• Vision– To enable software interoperability in the AEC/FM industry.
• Mission– To provide a universal basis for process improvement and
information sharing in the construction and facilities management industries.
• Deliverables– The key deliverable of the IAI is the IFC Object Model. The
term ‘model’ in this case means that it provides a formal specification of requirements which can then be used by software authors to create the IFC compliant software applications.
IAI
IAI F
oru
m D
enm
ark
IFC, wIFC, whoho are participating are participating??
• Global• AEC/FM professionals• Software companies• Research Institutes• Governmental supported development programs• List: Graphisoft, Autodesk, Nemetschek, Microsoft,
HOK, Kajima, London Underground, LBNL, Stanford ... 600 members
• Vera, IT och Fastighed, Corenet, Construction Research Center,,,
IAI
IAI F
oru
m D
enm
ark
IFCIFC based based exchangeexchange• IFC
IAI
IAI F
oru
m D
enm
ark
IFC, what is IAI about ?IFC, what is IAI about ?
From
Details
To• Vision
IAI
IAI F
oru
m D
enm
ark
IFC-modellens dækningsgradIFC-modellens dækningsgrad• IFC does not standardize data structures in
individual tasks, only the shared information
3D Modelling
Visualisation
ArchitecturalDesign
StructuralDesign
HVACDesign
BuildingServices
Equipment Maintenance
Marketing
FacilityMaintenance
Sale andrentalactivities
PropertyManagement
Repair andRenovation
IFC-modelIFC-model
IAI
IAI F
oru
m D
enm
ark
IFC, how is IFC structIFC, how is IFC structurureded??ISO/PAS 16739
IAI
IAI F
oru
m D
enm
ark
IFC, how is IFC developed?IFC, how is IFC developed?
IAI
IAI F
oru
m D
enm
ark
IFC, how is IFC developed?IFC, how is IFC developed?
IAI
IAI F
oru
m D
enm
ark
IFC, how is IFC developed?IFC, how is IFC developed?
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?
Shape (explicit)
Shape (extrusions)beams, columns, pipes, ducts, conduit, walls, etc.
Shape (topology)line representations for pipe, duct, structural, etc.
Building Elementswall, door, window, roof, stairs, etc.
Jeff Wix, IFC2x2 Foundation for AEC/FMJeff Wix, IFC2x2 Foundation for AEC/FM
HVAC Equipmentchillers, fans, pumps, boilers, coils, cooling towers, heaters, heat exchangers, etc..
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?
Relations Between Elementsholes, chases, voids, zones
Furnitureinc. system furniture
Electrical Elementstransformers, motors, generators, switches, protective devices, power and communication outlets panels, cubicles
Fire Protection Elementssprinklers, hose reels, hydrants, wet/dry rising mains
Sanitary ElementsWC’s, urinals, baths, bidets, traps gulleys
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?Space and Space Structurespace, building storey, building part, building, site
Zones, compartmentsfire, workstation
Systemspiping, ducting, cable, structural
Lightingrendering and lighting, light sources, rendering material reflections and textures
Manholesmanholes, inspection chambers, access chambers, meter chambers, valve chambers
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?
Grids2D/3D grid structures assignment of elements to grids
Controls, Instrumentssensor, actuator, controller, gauge, meter
Structural Elementsmembers, profiles, rebars, properties, joints, features, surface
Structural analysis:
structural members, boundary conditions, connections, supports, loads, etc.
Draughting
annotations on model space, line types, text, symbols, hatches, dimension lines
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?
Environmental Impactembodied energy, CO2
Move Management
Asset Managementmaintenance history, inventories
Air Handling Unit
Boiler
Pump Set[Physical
Association]
PreheaterValves
Luminaires[Spatial Association]
Helprequest, action, permit, warranty, operation
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?Time Seriestime related events
Constraintsrules, specifications, requirementstrigger conditions
Holes and Basesholes, sleeves, packing, framing, upstands, vibration isolation
Brackets and Fastenersbrackets, drop rods, steel sections, bracket assemblies, screws, bolts etc.
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?30
NameTitle
NameTitle
NameTitle
NameTitle
NameTitle
NameTitle
NameTitle
NameTitle
NameTitle
Actorspeople, organizations, org. structure, addresses
Costingobjects, cost planning, estimates, budgets
Abcd afrgf aahds jhiuhg reeiuhHfije ewku ijijij jhdfhb
Work Plans and Schedulesinc. nested schedules, resource allocation
O/Nr A1263
2xAbcd £ 263xafrgf £ 421xaahds £6854xjhiu £421
Orderswork orders, change orders, purchase orders
IAI
IAI F
oru
m D
enm
ark
IFC, what can IFC do?IFC, what can IFC do?
O/Nr A1263
2xAbcd £ 263xafrgf £ 421xaahds £6854xjhiu £421Associated Documents
ClassificationOCCS
Uniclass
External Data 2xAbcd £ 263xafrgf £ 421xaahds £6854xjhiu £421
Connectivityservices, structure, building
IAI
IAI F
oru
m D
enm
ark
IFC, how are they implemented?IFC, how are they implemented?IFC Express definition from IAI
DevelopToolkit
ProgramInputToolkit
Map-ping
OutputToolkit
Map-ping
Data i IFC format
IFC
ProgramInputToolkit
OutputToolkit
IFC IFC
ProgramIFC IFC
IFC
Express definition
IAI
IAI F
oru
m D
enm
ark
IFC, how are they implemented?IFC, how are they implemented?
ProgramInputToolkit
Map-ping
Data i IFC format
IFC
Express definition
Input Toolkit
Early binding
Late binding
IFCschema
Map-ping
ProgramMap-ping
Map-ping
IFC schema
OutputToolkit
IFCschema
IFC
IFCIFC
Output Toolkit
IFC schema
IAI
IAI F
oru
m D
enm
ark
IFC, how are they implemented?IFC, how are they implemented?• Views
IFC Schema
View 1
View 2
View 3
IFC R1.5.1 CAD View
IFC R2.0 Client briefing/space planning Architectural designArchitectural design Quantities take off / cost estimation
Architectural design Thermal load calculations / HVAC system design
HVAC design Architectural design
HVAC design Quantities take off / cost estimatingCAD View
IAI
IAI F
oru
m D
enm
ark
IFC, how are they implemented?IFC, how are they implemented?• Or via XML
IAI
IAI F
oru
m D
enm
ark
IFC2IFC2xx – Certification – CertificationView DefinitionsView Definitions
• Coordination view• BREPS• Parametric Geometry• Surface model (= open BREP)• MappedRepresentations• All subtypes of type ifcElement• All subtypes of spacial structure for logical purpose • Parameters• Swept geometry• Shape parameters of the elements• Spaces with geometry• BREP and open shell is always the fall back geometry• GUID• Representation of
building service
IFC2xViewdefinitions
www.iai.fhm.edu
IAI
IAI F
oru
m D
enm
ark
IFC2IFC2xx – Certification – CertificationView DefinitionsView Definitions
IAI
IAI F
oru
m D
enm
ark
Bentley Triforma CAD for Architects
DDS ElectroPartner/
HVACPartner
CAD for Electrical and HVAC Engineers
G.E.M. Team Solutions
IFC2x-Interface for Autodesk ADT
IFC-Interface for CAD for Architects
Graphisoft ArchiCAD CAD for Architects
Nemetschek Allplan 2003(Allplan, Allplot, Allready, AllFEM, Allfa)
CAD for Architects, Structural-, Civil- and HVAC- Engineers, Contractors and Facility Managers
BCA Singapore / novaSPRINT
e-Plan Checking Submission checking and control tool
Olof Granlund BSPro/RIUSKA IFC middleware and energy simulation
Solibri Model Checker Design Spell Checking
Vizelia Facility on line
VRML & CAD
IFC-customized VRML viewer and CAD for facility managers
YIT Cove Cost estimation
ACTIVe3D IFC-Tree & Viewer Visualisation
IFC2IFC2xx – Certification – Certification
IAI
IAI F
oru
m D
enm
ark
Bentley Triforma CAD for Architects
DDS ElectroPartner/
HVACPartner
CAD for Electrical and HVAC Engineers
G.E.M. Team Solutions
IFC2x-Interface for Autodesk ADT
IFC-Interface for CAD for Architects
Graphisoft ArchiCAD CAD for Architects
Nemetschek Allplan 2003(Allplan, Allplot, Allready, AllFEM, Allfa)
CAD for Architects, Structural-, Civil- and HVAC- Engineers, Contractors and Facility Managers
BCA Singapore / novaSPRINT
e-Plan Checking Submission checking and control tool
Olof Granlund BSPro/RIUSKA IFC middleware and energy simulation
Solibri Model Checker Design Spell Checking
Vizelia Facility on line
VRML & CAD
IFC-customized VRML viewer and CAD for facility managers
YIT Cove Cost estimation
ACTIVe3D IFC-Tree & Viewer Visualisation
Wid
espr
ead
field
s of
app
licat
ion
IAI
IAI F
oru
m D
enm
ark
FZK – Storey Viewer
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IFC 2x2 Electrical modelIFC 2x2 Electrical model
Snapshot from Snapshot from DDS Electro PartnerDDS Electro Partner
IAI
IAI F
oru
m D
enm
ark
IFC 2x2 Electrical modelIFC 2x2 Electrical model
Snapshot from Snapshot from Nemetchek Allplan FTNemetchek Allplan FT
IAI
IAI F
oru
m D
enm
ark
IFC 2x2 Electrical modelIFC 2x2 Electrical model
Snapshot from Snapshot from Autodesk ADTAutodesk ADT
IAI
IAI F
oru
m D
enm
ark
IFC 2x2 Electrical modelIFC 2x2 Electrical model
Snapshot from Snapshot from ArchiCadArchiCad
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
IAI
IAI F
oru
m D
enm
ark
Course:Course: IT in the Building ProcessIT in the Building Process
Product models in practice - based on the IFC pilot project Product models in practice - based on the IFC pilot project in connection to DR's new headquarter in Ørestadin connection to DR's new headquarter in Ørestad
Jan Karlshøj
CAD Manager, M.Sc,PhD
Building and Transportation and Tele, RAMBØLL
IAI
IAI F
oru
m D
enm
ark
Status of an IFC Pilot ProjectStatus of an IFC Pilot Project
• Is it possible to achieve the vision of a total interoperable IT-environment in a construction project by using IFC?– No– But what can be achieved, and what are the alternatives?
BackgroundBackgroundI have been active in IAI since 1996, and chaired the International I have been active in IAI since 1996, and chaired the International Technical Management Committee between July 1999 and July Technical Management Committee between July 1999 and July 20012001
IAI
IAI F
oru
m D
enm
ark
What have been tested?What have been tested?
• Building– Part of segment 1 of
the new headquarter for the Danish Broad-casting Cooperation
• 50,000 square meters
– Total project• 100,000 square meters• 350 million US $
– Why this project• Carl Bro participates in the project• Scale matters• Interesting project• Too big ?
IAI
IAI F
oru
m D
enm
ark
What have been tested?What have been tested?
• Software– IFC 2.0
• ArchiCAD
• Visio
• Solibri Model Checker
• RIUSKA
• Excel
• ConViewer
– IFC 1.5.1 • Architectural Desktop
– Tools
• IFC Tree Viewer
• IFC to VRML converter
• Process– Used concurrently with the ordinary process
• Why?– I don’t want to sign legal contracts or to use
IFC in full scale, before we have tested the new process with real data
• Exchange– Only by using IFC
IAI
IAI F
oru
m D
enm
ark
What have been tested?What have been tested?• Type of objects:
– Wall– Column– Beam– Slab– Window– Door
• Hierarchy– Site– Building– Floor– Space
• Roles• But not
– HVAC, electrical, structural model, requirements, financial information, maintenance etc.
IAI
IAI F
oru
m D
enm
ark
So, how did the testSo, how did the testss gogo??
• Exchange– Many things worked
• Basic geometry• Types• Some attributes• (Different concepts in different software
product)
– Basic limitations of the software• Only handle bounding box geometry• Only handle 2½D geometry• Only handle spaces of the same storey
IAI
IAI F
oru
m D
enm
ark
So, how did the testSo, how did the testss gogo??
• Limitations in IFC implementations– Support only specific views– Support only IFC import/export for some components
– Do not support features in IFC like openings in slab (has anybody ever heard about an elevator or a pipe?)
IFC ERROR: Kun åbninger i vægge understøttes på nuværende tidspunkt!IFC ERROR: Kun åbninger i vægge understøttes på nuværende tidspunkt!
IFC ERROR: At the moment only openings in walls are supported!IFC ERROR: At the moment only openings in walls are supported!
IFC ERROR: Kun åbninger i vægge understøttes på nuværende tidspunkt!IFC ERROR: Kun åbninger i vægge understøttes på nuværende tidspunkt!
IFC ERROR: At the moment only openings in walls are supported!IFC ERROR: At the moment only openings in walls are supported!
IAI
IAI F
oru
m D
enm
ark
So, how did the testSo, how did the testss gogo??• One common building model?
– Walls as one object per layer or one per wall– Some applications prefer ”tall” walls, whereas
others only display walls on the storey they belong to
– Again some applications support voids within a space, others do not
One BuildingOne Building ModelModel
One BuildingOne Building ModelModel
Domain specific Domain specific ModelsModels
Domain specific Domain specific ModelsModels
????
IAI
IAI F
oru
m D
enm
ark
So, how did the testSo, how did the testss gogo??
• Reaction from software companies– From very good feedback– To very low of feedback
• Looks like the business model is very important in this matter
IAI
IAI F
oru
m D
enm
ark
So, how did the test So, how did the test gogo??
• Users– Find the people who understand the use of models, instead
of traditional documents like: drawings and specifications– Willing to try a new approach– Be ready to be a beta tester
IAI
IAI F
oru
m D
enm
ark
ParticipantsParticipants
• Active participants – Engineering College of Copenhagen– School of Architecture in Aarhus– Byggeinformatik– Carl Bro
• Advisory Group– Danish Broadcasting Cooperation– Cowi– Vilhelm Lauritzen, Architects– PLH, Architect
• Ministry of Education financed the work carried out by the College and Architectural school (50,000 US $
IAI
IAI F
oru
m D
enm
ark
Compared to the “real” projectCompared to the “real” project
Status• 2D CAD-drawings
– in production: demand to use 2D-files
• Few CAD-models– 3D geometry for parts of the model
• Simulations– CFD, Bsim, Radiance, GTStrudl
• But at lot of– Documents (Word and Excel)
• Few databases• Start to use a common Document management system for approved
documents• Visualization
– Cave at the construction site?
IAI
IAI F
oru
m D
enm
ark
ConclusionConclusion
• IFC goes beyond what is supported by most applications
• IFC can be used, but for a broader acceptance improvements have to be made– Implementation– Guidelines– Training material– (Model Extensions)
• One unified model can not fulfil all the requirements at the moment
• Data Management and legal aspects have to be investigated further
IAI
IAI F
oru
m D
enm
ark
Architectural ContestArchitectural Contestfor Extension offor Extension of
Munich Main-Train-StationMunich Main-Train-Station
Current Situation:
Junction of:• 2 dead-end train-
stations– 36 Tracks
• 1 tunnel for city train• 2 tunnels for
underground
IAI
IAI F
oru
m D
enm
ark
Master Screen Floor # -1
IAI
IAI F
oru
m D
enm
ark
Wireframe-model Total View
New approach of using IFCNew approach of using IFC• Reference-data for architectural contests provided as IFC2x• Level of detailness moderate• Moderate requirements on accuracy• Participants can choose any the IFC-compliant CAD-software • As IFC = standard => support of the idea by authorities
IAI
IAI F
oru
m D
enm
ark
Section through Tunnels
IAI
IAI F
oru
m D
enm
ark
Section through track
IAI
IAI F
oru
m D
enm
ark
Master ScreenFloor # -1
IAI
IAI F
oru
m D
enm
ark
View from underneatrh new 2. S-Bahn-Stammstrecke new 2. City-Train Main-Track
IAI
IAI F
oru
m D
enm
ark
Junction new 2. City-Train Main-Track to U1/2
IAI
IAI F
oru
m D
enm
ark
East-Exit
IAI
IAI F
oru
m D
enm
ark
Junction U4/5 to U1/2
IAI
IAI F
oru
m D
enm
ark
IFC-2x ModelIFC-2x ModelImported into Allplan 2003Imported into Allplan 2003
IFC 2x - Model
IAI
IAI F
oru
m D
enm
ark
Erfaring fra MunchenErfaring fra MunchenRasso Steinmann, NemetschekRasso Steinmann, Nemetschek• The German Rail, the Bavarian Ministry for Economy and
the City of Munich´brought out an invited competition. They entered new ground, as they provided together with the typical documentation also a 3D-model, which contains the existing situation as well as rough proposal for a solution.
• The task is, to design an extension of the Munich Main Train Station,because they are currently digging a second tube for the S-Bahn (=City Train). Munich public transport is about to collapse, and therefore the second tube is really needed.
• Obermeyer Planen + Beraten made the 3D-model with ADT4 and provided the data as an IFC2x-model. The competition participants, who are using Allplan, were able to read this huge model in some 15 minutes without any difficulties, and saved a lot of work, at least some 2 weeks, which they had to invest without this 3D model.
IAI
IAI F
oru
m D
enm
ark
Industry Foundation ClassesIndustry Foundation Classes
Students are hereby invited to use the IFC Students are hereby invited to use the IFC specifications in their work, and take part in the specifications in their work, and take part in the development, testing and implementation of IFC.development, testing and implementation of IFC.
Thanks for listening !Thanks for listening !
www.iai-forum.dk
www.iai-international.org
http://www.blis-project.org/