I-794/Hoan Bridge Project: Stormwater Treatment

Embed Size (px)

Citation preview

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    1/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    2/54

    Presentation Agenda

    Project Overview

    Storm Water Overview

    WisDOT Storm WaterProcess

    Project Storm Water

    Project Features

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    3/54

    PROJECT OVERVIEW

    Carolynn Gellings, PEProject Manager

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    4/54

    DOT  – Southeast Region

    Carolynn Gellings, P.E. - DOT

    I-794 Hoan Bridge & Lakefront Gateway Project Manager

    DTSD SE Region - Environmental Services

    1001 W. St. Paul Ave.Milwaukee, WI 53233

    Phone: (262) 548 - 8716

    Cell: (414) 750 - 3233

    Email: [email protected]

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    5/54

    Project Location

    Connects SouthernCommunities withDowntown Milwaukee

    Vehicles per day (vpd):

    Lake Interchange Hoan Bridge

    Over 75,000 vpd Over 40, 000 vpd

    HoanBridgeProject

     Area

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    6/54

    Project Scope

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    7/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    8/54

    Project Scope: Hoan Bridge

    MMSD Jones Island Wastewater Treatment Plant

    Summerfest Grounds

    Lakeshore State Park Port of Milwaukee

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    9/54

    Schedule Overview

    Hoan Bridge painting continues through2016 and 2017

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    10/54

    PROJECT STORM WATER

    OVERVIEW

    Carolynn Gellings, PEProject Manager

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    11/54

    Storm Water Overview:

    Identifying Areas for Opportunity

    • Limited Real Estate• Construction Costs and Budget

    Constraints• Future Maintenance – Responsibility and

    Costs• Regulations and Requirements

    • Community Input• Utilities• Hazardous Materials

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    12/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    13/54

    Storm Water Overview:

    Design Partnering

    • Extensive coordination with the City ofMilwaukee and DNR to identify waterquality improvements for the area

    Concept drawings from

    design phase.

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    14/54

    Storm Water Overview:

    Storm Sewer System

    I-794 East/West:Complete Storm SewerReplacement

    Lake Interchange:Replacement of AboveGround SystemHoan Bridge:Downspouts, select catchbasins, select outfall

    replacement/pipe lining

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    15/54

    Storm Water Overview:

    Best Management Practices

    • Bio-infiltration Basin• Stormwater Quality

    Vault

    • Enhanced Catch Basins• Rehabilitating Existing Storm

    Water Treatment Units

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    16/54

    WisDOT STORM WATER

    PROCESS

    Hans Hallanger, P.E.Regional StormWater, ErosionControl & NoiseEngineer

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    17/54

    DOT  – Southeast Region

    Hans D. Hallanger, P.E. - DOT

    Regional Stormwater, Erosion Control & Noise Engineer

    DTSD SE Region - Environmental Services

    141 NW Barstow StreetWaukesha, WI 53187

    Phone: (262) 548 - 6706

    Cell: (414) 750 - 1071

    Email: [email protected]

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    18/54

    My Stormwater Background

    Wet Ponds

    Dry Ponds

    Infiltration Basins

    Bio-filtration Basins

    Swales

    Filter Strips

    Catch Basins

    Proprietary Water Quality Devices

    Underground DetentionWater Quality Analysis using WinSLAMM

    Erosion Control Best Management Practices (bmps)

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    19/54

    DOT Storm Water

    Analysis/Design

    Similar to any development

    Water Quantity

    Water Quality

    Site Specific Solutions

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    20/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    21/54

    PROJECT STORM WATER

    OVERVIEW

    Hans Hallanger, P.E.Regional StormWater, ErosionControl & NoiseEngineer

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    22/54

    Location Challenges

    Reminder

    • Limited Real Estate

    • Construction Costs and Budget Constraints

    • Future Maintenance – Responsibility and Costs

    • Regulations and Requirements

    • Community Input

    • Utilities

    • Hazardous Materials

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    23/54

    Existing Conditions

    N

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    24/54

    Existing Conditions

    N

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    25/54

    Existing Conditions

    W

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    26/54

    Existing Conditions

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    27/54

    Proposed Conditions  – 

    Water Quality

    Project Scope considered “Minor

    Reconstruction” 

    Same Urban Footprint

    No increase in impervious

    No change in alignment

    No increase in peak flows

    TRANS 401 = Project Does Not requirereduction in Total Suspended Solids (TSS)

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    28/54

    Proposed Peak Flows  – 

    Water Quantity

    Peak Flow Controls Not Needed

    No localized flooding

    No increase in new impervious

    Lake Michigan or Milwaukee Riverdownstream

    Maintaining Existing Drainage Patterns and

    Outfall Locations

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    29/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    30/54

    Project Features:

    Bio-Filtration Basins (Mini Ponds)

    Constraints Very Limited Open Spaces Premium Real Estate

    Proposal – Bio-Filtration Basins 4 Basins were fit into available spaces $75,000

    83% Total Suspended Solids Removal Treats 0.85 ac. of Freeway Green Space Appeal

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    31/54

    Bio-Filtration Basins - Locations

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    32/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    33/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    34/54

    Bio-Filtration Basins

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    35/54

    Bio-Filtration Basins

    P j t F t

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    36/54

    Project Features:

    Upgraded Catch Basin

    107 sumped catch basins

    $642,000

    Treats 32 acres of Freeway 26% Total Suspended Solids Removal

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    37/54

    Catch Basin - Locations

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    38/54

    Catch Basin - Locations

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    39/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    40/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    41/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    42/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    43/54

    Project Features:

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    44/54

    Project Features:

    Detention Vault

    1 New Unit – South end of Bridge, nearLincoln Memorial Drive

    $20,000

    50% Total Suspended Solids Removal Treats 0.9 acres

    4 foot deep sump with trapped outlet

    Requires maintenance – clean out sumps

    Similar to Catch Basin…but larger  

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    45/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    46/54

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    47/54

    Hydrodynamic Separator and Water

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    48/54

    Hydrodynamic Separator and Water

    Filtration Devices

    MilwaukeeRiver

    N

    Hydrodynamic Separator and Water

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    49/54

    Hydrodynamic Separator and Water

    Filtration Devices

    Hydrodynamic Separator and Water

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    50/54

    Hydrodynamic Separator and Water

    Filtration Devices

    Hydrodynamic Separator and Water

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    51/54

    Hydrodynamic Separator and Water

    Filtration Devices

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    52/54

    Storm Water Features Summary

    Bio-Filtration Basins. $75,000. 83% TSS Upgraded Catch Basins. $642,000. 26 %

    TSS

    Wet Detention Vault. $20,000. 50% TSSMaintenance of Existing Vaults Replace

    Cartridges. $3,000. 80% TSS

    Maintain Treatment Unit. 20% TSS

    Total BMP Cost = $ 740,000 Now Treating 32 acres vs. 0.25 acres

    Huge Improvement in TSS Removal

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    53/54

    Keys for Success

    Working together to provide improvements,when & where possible

    Ensure proper operation of devices….. 

    MAINTENANCE

  • 8/9/2019 I-794/Hoan Bridge Project: Stormwater Treatment

    54/54

    Questions?