Eastbound East For more information visit www.mtc.ca.gov or contact MTC Public Information at 415.778.6757 Page 1 of 2 September 2017 PROJECT FACT SHEET I-580 Access Improvement Project PROJECT BENEFITS Reduces traffic congestion in eastbound direction of I-580 in Marin County Provides bicycle and pedestrian access between Contra Costa and Marin counties COST ESTIMATE* (JANUARY 2017) Cost estimate by major project element Eastbound Peak Period Use Lane $47 M R-SR Bridge — Bicycle Pedestrian Path $27 M TOTAL $74 M Eastbound I-580 requires widening in Contra Costa County to accommodate the third eastbound lane. The retaining wall shown must be removed and replaced with a wall set 15 feet back from I-580. PROJECT OVERVIEW The project will reduce congestion on the Richmond-San Rafael Bridge by converting the existing shoulder on eastbound I-580 to a peak-period use lane between Sir Francis Drake Boulevard (Marin County) and Marine Street (Contra Costa County). To allow for the peak-period use lane and maintain bicycle access to Point Molate in Richmond, the project will upgrade the cur- rent bicycle access that relies on the I-580 shoulder with a separate bicycle/ pedestrian path on the north side of I-580 adjacent to westbound traffic. The project also will install a concrete barrier system on the upper deck of the Richmond-San Rafael Bridge to convert the existing freeway shoulder to a barrier-separated path for bicycles and pedestrians. Peak-Period Use Lane on I-580 The peak-period use lane will be open to motorists during the weekday evening commute hours, when eastbound traffic is highly congested. To accommodate the additional traffic, the lane will require reconstruction of some components of the freeway. These include: Reconstructing the Main Street on-ramp (Marin County) to improve the traffic merge with the new lane. Upgrading bridge approach to accommodate new traffic loads. Reconstructing a retaining wall in Richmond to create a safe sight distance for motorists using the new lane. Providing a barrier-separated bicycle/pedestrian path to Point Molate. Bicycle/Pedestrian Path To complete the path across San Francisco Bay, the westbound shoulder on the Richmond-San Rafael Bridge may be converted to a movable barrier-separated bicycle/pedestrian path. The movable barrier would allow Caltrans and BATA to complete bridge maintenance activities during closures of the path. These closures will typically occur at night. The path will be 10-feet wide and comply with the Americans with Disabilities Act. 2015 2016 2017 2018 Project Approval Design Prelim 3rd Lane Path Construction – 3rd Lane Construction – Upper Deck Path Advertise and Award Open 3rd Lane PROJECT SCHEDULE (AS OF SEPTEMBER 2017) *Includes all support costs & movable barrier

I-580 Access Improvement ProjectThe project will reduce congestion on the Richmond-San Rafael Bridge by converting the existing shoulder on eastbound I-580 to a peak-period use lane

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-580 Access Improvement ProjectThe project will reduce congestion on the Richmond-San Rafael Bridge by converting the existing shoulder on eastbound I-580 to a peak-period use lane

Eastbound East

For more information visit www.mtc.ca.gov or contact MTC Public Information at 415.778.6757Page 1 of 2 September 2017

PROJECT FACT SHEET

I-580 Access Improvement Project

PROJECT BENEFITS

• Reduces traffic congestion in eastbound direction of I-580 in Marin County

• Provides bicycle and pedestrian access between Contra Costa and Marin counties

COST ESTIMATE* (JANUARY 2017)

Cost estimate by major project element

Eastbound Peak Period Use Lane $47 MR-SR Bridge — Bicycle Pedestrian Path $27 M

TOTAL $74 M

Eastbound I-580 requires widening in Contra Costa County to accommodate the third eastbound lane. The retaining wall shown must be removed and replaced with a wall set 15 feet back from I-580.

PROJECT OVERVIEWThe project will reduce congestion on the Richmond-San Rafael Bridge by converting the existing shoulder on eastbound I-580 to a peak-period use lane between Sir Francis Drake Boulevard (Marin County) and Marine Street (Contra Costa County). To allow for the peak-period use lane and maintain bicycle access to Point Molate in Richmond, the project will upgrade the cur-rent bicycle access that relies on the I-580 shoulder with a separate bicycle/pedestrian path on the north side of I-580 adjacent to westbound traffic.

The project also will install a concrete barrier system on the upper deck of the Richmond-San Rafael Bridge to convert the existing freeway shoulder to a barrier-separated path for bicycles and pedestrians.

Peak-Period Use Lane on I-580The peak-period use lane will be open to motorists during the weekday evening commute hours, when eastbound traffic is highly congested. To accommodate the additional traffic, the lane will require reconstruction of some components of the freeway. These include: • Reconstructing the Main Street on-ramp (Marin County) to improve the

traffic merge with the new lane. • Upgrading bridge approach to accommodate new traffic loads. • Reconstructing a retaining wall in Richmond to create a safe sight

distance for motorists using the new lane. • Providing a barrier-separated bicycle/pedestrian path to

Point Molate.

Bicycle/Pedestrian PathTo complete the path across San Francisco Bay, the westbound shoulder on the Richmond-San Rafael Bridge may be converted to a movable barrier-separated bicycle/pedestrian path. The movable barrier would allow Caltrans and BATA to complete bridge maintenance activities during closures of the path. These closures will typically occur at night. The path will be 10-feet wide and comply with the Americans with Disabilities Act.

2015 2016 2017 2018Project Approval

DesignPrelim 3rd Lane Path

Construction – 3rd Lane

Construction – Upper Deck Path

Advertise and Award

Open 3rd Lane

PROJECT SCHEDULE (AS OF SEPTEMBER 2017)

*Includes all support costs & movable barrier

Page 2: I-580 Access Improvement ProjectThe project will reduce congestion on the Richmond-San Rafael Bridge by converting the existing shoulder on eastbound I-580 to a peak-period use lane

Page 2 of 2 September 2017

I-580 Access Improvement Project

The above rendering shows the proposed 10-foot bi-directional bicycle-pedestrian path on the upper deck of the Richmond-San Rafael Bridge. Path users will be separated from traffic by a movable concrete barrier system similar to the one installed on the Golden Gate Bridge in January 2015.

Larkspur

Corte Madera

Belvedere

Albany

Piedmont

Orinda

Kensington

Emeryville

Sausalito

Tiburon

El Cerrito

Marin City

Stinson Beach

Muir Beach

Mill Valley

San Pablo

Berkeley

Alameda

San Rafael

Richmond

OaklandSan Francisco

Richmond -San Rafael Bridge

MarinCounty

Contra CostaCounty

131

24 13

80980880

80

580

580

580

101

101

80

Bike/Ped PathThird Eastbound LaneBay Trail ExistingBay Trail Proposed

Larkspur

Corte Madera

Belvedere

Albany

Piedmont

Orinda

Kensington

Ross

Emeryville

Kentfield

Sausalito

Tiburon

El Cerrito

Marin City

Stinson Beach

Muir Beach

Mill Valley

San Pablo

Berkeley

San Rafael

Richmond

Oakland

Richmond-San Rafael Bridge

131

123

24

13

13

80

80

980880

80

580

580

580

580

101

101

Movable Barrier Separate Path

Fixed Barrier SeparatePath

Movable Barrier Separate Path and “ Fixed Barrier Separate Path”

Marine St

Main St

Sir Fran

cis Drak

e Blvd

Castro St

Grange

AveLarkspur

Corte Madera

Belvedere

Albany

Piedmont

Orinda

Kensington

Ross

Emeryville

Kentfield

Sausalito

Tiburon

El Cerrito

Marin City

Stinson Beach

Muir Beach

Mill Valley

San Pablo

Berkeley

San Rafael

Richmond

Oakland

Richmond-San Rafael Bridge

131

123

24

13

13

80

80

980880

80

580

580

580

580

101

101

Movable Barrier Separate Path

Fixed Barrier SeparatePath

Movable Barrier Separate Path and “ Fixed Barrier Separate Path”

Marine St

Main St

Sir Fran

cis Drak

e Blvd

Castro St

Grange

Ave

San Rafael inset

Richmond inset

San Rafael inset

Richmond inset

San Rafael

RichmondBi-Directional Bike/Ped PathUpper Deck

Third Eastbound LaneLower Deck

Connecting Marin and Contra Costa Counties for Bicyclists and Pedestrians The Richmond-San Rafael Bridge will connect the Bay Trail between Contra Costa and Marin counties for bicyclists and pedestrians, adding another link to the future 500-mile bicycle and hiking network benefits residents in both counties. The proposed path will begin in Richmond at Castro Street and continue adjacent to westbound I-580 to Grange Avenue in San Rafael. A mix of permanent and moveable barriers will separate bicyclists from vehicle traffic.

Rend

erin

g co

urte

sy o

f HN

TB C

orp