process, subsystems go through rigorous verification andintegration testing processes. During system manufacturing, systems go through athorough testing process to help ensure high product quality levels.The processor and memory subsystem contain a number of features designed to avoid orenvironmentally induced, single-bit, intermittent failures as well as handle solid faults incomponents, including selective redundancy to tolerate certain faults without requiringan outage or parts replacement.

QUESTION 86A customer asks why they might be interested in open source developed software.Which statement accurately describes the benefit?

Page 48: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

A. Open Source provides binary compatibility applications with AIX.

B. Open Source projects share the same terms and conditions.

C. Open Source uses the community development model.

D. Open Source code is free of security issues.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:Open source software is a community driven effort that uses expertise of variousindividuals and get evolved in to a robust and secure environment safe for applicationsand usage.

QUESTION 87A customer wants to replace their existing x86 server farm running Domino, WebsphereApplication Server, file serving, print serving, Cognos and DB2 database. WhichOperating System offers an integrated solution to satisfy the customer's requirements?

A. Red Hat

B. SUSE

C. IBM i

D. AIX

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:IBM i operating system can support Domino, Websphere, file serving, print serving,Cognos and DB2 database. Since it is an IBM operating system, it can easily run all therequired IBM products efficiently.

QUESTION 88A customer has 40 Power 520 servers and is concerned about the ongoing operationalcost, space, and high availability. Which solution should be discussed in order to satisfythe requirements?

Page 49: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

A. Purchase one S824 with PowerVM and PowerHA.

B. Purchase two S824 servers with PowerVM and PowerHA

C. Purchase one E870 with PowerVM and PowerHA.

D. Purchase four S812L servers with PowerVM and PowerHA

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:http://www.redbooks.ibm.com/redpapers/pdfs/redp5097.pdf (page 19)

QUESTION 89Due to new regulatory requirements, a Power Systems customer must set up a disasterrecovery site in a geographical location at least 120 miles (194 km) away from the mainsite. What is the minimum PowerHA solution that should be proposed?

A. Enterprise Edition

B. Standard Edition

C. Geographical Edition

D. Express Edition

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:The PowerHA SystemMirror for i Enterprise Edition includes all of the capabilities ofthe Standard Edition and more. The Enterprise Edition package enables you to extendyour data center solution across two sites.PowerHA SystemMirror Enterprise Edition includes support for DS8000, SVC, V7000,V5000 and V3700 with either Metro Mirror or Global Mirror and with 7.1 of PowerHASystemMirror, the Enterprise Edition also includes support for geomirroringasynchronous mode. Geomirroring synchronous mode support is included with thePowerHA SystemMirror Standard Edition.

QUESTION 90

Page 50: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

A customer with AIX and IBM i based applications is considering a move to opensource Linux applications on x86 systems. Which benefit should be highlighted for thecustomer to stay with the Power platform?

A. The Power Linux system is more powerful and will cost less than the x86 systems,thereby saving costs.

B. The Power system they are running on can support the existing applications and thenew Linux applications at the same time.

C. The Power system uses Lx86 allowing Linux to run unchanged on Power.

D. The customer can recompile the AIX and IBM i applications and continue with Linuxon their existing Power System.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:PowerVM Lx86 (Linux only) brings new benefits to customers and applicationproviders who want the reliability and flexibility of Power Systems in their Linuxenvironment, yet use applications that have not yet been ported to the platform. IBMPowerVM Lx86 allows most Linux x86 binaries to run unchanged on POWER systemsusing translation software that translates x86.

QUESTION 91A customer requires two local redundant VIO servers on their E870.What should be included with an E870 to satisfy the customer's requirement?

A. EXP24S disk drawer

B. Dual Solid-State Drives in the nodes

C. Split backplane

D. Dual SAS drives in the nodes

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:The EXP24S is a "simple" 24-bay SAS disk drawer. It doesn't have any local SAS

Page 51: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

controller technology or PCI adapter slots. The EXP24S is configured on PowerE870/E880 servers using feature code #5887. The EXP24S is two rack units (2U) in sizeand has two (redundant) power supplies. The 24 disk bays utilize hot- plug, Small FormFactor-2 (SFF-2) drives. Both hard disk drives (HDD) and solid-state drives (SSD) areavailable. The EXP24S will be pre-configured by IBM manufacturing to operate in oneof the following modes: Mode-11 string of 24 disk bays Mode-22 strings of 12 disk baysMode-44 strings of 6 disk baysThe mode is specified using a no-charge feature code when the EXP24S is ordered. TheEXP24S mode is not changeable after the EXP24S has shipped. HDD and SDD drivescan be intermixed within the EXP24s, but must be on separate disk strings. For the mostflexibility, Mode-4 is recommended as it provides boot support for up to four VIOS. InMode-4, each of the disk strings will have six disk bays. This allows each VIOS to havemirrored disk drives for normal operations, mirrored drives for alt_disk_install upgradeand two spare disk bays.

QUESTION 92A customer told the IBM reseller that they are reviewing proposals from severaldifferent computer manufacturers. What should the IBM reseller emphasize as a PowerSystems infrastructure advantage?

A. IBM owns and validates the entire hardware and system software stack.

B. IBM offers a lower price than their competitors.

C. IBM systems scales to a greater number of cores and memory.

D. IBM integrates their systems at the factory to minimize start up time.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:IBM will help you configure, validate hardware and software stack (OS, GeneralParallel File System (GPFS), and SAP), configure networking, provide basic skillstransfer and post-install documentation on IBM System x hardware. IBM also offersongoing managed services for this solution or periodic on site health checks to maintainyour current system environment, assistance with updating your configuration, andsharing best practices for optimal performance and reliability.

QUESTION 93Which tool can be used to determine the three-year TCO of an S824 system compared toan HP DL580?

Page 52: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

http://www.gratisexam.com/

A. Power Systems Speed Sheets

B. TCO Cost Estimator

C. Quick Pricer

D. Alinean TCO tool

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 94Which IBM resource is devised to help with the design and installation of a PowerSystems SmartCloud solution?

A. Redbook Planning Guides

B. Local Field Technical Sales Support

C. Lab Services

D. Advanced Technical Support

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:Redbook planning guides are a huge resource which provides designing and installationguidelines for various IBM products including but not limited to Power systemsSmartCloud solutions and host of other solutions.

QUESTION 95A retail customer has variable processing requirements. The processor and memory

Page 53: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

requirements are not constant and represent a significant cost element of the E870. Whatfeature should be presented to provide a solution for this situation?

A. Active Memory Expansion

B. PowerVM

C. Capacity on Demand

D. Active Memory Sharing

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 96A customer has a fully virtualized scale out Linux environment with 25 x86 servers,each with 16 cores. You are proposing to move all Linux partitions to eight Power S824servers, each with 24 cores. What cost reduction should be included in the TCOdocumentation?

A. Linux patching

B. Partition monitoring

C. Application maintenance

D. Network infrastructure

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:Hardware and software costs: costs associated with storage and network infrastructure;costs associated with server migrations; and costs associated with hardware and softwarefor high availability and disaster recovery https://www.vmware.com/pdf/TCO.pdf

QUESTION 97PowerVM Enterprise Edition provides which availability function?

A. High availability failover

Page 54: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

B. Live Application Mobility incase of a system failure

C. Policy based workload relocation

D. Live Partition Mobility

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:The Live Partition Mobility function offered on POWER6 technology-based systems isdesigned to enable the migration of an entire logical partition from one system toanother. Live Partition Mobility uses a simple and automated procedure that transfersthe configuration from source to destination without disrupting the hosted applicationsor the setup of the operating system and applications.Live Partition Mobility provides the administrator a greater control over the usage ofresources in the data center. It allows a level of reconfiguration that in the past\ was notpossible because of complexity or just because of SLAs that do not allow an applicationto be stopped for an architectural change.http://www.redbooks.ibm.com/redbooks/pdfs/sg247460.pdf

QUESTION 98A customer is running a critical and large Oracle Database on x86 servers in an 8-nodeRAC cluster. The client has regular outages and poor performance. Which POWER8advantage is most relevant to the customer?

A. Near linear scaling

B. Service Processor

C. ECC memory

D. License savings

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:There are some algorithms that scale nearly perfectly to thousands (or hundreds ofthousands) of threads

Page 55: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 99An IBM customer is implementing a very complex solution and is encounteringdifficulty with the integration of the IBM Power System and storage. What resourceshould the customer use for assistance?

A. Advanced Technical Support

B. Redbook planning guides

C. Support Line

D. IBM Knowledge Center

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://www-935.ibm.com/services/us/en/it-services/technical-support-services/

QUESTION 100A customer running Linux with VMware on their x86 systems wants to add an S822Linto the environment using a consistent virtualization technology. How can a Poweroption satisfy the requirement?

A. Implement PowerVM and VMware since the functionality and management interfaceare shared.

B. Implement Kimchi as the management interface to support both environments.

C. Convert VMware to PowerVM on the x86 systems for consistency with the PowerSystems.

D. Implement the appropriate KVM base version on the Power and x86 systems.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:You can implement KVM base version on Power and x86 systems.

QUESTION 101A customer has a BladeCenter S (BCS) with an 8-core POWER6 blade, 1.5TB of

Page 56: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

storage and an external LTO tape drive installed. They want to upgrade to a P0WER8.Which of the following is the lowest cost recommendation to satisfy their requirement?

A. Flex System and POWER8 node

B. S824

C. POWER8 blade in the current BCS

D. S814

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/hardware/s824/

QUESTION 102What is an advantage of a P0WER8 system compared to an x86 solution?

A. Supports PCIe Gen

B. More cores per socket

C. Lower PVU cost

D. Greater memory bandwidth

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:https://www.google.com.pk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0CBsQFjAA&url=https%3A%2F%2Fwww.ibm.com%2Fdeveloperworks %2Fcommunity%2Fwikis%2Fform%2Fanonymous%2Fapi%2Fwiki%2F61ad9cf2-c6a3- 4d2c-b779-61ff0266d32a%2Fpage% 2Ff1abe75a-a2b2-43dd-9d75-7dae28f5bc5f%2Fattachment%2F3d574a4b-b414-42c8-85b0- f941115d569f%2Fmedia%2F2014-06%2520Power%25208%2520Servers%2520June.pdf&ei=17loVa6GLYHkUISHgcAH&usg=AFQjCNGIgaigZjc7XddWybzRsEyNtcfncg&sig2=_lmFDqISPoIG2ek-0PWFhg&bvm=bv.94455598,d.d24 (slide 4)

Page 57: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

QUESTION 103A customer is implementing a new mission critical SAP landscape and requires a Powersystem with the highest level of RAS support. Which of the following will satisfy therequirement?

A. Any POWER8 system

B. E870 or E880

C. E880 only

D. S824, E870, or E880

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:Power8 system provides highest level of RAS support. Therefore, a Power system willbe able to manage mission critical SAP landscape.

QUESTION 104Which analytic solution is supported on Cognos?

A. Predictive analytics

B. Business intelligence

C. Stream computing

D. Cognitive data analysis

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:http://www.slideshare.net/senturus/cognos-10-predictive-analytics (slide 35)

QUESTION 105What is a limitation of the 4-core S814 model once installed? Inability to change the:

A. disk controller from non-cache to cache

Page 58: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

B. operating system from AIX to Linux.

C. attached tape drive from LTO-5 to LTO-6.

D. rack mount to deskside covers

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www-03.ibm.com/systems/power/hardware/s814/specs.html

QUESTION 106An installed HP Superdome / Oracle database customer is consider migrating toPOWER8. The customer has significant financial concerns because of the multiplepartitions and high Oracle licensing cost of their HP solution. What features / capabilityof POWER8 should be discussed with this customer?

A. Processor pooling and high performance cores

B. PowerVP and PowerSC

C. CUoD and CAPI

D. Shared Storage and Processor roadmap

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Reference:http://www-05.ibm.com/cz/events/febannouncement2012/pdf/power_architecture.pdf

QUESTION 107A customer wants to use a virtualization technology that has a consistent interface acrossboth the x86 and Power platforms. Which hypervisor for Power Systems will satisfytheir requirement?

Page 59: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points

http://www.gratisexam.com/

http://www.gratisexam.com/

A. PowerKVM

B. PowerVM

C. HyperV

D. VMware

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:PowerVM is a hypervisor for Power systems that has a consistent interface across x86and power platforms.

QUESTION 108An application has a high availability requirement and is implemented with two localpartitioned POWER8 servers and one remote partitioned POWER8 server. One localserver runs production and replicates data to the backup local server. The backup localserver replicates data to backup remote server. What is the minimum number of HMCsrequired to support the sites?

A. 4

B. 2

C. 3

D. 1

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Reference:You need 2 HMCs for backup local server to replicate data to backup remote server.http:// www.redbooks.ibm.com/redpapers/pdfs/redp5102.pdf

Page 60: IBM.Braindumps.C9010-250.v2017-04-12.by.Wang · should the company consider a Power Systems solution? A. IBM has superior firewalls. B. IBM AIX and IBM i have security check points