10
I-77 EXPRESS Lanes Charlotte, NC 25-April-2017 The Center for Transportation Public-Private Partnership Policy 1

I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

I-77 EXPRESS Lanes Charlotte, NC

25-April-2017 The Center for Transportation Public-Private Partnership Policy

1

Page 2: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

Project Overview

• 26 miles of dedicated toll lanes that operate adjacent to the existing general purpose lanes

• Divided in 8 segments to provide ample connectivity to the existing road network.

• Dynamic pricing to keep traffic moving

at consistent speeds for reliable travel times

• The same number of existing free lanes will remain along the entire highway in both directions

• Drivers decide to use the express lanes, the general purpose lanes or a combination of both

• Free access to express lanes for emergency vehicles, motorcycles and vehicles with three or more people using a transponder

2 April 25, 2017

Page 3: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

3

2009: A feasibility study considering converting existing HOV lanes on I-77 to Express Lanes and extending the converted lanes to Catawba Avenue (Exit 28) in Cornelius.

2011: NCDOT decided to approach the project as a P3 and the MPO amended the Long Range Plan to include Express Lanes on I-77.

2012: Final scope of the project is defined.

2013: 4 teams are pre-qualified to submit a bid.

2014: Project is awarded and Comprehensive Agreement is executed.

2015: Financial Close, Commencement of Construction.

• Public Funds $95 million,

• Private Equity $248 million,

• Debt $293 million.

2018: Scheduled Opening.

Timeline of the Project

April 25, 2017

Page 4: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

4

Project Improvements

A correct alignment of incentives in the P3 structure has driven a number of changes with a positive impact in the project.

1. Improved access to Charlotte’s financial district.

• Redesign I-77/I-277 Interchange.

2. Improved configuration of intermediate entries and exits:

• Additional intermediate entries and exits.

3. Additional access points.

• I-85 Connectors.

April 25, 2017

Page 5: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

5

I-77/I-277 Interchange

April 25, 2017

Page 6: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

6

New entries and exits

April 25, 2017

Page 7: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

7

New entries and exits

April 25, 2017

Express Lanes

General Purpose Lanes

Entrance Only Zone

Exit Only Zone

Express Lanes

General Purpose Lanes

Transfer Area

Express Lanes

General Purpose Lanes

Page 8: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

8

I-85 Direct Connectors

April 25, 2017

Page 9: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

9

Project Improvements

These changes result in:

• Reduced construction complexity, utilities and ROW.

• Increased accessibility to the Express Lanes for its users.

• Increased potential use of the Express Lanes and reduction of

congestion.

April 25, 2017

Page 10: I-77 EXPRESS Lanes Charlotte, NCp3policy.gmu.edu/wp-content/uploads/2017/05/TamargoP3Forum-I7… · 25/04/2017  · I-77 EXPRESS Lanes Charlotte, NC The Center for Transportation

10

Under Construction

April 25, 2017