1
CC HE CC HE Ch 10500m Ch 11000m Ch 11500m Ch 12000m Ch 12500m Ch 14000m Ch 13000m Ch 13500m SEE SHEET 03 CUT LINE SEE SHEET 03 CUT LINE SEE SHEET 03 CUT LINE SEE SHEET 03 CUT LINE THE FOOTPRINT OF THE JUNCTION IS BASED ON WORK COMPLETED TO DATE AND WILL BE PROTECTED FROM DEVELOPMENT. FURTHER DESIGN WORK IS ONGOING AND THEREFORE THE JUNCTION LAYOUT MAY CHANGE. 115.12 116.00 115.83 109.86 110.55 112.97 117.04 120.80 123.48 122.31 121.26 120.06 119.98 121.51 122.69 125.63 125.66 129.41 135.02 140.53 145.76 148.00 148.00 143.00 138.82 138.30 144.00 142.21 137.39 128.81 132.71 135.39 136.32 133.45 128.73 122.97 118.20 114.204 113.675 112.678 112.328 112.979 114.629 116.932 118.771 120.059 120.798 120.988 120.628 120.320 121.001 122.681 125.362 129.043 133.108 136.632 139.608 142.033 143.910 145.236 146.014 146.242 145.920 145.258 144.591 143.743 142.355 140.418 137.932 134.896 131.310 127.176 122.491 118.197 Left Arc R = -2880.0 L = 564.4 Right Arc R = 2880.0 L = 436.9 Straight L = 672.8 Left TR L=119.1 Left Arc R=-1020.0 L=211.8 L TR L=59.1 R TR L=29.6 Right Arc R=2040.0 L=246.1 R TR L=29.6 Straight L = 474.7 Right TR L=119.1 Right Arc R = 1020.0 L = 387.7 R TR L=59.1 L TR L=51.8 Sag Curve K = 100.0 L = 365.6 Hog Curve K = -182.0 L = 578.9 Sag Curve K = 100.0 L = 498.9 Hog Curve K = -182.0 L = 902.0 Straight Grad = -0.7% L = 206.0 Hog Curve K = -182.0 L = 863.9 10700 10800 10900 11000 11100 11200 11300 11400 11500 11600 11700 11800 11900 12000 12100 12200 12300 12400 12500 12600 12700 12800 12900 13000 13100 13200 13300 13400 13500 13600 13700 13800 13900 14000 14100 14200 As Extg C L PENNY-COME-QUICK UNDERBRIDGE C L CARLAND CROSS UNDERBRIDGE EXISTING LEVEL PROPOSED LEVEL (MC00) HORIZONTAL GEOMETRY VERTICAL GEOMETRY CHAINAGE Datum = 57.0m AOD TREE PRESERVATION AREA EXISTING WATERBODIES EXISTING WATERCOURSES HIGH VOLTAGE POWER LINE AMENITY GRASS SPECIES RICH GRASSLAND HEATH AND MOORLAND TREE AND SHRUB PLANTING SCRUB MARSH AND WET GRASSLAND (NATURAL REGENERATION AREA) PROPOSED SCHEME STOPPING UP / TURNING HEAD PROPOSED CULVERT PROPOSED STRUCTURE PEDESTRIANS CROSSING PROPOSED ACCESS TRACK DRAINAGE FEATURES WIND FARM CORNISH HEDGE WITH TURF CORNISH HEDGE WITH HEDGEROW POSSIBLE MULTI-SPECIES CROSSING MANAGEMENT OF RETAINED VEGETATION CONTRACTORS TEMPORARY WORKS AREA CARRIAGEWAY TO RETURN TO PASTURE PROPOSED ROUTE PROTECTION BOUNDARY KEY: REGISTERED PARK AND GARDEN SCHEDULED ANCIENT MONUMENT WIND TURBINE EXCLUSION ZONE SITES OF SPECIAL SCIENTIFIC INTEREST SPECIAL AREA OF CONSERVATION COUNTY WILDLIFE SITE CORNWALL WILDLIFE TRUST RESERVE WORLD HERITAGE SITE SOLAR FARM Date Drawn Scale Drawing Title Project Title Drawing Status Date Date Date Checked Approved Authorised Client Original Size Suitability Drawing Number Revision Project Originator Volume Location Type Role Number Project Ref. No. Rev. Date Description By Chk'd App'd © 2016 WSP | Parsons Brinckerhoff www.wsp-pb.co.uk Tel: The Forum Barnfield Road Exeter Devon EX1 1QR +44 (0)1392 229 700 AW CB 29/06/17 29/06/17 TH 29/06/17 --- --- P01 1:5000 HA551502 WSP GEN 0000 DR Z 00135 PREFERRED ROUTE SHEET 4 OF 4 A30 CHIVERTON TO CARLAND CROSS SUITABLE FOR STAGE APPROVAL S4 P01 29/06/17 FIRST ISSUE AW CB TH A1 This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the &RQWUROOHU RI +HU 0DMHVW\V 6WDWLRQHU\ 2IILFH &URZQ copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Highways England 100030649, 2017. 7 HS: 1:5000 VS: 1:2000 Notes 1. Do not scale from this drawing. Use figured dimensions only. 2. All dimensions are metres unless otherwise stated. 3. All levels are in metres above ordnance datum unless otherwise stated. 4. Junction layouts are to be finalised prior to the statutory consultation. THE FOOTPRINT OF THE DUAL CARRIAGEWAY IS BASED ON WORK COMPLETED TO DATE. MINOR CHANGES MAY DEVELOP AS DETAILED DESIGN WORK IS CARRIED OUT.

I THE FOOTPRINT OF THE JUNCTION IS BASED ON … · Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil ... 4.Junction layouts are to be finalised

Embed Size (px)

Citation preview

C

C

H

E

C

C

H

E

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I

I

I

I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

C

h

1

0

5

0

0

m

C

h

1

1

0

0

0

m

C

h

1

1

5

0

0

m

C

h

1

2

0

0

0

m

C

h

1

2

5

0

0

m

C

h

1

4

0

0

0

m

Ch 13000m

Ch 13500m

S

E

E

S

H

E

E

T

0

3C

U

T

L

I

N

E

S

E

E

S

H

E

E

T

0

3

C

U

T

L

IN

E

S

E

E

S

H

E

E

T

0

3C

U

T

L

I

N

E

S

E

E

S

H

E

E

T

0

3

C

U

T

L

IN

E

THE FOOTPRINT OF THE JUNCTION IS BASED ON WORK COMPLETED TO DATE AND WILL

BE PROTECTED FROM DEVELOPMENT. FURTHER DESIGN WORK IS ONGOING AND

THEREFORE THE JUNCTION LAYOUT MAY CHANGE.

115.12

116.00

115.83

109.86

110.55

112.97

117.04

120.80

123.48

122.31

121.26

120.06

119.98

121.51

122.69

125.63

125.66

129.41

135.02

140.53

145.76

148.00

148.00

143.00

138.82

138.30

144.00

142.21

137.39

128.81

132.71

135.39

136.32

133.45

128.73

122.97

118.20

114.204

113.675

112.678

112.328

112.979

114.629

116.932

118.771

120.059

120.798

120.988

120.628

120.320

121.001

122.681

125.362

129.043

133.108

136.632

139.608

142.033

143.910

145.236

146.014

146.242

145.920

145.258

144.591

143.743

142.355

140.418

137.932

134.896

131.310

127.176

122.491

118.197

Left Arc

R = -2880.0 L = 564.4

Right Arc

R = 2880.0 L = 436.9

Straight

L = 672.8

Left TR

L=119.1

Left Arc

R=-1020.0 L=211.8

L TR

L=59.1

R TR

L=29.6

Right Arc

R=2040.0 L=246.1

R TR

L=29.6

Straight

L = 474.7

Right TR

L=119.1

Right Arc

R = 1020.0 L = 387.7

R TR

L=59.1

L TR

L=51.8

Sag Curve

K = 100.0 L = 365.6

Hog Curve

K = -182.0 L = 578.9

Sag Curve

K = 100.0 L = 498.9

Hog Curve

K = -182.0 L = 902.0

Straight

Grad = -0.7% L = 206.0

Hog Curve

K = -182.0 L = 863.9

10

70

0

10

80

0

10

90

0

11

00

0

11

10

0

11

20

0

11

30

0

11

40

0

11

50

0

11

60

0

11

70

0

11

80

0

11

90

0

12

00

0

12

10

0

12

20

0

12

30

0

12

40

0

12

50

0

12

60

0

12

70

0

12

80

0

12

90

0

13

00

0

13

10

0

13

20

0

13

30

0

13

40

0

13

50

0

13

60

0

13

70

0

13

80

0

13

90

0

14

00

0

14

10

0

14

20

0

As E

xtg

C

L

PENNY-COME-QUICK

UNDERBRIDGE

C

L

CARLAND CROSS

UNDERBRIDGE

EXISTING LEVEL

PROPOSED LEVEL (MC00)

HORIZONTAL GEOMETRY

VERTICAL GEOMETRY

CHAINAGE

Datum = 57.0m AOD

TREE PRESERVATION AREA

EXISTING WATERBODIES

EXISTING WATERCOURSES

HIGH VOLTAGE POWER LINE

AMENITY GRASS

SPECIES RICH GRASSLAND

HEATH AND MOORLAND

TREE AND SHRUB PLANTING

SCRUB

MARSH AND WET GRASSLAND (NATURAL

REGENERATION AREA)

PROPOSED SCHEME

STOPPING UP / TURNING HEAD

PROPOSED CULVERT

PROPOSED STRUCTURE

PEDESTRIANS CROSSING

PROPOSED ACCESS TRACK

DRAINAGE FEATURES

WIND FARM

CORNISH HEDGE WITH TURF

CORNISH HEDGE WITH HEDGEROW

POSSIBLE MULTI-SPECIES CROSSING

MANAGEMENT OF RETAINED VEGETATION

CONTRACTORS TEMPORARY WORKS AREA

CARRIAGEWAY TO RETURN TO PASTURE

PROPOSED ROUTE PROTECTION BOUNDARY

KEY:

REGISTERED PARK AND GARDEN

SCHEDULED ANCIENT MONUMENT

WIND TURBINE EXCLUSION ZONE

SITES OF SPECIAL SCIENTIFIC INTEREST

SPECIAL AREA OF CONSERVATION

COUNTY WILDLIFE SITE

CORNWALL WILDLIFE TRUST RESERVE

WORLD HERITAGE SITE

SOLAR FARM

Date

DrawnScale

Drawing Title

Project TitleDrawing Status

Date Date Date

Checked Approved Authorised

Client Original Size

Suitability

Drawing Number

Revision

Project Originator Volume

Location Type Role Number

Project Ref. No.

Rev. Date

Description By

Chk'd

App'd

© 2016 WSP | Parsons Brinckerhoff www.wsp-pb.co.uk

Tel:

The Forum

Barnfield Road

Exeter

Devon

EX1 1QR

+44 (0)1392 229 700

uuuuuyuuyuyuyuy

AW CB

29/06/17 29/06/17

TH

29/06/17

---

---

P01

1:5000

HA551502 WSP GEN

0000 DR Z 00135

PREFERRED ROUTE

SHEET 4 OF 4

A30 CHIVERTON TO CARLAND CROSSSUITABLE FOR STAGE APPROVAL S4

P01 29/06/17 FIRST ISSUE AW CB TH

A1

This map is based on Ordnance Survey material with

the permission of Ordnance Survey on behalf of the

Controller of Her Majesty's Stationery Office. © Crown

copyright. Unauthorised reproduction infringes Crown

copyright and may lead to prosecution or civil

proceedings. Highways England 100030649, 2017.

7

HS: 1:5000

VS: 1:2000

Notes

1. Do not scale from this drawing. Use figured dimensions only.

2. All dimensions are metres unless otherwise stated.

3. All levels are in metres above ordnance datum unless otherwise stated.

4. Junction layouts are to be finalised prior to the statutory consultation.

THE FOOTPRINT OF THE DUAL CARRIAGEWAY IS BASED ON WORK COMPLETED TO DATE.

MINOR CHANGES MAY DEVELOP AS DETAILED DESIGN WORK IS CARRIED OUT.